Группа Всемирного банка · Environmental Assessment

China - Fourth Inland Waterways Project : environmental assessment (Vol. 4 of 10) : Lianjiang Xiniu navigation junction - environmental action plan

Китай Всемирный банк
Открыть оригинал документа

Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.

Полный текст

E788 V. 4 CHINA 4TH INLAND WATERWAYS January, 2003 Lianjiang Xiniu Navigation Junction Complex Sub mpnew/ Environmental Action Plan Draft Second Jan. 2003 South China Institute of Environmental Sciences, SEPA Project Owner: Guangdong Province Waterway Bureau EIA Undertaken by: South China Institute of Environmental Sciences, SEPA(SCIES) EIA Certificate Number: National EIA Certificate Grand A Number 2801 General Responsibility: Professor Xu Zhencheng, Director of SCIES Expert Consultants: Professor Wang Junsan (Local Ecological Expert) Professor Chen Zhanghe(Local Land-Plant Expert) Professor Han Boping (Local Aqutic Ecological Expert) Professor Chen Xianglin(Local Ichthyologic Expert) Professor Li Kaiming (Local Hydraulics Expert) Professor Zhen Fantang (Local Water Environmental Expert) Technical Responsibility: Professor Han Baoxin, Deputy Director EIA work Responsibility: Liang Mingyi Work Group Leader: Mr. Cai Xinde Mr. Qian Donglin Complied by: Cai Xinde, EIA Certificate GD-03820 Qian Donglin, EIA Certificate -13102 Liang Mingyi, EIA Certificate GD-03828 Zhang Yuhuan, EIA Certificate GD-03824 Huang Zhengguang, EIA Certificate GD-03837 Li Zhao Yong, EIA Certificate GD-03832 Shen Qian, EIA Certificate GD-03830 Examined by: Han Baoxin Finalized by: Xu Zhencheng Content 0 BRIEF INTRODUCTION TO THE PROJECT ................................................ 1 1. GOAL OF ENVIRONMENTAL PROTECTION ................................................ 1 1.1 GOAL OF ENVIRONMENTAL PROTECTION IN CONSTRUCTION PERIOD ..................... I 1. 1.1 Water environment ..................................................1 1.1.2 Ecological environment ...................................................1 1.1.3 Traffic order .................................................. 2 1.1.4 Acoustic environment and atmosphere environment ..................... ............... 2 1.1.5 Others .................................................. 3 1.2 GOAL OF ENVIRONMENTAL PROTECTION IN OPERATION ........................................ 3 1. 2.1 Water quality .................................................. 3 1. 2.2 Acoustic environment .................................................. 3 2. PROJECT DESCRIPTION ................................................. 3 2.1 CONSTRUCTING SCALE AND MAIN COMPONENTS OF THE PROJECT ......................... 3 2.2 SCALE AND MAIN ITEMS OF NAVIGATION LOCK CONSTRUCTION ............................ 4 2.3 SCALE AND MAIN ITEMS OF POWER STATION CONSTRUCTION ................................ 5 2.4 REGULATION FOR RUNNING OF RESERVOIR ............................................... 5 2.5 CONSTRUCTION OF RIVER DIVERSION ............................................... 7 2.5.1 Standards of river diversion ................................................ 7 2.5.2 Measures of river diversion ............. ................................... 7 2.5.3 Characteristics of cofferdam ................................................ 8 2.5.4 Construction of cofferdam ................................................ 9 2.6 THE CONSTRUCTION OF THE MAIN WORKS ............................................... 10 2.6.1 the engineering quantity .......................................... 10 2.6.2 the construction of the earth-rock engineering .......................................... 12 2. 6.3 the construction offoundation treatment works ......................................... 13 2.6.4 the construction of concrete and reinforced concrete ................................ 13 2.6.5 stone masonry ................................................................ 14 2.6.6 electromechanical and steel structure installation ..................................... 14 2.7 THE GENERAL SCHEDULE OF THE CONSTRUCTION ....................................... 15 2.8 THE NATURAL BUILDING MATERIAL AND THE CONSTRUCTION ROAD ................... 16 2.8.1 the natural building material .................................................... 16 2.8.2 the construction site and the construction pavement .................................. 18 2.9 THE SCHEME OF THE CONSTRUCTION COLLOCATION ............................................ 19 2.10 RESERVOIR SUBMERSION .................................................... 21 2.11 WATERWAY REGULATION IN DOWNSTREAM .................................................... 22 2.12 THE ASSESSMENT OF PROJECT INVESTMENT AND ECONOMIC BENEFIT ............... 22 3. ENVIRONMENTAL PROTECTION MEASURE ............................................ 23 3.1 ENVIRONMENTAL PROTECTION MEASURES FOR THE COMPLEX .......................... 24 3.1.1 PRE-CONSTRUCTION PHASE ..................................................... 24 3.1.2 CONSTRUCTION PHASE .................................................... 25 3.1.2.1 Water quality protection measures .................................................... 25 3.1.2.2 Fishery resource protection measures .................................................... 27 3.1.2.3 Prevention measurefor noise control .................................................... 27 3.1.2.4 The prevention measures for land erosion ............................................... 28 3.1.2.5 Other measures .................................................... 30 3.1.3 OPERATION PHASE .................................................... 33 3.1.3. 1 Water quality protection measures .................................................... 33 3.1.3.2 Erosion and bank slumping protection .................................................. 33 3.1.3.3 Fishery resource .................................................... 34 3.1.3.4 preventing accident .................................................... 34 3.2 ENVIRONMENT PROTECTION MEASURES FOR WATERWAY DREDGING PROJECT..34 3.2.1 Design phase ................................................. 34 3.2.2 Construction phase ................................................. 35 3.2.3 Operation phase ................................................. 35 4. ENVIRONMENTAL MONITORING PLAN ..................................................... 36 4.1 MONITOR ITEMS AND ASSESSMENT STANDARD ................................................... 36 4.2 ENVIRONMENTAL MONITORING IN CONSTRUCTION PHASE . .................................. 37 4.3 ENVIRONMENTAL MONITORING IN OPERATION PHASE ......................................... 38 4.4 ENVIRONMENTAL MONITORING REPORT ..................................................... 39 5. ENVIRONMENTAL MANAGEMENT PLAN .................................................. 39 5.1 THE ORGANIZATION, RESPONSIBILITY AND IMPLEMENTED SYSTEM FOR ENVIRONMENT ADMINISTRATION ...................... 39 5.1.1 Organization Framework ....................... ..,.,,.,,. 40 5.1.2 Responsibilities ...................... 41 5.1.4 CONTRACT DOCUMENTS ...................... 42 5.2 ENVIRONMENTAL TRAINING ...................... 42 5.2.1 Environmental protection knowledge and ability training ............. ............ 43' 5.2.2 Environmental protection ability training .................................................. 43 5.2.3 Training fees ................................................... 44 6. TIME SCHEDULE FOR ENFORCEMENT OF ENVIRONMENTAL ACTION PLAN ....................................................... 44 APPENDIX SUMMARY OF ENVIRONMENTAL PROTECTION MEASURES ...................... 46 2.1 BASEMENT OF THE PROJECT EIA ........................................................1 2.1.1 Environment related Laws and Regulations .................................................1 2.1.2 Technical Guidelines ........................................................2 2.1.3 Project Proposal and Feasibility ........................................................ 3 2.4 ENVIRONMENT STANDARDS AND CONTROL STANDARDS OF POLLUTANTS ...........3 2.4.1 Surface Water ........................................................3 2.4.2 Noise ........................................................4 2.4.3 Air Environment ........................................................5 2.4.4 River sediments .......................................................6 2.4.5 Soils ........................................................6 O Brief Introduction to the project Xiniu Navigation Junction Complex is situated in 3.5 kilometers of the upper reaches of Xiniu Town, Yingde City, Guangdong Province; it connects with Jiaqiaoshi Navigation Junction Complex of Hanguang Town of Yingde City upwards, and joins with backwater location of Feilaixia Navigation Junction Complex. For the details of its geography situation please see Fig. 1-1. This project is a Navigation Junction Complex constructing project. It included navigation lock, discharging sluice, power station, project of protective revetment, a little dredging works in downstream (The length of excavation section is 1630 km that will produce 25790m3 of dredging load; three new spurs will be built along the downstream.), temporary projects, living area, etc. Investment of project: The investment is estimated at RMB 267,078,000.00. 1. Goal of environmental protection 1.1 Goal of environmental protection in construction period 1.1.1 Water environment During the cofferdam constructing, dam constructing, the upstream and downstream cofferdams removing, and the excavation of both shipping way and foundation pit within cofferdam, the SS may be discharged into the water and cause water body pollution. The mail goal of water quality protection is Xiniu Town waterworks. 1.1.2 Ecological environment The construction times will about three years from 2003 to 2005. The normal hydrology condition and the living condition of aquatic will be interfered due to the construction of the project; the vegetation be damaged and land erosion become serious. Although the perturbation caused by construction of the project is unavoidable, but we can take some measure to protect the surrounding. The main objective for ecological environment is fishery resources in river, water and soil erosion and vegetation recovery. 1.1.3 Traffic order The navigation construction may influence the local traffic order. The chiefly reason is that the amount of vehicle using for transporting construction material will increase in construction period. At the moment, the objective is the safety of local people. 1.1.4 Acoustic environment and atmosphere environment The equipment, such as concrete mixer, etc. are the main noise pollution sources in construction time, some of them belong to the strong noise pollution sources. Earth and stone excavation, pilling and transport the building material, etc. will cause dust in the construction period of the project. The dust should be so controlled that the regional air quality can reach the class 2 standard of quality standard for environmental air. Main objective for acoustic and atmosphere environment is residential area both along the river and the transport road. The protection goal shown in table 1-1 and shown in Fig. 3.3, Fig. 3.4. Table 1-1 the protection goal of the noise and air pollution prevention Name Type Location Impact factors Distance from the factors to objectives Tenliaocun Residential WS of the dam Dam 500m area constructing Jiezaicun Residential ES of the dam Dam 450m area construction shangxinwu Residential ES of the dam Dam 770m area construction Zhangwu Residential WN of the dam Dam 800m area construction Xiniu agriculture shool About 2300m at the Trucks on the lOOm school NE of the dam road Intake of Xiniu Intake Downstream 3.5km Dam 3.5km 2 Project (SL201-98). 1.3 Project Proposal and Feasibility 1) Project proposal for the Lianjiang Xiniu Navigation Junction Complex: 2) Feasibility Study Report of the Lianiiang Xiniu Navigation Junction Complex: 3) An Introduction to the Lianjiang Xiniu Navigation Junction Complex: 4) Letter to SCIES for EIA study of the Lianiiang Xiniu Navigation Junction Complex issued by Guangdon, Province Waterway Bureau (Januarv of 2002). 2 Environment Standards and Control Standards of Pollutants 2.1 Surface Water Water Ouality Standard According to the water function directory of "Water Resource Quality Protection Program of Guangdong Province" and "Water Environmental Function Directory (trial)", the environment functions of the Lianiiang River in section from Hanguang to Lizui is Class III. in section from Lizui to Xiniu Town is Class II, and in section from Xiniu Town to downstream is Class III (also shown in the Fig.2.1). "Environmental Quality Standard for Surface Water" (GB 3838-2002) is the environmental quality standards for surface water assessment. Besides. the following standards are as references: 1) Water Ouality Standard for Fisheries (GBI 1607-89). The stipulations for SS in the standard says "increased SS concentration in the water by any activity is no more than 0m/L". "no harmful impacts should be allowed on any fish, shrimp or shellfish, if suspended solid set down to the bed": 2) Hygiene Standard for Drinking Water (GB5479-85): and 3) Standard for Irrigation water Quality (GB5084-92). Table2.l Environmental quality standards for surface water (GB3838-2002) (m2/L) Items ClassI 11 JmIrv Iv pH 6-9 3 The navigation lock and power station are planed to build up on the same shore. i.e. the left shore: the navigation lock is near in shore while the power station close to the river. The buildings from the left to right one by one are navigation lock, separation zone, of power station. 11 holes 8.0 meters in width flood diversion sluice, 21 holes 8.0 meters in width flap down gate, with its right shore get in touch with the dam. The panoramic view of the Complex is shown in Fig. 1.2. The Layout of the Complex is shown in Fig. 1.3. The vertical and cross-sectional designs of the complex are illustrated in Fig. 1.4.1 .5,1.6. (3) Grade of engineering and class of buildings (I) Grade of engineering: The third grade 02 Class of buildings: Main water-engineering building is at the 4h class, subordinated and temporary water-engineering building at the 5h class. (4) Dam height and Characteristic stage of water level of reservoir and backwater distance (QDam height is 8.5m; (

Основные сведения
Тип документа Environmental Assessment
Дата принятия
Страна Китай
Источник Всемирный банк