E-339 VOL. 6 INDIA THIRD NATIONAL HIGHWAY WORLD BANK PROJECT ENVIRONMENTAL MANAGEMENT PLAN CONSTRUCTION PACKAGE TV-B NATIONAL HIGHWAYS AUTHORITY OF INDIA NEW DELHI (Ministry of Surface Transport) March, 2000 TABLE OF CONTENTS A. INTRODUCTION ....................................................................... I B. SCOPE OF THE PROJECT ....................................................................... 2 C. ENVIRONMENTAL MANAGEMENT PLAN ................................ ....................................... 3 CA1 INTRODUCTION ....... 3 C.2 OBJECTIVES OF THE EMP ............ 3 C.2.1 Design Stage ....................................................................... 3 C.2.2 Construction Stage ....................................................................... 3 C.2.3 Operation Stage ....................................................................... 3 C.3 MEETING THE EMP OBJECTIVES .. .. 3 C.3.1 Commitment to address environmental health, safety and social impacts .......................... 3 C. 3.2 Commitment for constant dialogue with the public and interested stakeholders .............. - 4 C.3.3 Commitment related to training ....................................................................... 4 C. 3.4 Commitment to meet legal requirements ....................................................................... 4 D. CRITICAL IMPACTS TO BE ADDRESSED - PACKAGE IV-B ....................................................... 4 E. ENVIRONMENTAL MANAGEMENT PLAN (EMP) ....................................................................... 4 F. MONITORING PROGRAMME ....................................................................... 18 F.1 PERFORMANCE INDICATORS (PIS) ... 18 F.2 SELECTION OF INDICATORS FOR MONITORING ... 18 F. 2.1 Ambient Air Quality (AA Q) Monitoring ............................ 18 F.2.2 Water Quality Monitoring ............................ 19 F.2.3 Noise level Monitoring ............................ 21 F.2.4 Success of Revegetation ............................ 21 F.2.5 Soil Contamination ............................ 21 F.3 MONITORING PLAN ..... 21 G. ENVIRONMENTAL MANAGEMENT - BUDGET .23 ENVIRONMENTAL MANAGEMENT PLAN - IV B A. INTRODUCTION The Government of India (Gol), acting through the National Highways Authority of India (NHAI), a part of the Ministry of Surface Transport (MOST) is improving the Sikandra to Dhanbad portion of the NH-2 as part of the World Bank assisted Third National Highway Project. To facilitate implementation of the project, the project corridor has been divided into five packages, referred to as packages I to V. International consultants' have been appointed for the planning and design of each of these five packages. Based on the findings of the various project reports prepared by the consultants, the following contract packages have been selected as candidates for the appraisal by the World Bank in February 2000. Of these, the packages to be implemented in the first phase would be selected during the Appraisal Mission. Table 1 Contract Packages - IlIrd National Highway Project Contract Length Candidate for WB Description From (km) To(km) Appraisal & package (km) Implementation - A Agra- Shikohabad 200.000 265.000 65.000 I II-B Shikohabad - Sarai lkdil 265.000 330.000 65.000 I - C Sarai Ikdi - Bognipur (Sikandra) 330.000 400.000 70.000 l1-A Sikandra - Bhaunt 393.000 470.000 61.600 n II II1- B Bhaunt - Fatehpur Border 471.000 38.000 51.330 11 - C Fatehpur Border- Khaga 38.000 115.000 77.000 n III-A Khaga- Kokhraj 115.000 158.000 43.000 n llI III- B Kokhraj - Paharpur Village 158.000 245.000 87.000 III- C Paharpur village -Raja Talab 245.000 317.000 72.000 n IV -A Raja Talab - Mohania 318.000 65.000 78.000 IV -B Mohania-Sasaram bypass 65.000 110.000 45.000 nl lV IV -C Sasaram bypass 110.000 140.000 30.000 IV- D Sone River -Aurangabad 140.000 180.000 40.000 Fl V-A Aurangabad - Raniganj 180.000 240.000 60 000 Fl V V- B Raniganj - Barakatha 240.000 320.000 80.000 V-C BaraKatha- Barwa-Adda(Dhanbad) 320.000 398.750 78.750 Fl This report details the Environmental Management Plan for Contract Package IV-B, of the Third Natio nal Highway Project. The EMP is based on the EIA/EMP reports carried out along Package IV of the project. The International consultants entrusted with the project preparation of the various packages are: Package II: Sverdrup Civil Inc (USA) Package III: SNC Lavalin Internabonal Inc (Canada) in association with Engineers and Management Associates Package IV: COWI Consulting Engineers and Planners AS Denmark in IV with SPAN Consultants Pvt. Ltd. Package V: DORSCH Consult mbH in association with Gherzi Eastern Limited B. SCOPE OF THE PROJECT The high volume carrying stretch of the NH-2, between Sikandra to Dhanbad is to be widened to four lane, within the existing RoW, avoiding land acquisition as far as possible, except for locations where it is absolutely essential from traffic engineering, environmental and social aspects where a diversion from the existing alignment is necessitated. Following is the scope of work as stated in the ToR for feasibility studies and detailed engineering consultancy services, T:.. 7he scope will consist mainly widening of the existing two lane to four lane within the RoW, inter alia induding fixation of alignment, alignments of the proposed widening wont, improvements, if any. Required to the eisting alignment, identification and fixation of alignments of short bypasses, identification of locations of service roads, identification, location and design of toll plazas etc necessary arboniculture along the highway and plantation on the median stnps compatble with the surrounding landscape shall be suitably suggested. " T:.. 7he Consultant shall undertake a detailed environmental study in accordance with the standards prescnbed by Gol and Word Bank and will make suitable recommendations and prepare appropnate mitigation plan and resettement action plans. The Engineering design of the project will absorb all acceptable recommendations emerging out of the environmental studies." C. ENVIRONMENTAL MANAGEMENT PLAN C.1 INTRODUCTION The Environmental Management Plan (EMP) consists of the set of mitigation, monitoring and institutional measures to be taken during the design, construction and operation stages of the project to eliminate adverse environmental impacts, to offset them, or to reduce them to acceptable levels. The plan also includes the actions needed for the implementation of these measures. The major components of the Environmental Management Plan are * Mitigation of potentially adverse impacts * Monitoring during project implementation and operation * Institutional Capacity Building and Training * Implementation Schedule and Environmental Cost Estimates * Integration of EMP with Project planning, design, construction and operation. C.2 OBJECTIVES OF THE EMP The main aim of the Environmental Management Plan is to ensure that the various adverse impacts are mitigated and the positive impacts are enhanced. The objectives of the EMP at various stages of the project planning and implementation are as follows: C.2.1 Design Stage - To have minimum impact on road side trees, forestation and ground cover * To keep land acquisition and building demolition at a minimum a To provide maximum safety to the highway users and road side communities as well as segregation of local and slow moving traffic in the congested areas e To develop a design that incorporates environmental safeguards and * To provide mitigation measures to all expected environmental degradation C.2.2 Construction Stage * To prevent and reduce the negative environmental impacts of the project by implementable mitigation measures, to be carried out by the Contractor. e To ensure that the provisions of the EMP are strictly followed and implemented by strengthening implementation arrangements. C.2.3 Operation Stage * To prevent deterioration of environment components of air, water, soil, noise etc. * To improve the safety of the highway users and road side communities C.3 MEETING THE EMP OBJECTIVES The following commitments are important to effectively implement the EMP and have been adopted to address the various objectives of the EMP. C.3.1 Commitment to address environmental health, safety and social impacts To improve the environmental conditions, including areas such as environmental health, safety and social impacts, measures have been suggested and included as part of the EMP. Such measures have been continuously developed as an interactive process. 3 C.3.2 Commitment for constant dialogue with the public and interested stakeholders The community consultation process was carried out right from the inception stage of the project. Continuous dialogue with local inhabitants and stakeholders including public agencies has been established on various environmental issues to obtain their feedback. Consultation would continue throughout the implementation Stage of the project. C.3.3 Commitment related to training For the effective implementation of the EMP measures proposed, sustainable institutional arrangements have been proposed. To educate and train the PIU, the personnel of the Construction Supervision Consultants and the Contractors, an extensive training schedule has been worked out as part of the consolidated EIA report for the project. The training programme will be implemented as per the schedule proposed. C.3.4 Commitment to meet legal requirements The legal requirements, procedures, etc., that are necessary or mandatory for the commencement of the project have been met. The conditions stipulated by the various Statutory Authorities as the State Pollution Control Boards, Forest Departments etc. will be complied with. D. CRITICAL IMPACTS TO BE ADDRESSED - PACKAGE IV-B On the basis of the assessment of the potential impacts, the critical environmental components that need to be addressed in the Environmental Management Plan have been identified. The most critical issues to be addressed at various locations along the project corridor are described in Table 2 below. Table 2: Critical Environmental Issues to be Addressed Critical Environmental Issues Location High Pollutant Concentrations - Poor Air Quality Along the congested settlements and intersections Continuous exposure to high noise levels Along the congested settlements and sensitive land uses. Affecting water resources Community and village ponds in the direct influence area Removal of vegetative cover/ roadside tree Along the whole stretch plantations Loss of productive agricultural lands Not anticipated Soil erosion along the highway Not anticipated Soil Contamination Not anticipated Pedestrian and Traffic Safety more pronounced in major settements Traffic congestion due to encroachment within the existing RoW Environmental Quality at Sensitive Receptors Hospitals, educational institutions and other sensitive land uses E. ENVIRONMENTAL MANAGEMENT PLAN (EMP) The Environmental Management Plan is meant for mitigation/management/avoidance of the negative impacts and the enhancement of the various environmental components along the project package. For each measure on the various environmental components to be taken, its location, timeframe, implementation and overseeing/supervising responsibilities are listed. The measures adopted and/or to be adopted during the different stages of the project have been detailed in Table 3. 4 Table 3 Environmental Management Plan - Package IV B Environmental Remedial Measure Reference to Location Timeframe Mitigation Institutional responsibility issue/ component contract Cost .__________________________ [documents Implementation supervision DESIGN/ PRE-CONSTRUCTON STAGE .__ ___ ____ ___ 1. ALIGNMENT U.p , D.1.1. Constricted Alignment modified to minimize land Throughout project During Project Design Consultant PIU, NHAI sections/ settlements acquisition and to avoid other environmentally corridor Design Stage preparation sensitive areas like archaeological sites, Widening cost temples etc. . North South Central Widening to north has been preferred due to 66 to 68 89 69 to 70 comparatively lesser no. of big trees on that 71 to 72 90 73 side. 40 km has been widened to the north of the road and 2 km to the south and 3 km 74 to 88 centrally. 91 to 110 D.1.2 Land and To avoid social disruption and damage to Throughout project During Project Design Consultant PIU, NHAI Property religious structures, centerline of road had corridor Design Stage preparation been shifted/adjusted Reduced median width cost Adopting suitable cross-sections and 69 to 71, 83, 91 to 93, adjustment of median width 106 to 107 Retaining and toe walls have been proposed to limit the extent of widening D.2.1. Embankment Provision for turfing of the embankment Turfing/stone pitching & During the Project Design Consultant PIU, NHAI slopes slopes to check soil erosion with grasses and chutes Design Stage preparation stone pitching at slopes where intensity is 69, 70 and 97 cost severe. Side drains 69, 70, 71, 83, 91, 92, Effective drainage system have been provided 93, 97, 106 and 107 with kerbs, chutes and side drains Retaining/toe walls will Suitably designed slopes with selected be provided were embankments fill material, to be used required Adequate water way for the bridge and other Icro,s-drainage stnrturei provided_ to prevent_ 5 Environmental Remedial Measure Reference to Location Timeframe Mitigation Institutional responsibility Issue/ component contract Cost documents Implementation Supervision D.2.2. Quarries and Existing licensed quarries that are already in During the Project Design Consultant PIU, NHAI Borrow Areas operation shall be used for road construction. Design Stage preparation If a new quarry is to be opened by the cost contractor a comprehensive re-development plan will be prepared. Non-productive, barren lands, raised lands, river beds, waste lands have been recommended for borrowing earth. Borrow material will also be obtained from locations where villagers plan to make water/fish ponds or from high level agricultural land, where owners plan to lower it to make it irrigable. ^.WATER ' -j . . -. a i D.3.1. Water sources The existing course of the river and canals or Length of Kudra bridge During Project Design Consultant PIU, NHAI streams has been maintained at all locations. Is Increased from 64 m Design Stage preparation Where inadequate waterway has been to 74 m cost reported the bridge length has been increased. Most of the existing bridges have been retained and widening has been proposed on the downstreams side to prevent Increased siltation. In some cases existing levels of bridges have Pond km 106 been raised due to overtopping during monsoon season. Ponds are not affected and have been saved. The pond at km 106 will get partially filled up to save an old temple on the opposite side. D.3.2. Drainage Provision of adequate size and number of Raised Sections 69 to During Project Design Consultant PIU, NHAI cross-drainage structures. 71, 73, 77 to 80, 87, 89, Design Stage preparation Overtopped sections of the corridor have been 90, 91 to 94, 97 to 99, cost proposed to be raised suitably along with the 101, 102, 105, 106, 108, cross-drainage structures and adequate side 109 & 110 drain has been proposed 6 4. FLORA AND FAUNA D.4.1. Roadside Compensatory afforestation will be done as Throughout Project During Rs. 15.95 DFO, Design PIU, NHAI plantation per Forest Conservation Act 1980. Corridor within ROW Design Stage million for Consultant, PIU, NHAI Efforts made to minimize number of trees to afforestation be cut to avoid vegetation losses and save (Rs. 675/plant giant trees with girth size more than 2.5 m. including Widening of road has been proposed on one protection of sideof eistig cariagway o sae asmanyThroughout project plant x 2 x trees as possible. corridor 11815 nos.) 5. ENVIRONMENTAL QUALITY ;_,. ?.' _____ f-,. -> .,,F, D.S.1. Air Quality Pollutant attenuating tree plantation scheme Throughout Project During Project Design Consultant PIU, NHAI proposed. Corridor, especially Design Stage preparation Removal of bottlenecks and relieving along built-up stretches. cost congestion in built-up stretches through Service road provisions improved design. 69 to 71, 83, 91 to 93, Improving road geometry and widening of 106 to 107 road and providing service road In urban areas, shall smoothen traffic flow. D.5.2. Noise levels Removal of bottlenecks and relieving Throughout Project During Project Design Consultant PIU, NHAI congestion in built-up stretches through Corridor, especially Design Stage preparation Improved design. along built-up stretches. cost Attenuating tree plantation scheme proposed Junction Intersections as noise barriers. Major - 2 Improvement of junctions/intersections. Minor - 76 Segregation of slow and fast moving traffic by Total 78 providing service road. 6. UTILITIES ' ' ________, _, __,,,' ______;, -; D.6.1. All utilities, likely to be impacted will be As per utility relocation During the Project PIU, NHAI, Concerned PIU, NHAI Utility lines / relocated with prior approval of the concemed drawings prepared Design Stage preparation Government community utilities agencies. separately for this cost Departments All community utilities likely to be impacted, project and as reported such as sources of water will be relocated to by the concemed suitable places, identified based on agencies community needs. _ 7 i 7.CULTURALHERITAGE _ 7 ___________ ; 'i D.7.1. Alignment selected to minimize loss of cultural At locations of cultural During the Project Design Consultant PIU, PIU, NHAI Cultural properties property properties listed in Design Stage preparation NHAI, NGOs and R&R Public consultation carried out for obtaining Appendix 4 cost unit opinion for shifting of religious structures. Shivsagar: An o4d temple of Shiva with a pond adjacent to it has been saved by shifting alignment on northern side. 8. ENIRONMENTADL SAFETY I<:ir'' v ' . e D.8.1. Accidents Design Improvements at curves. All along the project During the Project Design Consultant PIU, NHAI Segregating slow moving traffic in the urban corridor especially at Design Stage preparation settlements by providing service lanes. settlements / inhabited cost Provision of wider median in rural stretches stretches. and plantation of shrubs/undertrees to avoid the glare of vehicles moving in opposite directions during night. Provision of proper signage. CONSTRUCTON S TAGE _ _ _ _ _ - _fi _ _ _ _ _ . '_,, ,,,, _ I. SOIL t4t ; j; t W t ;i ( Xi d - i.;00 2ti;.gi g~iir.<<,i j> NM C.1.1. Soil Erosion High embankments will be provided with Same as given in D2.1 During Engineering Contractor SC, PIU,NHAI chutes and drains to minimize soil erosion At all borrow pits and construction cost Stone pitching and retaining walls will be service roads made at high embankments in critical areas Turfing of low embankments and plantation of grasses and shrubs will be done for slopes protection. In borrow pits, the depth of the pit will be regulated and the sides of the excavation will have a slope not steeper than 1: 4, from the edge of the final section of bank. Soil erosion checking measures as the formation of sediment basins, chute drains, etc, will be carried out. C.1.2. Loss of topsoil Agricultural areas will be avoided for Throughout Project During Engineering Contractor SC, PIU,NHAI borrowing of materials, unless requested by Corridor construction costs the land owner for making water/flsh ponds or for lowering the land for making it irrigable. 8 C.1.3. Compaction of Construction vehicles, machinery and Throughout Project During Engineering Contractor SC, PIU,NHAI soil equipment will move, or be stationed in the Corridor construction cost designated area, to avoid compaction of soil. * C.1.4. Borrowing of No earth will be borrowed from within the All borrow areas. During Engineering Contractor SC, PIU,NHAI Earth RoW Recommended in construction cost Non-productive, barren lands, raised lands, Appendix 1 river beds, waste lands and area where people are willing to develop fisheries ponds have been recommended for borrowing earth. If new borrow areas are selected, there will be no loss of productive soil, and environmental considerations will be met with. If vehicles carrying materials from borrow areas are passing through villages, the excavation and carrying of earth will be done in such a way that it cause least inconvenience to the nearby people. The unpaved surfaces used for the haulage of borrow materials will be maintained properly Precautionary measures such as the covering of vehicles will be taken to avoid spillage during transport of borrow materials. To avoid any embankment slippages, the borrow areas will not be dug continuously. Replantation of trees in borrow areas will be carried out if desired. C.1.5. Quarry The quarry material will be obtained from Quarry sites During Engineering Contractor SC, PIU,NHAI licensed sites. recommended In construction cost Appendix 2 C.1.6. Contamination Construction vehicles and equipments will be Throughout Project During Engineering Contractor SC, PIU,NHAI of soil from fuel and maintained and refuelled in such a fashion Corridor borrow areas construction cost lubricants that oil/diesel spillage does not contaminate and construction camp the soil. Fuel storage and refuelling sites will be kept away from drainage channels and important water bodies. 9 C.1.7. Contamination Cutting and filling will be carried out as per Throughout Project During Contractor SC, PIU,NHAI of soil from design. Corridor construction construction wastes All spoils will be disposed off as desired and and spoils the site will be fully cleaned before handing All construction sites, over. construction camps Engineering Non-bituminous wastes from construction activities can be dumped in borrow pits and l covered with a layer of the conserved topsoil, l l l l 2. WATER C.2.1. Water bodies Desired measures will be taken up to prevent Throughout Project During Engineering Contractor SC, PIU,NHAI temporary or permanent damage to identified Corridor construction cost + 0.1 water bodies to be avoided. million At km. 106 for part (lumpsum) for refilling of the pond enhancement of pond C.2.2. Other Water Any community water source as wells, tube- Throughout project During Rs. 2.00 Contractor SC, PIU,NHAI sources wells, etc., lost incidentally will be replaced. corridor construction million (No. 100x20,000) C.2.3. Drainage and Earth, stones, wastes and spoils would be At locations of CD During Engineering Contractor SC, PIU,NHAI run-off properly disposed off, to avoid blockage of structures construction cost any drainage channel. C.2.4. Contamination All necessary precautions will be taken to Throughout Project During Engineering Contractor SC, PIU,NHAI of water from construct temporary or permanent devices to Corridor construction cost construction and prevent water pollution due to increased allied activities siltation and turbidity. All wastes arising from the project will be disposed off, as per SPCB norms, so as not to block the flow of water. Wastes must be collected, stored and taken to approved disposal site. Water quality to be monitored three times in a year for the first three years of the construction. 10 C.2.5. Contamination The slopes of embankment leading to water | Throughout Project During Engineering Contractor 1 SC, PIU,NHAI of water from fuel bodies will be modified and rechanelised so Corridor construction cost and lubricants that contaminants do not enter the water body. Oil and grease traps will be provided at fuelling locations, to prevent contamination of water. Waste petroleum products will be collected, stored and disposed off at approved sites Water quality to be monitored as detailed is Shivsagar Pond the Environmental Monitoring Plan C.2.6. Sanitation and Garbage tanks and sanitation facilities will be At Construction camp During Contractor SC, PIU,NHAI waste disposal in provided at camps locations, wherever construction construction camps The construction camps will be located in such located along the Project way that water sources is not contaminated. corridor Efforts will be made to provide good sanitary and sewage disposal facilities at camp to avoid epidemics The workplace will have proper medical facilities. C.2.7. Use of water The contractor will make arrangements for Throughout Project During Engineering Contractor SC, PIU,NHAI for construction water required for construction in such a way Corridor construction cost that the water availability and supply to nearby communities remain unaffected. Wastage of water during construction will be minimized. 3. AIR C.3.1. Emission from All vehicles, equipment and machinery used Throughout Project During Engineering Contractor SC, PIU,NHAI construction vehicles for construction will be regularly maintained to Corridor construction cost and machinery ensure that the pollution emission levels conform to the SPCB norms. The asphalt plants, crushers and the batching plants will be sited at least 1-2 km in the downwind direction from the nearest human settlement. Vehicles transporting earth materials will be covered. Mixing equipment will be well sealed and equipped as per SPCB norms. ____ 11 Si. Substance or Requirement Undesirable Effect Outside the Permissible Limit Methods of Remarks No. Characteristic (Desirable Desirable Limit in the Absence of Test (Ref. To Lin_tt m Alternate Source IS) 7 Iron (as Fe) mg/1, 0.3 Beyond this limit taste/appearance 1 32 of 3025 : Max are affected, has adverse effect on 1964 domestic uses and water supply structures, and promotes iron bacteria 8 Chlorides (as CI) 250 Beyond this limit, taste, corrosion and 1000 3025 (Part 32) mg/1, Max palatability are affected 1988 9 Residual, free 0.2 - 3025 (Part 26) To be applicable only when chlorine, mg/I, Min 1986 water is chlorinated. Tested at consumer end. When protection against viral infection is required, it should be Min 0.5 mg/l Desirable Characteristics 1 Dissolved solids 500 Beyond this palatability decreases 2000 3025 (Part 16) mg/l, Max and may cause gastro intestinal 1984 irritation 2 Calcium (as Ca) 75 Encrustation in water supply 200 3025 (Part 40) mg/I, Max structure and adverse effects on 1991 domestic use 3 Magnesium (as Mg), 30 Encrustation to water supply 100 16, 33, 34 of IS - mg/l, Max structure and adverse effects on 3025:1964 domestic use 4 Copper (as Cu) 0.05 Astringent taste, discoloration and 1.5 36 of 3025:1 mg/I, Max corrosion of pipes, fitting and utensils 1964 _ will be caused beyond this 5 Maganese (as Mn) 0.1 Beyond this limit taste/appearance 0.3 35 of 3025: - mg/I, Max are affected, has adverse effect on 1964 domestic uses and water supply I ____________ _________________ structureS . 6 Sulphate (as 200 200 Beyond this causes gastro intestinal 400 3025 (Part 24) May be extended up to 400 504) mg/i, Ptax irritation when magnesium or sodium 1986 provided (as Mg) does not I___ _____are present exceed 30 7 Nitrate (as NO2) 45 Beyond this methaemoglobinemia 100 3025 (Part 34) - mg/I, Max takes place 1988 8 Fluotide (as F) mg/I, I Fluride may be kept as low as 1.5 23 of 3025: Max possible. High fluoride may cause 1964 fluorosis I 9 Phenolic compounds 0.001 Beyond this, it may cause 0.002 54 of 3025: - (As CsHsOH) mg/i, objectionabie taste and odour 1964 Max = _ _= 10 Mercury (as Hg) 0.001 Beyond this, the water becomes toxic No relaxation (see note) To be tested when pollution is mg/i, Max Mercury ion suspected analyser 11 Cadmium (as Cd), 0.01 Beyond this, the water becomes toxic No relaxation (See note) To be tested when pollution is _ mq/1, Max= suspected 12 Selenium (as Se), 0.01 Beyond this, the water becomes toxic No relaxation 28 of 3025: To be tested when pollution is ma/I, Max l 1964 suspected 13 Arsenic (As) mg/i, 0.05 Beyond this, the water becomes toxic No relaxabon 3025 (Part 37) To be tested when pollution is _max _ l 1988 suspected 14 Cyanide (As CN), 0.05 Beyond this limit, the water becomes No relaxation 3025 (Part 27) To be tested when pollution is mg/I, Max toxic 1986 suspected 15 Lead (as Pb), mg/I, 0.05 Beyond this limit, the water becomes No relaxation (see note) To be tested when pollution is Max toxic suspected 16 Zinc (As Zn). Mg/i, 5 Beyond this limit it can cause 15 39 of 3025: To be tested when pollution is Max astringent taste and an opalescence 1964) suspected in water _ 17 Anionic detergents 0.2 Beyond this limit it can cause a light 1 Methylene-blue To be tested when pollution is (As MBAS) mg/I, froth in water extraction suspected Max I method 18 Chromium (As Cr'+) 0.05 May be carcinogenic above this limit No relaxation 38 of 3025: To be tested when pollution is _ mg/1, Max l 1964 suspected 19 Polynuclear aromatic - May be carcinogenic above this limit - - hydrocarbons (as _ PAH) q/1, Max I 20 Mineral oil mg/i, 0.01 Beyond this limit undesitable taste 0.03 Gas Max and odour after chlorination take Chromatographi place c method 21 Pesticides mg/I, Max Absent Toxic 0.001 - 22 Radioactive materials: 58 of- I_________ _______3025:01964 23 a) Alpha miters| - 0.1 - EBq/1, Max l | 24 Beta emiters pci/i,| - 1- Maxll - 20 - Si. Substance or Requirement Undesirable Effect Outside the PerMissible Limit Methods of Remarks No. Characteuistic (Desirable Desirable Limit in the Absence of Test (Ref. To _______ Limit) Alternate Source IS) 25 Aluminium (as Al), 200 Beyond this limit taste becomes 600 13 of 3025:1964 - mg/I, Max unpleasant .- 26 Aluminium (as Al), 0.03 Cumulative effect is reported to 0.2 31 of 3025: - mQ/ , Max cause dementia 1964 27 Boron,mg/l, max 11 - 29 of 3025: Source: Indian StancdardDrinking WaterSpectication-S10500o:1991 F.2.3 Noise level Monitoring The measurements for monitoring noise levels would be carried out at all designated locations along all contract packages in accordance to the Ambient Noise Standards formulated by Central Pollution Control Board (CPCB) in 1989/SPCB (refer Table 6) Sound pressure levels would be monitored on twenty-four hciur basis. Noise should be recorded at a "A' weighted frequency using a " slow time response mode" of the measuring instrument. The location, duration and the. noise pollution parameters to be monitored and the responsible institutional arrangements are detailed out in the Environmental Monitoring Plan (Table: 7) Table 6: Noise Level Standards Area Code Category Limits in Decibels (dBA) ___________ |_________
Группа Всемирного банка · Environmental Assessment
India - Third National Highway Project : environmental assessment (Vol. 6 of 10) : Environmental management plan - construction packages 4-B and 4-D
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Environmental Assessment
Страна
Индия
Источник
Всемирный банк