Page 1 FUJIAN PROVINCE July 29, 1999 International Bank for Reconstruction and Development 1818 H Street, N.W. Washington, D.C. 20433 Re: Loan No. 4502 CHA (Second Fujian Highway Project) Performance Indicators Ladies and Gentlemen: We refer to the Loan Agreement of even date herewith between People’s Republic of China (the Borrower) and the International Bank for Reconstruction and Development (the Bank) for the Second Fujian Highway Project (the Project), and to the Project Agreement of same date between the Bank and Fujian Province (Fujian) for the Project. For purposes of Part C(1) of Schedule 2 to the Project Agreement, Fujian Province shall monitor and evaluate the carrying out of the Project and the achievement of the Project’s objectives in accordance with the indicators set forth in the Annex to this Letter. Please confirm your agreement to the foregoing by signing on the form of confirmation below. Sincerely yours, FUJIAN PROVINCE By /s/ Liu Xiaoming Authorized Representative AGREED: INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT By /s/ Jean-Michel Severino Authorized Representative
Группа Всемирного банка · Side Letter
Conformed Copy - L4502 - Second Fujian Highway Project - Supplemental Letter
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Side Letter
Страна
Китай
Источник
Всемирный банк