Группа Всемирного банка · Procurement Plan

India - Second Mizoram State Roads Project : procurement plan

Индия Всемирный банк
Открыть оригинал документа

Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.

Полный текст

 Plan (Cons). 77961 PROCUREMENT PLAN FOR CONSULTANCY SERVICES Second Mizoram State Roads Project (P145778) WB CREDIT No – Not Alotted (Under Preparation) Descrip- Estim Methods Prior Adverti- TOR/ RFP No Obje- RFP Proposals Evaluatio No Objec- Contract Name of Services Exp. **WBR No. tion of -ated of Review/ sing for Shortlist Final ction from Issued to be Rec- n to be tion by the Number, Consultant/ to be Incur- Services Cost Selectio Post Short to be Draft to Bank for (Date) eived by Finalised Bank Value and Nationality Comp- red to (US$. n@ Review listing Finalised be TOR/ the Project (Technical (Technical/ Currency & Zip leted Date Package No. Milli- (Date) (Date) forwarded Shortlist/ Authoritie / #Combined Code, if (Date) SL No. ons) to the Final RFP s (Date) #Combine / Draft USA Bank (Date)** d/ Draft Contract/ (Date)** Contract/ Final Final -13 Contract) 4-Sept-13 (Date)** Contract) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 1 Project 2.9 QCBS Prior 27-May-13 10-Jun-13 17-Jun-13 24-Jun-13 26-Jun-13 24-Jul-13 7-Aug-13 14-Aug-13 24-Sept-16 WB 01 *PP Preparation Firm 21-Aug-13 X Consultant 4-Sept-13 11-Sept -13 18-Sept-13 X R I A 2 Project 2.9 QCBS Prior 27-May-13 10-Jun-13 17-Jun-13 24-Jun-13 26-Jun-13 24-Jul-13 7-Aug-13 14-Aug-13 24-Sept-16 WB 02 PP Preparation Firm 21-Aug-13 X Consultant 4-Sept-13 11-Sept -13 18-Sept-13 X R II A 3 Project 5.0 QCBS Prior 1-Jul-13 1-Aug-13 12-Aug-13 26-Aug-13 2-Sept-13 17-Aug-13 16-Sept-13 30-Sept-13 07-Jan-19 WB 03 PP Manageme Firm 7-Oct-13 X nt 31-Oct-13 15-Nov-13 29-Nov-13 X R Consultant A *PP: Target dates agreed as per Procurement Plan R: revision 1,2 etc. A: actual dates RFP (Request for Proposal): Same as ‘Bid Document’ #Technical and Financial ** Applicable in case of ‘Prior Review’ by Bank WBR No.: World Bank Reference Number @ State whether (i) Single firm or individual; or (ii) Competitive. If Competitive, then state whether Quality and Cost Based Selection (QCBS) or Quality Based Selection (QBS) m:\pdat\sbd\laci fomrs\procurement plans\\consultancy.doc January 14, 2000

Основные сведения
Тип документа Procurement Plan
Дата принятия
Страна Индия
Источник Всемирный банк