Группа Всемирного банка · Environmental Assessment

China - Second Jianxi Highway Project : environmental assessment (Vol. 11 of 14) : Suichuan County connecting road : environmental impact assessment (third edition)

Китай Всемирный банк
Открыть оригинал документа

Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.

Полный текст

E-425 VOL. 11 People's Republic of China World Bank Financed Jiangxi No.2 Highway Project Suichuan County Connecting Road Environmental Impact Assessment Report (Third Edition) Research Institute of Highway, MOC December 2000 People's Republic of China World Bank Financed Jiangxi No.2 Highway Project Suichuan County Connecting Road Environmental Impact Assessment Report (Third Edition) Research Institute of Highway, MOC December 2000 Research Institute of Highway Director Chen Guojing Chief Engineer Liu shutao Environment Protection Division Division Head : Ye Huihai Chief Engineer :Li zongyu Examiner Ye Huihai Project Team Leader : Yan Xiaolin Associate Research Fellow (EIA Professional Competence Certificate. No. 0060 Beijing) Project Team Member Shen yi, Associate Research Fellow (EIA Professional Competence Certificate. No. 2116 ); Li xiyun, Senior Engineer(EIA Professional Competence Certificate, No. 0909 Beijing); Dong bochang, Engineer(EIA Professional Competence Certificate, No. 08380): Wang Fang, Engineer (EIA Profesional Competence Certificate, No. 0098 Beijing): Fan qingchun, Engineer (EIA Profesional Competence Certificate, No. 0995 Beijing) I Contents Chapter 1 General Provisions ...........................................................I 1.1 Foreword ..........................................................I1 1.2 Assessment Basis ..........................................................1I 1 .3 Assessment Scope, Duration and Criteria .......................................................... 3 1.4 Targets for Environmental Protection ........................................................... 5 1.5 Assessment Factors and Method .........................................................6 1.6 Assessment Category and Key Points ..........................................................7 Chapter 2 Project Overview ..........................................................8 2.1 Alignment and Major Controlling Points ..........................................................8 2.2 Scale of Construction, Technical Standards & Quantities of Main Works ... 8 2.3 Traffic Volume Estimate ...........................................................9 2.4 General Outline of Project ...........................................................9 2.5 Investment Estimate and Financing .......................................................... 10 2.6 Time Arrangement for the Project ......................... ................................. 10 Chapter 3 Current Environmental Description & Assessment ................................... 11 3.1 Natural Environment .......................................................... 11 3.2 Social Environment .......................................................... 12 3.3 Ecological Environment .................... 14 3.4 Acoustic Environment .................... 16 3.5 Atmospheric Environment .................... 17 Chapter 4 Environment Impact Prediction & Assessment .................................... 18 4.1 Social Environment Impact Assessment ...................................................... 18 4.2 Ecological Environmental Impact Prediction & Assessment . . 20 4.3 Acoustic Environmental Impact Prediction & Assessment ...............................--. 22 4.4 Ambient Air Impact Prediction & Assessment .................................................. ..31 4.5 Environment Impact of Building Materials Quarries and Transport ................. 34 Chapter 5 Environmental Mitigation Measures ..................................................... 36 5.1 Design Stage ...................................................... 36 5.2 Construction Stage ...................................................... 36 5.3 Operation Stage ...................................................... 38 [ Chapter 6 Alternatives Analysis ....................................................... 40 6.1 "Without the project" analysis ..... .................................................. 40 6.2 Alignment selection procedure .................... ................................... 40 6.3 Environmental Benefits of the Proposed Project ............................................... 40 Chapter 7 Environmental Monitoring and Management ............. ......................... 41 7.1 Environmental Monitoring ....................................................... 41 7.2 Environmental Management Organizations ....................................... 42 7.3 Budget Estimate for Environmental Monitoring .................................. .... 46 Chapter 8 Public Participation .. .................................... 47 8.1 Survey Method and Contents ...................................... 47 8.2 Summary of the Survey .................. 47 8.3 Information Disclosures and Feedback ...................................... 49 8.4 Brief Summary ...................................... 50 Chapter 9 Assessment Conclusions ............................ ......... 51 9.1 Social Environment ...................I................... 1 9.2 Ecological Environment (including soil erosion, water environment) .. 1. I 9.3 Acoustic Environment ........................................ . .......... 52 9.4 Ambient Air .................................................... 53 9.5 Public Participation .................................................... 53 9.6 Environmental Investment and Management Plan ................ .............I .......... 54 9.7 Comprehensive Assessment .................................................... 54 Annex I Overview of the Assessment Unit and Staff Member Annex II Reference Annex III Public Participation and Questionnaires (group inquiry) Annex IV Environmental and Resettlement Bulletin for the World Bank Financed Jiangxi No.2 Highway Project Taihe-Ganzhou Expressway Annex V List of Tables and Figures Annex VI List of relevant reports 11 Chapter 1 General Provisions 1.1 Foreword Suichuan linking road-a part of Jiangxi No. 2 highway financed by the World Bank loan is an important entry-exit passage connecting Suichuan county, Jinggangshan City with Gan-Yue Expressway. The construction of it will play a very important role in realizing the hub function of Gan-Yue Expressway, improving local comprehensive transport network. It provides an important basic condition of opening to the outside world for Suichuan countv. According to the requirements and suggestions of the World Bank experts, we have made the Envirorunental Assessment Report for this linking road separately. The Research Institute of Highway (RIOH) under the MOC completed the EIA of Suichuan Linking Road (Version 1) for Gan-Yue Expresswav Taihe-Ganzhou Section in June.2000. In accordance with the suggestions in the aide-memoire at the second preparatory mission by the World Bank environmental experts for Jiangxi NO.2 highway. the RIOH made modification and compiled this EIA report. In December 2000, the EIA team again modified this EIA report in accordance with the aide-memoire at the pre-evaluation mission of Gan-Yue Expressway (Taihe-Ganzhou Section) of the World Bank environmental experts. 1.2 Assessment Basis (1) People's Republic of China Law on Environmental Protection (26 Dec.. 1989): (2) People's Republic of China Law on Water Pollution Control (I 5 Mav. 1996); (3) People's Republic of China Law on Atmospheric Pollution control (29 Dec., 1995) (4) People's Republic of China Law on Environmental Noise Pollution Control (29 Oct.. 1996); (5) People's Republic of China Law on Water and Soil Conservation (29 June.1991) I (6) People's Republic of China Law on Land Management (29 Aug.,1998) (7) Act of Environmental Protection and Management for Construction Projects [The State Council, C. 253] (18 Nov., 1998); (8) Announcement on Further Management of Environmental Impacts Assessment of Construction Project Loaned From Intemational Financial Institution [(1993) No.324 Document on Environmental Supervision, issued by China National Environmental Protection Bureau etc.]; (9) World Bank Operation Handbook OP/BP/GP 4.01 Environmental Assessment, March 1999: (10) Technical Guiding Provisions for Environmental Impacts Assessment (HJ/T2.1-2.3-93, HT/T2.4-1995. HJ/T19-1997. issued by China National Environmental Protection Bureau); ( 11) Environmental Protection and Management Measures for Construction Projects of Communication (The Ministry of Communications. C.(90) 17); (12) Specifications of Environmental Impacts Assessment for Construction Projects of Highway (Tentative) [JTJO05-96, The Ministry of Communications]: (13) Act of Environmental Protection for Jiangxi Provincial Construction Projects (29 April. 1995); (14) Program of Environmental Impacts Assessment for Taihe-Ganzhou Road Section of Gan-Yue Expressway (Highway Research Institute. The Ministry of Communications, March. 2000); (15) Reply to the Reviewing Opinions on Program of Environmental Impacts Assessment for Taihe-Ganzhou Road Section of Gan-Yue Expressway [(2000 No.58 Document on Environmental Supervision. issued by China National Environmental Protection Bureau. 14 April. 2000); (16) The Letter on Approval of Environmental Impacts Standard of Gan-Yue Expressway (Taihe-Ganzhou Road Section) [(2000) No.14 Document on Ganzhou Environment and Development. Jiangxi Provincial Environmental Protection 2 Department]; (17) Feasibility Study Report for Suichuan Linking Road Works of Taihe-Ganzhou Road Section of Gan-Yue Expressway (Jiangxi Provincial Communications Design Institute, Feb., 2000). (18) Two-stage Preliminary Design of Gan-Yue Expressway (Suichuan Linking Road) by Jiangxi Province Communications Design Institute, May, 1999. (19) Two-stage Preliminary Design of Gan-Yue Expressway (Suichuan Linking Road) by Jiangxi Province Communications Design Institute, September,2000 1.3 Assessment Scope, Duration and Criteria 1.3.1 Assessment Scope The assessment scope is shown in Table 1- 1. Table 1-1 Assessment Scope of Environmental Impacts of the Proposed Road No. Environment Elements Assessment Scope Area vw ithin 200m from twNo sides of the central line of the proposed I Acoustic Environment road and extending to 300m if there are sensitive locations as schools. hospitals Area 0ithin 200m from two sides of the central line of the proposed 2 Atmospheric Environment road and extending to 300m if there are sensitive locations as schools. hospitals Area within 200m from two sides of the central line of the proposed 3 Water Environment road. and Nvater regime within 200m upstream and 200m dow nstream from the location of road bridge across the ri ver Area within 200m from tv%o sides of the central line of the proposed 4 Ecological Environment road. eanh borrow. v6aste areas and quarries 5 Social En. ironment The project impacted areas 1.3.2 Assessment Time Horizon Construction: 2002.8-2004.8 Operation: 2004.2015 and 2023 1.3.3 Assessment Standards According to the Letter on Approval of Environment Impacts Standard of Gan-Yue Expressway (Taihe-Ganzhou Section) in Document [(2000) No.14 Ganzhou]. by Jiangxi Province Environmental Protection Bureau, the following criteria are used for the 3 assessment. (1) Water: The main river that Suichuan linking road passes through is Suichuan river. According to the status and function requirement of water, class III standard in GHZB1-1999 Ground Surface Water Quality Standard is used for the assessment of water quality, while Class I standard in GB5084-92 Farmland Irrigation Water Quality Standard is used for SS assessment, shown in Table 1-2. Table 1-2 Standard Limits for Water Quality Assessment mg/L (except pH) Indicator pH CODc, Petrol-oil SS Remarks Standard limits for Class I standard in GB5084-92 is used water quality 6.5-8.5 -20 (0.05 S 150 for SS assessment. the rest will apply assessment class Ill of GHZB 1-1999 standard (2) Acoustic: GB 12523-90 Construction WVork Sites Noise Limits Standard is used for the assessment of noise during the construction, in which Class IV standard is used for the dense residential quarters and first row of the buildings within the assessment scope of road sides; and Class I standard is used for the schools and hospital wards. shown in Table 1-3 and Table 1-4. Table 1-3 GB12523-90 Standard of Noise Limit for Construction Work Site (Unit: Leq (dB) Noise limit Construction phase Mlain sources of noisc Da! time Ni2ht time Earth & stone %%ork Bulldozer. exca%ator. loader. etc. 75 55 Piling Various piling machines 85 Work prohibited Structure Concrete mixer. X ibrating spear. electric saw. etc. 70 55 Finishinz Crane. lifter. etc. 65 55 Table 1-4 Noise Criteria for Urban Area (extracts) Leq:dB Type or Sensitive Points Daytime Nighttime GB3096-93 Class IV Standard 70 55 Class I Standard 55 45 4 (3) Ambient air Construction: Class II standard in Environment Air Quality Standard is applied to TSP assessment. Operation: Class II Standard in GB3095-1996 Ambient Air Quality Standard is applied . Refer to Table 1-5 Table 1-5 GB3095-1996 Ambient Air Quality Standard (extracts) (mg/ m3) Pollutant TSP Nitrogen Oxides Carbon Monoxide Daily Avera2e 0.30 0.10 4.00 Concentration Limit I -hour Average 0.15 10.00 1.4 Targets for Environmental Protection The impact factors on the ecological environment are land occupation. woodland vegetation damage, soil erosion, water quality pollution cause by bridge construction. The protective targets include: farmland. woodland, pond. high filling/cutting section (KO+000-K2+750.K4+200-K4+750). earth borrowing area (K14+400-K14+680). Meijiang river and canals. The impact factors on acoustic and ambient air include construction noise. secondary dust. Traffic noise and tail gas. The protective targets are presented in Table 1-6. As the construction of this road is the up-grade on the existing old road, no great impact would occur from the point view of ecological environment.. The main impact on the surrounding residents, schools and living comes from construction noise and traffic noise as well as tail gas in operation phase. Therefore environmental protection targets in this project are the sensitive locations to noise and ambient air along the road. Table 1-6 Sensitive Locations to Noise and Air along the Road Distance from Households No. Name Location Central Line of /Number of Environmental Features Road People Hongshan . 330 Enclosing wall around the school. I Central KO+600 60m at right from students. 20 playground and open ground before the Primary School the classroom teachers teaching building 2 Huanggang K3+500 Left 50m 30 /120 Farmland along the old road T3irough the Paddy field. vegetable plot and households 3 Dongtang K7+550 village. 14m after 7/300 along the old road forming as a street remove 4 Jiangchexia K8+200 Through the village. 40160 Paddv ftrid 20m after remove 5 Shanjiaoxia K8+700 Left 20m 18/75 At the foot hill with vegetable plot. paddy ____________ ________________ ~~~~ ~~field 6 Zhanetang K 10+200 Left edge 80.20 e Households distributing along the old road Zhangtan 30m nght of the 180 7 gPrimari K10+100 classroom. through students.6 Enclosing wall around the school. School the playground teachers ~~playground before the teaching building School the platground teachers 8 Meijian KI 1+350 lliroughthevillage. 60/240 Households distributinp along the old village 14m aflter remove road. farmland 9 Shaoxi K 1 2+200 Right 80m 90/400 Households distributing along the old 9 Shaoxi K I 2-'-200 Right 80m 90/400 road, farmland 10 Catingxia K12+900 Right 75m 34/128 | Canals. padd) field II Sheshane K13+900 Through the village. 40/160 1 Households distributing along the old 14m afer remove i road, farmiand 68 On the side of the old road. being old Sheang two-storev timber-strcture building Pma2 K13+0 Left 60m studentss3 classroom is vertical to the road . a clinic Primary school ~~~~~~~teachers ina~ 13 WanneiYangcu K16+SS0 niht 10 120/500 Paddy field. pond. counur road n _________ __________________ ___________ J surrounding 14 Anxia K 17+400 Left edge 57/240 Small road. paddy field 15 Chitang K 17+700 Left edge 80'320 Drn canal. pond. padd\ field. small ______________ ___________ quantities of resettlement 16 Zhangw-uli K18+150 Left 25m 60/240 Pond. paddy fields. small roads 17 Lubei K18+400 Right 100 10/160 | Close to national highwax 105. paddy 1 LueK_840 Rih10401 field. dr! canals Yuezili 18 jilh K}19-fi700 Right 30m 22/88 Small roads. paddy field Ijianshang_I 19 Zijzhitouxia 20st Through the v-illage. 120/480 1 Small road. padd\ field (Xitou) on 20m after remove 1.5 Assessment Factors and Method 1.5.1 Assessment Factors (1) Acoustic environment: equivalent acoustic level (A): LAeq; (2) Atmospheric environment: NON, CO. TSP. 1.5.2 Assessment Method In this report. the environment noise and atmospheric environment are assessed by 6 status monitoring and surveying statistic analysis, and predicted by analogic analysis and module computation. The analogic analysis is used for the prediction assessment at the construction stage, while the module computation is employed for the prediction assessment in the operation stage. According to the predicted results, the range up to the standard is given and used as a basis for the developmental activity conducted by the planning / construction department. Meanwhile, the locations sensitive to noise / waste gas environment are predicted and assessed. The ecological environment, water, and soil-and-water loss are assessed by surveying combined with analogic analysis, while the social environmnent, living quality and public participation are assessed by surveying analvsis. 1.6 Assessment Category and Key Points This works is the expanding construction and rebuilding project. There are environmental sensitive locations as schools and residential areas along the road within the range of assessment. The building of bridge has a certain influence on water environment. but smaller influence on ecological environment and soil-and-water erosion. According to Technical Guiding Provisions for Environmental Impacts Assessment, it is required that the assessment of special subject is analyzed. in which ecological environment (including soil-and-water loss) is assessed to be Category 111, water environment and atmospheric environment be Category III respectively, and acoustic environment be Category 11. According to features and pollution of this project, the assessment of acoustic environmental impacts is a key point in the assessment of this project. 7 Chapter 2 Project Overview 2.1 Alignment and Major Controlling Points The proposed road starts from Suichuan interchange of the main road, via Daquan, Hongshan, Huanggang, Zhongping, Dongtang, Zhangtang, Meijiang, Shaoxi, Hongtaxia (Niutou Computer station), Yangcun, Anxia, Jihe, Shangmaocheng, Zhuzitouxia, Xizhuang and ends at Jinggangshan highway, with a total length of 20.596km. Basically, the proposed road runs along the old road and is built by Class II highway standard. The design speed is 80 km/h with 12.Om for roadbed width. 2.2 Scale of Construction, Technical Standards & Quantities of Main Works According to the prediction of traffic volume. by reference to the regulations in JTJOO 1-97 Technical Standard for Highway Engineering and JTJO 11-96 Highway Alignment Design Specifications (The Ministry of Communications). the whole road is built by Class II highway standard with design speed of 80 km/h . and its main technical indicators and quantities of main works are shown in Table 2-1. Table 2-1 Quantities of Main Works/ Technical Indicators Item Name Unit Quantity Landform Plain. hill! land. Highwav class Class 11 Calculated Running Speed Km/h 80 Running Lane Width m 9.0 Pavement wvidth m 12 Max longitudinal grade 3.889 Earth'%ork and Stone%%ork for Roadbed lOOOm3 798.038 Land occupied .AlM 818.4 Removed Buildings m 25549.5 Mliddle Bridge m/place 236/4 Small Bridge m/place 153.015 Cul'.ert m/place 1568.17/82 Road pavement Asphalt-injected pavement Source: T\xo-stage preliminar\ design of Gan-Yue Expresswa\ (Suichuan linkibng road). b\JPCDl.Sept..2000. 8 1S2-1 ri' eaOl)iitRi Figure 2-1 Geographical position of the proposed road in Jiangxi province Hubei province " Anhui province - G316 De'an 9,ijan i /< D e'/ Jiujiangg / ressway/ -t \ \ ,\ D 7Ti1

Основные сведения
Тип документа Environmental Assessment
Дата принятия
Страна Китай