Группа Всемирного банка · Side Letter

Conformed Copy - L4600 - Shijiazhuang Urban Transport Project - Supplemental Letter 2

Китай Всемирный банк
Открыть оригинал документа

Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.

Полный текст

Page 1 PEOPLE’S REPUBLIC OF CHINA MUNICIPALITY OF SHIJIAZHUANG October 29, 2001, 2001 International Bank for Reconstruction and Development 1818 H Street, N.W. Washington, D.C. 20433 U.S.A. Re: Loan No 4600 CHA (Shijiazhuang UrbanTransport Project) Performance Indicators Ladies and Gentlemen: We refer to the Loan Agreement of even date herewith between People’s Republic of China (the Borrower) and the International Bank for Reconstruction and Development (the Bank) for a Shijiazhuang Urban Transport Project (the Project), and to the Project Agreement of same date between the Bank and Municipality of Shijiazhuang (Shijiazhuang) for the Project. For purposes of Paragraph C (1) of Schedule 2 to the Project Agreement, Shijiazhuang shall monitor and evaluate the carrying out of the Project and the achievement of the Project’s objectives in accordance with the indicators set forth in the Annex to this Letter. Please confirm your agreement to the foregoing by signing on the form of confirmation below. Sincerely yours, By /s/ Wang Jinze Authorized Representative MUNICIPALITY OF SHIJIAZHUANG AGREED: INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT By /s/ Yukon Huang Authorized Representative

Основные сведения
Тип документа Side Letter
Дата принятия
Страна Китай
Источник Всемирный банк