Группа Всемирного банка · Staff Appraisal Report

Niger - Second Highway Project

Нигер Всемирный банк
Открыть оригинал документа

Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.

Полный текст

't a3, FILE CO?X -RESTRICTED Report No. PTR-63a This report was prepared for use within the Bank and its qffiliated organizations. They do not accept responsibility for its accuracy or completeness. The report may not be published nor may it be quoted as representing their views. INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT INTERNATIONAL DEVELOPMENT ASSOCIATION APPRAISAL OF THE SECOND HIGHWAY PROJECT NIGER December 21, 1970 'Iransportation Projects Department Jiirrency _ouivalents 2urrency Unit - CFA Franc (CFAF) C?AF 1 = US$0.0036 CFA? 278 = US$1.00 JVAF 1 million US$3,600 FJ.h5cal Year: October 1 to September 30 lJeights anid l,easures: Metric Metric : British/US equiv4lent 1 meter (m) = 3.28 feet (ft) 1 kilometer (km) = 0.62 miles (mi) 7 square kilometer (kcm-) = 0.386 square miles (sq mi) 1 hectare (ha) - 2.47 acres (ac) 1 liter (1) = 0.22 British gallons (imp gal) = 0,26 US gallons (gai) 1 metric ton (m ton) = 2,204 pounds (lbs) Abbreviations and Acronyms: B.JEOM - Bureau Central pour les Equipements d'Outre-Mer - Commissariat a l'Energie Atomique CTDA - Canadian International Develo

Основные сведения
Тип документа Staff Appraisal Report
Дата принятия
Страна Нигер
Источник Всемирный банк