Resettlement Action Plan of Jinzhou Wastewater Treatment Project China Liao River Basin Project by World Bank Loan RP64 Volume 4 Resettlement Action Plan for Jinzhou Wastewater Treatment Project (Draft) Jinzhou Drainage Management Company October. 2000 HIT COPY I Jinzhou-english Jan 30 2001 .doc Resettlement Action Plan of Jinzhou Wastewater Treatment Project Table of Contents I PROJECT DESCRIPTION ....................................................... 4 1.1 BRIEF INTRODUCTION OF THE PROJECT .............................................. 4 1.2 AREAS AFFECTED/BENEFIT BY THE PROJECT .............................................. 4 1.3 SOCIO-ECONOMIC BACKGROUND OF THE PROJECT AREA ........................................ 4 1.4 APPROVAL OF THE PROJECT .............................................. 5 1.5 DESIGN PROCESS OF THE PROJECT .............................................. 5 1.6 PROJECT OWNERSHIP AND ORGANIZATIONS .............................................. 5 2 PROJECT IMPACTS ....................................................... 6 2.1 IMPACTS OF THE PROJECT ....................................................... 6 2.2 IMPACTS ANALYSIS ....................................................... 7 3 TARGET OF RESETTLEMENT AND REHABILITATION ........... . ....................... I 1 4 SOCIOECONOMIC SURVEY ....................................................... 12 4.1 SOCIOECONOMIC SURVEY PROCESS ....................................................... 12 4.2 MANAGEMENT MODE OF YAOGOU VILLAGE ....................................................... 12 4.3 TYPICAL INTERVIEW ....................................................... 13 4.4 MINORITY PEOPLE AFFECTED BY LAND REQUISITION OF THE PROJECT ................... 14 5 LEGAL FRAMEWORK .................................................................. 15 5.1 RIGHT ON LAND ACQUISITION AND COMPENSATION ............. ............................... 15 5.2 LAW AND ADMINISTRATION PROCEDURE ........................................................... 15 5.3 COMPENSATION .................................................................... 16 5.4 DUTY OF ORGANIZATIONS . .................................................................... 17 5.5 CONCERNED POLICY OF THE WORLD BANK ON RESETTLEMENT ............................ 17 5.6 RESETTLEMENT POLICY OF THE PROJECT . .......................................................... 17 6 ORGANIZATIONS ................ 18 6.1 RELEVANT ORGANIZATIONS ON RESETTLEMENT ACTION .................................... 18 6.2 RESPONSIBILITY ................................. . ........... 18 6.3 STAFFING ..... ......................................... 20 6.4 ORGANIZATION STRUCTURE .............................................. 22 6.5 MEASURES FOR INSTITUTIONAL STRENGTHENING .............................................. 22 6.6 IMPLEMENTATION .................................. . .......... 22 7 COMPENSATION QUALIFICATION AND POLICY ............................................. 25 7.1 COMPENSATION QUALIFICATION ...................................................................... 25 7.2 COMPENSATION POLICY . ...................................................................... 25 8 COMPENSATION STANDARD ...................................................................... 27 8.1 COLLECTIVE LAND REQUISITION ...................................................................... 27 8.2 DEMOLITION/RESETTLEMENT OF HOUSE AND GROUND ATTACHME:NTS ....... ............ 28 8.3 ENTERPRISE ...................................................................... 29 9 IMPLEMENTATION OF RESETTLEMENT AND REHABILITATION ....... ........... 30 9.1 RESETTLEMENT AND REHABILITATION MEASURES FOR COLLECTIVE LAND REQUISITION ...................................................................... 30 9.2 JINZHOU JIAXIN LTD. COMPANY .30 9.3 RESETTLEMENT FOR OWNER OF DEMOLISHED HOUSE .30 9.4 INFRASTRUCTURES AND GROUND ATTACHMENTS AFFECTED BY THAE PROJECT 30 10 ENVIRONMENTAL PROTECTION .31 2 Jinzhou-english Jan 30 2001 .doc Resettlement Action Plan of Jinzhou Wastewater Treatment Project 10.1 THE ENVIRONMENT AROUND DISHUIHU TEAM OF YAOGOU VILLAGE ..................... 31 10.2 CLEAN UP OF DISMANTLED HOUSES .................................................................. 31 10.3 POLICY ELIMINATING ENVIRONMENT IMPACTS CAUSED BY SEWERS CONSTRUCTION 31 11 PUBLIC PARTICIPATION AND CONSULTATION ........................................... 32 11.1 STRATEGY OF PUBLIC PARTICIPATION .................................... ......................... 32 11.2 PUBLIC OPINION SURVEY ...................................................................... 35 12 INTEGRATION WITH HOST COMMUNITIES AND POPULATION .................. 38 13 GRIEVANCES AND APPEALS ...................................................................... 39 14 IMPLEMENTATION SCHEDULE OF RESETTLEMENT ACTIVITIES .............. 40 14.1 COORDINATION OF RESETTLEMENT IMPLEMENTATION AND PROJECT CONSTRUCTION40 14.2 THE SCHEDULE OF RESETTLEMENT ACTIVITIES .................................................. 40 15 COST AND BUDGET FOR COMPENSATION ..................................................... 45 15.1 COST ...................................................................... 45 15.2 YEARLY EXPENDITURE PLAN ................................................. ..................... 47 15.3 FUND SOURCE ...................................................................... 47 15.4 FUND FLOWING ...................................................................... 47 16 MONITORING AND EVALUATION .................................................................. 49 16.1 INTERNAL MONITORING AND EVALUATION ........................................................ 49 16.2 INDEPENDENT MONITORING SYSTEM ................................................................ 50 16.3 MONITORING INDEX ...................................................................... 51 16.4 POST ASSESSMENT ...................................................................... 51 17 ENTITLEMENT MATRIX ...................................................................... 52 ATTACHED MAP: LOCATION OF PROPOSED JINZHOU WASTEWATER TREATMENT PROJECT 3 Jinzhou-english Jan 30 2001 .doc Resettlement Action Plan of Jinzhou Wastewater Treatment Project 1 PROJECT DESCRIPTION 1.1 Brief introduction of the project Jinzhou Wastewater Treatment Project (W.W.T.P) is one component in the proposed Liao River Basin Project (LRBP), which consist of Shenyang, Yingkou, Panjin urban W.W.T plants and Yingkou, Jincheng industrial W.W management sub-projects. The construction of the Jinzhou W.W.T project can improve the environment of the city and Daling-Xiaoling river basin. This sub-project consist of Dishuihu W.W.T Plant construction and urban sewers construction/improvement. Jinzhou Dishuihu W.W.T.P will be located on the Dishuihu team of Yaogou village, southeast of the city, and on the south bank of Xiaoling river. The phase one capacity of WWTP is 100,OOm /d., additional 100,000m3/d for phase two. The Plant will occupy 15 ha. land totally, among which 10 ha. for the phase one. Five new lines of sewage interceptors with 10,032 m total length will be constructed under the sub-project. 1.2 Areas affected/benefit by the project Areas affected by the project covers Dishuihe team of Yaogou village and Nanshan Economic Trade Trial Zone, Jinzhou city; Area affected by the sewers construction is around the urban of the city. The area beneficial from the project covers down stream of Xiaoling river with 56Km2 total area. Since the country's reform and opening to outside and the rapid economic development, population growth, urban construction, the domeslic and industrial wastewater have been increased gradually and are directly discharging to Xiaoling river without any treatment. This have aggravated the pollution of Xiaoling river. As a result, some certain pollutants excess the standard largely. The residential health and industrial production is being threatened seriously. When the W.W.T.P completed, the pollution load of Daling and Xiaoling rivers will be reduced largely, and water environment of Xiaoling river system can be restored. Meanwhile the pollution of Bohai sea will alleviate, which will be favorable to the aquaculture on the beach of Bohai sea. In general, the construction of W.W.T.P and sewers will produce a large significance on improving environment quality, boosting the opening to outside and economic development of Jinzhou city, through which Jinzhou city will become a economic and cultural center in western part of Liaoning province. 1.3 Socio-economic background of the project area Jinzhou city is situated in the west part of Liaoning, north of Bohai sea with Shenshan railway and road going through its urban area. Jinzhou city, adjacent Liaodong bay on south, is a important constitute of Liaoxi corridor and also is a important transportation hinge and military base. Its geographical coordinates are east longitude 120
Группа Всемирного банка · Resettlement Plan
China - Liao River Basin Project - resettlement action plan (Vol. 4 of 9) : Resettlement action plan for the Jinzhou Wastewater Treatment Plant
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Resettlement Plan
Страна
Китай
Источник
Всемирный банк