E-244 VOL. 7 Liaoning Urban Transport Project Anshan Subproject ENVIRONMENTAL IMPACT ASSESSMENT Draft Final Report Sep,1998 Anshan Metallurgical Design Institute Post, Buckley International. Inc Liaoning Urban Transport Project Anshan Subproject Environmental Impact Assessment Chief Engineer of AERIMI: Tang Shouli Director of Environmental Protection Institute: Chen Yunxiang Chief Engineer of Institute: Liu Guobin Project Manager: Fan Kai File NQ 12 * 086 * 27270 * 2 Anshan Metlurgical Desigin Institute, the Ministry4f Metallurgicgl Industry Sep, 1998 List of Contributors to the Environmental Impact Assessment Staff of AERIMI for EIA Chen Yunxiang, Professor Senior Engineer, Review and check Liu Guobin, Professor Senior Engineer, Review and check Fan Kai, Senior Engineer. Project Manager, Project analysis, pollution source analysis. investigation, alternatives analysis, environmental monitoring plan Mu Quanjun, Engineer, Project analysis, assessment on noise and vibration, monitoring and control plan Su Xizhen, Senior Engineer, Investigation of present socio-economic status and impact .4 analysis. present status of water and solid waste and impact analysis, monitoring and control plan Li Li, Engineer. Ecological ( soil and vegetation) investigation and impact analysis, current status of air environment and assessment, monitoring and control plan. Sun Yunhong, Engineer. current status of sunshine and impact analysis and drafting the tables and figures. Staff of Anshan Environment Monitoring Center for EIA Wang Jun, Senior Engineer. Monitoring noise. vibration, air and surface water Ma Junxian. Senior Engineer. Monitoring noise. vibration, air and surface water Translator: Fu Qingyu Liu Ping Zhu Haibin Cai Xiaoxiu Tan Liming Zhang Deling Translation reviewed bv: FU Qingyu CONTENTS EXECUTIVE SUM MARY ................................................................................................................ I 1 INTRO DUCTIO N .................................................................................................................... 7 1.1 Objective and Indicators............................................7 1.1.1 Objective....................................................7 1.1.2 Indicators...................................................7 1.2 Basis of EIA Report ..................... .....................7 1.3 Scope and Applicable Standards.....................................9 1.3.1 Scope of Assessment and Investigation............................9 1.3.2 Environmental Standards7....... .............9 1.4 Organization of the Report......................................... 11 2 PROJECT DESCRIPTION AND ENGINEERING ANALYSIS........................ 12 2.1 Genera. ....................... 12 2.1.1 Present Status of Anshan's Road Traffic ............ 15 2.1.2 Role of the Project in Traffic General Planning ........ 15 2.1.3 Preferred Alignment and Alternatives ......... 18 2.1.3.1 Preferred Alignment ..................... ................. 18 2.1.3.2 Alternatives ..................... ............... 23 2.1.4 Auxiliary Items ......................... ....................24 2.2 Schedule....................................................24 2.3 Investment in Project Engineering and Environmental Protection 25 2.3.1 Investment in Engineering.....................................25 2.3.2 Investment in Environmental Protection............................26 2.4 Motor Vehicle Fleet ........................... ..................26 2.4.1 Current Population and Expected Growth...........................26 2.4.2 Traffic Forecast........................................... 26 3 PRESENT ENVIRONMENTAL CONDITIONS..................................28 3.1 Physical Setting................................................ 28 3.2 Biophysical Environment.......................................... 28 3.2.1 Meteorology and Climate..................................... 28 3.2.2 Present Status of Noise and Vibration.............................29 3.2.2.1 Noise............................. 29 3.2.2.2 Vibration ............................................ 32 3.2.3 AirOQuality... ......... ........................................................................ 32 3.2.3.1 Routine Monitoring ................................ ..... 36 3.2.3.2 Monitoring of Present Status............................... 36 3.2.4 Surface Water Quality ....................................... 36 3.2.4.1 Routine Monitoring.............................................................. 38 3.2.4.2 Present Status Monitoring...................................................... 41 3.2.5 Present Status of Soil and Vegetation ............................. 41 3.2.5.1 Assessment of Soil Present Status........................... 41 3.2.5.2 Assessment of Vegetation Present Status ................ ...... 42 3.3 Socio-economic Environment ....................................... 43 3.3.1 Demographics on Both Sides of JRR.............................43 3.3.2 Distribution of Markets and Entertainment Places......................48 3.3.3 Distribution of Schools, Kindergartens and Hospitals ....................49 3.3.4 Distribution of Plants, Scientific Research Institutions, Stores and Hotels......50 3.3.5 Traffic Jams in Some Areas................................... 51 3.3.6 Land Use along the Project.................................... 52 4 ENVIRONMENTAL IMPACT ANALYSIS..................................... 53 4.1 3.2 . . Status Monitoring ....................I 4t 53 4.2 Impact Analysis of Noise and Vibration ................................ 53 4.2.1 A pproach ....... ... ........ ... .............. ......... .... ....... 53 4.2.1.1 Noise of Soil P Status ............. 53 4.2.1.2 Vibration of V et Present.Status............. 54 4.2.2 Pollution Sources Inventory .... .................... 54 4.2.2.1 Noise Source Inventory ........................................................................... 54 4.2.2.2 Vibration Noise Inventory. .................................55 4.2.3 Impact Analysis.................. ................. 56 4.2.3.1 Construction Phase.................................... 56 4.2.3.2 Operational Phase..................................... 57 4.2.4 Mitigation............... .................72 4.2.4.1 Construction Phase....................................... 72 4.2.4.2 Mitigation in Operational Phase ...................... .......73 4.2.5 Impact after Implementation of Mitigation Measures............... 84 4.2.5.1 Construction Phase.............. .............. 84 4.2.5.2 Operational Phase..................................... 84 4.3 Air Quality................................................... 85 4.3.1 Approach and Methodology..................................... 85 4.3.1.1 Model Used for Assessment............................... 85 4.3.1.2 General Quality of Ambient Air............................. 86 4.3.1.3 Determination of Forecast Point ............................ 86 4.3.2 Vehicle Emission Inventory.................................... .87 4.3.3 Impact Analysis............................................. 89 4.3.3.1 Construction Phase.................................... 89 4.3.3.2 Operational Phase................ ............... ... 89 4.3.4 Mitigation Measures...................... .................. 93 4.3.4.1 Construction Phase.................................... 93 4.3.4.2 Operational Phase..................................... 94 4.3.5 Residual Impact........................................... 97 4.3.5.1 Construction Phase................. .................. 97 4.3.5.2 Operation Phase...................................... 97 4.4 Impact of JRR Project on Surface Water............................... 97 4.4.1 Assessment Method.................. ...................... 97 4.4.2 Impact Analysis............................................. 98 4.4.2.1 Construction Phase.................................... 98 4.4.2.2 Operational Phase..................................... 98 4.4.3 Measures of Mitigation and Control of Pollutants. ...................... 99 4.4.3.1 Mitigation and Control during Construction Phase ................. 99 4.4.3.2 Mitigation and Control during Operation Phase......... ........ 99 4.4.4 Comprehensive Analyses . .....................................99 4.5 Soil and Vegetation Impact Assessment.................................... 99 4.5.1 Methodology. .................. . ...................... 99 4.5.2 Impact Analysis........................................... 100 4.5.2.1 Construction Phase..........00... ................. 00 4.5.2.2 Analysis of Impact of JRR Project on Soil and Vegetation ............ 100 4.5.3 Mitigation................... ............................. 100 4.5.4 Residual Impact........................................... 101 4.6 Sunshine Obstruction Assessment.................................... 102 4.6.1 Methodology............................................. 102 4.6.2 Sunshine Data and Predictive Result............................. 103 4.7 Social Environmental Impact Assessment............ ................. 104 4.7.1 Approach and Methodology.................................... 104 4.7.2 Impact Analysis............... ............. ..........104 4.7.2.1 Items Impacted in Construction Phase..... ................... 104 4.7.2.2 Impact Analysis in Operational Phase.................. 106 4.7.3 Mitigation............................................ 109 4.7.3.1 Mitigation Measures to be Taken in Construction Phase ... 109 4.7.3.2 Mitigation Measures to be Taken in Operational Phase ............. 110 4.7.4 Residual Impact .................. . ...................... 112 4.7.4.1 Construction Phase.................................... 112 4.7.4.2 Operational Phase..................... ................112 4.7.4.3 Displacement............................. .................113 4.7.5 Contingence Analysis.........................................115 4.8 Alternatives...................................................116 4.8.1 General.................................................116. 4.8.2 Noise and Vibration......................... ................116 4.8.2.1 Noise ............................................................................. 116 4.B.2.2 Vibration................................... .............. 117 4.8.3 Air Environment................. .......................... 118 4.8.4 Soil And Vegetation .............. 118 4.8.4.1 Analysis of Impact on Soil and Vegetation............ .................. 118 4.8.4.2 Analysis Conclusion of Impact on Soil and Vegetation ..................... 119 4.8.5 Surface Water .................................. ............... 119 4.8.6 Social Environment................. .................. ..... 120 4.8.7 Summary of Alternative Impact Assessment. ................. .......... 120 5 PLAN OF ENVIRONMENT MONITORING AND MANAGEMENT.......................................... 122 5.1 Institution and Staff Training.................................. ...... 122 5.1.1 Establishment of Institution .......................................... 122 5.1.2 Responsibilities of Administrative Institutions........................ 123 5.1.3 Training Programs.................................... ........ 124 5.2 Environmental Monitoring ......................................... 124 5.2.1 Equipment and Instruments ............................. ....... 124 5.2.2 Contents of Environmental Monitoring ......................................... ........................ 125 5.2.3 Responsibilities for Monitoring and Management .................................................. 125 5.2.4 Analysis and Transmission of Monitoring Data ................ ....... 125 5.2.5 Environmental Monitoring and Operating Cost ............. ....... 127 5.3 Environmental Action Plan ................................... ..... 130 6 PUBLIC PARTICIPATION .................................... ........131 6.1 Aim and Significance of Public Participation ............................. 131 6.2 Mode and Content of Public Participation .......................... ..... 131 6.3 General Investigation of Public Participation ........................ ..... 131 6.4 First Public Participation and Investigation Result ................ ......... 132 6.5 Opinions and Demands of Public to the Project ........................... 132 6.6 Handling Measures for Opinions and Demands of Public ............. ........ 133 6.7 Summary of Public from the Second Investigation on Public.......... ........ 134 7 CONCLUSIO NS ...................................................................................................................... 135 7.1 Comparison of with And without JRR in 2010 . ....................... ..... 135 7.2 Positive Impact ..... .......... . ..................... ...... 135 7.3 Negative Impact ............................................... 136 7.4 Mitigation Measures for Serious Impacts ........................................ 136 7.4.1 Design Phase ................................................. 136 7.4.2 Construction Phase .............................................. 137 7.4.3 Operational Phase ............... ................... . ..... 137 7.4.4 Summary .......................... ........ 138 7.5 Recommended Alternatives .................................. ..... 138 7.6 Summary of Assessment Conclusion ................................. 138 Annex 1: Environmental Standard adopted by the Environmental Impact Assessment of Traffic and Transportation Project of Anshan Annex 2: Environmental Standard adopted by the Environmental Impact Assessment of Urban Transport Project of Liaoning Province Annex 3: Outline of Technical Assistance LIST OF TABLES Table 1-1 Scope of Assessment and Investigation Table 1-2 Environmental Standard Table 1-3 Pollutant Limit Values Applied in Assessment Table 1-4 Category and Applicable Scope of Main Environmental Quality Standard Table 2-1 Present Status of Anshan*s Road Traffic Table 2-2 Road Engineering of JRR Table 2-3 Bridge Engineering of Anshan City's Jianguo Road Corridor Reconstruction Project Table 2-4 Engineering of Tram Line Movement ofJRR Table 2-5 Survey of Auxiliary Items ofJRR Table 2-6 Investment for Engineering of JRR Table 2-7 Investment in Environmental Protection and Mitigation Table 2-8 Current Status and Expected Growth of Anshan Urban Population Table 2-9 Kinds of Motor Vehicles at Present Time Table 2-10 Current Quantity and Expected Growth of Motor Vehicles in Anshan City Table 2-11 Constitution of Road Network of Anshan City in the Future Table 2-12 Change of Traffic Flow before and after JRR Table 3-1 Meteorological Parameters of Anshan Table 3-2 Results of Routine Measurement of Urban Road Noise Table 3-3 Leq and Excess Value according to Measurement of Present Noise Level with Project Table 3-4 Results of Vibration Measurement Table 3-5 Routine Monitoring Statistical Results of Anshan Air Quality Table 3-6 Statistics of Hourl) Monitoring Results of Air Pollutants (Heating Period) Table 3-7 Statistics of Hourly Monitoring Results of Air Pollutants (Non-Heating Period) Table 3-8 Statistics of Daily Average Values of Air Pollutants (Heating Period) Table 3-9 Statistics of Daily Average Values of Air Pollutants(Non-Heating Period) Table 3-10 Routine Monitoring Results of South Shahe River Water Quality Table 3-11 Present Situation Monitoring Statistics of South Shahe River Laodong Bridge Section Table 3-12 Quality of Soil at Roadside of Project Alignment Table 3-13 Present Status of Vegetation Table 3-14 Social Environment Survey Related to JRR Table 3-15 General Situation of Population Related to JRR Table 3-16 Disturbed Resident Distribution Related to JRR Table 3-17 Markets Related to JRR Table 3-18 Status of Recreational Places Related to JRR Table 3-19 School Status Related to JRR Table 3-20 Kindergarten Status Related to JRR Table 3-21 Hospital Status Related to JRR Table 3-22 Main Plant Related to JRR Table 3-23 Status of Main Organization & Scientific Research Institutions Related to JRR Table 3-24 Status of Main Market and Commercial Area Related to JRR Table 3-25 Status of Hotel, Hostel and Guest House Related to JRR Table 3-26 Existing Status of Main Intersection Crossed With Jianguo Road Table 3-27 Land Use of Project Road Sections Table 4-1 Prediction Model Table 4-2 Noise Levels of Different Equipment Table 4-3 Equivalent Noise Levels of Different Vehicles Table 4-4 Vibration Levels of Some Typical Equipment Table 4-5 Vibration Levels at Different Distance from Motor Vehicle Lanes Table 4-6 Noise Standard for Boundaries of Construction Sites Table 4-7 Noise Levels at Different Distance and Exceedance over Standard Table 4-8 Environmental Noise Standard Table 4-9 2010 Traffic Noise Prediction Result of Every Section with Project Table 4-10 2010 Traffic Noise Excess Status of Every Section with Project Table 4-I11 200 Traffic Noise Prediction Result of Every Section Without Project Table 4-12 2010 Traffic Noise Variation of Every Section With and Without Project Table 4-13 Noise Levels Comparison of Preferred Alignment and Alternatives Table 4-14 Noise at the First Row of Bu!ding Around Interchange Table 4-15 Noise Impact of Tramcar Along Laodong Road and Anquan Street Table 4-16 Noise Levels and Standard Exceedance of Different Sensitive Points Table 4-17 Layout of Sound Barrier Table 4-18 Survey of Schools Neighbouring the Project Road 'Table 4-19 Installation of Air Conditioners in Schools Neighbouring the Project Road Table 4-20 Survey of Hospitals Neighbouring the Project Road Table 4-21 Installation of Air-Conditioners in Hospitals Neighbouring the Project Road Table 4-22 Survey on Residential Building Neighbouring the Project Road Table 4-23 Comparison of Three Mitigation Alternatives Table 4-24 Installation of Ventilators in Residence Neighbouring the Project Road Table 4-25 Indoor Noise Status at Main Sensitive Points Along Road Table 4-26 Percentage of Samples Exceeding Standard Table 4-27 Parameters tf Atmosphere Forecast Point Table 4-28 Various Source lntensit\ Table 4-29 Emission of Various Vehicles Table 4-30 Estimate of Peak Hour Vehicle Pollutant Emissions in Urban Area of Anshan City Table 4-31 Calculated Results of Incremental Peak Hour Concentration at Various Wind Direction Table 4-32 Calculated Results of Incremental Daily Average Concentration at Various Wind Directions Table 4-33 Concentration at Different Points Table 4-34 CO Concentration Difference in Peak Hours, With Vs Without Project Table 4-35 Impact of the Proposed Prbject On Soil and Vegetation Table 4-36 Compensation Situation of Soil and Vegetation After Taking Mitigation Measures Table 4-37 Residual Impact of the Project on Vegetation Table 4-38 Sunshine Data Table 4-39 Present and Future Sunshining Hours Table 4-40 Layout of Traffic Lights Table 4-41 Displacement to Be Made Table 4-42 The Resettlement and Area of Replacement Residence Table 4-43 Living Conditions Comparison, Before and After Resettient Table 4-44 Requisition of Cultivated Land Table 4-45 Comparison of Acoustic Environment Quality of Elevated Road Alternative With Ground Road Widening Conception in 20 10 Table 4-46 Air Quality Prediction Result Comparison ofAlternative A with Preferred Alignment Table 4-47 Comparison of Impact on Soil and Vegetation between Alternatives and Preferred Alignment Table 4-48 Analysis of Impact of Various Alternatives on Social Environment Table 4-49 Comparison of Impact on Environment of Alternatives and Preferred Alignment Table 5-1 Training Program Table 5-2 List of Monitoring Equipment Table 5-3 List of Monitorin2 Points in Construction Phase Table 5-4 Content of Environmental Monitoring in the Construction and Operational Phase Table 5-5 Environmental Monitoring and Operating Cost Table 6-1 Statistics of Public Participation Table 6-2 Measures and Method for Settling Public Opinion Table 7- Increasing Rate Difference of Air Pollutants of With or Without JRR in 2010 LIST OF ILLUSTRATIONS Fig.1I-1I Geographical Map of Anshan ....................................................................... 8 Fig.2-1 Road Traffic Status and Environmental Monitorin2 Points of Anshan ................16 Fig.2-2 Planned Sketch for Anshan Future Traffic Network............................17 Fig.2-3 Roads and BfidgesofAnshan Project.....................................19 Fig.2-4 Position of Atxiliary Project...........................................20 Fig.3-1 Rose Diagram of Wind Direction in Various Seasons...........................30 Fig.3-2 Results of Measurement at 10 Road Section Related to the Project ..................31 Fig.3-3 Measurement Results of Present Road Noise................................34 Fig.3-4 Excess Value According to Measurement of Present Noise Level ...................35 Fig.3-5 Status of Air Quality (Heating Period)....................................39 Fig.3-6 Status of Air Quality (Non-heating Period).................................40 Fig.3-7 Population Distribution Related to Project Road..............................44 Fig.3-8 Social Environmental Status on Both Sides of Project Road (1) ....................45 Fig.3-9 Social Environmental Status on Both Sides of Project Road (2) ....................46 Fig.4-1 2010 Traffic Noise Prediction Result of Every Section with Project .................60 Fig.4-2 2010 Traffic Noise Excess Status of Every Section with Project ....................61 Fig.4-3 2010 Traffic Noise Prediction Result of Every Section without Project ...............65 Fig.4-4 2010 Traffic Noise Variation of Every Section with Project .......................66 Fig.4-5 Noise Levels of Different Sensitive Points..................................70 Fig.4-6 Noise Standard Exceedance of Different Sensitive Points........................71 Fig.4-7 Noise Barrier Plan..................................................76 Fig.4-8 Investigation Results of the Schools and Hospitals along the JRR Road ...............77 Fig.4-9 Investigation Results of the Residential Areas along the JRR Road ..................79 Fig.4-10 2010 Air Quality Prediction Result along the Project Road.......................91 Fig.5-1 Noise, Vibration, Air and Surface Water Monitoring Point during Construction .........128 Fig.5-2 Monitoring Points of Noise, Vibration, Air, Surface Water during Operation ..................... 129 List of Attached Drawings Fig. I Road Transverse Section ofJRR ( I ) Monitorinn. .............................. 139 Fig.2 Road Transverse Section of JRR ( i N)......... .. ..................... ............ 140 Fig.3 Road Transverse Section of JRR (III)............................................................. 141 Fig.4 Road Transverse Section of Aternative Scheme ofJRR ........ .......... ....... 142 Fig.5 Project Location before and after Tram Line Change in front of Anshan Railway Station....... 143 Fig.6 Project Location before and after Changing Tram Line in Anquan Street... ........... 143 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment EXECUTIVE SUMMARY I PROJECT DESCRIPTION Jianguo Road Reconstruction (JRR) project is the Anshan subproject of Liaoning Urban Transport Project using loan from the World Bank, which includes the following five components: A) Road Infrastructure The project which shAli involve a road section of 18.87 km in total length, includes Jianguo Road's (south-north) widening and extension to north; construction of Hebei Road to connect the northern exit of the city; widening and reconstruction of Huangang Road (east-west) and Yongchang Street (east-west); construction of Wuyi Road Interchange as main crossing at the meeting point of Huangang Road with Yongchang Street; widening, reconstruction and extension to south of Yuanlin Road and Zhonghua Road to connect South Ring Road which will be extended to east; movement (required by widening of Jianguo Road) of tram line (now located at Jianguo Road and its west side) to the west close to Zhongchang Railway. Refer to Fig. 2-3 and Table 2-2 through 2-4 about the layout of road infrastructure. B) Traffic Management * Building of three new social parking lots in Hunan. Zhanqian and the People's park area. * Channelization of eight intersections (Yuanlin Rd., Sandaojie and Wuyi Rd. Intersections etc.). * Furnish the traffic signs and markings. * Provide and renew the traffic light facilities (at Jianguo Rd., Huangang Rd., Yongchang St. and South Ring Rd. etc.). * Provide the median separator. pedestrian physical separator and separation facilities 'separating the motor vehicle and non-motor vehicle on Jianguo Rd., Huangang Rd.. Yongchang Street, Shengli Road. Yuanlin Road. Jiefang Road. * Set up 4 non-motor vehicle lanes on Lishan Street. Youai Street etc.. C) Public Transport * Set up three bus special lanes (Shengli Road Center Bus Lane Project. Renmin Road Bus/NMV Only Road. Zhonghua Road Tram/NMV Only Road). * . Set up Wuyi Bus Transfer Station. D) Road Maintenance * Reconstruct 4.0 km-long H1ongqi Road (Enclosing wall of enterprises on the both sides of this road will remain unchanged. * Pave 6 walkways for pedestrian (Shuguang Street etc.). I Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment E) Technical Assistance It shall include the MVECS. other TA and training items. Auxiliary items include traffic control, public transport and road maintenance etc.. For brief introduction and distribution of auxiliary items, see Table 2-5 and Fig. 2-4. Implementation of auxiliary items shall exert less influence on environment than construction of infrastructure. As a part of outer frame "qi" (outer circle road ), the South Ring Road, West Ring Road and North Ring Road wer6 principally implemented. The roads at four ends of "t" from " " (east, south, west and north of the city ) were also finished (see Fig.2-2). The project mainly concerns the "+" skeleton which is the key part for realization of Anshan Urban Traffic Development Program. The total investment of JRR project amounts to 1268.0622 million Yuan RMB among which 34.6297 million Yuan RMB is used for environment protection. 2 ENVIRONMENTAL SURVEY AND PRESENT ENVIRONMENTAL CONDITIONS Anshan city, located in the middle of Liaoning Province (see Fig. 1-1), is a heavily industrial city. The plant area of Anshan Iron & Steel Complex (AISC, employees 0.2 million ) is concentrated on the northwest to the city, occupying 1/4 land of the city. 0.2 million AISC's employees going to and off work result in tidewise traffic. Present status of Anshan's road traffic is as follows: sparse road network, low traffic capacity of roads, inconvenient traffic feom ast- to-west, more road break-off because of different land use of the city. For details, see Fig. 2-1. For this assessment, air quality and traffic noise have been monitored in summer and winter, obtaining 8092 monitoring data of air quality and 1544 data of noise and vibration. Monitoring results of routine measurement and this assessment show that the noise level on the both sides of roads in urban area generally has exceeded the standard, especially at night (max. excess 15.3 dB), air environmental quality is poor, the hourly concentration of all pollution factors has exceeded the standard, the daily average values have exceeded the standard, in which the excess rates of HC and B[a]P are 100%. For details, see Table 3-2, Table 3-3, Table 3-5, Fig. 3-2 - 3-6. For survey of social environment, see Fig. 3-7 through 3- 9. At present, the main problems that the city of Anshan faces are the traffic noise pollution and air pollution resulting from the industrial pollinate, meanwhile, the traffic congestion cause inconvenience to the outgoing of the public. 2 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment 3 ENVIRONMENTAL IMPACT 3.1 Comparison of With and Without JRR in 2010 The negative impact of traffic noise with JRR on the other roads within the urban area is slightly lower than without JRR. With JRR, the total emission of CO, NOx, NO2 and HC from vehicles in the whole city is less 23.36%, 17.86%, 17.86% and 21.72% respectively than that of without JRR. The JRR project hag-significant importance for inhibiting further deterioration of Anshan air environment, but alsq a little negative impact in the view of traffic noise and pedestrians walking at some sections. Moving of tram line will solve the problem of mutual interference of vehicles and tramcars. The interference occurs mainly in front of Anshan Railway Station, at Jianguo Road section from Rainbow Bridge to Wuyi Road Intersection and at area near Lishan Underpass. In the meantime, the negative impact of tramcar noise on the residents along the line will be reduced. 3.2 Positive Impact Relieve traffic pressure of other trunk roads in Anshan City. Solve the problem of traffic jam of AISC's production & staff transportation, reduce traffic load near area of railway station, thoroughly eliminate the confusion and crowded situation of Anshan urban traffic. Shorten the time and distance of traveling of pedestrians and MV & NMV vehicles, favorable to improve the life quality of public. Arrange the resettled residents in the neighborhood and incorporate the dismantled enterprises into the appropriate industrial zones, to improve living environment of displaced residents, make the city arrangement more reasonable and raise the living quality of public of the whole city. In large range, the negative impact of traffic noise with JRR is less than that of without JRR; the impact of vehicle emission on air environment is larger than the existing situation. but the increasing rate is less than that of without JRR. Compared with the existing situation, the increasing rate of air pollutants of with or without JRR is shown in Table 7-1. When the project is completed. the density of pollutants in the air at most road sections is lower than that of without JRR. Moving of tram line will solve the problem of mutual interference of vehicles and tramcars. The interference occurs mainly in front of Anshan Railway Station, at Jianguo Road section * from Rainbow Bridge to Wuyi Road Intersection and at area near Lishan Underpass. In the meantime, the negative impact of tramcar noise on the residents along the line will be reduced. Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment 3.3 Negative Impact In construction phase, normal traveling of vehicle and pedestrians will be negatively impacted, and the living of the residents near the construction site will also be affected. The project will occupy 44350 m2 cultivated land which can never be restored, and 103231 m2 green area (among which 57.38% of trees to be cut down are over 25 years old) will be destroyed. When the project is completed, it is not convenient for the public to cross the street. Due to increased vehicle floW and speed. the impact of traffic noise on buildings adjacent to the road sides will be more seriqus than the existing situation. The density of air pollutants in the area of Laodong Road will be higher than that of without JRR in 2010. The negative impact in the view of vibration, surface water and sunshine will not be greater than that of without JRR, and the impact of solid waste disposal during construction phase on environment is very little. 4 MITIGATION MEASURES FOR SERIOUS IMPACTS 4.1 Design Phase * Traffic light for pedestrians crossing street shall be added at the intersections where the public crosses the street frequently. Traffic policeman box shall be added on Jianguo Road section in front of gate of Sifangtai Fruit Wholesale Market where there is heavy flow of customers and vehicles to facilitate the pedestrians crossing street and vehicles turning left. * - By many times of discussions and agreement with ARPO, Anshan Urban and Countryside Planning Institute and Beijing Municipal Project Design & Research Institute, two sound barriers 3 m high and 250 m long shall be installed respectively on the both sides of approach of Wuyi Road Interchange's section near Wuyi Road Primary School. * 91 air-conditioners shall be installed in the patient ward and diagnosis room of three hospitals such as Hospital of Grain Bureau etc.; 262 air conditioners shall be installed in the classrooms of 5 schools Neighboring the project road; 5094 air-conditioners shall be installed in the residential buildings Neighboring the project road in order to reduce noise pollution in summer. * By agreement with the design institution, the original space of 5m between the trees on both sides of the street shall be changed to 2.5m, in order to restore the green area destroyed by the project as soon as possible. In 2010 all the destroyed green area can be restored. 4 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment 4.2 Construction Phase APRO must clarify the environmental protection responsibility during the construction and transportation while entrusting the contractor with the project and must incorporate the responsibility in the contract. The construction shall be accomplished section by section and half by half at main places such as AISC entrance; temporary passageways shall be set up during construction phase. Designated person shall fetch pupils to cross the street when construction is being made near schools. The construction tim'e shall be shortened; construction at night shall be avoided; construction equipment and facilities of lower noise shall be used; operation at night of machinery with high noise and vibration must be approved by Anshan Environment Protection Btireau. By bulk transportation, the material must be covered and the transportation should avoid peak hours of traffic; water sprinkling times should be added on the way; the site of construction should have temporary store houses for bulk material; when old buildings or structures are dismantled, plastic fence should be set up around building in order to suppress dust emission to the environment. In construction phase, Anshan Environmental Monitoring Center shall carry out monitoring of noise, air, surface water and so on during construction phase. 4.3 Operational Phase Anshan City has solemnly promised to develop and implement motor vehicle emission control strategy (MVECS) to avoid deterioration of environment resulting from increase of vehicles after 2010. For details. see Annex 3. Vehicles must be inspected annually and randomly: the vehicles of high noise and emission which are beyond standard must be brought under control within the specified time. The vehicles of high noise and emission which are beyond standard must not run. Anshan Environmental Monitoring Center will carry out monitoring of noise, air, vibration and surface water related to the project. 5 PLAN OF ENVIRONMENTAL MONITORING AND MANAGEMENT The'-administrative institutions shall be staffed by one or two full-time environmental protection personnel to ensure the responsibility of daily management, accepting complaints concerning environmental impact. handling pollution cases as well as controlling and coordinating the monitoring activities on motor vehicles emission and traffic noise which are conducted by Anshan Environment Monitoring Center and Anshan Vehicle Inspecting Station. The project shall be managed successively by ARPO during the phase of construction and b. Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment the AUCB in the operational phase. The environmental monitoring ( including the air, noise. vibration and surface water etc.) shall be managed by the Anshan Environmental Monitoring Center. A monitoring plan, five years for the construction period and three years for the operational phase, is envisaged for the project, refer to Table 5-3, 5-4 and Fig.5-1, 5-2 about the monitoring items and monitoring points, the environmental monitoring cost totals 0.7534 million Yuan RMB . For the successful implementation of environmental protection measures, a training program is proposed to train Project Office staff and contractors, and two officials from the Project Office shall be trained abroad for 30 days by a qualified overseas training institution, the 20 project contractors shall be trained by the AEPB for 10 days. the training cost totals 0.2063 millionYuan RMB and the training content is shown in Table 5-1. 6 SUMMARY OF ASSESSMENT CONCLUSION Two public investigations have been carried out in EIA. The second social investigation to the public demonstrates that 97.8% of 456 persons including peddlers to be moved from Yongchang Market to Sandao Street Market think the impact of the project on them shall be reduced to the acceptable degree if the mitigation measures are executed. The other 2.2% express indifferent attitude to the mitigation measures. Anshan Environment Monitoring Center who will carry out environmental monitoring and vehicle inspecting of this project is one of the best environmental organization with rich experience and modern equipment in Liaoning Province and is able to complete the above mentioned work. By consultation with Anshan municipal government, the environmental administrative organization recommended in EIA report during construction and operational phase is feasible. Based on achievement in different topics, the EIA report recognizes that the positive impact on environment of JRR project is greater than the negative one. The project has reasonable effect to improve environmental quality of Anshan City. The selected alignment of the project is reasonable, the project is feasible from the view of environmental protection. 6 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment 1 INTRODUCTION 1.1 Objective and Indicators 1.1.1 Objective The project is a component of Liaoning urban traffic comprehensive rectification program. For Anshan project geographic location, see Fig.1-1. According to China's Environmental Protection Regulation for Constructional Engineering. Anshan Renewal Project Office (ARPO) has entrusted us to provide this report. Based on results offocial investigation and present environment quality monitoring, on characteristics of urban traffic reconstruction engineering, the report provides a comprehensive and systematic analysis of positive and negative influences to Anshan's natural and social environment when the project was constructed and put into operation according to the preferred alignment or alternatives. It also makes measures to mitigate and compensate negative influences of the project. points out the feasibility of the project considering environment protection and gives proposal to make a plan of environmental administration and monitoring. 1.1.2 Indicators Objective: Improve maintenance and environmental sustainability. Goal: Environmental protection of the project area Strategy 1: Establish and implement an EAP and monitoring program Indicator: Annual monitoring results for air quality and noise as per the EAP Strategy 2: Develop and implement a long-term motor vehicle emission contre! strategy(MVECS) to mitigate citywide impacts on air quality. Indicator: Development of a MVCES for Anshan City by July 2001. (date to be confirmed during Appraisal). Indicator: Adoption and implementation of the MVECS(including an Inspection and Maintenance Program) for Anshan City. with specific targets, by July 2002.(Date to be confirmed during Appraisal). Indicator: Annual reporting on performance of MVECS. 1.2 Basis of EIA Report a) "The Entrustment Letter of the Project". Sep.10. 1996. ARPO. b) -Enhancement of Enironmenial Protection 11'Ork Regarding Projects using loans fi-om International Financial Organizations". 1993. M 324. National Environmental Protection Agency. c) "Reply to the Revieir of Environmental Impact Assesment Program o Liaoning Urhan Traffic Projects FinanciallY Supported by the 11'Orld Bank". 1996. N2 287. National Environmental Protection Agency. d) "Environmental Inmact Asse.s.sment Program ofLiaonin,( Crhan Traffic & Transportation 7 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Fig.1-1 Geographical Map of Anshan N Tiering Fuxin Shenya Fushun aong Piroinso Chaoyang Liaoyan Benxi Jinzhou Poan ji ANS Hutudao Yingkou o Port Dandong Bayuqua Datian Fig.i-i Geographicat rmap of AnshaLn - Expressway - sraly 0 City under province Doubte-line Provca 0 km 8 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Projects", Nov. 20, 1996, Liaoning Environmental Scientific Research Institute. e) "Terms of Reference for Environmental Impact Assessment of Liaoning Urban Traffic & Transportation Projects" (TOR) approved by the World Bank. f "Feasibility Study of Anshan Traffic Project Financially Supported by the World Bank", Apr.1996, Anshan Town & Country Construction Planning Institute. g) "Feasibility Study ofJRR ofJAnshan ", May. -1998, Beijing Municipal Engineering Design & Research Institute. h) "General Action Plan ofAnshan City Traffic Control", ARPO, October, 1997. i) "Planning ofAnshan Public Traffic", ARPO, October, 1997. j) "General Action Plan of Urban Road Maintenance of Anshan Traffic Project Using Loan from the World Bank", Anshan Municipal Facilities Repairing Company, October, 19, 1997. 1.3 Scope and Applicable Standards 1.3.1 Scope of Assessment and Investigation The scope of assessment and investigation is shown in Table 1-1. Table 1-1 Scope of Assessment and Investigation Item Scope of assessment and investigation Noise 100m on both sides of roadway Air quality, social surrounding 300m on both sides of new section. 100 m on both sides of reconstructed section Ecology and landscape I O0m on both sides of roadwaN Surface water Shengli Road Bridge over Shahe Rixer. Zhongchang Railway Bridge Vibration Buildings adjacent to both sides of road Sunshine Buildings on the north of interchange and %viaduct 1.3.2 Environmental Standards Environmental standards applied in the EIA repcrt are shown in Table 1-2, pollutant limit values applied in assessment are shown in Table 1-3 and Table 1-4. Table 1-2 Environmental Standard Kind of standards Item Standards applied Note Noise Noise limits fr construction sites- G812523-90 During construction Exhaust -Integrated Emission Standard of fir Pollutants" GBl6297-1996 During construction For emission gas Emis.sion Standard for Air Pollutants fiom ehicle' During construction (H14'61.1-14761.7-93 Standard jor Evhuust Gas and Sewate Enis.,ion in Liaoning Sewage Province- )B21-60-89 Noise -Stanuard of E-nvironmen1tl .\oisc of U rhai -rea GB3096-93 Total htydrocjrbon: Air limhiw lir Oualitv Standard (18309V-1996 Totlxocro For DB2/-60-8 9 en% ironmental Vibration nvrtmnntal fibration Staniard for I rhan. Ireas GBIO070-88 qualit% Surface %%ater IM ironnnal Ouality Standard 1tr Nuriae i1 ater GB3838-88 Sunshtne Rele%tant standard for architectural desiun 9 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Table 1-3 Pollutant Limit Values Applied in Assessment Kind of Item Pollutant Limit value Note standards Noise Leg Day time: 75 dB night time: 55 dB Particles 150 mg/M3 Hs=30 m For emission Exhaust 27 kg/h Hs=30 m gas Asphalt smog 150 mg/m3 Hs=30 m 1.6 kg/h Hs=30 m Sewage SS 100 mg/1 Petroliterous matter 8.0 mg/1 Day time: 55 dB. night time: 45 dB Zone of class I Noise Leq Day time: 60 dB. night time: 50 dB Zone of class 11 Day time: 65 dB. night time: 55 dB Zone of class Ill ik Day time: 70 dB. night time: 55 dB Zone of class IV SO, DA: 0.15 mg/m'. HM: 0.50 mg/m3 TSP DA: 0.30 mg/m3 NOx DA: 0.10 mg/m3. HM: 0.15 mg/m3 NO, DA: 0.08 mg/m3 HM: 0.12 mg/m3 For Ambient CO Daily average(DA): 4 mg/m3 Ho rly maximum (HM): 10 mg/M3 environmental air Pb Quarterly average: 1.5pg/m' quality B[a]P Daily average..0.01 pg!m' Total hydrocarbon 3.0 Mg/m Once maximum Vibration VuM Day time: 75 dB. night time: 72 dB pH 6-9 Surface DO 2 mg/ water CODer 25 mg/1 Petroliferous matter 1.0 mg/1 NH3-N 1.0 mg/I Time of sunshining 5-6 h Kindergarten, hospital etc. Sunshine through windows 3-4 h School. office or public building 1-2 h Residential building Table 1-4 Category and Applicable Scope of Main Environmental Quality Standard Item Category Applicable Scope Category applied in EIA 0 Villa and hotel area. convalescent area 1 Area where residential building, teaching building. cultural Schools and hospitals institution and otlice building are mainly located. Noise 2 Combined residential. commercial and industrial area 3 Industrial area Area at both sides of the traffic trunk line residential buildings along the proiect road I Natural preservation area. scenic spot and other places requiring special protection Ambient Residential area. combined area, culture & educational institution 1 2 _ ._ area, common industry area and rural area air-- 3 Particular industry area I Water source preservation area, national preservation area Class I preservation area for centralized drinking water source, preservation area for rare fishes and fish and shrimp spawning pond Surface Class 2 preservation area for centralized drinking water source, water preservation area for common fishes and swimming pool , Water area for common industry and water area for the purpose of entertainment which don't directly contact with people's body _ _ V Water area for the purpose of agriculture and common scenery J 10 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Zoning category of environmental quality applied in EIA were determined by Anshan environmental protection administration department. The environment standard adopted in EIA has been approved by Anshan Environmental Protection Bureau and Liaoning Environmental Protection Bureau. For details see Annex I and Annex 2. Noise level of hospitals, kindergarten and schools follow category I and others category 4 according to Anshan Category Drawing Applying Urban Environmental Noise Standard approved by Standing Committee of Anshan People's Congress. 1.4 Organization of the Report There are some differences between EIA reports of English and Chinese language because the requirements on repdVt's form and contents from National Environmental Protection Agency are somewhat different from those from the World Bank. The English EIA report is written by reference to "Liaoning Urban Transport Project Environmental Impact Assessment Annotated Table of Contents (draft, January 15, 1997)" provided by the World Bank. But the English and Chinese EIA reports are the same with regard to assessment methods, basic parameters and conclusion. 11 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment 2 PROJECT DESCRIPTION AND ENGINEERING ANALYSIS 2.1 General The subproject consists of five components of road infrastructure, traffic management. public transport, road maintenance and technical assistance & training. The project description is divided into two components according to the extent of the potential environmental impact. A) Components with potential environmental impact 1) Extension of South'Ring Road South Ring Road shall extended 1.34 km eastward from Glass Factory, including construction of Dongshao Underpass, belt railway Underpass and a viaduct. This road shall be four-slab road and 50 m width of redline; Zhonghua Road shall be widened and extended 0.46 km to south, starting from Changdian Street and ending at South Ring Road. This road shall be one- slab and 40 m width of redline: Yuanlin Road shall be reconstructed and extended 1.40 km. This road shall be three-slab and 50 m width of redline. 2) Huangang Road and Yongehang Street A three-layer full-directional interchange (no limit of traffic direction) shall be built at intersection of Wuyi Road and Jianguo Road, Huangang Road and Yongchang Street shall be widened, totaling 4.26 km in length, three-slab and 42 m width of redline. Wuyi Road Interchange shall cross over Zhongchang Railway in east-west and connect with Jianguo Road in south-north. 3) South Jianguo Road and North Jianguo Road Jianguo Road shall be constructed and widened from South Ring Road (Sifangtai Interchange) to East Jianguo Road, including construction of underpass under belt railway, Minsheng Road viaduct, Lishan Street viaduct. This road shall be three-slab and 50 m width of redline, totaling 8.6 km in length; Laodong Road shall be widened from Jianguo Road to Hebei Road, including construction of bridge over Shahe River. This road shall be three-slab and 40 m width of redline, totaling 1.77 km in length. 4) Hebei Road The proposed Hebei Road starts from Jianguo Road and ends at Shengli Road, which passes through residential area of Shahe village. This road shall be three-slab and 42 m width of redline, totaling 1.05 km. 5) Tram line movement The tram line to be changed starts from Anshan Railway Station and ends at Laodong Road. the length totaling. 5.2 km. The existing tram line will be moved westwNard and the moved 12 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment tram line will go through the Eryijiu Rd., Zhanqian Square, Yijingxiang Underpass, Lishan Underpass, Anquan St., Lishan Railway Station, Lishan Turnaround. Viaducts at Sankong Bridge and Lishan Underpass shall be built along the tramline. 6) Off-street parking The station in front of railway station to be built shall occupy the area of about 5000 m2 and 2 hold max. 96 vehicles; People's Park station, 8000 m , max. 157 vehicles; Hunan station, 1320 M2, 37 vehicles. This project involves road, water drainage, greening and lighting. 7) Bus transfer station To convenient AISC's employees and reduce the ratio of AISC's employees who cycle to work, a bus transfer station, occupying the area of 7706 m2, shall be set up under Wuyi Road Interchange. 8) Reconstruction of Hongqi Road Hongqi Road maintenance project consists of Hongqi Road (Lingshan Road - junction of Zhongchang railway) and Laodong Road (junction of Zhongchang railway ~ Shahe Bridge), 4003 m in length. b) Components with minor or non environmental impact 1) Bus only road Shengli Road and Renmin Road is the main trunk where there are many bus lanes and large p-ople flow. 6 bus lanes is on Shengli Road and 12 on Renaming Road now. To improve public transport and reflect the principle of preference for public transport, Shengli Road bus special lane (Shifu Square - Lishan Square), Renaming bus only road (Jiudao Street in Tiexi district ~ Jianguo Road) and Zhonghua Road tram/bus only road shall be set up. 2) Channalization of intersections The following intersections are selected to be channalized according to the conditions of traffic jam at intersections and bus traffic volume: WuVi Rd.! Dongshan St. Jianshen Rd./ Yuanlin Rd. Sandao St. in Tiexi district/ Minsheng Rd. Sandao St. in Tiexi district/ Jiefang Rd. Yuanlin Rd./ Jiefang Rd. 13 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Yuanlin Rd./ Luhua St. Yuanlin Rd./ Gongnong St. Eryijiu Rd./ Zhonghua Rd. 3) Traffic signal improvement There are existing 49 traffic light controlled intersections in the city. It is envisaged in the project that 41 more intersections shall be provided with traffic lights and the traffic lights for pedestrians and cyclist shall also be provided. The traffic lights for cyclist totaling 23 will be mainly distributed orthe three-slab roads, while the traffic lights for pedestrians totaling 20 will be mainly distributed on the down Anshan and the exits of AISC. Due to the fact that most of the traffic light facilities become obsolete, it is envisaged that 36 traffic light facilities shall be improved. After the improvement, the number of traffic light controlled intersections will reach 90, which accounts for 50% of the number of the main intersections of Anshan. 4) Traffic sign and marking 1364 traffic signs and markings shall be improved or newly erected, including 480 instruction signs, 359 prohibition signs, 223 warning signs, 267 guideposts and 35 bridge nameplates. 5) Pedestrian physical separator Pedestrian physical separator totaling 18.4 km in length shall be provided in the bustling business area such as downtown area, Renmin Rd. business area, Renmin Department Store, Diandi Department Store, and Lishan Department Store. 6)-Median separator Median separator totaling 16.6km in length shall be provided on Jianguo Rd., Huangang Rd., Yongchang St. and south section of the Yuanlin Rd.. 7) NMV exclusive road It is envisaged in the project that Zhengyi St., Youai St., Lishan St. and Guangming St. shall be used exclusively by NMV. 8) Pedestrian sidewalk Sidewalk totaling 62946 m2 in area shall be provided on Jiaotong Rd., Shuguang Rd., Shengou Rd., Sandao- St. in Tiexi district, hunan district and Erdao St. with respect to the roaJ conditions. 14 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment 1 9) TA and training It shall include the MVECS, other TA and training items. 2.1.1 Present Status of Anshan's Road Traffic Anshan is a heavy industrial city. The plant area of Anshan Iron & Steel Complex (AISC, employees 0.2 million) is concentrated on the northwest to the city, occupying 1/4 land of the city. Eighty-seven percent of city's total employees are working in industrial enterprises. Table 2-1 and Fig.2-1 show the present status of Anshan's road traffic. -Table 2-1 Present Status of Anshan's Road Traffic Item Characteristics Phenomena Huge number of persons going to work Plant buses are dominant Traftic Heavy bicycle traffic Crowded traffic. easy block and accident requirement Heavy traffic during the rush hours Tide%%ise traffic Crowded place: railway station square and Opposite traffic direction in the morning and evening Iside of Anshan Iron & Steel Complex Basic Road network imperfect Sparse road net%%ork. low traffic capacity of roads facilities Traffic constitution unreasonable Inconenient trafflic from east to west Traffic facilities uncompleted More road break-off because of different land use of the city Traflic Low level of traffic management Imperfect traffic administration organizations backward administration traffic managing facilities lack of technical personnel 2.1.2 Role of the Project in Traffic General Planning According to traffic flows and tendency of population growth, Anshan municipal government has made an Anshan Urban Traffic Development Program valid until 2025. The program has established a skeleton of urban traffic network shown in Fig.2-2. It is a rapid speed road system like the Chinese letter " 4l". Based on this skeleton, supported by some corridors and combining a number of branch ways, Anshan's chessboardwise and radiated road network will be formed in the future. As a part of outer frame -"1 (outer circle road ), the South Ring Road, West Ring Road and North Ring Road were principally implemented. The roads at four ends of "+" from "fp" (east, south, west and north of the city ) were also finished (see Fig.2-2). The project mainly concerns the -t" skeleton which is the key part for realization of Anshan Urban Traffic Development Program. 15 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Fig.2-1 Road Traffic Status and Environmental Monitoring Points of Anshan s noffice points of Ansha -Sat Laodo Road rg 14A Anshon /ULishan District Iron & Steel Complex/ Xiaodonegat poiwt ponnt / Hn g d Tiexi // Oianshan Dst Tiedong 219 Park District 9 points of9Anshg 167 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Fig.2-2 Planned Sketch for Anshan Future Traffic Network to Shenyang to Liaoyang K1 to Datian to Haicheng to Longchang to Xiabahui Fig,2-2 Planned sketch for AnshaQn future traff ic network Competed Main trunk ----- - PlnnedSub trunk, PtannedBranch and Highway _______0 1 2 3km Reconstruction 17 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment 2.1.3 Preferred Alignment and Alternatives 2.1.3.1 Preferred Alignment The project which shall involve a road section of 18.87 km in total length, includes Jianguo Road's (south-north) widening and extension to north: construction of Hebei Road to connect the northern exit of the city; widening and reconstruction of Huangang Road (east-west) and Yongchang Street (east-west): construction of Wuyi Road Interchange as main crossing at the meeting point of Huangang Road with Yongchang Street- widening, reconstruction and extension to south of Yuanlin Road and Zhonghua Road to connect South Ring Road which will be extended to east; movement (required by widening of Jianguo Road) of tram line (now located at Jianguo Road and its west side) to the west close to Zhongchang Railway. Items of engineering of the project concerming roads and bridges, movement of tram line are shown in Table 2-2 to Table 2-4. Position of bridges and various road sections and their relations are shown in Fig.2-3. Relevant engineering is shown in Fig.2-4. Other infrastructure are shown in Fig.1 to Fig.6 attached at the end of EIA. Table 2-2 Road Engineering of JRR PoJect section Name From- to Direction Sort of road Length Current width Planned red N& ofroad ( m) of lane (m) line ( m) 1-0 South South Ring Road - Glass Factor-_ E-W Existent 800 41 I-1-1 Ring Glass Factor) - Zhonghua Road E-W New construction 700 50 1-1-2 Road Zhonghua Road - -Yuanhn Road E-W Nesw construction 640 50 1 1-2-1 Zhong- Nanchangdian Street -Belt Railway S-N Widened 160 20 40 1-2-2 hua Rd. Belt Railwas - South Ring Rd. S-N Widened 460 7 40 1-3-1 Yuanlin Jiefang Road - Nanchangdjan St. S-N Reconstruction 1250 26 50 1-3-2 Road Nanchangdian St - South Ring Rd S-N New% construction 250 2-1-1 Huan- West Minsheng Rd - East of Welfare Plant E-W Widened 140 18 2-1-2 gang East of Welfare Plant - West Jiudao St. E-W New construction 1010 42 2 2-1-3 Road West Jiudao Street - ZhongchangRailway E-W Reconstruction 1000 18 2-2 Wuyi Rd Wuyi Road - Interchange Newk construction 2-3-1 Yong- Jianguo Road - Shenglh Road E-W Widened 700 12 2-3-2 chang St. Shengli Road - Yuanin Road E-W Widened 850 18 42 '3-1 Hebei Rd. Zhongchang Railw%a% - Shahe Square E-W News construction 1270 3-2-1 Laodong Hebei Road - Laodong Bridge S-N Widened 70 11 3-2-2 Road . Laodong Bridge -Youa Street S-N Widened 540 12 40 3-2-3 Youai Street - East Jianguo Road S-N Widened 1060 18 3-3-1 Laodong Road - South of Lishan E-W Reconstruction 270 15-25 50 Underpass belo" railwa% 3 3-3-2 South of Lishan Underpass below railwaN - S-N Widened 2470 18 Heping Road 3-4-1 Jianguo Heping Road - Wus i Road S-N Widened 1350 18 46-50 3.4-2 Road Wuyi Road - Eruii1u Road S-N Widened 850 21 3-5-1 Eryijiu Road - Minsheng Road S-N Widened 750 22 48 3-5-2 Minsheng Road - Jiefang Road S-N Widened 1430 24 3-6-1 Jiefang Road - Underpass below railway S-N Widened 1000 24-31 50 3-6-2 Underpass below railwal - South Ring Rd S-N Widened 650 30 18 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Fig.2-3 Roads and Bridges of Anshan Project ' Londoe Rd 3 T ...--..Anshon 4e76 . 4 ' East JM9uo Road -ron & Steel - aL*odonnRd 31 Complex Jw*quwR 3 I 70 409 JRdnnu Rd 3 140 Hun naR 2 Hucnkn Rd. 3oa 700 8500 J750u Rd 5 Jianguo VA 1430 219 Park |1000 Jiku Rd. 8 6oth5025 to Zhoxghu . \ yut 9.10 io\ Southing t. Ine-hne idc n ---Railway I12land section No. over-river bridge to be built 19 Liaoning Urban Transport Project-Anshan Subproject Environmental impact Assessment Fig. 2-4 Position of Auxiliary Project - - * Lingshan / S Industrial ... .. Zone .. .Anshon/ Iron & Steel Complex / 20 Bus depot atready available /to nwfo Fig. 2-4 Position of Auxitiary Pro ject Project road - Special Lane for 0 Budeo mmm Project road public bus Budeo Special Lane Big-sized stop Public parking ame f or bieycle f or bus station 20 Liaoning [.!rban Transport Project-Anshan Subproject Environmental Impact Assessment Table 2-3 Bridge Engineering of Anshan City's Jianguo Road Corridor Reconstruction Project No Name of bridge sort of engineering Form of bridge Length of Width of Note ______________________ ____________ ________________ bridge (in) bridge (mn) The existent bridge width is 13 m. The lane on the reconstructed I I .aodone Road B3ridge oler ri'1er Reconstruction 216 36.5 brdei32mwe.* __________________bridge is 32 m wjoe.,- 2 1Jdkian Street Niaduct New construction Viaduct 621 17.5-21.0 [op layer is Jianguo Road. [he ground level keeps unchanged for /10, convenience of AISC*s transportation. X\inaodoinLmien Ninduct NewN construction Viaduct 224 17.5 for convenience of vehicles and employees going to or leaving AISC. For convenience of motor vehicles from Ileping Road turning I Hepinie Road iduct Ncew contstrulction Viaduct 256 17.5~ leIt%ard to JianguO Road. AISC's emplo\ecs go to and leaNe AISC through the wa under the 5 Ilping Bride induct New construction Viaduct 159 9.5 bridge. .rThree laers. no limit of 3 17.5-25.0 For traffic from cast to %est. The road [-W is an the top layer, 6 Wu% i Road I nterchan. NeIosruto 3274(l) anadtrallic directs /8 Jianguo Road is second layer. 17.5-25.0 For smooth traffic from cast to west and tratlic from Qianjin Road 7 Minsheng Road viaduct New% construction Viaduct 315 /10121 turning lellward to Jianguo Road. lialn,uI Road undl-epa, bloi%% the TI'he existent bridge opening is 24m wide. The existent lane fir non- %rilNiia idened 2. motor Nehicle will be sunk and become lane flor motor % chicle. I)MI1n1ahIll Sinier P.in1 unILerpaPIN c 1 bridges \ ill merge Crossing the marshaling yard of Donganshan Sinlter Plant railw%,a\ 9Nc%% construclill 15.6 36.0 hClmo% railw\ iInlo One and the highwa\ from city center to I)onganshan Sinter Plant. I nl ndrp_s belo\i% lct Rail\\as New construction 51.6 25.0 Crossing the existent Belt RailwaN. Note: (I) This is the length from east to west. (2) The value means: ( width of main bridge ) / ( width of ramp bridge 21 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Table 2-4 Engineering of Tram Line Movement of JRR Subsection Name of Road Meter of tram line to be moved (m) Length of Distance from present Distance from moved N road Starting point - termination point orientation Movement of Movement of No road section tram line to road tram line to road both lanes single lane move (m) centerline (m) centerline (m) Anguan Ligong Street - Laodong Road S - N 440 440 3-3-1 Laodong Anquan Street - Lishan Underpass S - N 200 6-8 20 33 3-3-2a Lishan Underpass - Ziyou Street S - N 380 22 20-22 Zivou Street - Sanye Design Institute S-N 140 22 17-20 3-3 3-3-2b Sanve Design Institute - Shuangshan Road S - N 270 21 25 Jianguo Shuangshan Road -Youhao Street S - N 260 2620 21 17-20 Road Youhao Street - Guangming Street S - N 410 20 25 Guangming Street - Yongan Street S - N 220 20 25 Yongan Street - Tongshan Street S - N 290 19 25 Tongshan Street - lieping Road S - N 450 18 25 3-4-1 Ileping Road - AISC Power Plant S - N 740 14-25 20-24 AIS Power Plant - Pet Market S - N 300 25 25 3-4 3-4-2 Jianguo Pet Market - Gongan fire lighting team S - N 740 2140 Yhe tram line is located 25 road center. Road fongan tire fighting team - Rainbow Bridge S - N 190 The tram line is located 25-80 road center. Rainbow Bridge - Wenhua Street E -W 170 Total engineering of tram line movement (m) 3000 1900 300 5200 22 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment 2.1.3.2 Alternatives a) Jianguo Road Alternative (A) Since the preferred alignment brings more work of demolition and resettlement, occupation of green vegetation at east side of northern Jianguo Road and difficulty in construction management, the designer proposed a scheme of widening Jianguo Road's southern part (South Ring Road- Wuyi Road ) and making its northern part (Wuyi Road - entrance of Laodong Road ) to an elevated road. The related road with a total length of 4.2 km and a width of 17 m will be constructed over the original tram line. Two direction-limited interchanges will be built up at Lishan Underpass and Guangming Street (east gate of AISC ) to solve the problem of motor vehicle traffic of AISC. Another interchange of same type will be erected at Heping Road to connect the related road with roads to city center. The main function of the related road is to facilitate motor vehicles traffic between all districts of the city. The present northern Jianguo Road keeps unchanged, serving as a special route for public omnibuses. b) Hebei Road Alternative (B) According to the preferred alignment, the Hebei Road connecting Laodong Road with Shengli Road is a new construction going through the present single-story-house residential zone. The alternative suggests that the existing Shahe Street on the north of the zone replaces the Hebei Road. The beginning of Shahe Street is the north of and 250 m apart from proposed Hebei Road. The Shahe Street goes 814 m in the direction of northeast, turns with a length of 615 m to southeast and then meets Shengli Road. It connects also Jiancai Street which is planned to be built on the east of Shengli Road. The alternative requires reasonable reconstruction of Shahe Street. distance from red lines shall be 30 m and width of road without separation strip shall be 15 m (See Fig.2-3). c)' South Ring Road Alternative (C) According to the preferred alignment, a section of South Ring Road (the Glass Factory -- Yuanlin Road) will pass through the Zhendong Metal Structure Factory. According to the alternative, this sectionwill be a detour on the south of the plant where Yuanlin Road makes a curve (See Fig.2-3). d) Shahe River Bridge Allernative (D) The'-preferred alignment determines demolition of Shahe River Bridge (Laodong Road Bridge ) and build-up of a neix one at the same place. The alternative suggests that the old bridge keeps unchanged and the new one will be built up on the west of the old one. x%ith a distance of 25.56 m. The length and width of the new bridge are according to the stipulation of the preferred alignment. The alternative will result in turninI of Laodon Road on both sides of Shahe River to meet 23 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment the new bridge and bring extra requirement of demolition and resettlement in the zone nearby the ends of bridge (see Fig.2-3). e) Summary of alternatives Except differences from preferred alignment mentioned above. other contents (including the movement of tram line) of the alternatives are the same like contents of the preferred alignment. 2.1.4 Auxiliary Items Auxiliary items inclqde traffic control, public traffic and road maintenance etc.. With progressive realization of JRR project, these items shall also be implemented successively. It will help in improving traffic conditions of Anshan city to a great extent. For brief introduction of auxiliary items, please see Table 2-5. For distribution of main engineering of auxiliary items, please see Fig.2-4. Table 2-5 Survey of A xiliary Items of JRR No. Item Quantity Investment Remarks I Set up of bus only road 3 3304.00 Renaming Road. Shengli Road, Zhonghua Road 2 Costrctin ofoffstret arkig 3 377.57Hunan station. station in front of railway station. People*s 2 Construction ofoff-street parking 3 3770.57 station 3 Channelization of intersections 8 3795.45 Yuanlin Road. Sandao Street Wuyi Road 4 Traffic sign and marking 5496.09 Including indication sign, prohibition sign. warning sign 5884.66 Jianguo Road. Huangang Road, Yongchang Street. Yuanlin Road. South Ring Road, Laodong Road. etc. 6 Installation of separator 9073.49 Jianguo Road. Huangang Road, Yongchang St.. Yuanlin Road. Shengli Road, Jiefang Road etc. 7 Set up of NMV exclusive road 4 9035.61 Lishan St., Guangming St.. Zhengyi St., Youai St. 8 Paving of pedestrian sidewalk 6 5496.56 Tiexisandao St.. Guangming St., Tiedongerdao St. etc. Two stations (south. north) will be set up in the southeast 9 Set up of big-sized bus transfer 1417.89 ofuiRa. necag of Wuyi Road Interchange Road will be widened from 7.Om to 9.Om and enclosing 10 Reconstruction of Hongqi Road 4 km 28082.94 wall of enterprises on the both sides of road will remain unchanged. Note: Investment is in 103 Yuan RMB. This table is provided by Liaoning Urban Construction and Renewal Project Office. Items 1-2 shown in Table 2-5 shall ensure the preferential passing of public bus and avoid influence on smooth traffic of main lane caused by temporarily stopped motor vehicles. The aim of items 3-8 are the separation of traveling of MV & NMV, separation of pedestrian and vehicles to ensure a good order of MV & NMV traveling and pedestrian walking. Item 9 shallmake it convenient for AISC employees to go to or go off work. Item 10 shall solve the problem of transportation using motor vehicle between AISC and Lingshan district. 2.2 Schedule Design schedule The fea:ibility study has been finished by the end of May. 1998. 24 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment The preliminary design shall be finished at the end of Nov. 1998 and detailed design shall be finished at the end of Feb. 1999. Construction schedule a) The extension of the southern part shall be completed first, that includes: reconstruction of Yuanlin Road (1-3-1), extension and new construction of road ( 1-3-2), widening of Zhonghua Road ( 1-2-1). reconstruction of road ( 1-2-2) and construction of sections of South Ring Road from Glass Factory to Zhonghua Road (1-1-1) and from Zhonghua Road to Yuanlin Road (1-1-2). b)After finish of engineering concerning southern roads, the traffic on Jianguo Road will be transferred to the Yianlin Road and South Ring Road, so the comprehensive reconstruction of Jianguo Road could start. Simultaneously, the Yongchang Street and Huangang Road can be widened. c)After completion of construction of Jianguo Road, Yongchang Street and Huangang Road, start the reconstruction of Laodong Road Bridge, finally start the construction of Hebei Road. According to the feasibility study. the project will last 5 years, the construction will begin in Feb. 1999. 2.3 Investment in Project Engineering and Environmental Protection Total investment amounts to 1268.0622 million Yuan RMB among which 45 million US$ are loan from the World Bank. 2.3.1 Investment in Engineering According to the feasibility study of JRR, the whole engineering will cost 1268.0622 million Yuan RMB among which 951.4059 million are used for infrastructure construction (see Table 2-6). Table 2-6 Investment for Engineering of JRR Item of engineering Investment (million Yuan RMB) Extending sub-project of South Ring Road 135.1827 Jianguo Road sub-project 356.2519 Huangang Road sub-project. Yongchang Street sub-project 414.5085 and Wuvi Road Interchange Hebei Road sub-project 45.4628 improvement of public traffic 115.6632 Traffic facilities 40.1318 Repairing and maintenance of roads 34.2409 Enironmental protection 34.6279 noan interest during the conetructioii (mniod 91.9925 I otal 1268.0622 25 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment 2.3.2 Investment in Environmental Protection According to the feasibility study, the investment for environmental protection shown in Table 2-7 accounts for 2.73 % of the total investment for JRR. The investment for environmental protection related to JRR project does not include cost for monitoring and measuring of vehicle exhaust gas and noise. This task will be undertaken by Anshan Environmental Monitoring Center which is equipped with modem facilities and financially supported by Anshan municipal government. Table 2-7 Investment in Environmental Protection and Mitigation (thousand Yuan RMB) Item Expenses Sub-total 4 Sound barrier of Wuyi Road Interchange 3600.0 Noise control Installation of air-conditioner in the hospitals and schools 1522.2 20404.2 Installation of air-conditioner Neighboring residential building 15282.0 Greening 12843.0 12843.0 Monitoring Operational phase 158.8 753.4 Construction phase 594.6 Training Abroad 126.3 206.3 Home 80.0 Technical Assistance 421.00 421.00 Total 34627.9 2.4 Motor Vehicle Fleet 2.4.1 Current Population and Expected Growth Anshan City with a total area of 9251 km2 has now a population of 3.3125 million, exercises jurisdiction over Haicheng City, Taian County and Xiuyan County. The urban area is of 624.29 km2 (completed zone 114 kn2). Land use in different phases and expected population growth of Anshan City in planning zone, construction zone (including Tiedong District, Tiexi District, Lishan District, Jiupu subdistrict and Shahe subdistrict ) are shown in Table 2-8. 2.4.2 Traffic Forecast With an average growth rate of 13.5% from 1991 to 1995 and a growth rate of 6.05% from 1995 to 1996, the actual amount of motor vehicles in Anshan City has reached 64798 at the end of 1996. According to the forecast made by Anshan Vehicle Administration Office, the annual growth rate of vehicles will be of 6% in the future. Table 2-9 and Table 2-10 show the kinds and growth expectation of motor vehicles. The constitution of road network in the future is shown in Table 2-11. Table 2-12 shows change of traffic flow on main road of JRR project before and after JRR. 26 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Table 2-8 Current Status and Expected Growth of Anshan Urban Population Item Unit Current In the year 2000 In the year 2010 Population in the construction zone million persons 1.1546 1.36 1.54 Area of the construction zone kM2 100.01 141.08 185.72 Average land occupation m2/person 86.6 103.7 120.6 Transit population million persons 0.07 0.1 0.15 Table 2-9 Kinds of Motor Vehicles at Present Time Item Truck Passage vehicle Others Total Large Total 8537 1928 1832 12297 size Private 518 108 11 638 Total 8712 16063 758 25533 Small size Private 696 4259 12 4967 Taxi 4291 4291 Kind Large Small Tractor Total 12 1147 1159 Private 2 971 973 Kind Twin-Tyred Tri-Tyred Portable Motorbike Total 12115 1900 10838 24853 private 11585 726 10507 22818 Miscellaneous Kind Trolley Bus Battery Car Trailer _ _ _ _ _ Total 166 12 778 956 Table 2-10 Current Quantity and Ex ected Growth of Motor Vehicles in Anshan City Year 1996 1998 2000 2005 2010 Quantity 64798 72807 81806 109475 146502 Table 2-11 Constitution of Road Network of Anshan City in the Future Road Length (km) Average width (in) Average Speed of Vehicle at Peak Hour (km/h) section .ear2000 .ear2010 vear2000 vear 2010 At present In the vear 2010 High speed trunk road 0 43.38 0 36.90 0 49.34 Main trunk road 165.22 172.26 26.68 28.03 34.67 36.17 Secondary trunk road 78.99 157.44 16.45 17.71 32.67 30.75 Branch road 24.39 23.96 12.29 14.38 20.94 21.20 Total of length 268.30 397.04 22.47* 24.02* 33.76* 38.49* Total road section 379 505 Note: Data is from Comprehensive Traffic Planning of Anshan City compiled by Southeast University and Anshan town & Country Construction Planning Institute in Dec. 1995. * refers to average value. Table 2-12 Change of Traffic Flow before and after JRR (veh/h) Road section Road Current status 2010 with project 2010 without project 2010 project alternative (elevated road) 1-3 Yuanlin Road 912 568-1224 706-881 620-780 ~2-1 Fluanianp Road 2156- 31)52 1437-2207 1762-2806 1050-2140 2-3 Yongchanp Street I 7-4 887-2567 1459-2404 868-1669 3-3-2 North Jianeuo Rd. 55 596 795-1216 1669-2006 1230-1309 3-4-1 South JianLuo Rd. 1462 2778 1191-2274 2048-2763 1160-1731 3-4-2 South Jianguo Rd. 874 2492 1468-2945 1547-1736 1776- 1881 27 Liaoning Urban Transport Project-Anshan Subproject Ensironmental Impact Assessment 3 PRESENT ENVIRONMENTAL CONDITIONS 3.1 Physical Setting -All the engineering of the project will occur in the urban area of the city. Anshan City is located at 122 ' - 123 ' E and 40 - - 41 o N. in the middle of Liaoning Province. It is 89 km in the south of Shengyang. 308 km in the north of Dalian, 120 km of Yingkou Bayuquan port. The Zhongchang Railway passes the city from south to north and the Shenyang-Dalian Expressway passes the city in the western. There is an air port on the southwest of the ciV where the flight to Beijing. Guangzhou, Fushan, Huizhou etc. is available. Fig. 1-1 shows the geographical position of Anshan. The Qianshan Mountain is located on the east of the city. On the west, Anshan is conjunct with the alluvial plain via rivers of Liaohe, Hunhe and Taizihe. The southeast part of the city is higher while the northwest part is lower. Elevation of construction sections of the project is between 25.8 m and 57.6 m. From N-E to S-W, the thickness of underground base rock covered mainly by the sediment of Quaternary System varies gradually greater (from 20 in to 55 in). The baserock in the north of Anshan railway station consists principally of Liaohe group of strata while in the south of Anshan railway station mainly of limestone of Cambrian System. The following shows the sequence of baserock distribution from N-E to S-W. * Granite of Archaean Era * Metamorphous feldspar-silicarenite, dimicaceous-schist and sericite-schist of Liaohe group of strata * Sinian System silicarenite and Cambrian System limestone with intercalation of dolomite limestone, marlite and shale The underground water is of the following kinds: * Perched water over the sediment of Quaternary System * Baserock crevice water * Karst fracture water The underground water is principally of calcium bicarbonate type with a mineralization degree of less than Ig/L, supplemented by precipitation and subsurface flows, applied in the way of pumping. 3.2 Biophysical Environment 3.2.1 Meteorology and Climate Anshan City is located in the warm temperate region of continental monsoon climate. In summer, south wind is dominant. temperature is rather high, air is humid and rain occurs often. In winter that lasts as long as 6 months, north wind is dominant, temperature is low and there is few precipitation. In spring. it is dry and windy, sunshine time is long, evaporativity is 28 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment high and humidity is low. The autumn is short and pleasantly cool, wind and rain occur now and then. Meteorological parameters collected in recent years are shown in Table 3-1. Table 3-1 Meteorological Parameters of Anshan Item Temperature Precipitation Relative humidity Sunshine time Wind speed Annual average 10.7 T 929.4 mm 63 o 2617.2 hrs 2.6 m/s Average temperature in the hottest month ( Jul.): 23.6 *C. Average temperature in the coldest month (Jan.): -5.4 C. Percentage of annual sunshine: 59.1%. The wind direction rose illustrations in the year and different seasons are shown in Fig.3-1. 3.2.2 Present Status of Noise and Vibration 3.2.2.1 Noise a) Routine measurement of urban road noise Every year Anshan Environmental Monitoring Center conducts routine measurement of urban road noise at 37 road sections in spring and autumn. Table 3-2 shows results of measurement at 10 road sections related to the project in the years 1990-1995. Fig 3-2 also shows these results as well as the position of these roads. Table 3-2 Results of Routine Measurement of Urban Road Noise (dB) N Name of road sections 1990 1991 1992 1993 1994 1995 1 Jianguo Road 78.7 78.7 78.4 77.6 73.6 76.3 2 Shengli Road 74.3 74.3 74.8 73.4 71.4 72.6 3 Zhonghua Road 72.9 72.9 74.2 75.7 73.0 72.8 4 Yuanlin Road 77.2 77.2 75.3 75.2 72.1 75.8 5 Laodong Road 76.0 76.0 78.8 79.1 74.7 75.1 6 Qianjin Road 77.3 77.3 74.4 77.9 71.6 73.6 7 Wu\i Road 71J] 71.0 71.6 75.9 71.5 71.2 8 Wenhua St. 76.5 76.5 75.0 76.0 72.4 72.1 9 Huangang Road 77.8 77.8 76.6 76.1 74.8 70.4 10 Yongchang Street 730 73.0 - 73.5 66.6 72.4 Table 3-2 demonstrates that the urban road noise level seriously exceeds the standard. Although'the speed of motor vehicles on the roads is not high. but the pavement distress, high frequency of vehicle stop and start. vehicle obsoleteness and vehicles hooting etc. result in high noise. b) Measurement oflpresent road loise According to the requirement ot [IA program. Anshan Enx ironmental Monitoring Center has executed measurement of present road noise at 16 points (see Fig.2-1) related to the project and achieved 1536 parameters. The object of measurement is to know: 29 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Fig.3-1 Rose Diagram of Wind Direction in Various Seasons N N N Spring Summer (c=6.257) (c=17.39%) N N Year (c=13.70%) Autumn Winter 5% (c=17.03%) (c=1417%) Fig.3-1 Rose diagram of wind direction in various seasons 30 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Fig.3-2 Results of Measurement at 10 Road Section Related to the Project oModon Road ' 18 Uishan Underpass0 North Jianguo Road Es agoRa Anshan/ Iron & Steel /J Complex / 1 XModong Gate / fluangang Roadi Heping Bridge Entrance of Angang0 A .Xigonan Gate 13 0' (1tpe s n Ha Mcn r ssngna 00 COM0persons 3 oncosng1S o Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment * Noise influence extent at different sensitive points. * Present status of noise pollution along Jianguo Road corridor which will be reconstructed. * Noise source at roads to be constructed. The measurements were conducted in two stages. one in October and the other in December 1996. 3 continuous days were taken at each stage. The starting time each day was at 7:30, 9:00, 12:00, 17:00. 19:00, 23:00. Automatic noise level meter has been adopted. The results of measurement are summarized in Table 3-3. Measurement results of present noise level is shown in Fig.3-3 and exceedance over standard of different sensitive points is shown in Fig3-4. Table 3-3 shows that tte noise level at sensitive points exceeds the standard very seriously at night time (max. excess 15.3 dB). The present noise pollution.is also most serious at night. 3.2.2.2 Vibration According to the requirement of EIA program and the review comments, Anshan Environmental Monitoring Center has conducted vibration measurement at 7:30, 12:00, 17:00, 23:00 on Oct.28,1996 and Dec.28.1996, using HE 5931 vibrometer. Measurement point was selected in front of main building of Anshan Employees University which is located in the east of Jianguo Road (see Fig.2-1). The results of measurement are shown in Table 3-4. Table 3-4 Results of Vibration Measurement Date Time VLz,o (dB) Excess over standard 7:30 74 Within standard Oct.28.1996 12:00 75 Within standard 17:00 73 Within standard 23:00 72 Within standard 7:30 77 2 dB Dec.28,1996 12:00 77 2 dB 17:00 75 Within standard 23:00 72 Within standard Table 3-4 demonstrates that there is no excess vibration except VLzio value that exceeds 2 dB when monitoring at 7:30 and 12:00. This means the motor vehicles produce less vibration influence to sensitive points at both roadsides. 3.2.3 Air Quality Anshan is a heavy industrial city and its air pollution is more severe. Among the industrial enterprises, Anshan Iron and Steel Co. is the largest air pollution source. The emission of smoke and dust, SO2, NOx, and CO have separately made up 63%, 81%, 92% and 87% of the whole city. The emission of exhaust gas from main air pollution sources of the whole city is 168432.6 Mm 3/a while the emission of the above pollutants are 185100 t/a, 78100 t/a, 57800 t/a and 7000 t/a separately. 32 Linoning Lrban Transport Project-Anshan Subproject Environmental Impact Assessment Table 3-3 Leq and Excess Value Accordi g to Measurement of Present Noise Level with Project NQ Name of measurement point Distance to road Code of road Leg (dB) Stand rd (dB) Excess over stand rd (dB) center (m) section Peak hour Day Night Day Night Peak Hour Day Night 1 Glass factor< 20 1-1 71.8 67.5 64.0 70 55 1.8 - 9.0 2 Nanchanudian Prinar\ School 15 1-2 75.0 71.6 64.0 70 55 5.0 1.6 9.0 1 1)onuchunLdian Residential nuarler 7.5 1-3 75.0 71.3 64.1 70 55 5.0 1.3 9.1 1 Yilu Primar% School 15 2-1 72.6 70.6 67.2 70 55 2.6 0.6 12.2 5 \lS( I w-inverinu CoicLe IS 2-3 68.3 67.0 63.8 70 55 - - 8.8 S I Icli Roaid KRe idollial QIrICI 3-1 - 72.1 55.4 55 45 - 17.9 10.4 I aodonL Road Priimar\ Sehool 15 3-2 74.7 74.2 67.7 70 55 4.7 4.2 12.7 8 \11<( ( hemical Plant Ol 15 3-3 70.9 68.3 63.3 70 55 0.9 - 8.3 9 \nhan I nploicc k ilersit\ 15 3-4 76.2 74.6 70.3 70 55 6.2 4.6 15.3 10 AISC Dail\ 10 3-4 75.9 72.1 66.1 70 55 5.9 2.1 11.1 II .icshkhan Street Residential Quarter 20 3-5 73.7 72.6 68.8 70 55 3.7 2.6 13.8 12 Shengli AssemblI lall 25 Shengli Rd. (S) 69.7 68.9 67.5 70 55 - - 12 , 13 I )kirict in the w%ot of Rainho\% kridue 20 Renmin Rd. 73.4 70.9 65.4 70 55 3.4 0.9 10.4 Il liangyiani Priniari School 20 Shengli Rd. (N) 75.4 73.7 69.3 70 55 5.4 3.7 14.3 1 kiih.ol': '.tdIon V-,dV',11 flqanak RcCOm CiaCed tram line 66.8 63.0 55.5 60 50 6.8 3.0 5.5 16 I ipoit1 StrCet RCsidCntIai QUarler Special trolle bus Iknc 76.0 - 66.9 70 55 6.0 - 11.9 \ote I he noise level of davtime and nighttime are calculated and peak hour noise level is counted by converting measurement results of present traffic volume standard vehicle quantity according to large-duty, medium-duty and small duty vehicles and taking weighted average on traffic volume of daytime and nighttime. 33 Liaoning Urban Transport Project-Anshan Subiproject Environmental Impact Assessment Fig.3-3 Measurement Results of Present Road Noise N s 6A 7 14 Anshan 719Lishan District Ircin & Steel Comple m.j Tiexi 73A // 1 ° dog67. Oianshn District e,o NOTB: 7U3 Penk bomr Fig.3-3 Measurement results of present road noise ---Projetroad '~ry ' ' =*lry ---Rölvay @ interchang 34. Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Fig.3-4 Excess Value According to Measurement of Present Noise Level N -s6A 12.7 ! 714 30 15 Anshan Lishan District Iron &Steel Comple u /D 2Oianshan / A Tiedong . 219 Par District 1 Peuk hour Fig.3-4 Excess value accordling to measurement of' present noise level Project road --•*Angang boundorypon - --Rakway 0 Interchon--se99 Liaoning Frban Transport Project-Anshan Subproject Environmental Impact Assessment 3.2.3.1 Routine Monitoring For routine monitoring statistical results of urban environment air quality prepared by Anshan Environment Monitoring Center in 1995, see Table 3-5. Table 3-5 Routine Monitorin Y Statistical Results of Anshan Air Quality Sampling Sampling TSP so, NO, Co location type A C A C A C A C 219 Park Hourlyaverage 0.020-0.248 - 0.014-0.092 - o.024-0.112 - 1.145-4.548 - DailN average 0.027-0.221 - 0.014-0.074 - 0.027-0.077 - 1.145-3.465 - Underpass of Hourly average 0.053-0.850 - 0.02.-0.327 - 0.037-0.623 25.0 2.818-10.238 1.7 Minsheng Road Dailyaverage 0,184-0.723 55.0 0.022-0.182 10.0 0.049-0.31 65.0 3.274-8.438 70.0 Taiping HourlAaverage 0.020-0.260 - 0.012-0.310 - 0.011-0.226 1.7 1.145-8.342 - Quarter Daily average 0.030-0.217 - 0.013-0.196 10.0 0.016-0.105 5.0 1.145-3.544 - Tiexi Wudao Hourly average 0.070-0.634 - 0.013-0.034 - 0.025-0.222 3.3 1.145-5.874 - Street Daily average 0.090-0.430 25.0 0.026-0.034 10.0 0.038-0.177 35.0 1.145-5.494 - AISC Sinter Hourly average 0.033-0.582 - 0.013-0.346 - 0.024-0.340 1.7 1.259-8.874 - Plant Daily average 0.054-0.450 - 0.01S-0.026 - 0.032-0.178 5.0 1.431-7.519 10.0 NQ 2 AISC Hourly average 0.092-3.446 18.3 0.013-0.343 20.0 0.026-0.740 21.7 1.145-36.926 13.35 Steelmaker Daily average 0.161-2.065 60.0 0.032-1.211 45.0 0.052-0.393 40.0 1.488-19.446 35.0 Note: A - min. to max. (mg/M3); C - Percentage of samples exceeding standards (%). It can be known from the above table that the air quality of the contrast place (219 Park) is fairly good; the excess rate of daily average value of SO2 in the urban area is 10%; there are excess phenomena in hourly and daily average values of NOx; the CO value exceeds the standard in the dense traffic area (Minsheng Road Underpass) and the excess rate of the daily average value can reach 70%. The values of the above pollutants exceed the standard severely in AISC plant area (Sinter Plant and N9 2 Steelmaker). 3.2.3.2 Monitoring of Present Status For this environmental assessment, the air environmental quality monitoring was carried out at 8 monitoring points in the non-heating period (Oct.26 to Nov.1,1996) and the heating period (Dec.20 to 26,1996) by Anshan Environmental Monitoring Center on the basis of related national regulations. obtaining 8092 effective monitoring data. For the distribution of monitoring places see Fig.2-1. For the monitoring statistical results see Table 3-6 to Table 3- 9, Fig.3-5 and Fig.3-6. All the above tables perform "Air Environmental Quality Standard" GB3095-1996, formally executed on Oct.1, 1996. It can be seen from the monitoring results that Anshan air environmental quality is poor. the hourly concentration of all pollution factors has exceeded the standard, the daily average values have exceeded the standard, in which the excess rates of HC and B[a]P are 100%. 3.2.4 Surface Water Quality This project is only involved with South Shahe River in the north of Anshan urban area. This river is a seasonal one, taking its source at Qianshan Mountain in the southeast of Anshan. It mainly receives domestic sewage in the north of Anshan urban area and the treated industrial waste water of AISC Qidashan Concentrator and AISC north plant area. At present, the water is mainly used for the agricultural irrigation. 36 Liaoning Urban Transport Project-AInshan Subproject Environmental Impact Assessment Table 3-6 Statistics of Hourly Monitoring Results of Air Pollutants (heating period) SO2 '10r CO HC Sample Percentage Percentage Percentage Percentage of location Concentration of samples Concentration ofsamples Concentration of samples Concentration samples number range exceeding range exceeding range exceeding range exceeding (mg/n) standards (mg/Rm) standards (mg/m') standards (mg/m') standards .(%) (%) () () Std. 0.5 0.15 10.0 3.0 1 0.01 -0.34 0.00 0.01 -0.31 7.94 1.2 - 10.0 0.00 0.96-2.49 0.00 2 0.01 -0.44 0.00 0.01 - 0.35 7.94 1.2 -10.9 0.79 1.03-3.01 3.57 3 0.01 -0.55 0.79 0.03 -0.63 57.14 1.2 -9.0 0.00 1.34-4.61 7.14 4 0.01 -0.49 0.00 0,02 - 0.56 11.11 1.2 - 15.6 3.17 1.06-2.90 0.00 5 0.01 -0.40 0.00 0.02 --0.72 11.11 1.2 - 14.0 0.79 1.01 -3.17 3.57 6 0.01 - 0.491 0.00 0.02 -.0.68 38.89 1.2 - 16.1 2.38 1.23 -4.70 10.71 7 0.01 -0.71 2.34 0.0 1 -0.62 23.02 1.2 -21.2 0.79 1.35 -2.69 0.00 8 0.01 -0.37 0.00 0.01 - 0.23 7.14 1.2- 10.4 0.79 1.25-2.13 0.00 Table 3-7 Statistics of Hourly Monitoring Results of Air Pollutants (no -heating period) SO2 NOx CO HC Sample Percentage Percentage Percentage Percentage location Concentration of samples ( oncentration of samples Concentration of samples Concentration of samples number range exceeding range exceeding range exceeding range exceeding (mg/rm) standards (mglm') standards (mg/m) standards (mg/m) standards (%) (%) (%) (%) Std. 0.5 0.15 10.0 3.0 1 0.01 -0.32 0.00 0.02 --0.72 11.90 1.2 -6.9 0.00 2.55 - 10.15 85.72 2 0.01- 0.27 0.00 0.01 - 0.45 8.73 1.2 - 28.5 2.38 2.66- 13.01 89,29 3 0.01 -0.43 0.00 0.) I - 0.91 46.83 1.2- 13.8 3.97 2.58- 11.90 85.72 4 0.01-0.30 0.00 0.01 -0.65 15.08 1.2- 15.2 3.17 2.31 -6.90 89.29 5 0.01 -0.28 0.00 0.01 -0.57 5.56 1.2 - 14.0 2.38 2.51 -6.33 75.00 6 0.01 -0.30 0.00 0.0. 1.08 50.00 1.2 - 14.4 3.17 2.50-8.38 85.72 7 0.01 -0.22 0.00 0.01 0.73 28.57 1.2 - 12.8 2.38 251 -6.94 78.57 8 0.01 -0.22 0.00 0.01 - 0.62 8.73 1.2 10.2 0.79 2.57-5.73 96.43 Table 3-8 Statistics of Daily Average Values of Air Pollutants (heating period) SO2 1N ( H1C Sample Percenta2e Percentage Percentage Percentage location Concentration of samples ( oncentration ofsamples Concentration of samples Concentration of samples number range V%ceeding range exceeding range exceeding range exceeding (mg/I) standards rm±m I standard Omporn') standards (mg/m) standards Std. 0.15 0.10 4' 1.0 I 0.o44 -0.107 0.00 lo55 0. 114 28.57 1.25 3.2s 0.00 1.150-2.015 100.00 2 0.041-0.178 14.29 ( O56 0.111 28.57 1.29-4.08 14.29 1.535-2.163 100oo 3 0.144--0.262 71.43 0 153 10.288 100.00 1. 12 , 89 (1.00() 10503-2.650 100m.0 4 O.094-0.214 28 5 - -i1-1 28.5 1 24 5 2Y 14.2) 1.398-1.890 M(1.01 5 0.05) 0.212 14.29 l )l 8.57 I (9 3 9u (.00 1.460 1.985 10oo00 6 0.042-0.156 14.29 0.0- 7 0.302 85.71 1 .32 4 25 28.57 I.645-3.095 1 loon ? 0.096 0.216 57.14 0 uxo .179 71.43 1 33 3.91 1 .00 I.663-2.065 10.00 8 0.f6, -o.2o2 28.5- o.'5 ( 113 142) 1 23 291 f.0no 1,458 1 638 10o 0 37 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment TSP Pb tBlaj' Sample Percentage Percentage Percentage location Concentration ofsample% (oncentration of samples ( oncentration of samples number range exceeding range exceeding range exceeding (mg/n) standards ug,m') standards (Off5mg"In) standards ___________ (%) (%.) (%.) ________ Sid. 0.30 1.5 1.0 1 0.59-2.17 100.00 0.106-1.214 0.00 5.92 -23.43 100.00 2 0.25-1.44 85.71 0.173-0.730 0.00 3.39-24.59 100.00 3 0.47-1.27 100.00 0.108-- 1.000 0.00 16.37-36.22 100.00 4 0.30-0.78 100.00 0.193--0.530 0.00 7.42-27.75 100.00 5 0.27-0.70 85.71 0.124-1.130 0.00 5.21-31.83 100.00 6 0.40-0.82 100.00 0.140-1.084 0.00 19.51-44.39 100.00 7 0.41-1.55... 100.00 0.385-1.262 0.00 17.83-47.44 100.00, 8 0.20-0.88 85.71 0.326-0.634 0.00 7.44-31.23 100.00 Table 3-9 Statistics of Daily Average Values of Air Pollutants (non-h ating period) S02 NOx CO HC Sample Percentage Percentage Percentage Percentage location Concentration of samples Concentration of samples Concentration of samples Concentration of samples number range exceeding range exceeding range exceeding range exceeding (mg/im) standards (mg/m3) standards (mg/m) standards (mg/m) standards (%) (%) (%) (%) Std. 0.15 0.10 4.0 1.0 1 0.019-0.132 0.00 0.046-0.206 14.29 1.27-3.68 0.00 3.28-6.20 100.00 2 0.022-0.124 0.00 0.016-0.159 14.29 1.20-4.97 14.29 3.00-6.56 100.00 3 0.023-0.167 14.29 0.104-0.480 100.00 1.92-7.35 57.14 3.29-7.77 100.00 4 0.036-0.126 0.00 0,039-0.232 28.57 1.20-5.31 14.29 3.06-5.21 100.00 5 0.029-0.121 0.00 0.025-0.167 14.29 1.20-4.95 14.29 2.77-4.99 100.00 6 0.027-0.108 0.00 0.046-0.462 85.71 1.24-6.28 28.57 2.82-5.72 100.00 7 0.029-0.119 0.00 0.071-0.306 57.14 1.34-5.08 14.29 2.96-4.85 100.00 8 0.022-0.113 0.00 0.016-0.148 14.29 1.20-3.19 0.00 3.78-4.73 100.00 TSP Pb BlalP Sample Percentage Percentage Percentage location concentration of samples concentration of samples concentration of samples number range exceeding range exceeding range exceeding (mg/m) standards (ug/mj) standards (101 mg/m) standards (%) (%) (%) I Std. 0.3 1.5 1.0 1 0.32-2.17 100.00 0.958-2.461 100.00 2.42-12.23 100.00 2 0.17-0.80 57.14 0.453-1.747 0.00 1.68-9.12 100.00 3 0.43-0.96 100.00 2.107-2.916 100.00 3.60-6.90 100.00 4 0.15-0.56 42.86 0.164-2.877 100.00 1.86-6.58 100.00 5 0.10-0.68 57.14 0.215-2.893 100.00 2.38-8.92 100.00 6 0.28-1.04 57.14 1.132-3.290 100.00 2.30-20.48 100.00 7 0.26-0.88 85.71 1.157-2.547 100.00 2.12-8.16 100.00 8 0.08-0.54 42.86 0.323-1.906 0.00 1.50-2.46 100.00 3.2.4.1 Routine Monitoring For the monitoring results of South Shahe River (Liuerpu Section at 10 km downstream of Laodong Bridge) prepared by Anshan Environmental Monitoring Center in 1996 see Table 3-10. 38 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Fig.3-5 Status of Air Quality (Heating Period) pount 10 . -.. - - Roii Anshan / /4 Tiexi / / Oianshan Dstr c Tiedng Distrct 219 Park -a-, District / 1.2.16Day concentration Range 1 MN10x 0l1 Ca 1.594- NfH 1-U2 Fig.3-5 Status of Air Quatity (Heating period) Project road NW' g ' bong dary Ai montorn - - -Rollway Interchange C===EEM 39 Llaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Fig.3-6 Status of Air Quality (Non-heating Period) N S 1gir Anshan 11 7 4 7bd/ / l\Qiainshan ---rProct road • ••• dry AT ng diin - - - Rannay O 0nterchange 40 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Table 3-10 Routine Monitoring Results of South Shahe River Water Quaity Item pH DO (mg/I) COD (mg/I) Oils (mg/1) SS (mg/1) NH3-N (mg/I) Dr, season 6.08 5.20 74.11 3.5 I 199 10.12 Rainy season 6.39 3.78 52.23 1.29 138 4.39 Normal season 6.10 2.36 75.66 1.61 68 9.01 Average 6.19 3.78 67.66 2.13 135 7.84 The above table has indicated that the main excess pollutants of South Shahe River are COD, oils and suspended solids which severely exceed the standard in the dry season. The excess conditions are caused by urban domestic sewage, industrial discharge water of enterprises of AISC and so on and Qidashan Concentrator's discharge water separately. 3.2.4.2 Present Status Monitoring A monitoring point is set up near Shahe Bridge (Laodong Road Bridge) for the assessment (refer to Fig.2-1). The monitoring was carried out in two stages (Nov.5 to 7,1996 and Jan.11 to 13,1997) by Anshan Environmental Monitoring Center. with one time per day and 3 days stages. obtaining 36 monitoring data in total. For the monitoring statistical results see Table 3-11. Table 3-11 Present Situation Monitoring Statistics of South Shahe River Laodong Bridge Section Period Nov.5 to 7,1996 Jan.11 to 13,1997 pH Concentration (mglI) 7.05-7.23 7.00-7.20 Percentage of samples exceeding standards (%) 0.00 0.00 DO Concentration (mg l) 2.99-3.34 2.95-3.04 Percentage of samples exceeding standards (%) 0.00 0.00 COD Concentration (mg!l) 28.84-35.84 28.38-32.85 Percentage of samples exceeding standards (%) 100.00 100.00 Oils Concentration (mg/l) 0.56-0.99 0.57-0.72 Percentage of samples exceeding standards (%) 0.00 0.00 NH3-N Concentration (mg/1) 5.67-7.29 5.92-6.78 Percentage of samples exceeding standards (%) 100.00 100.00 SS Concentration (mg/l) 136-233 237-295 Percentage of samples exceeding standards (%) 100.00 100.00 The statistical results have indicated that all the COD. NH3-N and SS in water of South Shahe River exceed the standard and the maximum is 6.29 times. 3.2.5 Present Status of Soil and Vegetation 3.2.5.1 Assessment of Soil Present Status According to requirement of ElA program. on-site prospecting and investigation of soil haNe been conducted. relevant information have been collected. instead of sample analyzing. In addition. qualitative description of land application and soil pollution on both sides of roads to be constructed. extended and reconstructed in accordance with the project have been conducted. The results are show\ n in Table 3-12. 41 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Table 3-12 QualitN of Soil at Roadside of Project Alignment Branch N Name of road Land application Quality 1-1 South Ring Farmland. counin residence Good quality brown soil 1-2 Zhonghua Earth-paxed roads. priNate shops, factor' buildings Good qualicN brown soil 1-3 Yuanlin Greenbelt Good quality brown soil 2-1 luangang School . laclories.'single-stor\ residential house, A \mall part of soil was polluted by oil. ___________the rest is of ordinary qual ity. 2-2 Wuyi Road Wholesale market of small commodities. AISC Ng Most part of soil is covered with cement Interchange 2 kindergarten. AISC NQ I domitorx and asphalt. 2-3 Yongchang Brick-paxed sidcoalk. the Peoples Park Good qualiq brown soil 3-1 Hebei Farmland. pri ate motorcycle repair shop. Ningle- A small part of soil was polluted b% oil. armstond countr residence the rest is brown soil of good qualit. 3-2 Laodong Vegetable plots. factories Good quality brown soil 3-3 On the westee side there is greenbelt. On the Brown soili a small part of it was polluted 34 eastern side there are factories, shops. b oil. 3-5 Jianguo On the westcrn side there are freight tard of the Cement or brick paved 3-6 railway station and shops. On the eastern side there areiresidential houses andshops Park_Good __ualit__brown_soi_ Due to construction and reconstruction engineering, the soil within the city area was mixed with a lot of lime, brick fragment. daylife rubbish such as stove slag etc. which made the soil being of high porosity and low water & fertilizer conserving ability. Under the influence of AISC and other old enterprises the soil and water were polluted to certain extent. The uncovered soil in assessment zones was also polluted to different extent because of precipitation and dust falling. But in general, the investigated soil is not polluted by the land -users except that (polluted by oil) used by the Machinery Repair Plant of AISC Construction Co. and two small-sized private motorcycle repair shops. In addition of infrastructure, three public parking stations (Hunan station, People's Park station, station in front of railway station) and anew bus depot (No.16 line bus) shall be set bing hplaces poccupid long to land reserved for urban construction application, mainly with ground surface of cement or asphalt and occasionally with some buildings. According to site survey and investigation, the soil is not polluted by land users and the land is used for .public applications. The heavy repair of Hongqi Road will be carried out on the basis of road's original foundation and shall not bring change of original land application. 3.2.5.2 Assessment of Vegetation Present Status On-site prospecting and investigation of vegetation along both project's roadsides have been conducted. The results in details are shown in Table 3-13. Table 3-13 shows a good present status of vegetation along both project's roadsides that flowers, grass, trees or shrubbery are planted at places where the planting is feasible. Among tl& trees, poplar and willow are dominant. Over 60% of the trees are 25 years old or olderf which lost branches during heavy rainfalls and winds. Typically trees over 25 years will be cut and replaced with young trees in Anshan City. In the construction of parking stations and bus depot, no green land and trees are related. In the engineering of Hongqi Road reconstruction (road widening), near 100 trees (more than 20 years old) shall be cut down which takes 50% of trees already available. 42 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Table 3-13 Present Status of Vegetation Age of Tree Road Name Poplar Willow Chinese Pine Maple Fruit Other Area of lawn code ofroad scholartree tree tree (m) >25 10-15 <5 >25 10-15 <5 >25 <5 <5 <5 <5 <5 1-1 South Ring 60 15 20 5 2 1-2 Zhonghua 37 1-3 Yuanlin 486 124 120 80 20 2-1 Huangang 245 203 167 28 20 270 2-2 Wuvi Road 96 100 14 Interchange 2-3 Yongchang 450 1 100 20 10 70 205 2850 3-1 Hebei 57 42 78 30 25 3-2 Laodong 35 358 15 3-3 541 139 31 843 383 69 281 87 451 70 10925 3-4 Jianguo 3-5 256 30 267 255 50 12 28 1750 3-6 Total 2263 653 198 1814 782 139 10 72 518 115 496 70 15795 Note: Area of nurseries at Huangang road is 6500 m2 ( trees below% 5 \cars). 3.3 Socio-economic Environment For social environment survey related to JRR, see Table 3-14. For details, see table 3-15 ~ 3-26. Fig.3-7 shows the distribution of population related to JRR and Fig.3-8 and Fig.3-9 show distribution of other sensitive points. Table3-14 Social Environment Survey Related to JRR Objectives impacted by the project Quantity Total number of the people Remarks Households 4512 18141 Table 3-16. Fig.3-7 Markets 9 4693 Table 3-17. Fig.3-8 Entertainment places 2 Table 3-18. Fig.3-8 Schools 10 10971 Table 3-19. Fig.3-8 Kindergartens 3 813 Table 3-20, Fig.3-8 Hospitals 6 282 Table 3-21, Fig.3-8 Factories I5 Table 3-22. Fig.3-9 Office & scientific research institutions 2 Table 3-23, Fig.3-9 Commercial outiths 3Table 3-24. Fig.3-9 Hotel / motel 6 Table 3-25. Fig.3-9 Main intersection 6 Table 3-26. Fig.3-7 3.3.1 Demographics on Both Sides of JRR The population (18141 persons. 2% of city population) along the proposed traffic corridor is not evenly distributed. to be specific. mainly distributed along Hebei Road and South Ring Road. the rest distributing along east side of .1ianguo Road and other sections. For the population distribution along the road see Table 3-15 and Table 3-16 and Fig.3-7. 43 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Fig.3-7 Population Distribution Related to Project Road Nn aodong Road .L Lishan Underposs t - - North Jianguo Road . "-. / 4#East kanpu Road Anshan / Iron & SteelQ Complex Xiaodon Gate / Huangang Road Heping Bridge/ SEntrance of Angang 0 Xiao on Gate a asa, 219 Park Fig,3-7 Poputation distribution re(Lated to pro ject roaLd <1000persons/ section 4 main crossing m m >1000persons/ section 44 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Fig.3-8 Social Environmental Status on Both Sides of Project Road (1) - tOoyang Anshan0 Iron & Steel East noRoad Complex j North Janguo Road Huang ng Roa- Yongchang Street *no filfyle tokHren Fig,3-8 SoCial environmnental status on both sides of project roadl (D) ® Schoo( A Marke t Etrtämmet ®Kindergarten ® HospItatlene Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Fig.3-9 Social Environmental Status on Both Sides of Project Road (2) 3-1 ° Anshan Iron & Stee EastJuRoad Comnplex 0s North Janguo Road n uagng Roa e °°. Yongchang Street A ~ ~ ~~ 1 MakepacrkFctr Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Table 3-15 General Situation of Population Related to JRR Road Road section Impacted Impacted population Remarks length (m) household Urban population Rural population Jianguo Road corridor 3-2-2. 3-2-3. 8770 1440 5877 3-3, 3-4, 3-5, 3-6 Yongchang Street 2-2. 2-3 1550 562 1560 Huangang Road 2-1 2150 831 3342 Hebei Road 3-1. 3-2-1 270 450 600 1200 Shahe Strz~et 1429 41 146 Superseded line of Hebei Road South Ring Road. Zhonghua Road 1550 348 1380 1-1. 1-2 Yuanlin Road Reconstruction 1-3-1 1250 283 1120 2426 Anguan Street 450 140 490 Changing trunk line Total .4095 13135 5006 Total 18141 persons Table 3-16 Disturbed Resident Distribution Related to JRR Road section N House-hold Population Female Old people Children Remarks South Ring Road (1-1) 1 225 900 432 300 185 Yuanlin Road (1-3) 2 283 1120 572 416 208 3 270 1080 448 460 252 Huangang Road 4 381 1524 915 662- 365 Including partial residents living at former Huangang Rd (2-1) 5 180 720 332 320 165 Yongchang St. 6 207 980 439 336 198 (2-3) 7 355 1912 840 779 344 Hebei Rd. (3-1) 8 450 1800 1080 600 405 Laodong Rd. (3-2) 9 212 948 409 406 199 A few of household will relocate 10 262 960 476 410 241 Including Lishan Underpass Jianguo Rd. 11 319 1276 626 365 289 (3-3) 12 279 921 473 380 235 Jianguo Rd. (3-4) 13 380 1520 712 720 358 Includmng the replacement at Wuyi Road intersection Jianguo Rd. 14 249 850 401 392 213 (3-5) 15 140 420 198 200 123 Jianguo Rd. (3-6) 16 108 432 259 91 96 Shahe St. 17 41 146 86 73 35 - Alternative of Hebei Road Anquan St 18 140 490 294 245 121 Changing line of tramcar Jianguo Road is the longest traffic trunk in south-north direction in the urban area. The population is unevenly distributed related to JRR. In the mid-section there are Anshan Railway Station, Zhanqian flourishing commercial area, science-technology-finance area and so on. In the north section on the west side of the road, there are 4 entrances on the east of AISC plant area. The residents are concentrated on the east side. In the south section, the population is sparse. All the people living along the road are non-agricultural population. Yongchang Street and Huangang Road is the longest trunk in the east-west direction of Anshan City, running through the city from the east to the west. All people along both road sides of Yongchang Street are non-agricultural population. The population on the south side of the road are larger than that on the north side. AISC plant area is on the north side of Huangang Road. So the people are concentrated on the south side of the road. And they are all the non-agricultural population. Hebei Road is a trunk line planned to be constructed along the north bank of Shahe River in 47 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment the north of Anshan and crossing through Shahe Village. 3.5 of the population impacted will be agricultural. South Ring Road will be stretched and go through Qianyu Village and Houyu Village. The impacted people are the rural population. The people living along the south of Yuanlin Road which is going to be reconstructed are the urban residents, evenly distributed over both sides of the road. 3.3.2 Distribution of Markets and Entertainment Places For distribution of ma kets and entertainment plaecs related to JRR, please see Fig.3-8, Table 3-17 and Table 3-18. There are 9 markets on both sides of the proposed road. Table 3-17 Markets Related to JRR Rd. section Market name Occupied area of Crowd at peak hour Market Varieties Daily gross sale the market ( m') (person I da%) tand count (Yuan / day) Yuantin Rd (1-3) 1 Dongnng Comprehensi%e Market 1800 11000 300 Vegetable. fruit and food etc. 40000 2 Vehicles Market 1000 3000 40 Bicycle and parts 10000 Yongchang Street 3 Clothmng Market in Sandao Street 2880 80000 1 8 I 8 2500000 (2-3) 4 Zhanqian Service Street 1880 15000 350 %gricultural products and fruit etc. 50000 Laodong Rd ( 3-2 5 Fruit and Food wholesale market 1000 8000 300 Vegetable. food and fruit, etc 25000 6 Xinxing Comprehenise and 1300 100o 430 Small commodities. non-staple 190000 Wholesale Market food. knitting wool and tobacco etc. Jianguo Rd. 7 Food Company of Aishan Cis. 2700 500 100 Meat. vegetable and fruit etc. 260000 Cold Storage (3-5> 8 Wholesale Market of Decorat,w 2000 2500 231 Decoratively material 100000 Material Jianguo Rd. ( 3-6 9 Fruit Wholesale Market of the cit% 5000 50000 1000 Dried and fresh fruit 550000 On the south section (3-6-1) of Jianguo Road, there is the biggest Fruits Wholesale Market of the city, with handling capacity of 3000 car/a, a flow of motor vehicles of 500 veh./d. a flow of handcarts and tricycles of about 3000 veh./d, a customer flow of over 50000 people/d. No traffic lights are available currently on this section. Table 3-18 Status of Recreational Places Along the Line Minimum People in Road section Name Road distance to Major facilities busy season Remarks the road (m) (person/day) Lishan Underpass- AISC North For the meeting Heping Rd. ( 3-3-2) Chemical Club Jianeuo Rd. 28 Film projector 200 of this factory Eryijiu Road- Old People's South Dance hall. billiard Building of Minsheng Road Palace Jianguo 14 \idco. old peoples 3000 seven floors (3-5-1) Road recreational rooms. etc. There are Sandao Street Light Industrial Products Market and Erdao Street Market on Yongchang Street (2-3-1), their customer flows are 8000 people/d and 15000people/d respectively. The two markets are halved by Yongchang Street. The Old People's Palace, which is located on the south section of Jianguo Rd. (3-5-1), entertains approximately 3000 people/d. 48 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment 3.3.3 Distribution of Schools, Kindergartens and Hospitals For distribtion of schools, kindergartens and hospitals related to JRR, please see Fig.3-8. For status of these schools. kindergartens and hospitals see Table 3-19 to Table 3-21. There are 10 schools, 3 kindergartens and 6 hospitals along the proposed road. Table 3-19 School Status Related to JRR Rd. section Na School lotalitudents Staff Remarks tperson) (person) Zhonghua Rd. I Nanchangdian 1500 80 There ate a few .tudiet trom nral area n the school. There are no residents ling (1-2) Primarx School n the wek - f tfhe Rd I lie students ha%e to cross South Changdjan Street Yuann Rd.(-3) 2 NQ 31 Middle School 1650 105 3 N, 34 Midle School 1900 91 \lost tudcnt-, ike n the southside of the Rd., The distance from the teachin. Huangang Rd. building to the present Rd as 50n (2-1) 4 Qianin Prmark School 474 42 ro be relocated Yongchang 5 Wuo i Road Primar 960 50 loit student like i the residentnal area in the south of school St. (2-3) School 6 AfSC Engineering 1050 360 Yongchang College St. (2-3) 7 Gangdu Primar\ Schoxl 2700 119 ihe childien fiom h otachatStrect southern residential area stud% in this school 8 NQ 15 Middle School 2800 230 Hebei Rd (3-1) 9 Xishahe Primar\ School 720 20 Laodong Rd. 10 Laodong Rd Pnimati "Chol 1150 60 Table 3-20 Kindergarten Status Related to JRR Rd. section N Kindergarten Children Remarks Yuanlin Rd. (1-3-1) 1 NQ 13 Kindergarten of AISC 500 Wuvi Rd. (2-2) 2 NP 2 Kindergarten of AISC 260 Vo be relocated Jianguo Rd. (3-3-2) 3 Ns 7 Kindcrgarten of AISC 313 Rctnovc to the place 100m from the road Table 3-21 Hospital Status Related to JRR Rd. section Na Hospital No. of bed near the read Doctors and nurses Remarks Huangang Rd. (2-1) 1 Tiexi Health C'entcr for Women - 20 and Children Yongchang St. (2-3) 2 lnmcomeologetn spiont Hareai - 20 To be displaced Jiahpuo Rd. (3-4) 3 Rail%ax HoNpitul -_30 To be displaced 4 Anshan Sencil )iscasef Hospital 5 76 The gate is iatallef to Janguo Rd Jianguo Rd. (3-5) 5 Anshan Bone Di'cae I loNpital 6 65 6 Hospital of(irain Burcau 4 58 The gate is tacmng I_ I _ _ the ssest Lying on the southeast corner of the intersection of Zlhonghua Rd. (1-2-1) and Nanchangdian St. is the Nanchangdian Primar School. whose teaching building is vertical to Zhonghua Rd. and-gate faces Zhonghua Rd. Ninety percent plus of the I 1500 pupils reside in the area east of Zhonghua Rd. and South of Nanchangdian St.. There is no residential area on the west of Zhonghua Rd.. The Qianjin Primary School is located on luangang Rd. (2-1-3). 474 pupils study in the old and poorly equipped building suffer from the noise produced by the neighbouring AISC's railwaN line and the -as leaka,_!e emitted from the niorth\,ard uas container. 49 Liaoning Irban Transport Project-Anshan Subproject Environmental Impact Assessment The Wuyi Road Primary School is located on the south side of Yongchang Street (2-3). with its side gate being vertical to Yongchang Street. Two thirds of its 960 pupils live in the residential area south to the school and 156 teachers and pupils go to school by bicycle. Na 15 Middle School and Gangdu Primary School lie on the north side of Yongchang Street (2-3-2). The former's gate faces Yongchang Street and fortunately the teaching building is over 50 m away from the road. Lying on the east side of Zhonghua Road, the latter is far away from the Yongchang Street. 420 teachers and students have to make left-turning to get into the school. The Laodong Road Primary School is located on the west side of Laodong Rd. (3-2-1), 100 m north to the Shuiyual St.. The school gate is 12 m away from the existing road, and the teaching building is 30 m away from the gate. Two thirds of its 1150 pupils live in the residential area east of Laodong Rd..There is a Lishan Wholesale Market 50 m south to the school, most customers are residents dwelling in the southward residential area of Laodong Rd.. Most traffic occurred in front of the school is right-turning traffic, no traffic control facilities are currently available in front of the school and market. The N2 2 Kindergarten of AISC, which is located on the Wuyi Rd. (2-2) and has 260 kids, mainly provide nursing service to children of nearby AISC employees. It shall be relocated because the proposed Wuyi Rd. Interchange will run through the existing kindergarten. The hospital of Grain Bureau is located on the west side of Jianguo Rd. (3-5-2) and is, at minimum, 5m away from the existing road. The wards are located on the second floor, housing 26 hospital beds, among which 4 beds face the road and 13 beds are idle. 3.3.4 Distribution of Plants, Scientific Research Institutions, Stores and Hotels There are 15 factories, 2 scientific research institutions, 3 stores and 6 hotels along the proposed road. For their layout and current situation see Fig.3-9 and Table 3-22 through Table 3-25. For details of displacement of some buildings see relevant parts in this chapter. Table 3-22 Main Plant Related to JRR Rd. section Number of plant N Plant name South Ring Rd. (1-0) 1 1 Glass Plant 2 2 Qianshan Material Recovery Co. Zhonghua Rd. (1-2) 3 Power Installation Co. I 4 Zhendong Metal Structure Factory Yuanlin Rd. (2-1) 1 5 Flow Meter Plant 6 Purifying Equipment Co. .-Huangang Rd. 4 7 Machine Repairing & Machining Plant of N2 2 Construction Company of AISC (2-1) 8 Cast Pot Plant 9 Steel Wire Plant Wuyi Road intersection 2 10 Mine Equipment Department of AISC (2-2) II AISC Comprehensive Utilization Company Yongchang St. (2-3) 1 12 Automatic Control Equipment Plant for Optic Instrument Jianguo Rd. (3-3) 1 13 Welfare Plant of NQ 2 Steelmaker Jianguo Rd. 2 14 AISC Repairing & Building Plant (3-4) 15 AISC Power Supply Plant 50 Liaoninp Urban Transport Project-A nshan Subproject Environmental Impact Assessment Table 3-23 Status of Main Organization & Scientific Research Institutions Related to JRR Rd. Section No Unit Rd. People Jianguo Rd.-Shengli Rd. (2-3-1) I Iron & Steel Research Institute of AlSC Yongchang Street 1000 Ileping Rd.- WuNi Rd. (3-4-I) 2 .1nshan General Labor Union South lianguo Rd. 45 Table 3-24 Status of Main Market and Commercial Area Related to JRR Daily sails Rd. section Na market Rd. Scale Area Daily flow thousand (m2) of people Yuan/day Jianguo Rd. (3-4-2) - Commercial Center Jian'u Rd. IN) Large - - - Wuyi Road intersection (2-2) I AISC Supermarket Wuxi Rd Small 600 200 10 Jianguo Rd.-Shengli Rd. (2-3-1 2 (*it of Fashionable Dress Yongchangstreet Medium 1200 5500 400 Ert ijiu Rd.-Minsheng Rd. (3-5-1) 3 H holesale Company of South banguo Rd Medium 1020 500 30 Knitting & Cotton Textile (at the peak) Table 3-25 Status of Hotel, Hostel and Guest House Related to JRR Rd. section No Name Guest rooms Number Remarks adjacent to Rd. of beds Jianguo Road intersection (34-1 I Xinggong I lostel 3 6 Guest rooms at the third floor 2 Chunhua I otel 2 4 Guest rooms at the sixth floor - Jianguo Rd. (3-5-I) 3 Ron . , j Ri i,i De,e,opnent co. - - 4 1Hostel of Vegetable Co. - - Jianguo Rd. (3-5-2) 5 Milk Wax flotel 8 16 Guest rooms at the fifth and sixth floors Jianguo Rd. (3-6) 6 Jiaoton., (juest House 5 10 3.3.5 Traffic Jams in Some Areas (1) Zhanqian area There is Anshan Railway Station with a passanger flow% of appximately 40000 people/day on the west of the square, the rainbow bridge that connects Tiedong and Tiexi district is situated on the north side of the Railway Station. The tramcar pass the area on east side of the square. The Long-distance Buses Station ( travel to other cities) is located on south side of the square. Currently, many local buses and long-distance buses pass this area everyday. During the peak hours. a lot of commuters pass this area. which make this area a concentrated place of pedestrians and vehicles. The underground market located on the east side of the square has a passage leading to the Railway Station Square which. for some reasons. functions not efficiently. (2) Main gates ofACIS About 60 to 70 percent of the 200000 employees of AISC work in the main plant area. 70 percent of the AISC traffic \olUne is completed through .ianguo Rd.. and all the gates are within the proposed road seclions. Because of the significant traffic volume (person flow of 20000 and motor vehicle tlo\\ of 500 veh. during peak hours) occurring at the intersections adjacent to AISC gates. traffic jam is not a rare scene at these points. During the peak hours. what is worse. the jams even spread to neighbouring intersections. For the distribution of gates f .\ISC and current situation of their relevant intersections see SI Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Fig.3-7 and Table 3-26. Table 3-26 Existing Status of Main Intersection Crossed with Jianguo Road Rush traffic flow of Ru,h traffic flow Eli%ting Rush traffic N Intersection non-motor of motor %ehicies Service level status of flow in peak hour Remarks traffic %ehicles at peak hour at peak hour inrrasruclure People Motor ( Yeh/h ) (ch/h 104) vehicles I Wuyi Road 20625 251 0 D and belto Underpiss 2.8 500 Froni entrance of SC 2 Lishan underpass 50000 924 B and belo% t nderpis 5.6 650 ditto 3 Hepingmen 22637 2261 C and belo% .eeil crossng 2.0 500 ditto 4 Xiaodong-men 23000 276 B and below% Locl crossn 2.3 600 ditto 5 Minsheng Road 17264 2702 E Underpass . (3) Minsheng Rd intersection The intersection, five-direction as it is, is the main one that undertakes northward and southward traffic and connects Tiedong and Tiexi district. For its current situation and location see Table 3-26 and Fig.3-7. 3.3.6 Land Use along the Project Land along the traffic corridor system of Jianguo Road is mainly farm land, industrial area. residential houses, markets, school, various commercial uses and so on. Most of the newly- built road section (Hebei Road, South Ring Road and so on)are mainly on the farm land. Other road sections are on the land of industrial area. residential area, commercial area, schools, markets and so on. For the land use of various road sections see Table 3-27. Table 3-27 Land Use of the Project Road Sections Na Description Zoning Existing land use 1 South Ring Road Rural community area Farm land 2 Zhonghua Road 1-2 Qian%u industrial area Plant and so on 3 Yuanlin Road 1-3 Residential area School. market. kindergarten and residential house etc. 4 Huangang Road South side Mingled area Resident, school and commerce etc. 24 1North side Industrial area AISC plant area 5 Yongchang Street 2-2. 2-3 Minaled area School. commerce. market, plant and residential house etc. 6 Hebei Road 3-1 Rural community area Rural houses. schools and plants run by the village etc. 7 Laodong Road East side Residential area Residential house. commercial network etc. 3-2 West side Mingled area Residential house. commerce and industry etc. 8 Jianguo Road East side Minpled area Residential house and plant etc. 3-2 West side Industrial area AISC plant area 9 Jianguo Road East side Mingled area Residential house, plant and guest house etc. 3-4-1 West side Industrial area AISC plant area 10 _inu od atsd Mingled area Commercial netmork. residential house and hotel etc. 10IJianguo Road East side 3-4-2, 3-5-1 West side Storage area Rail%aN goods %ard etc. 11 Jianguo Road East side Residential area Residential area etc. 13-5-2 West side Service area Market. hospital and recreational lace etc. 12 Jianguo Road East side Residential area Residential houses R n3-6 tWest side Sen. ice area iMarket and hotel etc. MigldaraReienil ose omecead nusr ec Liaoning Urban Transport Project-Anshan Subproject Environmental !mpact Assessment 4 ENVIRONMENTAL IMPACT ANALYSIS 4.1 Introduction The following items were analyzed in this paper in accordance with the "Outline Environmental Impact AnalvsiJ( approved by the National Environmental Protection Agency. "TOR approved by the World Bank and the concern of the public. * Noise and Vibration * Air Quality * Water Quality * Landscape and Ecology * Socio-economic Components * Sunshine * Alternatives The patterns below shall be followed to the best of Author's ability (in construction and operation). * Approach and Methodology * Vehicle Emissions Inventory * Impact Analysis * Mitigation * Residual Impact The impact of preferred alignment and alternatives on environmental, with or without project. were described and compared. 4.2 Impact Analysis of Noise and Vibration 4.2.1 Approach 4.2.1.1 Noise The speed of motor vehicles ill. upon the completion of the project, reach 38.49 km/h. as compared to existing 33.76 km. h. The project will ease the traffic jam significantly. however. the noise pollution will be worsened due to the increase of speed. Prediction on noise impact w as made. which is based on the FHWA and corrected in accordance with the actual conditions. After completion of JRR project. the road is w% idened. most lanes are separated and the levelness of road is extraordinarill improved \\hich decrease the frequency of stop-start of vehicles. The noise produced \ ehicle tra%cling at higher speed shall therefore also be reduced. See Table 4-1 for prediction model. The analyses include: * Noise analysis in the lear of 2010. mith project 53 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment * Noise analysis in the vear of 2010. without project * Noise level comparison in the year of 2010. with vs without the project * Noise analysis of alternatixes * Noise analysis of interchange * Noise analysis of line changing of street car 's Noise analysis of sensitive points Table 4-1 Prediction Model Component Model type Assumptions Modifications Noise US federal Highways Administration Traffic %olume as per MVA study. Modified parameters based on Model (FHWA) Viaduct and ground leel traftic Chinese regulatory requirements 4.2.1.2 Vibration k As mentioned hereinbefore, there are two schemes for the project, i.e., widening and elevating schemes. The latter will produce more vibration, therefore more impact than the former. The proposed elevated road lies on the west side of Jianguo Road, 50 m away from the nearest sensitive points. So. the elevated road will produce very little impact on sensitive area. The monitoring on current status shows that the vibration level of Jianguo Road at different time period didn't exceed the limit. As required by "Outline Environment Impact Analysis" and its review provided by State Bureau of Environmental Protection, the impact analysis on vibration in current and operational phases shall be made, the prediction calculation on traffic vibration is left out of consideration. 4.2.2 Pollution Sources Inventory 4.2.2.1 Noise Source Inventory a) Construction phase The equipment employed in the project have a great variety, as shown in Table 4-2. The JRR project is now being under the phase of feasibility study. The construction schedule and construction team are not decided yet. Table 4-2 shows possibilities of schedule and team choice as well as equipment which shall be used in the construction. Some equipment are only for reference because they shall not definitely be used in the future. As indicated in Table 4-7, the noise levels at 50 m from the construction equipment exceed the night standard (55 dB). Because the roads to be constructed are adjacent to the residential buildings, these equipment is forbidden at night. b) Operational phase The design speeds of vehicles on different road sections are graded as 40, 60 and 80 km/h. The Table 4-3 shows the noise levels of vehicles under three speeds. 54 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment 4.2.2.2 Vibration Noise Inventory a) Construction phase Most of the equipment that are to be used in the project are heavy duty equipment, which will, while operating. vibrate evidently and produce big impact on the environment. Given below are the vibration levels of some typical equipment on operating duty. See Table 4-4. Table 4-2 Noise Levels of Different Equipment N2 Item Distance from test point to equipment (m) Lma.(dB) I Wheel loader 5 90 2 Grader 5 90 3 Vibroll 5 86 4 Double wheel and doule vibrating roller S 81 5 Three wheel roller 5 81 6 Wheel roller 5 76 7 Bull dozer 5 86 8 Hydraulic wheel excaNator 5 84 9 Paver 5 87 10 Generator 5 98 II Impact drill 5 87 12 impact pile-driver 5 112 13 Truck 5 92 14 Concrete mixer 5 91 15 Concrete pump 5 85 16 Wheel crane 5 96 17 Pneumatic hammer and rock drill 98 18 Vibro tamper 84 19 lPneumatic spanner 5 95 Table 4-3 Equivalent Noise Levels of Different Vehicles (dB) Item Li (40 km/h) Li (60 km/h) Li (80 km/h) - Height of noise source Light-duty vehicle 68.5 73.1 77.7 0.6 Medium-duty vehicle 75.4 81.8 88.2 1.0 Heavy-duty vehicle 84.4 88.0 91.6 1.0 Note : Li is referred to the max. average of A class noise at the place 7.5 m from vehicle of i type. Table 4-4 Vibration Levels of Some Typical Equipment Item Vibration levels at different distance (dB) 5m 10M 20m Vibratory pile driver 94 79 70 Concrete mixer 55-72 50-67 45-62 Excavator Crawler 75-85 72-80 68-78 Wheel 68-72 65-70 57-63 Vibroll Vibration 85 71 60 _ Withoul libration 60 55 50 Bull-dozer frael 81 78 76 Operation 72 70 68 55 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment b) Operational phase Most of the vibration in this phase is generated by the vehicles traveling on road, especially the trucks, for details see Table 4-5. Table 4-5 Vibration Levels at Different Distance from Motor Vehicle Lanes Item Vibration level at different distance (dB) 2m 4m 8m 16m 32m 64m Heavy-duty truck 67 65 63 58 47 47 Medium-duty truck 64 65 62 55 46 43 Light-duty truck 63 61 58 51 46 42 4.2.3 Impact Analysis 4.2.3.1 Construction Phase a) Noise impact analysis (1) Scope and applicable standard According to the "Standards for Analyzing the Impact of Highway Construction Project on Environment", the scope refers to 50m from both sides of the road or around concrete mixer. "Noise Standard for Boundaries of Construction Sites" GB12523-90, was adopted. For the noise limit in different construction phase, see Table 4-6. Table 4-6 Noise Standard for Boundaries of Construction Sites Construction Major noise sources Noise limit (dB) phase Day Night Earth work Bull-dozer, excavator, loader 75 55 Piling Pile driver 85 / Concrete mixer, vibro tamper, electric saw 70 55 Finishing Crane, elevator 65 55 (2) Impact analysis According to Table 4-2 and GB12523-90, the noise levels at different distance (5-50 m) from equipment and its exceedance over the standard are shown in Table 4-7. The exceedance over standard listed in Table 4-7 is referred to noise level over standard at the place 50 m from the construction equipment. Exceedance over standard is 1-23 dB at night and 1- 9 dB in the daytime. So all the equipment listed in Table 4-7 is not acceptable at night (22:00-06:00) and is acceptable in daytime except generator, impact driver, concrete mixer, wheel crane, pneumatic hammer and rock drill. b) Impact analysis of vibration in construction phase As indicated in Table 4-4, the max. vibration at distance 10-20 m from the equipment is 76- 80 dB, which exceed the daytime standard by 1-5 dB, and the nighttime standard by 4-8 dB. Vibration impact is more harmful at night. Since the equipment listed in Table 4-4 are 56 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment seldom used at night and the usage of impact piling machine, vibro-road roller etc. is forbidden at night, impact of vibration on residents in th- day time shall mainly be taken into consideration. Table 4-7 Noise Levels at Different Distance and Exceedance over Standard (dB) N2 Item Distance Standard Exceedance over standard Sm 10m 20m 40m 50m Day Night Day Night I Wheel lo4der 90 84 78 72 70 75 55 15 2 Grader 90 84 78 72 70 75 55 15 3 Vibroll 86 80 74 68 66 75 55 11 4 Double wheel and double vibrating roller 81 75 69 63 61 75 55 6 5 Three wheel roller 81 75 69 63 61 75 55 6 6 Wheel roller 76 70 64 58 56 75 55 1 7 Bull dozer 86 80 74 68 66 75 55 II 8 Hydraulic wheel excavator 84 78 72 66 64 75 55 9 9 Paver 87 81 75 69 67 75 55 12 10 Generator 98 92 86 80 78 75 55 3 23 II Impact drill 87 81 75 69 67 75 55 12 12 Impact driver 112 106 100 94 92 85 7 13 Truck 92 86 80 74 72 75 55 17 14 Concrete mixer 91 85 79 73 71 70 55 1 16 15 Concrete pump 85 76 70 64 62 70 55 7 16 Wheel crane 96 90 84 76 74 65 55 9 19 17 Pneumatic hammer and rock drill 98 92 86 80 78 75 55 3 23 18 Vibro tamper 84 78 72 66 64 70 55 9 19 Pneumatic spanner 95 89 83 77 75 75 55 20 4.2.3.2 Operational phase a) Noise impact analysis (1) Scope and applicable standard The scope for traffic noise is 100m laterally on both sides and 50m vertically. According to the zoning of Anshan City. the project involves four categories of zones. For the environmental noise standard of different zones see Table 4-8. Table 4-8 Environmental Noise Standard (dB) Category Applicable zone Day Night I Residential. educational. cultural and governmental 55 45 2 Residential. commercial and industrial or commercial 60 50 3 Industrial 65 55 4 Roadsides to trunk line 70 55 (2) Noise impact analysis (1 Noise prediction and analysis for the year of 20 10% with project The traffic noise of 14 sections in the year of 2010 with project has been predicted. The traffic noise level at 0.0 m. 10 m. 20 m. 30 m. 50 m, and 100 m respectively to the red line of everx section in peak hours. daytime and at nighttime has been predicted. For the details. see Table 4-9 and Fig.4-1. Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Table 4-9 2010 Traffic Noise Prediction Result of Every Section with Project (dB) Distance Section 1-1 1-2 1-3 2-1 2-3 3-1 3-2 3-3 3-4 3-4 3-5 Shengi Rd. Shengi Rd. Reamin Rd. to red line Description Janguo Rd. Pingan St.- Kangning Minsheng Shengli Rd.- Shengli Laodong Shuangshan Gangeheng Wuyl Ild. - 'Lieshishan Bagna St. - Henan St. - Jiangue Rd (m) -Zhonghua Southern St.- Pingan Rd. - XIng- Zhonghua Rd.-Lao- Bridge- Rd.-XIao- SL-Wuyi Wenhu St. St. -Ante St. Xinhua St. Shulyuan St. - Tiexi turn- Rd Ring St. sheng Rd Rd. dong Rd. Shulyuan SL dong gate Rd. around Peak hour 76.9 68.9 73.3 77.7 70.7 77.9 79.6 77.4 78.5 73.4 77.9 69.4 72.7 71.9 0.0 Day 75.6 68.1 72.5 76.9 69.9 77.0 78.8 76.6 77.7 72.6 77.1 68.6 72.0 71.7 Night 66.2 60.0 62.3 66.9 60.2 67.1 68.1 66.7 67.7 62.6 67.5 64.5 64.2 66.0 Peak hour 75.1 664 71.5 75.7 68.7 75.8 77.7 75.4 76.6 71.7 76.2 67.6 70.9 68.2 10 Day 73.8 65.6 70.7 74.9 67.9 75.1 76.9 74.6 75.7 70.9 75.4 66.8 70.2 67.4 Night 64.4 57.6 60.6 64.9 58.3 65.1 66.8 64.4 65.7 60.8 65.7 62.6 62.4 63.1 Peak hour 68.8 59.8 65.2 69.2 62.2 69.4 71.3 68.9 70.0 65.3 69.8 61.3 64.6 61.2 20 Day 67.4 59.0 64.4 68.5 61.4 68.6 70.4 68.1 69.2 64.6 69.0 60.5 63.8 60.4 Night 58.1 51.0 54.3 58.5 57.8 58.7 60.4 58.3 59.2 54.5 59.4 56.2 56.1 56.4 Peak hour 67.7 58.5 64.1 68.1 61.0 68.2 70.1 67.7 68.8 64.2 68.7 60.2 63.5 59.7 30 I)ay 66.3 57.7 63.3 67.3 60.2 67.5 69.3 67.0 68.0 63.5 67.9 59.4 62.7 58.9 Night 57.0 49.7 53.2 57.3 50.6 51.5 59.3 57.1 58.1 53.4 58.3 55.0 55.2 55.0 Peak hour 65.9 56.3 62.4 66.2 59.1 66.4 68.2 65.9 66.9 62.5 67.0 58.4 61.7 57.4 .50 Day 64.5 55.7 61.6 65.4 58.4 65.6 67.4 65.1 66.1 61.7 65.2 57.6 60.9 56.7 Night 55.2 47.8 51.4 55.4 48.7 55.6 57.4 55.2 56.2 51.6 56.5 53.2 53.2 52.9 Peak hour 62.7 53.1 60.1 62.9 55.8 63.1 64.3 62.5 63.6 59.2 63.7 55.2 58.4 53.8 100 Day 61.3 52.3 58.3 62.1 55.0 62.3 64.1 61.8 62.8 58.4 63.0 54.4 57.7 53.0 _ Night 52.0 44.3 48.2 52.1 45.3 52.3 54.1 51.9 52.8 48.3 53.3 49.9 49.4 49.4 58 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Table 4-10 2010 Traffic Noise Excess Stat s of Every Section w ith Project (dB) Distance Section 1-1 1-2 1-3 2-1 2-3 3-1 3-2 3-3 3-4 3-4 3-. Shengh Rd. Shengil Rd. Renmin Rd. to red line Description Jianguo Pingan St..- Kangning Minsheng Shengli Rd.- Shengli Laudong Shuangshan Gangcheng NWuI Rd. Lieshishan Bagua St. - Ilenan St. - Jianguo (n) Rd.-Zhong- Southern St.- Pingan Rd. - XIng- Zhonghua Rd.-Lao- Bridge- Rd.-Xiao- St.-Wuyl Wenhua St. St. -Anle St. Xinhua St. Shulyuan St. Rd.-Tied hua Rd Ring St. sheng Rd Rd. dong Rd. Shulyun St. dong gale Rd. turn- around Peak hour 6.9 - 3.3 7.7 0.7 7.9 9.6 7.4 8.5 3.4 7.9 - 2.7 1.9 0.0 Da\ 5.6 - 2.5 6.9 - 7.0 8.8 6.6 7.7 2.6 7.1 - 2.0 1.1 Nighi I 1.2 10.0 7.3 11.9 5.2 12.1 13.1 11.7 12.7 7.6 12.5 9.5 9.2 11.0 Peak hour 5.1 - 1.3 5.7 - 5.8 7.7 5.4 6.5 1.7 6.2 - 0.9 - 10 Da\ 3.8 - 0.7 4.9 - 5.1 6.9 4.6 5.7 0.9 5.4 - 0.2 - Night 9.4 2.6 5.6 9.9 3.3 10.1 11.8 9.4 10.7 5.8 10.7 7.6 7.4 8.1 Peak hour 3.8 4.8 10.2 9.2 7.2 14.4 11.3 13.9 10.0 5.3 14.8 6.3 9.6 1.2 20 Dw, 2.4 4.0 9.4 8.5 6.4 13.6 10.4 13.1 9.2 4.6 14.0 5.5 8.8 0.4 NiLht 3.1 6.0 9.3 8.5 6.8 13.7 10.4 13.3 9.2 4.5 14.4 11.2 11.1 6.4 PCak hour 2.7 3.5 9.1 8.1 9.0 13.2 10.1 12.7 8.8 4.2 13.7 5.2 8.5 - 3o D)a\ 1.3 2.7 8.3 7.3 5.2 12.5 9.3 12.0 8.0 3.5 12.9 4.4 7.7 - Niht 2.0 4.7 8.2 7.3 5.6 12.5 9.3 12.1 8.1 3.4 13.3 10.0 10.2 5.0 Peak hour 0.9 1.5 7.4 6,2 4.1 11.4 8.2 10.9 6.9 2.5 12.0 3.4 6.7 - 50 Da\ - 0.7 6.6 5.4 3.4 10.6 7.4 10.1 6.1 1.7 10.2 2.6 5.9 - Night 0.2 2.8 6.4 5.4 3.7 10.6 7.4 10.2 6.2 1.6 11.5 8.2 8.2 2.9 Peak hour - - 5.1 2.9 0.8 8.1 4.9 7.5 3.6 - 8,7 0.2 3.4 - 100 Day - - 3.3 2.1 - 7.3 4.1 6.8 2.8 - 7.8 - 2.7 - Nig- - 3.2 2.1 0.3 7.3 4.1 6.9 2.8 - 8.3 4.9 4.9 - 59 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Fig.4-1 2010 Traffic Noise Prediction Result of EBerN Section with Project R1Z1to Goyau0 71.3 704 aA(3-1 o =2 e.s sM. IG&in as 61L sTl 6sA 76.1A 7s. 7U as An 6S MS S Iro &7 Stel60SW9 77. M 607U4 . 2 as t.2. &1 6373 795Was Iro & 0Steel 0tass. Comle 6 / Wam a 75. 597 4l C U ulA ~ ~ #. At 9.25 M .7, 71.7 54A as I~L 6.3 SssU OA JO4 59. 1 dB 4 I3A s a 6 26779 . 1 9. .9 219 oork SM X7 &6 as.s ssue 627 6I6 SIA.3M 1IA U2 GSAAS 611. 20a ass.0SL 73 SA GIA M'51 SL? 6.A 5.0 5905A-9W I~~% SU 15.27. S7 673 58. *24UM asa section s sihpojecs Project ~~ ~21 Parktenaie xstn Secton artng os Iterhne aidcsn 0 5 o Railway ~ ~ ~ # an4 scinNoovr-rvrbigSob ut 6t0 .ss. Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Fig.4-2 2010 Traffic Noise Excess Status of Everi Section with Project . 9.6 .O 1311 N ~7.74 11.8 ( 11.3 10A 1064. i 3-1 o 1&1 9.3 93 7.9 7.0 11 -- 5.8 5.1 11 .. 141 1314L 13.7 13 115 125- 11A 15.6 1T6 7.7 79.1L 2.90. 011 1 17A9 Iron~~~L & te 1_7. 3 72 Comple3 207 92 '09 09 2L7 SA~~. 7.7 10.23107 2.9/ 31 13. 13.32 9 &9~~& 1.1 1.82K 1 SA~~~3 2J2 L2 70 4.. SA I a 5..3 4414. ? = = = = = 7.6 10 1.1 11A I-LI = 5.0'3 o 7.9. 7.113 1O2 SA 197 M 12.0 132 11333 -2.-7 491 SX 11312A9 5.1 &.8 9AX 3.8 2A 3.1 42 U & U _1 666 17 1.3 0. '. 0.SA228. 4;7~~0. - bo 52qy N Tro~ ~ ~ Ha"33kkL Fig.4-2~~~~~ ~7. 6.40 Trfi osdxes Bttso vr section 9.0h Sroj5.6 Project ~ ~ ~4 4.1d SA0K Atenaie.7x;tn schemo int =a RQ;Iway Section parting point 21 Pnecark ,vautan 0 o and ectinn N .S 2.5 r 73 vrirde ab u 61 07 . Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Table 4-9 shows that noise level on both road sides after completion of JRR will mostly exceed the standard, see Table 4-10 and Fig.4-2. According to "Environmental Noise Standard ofAnshan Cit'v ". all the noise levels beside the red lines of all sections except some in peak hours and daytime. exceed the standard. The piak hour noise level exceeds the standard IV by 0.7 - 9.6 dB, the daytime noise level exceed the standard IV by 0.2 - 8.8 dB, the nighttime noise level exceeds the standard IV by 3.3 - 13.1 dB. Almost all the noise level of difference zones within 20 ~ 100 m of the road exceed the standard to large extent. The section that suffers the most serious noise is Section 3-5, whose noise level exceeds the standard by 14.8 dB in peak hours, 14.0 dB in daytime and 14.4 dB in- nighttime. ( Noise prediction analysis in the year of 2010 without project The model employed prediction points selected and prediction period selected in the year of 2010, without project are exactly the same as that of the year of 2010, with project. For the prediction results see Table 4-11 and Fig.4-3. As Table 4-11 shows, with the project, the noise levels of the area near the red line, except that of section 2-3 South Shengli Road and North Shengli Road, exceed the standard. Without the project, the noise levels in difference zones within 20-100m of the road is similar to that of with project. ( Noise level in the year of 2010. with vs. without project Comparison was made based on the prediction results. The values' in the Table 4-12 and Fig.4-4 were the difference of with vs without project. The purpose of predicting the noise levels of South Shengli Road, North Shengli Road and Renmin Road that are out of the scope of the project is to demonstrate the impact of the project on the road of the city. We can conclude that in the year of 2010. The noise levels of South Shengli Road and Renmin Road during the day and at night, with project, are decreased by 2.1 and 1.6 dB, the max. respectively, as compared to that of without project, which shows that the project has good impact on the urban area. South Shengli Road and Renmin Road are chosen to represent other non-project roads. After completion of JRR project, vehicles on other roads such as South Shengli Road and Renmin Road shall be attracted to travel on the project road. Traffic flow and noise level from vehicle on other roads shall be reduced. Therefore, the overall noise level in the city on traffic trunks shall be accordingly decreased. The noise level of section 1-2, with project is lower than that without project. There are three reasons of serious status of noise level on road section 1-2 (extension of Zhonghua Road) vehicles on Yuanlin Road have to pass this section to enter South Ring Road, vehicles traveling on this section are most of heavy-duty ones (there are many plants in this zone); high frequency of stop-start of vehicle due to bad road paving. The noise level of section 3-4 at nighttime, with project, is lower than that without project. 62 Liaoning Urban Transport Project-Anshan Subproject Environiental Impact Assessment Table 4-1I 2010 Traffic Noise Prediction Res It of Every Section without Project (dB) itenC Section I-1 1-2 13 2-1 2-3 3-2 33 3-4 3-4 3-5 Shengli Rd. Shengli Rd. Renmin Rd. to red lint. Description Jdianguo Pingan St.- Kangning Minsheng Shengli Rd.- Laodong Shuangshan Gangcheng Wuyi Rd. - Lieshishan Bagua St. - Ilenan St. - Jiangue (m) Rd.-Zhoug- Southern St.- Pingan Rd. - Xing- Zhonghun IIridge-Shui Rd. -Xiao- St.-Wui Wenhua St. St.;-Anle St. Xinhus St. Shuiyuan Rd.-Tiexi turn- A*' hua Rd Ring St. sheng Rd Rd. -yunn St. dong gate Rd. . St. around Peak hour 76.6 73.6 72.6 72.0 69.7 76.2 75.6 76.7 71.8 74.3 69.8 70.0 73.4 0.0 th 75.8 72.8 71.8 71.2 69.0 75.9 74.8 76.2 71.0 73.7 69.2 69.2 72.6 Nicht 63.0 71.5 64.5 67.7 60.0 61.9 64.9 68.9 66.0 67.0 62.2 64.2 67.6 Peak hour 74.6 69.3 69.7 68.6 66.7 72.8 72.9 72.8 68.4 71.2 67.9 68,2 70.1 1o 1 ),1 73.8 08.5 68.9 67.8 65.9 72.0 72A 72.4 67.1 70.5 67.A 67,4 69.3 Nivhi 61.0 66.5 61.6 64.2 50.4 63.1 62.9 65.4 62.8 64.5 60.3 62.4 64.4 11cak hour 68.2 62.1 62.9 61.6 59.8 65.7 65.0 65.6 61.4 64.1 61.6 61.8 63.2 20 I)aW 67.4 61.3 62.1 60.8 59.0 64.7 65.0 65.2 60.6 63.5 60.9 61.0 62.4 Night 54.6 59.5 54.8 57.1 49.4 55.9 55.1 58.3 55.9 57.8 53.8 56.1 57.5 Peak hour 67.0 60.5 61.5 60.1 58.3 64.1 64.3 64.1 59.9 62.7 60.4 60.7 61.8 30 Da% 66.2 59.7 60.7 59.3 59.6 63.3 63.5 63.7 59.1 62.1 59,7 59.9 61.0 Nilu1 53.4 59.4 53,4 55.6 47.9 54.4 53.6 56.8 54.5 56.5 52.7 55.0 56.0 Ileak hou 65.1 58.2 59.4 57.9 56.2 61.1 62.0 61.8 57.7 59.7 58.6 58.9 59.6 5 )a% 64.3 57.4 58.6 57.6 55.2 60.9 61.2 61.5 56.9 60.1 58.1 58.1 58.8 _Niht 51.5 55.0 51.4 53.4 45.6 52.2 51.3 5-.6 52.3 54.5 50.8 53.2 53.9 Peak hour 61.7 54.4 55.8 54.3 52.5 58.1 58.4 58.1 54.0 56.9 55.2 55.7 56.0 100 Da 61.0 53.6 55.0 53.5 51.8 57.3 57.6 57.7 53.2 56.2 54.7 54.9 55.2 Night 48.2 51.2 48.2 50.7 41.9 48.4 47.7 51.0 48.7 51.0 47.5 50.0 50.3 63 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Table 4-12 2010 Traffic Noise Vari tion of Every Section with and without Project (dB) Distance Section 1-1 1.2 1-3 2.1 2-3 3-2 3-3 3-4 3-4 3-5- Shengit Rd. Shengli Rd. Renmin Rd. to red line Jiangue Pingan St.- Kangning Minsheng Shengli Rd.- Laodong Shuangshan Gangcheng Wuyl Rd. - Lieshishan Bagua St. - Ilenan St. - iangue Rd - (M) Description Rd.-Zhong- Southern St.- Pingan Rd. - Xing. Zhonghua Bridge-Shui Rd. -XIao- St.-Wuyl Wenhun St. St.-Anle St. Xinhua St. Shulyuan St. Tied turn- bu Rd Ring St. sheng Rd Rd. -yuan St. dong gate Rd. around Peak hour 0.3 -4.7 0.7 5.7 1.0 3.4 1.8 1.8 1.6 3.6 -0.4 2.7 -1.5 0.0 Day -0.2 -4.7 0.7 5.7 0.9 2.9 1.8 1.5 1.6 3.4 -0.6 2.8 -1.5 Night 3.2 -11.5 -2.2 -1.9. 0.2 1.2 1.8 -1.1 -3.4 0.5 2.5 0.0 -1.6 Peak hour 0.5 -2.9 1.8 7.1 2.0 4.7 2.5 3.7 3.3 5.0 -0.3 2.7 -1.9 10 Day 0.0 -2.9 1.8 7.1 2.0 4.9 2.5 3.3 3.3 4.9 -0.6 2.8 -1.9 Night 3.4 -8.9 -1.0 0.7 1.9 3.7 1.5 0.3 -2.0 1.2 2.3 0.0 -1.3 Peak hour 0.6 -2.3 2.3 7.6 2.4 5.7 3.1 4.4 3.9 4.7 -0.3 2.8 -2.0 20 Day 0.0 -2.3 2.3 7.7 2.4 5.7 3.1 4.0 4.0 5.5 -0.4 2.8 -2.0 Night 3.5 -8.5 -0.5 1.4 2.4 4.5 3.2 0.9 -1.4 1.6 2.4 0.0 -1.1 Peak hour 0.7 -2.0 2.6 8.0 2.7 6.0 3.4 4.7 4.3 6.0 -0.2 2.8 -2. I 30 Day 0.1 -2.0 2.6 8.0 2.6 6.0 3.5 4.3 4.4 5.8 -0.3 2.8 -2.1 Night 3.6 -7.7 -0.2 1.7 2.7 4.9 3.5 1.3 -0.9 1.8 2,3 0.? -1.0 Peak hour 0.8 -1.7 3.0 8.3 2.9 7.1 3.9 5.1 4.9 7.3 -0.2 2.8 -2.2 50 Day 0.2 -1.7 3.0 8.3 3.2 6.5 3.9 4.6 4.8 5.1 -0.5 2.8 -2.1 Night 3.7 -7.2 0.0 2.0 3.1 5.2 3.9 1.6 -0.7 2.0 2.4 0.0 -1.0 Peak hour 1.0 -1.3 4.3 8.6 3.3 6.8 4.1 5.5 5.2 6.8 -0.1 2.7 -1.2 100 Day 0.3 -1.3 3.3 8.6 3.2 6.8 4.2 5.1 5.2 6.8 -0.3 2.8 -2.2 Night 3.8 -6.9 0.0 1.6 3.4 5.7 4.2 1.8 -0.4 2.3 2.4 -0.1 -0.9 64 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Fig.4-3 2010 Traffic Noise Prediction Result of Ever% Section without Project 7 na4.1 S 5.9 3-1 0 72.0 71.2167.7 48U 67.8 6L2 617 60.8 37. SlS F:7 57O SS.W 7. 64.1 6775.72. 6U 61.8 6421.5 60& VS 5871 537M.7A7. 73A 72.4 67SA 71#3 64 .1 63752k, as. 1s sAr.s 61.815 61. 50 sn.o_ 92 ss2=s. 7175I 64W 641 65 57.8 62.79. WI56 9.7 V. 5"95"9 5 65 5170 7G6 75W M5Z9.015.11 7 73. 61W M8. X2 s51 _1 Par 71 6.2-641 61.7 699 55A / 2DM 61 6L9N X6~ '5 65.0 7530 55.11. 1605.1~ 51. SL 57 5. 60~se 64IA 3 1 &MDa N, to Has&MV Fig.4-3st. 170.a Trf acsosepecitonrs(ofv y section1. witou prssc xCMKM ~ 99 1t 54.5a t;v oxstn ProjecI ro.d scsm inteschangs Raftway Seto satin oin 0 Itrhne viauc ad 0 S w and sectionn ~ ~ 6A& No55.8ierbiget e ut 04 65.75. Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Fig.4-4 2010 Traffic Noise Variation of Every Section with Project 3.7 45 21 60 toa 4.9 .7.1 6S 5.2- 5.7 $5.71 74 1.77IA 3.1ha 3.3 Iron & Steel 2, ..5 0. .t.s o4.5rir .ui ot'roec -1.9 *IS I1. T2t *27 wt1 po1 7A Prjc roo is~enoIe ~ xs W 1 M 1 W 1 olL . 93 *U &7 332. .1 *I2 -2 1A2 4 . M4 S 1A5L 57 5.5 1l4 0.9 4273 _LS Oh SA A-O 70.19 A 4S -2 -.7 1-- Sc p o 26 2. 0/ 29 12 &0~a is e32. Comple 2/ na Z U~ U. 25 21 Pr /3 s as NOW 2A 2./4 SSn 4M W1A 32 ~ ~ - 4.s 7 - o1 -133&s6U - -2. sn s -10 OsLa -2.3 ~ ~ ~ 4 2.3-3 00 LA 3' -M -22 -75.2 U~~1 0.2 0.2 L -. LD~~~$ 3.2 3A-L_ 0 0 to ~ ~ ~ ~ ~ ~ ~ ~ ~ 1 Park Wihpoec iuswtot rjc Fig.4-4~~~~~~~O 207 -2.2icnievaito o.eey eto n scin No ove-rve br.sg ts besA 664 osn . a a Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment After the project is completed, the noise level of most sections will present a certain amount of increase, which may possibly lead to the deterioration of the environment of surrounding area. The corresponding mitigation measures have been proposed in EIA. J Noise impact analysis of alternative scheme The elevated road. proposed to be built between Wuyi Road Interchange and Lishan Street Viaduct. locates on the west side of the existing Jianguo Road. on the west side of which runs the Zhongchang Railway and lies the Anshan Iron & Steel Complex. Its smallest distance from the first row of building in the sensitive zones is 50 m. To compare the noise prediction results of the elevated road with that of ground road. the prediction points for noise were set with distance of 50 m, 60. 70. 80. 100 and 150 m. For the noise levels comparison of both schemes, in the year of 2010, see Table 4-13. Table 4-13 Noise Levels Comparison of Preferred Alig ment and Alternatives (dB) Distance from Section Lishan Street-Xia dong gate Viaduct Xiaodongmen-Wuyi Road Interchange the red line (m) scheme Elevated road Ground road Elevated road Ground road Peak hour 78.1 77.4 78.7 78.5 0 . Daytime 7.3 76.6 77.9 77.1 Nighttime 67.3 66.7 68.0 67.1 Peak hour 76.0 75.4 76.6 76.5 10 Da,time 75.2 74.6 75.8 75.7 Nighttime 65.2 64.4 65.8 65.7 Peak hour 72.5 68.9 73.1 70.0 20 Daytime 71.7 68.1 72.3 69.2 Nizhttime 61.8 58.3 62.4 59.2 Peak hour . I.3 67.7 71 6 68.8 30 Daytime 70.5 67.0 70.9 68.0 Ni_ahttinme 60.6 57.1 61.1 58.1 Peak hour 69.5 65.9 70.1 66.9 50 Daytime 68.7 65.1 69.4 66.1 Niahttime 58.8 59.5 56.2 Peak hour 66.1 62.5 66.9 63.6 100 Da%time 65.6 6.s 66.1 62.8 _ _ Nighttime 55.6 i .9 56.3 52.8 As Table 4-13 shows, the area along the elevated road suffer more noise impact than the ground road. The reason is that. in the elevating scheme. the existing Jianguo Road will remain in service. besides. the traffic flow will increase by a big margin compared to that of ground road. Therefore. the widening scheme is better than the elevating scheme in terms of noise level. 6.Noise impact analysis of interchange and viaducts The noise impact of interchange and viaducts proposed in the project, namely Wu- i Road Interchange. Minsheng Road Viaduct and Lishan Street Viaduct, was predicted. with the prediction point on the first row% of building around the interchange and viaduct. For details see Table 4-14. 67 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Table 4-14 Noise at the First Row of Building Around Interchange (dB) Name of interchange Peak hour Daytime Nighttime Hk ith Without H ith Without With Without Wuxi Road Interchange No.5 76.5 '9.7 75.7 69.7 65.7 Lishan Street Viaduct 79.4 75.6 78.6 74.8 68.7 64.7 Minsheng Road Viaduct "9.9 75.1 79?. 1 72.9 69.5 62.2 As indicated in the prediction, the interchange area suffer more noise pollution. 9 Analysis of noise impact brought out by the tramcar line changing The tramcar line to be changed starts from Anshan Railway Station and ends at the meeting point of Laodong- Road with Ligong Street, the length totaling 5200 m. The noise levels before and after changing the line remain the same. Residential area is on the east side of the project road. As the tramcar line is moved 5-60 m westwards. the tramcar line is far away from sensitive points on the east side of Jianguo Road.. The section of tramcar line (Lishan Underpass-Ligong Street) will be moved from Laodong Road to Anquan Street. The existing track is 6 m away from the first row of buildings on roadsides, the distance will be increased to 12-15 m after the moving. On the both sides of Laodong RoaU, there are residential areas. On the east side of Anquan Street, there are residential areas while on its west side there are Changda railway and AISC plant area. Therefore, the residents affected by traffic noise shall be reduced if the tramcar line is moved to Anquan Street. The noise pollution is accordingly transferred to area neighboring Anquan Street. The noise impact imposed on the first row of building at Laodong Road and Anquan Street by tramcar are shown in Table 4-15. Table 4-15 Noise impact of Tramcar along Laodong Road and Anguan Street Leq, I m away Leg at the first row of building along the road Time section from the track of Laodong Road Anquan Road tramcar (without project) (with project) During tramcar traveling 76.0 60.4 54.4 ,As shown in Table 4-15, the residents dwelling along Anquan Street suffer less noise impact than the current residents dwelling along Laodong Road after the tramline is moved. Although the noise pollution at Anquan Street will be more serious, the line changing project, from the point of view of whole city's road network. will reduce the range and extent of noise impact on the city. Noise impact analysis. As mentioned above, the tramcar line will be moved westwards for 5 to 60 meters to run parallel with Changda railway line. Starting from Lishan Underpass, the tramline on Laodong Road will be changed to Anquan Street. The running tramcars produce point-source of noise. The tram car line, without project, is close to the noise sensitive area along Jianguo Road and produce large impact on the area. The noise impact of tramcar is left out of consideration in the noise impact prediction without project, therefore, the predicted value, without project, is lower than that under actual 68 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment condition. The tramcar. with pro ject. will produce less impact on most sections as the moved line is far away from the noise sensitive area. So its noise impact can be neglected. In all. the line changing project "\ill play an actiNe role in mitigating the noise pollution and improving the acoustic en% ironient of noise sensitive area along the road. Noise impact analysis of selsitive point The sensitive points are mainl consisted of residential buildings. schools. hospitals and administrative buildings etc.. The noise levels & its exceedance over standard and locations of sensitive points in the year 2010 are shown in Table 4-16. Fig.4-5 and Fig.4-6. Table 4-16 N"ise Leels And Standard Eceedance of Different Sensitive Points dB) Sensitive Noise Level Noise levels exceeding standard Zoning hQ points Peak Da, Night Peak Day Night category hour time time hour time time I Nanchan2dian Primar\ school 69.9 68.1 60.0 14 9 13.1 15.0 1 2 Donchanudian residential area 72.3 71.5 61.3 2. 1.5 6.3 4 3 Pol%technic of AISC 70.7 69.9 0 .2 0. - 5.2 4 4 Laodong Road Primar School 66.5 65.3 55.3 Ii 10.5 10.3 1 5 HLualonI Entertainment Center ot AlM 67.7 67.0 59.3 - 4.3 1 6 Anshan kk orkcr's Universit\ 68.8 68.0 8.1 -1 3.1 2 7 Anhan I ederation of Trado I nion 77.5 7r.7 no.7 7.i 6.7 11.7 4 8 De.:gn Iaraum of ' 3 Metallur,.; ( on.s.u. n 65.9 65.1 55 - - 0.2 I 9 Tuanjie Primary School 54.9 54.1 44.7 - - - 10 AISC Daily 76.5 75. 65.7 6.5 5.7 10.7 4 11 The Aped's Palace 75.1 72.9 63 2 2.9 8.2 4 12 Fianvuan MInsion 76.9 75.1 65.5 6.9 5.1 10.5 4 13 Global Hotel 71.9 71.1 61.1 1.9 1.1 6.1 4 14 No 34 Middle School 64.2 63 4 53.4 9.2 84 8.4 1 15 Hospital ofiOrain Bureau 7 7 7 711 61 219 221 22.5 1 16 Rcuentla quarter m nrout of Luma R ii.u n 66.8 63.0 555 6.5 3.0 5.5 2 17 Wu\ i Road Prinr\ School 71.3 70.5 61 16. i5 16.0 1 18 Shengli Auditorium 60.2 59.4 5.0 . 4 19 Xianggian Prinar\ School 63.- 62.7 54 9 8.4 7.7 9.9 1 20 West of Rainbo llride 68.2 67.4 63 I - - 8.1 4 21 Qiming residential (uarter, 74 2 73.5 63.5 4.2 3.5 8.5 4 Note: No.1 8. 19 and 20 are comparing sensitive points and not located at the road sections of JRR project. The status of noise levels exceeding standard at sensiti-c points shown in Table 4-16 is referred to the place in front of and I m from building. Since the sensitive points belong to areas of different functions. the exceedance of noise le\els over standard is different. The table shows the exceedance o' noise levels is more serious at night than in the daNtime. but the noise impact at night on schools and offices is not important because nobody is living or working there at night. Due to double glazing of \\indo\ which can somew,hat stem noise impact. the residential buildings and offices shall be inflUenced more slight h i no"se in w ter than in summer. Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Fig.4-5 Noise Levels of Different Sensitive Points 14 1 ornpl- 65.3 N7. so 31o 40 MB MA 77.5 7W7 &7 33A2 F7;.s 7.o 61'.1 CA Ot 70.7 M L 7 65.5 #.21a Park /77.9 77.1 /11.68.1 (to HU&MV 40. Unmd Fig.4-5 Noise (evets of dif ferent sensitive points - roec rad-Alternative nxihtnge Nosesensitive Railay 1--11Section parting point *Interchange, viaduct and a see lone - -- olway I -1and sectionn No, over-river bridge to be buit 70 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Fig.4-6 Noise Standard Exceedance of Different Sensitive Points ...... q , to our * -11.5 0 t *. 10.5 10.3 4 3-1o (f84 - to H// gene 0.7 8.1w / 5.2. 0S 19 6.5 Anshtd"pont I 5.1 10.5 6.1 16.r 22.1 13 Pea hour 7 6. 14.7 3.1 1s9 Uld - ~ ~ ~ ~. Pro Pect rodhsh= nerhag bjc 1. 713 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment b) Vibration impact analysis With respect to the monitoring results of current vibration, the vibration levels of motor vehicles running on Jianguo Rd. do not exceed the standard at any time, which means a slight impact on along the line. The project, which comprises dominantly of widening and new building of ground roads. will produce less impact on surrounding environment. With respect to the "Outline Environmental Impact Assessment' and its review. no prediction and analysis on vibration impact shall be made. The vibration prouced by running motor vehicles. in brief, will not exert big impact on surrounding environment after the project is completed and put into operation. 4.2.4 Mitigation 4.2.4.1 Construction Phase a) Noise mitigation in construction During road construction most of the noise generated shall exceed the specific figures in the Noise Standard on construction site. Because the noise is inevitable during the construction, in order to reduce the noise impact on the surrounding environment, the following measures shall be taken to mitigate the impact. (1) No operation of equipment such as, impact piling machine, pneumatic hammer, drill etc. which generate high noise is allowed at night (22:00--6:00 next day). (2) Low noise equipment or equipment with acoustic device shall be used and the impact piling machine, generator etc. shall be equipped with muffler. (3) The construction department should make good arrangement for construction time and site. The high noise equipment should be placed far from the sensitive area and maintained periodically to ensure the operation of the equipment. (4) A temporary sound isolating fence structure or sound absorbing and isolating barrier must be installed at the site which is seriously affected by the noise produced by the construction machinery to minimize the noise pollution to the surrounding areas. The fence structure must be adopted to isolate noise when construction is carried out near Wuyi Road Primary School, Old People Palace, etc. which are the sound environment protection objects. (5) Some building structures should be precast in the proper place outside of the urban area as much as possible, then be brought to the site for installation. During construction of Wuyi Road and Minsheng Road Interchanges, the large precast structures should be mainly installed at site. b) Vibration mitigation in construction phase To mitigate the vibration affecting the surrounding environment in construction phase, the 72 Liaoning I rhan I ransport Project-An.han Subproject EnvironmentAl Impact Assessment construction department must take the following measUis. (1) The construction department must apply to the environmental authority for using heavy construction equipment especially high vibration equipment. The construction cannot be started until the approval is obtained. (-2) No operation of high vibration equipment. such as piling machine. etc. is allowed from 22 o'clock till 6 o'clock next morninu. (3) The low vibration equipment hould be used and be maintained periodically to ensure the good operation conditions. 4) The operation hours of W11 con.truction machiner- %hich may cause vibration must be limited from 6:00~-2.0. If the operation hours are intended to prolong, it is necessary to obtain the approval of relevant enx ironment authoritN. 4.2.4.2 Mitigation in Operational phase a) NOiSC MitiLgLriOl in operaCiti pI J)hOUW The traffic flow in most sections of reconstructed or new road and the speed of automobiles shall be increased greatly and the sound enN ironment alone the road shal! be chanued. It can be seen from the noise prediction and the comparison of with vs without project. that the traffic noise along the road shall be increased ano the impact on the schools, kindergartens. hospitals, institutions and residents along the road shall be more serious. Theretbre the following measures are proposed to be taken. 1) Enhancing trl/iC comprewJe011 control in ite cit I Intensify the manauement and execution of law.'.s. The departments of public securit . CoMmunication and environmental protection shall work closely. implement environmental protection criteria. law\s and rules issued by national and locaPeovernment and enforce the lazi's strictl\.. '> Strengthen traffic comprehensive control in the city and improve traffic order The obsolete and old motor vehicle over service life must be eliminated and scrapped in a planned way. The tractors must be strictly controlled for enterint into the urban area. No homing is allowed in the urban area. Remove obstacles on the road. minimize the tralfic interference in length and breadth and reduce the traffic noise produced h start or stop of automobile. Appoint a special lane for freiLht xAhicle to reduce the area polluted by traffic noise. 73 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Complete the city traffic sNstem as soon as possible and build ring road to reduce the number of motor vehicle which enter into the urban area. Enhance noise monitoring and control of motor vehicle. The departments of public security and environmental protection should bring the noise control of vehicle into program of work. The noise of motor vehicle must be controlled by way of primary check, annual check and spot check in order to raise the annual check ratio of vehicle and ration of vehicles meeting noise standard. (2) Reasonable plan and arrangement for the land on boths ides ofroad © The planned distanie from the new buildings on both sides of the main line to the red line of road should be no less than 20 m. It is recommended to set up afforestation isolating zone in this area. Z For the reconstructed area where the newly built Hebei Road, Zhonghua Road and Yuanlin Road pass through, the configuration of buildings should be reasonably planned to comply with the regional environmental quality standard according to the requirements of division of area with different noise levels. 9 The first row buildings along the two sides of the trunk line are not suitable to be used for noise sensitive places such as schools, hospitals, kindergarten etc.. These organizations are not suitable to be built in 100 n from the red line of the road. The first row buildings along the road are suitable to be used as commercial shop. car parking, etc. which are not sensitive to noise. In this way, not only the land can be fully used, but also the noise impact on the sensitive objects can be reduced. (9 The first row buildings along the road should be parallel to the road. This may mitigate the impact of traffic noise on the buildings behind them. (3) Installation of noise barrier along the rcad The noise barrier shall be determined by the professional design institution. When making decision of barrier's location, type, and material etc., many factors such as neighboring buildings shape and noise level. road structure, weathering resistance and safety of barrier and landscape of the city shall be taken into consideration. According to the experiences at home and abroad. the noise barrier shall be installed on the two sides of elevated road. Based on engineering characteristic of JRR project, the following points are recommended. ( No noise barrier installation along the ground road The distance between sensitive objects greatly affected by the traffic noise and the first motor vehicle lane shall be over 15 m. Since the two sides of the road have very close connection, the residents along the road are not willing to obstruct the connection between two sides in accordance with the public opinions. The individual protection against noise of sensitive objects shall be adopted to minimize the traffic noise pollution instead of installation of noise 74 Liaoning Urban Transpoirt Project-Anshan Subproject Environmental impact Assessment barrier. %. Installation of noise barrier along elevated road The elevated road between WuPi Road Interchange and Lishan Interchange as an alternative of the desion shall be located io the west of Jian-uo Road. The distance bctween elevated -road and noise sensitive area 1, oer 50 rn. It can he seen from the prediction of traffic noise impact of the alternative that the traffic noise of the elexated road shall ha%e less impact on the sensitive area along the road. so the noise barrier is not recommended. Installation of noise barrier in iterchante area It can be known from thL resu1s oftraffic noise prediction in interchange area that the traffic noise impact in Wuvi Road Interchange is more serious. !he traffic noise at Wuyi Road Interchange has reached 79.7 dB in the da time and 60.7 dB during night. The traffic noise at Wuyi Road Interchange (about one meter in front of buildings ) has exceeded the standard of categon 4 noise zoning. The possible sections which shall be proN ided with noise barriers. length of the section. size of the barriers and protected objects are shown in Table 4-17 and Fig.4-7 through discussions with ARPO and Beijing General Municipal Engineering Design and Research Institute. Tahle 4-17 LuNout of Sound Barrier Item Contents Position Wuyi Rd. Interchange (elevated part on Yongchan, S-.) Size of the sound barrier LXH1:500 mX3.0 n (length of mitigated area:250 m Noise reducing performancc 12.8 dB (peak hour). 12.5 dB (day). (.0 dB (night) Inc!tment Unit price (vian runn:ig mcter) 7200 Total price (thousand_vuan) 3600 (4) Protective measures to sensitive points The sensitive noise receptors that need protection comprise ot' schools. hospitals and residents etc., their respective surve\ results and the noise reducin measures are shown below: Schools There are. as shown in Table 4-18 and Fig.4-8. five schools that neighbor the project road exceeding the noise standard (nighttime: 55 dB: daytime: 45 dB). Table 4-18 Surve* of Schools Neighbourini the Project Road No Name of school Section Name of the No. of No. of Number of w,ooden section classes classroom doors and %sindoms 1 n Laodong RD. Primary School 3-2-2 Laodone Rd. 22 66 132 2 No.34 Middle School 2-1-I Iuan any Rd. 18 54 108 (6) 3 Wui Rd. Primar- School 2-3-1 Yonchang St. 12 36 72 (4) 4 Nanchan.-dian Prinar. School 1-2 Zhonht Rd. 25 75 150 S Polytechnic of AISC 2-3-2 Yongchan., St. 10) 32 48 Note: Number in brackets refer to to he number ofwindows not facing dhe project road. Having sought the opinions of the afOrementioned schools and discussed with the Project Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Fig.4-7 Noise Barrier Plan *N Sankong Underpasssn / Wuyi Rod Oli a w ide! / 71.2/58.4 Peak hour f61.0/52.0 NiMb Nobe: s ~No beumer/O%m Ie Fig,4-7 Noise barrier plan - Pro ject road ww Noise barrier ---Raitway === Af ter changing tram tine O Interchange o 250 5oon 76 Liaoning Urban Yransport Project-Anshan Subproject En%ironmental Impact Assessment Fig.4-8 Investigation Results of the Schools and Hospitals along the JRR Road *.. to. oLyang 66 13 Anshan Iron & Steel/ East JWannuo Rotd 72 4O 32 48 219 Park- 30 'l NMI: /75 Number of rooms '3 Number of wooden wooden not facing / 7S\ the pro ject roa X /43 Number of wooden -1-1-J_ doors and windows Number of closed windows to HiangV+ B*W M Sb Fig,4-8 Inve5tigati0n re5u t5 of the schoots and hospitcAs cAong the JRR road Projct oadAtternative 9Interchange, viaduct and - Po jct oadscheme over-river bridge to be buAlt 1-- ection parting point Existing a son IODo - - - Raitway and section No, O interchange 77 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Office. it is decided that the classrooms shall be equipped with air-conditioners to mitigate the noise impact resulting from traffic noise when windows are opened in summer. Refer to Table 4-19 about the installation of air-conditioners. Table 4-19 Installation of Air-conditioners in Schools Neighboring the Project Road No. of No. of air- Make and Model of Total price No. Name of schools classes conditioners Air-conditioners Unit price (104 Yuan) 1 Laodong Rd. Primary School 22 66 uabao. KF-33Gw/F2 4300 28.38 2 No. 34 Middle School 18 54 Power: 1320W 23.22 3 Wuyi Rd. Primary School 12 36 Refrigeration (Yuan 15.48 4 Nanchangdian Primary School 25 75 capacity:3300W RMB 32.25 5 Polytechnic of AISC 10 32 Noise: 42 dB /unit) 13.76 6 Total 113.09 Note: The price quoted is fhe current market price. 9 Hospitals There are, as shown in Table 4-20 and Fig.4-8, three hospitals that neighbor the project road suffering from excessive noise. These three hospitals are located at the both sides of South Jianguo Road between East Jiefang Road and Minsheng Road, where vehicle flow is large and noise pollution is serious. Table 4-20 Survey of Hospitals Nei hboring the Project Road No. Name of hospital Section Name of section No. of No. of No. of Wooden No. of Enclosed floors rooms windows windows Anshan Senile D isaSe il 3-5-2 South Jianguo Rd. 8 40 40 Disease Hospital 2 Hospital of Grain 3-5-2 South lianguo Rd. 3 21 21 Bureau Anshan Bone 3 Disa Hoit 3-5-2 South Jianguo Rd. 6 30 30 Disease Hospital Having discussed with the Project Office, it is decided that air-conditioner shall be installed in the aforementioned hospitals to mitigate the noise impact. Refer to the following table about the installation of the air-conditioners. Table 4-21 Installation of Air-Conditioners in Hospitals Neighboring the Project Road Total price No. of No. of air- Make and model of Unit pc ( Yu NO. Name of hospital rom odtoes arcniinr Unit price (10 Yuan rooms conditioners air-conditioner RMB) I Anshan Senile Disease Hospital 40 40 Huabao, KF-336WIF2 17.20 2 Hospital of Grain Bureau 21 21 Power: 1320W 4300 9.03 3 Anshan Bone Disease Hospital 30 30 Refrigeration capacity: (Yuan RMB 12.90 3300W Noise: 42 dB /Unit) 4 . Total 39.13 Note: The price quoted is the current marker price ( Residential building There are many residential buildings along the project road and 6375 windows of these residential building are facing the road. For details, see Table 4-22 and Fig.4-9. As indicated in Table 4-9 and Table 4-16, noise level of residential building neighboring the road mostly 78 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Fig.4-9 Investigation Results of the Residential Area., along the JRR Road 3-1 0 NO.15 as 20W6a 38 126 Sho* 76 .3o. 1 27 - 0 10291 453 ' , 114 576 25515 3 26 Eat JiKnguo Road No 5 No.10 Anshan Iron & Steel .3 1 Complex N.A 53' 19 429 324 4 117 105 0O.5 11 5 0.7o 9, 8 10 343 333'4, 43 10 o0Jq No.13 5 4 ' 0 15 15 219 Park No.14 Number of windows the road Number of wooden / 74 140 windows atong the road 0.1 66 134 0s- Number of c(osed '0 \ 6 O 955 windows atong the rood 111 244 1 Number of residential S32 11124 building / 41--1 '5 25 / 56 Number of air-condit oners 104 97atong the" roa 14O.3 2 13 Number of wooden windows to Ho&e%not facing the pro lect road Fig,4-9 Investigaton re5utts of Tche resCdentit areas at(ong the JRR road Projec roaA ternative 0Interchange, viaduct and - Po jct oa GEME:lBscheme over-river bridge to be built Section parting point Existing a Mo IW00O ---Railway 1-1and sectionn No. O interchange 79 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment exceeds the standard, so noise reducing measures must be taken. The following options have been considered: * Sound barrier * Sound-absorbing road * Separation belt for greening * The measures taken for windows of residential building Table 4-22 Survey on Residential Building Neigh oring the Project Road No. Section Section No. of No. of windows Wooden Enclosed No. of air- buildings Neighboring the road windows windows conditioners I 1-1-1 South Ring Rd. 6 274 140(66) 134 2 2 1-3-1 Yuanlin Rd. 25 1099 855(111) 244 5 3 1-3-2 YuanliRd. 13 556 459(104) 97 2 4 2-1-1 Huangang'Rd. 4 136 117(53) 19 5 2-1-2 Huangang Rd. 11 429 324(117) 105 1 6 2-1-3 Huangang Rd. 9 343 333 (43) 10 7 2-3-1 Yongchang St. 10 480 300 (48) 180 8 8 2-3-2 Yongchang St. 9 209 139 (36) 70 1 9 3-2-2 Laodong Rd. 5 67 61 6 10 3-2-3 Laodong Rd. 26 1029 453(114) 576 3 11 3-3-1 Jianguo Rd. 4 351 278 (27) 73 3 12 3-3-2 Jianguo Rd. 13 255 250 (89) 5 13 3-5-1 Jianguo Rd. 4 139 60(20) 79 5 14 3-5-2 Jianguo Rd. 15 676 423 (32) 253 15 15 Tramcar line Anguan St. 10 332 206 (38) 126 16 Total 164 6375 4398 (898) 1977 45 Note: Numbers in brackets are the number of windows not facing the project road. Analysis of options Sound barrier To attain better noise reducing effect, sound barrier (advertisement board) must have adequate length and height and opening must not be in it, or noise isolating effect will be lowered. On one hand, implementation of this option shall affect going & coming of residents and lighting, cut connections between both sides of the road; on the other hand, investment of this option is very high, 7200 Yuan RMB per running meter of 3-meter-high sound barrier. Sound-absorbing road Anshan City is a heavily industrial city with much dust and snowfall in winter, which shall result in clogging of sound-absorbing holes and then spoil sound-absorbing effect of sound- absorbing road. Cost of sound-absorption road is very high and no sound-absorption roads have been used successfully in the northeast of China. Separation belt for greening The distance between residential buildings and red line of the project road is 0-20 m. It is introduced that noise is reduced by only 3 dB for separation belt 50 m wide. Because no buffer zone over 50 m wide is on the both side of the project road, it is impossible to implement this option. 80 iUaonin2 Urban Transport Project- tnshan Subproject Environmental Impact Assessment The measures taken for xindo\s of residential buildin:. Residential buildings neighboring the project road are provided with double glazing windows. If widows are ensured to be enclosed in summer. the goal to reduce noise shall pe attained. In eneral. the double glazing windows hall make a noi>e difference of ouer 20 dB betw-een the indoor and the outdoor. In case of enclosed v\indows. residents neighboring the project road suffer from litle impact. inck-sed windows shall meet with the requirements to isolate sound and reduce noise impact. When windows are open for ventilation in summer. Indoor acoastic environment shall \%orsen. so noise reducine measures must be taken. Selection of'option.s After detailed analysis of options to reducc noise has been finished, it is khown that ;istallation of >aUnd barrier. Aound-absorbin- road and separation belt for yreening is impossible. Haviig di>2ussed with ARPO, it i deded that option 4 (enclosed windox\s is adopted. Detailed introduction to selet-ed option In order to implement this option. tie following two problems mu t be solved: (a). Enclosure of the windokvi: (b).ventilation. lwo noise reducinu allenatives are proposed based on numerous on-site surve\ s and ample discussions: Alternative i: Apply weathcrstripping and install the air-conditioners AlternaZive 2: Apply weatherstripping and install the .entilator. As suggested by the Anshan Project Office. I he au conditioners shall be installed householdwise. And the number ot'households shall be caiculated by multiplying the number of windows neighboring the protect road with a convertinu ratio which shall be 79.9"0 in accordance wN ith the site surve\ an d the opinion of the project office. For comparison of two alternati%es. see Table 4-23. It is settled through the negotiation that air conditioners. a. required by WB. shall be installed in the households neighboring the project road . for details ee Table 4-24. (5) Noise COWontrl Ofifmotr VhiCle. 1traffic managentit and mainlenance ofpavement 1; Strictly follow the motor xchicle noise emi>i.on standard GB495. Implement the stipulation of periodic motor \ehicle noise monitoring. Vehicle exceeding noise -tandard shall be forced to be repaired. It can not run on the road until the noise emission comes up to the standard. 2) The new vehicle applying for license plate should install muffler which must meet the requirement of communication authority. In return. the communication authority shall not issue the license plate to the new motor vehicle w\hose noise exceeds the noise emission standard or permit it to run on the road. 81 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Table 4-23 Comparison of Two Mitigation Alternatives (Yuan RMB) Alternatives to reduce noise Install air conditioners Install ventilators Compared item Quantity Unit price Total price (104) Quantity Unit price Total price (104) Measures Air-conditioner 5094 3000 1528.2 -- -- -- Ventilators -- -- -- 6375 14Q 89.25 Estimation of investment 1528.2 89.25 Strong points 1. Has good sound isolating effect I.Take full advantage of the existing facilities. 2. Beautify living environment 2. Noise isolating effect meets requirements on indoor environment. Comparison _3. Make resident more comfortable 3. Cost is relatively low. Weak points I. Cost is very high I.Noise isolating effect is worse than the other option. 2. Expenses of operation and maintenance are high. 82 i inunin t rban Transport Project-Anshan 'bproject En% ironniental Impact Assessment Table 4-24 Installation o; Air-conditioners in Rcsidence Neighboring the Project Road . No. of No. of air Total price No. Section Nane of section iModel and unit price! buildings conditioners :{10 Yuan RNIB ) -1-1 South Ring Rd. 65.7 Ytianlin Rd. S3 7 2 - Huiang--ang Rd- S i i-o ii.4 -n Rd 1 o 2. o 2-; -3uan an' Rd l i r-c1nitine 8 o 3-2-1 Ldn- R 0 3 -3 1,au idon' R d 231 46.-ciiiluct 8 i 3-3-! J ianguuo R L. T 8 3n6 pri,:_3n0 (IO4.0 12i 3-3-2 iguioRd. 204 YutanRiMi 0o1.2 31 Jia o Rcd. i i i 3-5-2 Jiar6uo RI. 5 0 . t 162.0 Sr cetcar line i An,juan t. 26- 79.5 6 14 504 1528.2 \;c lh unit pr'ie include, the o,ather .pr coo a i " Ion cc rrti1 restrain the speed. especialK during ig~ht \corclng to th1e design. the .,peed limit of the trunk line is 60 km h and the sub-trunk line 40 km . 4 Do . good job ot pac emIenj maintcnance. The poor pa,- ement shouid be repaired In time. b V ibration miitigaion m opertunhhe (1) Source of \ibrauton in operationl_,_as After cimpletion of JRR prolect. the vibraution which atTCets SuLTounding environmer shall mainty come from the huav\ \ chicle dri ing on the road. WVhen drivinu at hiLh speed. the heakv '.ehicle shall cause high \ ibration w nile the light schicic cause low ibration. (2\ ibration mänitiuation in operational phase 1 In the design of elevated road. large displacement expansion joint. artificial expansion ;oint (seamless expansion joint). karge basin type rubber support and spherical croxkn rubber support shall be selected to reduce the vibration caused b\ traffic. '9 The condition and the laness of the pavement shali so affeet the vibration that the flaness of the pak enent must be fntrolled under 4 mm. When heavy \chicle is dr,\ in on the road. the speed must be limited strctly. maximum 50 km'h. 4 Make reasonable plan 1r the land utili/ation along the two sides ol the road. [r to arrange the vibration sensitixe huildings as far as possible from the road. Vibration diftIers from noise. there is no xay to proiect the object affected by x ihration. S it Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment is required to take vibration protective measures into full consideration when designing the ground road. interchange and elevated road. Trafflc management must be enhanced to reduce vibration level generated by vehicle and decrease impact on the receptors along the road as much as possible. 4.2.5 Impact After Implementation of Mitigation Measures 4.2.5.1 Construction Phase During the construction of the project. the operation of mechanical equipment shall cause noise and vibration thus affecting the surrounding environment. Since the road construction is just a short term action, the impact of noise and vibration on the surrounding sensitive points is temporary. As longk as the construction team observes the construction rules and takes the mitigation measures, the impact generated by the construction equipment on the sensitive points in the surrounding area shall be effectively mitigated. The construction team must take practical measures to mitigate noise and vibration based on the features of construction and the distribution of sensitive points under the strict supervision of environmental protection and city construction departments. 4.2.5.2 Operational phase a) Noise (1) Analysis of sensitive point affected by noise Noise at most sensitive points in various noise areas along the project road shall exceed the standard. In Anshan, the buildings are provided with double glazing windows which isolate noise efficiently, thus being favorable to mitigate the noise impact on the sensitive points. The sensitive points such as Tianhe Mansion, Global Hotel, etc. shall be affected greatly by the traffic noise. However, these buildings are provided with better noise isolating facilities (glass enclosure. double glazing windows, air conditioners. etc. ) so that there is less impact on the inner living environment. The residential building, schools and hospitals neighboring the project road are important sensitive points in this project. The effective measures to reduce noise impact shall be taken, that is, air-conditioner shall be installed in the schools and hospitals and air-conditioner shall be installed in the residential buildings neighboring the project road. (2) Noise conditions of different sensitive points after realization of mitigation measures All the sensitive buildings in Anshan are provided with double glazing windows. Using double glazing windows is favorable to reduce noise impact. The following mitigation measures shall be taken for the noise sensitive points neighboring the project road: air-conditioners shall be installed in the schools and hospitals neighboring the project road exceeding the noise standard; air-conditioners shall be installed in the residential buildings neighboring the project road, sound barrier shall be installed on elevated 84 Liaoning t rban l ransport Project- knstnin ,ubproject En% ironmental Impact Assessient part on Yx ngeeane Street. Fk 1ioor and outdonr noise status these i nmcnsik ie puiats af,r aforementioned nieasure are taken see Table 4-2 . Table 4-25 Indoor Noise Status at N1iin Sensitis e Points Along Road (dB) Description Ourdoor N>se indoo,r Noj-- Pcak hour :Da>. time hNijit tii_te Peak hour Day time Niht time. a ar nm na . 61 60.0 i 499 481 4'0 n . d3 52.3 t 5t.5 41 3 \ S( I -hndo.cal Coleg- - 9 - 602 50 7 4 9 4 1 g, id Pr-n,r\ School 5.3 46 3 5.3353 u of '7sC Cm Iala 66- 59.3 4-1 393 \n a.n -ni,,ersi '.r \k rk'-' zand 68 Xs 4a S 4i D3 nshan 2Ihmicipl a or., 5ni.n . ~6.4 uai'-;c Prinar\ School 54.9 4. i 4 -- l l :d K:mplcs P.aacc -3 2 l in:, kan .oL 9 75 1 5. 55. 45 5, I ( lo e H teI 6 fl l1 5Ll 1 ',4 Iiddle ct oni 64 63 - 44. 2 -13 1 33- 4 5 si:of( G a , 41ieal 77 -5 1 57.9 57 i 47 16 Lishan kuilw a Station Reside tial \rna n68 t)3Y 5 5 46.8 43.! 3 k.\\ ti Road Pimar, S,lool 581 5. 38.4 832 H8 'heng \ssjnh\ bh ai 6), J.7 5 4 5 40.2 '9.4 19 \'aniguian Primar, lo 63.4 6 7 54. 43.4 4 1 \est. Rainhow R-d ctial.\rea 65.2 i4 . 4s2 4-4 4 21 Qiming Redenaal .\re. 74 21 t,3 54. ' 51.5 b) Eihration In åperational phase. the x;bration has less impact on the sensitive points along the roai. As lor - as the mitigation plan i> strictl, impemented. the ibrati,n generated by motor vehicI shad not contribute impact like noise on the sensiti- c points along the r sad. 4.3 Air Quality 4.3.1 Approach and Methodology 4.3.1.1 Model Used for Assessment >Models MOBIIV 5 and CI.\l. 3 provided by Canadian Jacques \\ hitford Conian. are selected to forecast respecti eCly the pollution soirc (sehiclc emission g,ts) intensit\ and the impact of C(. NO\. No and 1IC from pol(1tion source on sensiti points nearby road seetions in 201 0 under conditions of n ith JRR. tlhout J R and using alternatix e of eies ated road. ihe olow ings are nain -et cond iltions for modelk: b Anibient wind speed: 1.0 m s 9 \\ ind direction: Most unkorable \%ind directions 1 . \V. N ) at each sensiti,\ point in ltucnced iy nearby rkmd >ection: ukinter and suminmer pre ailnnin d directions \' Liaoning Vrban Transport Project- knshan Subproject Enmironmental Impact Assessment and SSW. * Period: Contribute i aluC of pollutant concentration on road sections shall be predicted through the source intensitM during heating period (N inter). * Status of traffic: The len-th. w idth of each road section: vehicle lane arrangement: vehicle flow and speed in 2010 provided by the designing department. Vehicle lanes * without hard separator between up and domn lanes \\ill be considered as one road section. * Topographic roughness: 4,-370 cm is selected * Elevation of measuring points: Z=1.5 m * N02 emission: refers to Source and Control of Oxides of Nitrogen Emissions prepared by Station Source Division and Mobile Source Control Division of California Environmental Protection Agency. USA. in August 1997. 4.3.1.2 General Quality of Ambient Air There are more than 2000 industrial enterprises in Anshan City among which 24 are main industrial pollution sources according to national standards (The Anshan Iron & Steel Complex is regarded as one unit ). The systematic emission from these 24 enterprises is up to 168.4 billion m, which covers 90.3% of systematic industrial emission of the whole city among which 87.2% comes from Anshan Iron & Steel Complex. According to monitoring of present situation conducted during EIA, and compared with GB3095-1996, the percentage of monitoring points beyond standard is shown in Table 4-26. Table 4-26 Percentage of Samples Exceeding Standard Pollutants SO2 I NOx CO HC TSP A B A B A B A B B Heating period 25.0 25.0 100.0 100.0 87.5 37.5 50.0 100.0 100.0 Non-heating period 0.0 12.5 100.0 100.0 87.5 75.0 100.0 100.0 100.0 Note: A - one-hour value B - daily average value 4.3.1.3 Determination of Forecast Point. Based on the zoning of Anshan urban area and road arrangement of this project and according to the outline of this project assessment, five locations along the project roads are selected in the air forecast and assessment. The parameters of forecast points are shown in Table 4-27 and the detailed locations in Fig.2-1. Table 4-27 Parameters of Atmosphere Forecast Point No Location Location number Coordinate (m) The shortest distance X V from the road Northeast of Anshan Glass Plant I 1650 1200 258 2 Residential Area in Lieshishan Street 3 195 3700 50 3 Tuanjie Primary School 4 4200 7730 100 4 Laodong Road Primarn School 5 5470 9550 96 5 Bajiazi Subdistrict Office 6 760 6120 76 (160 after construction) Determination of coordinate si stem In this environmental assessment. the unified coordinate s, stem is set up, with origin in the 86 l :oninu t rban i ransport 'roix- \nshat tui)project Eiiuronmental inpact xssessmeit southwk% est of \nsha n Ciu an ih t Iate and norti ire hC di r;1, d i n wc N and Y as y's. 4.3.2 Vehicle Emission Inventory According to parameters ot pelk hour xehicle fla : a Specd a upper and dos, n lanes of ever'- section of 1is prlject a.. ý e road conditiows etc. 1cr i three condions of ', ith & .without Project. and adoping ah2rnatise schem in 2 10 bupplied by the design institu[C. using MOBILF 5 mod;!. Oj .Ox and 1C C urce nteisit-. and vehicle emissions are separately calcaiated. For ! u *alcJxcd results cc Tahie 4-23. We can lind that total ( c -d ilC Cmissions on Jiangu k oad with project (whole-line widening)are rciatise bc-.e: tihan that of -.,ithout pruiect. but NOx is hiuher. In the condition of .k-h projec. i() and 11C cmi'.ion, of th, wshoie-line widening scheme are lokser than that of ti ei ring scherne. but Co is higher. Ernissions source intensity or dif!'.rent types of sehicle !re shn\.: in Tfable 4-29. \cording to the re.ated inf ormation oc uxhan ( >i</0ensiV Traf& Pla;ning we has e catuated vehiIe polluta, emissi -rout of .\nshan urban arca of 'ith & -itnout projeut in 2010 (see Table 4-30). e results nase shown that schi.e imrets oni en\ ironment sith project .il be ionker than that of , ithout project. which is favorable for restraining further deterioration of' Anshan air ens ironment qualitv. Table 4-2 \ arious Source IntenNits kh km) Road L Without projer in 201, With project in 20 201o Elevated rnad in 2010 . -~ 0 1 >a\ , ~ ~ r--(iI '0x iii -I 39.0 4.5_ 38.» 37.6 5.2 7.2 -~4 :L 4____ vl 4.6 6. 6 1- -l 1 6 11.9 1.7 .5 -, 76 f , 62 237 __8. 1.-2.2 3 4 ¯ - 1 18 7____1_ __________ 5 4-1)> 4.4 7 7 - 1210 6.8 6 S4 2.3 4.4 1 0 6 (6.,N 5 1-8 2 _ 1 i i-< - 28__ 1. _ox __i _ , 2-3-1 18 415.2 5.9-11.0 ' s i8 2 4 . 9 6 9 4.9 27.3- 71.2 2.7-4 9 3 9. 1(7 2-3 2 328-9.2 2.6-44 i5 l 104 - 4 6. .1 090-19.5 2.-.6 3 3- 1 - 96. 4 90.7 7.1 15.2 3-2-1 1209 3 l2 124 99.4 6.7 16.4 3-2-2 2.~ 0.4 17 3 6,7.9 5.8 i1.5 3-2-3 4.4 0.6 ] ; 7_ .~ ____1__ 5 85.6 7.0 14.3 3-3-1 62.5 21 hS. < 1 2 1 1815 4 31 z 3-2 3.6 81.7 2.s3.6 , 4 4 ?5.4 .7 u 4114 __ 6 3.5 3 - - -J,_ ____ 3 --2 306 1.7 2..;3 . 1 , 4to___ .;u.s46. 3. ,-1 3 7 1. 4 h . .;245 50 1')j4 . 08 3 -4 .6 2 -48. 1 5.1 l I . 4o 2 6 4 5 42 SI I j 54 1160 S) 6.0 9.4 l1.8 l_ 3__ i_ l_. 5. 2 2 11__ 1-7 1)9 i j. I. I 3-- 4 4.7 158 1 3' __ 0. __5.2 ' Il9 ' 5.0 '-.0 1 22 35 6o ,2244.0 4.4 112 2 8 2.4 6.S 8 ) 99 2 1590 . 6.6 7.7 16.4 2t 8 3..6-1 098 5. _ . 6 1'> 80 - I~ 3-6-2 l o6 1 6.6 - - '6 . 12.8 tl 2071.1 96 2 l 1~34 Iln 1458.4 119.0 216.1 \ote : otal~ refers to x h utlol peak hour sorce icmh h. NO \alue i-, jo pe enit ol 'M K u. 87 Liaoning I rHan Transport Project- knhun Suhproject Environmental Impact Assessment Table 4-21) Emission of Various 1 chicle% (g/km.ehicle) ategories if schicles LDGN LDG II I.DT2 HDG\ LDD1 IIDDV IC Weighted average CO 74.00 92 11 112.01 185.48 1.99 13.17 107.90 80.21 10 NO\ 2.24 3.58 4.59 4 U 0.94 10 '" 0.34 3.44 (km h) No, 0.22 1).1 0.46 0 41 0 09 1.08 003 0 34 IlK 10.64 20 4 25 51 21.25 ) 4( 3 43 13.13 13.72 CO 46.33 59.1 (I 95 1. 14.69 I 2 . 0 50.88 50.58 20 NO\ 2.02 3.22 4.12 4.30 u" 8.68 0.32 3.04 (km h) NO 0.20 0.32 0.41 0.43 0,08 (.87 0.03 0.30 11C 6.60 12.40 15.43 12.87 o.3 2.56 7.07 8.43 CO 37.11 48.13 58.60 77.17 0.89 5.99 33.69 40.10 30 NOx 1.94. 3.10 3.97 4.56 (.65 7.39 0.34 2.86 (km/h) NO, 0.19 0.31 0.40 0.46 (.(7 0.74 0.03 0.29 IC 5.25 9.71 12.07 8.32 0.28 1.99 5.17 6.58 CO 27.04 35.98 43.81 56.51 0.66 4.43 25.23 29.52 40 NOx 1.99 3.09 3.96 4.81 0.58 6.64 0.39 2.84 (km/h) NO 0.20 0.31 0.40 0.48 OM06 0.66 0.04 0.29 HC 4.07 7.69 9.56 5.74 0.23 1.59 4.24 5.13 CO 20.17 27.65 33.66 44.90 0.52 3.51 19.57 22.39 50 NOx 2.04 3.1o 3.97 5.07 (.55 6.30 0.43 2.85 (km/h) NO, 0.20 0.31 0.40 0.51 0.06 0.63 0.04 0.29 HCt 3.30 6.39 7.94 4.20 0.19 1.31 3.59 4.19 CO 15.67 22.19 27.01 38.99 0.44 2.99 15.81 17.79 60 NOx 2.06 3.11 3.98 5.32 ().55 6.32 0.46 2.88 (km/h) NO, 0.21 0.31 0.40 0.53 0.06 0.63 0.05 0.29 HC 2.80 5.55 6.89 3.30 0.16 1.12 3.14 3.58 Note: Categories of vehicles: LDGV - light-duty gasoline %chicle LDGTI - light-duty gasoline truck I LDGT2 - light-duty gasoline truck 2 HDGV - heavy-duty gasoline xehiclc LDDV - light-duty diesel %ehicle HDDV - heavy-duty diesel vehile MC - motorcycle Table 4-30 Estimate of Peak Hour Vehicle Pollutant Emissions in Urban Area of Anshan City Item Status Without project in 2010 With project in 2010 Remarks Average speed of road sections (km/h) 33.76 36.00 38.49 Peak hour Fast speed road ( 49.33 49.34 Outer ring line Main truck 34.67 36.54 34.17 Secondary truck 30.75 32.67 32.67 Branch 20.94 14.37 21.20 Total haulage mileage (veh-km/h) 250200 393369 325200 Peak hour CO 36.02 33.30 30.87 Pollutant NOx 2.85 2.84 2.84 source intensity NO, o.29 0.28 0.28 (p/km.veh) IC 5.96 5.63 5.31 CO 9.01 13.10 10.04 Pollutant NOx o.71 1.12 0.92 emission NO, 0.07 0.11 0.09 (t/h) liC 1.49 2.21 1.73 Note: veh - Amount of equivalent mini motor-car Table 4-30 shows environmental impact imposed by vehicles emissions with vs without project. With the increase of vehicles resulting in worsening impacts on environment, a long- 88 Junin-- i rhan Transport 'pr,ject Lm ioin subp ye En irnental impact A sesniiem nt term motor vehile emi io- !· irategy\ VKS h lal b dc elo u.d and implenented for -nshau 'ity to redce xh- c 0ion> a1nd mii i.xi.e c it. v, ide 1npacts on air qua it . 4.3.3 Impact Analysis 4 3 3. i Construction Phase The impact on the atmo<peri em i:onnem in fte ý.'nsntcuon phase of this project nminl.. come Irom the fol ing s. ree>. • Dust produced ty demnoli ; hluin bliilngs & ,trucU • D )us: produced b :aeng .,nd relaiming .mJ and Lrax el n eunstruction srie. * The secundar- dust rodu1tion along the tnirasprrt ine caused by the construct:t,e materials transportion i oistrUetion waste and bun materials for construction use). " Dust and >moke produced . mixing concrete and asphalt conerete. " Dust produced hy un and unioa,inL matvries .n construction sites anc Ltust produced by veathe ing f h!:k material in stv,k\,,rcl, According -, th inesti'n the ornstruct a mat n f sand, gracel and so on ir this prolect are all purchased from outside. Ilhe fee for purchasing sand and graxel inclLJi the 2\pensjs used for ensi-onrnent nrotection of and-gra,el nivnc pit and csithdown. The sand-gravel stacking and reClaining site> are lolned ni te unrN ide oi Tie iy n a sparse population. h1e impactl of dust on the cnvironnment i.,, not serious. Sit staliton of precast structures CIl i-e adopted in the interchangc coniruetion. i'he cement produc,:on & storage facilities xii be prvided with deJustin e i f pkrtants Jenit% : -i edischarge ulet can mcct th, cquirements of emission st>Jdrd. 1le naxing ,ation o! asphait conerete located in Anshan sutburbs w ii be responsibl. 1n th phalt conerete proJuciion. According to the on-the-sp,t nx estigation. Asphalt \vixi 'L,.at of 1-l,eriil Nuppiy Stor Urhan Construction Bureau of Anshan Ci t, located in i tt. Q,an1than dlistniet. xxnil be proxided with water-film precipitators and de-dutin' J ones. while A-halt \liimnu Station of Road Administration Deparnent of \nhan City. ciated iii the wvest ide of-\SC plant area. wii be also provided with' dedusting yelone. :\er the treanntlllt. the JIscarged dust can ba>ical reach the emission standard. but cli*ssoiti oi asphatr smoke kkill c.\cced the standards. In addition. the dust produced b handling and storage of bulk materials on the construction sites and the removal of btildinus ,hall haXe serlous impact on the enironment. so appropriate measures should be taken. 4.3.3.2 Operational phase Using (CAL 3. wve baxe calculated the inerernental peak iour and daily ax erage concentrations ol wxithout and w\ith prjeci sen ane, and adoptin. eie-aied road in -12010 at varioujs ind directions. For the caletated resuil ,e Table 4-31. Table 4-32 and Fig.4-10. lo simplify the calcuaon. the ap and dows n lane are conbined together in the assessment. The results of prediction shoum in Table 4-33 demonstinaie Jhat the impact of combination or separation of up and do lie <ali he similiar. Liaoning urban Transport Project- %nshan I,uhproject Environmental Impact Assessment The following conclusion can be drawn from the prediction in Table 4-31 and Table 4-32. Table 4-31 Calculated Results of Incremental Peak Hour Concentration at Various wind Direction (mg/m3 Factor Ng N NNE E s SSw, A B c AB C A B B I c B C 4 B C A B C l 1.10 0.50 0.50 0.50 0.10 0. 10 2.90 0.20 0.10 1.3>0 0.30 0.40 1.30 0.30 0.40 0.50 0.40 2.40 2 6.80 4.20 4.10 6.50 3.80 3.70 0.00 0.00 0.00 0. lo 0.00 0.00 3.70 3.00 2.50 4.70 3.00 2.80 Co 3 0.80 1.10 1.40 0.80 1.30 1.>50 0.00 0.00 0.00> 000 000 0.00 0.80 0.20 0.20 0.70 0.90 1.30 4 0.00 0.00 0.00 0.5 100 0.90 0.00 1.10 1.40 0.1l0 1.31) 1.60 0.20 2.10 2.10 0.00 0.00 0.00 5 0.00 0.60 0.40 0.00 0.60, 0.30 0.30 1.00 0.70 3.5>0 o.1 0.10 3.00 0.00 0.00 3.10 0.00 0.0 l 0.00 0.00 0.00 0.00 1,00 020 0.0) 0.00 0.20 ø.m0 0.00 0.20 0.00 0.00 0.00 0.00 000 2 0.20 0.20 _0.10 0.2 0.2<> 0.00 0.00 0<0< 0.00 0.00 <.00 0.10 0.20 0.10 0.20 0.20 0.20 NOx 3 0.00 0.10 0.20 0.00 0.10 0.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.10 4 0.00 0.00 0.00 0.00 0.10 0.10 0.00 0.20 0.20 0.00 0.20 0.20 0.00 0.20 0.20 0.00 0.00 0.00 5 0.00 0.10 0.00 0.00 0.10W 0.00 0.00 0.10 0.10 0.10 0.0 0.00 0.10 0.00 0.00 0.10 0.00 0.00 1 0.00 0.00 0.00 0.00 0.00 0.00 0.02 0.00 0.00 0.02 0.00 0.00 0.02 0.00 0.00 0.00 0.00 0.00 2 0.02 0.02 0.02 0.01 0.02 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.02 0.01 0.02 0.02 0.02 NO2 3 0.00 0.01 0.02 0.00 0.01 0.01 0.00 0.00 0.00 «.0) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 4 0.00 0.00 0.00 0.00 0.01 0.01 0.00 0.02 0.02 0.00 0.02 0.02 0.00 0.02 0.02 0.00 0.00 0.00 5 0.00 0.01 0.00 0.00 0.01.0< 0.00 0.01 0.01 0.01 .00 <.00 0.01 0.00 0.00 0.01 0.00 0.00 l 0.10 0.10 0.10 0.00 0.00 0.00 0.40 0.00 0.00 0.20 0.00 0.00 0.20 0.00 0.00 0.10 0.00 0.00 2 1.10 0.60 0.60 1.20 0.50 0.60 0.00 0.00 0.00 0.00 0.001 0.00 0.60 0.50 0.50 0.80 0.50 0.50 HC 3 0.10 0.20 0.20 0.10 0.20 0.20 0.00 0.00 0.00 0.00 0.0» 0.00 0.10 0.00 0.00 0.10 0.20 0.20 4 0.00 0.00 0.00 0.10 0.10 0.10 0.00 0.20 0.20 0.00 0.20 0.40 0.00 0.20 0.30 0.00 0.00 0.00 _ 5 0.00 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.50 0.0 o.00 0.50 0.00 0.00 0.50 0.00 0.00 Note: A. B and C mean without project. ith project ( widening ) and ele ating ( alternative ) scheme separately. Table 4-32 Calculated Results of lncremental Daily Average Concentration at Various Wind Directions (MI3 Factor NR N NNE E S SSW W A B C A B C A B C A B C A B C A B C I 0.83 0.38 0.38 0.38 0.08 0.08 2.18 0.15 0.08 0.98 0.23 0.30 0.98 0.23 0.30 0.38 0.30 0.30 2 5.10 3.15 3.08 4.88 2.85 2.78 0.00 0.00 0.00 0.08 0.00 0.00 2.78 2.25 1.18 3.53 2.25 2.10 CO 3 0.60 0.83 1.05 0.60 0.98 1.13 0.00 0.00 0.00100.00 0.00 0.60 0.15 0.15 0.53 0.68 0.98 4 0.00 0.00 0.00 0.38 0.75 0.68 0.00 0.83 1.05 0.08 0.98 1.20 0.15 1.28 1.58 0.00 0.00 0.00 5 0.00 0.45 0.30 0.00 0.45. 0.23 0.23 0.75 0.53 2.63 0.08 0.08 2.25 0.00 0.00 2.33 0.00 0.00 l 0.00 0.00 0.00 0.00 0.00 l0.00l 0.15 0.00 0.00 0.15 0.00 0.00 0.15 0.00 0.00 0.00 0.00 0.00 2 0.15 0.15 0.15 0.08 0.15 0.15 0.00 0.00 0.00 0.00 0.00 0.00 0.08 0.15 0.08 0.15 0.15 0.15 NOx 3 0.00 0.08 0.15 0.00 0.08 0.08 0.00 0.00 0.0) 0.0 0.0 o1.00 0.00 0.00 0.00 0.00 0.00 0.08 4 0.00 0.00 0.00 0.00 0.08 0.08 0.00 0.15 0.1510.00 0. 15 0.15 0.00 0.15 0.15 0.00 0.00 0.00 5 0.00 0.08 0.00 0.00 0.08 0.00 0.00 0.08 0.08 10.08 0.00 0.00 0.08 0.00 0.00 0.08 0.00 «.0 1 0.00 0.00 0.00 0.00 0.00 0.00 0.02 0.00 0.00 1.02 0.00 0.00 0.02 0.00 0.00 0.00 0.00 0.00 2 0.02 0.02 0.02 0.01 0.02 0.02 0.00 0.00 0.0<) o.» 0.0 1.00 0.01 0.02 0.01 0.02 0.02 0.02 NO¿ 3 0.00 0.01 0.02 0.00 0.01 0.01 0.00 0.00 0.0> o.o0 I.o 1.00 0.0 0.00 0.00 0.00 0.00 o.1 4 0.00 0.00 0.00 0.00 0.01 10.01 0.00 0.02 0.02 00.02 10.02 0.00 0.02 0.02 0.00 0.00 0.00 5 0.00 0.01 0.00 0.00 0.011 0.00 0.00 0.01 0.01 0.01 0.00 0.00 0.01 0.00 0.00 0.01 0.00> o0 1 0.08 0.08 0.08 0.00 0.00 0.00 0.30 0.00 0.00 0.15 0.00 <.00 0.15 0.00 0.00 0.08 0.00> <1.00 2 0.83 0.45 0.45 0.90 0.38 0.45 0.00 0.00 0.0010.00 0.00 0.00 0.45 0.38 0.38 0.60 0.38 0.38 HC 3 0.08 0.15 0.15 0.08 0.15 0.15 0.00 0.00 0.00 0.00 0.00 0.00 0.08 0.00 0.00 0.08 0.15 0.15 4 0.00 0.00 0.00 0.08 0.08 ).08 0.00 0.15 0.15 10.00 0.15 0.30 0.00 0.15 0.23 0.00 0.00 0.00 5 0.00 0.08 0.08 0.00 0.m8 0.08 [0.08 0.08 08 0.38 0.00 0.00 0.38 0.00 0.00 0.38 0.00 0.00 Note: A, B and C mean without project. u ith projeet ( widenin, ) and eleating. ( alternative ) scheme separately. 90 iaonng r¾n Transport Project-Anshaw -ubproject ný ironmental Impuct Assessment Fig.4-lo 21') Air Qualit% Predictio i iResul talong the Projec Road - }} to Lyan 3-1 Anshan irGn & Stee Compiex Ecst JAarq -,d O.OD-0.- 0.W73./ / / 0^0 o-oo(1 0.0CG6 Imi,-4.08 NHHC L%2.1 0g4l 210 -r uji dc tio,- R--u t,1 p, gt POject Roacý Pr>jectrood o ~ k,eric.t-ve Scheme A Scheme 0 500 IWO - - - Ra;way 1 c ng; crdi sectýo9 No. Liaoning I rban Transport Project-.%n han Subproject Environmental Impact Assessment Tabl 4-33 Concentration at Different Points No Distance to project road curb (m) Combined Total lIp Lane Down Lane 1 5 2.0075 I .80 I.10 0 70 2 10 1.8150 1 50 0.90 0,60 3 24 1.2546 I.Hi 0.60 0.50 4 50 0.8763 u 80 0.40 0 4) 5 100 0.5853 0.00 0.30 0.31 6 150 0.4564 0.40 0.20 0.20 7 200 0.3813 01 0.20 0.20 8 250 0.3307 0 44 0.20 0.20 9 300 0.2944 0.20 0.10 0.20 10 350 0.2666 0.20 0.10 0.10 II 400 0.2446 0.2o 0.10 0.10 12 450 0.2267 0.20 0.10 0.10 13 500 0.2117 o.2U 0.10 0.10 Note: 1. Scurce intensity ofCO: 40 u'mil.veh, flow: 1566 veb. 2. The width of combined lane is 23 m: up lane and down lane are 11.5 m. 3. The total refers to the sum of pollutant contributive concentration of up and down lanes. In case of with JRR, the positive influence of elevated road is generally higher than the impact of preferred alignment. The concentrations of Point I ( northeast of Anshan Glassworks ) and Point 2 ( Lieshishan St. residential area ) with project are lower than that of without project. The concentrations of point 3 ( Tuanjie Primary School ). with and without the project, remains at the same level. The concentration of Point 4 ( Laodong Road Primary School ) with project is higher than that of without project. The concentration of Point 5 ( Bajiazi Subdistrict Office) with project is much lower than that of without project when the dominant wind is in south direction and is lightly higher than that of wkithout project when the dominant wind is in north direction because the road shall be changed to the north of the Point after the implementation of the project. North wind makes the concentrations of Point 2 and 3 high. the west wind maximize the concentration of point 2. and east and south wind maximize the concentration of Point 4 and 5. The predicted concentrations of CO, HC and NO2 are much lower than the environmental standard, while the max. Only NOx concentration predicted exceeds the standard. However. the hourly and daily average concentration of these three pollutants change in the same pattern at different points and under different wind directions. the CO is therefore selected for analyzing the impact on environment with and without JRR in 2010. The CO concentration difference in peak hours is shown in Table 4-34. Table 4-34 CO Concentration Difference in Peak Hours, With vs Without Project Wind direction N NNE E S SSW W 1 -0.6 -0.4 -2.7 -1 0 -1.0 -0.1 2 -2.7 -2.7 0.0 -4.1 -0.7 -1.7 3 +0.3 +0.5 0.0 0.0 -0.6 +0.2 4 0.0 +0.5 +1.1 -1.2 +1.3 0.0 5 +0.6 +0.6 -0.7 ..-.4 -3.0 -3.1 Note: The above data are differences of concentrations with and ithou project. in mg!'m. 92 ti: inu l rba I ranspr -ev: - i \ ba ii ii)projel t E . nmens i Impact \ms\pnct .! n the *ahlc. th: poso e p \c : o .rr th iccative irmpact Hmm the poim 0 view ot concentration. \\ i re:.pcct to meteoroloci coniitions of Anshan Citv, NNI an,i SSW wkind direction freq;Aelnc\ 1 ll .5% and 10.75' respectixely in summer ( 18.61% and [0.'8" in winter-. Under Ihe \ \1 and SS\\ nmid. tir J1-) concentration i of different mnor: pomts. >c,pt , 4. 6 urd Jk .1 PoW 4 der- SS\\ dccreascs shirph kr the implere ritatin o picei fhl, riax. dre,_,l , i3 r i'. m s hk the may i !reUse 1 mm on k. SK the prn,l, i Anie 0 Ii,e u r u of n IghborinL area. mth an e,.:,pt ion u 1 int 4. .itnough thu roei - k wi: se he mcreasc o" 11 ie ratio at >ome points. a canlusi' ca: i e nade 1m the f oti i .hide em1 isscon !!n[. is n i the preeio us chapter thk the prject wuld pla, -an :etI\.:role in rtsei)inn t ing of the atmopherc ervironment of Anshat Ci1 4.3.4 Mitigation Measures J 14.1 Cinstructk phase 2:L poLutant-s prodtced in sar & stone s;e. -meIn let>r a d hituminou mv xer s. be controlled as fllow: • Strengthel the contr )1 !n ,oliant cm sion n mre e mintenance dedusung facilities. " I luc dr. e,can nu de' le Jei n cloped by \.rshan Ir Proect:ion 1-guipme- Plant shall be en lhe .1i; txku units ( hitum e nerete nixer. in an tim: gua rantee the quay' ofi emis:Clan. the sec(wdar. du,t 1',, med Jan hui, traänspor. -ai be contro!led as follo\s: SAPRO niust C lri y ie eu) 1ironmCetil proteciwin respnsihility during the construction and transportation while _tntrustinj the contractor ws ith the project and must incorporate the responsihil in the ..ntract. " [ihe builk material mus te transported in Tik car .)r covered by canvas and not overloaded. * \l uni ts nrh transp a1n .2chicles mu-! x)ply fOr srecial pass from p,blic traffic ajnvistrautn anl Carrk L i Uu2prtiUon m s folted ro'te and timi severe| . b During the peak hour> ! tJrnsirtation. jhe 1 nsportation cornnan niust increasc the frequency of wkater sprai\ m1 nl en transportatiwn route. \ater must be sprayed ai east 3 times durin th da ) - I~ , b APR( ) must clar il\ the ! olimlental protekti. res 'fl lor Jurin c the construactUein and transportatin .!ie e ising i te cont,rct r nh thc pr- ect and must incorprat,_ '>3 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment the responsibility in the contract. * APRO must make proper arrangement to road construction and shorten the construction period of each road section. * The construction company must provide transit shed for the bulk material at construction site to avoid open storage of building material. e. Water must be sprayed to control the dust while unloading the bulk material by the construction company. * While pulling down buildings and structures. the construction company must provide provisional enclosure (magnesia plate or shedding cloth) not below 2 meters at the surrounding of construction site and spray water to control the dust with spray nozzle to reduce the influence of dust on environment. * The construction company must lay iron plates or grass mat on the ground of entrance of exit at constructioi site to prevent vehicles from setting out with mud and must assign a person specially for cleaning work at that place. 4.3.4.2 Operational phase a) Technical Assistance Anshan City ha: -olemnly promised to develop and implement motor vehicle emission control strategy (MVECS) to alleviate further worsening of air quality caused by increase of vehicles and vehicle speed*s slow down again in the urban district. The research and implementation of MVECS of Anshan City is a part of technical assistance (TA) for MVECS of Liaoning urban transport project. For details, see Annex 3. On the basis of a clear understanding of issues facing Anshan City, the trends of motor vehicle growth and impact of the emissions on air quality and knowledge of motor vehicle emission control technologies and programs, a series of motor vehicle control measures will be developed as the core of the strategy. These measures will include, but not limited to: * stringent motor vehicle emission control standards and regulations * vehicle inspection and maintenance program * catalytic purification facilities * \engine improvement * retirement of aged vehicles * monitor and enforcing the motor vehicle emission standards * promote public transportation * increase motor vehicle speeds * motor vehicle quantity control in urban center * develop clean or alternative fuel technologies Means of technical assistance include: * consulting services * technical workshop * overseas study and inspection Working amount of technical assistance * local consultants 40 men.months * out-of-province consultants 15 men.months * workshop depending on completion of TOR of TA 94 Liaoning t rban l ransport Project-nshan Subproject Environnintal Irnjct AXsessnent * m2rsea st!dy and inpeecuon 2prsons aune i,i- liementing schedle of lA b commencement of MVECS dec elopment July 1 999 Scomnpletion o MVE-CS de, elopnment !uly 2001 ' idoption and imipieimet o f MIVE( S id '0021 Recoring on progre anrd..ly prir to 2002 * Reporting on perfonnance of NI VECS antially after 2002 b C Curre'nL - easures improven;er of environmenal protecaon rcg'ions According to the regulations in rhal ol Envinnnnenta Prtection of Anshan City friom 19N8 tn /J02 issued by the gvernment of Arsh (it (No. 26. Mak I !, 1998), the legislatie department shall c. mplcte drafting of A.dmiiiclrt:e Aeascre. fun- iel ,·ai. n f th it md sabniit it to Ite Standing irnr,ttee of anshan People's S>nrcss !or rex iew m 2001 Inspection t venicle emission * Fuaw departnx nts such is I i,oning Fnvironntal Pn,tection Bureau, iaoning Public - Dep:rtnent etc. ha% e intiv signed :nd issued Circular o ti P[eveion>i ex (j Comrr 1 utfehicle i. isi< i >IIU!ion and Administrative Work in .king Energ Q issued b\ 1Liaoningý Environmental Pr,)tection Bureau, No. 97. Sep. 9. ,997 v.hich stipulates that the en,,ironmn:tal adminitrative department (l>cal enironmental protei -enurcau) must carely perf m the function to super. ise md control ' chielc emission integrally and direct the local -cicle yearly-inspection ottce in inýýpcting. • ,ini. (on mp. meraHnfl Emivsion Pr e :!ion u Alowtr 'chicle., of _i han Enirtmental [Protee',:7n Bieau issued b- the go\ ernment of Anshan City. No.4Z. April 2. 1998) stipiates that \nshan T-n ironmentJ Moriitoring Center mut tak- responsibility of monnoring \ehicie enission " Besides annual-inspection. rLi;dom inspection t \ehick: eniissifn must be strengthened in order to ensure that the emission from operating vehicles re-ch a set standard steadily ( issued by Liauning En ironmen Protection Bureau. No.97 1. " The company undc:'aking "m>pection ot kehicle Vmissi n must Lubmit data of in'pectiori and stadstics to the !ocal cm ronmental proteccon once a uer. (issued by Liaonin Em\ ironment Protection Bureau. No.)) 3) ( onitrol ut Vehicle Emisco: that K l to teet the standard * The emission index of operatin ehicles mnust mect the requirements of iandard 1f hicile Emissin (G1B 14761.5-9R (Issued b Liaoning En' ironment Protection Bureau. o.97) Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment * *The traffic administration under the Public Securit% Bureau (Anshan Traffic Police Department) must take vehicle emission inspection as one of the items of primar\ inspection. annual inspection and random inspection of vehicle" (issued by the government office of Anshan City [1998]. No.43). -When the vehicle is registered, if its emission pollutants can not meet the requirement of national standard. the driving license must not be issued.- (Taken from Document No.236 regarding Liaoning Public Trafic (1997) issued by Liaonino Public Security Department). "The operating vehicles whose tail gas emission don't reach a set standard must not be issued with certificate of inspection of vehicle pollutants emission issued b\ en\ ironmental protection department and must be disqualified tor annual inspection". (Issued b\ Anshan government [19981. No. 43 document). * "The vehicles without certificate of inspection of vehicle pollutant emission and whose tail gas random inspection is not qualified shall be punished by traffic administration under the Anshan Public Security Bureau (Anshan Traffic Police Department) according to Item 48 of Liaoning Environmental Protection Regulations." (issued by the government of Anshan City [1998], No.43) * "Beginning from March 1. 1998, the vehicles v.iose emission index don't reach national standard must be equipped with tail gas purifier for reduce the tail gas pollution." (issued by the government of Anshan City [1998] document No.43). "Liaoning Environment Protection Bureau, Liaoning Public Security Department. Liaoning Traffic Department and Liaoning Science & Technical Committee recommend to use high-efficiency oil- saving WB-1 overflow purifier." (issued by Liaoning Environment Protection Bureau. No.97). "For those vehicles which are not suitable for installing purifier, prevention measures such as motor cleaning, maintenance and application of oil-reducing additive must be taken to reduce emission pollution." (Issued by the government of Anshan City [19981, No.43). * "The vehicle administration (Anshan Traffic Police Department) must retire the vehicles that operate over the limited time and discharge tail gas beyond the standard." "The traffic administration takes emission pollutants index of vehicles as the examination content of vehicle maintenance quality to ensure the vehicle emission reach national standard." (Issued by the government of Anshan City [1993]. No. 43) (4) Traffic control Since 1992, Anshan Traffic Police Department has issued Notice on intensifing urban parking management, Notice on intensifying vehicle running management, Notice on intensifying vehicle out-looking and running management. Notice on traffic control at some routes, road sections and crossings, Regulation of improving traffic order of Zhanqian district and Notice of intensifling road traffic management and so on, in addition, Anshan Public Security Bureau. Anshan Administration for Industry and Commerce, Anshan urban Construction Bureau and Anshan Traffic Bureau issued Notice on fiArther strengthening traffic control of roads in urban area on Nov.15. 1997. The vehicle administration office of Anshan Public Security Bureau issued Notice of regarding the vehicle retirement. Based on the above regulations, the traffic control measures of Anshan City is as follows: (Responsibility of Anshan Traffic Police Department) 96 iamnin2 t rban '1 ran_sport Project-Xn aiiatn subproject Environmentaimpact sment * Purking 2 nhe fnm m and suy in rad-z (excep tfr : ,us > nf . lowsd. * \ricultura vehncles must no, alIowed to r. n in urban district. * Urucks must not be permitted to run ,i urban roads during rush hour o 7:00 - 8:00 and 16:30 -- 17:30. ' Tumin, around of the r.. ain i ehic!, is -- aloN ed in urnr area except a: rossings. a Cr the ter roads. :ach as JiK.,guo Roa,-: Ibna_ 'd YuLnlin Roa. _nd She Ji Rsad. the vehics con r material and tar:h\rkto c,,nst:-uction site Inus not ne allowed to pass thre.,h. * To gate 1h in-pact re,uning from thk: pr-, :t c.tr :tion. twL sneciai Lnes i'r ius shall 'ne se u in .'.nshar. Cik (Renmin Road ud SVery Road). i Channeliation au:nin!ststit i, thal be caiTic.d Ot at 8 Jrossing from W P> RoA:d . Donushan Sireer and so ,n. * NMV excluive rad- shl pro- ided at sur ud ectie . such as Zhengz Strcet etc. * According to the Vei:icl Reircment .amlW joued by State Economic unJ I iade Commission, Suue En\ ironimenal Protecti«n B ireau ani se on (State Econ -mic and Trae Cnnnission [i 9.7j!. chices that don ct cet '-e st.adard must reire. In addin, nased un traffic siuation o Anshan traffic road,. the license f agricultura ' chicles ind tricvcie must not be issued. Vhic aninist kfion ktIce of Ansrn PuNiH l ecurit Bureau MuSt be in chrgeoft the implementation, 4.3.5 Residual Impact 4.3.5.1 Construction Phase After tbc mitigation meaures in construction pha--- ha e bcen realizLed: * Thlc lst ad emisn fr,n, sandnd d zton; site. _enient nlant as we. b bnan us concrete mixer can mecet thc 'tandard. SThe secndary dust produce bx buHk ma:ria is oht undr controi • The impact oidust produccd in .:.nstructi 'n suic be miinimii,d. 4.3.5.2 Operationa Phase AfCr takng the aboe c mennincd nieasure. the i-mbKrs of m-tor k hices trra, lin on ,he non-proicct road shall be accordingly reduced in l: the vehicle speed is increa-ed: the traveling time and distance siall be reduced: the ehicles of high pollutant ernilion sbl1 be retused or limited. IhereK-re. the ,chicle emission Althin the city and on the project road shall be r,duced wxhich play, an aetix e role in improx ng the jns ironmental quality in An,han City and along the project road. 4.4 Impact of JRR Project on Surface Water 4.4.1 Assessment Method Accordinu to milieu of cach road seetion of JRR project. the La,dong Bridge section wil influence the surface rixer tem and the South Shahe Rix er n il be directl; affected during construction phase. On other road seceons. the pollutants nxil be carried away by rainfall into river ch as South Shahe R er. N'it-ianghe Rik2r via the municipal scner netw'ork. Ke point of assessment is Iinact ot dornestic age on surIace w.ter. resulted b Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment construction team. The impact of JRR project on surface water will be assessed based on obserNation results of present condition of rivers (South Shahe River etc.) as well as on draining of waste water during construction phase and of pollutants during operational phase into rivers. Model of predicting the impact of domestic sewage which is used at site is taken from JTJ 005-96 "Specifications for Environment Impact Assessment of Highway (on trial)". 4.4.2 Impact Analysis 4.4.2.1 Construction Phase Sewage water during construction phase consists of domestic sewage drained by construction personnel and a small amount of leakage water from construction facilities. With reference to construction of similA bridges and condition in Anshan app. 80 workers who will live at site are estimated to conduct the construction of Laodong Bridge. According to aforementioned model, 2.31 m3 per day of domestic sewage shall be discharged directly into Nanshahe River. The sewage from other workers shall be drained into sewer network of the city. According to measuring statistics provided by Anshan Environmental Monitoring Center in recent years. daily average of industrial waste water and municipal domestic sewage drained into South Shahe River amounts up to 340.56 m 3/d. Therefore, the domestic sewage from construction personnel during construction phase has low incremental impact to water quality of South Shahe River because it is very small in quantity and especially doesn't contain any special pollutant. Waste water during construction phase is mainly the oil-bearing sewage produced by construction equipment because of oil leakage. It is very small in quantity and flows rarely into rivers. In addition, waste water includes the flushing water for sand and stone, overflow from agitator of paving material. Since the flushing and agitating will be done not in site and the flushing water will be reused, this part of waste water has no impact on quality of surface water. 4.4.2.2 Operational Phase Due to automobile troubles, traffic accidents and so on, gasoline or machine oil may be leaked on road surface during operational phase. When it rains, the rainfall will bring all the oils, dusts and pollutants into rivers via the sewer network. Table 3-11 (the present status of water quality of South Shahe River) indicates that the water quality of river at Laodong Bridge section is already far away from class V of the national surface water standard because of upstream pollution by industrial waste water and domestic sewage. The pollutants produced by traffic is much smaller in quantity in comparison with those from industrial waste water and domestic sewage. And after diluted by rainfall the sewage drainage from JRR project will not affect the water quality of South Shahe River. The rainfall runoff on the surface of other road sections will be collected in drainage ditches via the sewer network and finally flow into Yunlianghe River. Amount of pollutants discharged into rivers will almost be the same before and after JRR project. 98 1.1aoning I rban Transport Project- \n Ni Subprojet Environnental impact Xssessnent 4.4.3 Measures of Mitigation and Control of Pollutants 4.4.3.1 Mitigation and Controi during Construct:on Phase 8 Pro';ibit e' e. where wantn irainage f domede sen 've ischarge it exclusj\ ely into * the -u.cipai seu er netrk. • Pre -,ent Icl telakage., l ro,o stu:,:g ip en • Proposc to minimL: as mit,ihl a- p,ssibze the tir of ,ad construc ion. so the tine of * inLuence of ri\ er-crossibridc e constructin wil he '.horter. Re-ise the ._ushi< ater or Ž,and and sione and he oerth.w water froin agtator kt pu, nina mtIriais. 4A3.2 Mitigation and C-ntro! d.,ring Operationa! Phas= Keep away s a good condition cr automuNies to meinimize th leakag. of gasoline Sr nchiný. oi! ønto the road suri'ace. su Ie effee: of pouiitant.., o: surVc: water w il be (crexc. Drai- off holesa; ba_en con>idcrcd in the design to remo e t- rain runoff -rm the 'vel bridge surface. Ehe rainfall on the :ri<.ine surface of Laodong Row. Bridge nd th interchanges wit low down the slope into the sewer netwtork. The raintall .n the k:el surface of the interennges wi be reno;ed i-rougn drainf hoppers which are connected with municpal >ewer network. 4.4.4 Comprehensive Analyses in construction and operato.a anhser. the miea ion anJ control .easures of he sewage ,rain can lowver and prv.en the effects of poltant> on the surface Vater qualit\ the water ol rivers in the assessnit arca can only be used i r iiriiating the iields accordir- to nre,ent q!_it% of watcr. i h, ri,er atr fter taking tr:eneasures can mee: the reoirnts of agricuL[tural irrigationf. 4.5 Soil and Vegetation Impact Assessment 4.5.1 Methodology Impact on soil analsis: According to charactcristics of the project. qcualitati; c decription <hal be made in teris (- .Ac tuall appijeation inction of soil. nmpyct on vegetatwn ana! ij On the hasis of informa obt. ed irom alon- : and i estiation. mobematies ztatistics of effeLting a ' of green land and tr,, :ha be made in accordance w ith the lølowing estimates : • Single tree : 16 m S'I rees alongside rod 4 ni. \ lenLth o f tree ru Liaoning L rban Transport Project- Answn Isubproject Environmental Impact Assewment * Green land : actual area 4.5.2 Impact Analysis 4.5.2.1 Construction Phase The impact on soil and \c,ctation in construction phase descried in this assessment mainl\ refers to the impact on soil and legetation due to occupation of land by road construction. The impact on soil and vegetation due to occupation of land by the project road will be described in following section. In the course of constuction. the work-site shed and warehouse for building materials will occupy land. Though the occupation which does not result in change of soil property and in cutting of trees will not last long at each road section. there shall still be short time change of land application and short time vegetation damage which can be restored in the future. 4.5.2.2 Analysis of Impact of JRR Project on Soil and Vegetation On the basis of investigation data of present situation and feasibility study of proposed project, it can be known from calculation that the project construction will occupy 44350 m2 of farm land and vegetable plot. This part of land is located at boundary between city and village and has been divided to land of urban application. That means the owners of land are not living by it. 15795 m2 of lawn and greenery patches and 6500 m2 of shelter forest and 7130 trees will be cut down, among which the trees over 25 years account for 60% approximately. Tree cutting quantity takes app. 70% of alongside trees. In the assessment, according to the size of tree, approximate calculation of actual greening effect of trees is made, big tree is computed in terms of 100% of greening area. middle tree 65%. small tree 10% and the newly planted tree 3.1%. the result of calculation is detailed in Table 4-35. Table 4-35 Impact of the Proposed Project on Soil And Vegetation Road Road name Area of cultivated land Trees to be Area of greenery patches and Greening section to be covered (mt) cut (each) shelter forest to be covered (m) area (m) 1-1 South Ring Road 31600 102 - 1444.0 1-2 Zhonghua Road - 37 592.0 1-3 Yuanlin Road - 830 - 10000.0 2-1 Huangang Road - 663 6770 13448.4 2-2 Wuvi Road Interchange - 210 - 2721.6 2-3 Yongchang Street - 855 2850 12485.0 3-1 Hebei Road 12600 232 - 2948.8 3-2 Laodong Road 150 408 - 6312.0 3-3-3-6 Jianguo Road - 3793 12675 53306.2 Total 44350 17130 22295 103231.0 4.5.3 Mitigation New trees will be planted on both sides of newly built and widened roads, the spacing between trees shall be 5 m: flower. grass and shrubbery on the separation belt will be grown. Because land in city is limited. there are many specific difficulties in raising greening area. In 100 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment order to reach the greening goal in the near future. the following mitigation measures are put forward in this environmental assessment specially. The space between planted trees along the road shall be half of the space (2.5 m) between adult trees. Several years or over ten years later those trees shall be spaced out or transplanted. On the basis of concrete condition of both sides of the road, the climbers, such as virginia creeper, wild grape and Chinese wisteria etc. can be planted on the available walls of buildings and piers of interchange etc. These plants can grow upwards, in this way perpendicular greening will be realized. About 15560 climbers shall be planted, totaling 5187 running meters. In order to make the environment green, some shade flower and plant shall be planted on the ground under the newly-constructed interchanges. According to the climate characteristics in this area. poplar and willow shall be chosen as trees that line a street. The above mentioned trees shall be planted in the following spring after the road completion. The construction shall be carried out section by section or side by side, so the raw material for temporary use can only occupy one or another section or section side of the road to avoid occupation of land which is not used for this purpose. By taking the above mitigation measures, after the implementation of this project. the greening effect of resuming ecology and vegetation is detailed in Table 4-36. Table 4-36 Compensation Situation of Soil and Vegetation after Taking Mitigation Measures Road Road name Compensation greenery Compensation Gree ing area in different year (m) section patches and lawn (mz) trees replanted 2001 2006 2011 2016 1-1 South Ring Road 3195 1000 3691.0 4795.0 13595.0 16795.0 I-2 Zhonqhua Road - 376 186.5 601.6 3910.4 9113.6 -3 Yuanlin Road 5140 200 5439.2 5660.0 7420.0 8060.0 2-1 Huangang Road 4474 1240 5.89.0 6458.0 1737.0 21338.0 2-3 Yongchang Street 2266 844 2684.6 3616.4 11043.6 13744.4 3-1 Hebei Road 4620 961 5096.7 6157.6 14614.4 17689.6 3-2 Laudong Road 4038 1100 4583.6 5798.0 15478.0 18998.0 3-3-3-6 Jianguo Road 22264 4721 246015.6 29817.6 71362.4 86469.6 l otal 3 .143 10442 51376.2 62904.2 154793.8 188208.2 4.5.4 Residual Impact It can be know-n from the aboe analysis. 44350 m of hrmiland and vegetable plot w ill lose their function and shall ne\cr he reused due to the traffic road reconstruction project. Although trees. flowers and plant, will resume its orecin area more better than ever, its recent greening effect is far inlerior to that of present state. To catch up with the present greening effect. it needs 8 years or so at least. Ihe residual impact after mitigation is listed in Table 4- 37. 101 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Table 4-37 Residual Impact of the Project on Vegetation Road Road name Green area occupied b% Residual impact (counted per green area) (m2) section the project 2001 2006 2011 1-1 South Ring Road -1444.0 224')) 3351.0 12151.0 1-2 Zhonuhua Road -592.0 -45.5 9.1) 3318.4 1-3 Yuanlin Road - 10000.0 -45W 8 -4340.0 -258.0 2-1 luangang Road -13448.4 -83594 -6990.4 3921.6 2-3 Yongchang Street -15179.6 -12495.0 -11563.2 -4136.0 3-1 Hebei Road -2948.8 2147.9 3208.8 11665.6 3-2 Laodong Road -6312.0 -1728.4 -514.0 9166.0 3-3-3-6 Jianpuo Road -53306.2 -28700. -23488.6 18056.2 Total -103231.0 -51854.8 -4.326.8 51562.8 Note :-' refers to advers6 impact of the project. 4.6 Sunshine Obstruction Assessment 4.6.1 Methodology As for Anshan JRR project. there is no elevated road in preferred alignment, and the elevated road in the alternatives is far away from residential areas. In the design of interchanges and viaducts, design institute have already paid attention to the problem of sunshine obstruction. In this assessment, the numerical modeling method will be adopted to evaluate the sunshine obstruction of JRR project. Coefficient ofsunshine distance l, lo = ctgh X cosy h = arcsin ( sin 4) X sin E +cos 4) X cost) t= 15 T + -300 Where: h - Sun height angle, deg; 4)- Latitude of Anshan City. deg; - Winter solstice declination, deg, y - Angle between building and sun position line. deg: T - Beijing time, o'clock: X - Longitude of Anshan City. Sunshine distance D D=H X 1o Where: H=Ho - H, Ho - Interchange height. m: H, - Distance from widow bottom of building's first floor to the ground surface, m; DR<D means sunshine obstruction. the other case means no obstruction. DR - distance from interchange to building, m. Full-window sunshine time AT 102 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment n AT = (Qi X A t) Where: AT- interval of time accumulation, h; n - numbers of time accumulation n = ( T2 - T, ) /A t, T, - beginning of full-window sunshine exposure; T2 - end of full-window sunshine exposure. Qj - factor for determination ( Qi = 0 means obstruction; Qi = 1 means no obstruction) 4.6.2 Sunshine Data and Predictive Result Sunshine data Sunshine data are shown in Table 4-38. Positions of measuring points which are identical to the current places of monitoring are shown in Fig.2-1. Table 4-38 Sunshine Data Building measured a (deg) Ho (m) Ho' (m) Hw (m) DR (m) 1 Building located at East Jianguo Road approach of Lishan Street Viaduct -6 6 9 1.0 13.5 2 Building located at Laodong Road approach of Lishan Street Viaduct -49 6 9 1.0 13.5 3 Building located at Yongchang Street approach of Wuyi Road Interchange 20 6 9 1.0 15 4 Building located at East Minsheng Street approach of Minsheng Road Viaduct 24 6 9 1.0 . 8 Note: HO- interchange or viaduct height: Ho' - interchange height (Ho) plus height (3m) of sound barrier set up on interchange or approach. Predictive result Present and future sunshining hours to roadside buildings are summarized in Table 4-39. Table 4-39 Present and Future Sunshi ing Hours Present Predictive Predictive Kind of Standard Ne Building measured sunshining sunshining hours sunshining hours building of hours without sound with sound (first floor) sunshining barrier barrier _ (hours) - I Building located at East Jianguo Road 2.1 18 0 residence 1.0 _ approach of Lishan Street Viaduct 2 Building located at Laodong Road 1.7 1.6 1.4 residence 1.0 approach of Lishan Street Viaduct 3 Building located at Yongchang Street 5.2 5.0 1.8 store 1.0 approach of Wuyi Road Interchange 4 Building located at East Minsheng Street 1.7 1.1 0 store 1.0 _ approach of Minsheng Road Viaduct Table 4-39 shows the sunshining hours to the roadside buildings will be somewhat decreased without setup of sound barrier on interchange or approach. but still meet standard of sunshine level. With barrier and during construction phase. the sunshine level will generally be below the standard with few exceptions of such as Yongchang Street. Laodong Road etc.. 103 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment 4.7 Social Environmental Impact Assessment 4.7.1 Approach and Methodology Investigation had been made from Nov.5th to Dec.20th to find out the environmental impact of the proposed project on roadside environment. During the period. large amount of information from subdistrict office. residents committee. industrial and commercials administration. enterprises and institutions, schools and hospitals etc. had been collected. particularly. sensitive points along main road sections had been investigated. In accordance with the current situation. traffic \ olume difference in construction and operational phases of the proposed project, sizes of to-be-built roads and interchanges and their impacts on sensitive points along the road. measures and had also been proposed to alleviate the impact. 4.7.2 Impact Analysis 4.7.2.1 Items impacted in construction phase * Travelling of pedestrians along both sides of project road. * Customers and motorless vehicles going in and out of markets * AISC employees coming and going through the gates. * Travelling of vehicles on S-N road and E-W road. a) Impact on traveling ofpedestrians Construction of road shall impose short-term impact on traveling of pedestrians along the both sides of the project road. Impact degree shall be different according to the construction scale of road sections and the distribution of residents. (1) In Bailou residential area (section 2-3-2) on the south of Shengli road and the east of Yongchang Street, the senior citizens over the age of 50 account for 56% of the total population there (see Table 3-16). Many people go to the People Park on the west side of the road in the morning and evening. About 100 pupils study in the school on the north side of the road. construction will affect traveling of over 400 people. (2) Most residents who live on the east side of Laodong Road (section 3-2-3) shall cross the road when shopping. Over 200 residents will be affected by the construction. (3) Changing tramear line at Jianguo Road (section 3-3) to the west will influence about 100 residents taking tramcar who live on the east side of the road. They will detour and ride other buses instead of tramcar. (4) Many residents who live on the east side and west sides of Yuanlin Road (section 1-3) go shopping to the market on the east side because the market on the west side is far away from the residential area. Construction will impose impact on over 200 residents who live on the west side and go shopping to the east market and less impact on residents live on the east side. (5) Residents who live on both sides of Yongchang Street which lies on the west side of Shengli Road can go shopping on their own side. but usually about 50 residents cross the street to go shopping and they will suffer impact of construction. On the west side of north section (3-3) of Jianguo Road there is AISC plant area. The 104 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment residents who live on the east side don't need to cross the road. On the west side of south section (3-5) of Jianguo Road there are warehouses and shops and is sparsely populated. The residents living on east side seldom cross the road. South Ring Road and Hebei Road are newly finished, most residents who lived in the area occupied by the project road have already moved to other areas before starting of construction, and residual residents can detour the roads in the village. Thus, construction shall impose less impact on the traveling of the residents who live in the section mentioned above. b) Impact on markets and entertainment place (1) Because both Erdao Street market and Sandao Street market are divided by Yongchang Street, construction.will impose impact on customers's traveling and thus on business of 12 peddlers on both sides of the road. (2) Every day about 300 handcarts and 500 trucks go to and out of Anshan Fruit Wholesale Market. Construction shall impose short-term impact on going into and out of the markets of MV, NMV and customers. (3) The Old People's Palace is located on the east side of North Jianguo Road and goods yards and shops are located on the west side, people who go into and out of the Old People's Palace can detour Qianjin Road or East Minsheng Road. (4) Since Dongning Market, Decorative Material Market, Vehicles Market, cold storage and Laodong Road Market etc. are of small size and far away from the project road and they almost have side gates, people can go to markets via the other roads. Less impact shall be imposed on NMV and customers going to and out of these markets. c) Impact on ingoing and outgoing ofAISC employees at some main gates There are 145000 AISC employees going to and from AISC every day, among which 12100 employees ride bicycle. Traffic flow is concentrated on the project road -- at front gate at North Jianguo Road, Heping gate, Xiaodong gate. Lishan Underpass and Xiaonan gate at Huangang Road. During the construction, traffic blocks will impose negative influence on AISC employees going to or going off work. d) Impacts on schools (1) About 700, 500, 80, 200 pupils cross the project road to go to N2 34 Middle School, Laodong Road primary School, Nq 15 Middle School and Wuyi Road Primary School respectively. The construction will impose great impact on these schools. (2) Most pupils can go to NQ 31 Middle School. Gangdu Primary School and Xishahe Primary School via other road instead of the project roads. Thus. the construction will impose little impact on these schools. (3) Qianjin Primary School is located on the south side of Huangang Road and there is no residential area on the north side. Qianjin Primary School shall move to the new building on the south side during construction. Nanchangdian Primary School is located on the east side of the project road and there is no residential area on the west side. Thus, the construction 105 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment will impose little impact on these schools. e) Impact on medical instituiions The medical institutions located in the area of EIA are either owned by enterprise or by district government, thus have few patients. As for a certain hospital. 20 patients max. per day have to cross the street to see a doctor. 4.7.2.2 Impact analysis in operational phase a) Outgoing and living quality ofresidents dwelling along the road (1) Impact on outoinu The widening of Jianguo Rd. and Huangang Rd. will not impose significant impact on the residents who live on the west side of Jianguo Rd. and south side of Huangang Rd. due to the fact that they rarely cross the road. Changing the line of tramcar will inconvenence the tramcar riders nearby. The residents who live on the south side of Yongchang St. and west side of Shengli Rd. needn't cross the road when shopping, thus the project won't affect the residents as far as outgoing is concerned. The reconstruction of Yuanlin Road will impose little impact on resident's outgoing and crossing the road. The project has no impact on area neighboring South Ring Rd., because the area is thinly populated and mainly for industrial use. The most affected residential area is Bailou Residential (7") area because 320 teachers, students and pupils of NQ 15 Middle School and Gangdu Primary School have to cross the street and the senior citizens over the age of 50 account for 56% of the total population there. (2) Impact on living quality The higher traffic volume and vehicle speed after completion of the project will lead to increase in traffic noise, e.g., the noise level in Bailou residential area will increase by 3 dB. For details of noise impact on residents see Noise Impact Analysis of the report. For'details of impact of displacement see relevant part in this chapter. b) Impact on markets and entertainment places (1) Impact on markets Less impact will be imposed on vehicles and customers going to and out of Dongning Market (10#), Decorative Material Market (74), Vehicles Market (2"), Cold Storage (64) and Xinxing Market (5#). 106 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment The left-turning of the vehicles and the crossing street of customers going into and out of the Fruits Wholesale Market (8') will be affected significantly by the project. The project will occupy 12 pedlar stands in Erdao Street and Sandao Street Markets located at both sides of Yongchang St., besides, widening the road will enlarge the distance between the two parts of markets halved by Yongchang St. The residents who live on the east side of Laodong Rd. and do shopping on the west side of the road will be affected by the project. (2) Impact on entertainment places The widening of thq road and the increased traffic noise won't impose much impact on the Chemical Plant Club of AISC. After the project is completed. the motor vehicles that used to pass Zhanqian area through Jianguo Rd. will detour the area through Qianjin Rd.. Shifu Square and via Wuyi Road back to Jianguo Rd.. So the traffic volume on the section of Qianjin Rd. adjacent to the Old People's Palace will increase slightly. The Old People's Palace is I Om from the motor vehicle lanes of Qianjin Road and the traffic noise will increase by 3 dB at this point. c) Impact on schools, kindergartens and medical institutions (1) Impacts on schools and kindergartens Most of the teachers, students and pupils of N2 31 Middle School (10), Gangdu Primary School (74), Xishahe Primary School (1 ) etc. won't be affected by the project because they needn't cross the project road to and from school. Besides. the aforementioned schools and Ng 34 Middle School will also not be affected by the traffic noise because of their teaching buildings being far away from the proposed road. The teaching building of Qianjin Primary School. through which the proposed Wuyi Rd. hnterchange will run. shall be relocated. Part of the teaching building of Wuyi Rd. Primary School shall be demolished as the approach of proposed Wuyi Rd. Interchange will run through the campus on its northern side. The traffic noise resulting from the interchange will impose adverse impact on the school. whereas the interchange will convenience the teachers and pupils who used to cycle by left- turning or walk across the road to or from school by allowing them go through underneath the interchange. Two thirds of the pupils of Laodong Rd. Primary School live on the east side of Laodong Rd., thus widening the existing road \\ill affect their crossing the road. The traffic noise won't impose much impact on the school. The traffic noise level in operational phase at Nanchangdian Primary School will decrease by 3 dB. The project won't affect the pupils' outgoing as the\ all live on east side of the proposed road. 107 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment The proposed road will incomenience the teachers and students' outgoing of AISC Engineering College and NL 34 Middle School. imposing less noise impact on the teaching activity. NQ 2 Kindergarten of AISC shall be relocated. (2) Impact on medical institutions There are intersections and passages for pedestrians near the Woman and Child Health Center (1), Hospital for Geriatrics (). Bone Disease Hospital (5) and Hospital of Railway Station. So the outgoing of doctors and patients won't be affected by the project and as most of the above-mentioned hosRitals don't have or have few beds facing the road, the traffic noise imposes almost no impact on these hospitals. The hospital of Grain Bureau has a ward housing 4 beds that faces the road and, during the operation, will suffer a noise level increase of 8 dB. the patients will be affected. d) Impacts on plants and enterprises The project won't impose much adverse impact on the enterprises that needn't be relocated. on the contrary, more convenient traffic resulting from the project will be expected. See resettlement of enterprises in Displacement Report for details. The project will, to a large extent. ease the traffic blocks that take place during the peak hours when AISC employees go to or get off work. The line changing of tramcar will eliminate its interaction with traffic on Jianguo Road. which will help in serving the AISC employees more efficiently. The motorless vehicles lane to be built on Jianguo Road. under interchanges and viaducts will convenience the AISC employees who cycle to work. The motor vehicles of AISC will travel more quickly. although they will impose relatively larger impact on traffic on Jianguo Road and Laodong Road. e) Impact on traffic hub There are Anshan Railway Station (daily passanger flow 40000 people), Long-distance Buses (travel to other cities) Station (daily passenger flow 10000 people), bus stops and Rainbow Bridge around the Zhanqian Square. The pedestrians to and from the aforementioned places will be affected by the project. According to the Urban Traffic Planning, the buses and some motor vehicles that used to pass the Zhanqian area will instead travel on the Wuyi Road Interchange upon the completion of project, which will ease the traffic pressure on Zhanqian area. Interchanges or viaducts will be built at intersections of Lishan Underpass, Heping Gate. Wuyi Road and Minsheng Road, on which the motor vehicles, motorless vehicles and os Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment pedestrians will travel on separated lanes. This will eliminate the traffic jams that take place during the peak hours when AISC employees go to or get off work and the AISC vehicles will travel more safely and quickly. f) Impacts on other sensitive points The line changing of tramcar will convenience the pedestrians to and from Zhanqian Square and east side of North Jianguo Road. Approximately 441 people will be affected by changing of the tramcar line which will be moved from Laodong Road to Anquan Street, decreasing the 1757 people affected than without changing the tramcar line. Besides, the residents at Anquan Street will be imposed to less noise impact as the changed tramcar line will be 12 to 15m away from the residential building to its east. The project won't impose much impact on the office buildings, scientific research institutions, and hotels etc.. 4.7.3 Mitigation 4.7.3.1 Mitigation measures to be taken in constructin phase Makeshift passage shall be provided for pedestrians crossing the road and going into or out of the market. Special personnel shall be provided to be responsible for the security of pupils who have to cross the construction site. Low noise equipments shall be preferred. Since most of teaching buildings are far from the existing road, impact of construction noise on them will not be serious. The contractor' had better not ca.ry out the construction in traffic peak hours of non- motorized vehicles and staff going to and out of work and school hours. The construction site in Zhanqian area shall be enclosed and the construction shall be carried out section by section so that the vehicles can detour through other roads. The construction of up and down lanes of all proposed road shall be carried out one after another, such as the widening of south section of Yuanlin Road and the road construction in front of Fruits Wholesale Market's gate. The construction of interchanges (or viaducts) near 4 gates of AISC on Jianguo Rd. and of Minsheng Rd. Interchange (viaduct) shall be carried out in stages. so as to provide gates for employees and vehicles coming and going. The existing underpass (for example. the Wuyi Rd. I inderpass) shall be used for traveling of pedestrians and vehicles during the construction of nct interchanges. The occupants of sensitive buildings to be displaced shall be compensated by construction units, besides, the new teaching buildings and residential buildings shall be built prior to the demolishment of old ones. 109 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment 4.7.3.2 Mitigation measures to be taken in operational phase a) Increasement and full use of travelling capacity of existing intersections 17 traffic lights for pedestrians and 17 traffic lights for bicycle will be installed in Anshan. 73 traffic lights for motor vehicles will be installed, among which 20 is related to JRR. For details, see Table 4-40. The residents and pupils who live in the Bailou Residential Area as well as the teachers and students of AISC Engineering College can cross the street under control of the traffic light of Yongchang Street Int,ersection. A traffic directing polt shall be provided in front of the Shifangtai Fruits Wholesale Market on Jianguo Road. Pedestrians who go to and out of Erdaojie market and Sandaojie market can go to markets through approach underpass of Wuyi Road Interchange. The residents and students who live on the east side of Laodong Road can go shopping and go to school to the west side under the control of the traffic light of Shuiyuan Street intersection. Table 4-40 Layout of Traffic Lights Road section Traffic light location I 3-6-2 Underpass-South Ring Road Kangning St.. ianguo Road 2 3-5-2 Minsheng Road-Jiefang Road Anle St.. Jianguo Road 3 3-5-1 Eryijiu Rpad-Minsheng Road Minsheng St.. Jianguo Road 4 3-5-1 Eryijiu Road-Minsheng Road Gongnong St., Jianguo Road 5 3-4-2 Wuyi Road-Eryijiu Road Zhangian St., Jianguo Road 6 3-4-2 Wuyi Road-Eryijiu Road Wenhua St.. Jianguo Road 7 3-3-2 Lishan Underpass-Heping Road Jianguo Road. Heping Road 8 3-3-2 Lishan Underpass- Heping Road Jianguo Road. Shuangshan Road 9 3-3-2 Lishan Underpass- Heping Road Guangming St.. Jianguo Road 10 3-3-1 Laodong Road-Lishan Underpass Laodong Road. East Jianguo Road 11 3-2-3 Youai St.-East Jianguo Road Lishan Railway Station St., Laodong Road 12 3-2-2 Laodong Road-Youai St. Shuiyuan St.. Laodong Road 13 2-1-1 West Minsheng Road-East of Welfare plant Daxi St.. Huangang Road 14 2-1-1 West Minsheng Road-East of Welfare plant Huangang Road. West Minsheng Road 15 2-1-2 East of Welfare Plant-West Jiudao St. Huangang Road. Bajiazi St. 16 2-1-3 West Jiudao St.-Zhongchang Railway Liudao St., I luangang Road 17 2-3-1 Jianguo Road-Shengli Road Wudao St.. Yongchang St. 18 2-3-2 Shengli Road-Yuanlin Road Yongchang St.. Shengli Road 19 2-3-2 Shengli Road-Yuanlin Road Yongchang St.. Zhonghua Road 20 2-3-2 Shengli Road-Yuanlin Road Yongchang St.. Yuanlin Road The residents and students who live on the south side of Huangang Road can cross the road under the control of the traffic light of West Minsheng Road intersection. The medical staff and patients of the Women and Child-health Center can cross the road under the control of the traffic light of Liudaojie Intersection. The customers and motorless vehicles to and fro the Xinxing Market and Cold Storage as 110 Liaoning Urban Transport Project-Anshan Subproject Environmental impact Assessment well as the medical staff and patients to and from the Hospital of Grain Bureau, Bone Disease Hospital and Hospital for Geriatrics can go through intersections of Anle Street, Lieshishan Street and Minsheng Road intersections with Jianguo Road. The intersection formed by Jianguo Road and Wenhua Street, located on east side of Rainbow Bridge is equipped with traffic light to direct the traffic. Traffic light shall be available at the intersections formed by the North Jianguo Road and sub- trunk lines leading to AISC plant area. b) Facilitate the motorless vehicles of AISC Interchanges or viaducts will be built at Lishan Underpass. Wuyi Road Intersection, Heping Gate and Xiaodong bate etc. to minimize the traffic jams occurring in the peak hours. c) Set up of three public parking stations As Anshan City does not possess any standard public parking stations, it is planned to set up three such stations in front of railway station, near the People Park and at Hunan region where traffic order is in confusion. The land to be used for this purpose belongs to that of urban application. These three stations will make contribution to reducing traffic jam, improving traffic order and giving more safety to pedestrians and vehicles. d) Set up of big-sized bus station On the land planned to be used for JRR project, a big-sized bus station shall be set up at the southeast of Wuyi Road Interchange. At the place, there is no other sensitive point except the Tengda Disco-theque which will be moved to other place. Wuyi Road Interchange is a hub of Anshan urban traffic. After completion of reconstruction of Jianguo Road, Huangang Road aE1d Yongchang Road, buses can more easy enter urban area of the city. At the same time, p%blic traffic vehicles at the big-sized bus station can enter or get out of Jianguo Road through different lanes of Wuyi Road Interchange. The traffic on Jianguo Road can not be negatively influenced and the urban traffic of the city shall be accordingly improved. e) Other traffic facilities In combination with infrastructure. the JRR project shall provide plant belt for separation at Jianguo Road, Huangang Road and Yongehang Street and separating railing in the middle of the road, set up or renew the traffic signal facilities. These measures shall help in improving the traffic order at city center or commercial flourishing region, give more safety to pedestrians crossing street and thus raise greatly the living quality of the people. f) Other mitigation measures There are some vacant stands in Erdao Street Market and Sandao Street Market to position the 12 pedlars whose stands x ill be occupied by the proposed road. Greenbelt separation shall be provided on all the sections of road to compensate the loss of occupied greenery patches. 1I Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment The construction unit shall compensate the farmers whose land neighboring South Ring Road and Hebei Road is occupied with respect to stipulations of state policies concerned. See displacement of enterprises in Displacement Report for details. 4.7.4 Residual Impact 4.7.4.1 Construction Phase Impact on main sensitive points during construction phase is concentrated at influencing people crossing street4tnd at temporary, unfavourable influence caused by building demolition due to land acquisition. Sixty percent of such impact can be mitigated through measures described in EIA report. 4.7.4.2 Operational phase A series of measures described in EIA report shall be taken to mitigate impact on sensitive points of p oject road during the operational phase. The residual impacts are as follows. a) At intersections of project road and other urban roads of the city, new or renewed signal facilities to control motor vehicles and manual driving vehicle travelling or pedestrian walking shall be set up. In addition, port-wise stops of bus and public parking stations shall be constructed. People crossing streeet can be controlled by signal system of the nearest intersections. Though a few people have to go 80 m of additional way to get at the nearest intersection, their walk crossing street shall be safe. and the motor vehicles travelling on lanes shall be more smooth. The designation of special lanes for public bus and motorless vehicles shall reduce time needed by people to travel. b) Residents and students from Bailou residential area shall walk through intersection of Shengli Road and Yongchang Road. Though a few people have to go 250 m of additional Way, their walking shall become more safe than before. c) At some intersections to AISC of Jianguo Road and intersection of Minsheng Road. interchanges, overpassing bridges, signal control systems or designated special lanes for motorless vehicle shall be provided to separate motor vehicles and motorless vehicles travelling and solve the problem that vehicles have to make turning. The travelling of vehicles going in and out of AISC shall become more safe and convenient. More important is that the problem of traffic confusion and jam at the peak hour when AISC staff go to or go off work shall be solved. The positive influence is obvious. d) Motor vehicles, motorless vehicles and the people going in or out of the Fruit Wholesome Market shall pass through the traffic sentry-box located on Jianguo Road. In addition of traffic safety, the waiting time of vehicles and pedestrians for passing through shall be reduced to 2 minutes max. e) The people on Yongchang Street going in or out of Erdaojie or Sandoajie market shall walk through the underpass of bridge approach of Wuyi Road Interchange. There shall be no negative influence on people crossing street. On the contrary. people crossing street shall 112 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment become more safe because most vehicles shall travel on the interchange. 4.7.4.3 Displacement a) Displacement and compensation See displacement in the following Table 4-41. The total cost of displacement will be 258850000 Yuan RMB. b) Resettlement and area of replacement residence Most residents including farmers shall be resettled in the neighbourhood of displacement area. See resettlement and g1rea of replacement residence on the following Table 4-42. c)Living conditions comparison, before and after resettlement As indicated in Table 4-43. the living condition of resettled residents will be greatly improved. d) Other displacement Most of the 78 enterprises, which will be affected by the project, will be partially pulled down and new building can be built in the neighbourhood, few shall be moved to proposed industrial area. 22 institutions will be pulled down. 14 entirely and 8 partially. The institutions with a large building area to be pulled down are Qianjin Primary School and Wuyi Road Primary School etc.. 378 shops will be pulled down, 355 entirely and 23 partially. 1404 people will be affected. Table 4-41 Displacement to be Made N Displacement objective Displacement volume Remarks I Residential building Total hou,eholds:1751 Resettled in the neighbourhood Displacement area:55193.32 m' Number otpeople atTected:4887 2-7 Enterprises and institutions Nunber:l100 utions include educational, medical, banking. Number of employees: 1810 public security and municipal institutions 3 Shops Number:378 Relocated in the neighbourhood Buidine area:25650 m Number ofemplo\ees: 1404 4 Infrastructure 51099 In inderground pipelines etc. 5 Cultivated land 3887 or C'ulti%ated land occupied by road, 44350 m2 Table 4-42 The Resettlement and Area of Replacement Residence Description Households Area of replacement Residential area for resettlement to resettled residence South Ring Road 208 11440 Houtu Residential Area Huangang Road. 729 40095 Wu, Road Residential Area:450 Households. Yongchang St. Chourankenu, Residential Area: the rest Jianguo Road 172 9460 Chourankenu Residential area:461 households. BeicUkou Re,idential Area: 261 households Hebei Road 371 20405 Beicukou Residential Area Wu\ i Road 271 14905 H olu Road Re-,idential Area 113 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Table 4-43 Living Conditions Comparison, Before and After Resettiment Description Before Resettlement After resettlement Difference Building area per capita (n/people) 11.29 19.6 +8.31 Building area er household (m'/h) 31.52 55 +23.48 Brick and concrete construction 25.8 100 +74.2 Construction Half-timber construction 52.2 0 -52.2 (%) Simple construction 22 0 -22 Facing Southward 46.3 85 +38.7 direction Other 53.7 15 -38.7 Water suppl\ 74 100 +26 Power suppl\ 100 100 0 Utilities and -Heat supply 22.3 100 +77.7 accessories Communications 4.0 100 +96.0 Water closet 32.8 100 +67.6 Kichten 63.0 100 +37.0 Balcony 2.3 100 +97.7 Infrastructures to be affected include water supply pipelines, heat supply pipelines, gas pipelines, communication lines, power lines and cables, road lamps etc., totalling 51099 m in length. e) Analysis on requisition of collective land (1) Requisition of cultivated land Table 4-44 Requisition of Cultivated Land Name of village Houyu Qianyu Qianshahe Zhongshahe Xishahe Total Area of requisited cultivated land (mu) 7.5 63.2 5.65 3.0 32.62 111.89 Area of caltivated Ian before requisition 132 630 240 950 784 2736 Percentage (%) 5.7 10 2.4 0.3 4.2 4.1 Note: 1 mu = 666 m As shown in Table 4-44, 63.2 mu (ranking first in terms of occupied area) of cultivated land of Qianyu Village will be occupied by the proposed South Ring Road. 113 people, of which 43 people are labours, will be affected. 4.2% of the cultivated land of Xishahe village will be occupied and 120 people, of which 54 are labours, will be affected. (2) Resettlement measures Defray the labour settlement fee to skilled labours who can find a job, they account for 20% of the migrators. The migrators of Xishahe Village will be resettled in Beichukou (northern exit of the city) Residential Area and migrators of Qianyu Village will be resettled in Houyu Residential Area to be engaged in non-agricultural business, they account for 40% of the migrators. The remaining migrators will be resettled in village-owned enterprises to be engaged in industrial production. 114 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment 4.7.5 Contingence Analysis The project-related contingences include the leakage of poisonous, harmful, inflammable and explosive matters during transportation and traffic accidents of vehicles transporting aforementioned matters. The contingences occur seldom will cause unexpected damage to the environment. a) Impact analysis of contingences The leakage may occur during the transportation or be resulted from the traffic accident. The leaked liquid matter may permeate into the urban sewage network and subsequently pollute the rivers such as Yunliang River and South Shahe River or, if it is inflammable or explosive, matter, explosion of urban drainage pipeline may be caused. The volatile matters may diffuse in the air and form air pollution. The traffic accident will cause traffic jams in some road sections which will subsequently deteriorate the ambient air quality. Besides, the fire and explosion resulted from the traffic accident will also cause air pollution. According to the estimation, the leaked polluant (e.g. the poisonous, inflammble and explosive acrylonitrile) will pollute the leeward segmental area of 800 m, given that the stability of atmosphere is D Class and the ground wind velosity is 2.0 m/s. The segmental area includes 0.043 km2 of high-density polluant area (1000 mg/M3), 0.055 km2 of medium- density polluant area (500 mg/m 3) and 0.069 km2 of low-density polluant area (300 mg/M3). The boundaries of these three areas is 420 m and 610 n from the polluting source in the leeward direction. When all the polluant leaks out due to traffic accident, the polluting range will be greatly enlarged. b) Precautions against contingences and handling measures (1) As the proposed road is located in densely populated urban area, it should be closed to vehicles transporting dangerous goods. (2) The companies who have to transport dangerous goods on proposed road must get the permit for transporting issued by traffic administration authority, and the vehicles transporting dangerous goods shall travel on designated routes, lanes and at designated speed and time. Besides, the vehicles and containers must comform to the relevant technical standards. (3) The traffic administration and the motor vehicles maintenance shall be intensified, and motor vehicles drivers shall be trained to minimize the occurrance of traffic accident. (4) Great attention shall be attached to design of bridges and strict construction supervision and acceptance shall be carried out. Maintenance rules of bridge shall be made out to zero the possibility of bridge collapse. (5) Once the leakage of dangerous goods takes place, traffic policeman team. fire-fighting team etc. shall go to the accident site in time and take emergency measures. e.g.. absorb. collect. dilute or cover the leakage. to prevent the diffusion of polluant. Further measures shall also be taken to eliminate the adverse impact on environment. (6) The traffic administration authority shall disperse the vehicles and people on accident site 115 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment in time, clear up the barriers on road and mend the damaged bridge and road in order to resume the traffic as soon as possible. 4.8 Alternatives 4.8.1 General Four alternatives related to different road sections are as follows (see Fig.2-3 for details): * Alternative A An elevated road from new Wuyi Road to the entrance of Laodong Road shall be setup at the west side of north section of Jianguo Road instead of surface widening of north section of Jianguo Road, and the existing north section of Jianguo Road can be used as special road for passenger traffic. * Alternative B The existing Shahe Street at north side of Hebei Road (recommended by the preferred alignment) shall be reconstructed instead of building Hebei Road. * Alternative C The road across Zhendong Metal Structure Factory shall run along the south side of the plant area. * Alternative D According to the size recommended by the preferred alignment, a bridge shall be built across Shahe River at the west side of the existing Laodong Bridge which shall be used only for traffic of non-motor vehicles from south to north. 4.8.2 Noise and Vibration 4.8.2.1 Noise a) Analysis of noise pollution of alternatives Compared to the preferred alignment, the alternatives B, C and D of Hebei Road, South Ring Road and Laodong Bridge show only slight change of construction site and the design parameter of the road, the motor vehicle flow etc. are almost the same. The acoustic environment along the road according to alternatives is similar with the prediction in paragraph 4.2 of this report, so no further indication of noise impact is necessary. The elevated road in alternative A is proposed to set up at the west side of the existing Jianguo Road. The side of the elevated road is over 50 m away from the first row of buildings of sensitive area. Compared to surface widening of ground road (preferred alignment ). the alternative A will be different in the acoustic environment along the line. b) Comparison of acoustic environment quality between alternative A and the preferred alignment Greater noise shall occur when motor vehicles run fast on elevated road and the noise is more complicated. Because the proposed elevated road shall be far from sensitive area and medium high or lower buildings shall be mainly built in the sensitive area, so the prediction points of noise within sensitive area shall be set on the ground surface. The noise prediction value of 116 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment the elevated road alternative is the result of noise of motor vehicles running on the elevated road plus that on the ground road (existing Jianguo Road ). The result of prediction is shown in Table 4-45. In order to make the noise predication value of the alternatives and the preferred alignment comparable, the noise prediction points 0 m, 10 m, 20 m, 30 m, 50 m and 100 m from red line bf Jianguo Road are 50 m. 60 m, 70 m, 80 m, 100 m and 150 m away from the side of the elevated road. The predication results of acoustic environment quality in 2010 of elevated road alternative and ground road widening conception are shown in Table 4-45. Table 4-45 Comparison of Acoustic Environment Quality of Elevated Road Alternative with Ground __ _ Road Widening Conception in 201 (dB) Distance Start and end Lishan Street Viaduct to Xiaodong gate Xiaodong gate to Wuyi Road Interchange (M) Time Elevated road Ground road widening Elevated road Ground road widening Peak hour 78.1 77.4 78.7 78.5 0 Day 77.3 76.6 77.9 77.1 Night 67.3 66.7 68.0 67.0 Peak hour 76.0 75.4 76.6 76.5 10 Day 75.2 74.6 75.4 75.7 Night 65.2 64.4 65.8 65.7 Peak hour 72.5 68.9 73.7 70.1 20 Day 71.7 68.1 72.3 69.2 Night 61.8 58.3 62.4 59.2 Peak hour 71.3 67.7 71.6 68.8 30 DaN 70.5 67.0 70.9 68.0 Night 60.6 57.1 61.1 58.1 Peak hour 69.5 65.9 70.1 66.9 50 Day 68.7 65.1 69.4 66.1 Night 58.8 55.2 59.5 56.2 Peak hour 66.1 62.5 66.9 63.6 100 Day 65.6 61.8 66.1 62.8 Night 55.6 51.9 56.3 52.8 Note: Distance is from the noise prediction points to red line of ground road. The above comparison shows that the noise impact of the elevated road will be greater than that of the ground road widening conception. That is to say, the acoustic environment quality in sensitive area along the elevated road will become worse than that of the conception of ground road widening. Ground road widening is better than the elevated road from the view of environment protection. 4.8.2.2 Vibration In the alternatives B. C. and D. the vibration shall not be increased. Though the vibration caused by the running vehicle on the elevated road of alternative A is greater than that on the ground road. it will have much less impact on people's health. The vibration shall fall down rapidly as distance increases. because the elevated road is far away from sensitive area. Therefore. the phenomenon of '.ibration disturbance to people of the alternatives shall be similar with that of the preferred alignment. 117 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment 4.8.3 Air Environment The vehicle flow and speed at each road section of the alternatives B, C and D is similar with those of the preferred alignment, and it is only the alignment that will be changed. The degree of vehicle emission impact on both road sides of the alternatives B. C and D and the preferred alignment is also the same. According to the position of elevated road and its influencing range. the prediction result comparison of the alternative A with the whole line widening conception in 2010 is shown in Table 4-46. Table 4-46 Air Quality Prediction Result Comparison between Alternative A and Preferred Alignment Factor Numberofpoints N NNE E S SSW W CO 3 -0.3 -0.2 0.0 0.0 0.0 -0.4 4 0.0 0.1 -0.3 -0.3 -0.4 0.0 No. 3 -0.1 0.0 0.0 0.0 0.0 -0.1 4 0.0 0.0 0.0 0.0 0.0 0.0 HC 3 0.0 -0.1 0.0 0.0 0.0 0.0 4 0.0 0.0 0.0 -0.2 -0.1 0.0 The above table shows that the density contribution value of pollutants at points NQ 3 and N2 4 of the preferred alignment is mostly smaller than that of the alternatives. When comparing the alternative A with the preferred alignment, the CO, NOx and HC contained in emission of all vehicles traveling on the whole line will be increased by -1.01%, 8.99% and 1.88% respectively. 4.8.4 Soil and Vegetation 4.8.4.1 Analysis of Impact on Soil and Vegetation Through the site investigation of 4 alternatives recommended in the design, the impact of alternatives on the soil and vegetation isn't higher than that of the preferred alignment. The impact changes of alternatives are analyzed as follows: a) Alternative A To build the elevated road, 126 poplars, 551 willows ( 55% big trees ), 281 small pines, 451 small peach trees and 70 other small trees will be cut down. That is to say that a total green area of 12195 m2 will be damaged. Compared with the corresponding road sections of the preferred alignment, 1344 trees will be saved. In the meantime, because this section of Jianguo Road will no be widened, near 10900 m2 of planted area and greensward will not be occupied. In addition, after the change of the tram line, a part of land occupied by the original line will be greened, i.e. additional 7200 m2 of green area can be achieved in comparison with the preferred alignment. b) Alternative B This alternative will widen the newly-built Shahe Road. so having no impact on soil and 118 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment vegetation. Conversely, because Hebei Road will not be built, 12600 m2 farm land shall be free from occupation and 232 trees from cutting down ( green area 2948.8 m2 c) Alternative C This alternative will make the newly built section of South Ring Road across the farm land at the South of Anshan Zhendong Metal Structure Factory instead of crossing the factory. In this case, 2100 m2 more farm land shall be occupied. At the same time, considering the planting on both sides of this road and using separation belt for greening, we can plant 24 trees and obtain 20 M2 lawn more than the preferred alignment. d) Alternative D This alternative will build a new bridge at west side of existing Laodong Bridge. In this case, 400 m2 more vegetation land will be occupied and 20 more trees will be cut. 4.8.4.2 Analysis Conclusion of Impact on Soil and Vegetation Based on the above 4 alternatives analyses of impacts on soil and vegetation, the comparison of each alternative with the preferred alignment is listed in Table 4-47. The table shows that the alternatives A and B are feasible and superior to the preferred alignment in the view of reducing land acquisition and green area damage, but the alternative C is not feasible. Table 4-47 Comparison of Impact on Soil and Vegetation between Alternatives and Preferred Alignment Design Occupied Occupied green area Compensation green area to farm land Tree Green land, lawn Total actual green Tree Green land, Total recent be used (m) andso on ( m2) area (m) lawn ( m 2) green area ( m 2) Dormer design 44350 7130 22295 103231.0 10442 37643 51376.2 A Preferred 0 2823 10900 35111.0 2716 5562 6403.3 Alternative 0 1479 0 12195.0 0 7200 7200.0 B Preferred 12600 232 0 2948.8 961 4620 5096.7 Alternative 0 0 0 0 961 0 476.7 C Preferred 0 0 0 0 282 750 812.0 I Alternative 2100 0 0 0 306 770 863.0 D Preferred 0 0 0 0 0 0 0 Alternative 400 20 0 208 42 0 12.5 4.8.5 Surface Water Among all the alternatives of this project, only the impact on surface water of alternative D is a little different from that of preferred alignment. According to the preferred alignment the old bridge shall be demolished. some suspended solid occur and get into South Shahe River. In alternative D, since the old bridge will not be demolished, the total amount of suspended solid into South Shahe River is similar to that in preferred alignment in which a new bridge will be built. Since the construction phase of demolishing the old bridge is relatively short. so the relevant pollution will have little impact on South Shahe River which is only used for irrigation. 119 Liaoning Urban Transport Project- Anshan Subproject En%ironmental Impact Assessment 4.8.6 Social Environment The analysis of impact on social environment of alternatives is shown in Table 4-48. From Table 4-48. it can be concluded: compared to preferred alignment. Alternative A has greater impact on sensitive points. so it will not be recommended. But alternative B. C and D have less impact on sensitive point comparatively. 4.8.7 Summary of Alternative Impact Assessment Based on preferred aignment, the impact of alternatives on each environmental key element is shown in Table 4-49. Table 4-49 Comparison of Impuct on Environment of Alternatives and Preferred Alignment Alternative Key element of environment A B C D Noise - x x x Vibration - x x x Air - x x X Vegetation ( soil greening) + + - X Surface water ( South Shahe RiNer) x x x + Sunshine x x x x Community - + + x Note: The symbol .+", "-", and "x" respectively indicate negative impact, positive impact and almost no impact. Although 22916.0 m2 green area can be saved in the alternative A, the negative impact area of noise, vibration and air in this alternative will be larger than that in preferred alignment. so alternative A in this assessment will not be recommended. In alternative C, Zhendong Metal Structure Factory can avoid being divided into two, but more than 2100 m2 cultivated land will be occupied. By comparison of alternative D with preferred alignment, the former one can only decrease emission of suspended solid caused by the old bridge dismantling, but owing to the short period of dismantling, the alternative D will not improve the water quality of South Shahe River. So alternatives C and D will not be recommended in this assessment. By comparison of alternative B with preferred alignment, 12600 m2 ( 28.4% of total occupied cultivated land by preferred alignment ) will be saved and green area will not be lost. In addition, displacement of Shahe Village will be avoided and expense of constructing Hebei Road will be canceled. In this assessment, alternative B has significant effect on protecting cultivated land, minifying displacement and so on. so we suggest to utilize alternative B instead of utilizing Hebei Road new construction conception. 120 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Table 4-48 Analysis of Impact of Various Alternatives on Social Environment Preferential Alternative Alternative Sensitive point alternatives in comparison with preferred project Conception No. Construction phase Operational phase I le%aling north Residents and Less displacement and resettlement. Increasing noise h% 0.7 dl or so. which slightl, impacts residents H Idening of JianiUo Road A section of Jiinguo fiactorv dillicult in east side, higher cost. and having no sufficient connection with Road construction trunk line or subtrunk line within the city IHebei Road I Shahe Street Residential building Less resettlement Lower cost of construction Sooth Ring Road crossing C Crossing south side of Zhendong Metal Less displacement of factory building. no It is safe for staff and workers to come and go between the through the factor\ the fiactorN Structure Factory impact on production buildings. The alignment is not desirable. OC11moblh old Shale itridge Rescric the old bridge Vehicles and Increase a small amount of displacement Motor \hicles and non-motor \ehicles run separatel. the J1d bulld I ne on1e 1) and build a e\\ one pedestrians at \est side, no impact on the tralfic from landscape is not so beautilfil. I I 1south to north 121 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment 5 PLAN OF ENVIRONMENT MONITORING AND MANAGEMENT 5.1 Institution and Staff Training 5.1.1 Establishment of Institution The project shall be managed successively by ARPO during the phase of construction and by Anshan Urban Construction Administration Bureau after its completion. Both institutions known as administrative institutes shall provide full-time environmental protection staff. The administrative institutions shall be staffed by one or two full-time environmental protection personnel to ensure the responsibility of daily management, accepting complaints concerning environmental impact, handling pollution cases as well as controlling and coordinating the monitoring activities on motor vehicles emission and traffic noise which are conducted by Anshan Environment Monitoring Center and Anshan Vehicle Inspecting Station. The relation among organizations of environmental management and environment monitoring and the handling precedures of environmental pollution contingency are shown below: The People's Govern men t of Anshan F Anshan Construction Committee--- Anshan Environmental ProtecinBra Operational phaseT onstruction phase Operational phase Construction phase Anshan Urban Anshan Renewal Project Anshan Construction Bureau Office Environmental Monitoring Center The responsibilities of the institutions shown above are to guarantee that the project attain the requirements of environmental protection, the AEPB is the government organization in charge of the environmental protection. The environmental management, monitoring and counseling etc. in are of great importance to the project as the weak link of the environmental protection of the project is that of construction phase. The construction company must strengthen the environmental protection. Each construction company shall be staffed with at least one full-time environmental protection engineer who shall be in charge of the prevention and handling of environmental pollution and the technical instruction on the construction personnel. The AEPB shall send supervisors to give the construction company instruction and handle the pollution cases in time. Should any environmental pollution or disputes relating to the environmental pollution occur. the victimized party can file the complaint to the local departments in charge of the environmental protection. At least two employees of each construction company shall attend the environmental protection training, refer to Table 5-1 about the training content and duration. 122 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment The ACC, AUCB and the project office shall be responsible for the coordination and management of the environmental protection of the project. The environmental protection work in operational phase including mainly of the implementation of the mitigation measures and maintenance of noise reducing facilities shall be undertaken by the project office and supervised by the AEPB. The environmental monitoring in operational phase shall be undertaken by the AEMC. Traffic accident Traffic Police Department of Anshn Property of accident is judged by Traffic Police Departmento _ Trafic Pubic Depa nt of AEnvironmental Protection of Anshan Bureau of, Anshon A] ulconiPuainl rn Deputmntof himo Bureaeau of A iceW A Non-environmental Environmental Pollution Contingency Polution Contingency Public Utilities Bur e s Municipal Construction of Anshan Bureau of Anshon Anshan First-Aid Center to Pubiironmities urlem of Anshon Environmental Monitoring Center of Anshon A --Unit in charge 5.1.2 Responsibilities of Administrative Institutions The Administrative Institutions of JRR shall not only conduct realization of the project, maintenance of road facilities, but also have the following environmental responsibilities: SExecute routine monitoring on motor vehicle emissions. traffic noise and vibration. Make inspection tour to construction site to offer advice on environmental problems and to supervise that the construction contractors 'follow the state and local rules of environmental protection in construction phase. 0 Help Anshan Environmental Protection Bureau (AEPB) to handle traffic accidents related to pollution. 0 Receive complaints from residents. enterprises & institutions and assist AEPB to solve such problems. 0 Assist AEPB to offer trainmng to project contractors. * Review monitoring results and make appropriate decisions for mitigation if needed. 123 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment 5.1.3 Training Programs All the environmental staff from administrative institutions are well skilled in environmental administration and monitoring related to urban road traffic and they are able to shoulder the responsibility of environmental protection tasks required in this report. Having discussed with the environment officials with the World Bank, the World Bank proposed that officials from the Project Office shall be trained abroad. Refer to the following Table 5-1 about the training program. For the successful implementation of environmental protection measures in construction phase, a training program is proposed to train contractors who will be involved in the project. For details see Table 3-1. Table 5-1 Training prograin Item Overseas training Domestic training Trainee Officials from the Project Office Contractors Training organization Qualified consultative company from abroad AEPB Establishment of the Environmental Environmental protection Management Organization for transport project laws, construction regulations Training contents Drawing up of regulations regarding the and environmental monitoring environmental protection regulations Environmental monitoring measures Number of trainee 2 15-20 Duration 30 days 10 days Cost Sub-total 126300 (15000 US dollars) 80000 (Yuan RMB) Total 206300 5.2 Environmental Monitoring 5.2.1 Equipment and Instruments Equipment and instruments for monitoring required in the project are shown in Table 5-2. Table 5-2 List of Monitoring Equipment Instrument and equipment QtY. Price (104 Yuan RMB) I Noise monitor 8 8.0 2 Vibration monitor 5 5 3 TSP sampler 5 6.0 4 NO, sampler 5 4.0 5 Analytical balance I 0.5 6 Gaseous phase chromotogroph for CJ I I 10.0 7 Atomic absorption spectrometer 1 60.0 8 CO, NO, automatic monitoring station 3 (including an existing one) 120.0 ( 2 new ones) 9 Noise automatic monitoring station 3 24.0 10 Noise monitoring vehicle I Already available I1 Computer 2 Already available 12 Oil analyzer I 8.6 13 Total cost - 246.1 Note: No consideration is given to inflation. Anshan City has lots of manual noise monitors. The task of environmental monitoring of JRR project shall be taken by Anshan 124 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Environmental Monitoring Center. It is not necessary to purchase equipment noted with "already available" listed in Table 5-2. The cost of equipment given in the table is based on the present price. According to coordination of Anshan municipal government, the fee of purchasing equipment and executing environmental monitoring shall be taken by Anshan Financial Bureau, not be involved in the cost estimate of JRR project. 5.2.2 Contents of Environmental monitoring The contents of environmental monitoring in construction and operational phases are shown in Table 5-3 and Table 5-4. The monitoring points for noise, vibration, air and surface water in construction phase are shown in Fig.5-1 and that in operational phase in Fig.5-2. 5.2.3 Responsibilites for Monitoring and Management a) Institution responsible for environmental monitoring Anshan Environmental Monitoring Center b) Ability of environmental monitoring institution Anshan Environmental Monitoring Center under the leadership of AEPB undertakes the preparation of "Anshan Environmental Quality Report", the routine monitoring on air, noise, vibration, surface water etc. and the environmental monitoring related to environmental impact assessment of other construction projects. Since AEMC is equipped with advanced facilities and possesses technical strength, it is well able to conduct environment monitoring task of JRR project. c) Institutions responsible for monitoring advice and taking relevant legal action * Anshan Environmental Protection Bureau * Anshan Public Security Bureau 5.2.4 Analysis and Transmission of Monitoring Data a) Report Content: original data (including parameters. monitoring point and time), statistical data, analysis and assessment. signature of responsible personnel. Frequency: a comprehensive report shall be made quarterly. a general report shall be made yearly. b) Transmission of report The report will be submitted to Anshan Environmental Protection Bureau and administrative institutions of JRR. Anshan Environmental Monitoring Center shall prepare -Anhan Environmental Ouality Report- based on the monitoring data. 125 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment * Table 5-3 List of Monitoring Points in Construction Phase No. Contract No. Section Construction period 1999 2000 2001 2002 2003 Start End A B C A B C A B C A B C A B C I ASRI-1 South Ring Rd. 4/26/99 I1/21/99 OA AOA A 2 ASRI-2 Zhonghua Rd. 2/22/99 11/28/99 OA AOL A 3 ASRI-2 Yuanlin Rd. 2/22/99 11/28/99 OA AOL A 4 ASRI-3 Wuyi Rd. Interchange 3/1/00 11/20/01 OA AOA A OA AOA A 5 ASRI-4 Huangang Rd. 1/8/01 11/18/01 OA AOA A 6 ASRI-4 Yongchang St. 1/8/01 11/18/01 OA AOA A 7 ASRI5South ianguo Rd. 3/1/00 12/5/00 OA AOA A (South Ring Rd. -iefang Rd.) 8 ASRI-5 South Jianguo Rd. 3/1/00 12/5/00 OA AOA A (Jiefang Rd. -Wuyi Rd.) 9 ASRI-6 North 3/2/02 12/6/02 OA AOA A (Wuyi Rd. -Laodong Rd.) 10 ASRI-7 Laodong Rd. 3/2/03 11/21/03 OA AOLA 11 ASRI-7 Hebei Rd. 3/2/03 11/21/03 Oi AO A 12 ASRI-7 Shahe Bridge 3/2/02 11/21/02 >-< >-< >-< 13 ASRI-l Hongqi Rd. 2/22/03 11/28/03 OA AO A Note: A-Foundation pit B-Foundation C-Road surface 1. The construction includes 3 phases, namely digging the foundation pit, laying the foundation and road surface paving. 2. O:to be monitored once in each period for a duration of 5 days continuously. A: to be monitored once in each period for a duration of 3 days continuously (day and night). A:to be monitored once in each period for a duration of 3 days continuously (day and night). >-<:to be monitored twice, namely in high (August) and low (April) water period, for a duration of three days (in the morning and afternoon of each day) 3. Daytime: 6:00-22:00, nighttime: 22:00-6:00 0: TSP A:Leq, Lgo n: Vlio >-<: pH value, SS, oil 126 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment 5.2.5 Environmental Monitoring and Operating Cost The monitoring and operation cost throughout the construction phase (5 years) and operational phase (3 years) are shown in Table 5-5. Table 5-4 Content of Environmental Monitoring in the Construction and Operational Phase Item Description Construction phase Operational phase Sources Mechanical equipment and Motor vehicle transportation vehicle Monitoring arameters Leg. L,o Leg and LIo. Ls0. Lgo Applicable for qualitv GB 12523-90 GB3096-93 Stan for measurin GB 12524-90 GB/TI4623 Noise . The Chemical Club of AISC. N 34 Middle School. Minsheng Road Underpass, Laodong Road Primary . See Table 5-3 and Fig.5-1. School, Wuyi Rd Primary School, Nanchangdian Monitoring locations Primary School. Dongchangdian residential district. Hebei Road residential district Noise shall be monitored for 24 hours per Monitoring frequency See Table 5-3 and Fig.5-1. month, as well as traffic volumes and the average vehicle speed, once at peak hour. daytime and nighttime Source Mechanical equipment etc. Motor vehicle Factor to be monitored VL io VL,jo, VLz5o, VL, and VL,, Applicable for quality GBI0070-88 GBI0070-88 standard for measuring GBI0071-88 GBI0071-88 The Club of the Chemical Plant of AISC, Na 34 Middle School. Minsheng Road Underpass, Vibration Monitoring point See Table 5-3 and Fig.5-1. Wuyi Road Primary School, Nanchangdian Primary School. Laodong Road Primary School Vibration shall be monitored for 24 hours Monitoring frequency See Table 5-3 and Fig.5-1. per month, as well as traffic volumes and the average vehicle speed, once at peak hour. daytime and nighttime Source Construction dust and road dust Exhaust gas and road dust Factor to be monitored TSP CO. NO, TSP, Pb, Hydrocarbon Applicable for quality GB3095-1996 GB3095-1996 standard for measuring GB1T 5432 GB9801-88. GB/T15436-95, GBT15452-95. GB/iT5264-94 The Chemical Club of AISC. No 34 Middle School. Minsheng See Table 5-3 and Fig.5-1. Rod Underpass. Wuyi Road Pimay School. Dongchangdian Air Monitoring point ' residential district, Laodong Road Primary School CO. NO2, concentration should be recorded by Monitoring frequene) See Table 5-3 and Fig.5-1. automatic monitoring station. Manual monitoring once in heating period and once in non-heating period. each time five days Dismantlement and building-up of Source 1andong Bridge Rainfall of Laodong Bridge and road Factor to be monitored pH. SS. Petroleum pil. SS. DO. COD. NH3-N. Petroleum Applicable for qualitv G133838-88 Class V Water Standard GB3838-88 Class V Water Standard Surface standard for measurinu 6i16920-86 G116920-86. GB7489-87, GB7493-87 water Monitoring point Sce Table 5-3 and Fig.5-1. South Shahe River (downstream from 1aodong Bridge) Surtice w.ater shall be monitored tk ice per Monitoring frequencN See Table 5-3 and Fig.5-1. %ear (once in rare-water period. the other in rich-w atcr period). each time tw.o da\s. 127 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Fig.5-1 Noise, Vibration. Air and Surface Water Monitoring Point during Construction 0 Qianshan District lishan District / UshWn Park( Anshan Iro & Steel Complex - Project road m-mAternative scheme 0 Existing interchange Surfa~ce water DonghanMontrin Secton - -Roltway I 1-1-1 Section partin point * Interchange.vioduct and * Noise.vibrotlon or o 50 Im"R and section No. river bridge to be buitt air monitoring point 128 Liaoning Urban Transport Project-Anshan Subproject Environmental impact Assessment Fig.5-2 Monitoring Points of Noise, Vibration, Air, Surface Water during Operation Qianshan District F [ra pin iishan District Anshan Iron Steel Complex < o Dongshan lMountain Seenie Zone 'Ile Tietye W a Qianshan District Fig. 5-2 Monitoring points of noisemvbration.air and surface water during operation - Project road warm Alternative scheme 0 Existing interchange >----Surf ace water - -Railway 1-1-1 Section partin%point 9 Interchangemvaduct and monitoring section and section o. over river bridge to be built a Noisevibration and Noise and air A Noise A Noise and vibration air monitoring point monitoring point monitoring point V monitoring point 0 500 looon 129 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Table 5-5 Environmental Monitoring and Operating Cost (10000 Yuan RMB) Item Construction Phase Operational phase I Noise 2.16 6.06 2 Vibration 1.73 5.62 3 Air 666 17.52 4 Water o.57 0.98 5 Automatic monitoring station 15.00 6 Preparation of report and unforeseen fee 4.76 14.28 7 Total 15.88 59.46 5.3 Environmental Action Plan The Environmental Action Plan provides mitigation measures and scope of environmental management and monitoring during the construction and operational phase. The purpose of EAP is to ensure successful implementation of mitigation measures. Realization of EPA will reasonably improve the environmental quality of areas related to the project. The EAP has the following roles: * Ensure the mitigating measures be implemented. * Provide implementation documents. * Ensure the responsibility and role of administrative institutions be fulfilled. * Define the environmental monitoring range in construction and operational phase. * Ensure the funds for environmental protection be available. EAP is one of the important documents that will be submitted to the World Bank for project approval. For details see EAP report. 130 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment 6 PUBLIC PARTICIPATION 6.1 Aim and Significance of Public Participation The aim of public participation is to know the public suggestion and demands to the project and submit these suggestions to the departments concerned for study and consultation in order to make public conform the project completely. and the public participation will play an important role in taking effective measures and making decisions for the project construction, therefore the comprehensive and long-time benefit of the project will be gained. 6.2 Mode and Content of Public Participation In the first phase of public participation, the project environment assessment team held meeting to collect the public opinions, issued list of inquiry and made random investigation to learn the public suggestions and opinions to the proposed project. After the measures made by the assessment team had been adopted, the second public investigation was conducted again to seek public suggestions to these measures. The content of the first investigation: a) Beneficial or harmful, long term or short term, acceptable or unacceptable impact of the proposed project to the people during the construction and operational phase of the project. b) The attitude or demands and specific suggestions to the project from the public, enterprises and institutions impacted by the proposed project. 6.3 General Investigation of Public Participation In order that the investigation of public participation can really reflect public suggestions to the whole proposed project and that the investigated objects can fully represent all aspects, the environment assessment team held meeting to seek public suggestions to traffic road reconstruction on December 2 to December 15 in 1996 and along both sides of the road proposed to be constructed in Tiedong, Tiexi and Lishan Districts, Shahe and Houyu villages which shall be affected by the project. The minutes of meeting were taken and the list of inquiry was distributed to the impacted individuals within above impacted areas and the investigated members are selected at random among the public for detail investigation. The investigated public are from different trades and professions and represent different social strata and aspects. 456 persons of different age. sex. profession and title were investigated. The detail is shown in Table 6-1. After having discussed methods and measures to deal with the suggestions and opinions which had been proposed in the first investigation with Anshan Construction Committee. ARPO. Anshan Town & Country Construction Planning Institute, Beijing Municipal Engineering Design & Research Institute. the EA tcum conducted the second investigation among people who had proposed suggestions in the first in% estigation on March 3 to 12. 1997. The EA team introduced solution to their suggestion and collected their feedback. In addition. 68 persons have been investigated on Mar. 2 and Mar.3 to collect their 131 Liaoning Urban Transport Project-Xnshan Subproject Environmental Impact Assessment suggestions and opinions to the build-up of nexx depots and the engineering of Hongqi Road reconstruction. Table 6-1 Statistics of Public Participation Number Personnel Composition Area of Sex Occupation Age people male female oflicial%w rkcr thrmer student, buinc-man 18 19 - 35 36 - 45 46 60 -60 Tiedong 210 176 34 35 106 - 27 46 27 26 57 34 66 district Tiexi 76 42 34 17 45 - 10 - In 11 29 13 13 district Lishan 67 53 14 14 28 - 8 l 8 7 19 9 24 district I Shahe 56 39 17A 4 11 41 - - - 16 13 18 9 Houyu 47 37 10 3 i 26 - - - 12 19 9 7 village __ Total 456 347 109 73 208 67 63 63 45 72 137 83 119 6.4 First Public Participation and Investigation Result From the public investigation. it is known that most of the people. enterprises and institutions are for the project. Among 456 persons, 96.24 percent are for the project, 1.31 percent are against the project, 2.45 percent adopt indifferent attitude. and 57.24 percent of 456 persons put forward their opinions and suggestions to the project which focus on noise disturbance and inconvenience of crossing street. All the enterprises and institutions investigated are for the project. In addition, most people investigated agree with the build-up of new bus depots and the engineering of Hongqi Road reconstruction. All the people support the reconstruction engineering and even hope the early starting of the engineering. 6.5 Opinions and Demands of Public to the Project From investigation of public participation we can know that although most of public are for this project, they give maximum attention to these problems related to their own benefit and caused by the project, such as noise pollution, greenery patches occupancy, the problem of crossing street and displacement arrangement, therefore they put forward the following suggestions and demands. a) 3-6-2 section of Jianguo Road Sifangtai Fruits Wholesale Market. one of the biggest markets in North-east region of China, lies at the west side of the road. Every day, almost 500 motor vehicles, 3000 man-power vehicles, and almost 50 thousand people come in and out this market. So left-turning problem for those vehicles should be solved. b) 1-2-1 section of Zhonghua Road The east side of the road is against Nanchangdian Primary School. Although the school supports the road widening construction. they ask for taking noise control measures. 132 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment c) 2-3-1 section of Yongchang Street Wuyi Road Primary School lies to the south side of this road section. After Yongchang Street is widened, Sandaojie Clothing. Shoes and Cap Street ( Bagua clothing market ) and Erdaojie Vegetable Market will be divided into two parts. so the school and the peddlers ask for solving problem of pedestrians crossing street, in addition. both sides of the road shall be very close to the residential buildings and Wuyi Road Primary School. Some existing buildings are within the red line. the residents and school give strong response to the traffic noise and ask for taking measures to reduce noise. d) 2-3-2 section of Yongchang Street People's Park, Ng 18 Middle School and Gangdu Primary School of Anshan lie to the north of this road section, populous residential area lies to the south side, and more old people (879 persons are over 55 years old) are living there, therefore, safety measures for crossing street are requested. e) 3-5-2 section of Jianguo Road The office of the recreational place-Anshan Old People's Palace, is located on the side of the road section, so noise mitigation measures must be taken. f) 3-2-3 section of Jianguo Road Lishan Wholesale Market and Laodong Road Primary School are located on the west side of this road section. so measures for crossing street must be taken. g) 2-1-3 section of Huangang Road Qianjin Primary School must be moved in order to construct this road section. By interviewing and investigating. it is known that because this primary school is impacted heavily by the vibrating and noise of AISC and its special railway line, most pupils in this area went to schools in other areas. To displace the school is popular confidence. h)The only existing greenery patches and trees must be protected during the construction phase of the project. 6.6 Handling Measures for Opinions And Demands of Public By social investigation along the line, the project has caused great social impact and public attention. Based on the public*s opinions and demands to the project, through technical and economic analysis, comparison and selection of conditions. the project construction unit. design institute and EIA team \\ill proceed from actual conditions and take serial measures to solve the problem represented by the masses violent]-. The detail is shown in Table 6-2. Air- conditioners shall be installed in the schools and hospital neighboring the project road and ventilators shall be installed in the residential buildings neighboring the project road to reduce impact resulted from traffic noise when windo\s are open for ventilation in summer. In 133 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment addition. protecting measures for the existing greenery patches and trees in operational phase have been considered. The detail is described in the paragjraph of ecology and vegetation impact assessment. Table 6-2 Measures and Method for Settling Public Opinion Road name Road section Measures and method Zhonghua Road 1-2-1 Nir-condmon 'hall be installed in the clAi-ros ot \anchangdian Prirnary School Huangang Road 2-1-3 Qianjin lriniars School shall he rcino%ed and merged into Huiming Primarn School. 2-3-1 Sound barrier shall be installed in thi road section Air-conditioners shall be installed in H uli Road Yongchang Primar School Ventilators shall he inalled in the residential buildings neighbouring the road the passave % ak for pedestrians and non-atiloohile croing -treets shall be provided under the bridLe - approach of i us Road Interchange Street 2-3-2- Trallic light conNenient for pedeNsrian crossiln street shall be provided at the intersection A of'Shenfli Road and Zhonghua Road. Jianguo 3-2-3 Traffic light shall be provided. Road 3-5-2 B, calculation, the indoor noise NaluC can't exceed the state limit. 3-6-2 The police box used for traffic policeman on duti shall be established. 6.7 Second Public Participation and Investigation Result By the sec.ond social interview,Ning and investigating along each section of the project road. the public, enterprises and institutions have enough knowledge of necessity and importance of the project. The design institution and environment assessment team and other enterprises concerned have properly solved the related problems of noise impact and crossing street put forward by the public. Among 261 persons who expressed opinions and suggestions, 87.74 percent was satisfied, 8.81 percent thought it acceptable and 3.45 percent were not very satisfied yet. 134 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment 7 CONCLUSIONS 7.1 Comparison of With and Without JRR in 2010 The negative impact of traffic noise with JRR on the other roads within the urban area is slightly lower than without JRR. With JRR, the total emission of CO, NOx, N02 and HC from vehicles in the whole city is less 23.36%, 17.86%. 17.86% and 21.72% respectively than that of without JRR. With JRR, at road sections to the south of Wuyi Road Interchange, the contribution volume of emission from vehicles to air environment is small: under the condition of south or west wind, it is less thanlwithout JRR at the north section of Jianguo Road and at the east-west road of the project; under the conditions of other wind directions, it is slightly higher than without JRR, but the absolute total emission under latter wind direction is less than that under the former wind directions. With JRR, the negative impact on foot travelers and AISC"s (Anshan Iron & Steel Complex) production & staff transportation is less than without JRR. The JRR project has significant importance for inhibiting further deterioration of Anshan air environment, but also a little negative impact in the view of traffic noise and pedestrians walking at some sections. 7.2 Positive Impact Relieve traffic pressure of other trunk roads in Anshan City. Solve the problem of traffic jam of AISC's production & staff transportation, reduce traffic load near area of railway station, thoroughly eliminate the confusion and crowded situation of Anshan urban traffic. Shorten the time and distance of traveling of pedestrians and motor & motorless vehicles, favorable to improve the life quality of public. Arrange the resettled residents in the neighborhood and incorporate the dismantled enterprises into the appropriate industrial zones, to improve living environment of displaced residents, make the city arrangement more reasonable and raise the living quality of public of the whole city. In large range. the negative impact of traffic noise with JRR is less than that of without JRR: the impact of vehicle emission on air environment is larger than the existing situation. but the increasing rate is less than that of without JRR. Compared with the existing situation. the increasing rate of air pollutants of with or without .IRR is shown in Table 7-1. When the project is completed. the density of pollutants in the air at most road sections is lower than that of wvithout JRR. Moving of tram line will soke the problem of mutual interference of vehicles and tramcars. The interference occurs mainly in front of Anshan RailwaN Station, at Jianguo Road section 135 Liaoning Urban Transport Project-Anshan Subproject Enironmental Impact Assessment from Rainbow Bridge to Nk-M i Road Intersection and at area near Lishan Underpass. In the meantime. the negative impact fit tramear noise on the residents along the line w,ill he reduced. Table 7-1 Increasing Rate Difference of Air Pollutants of with or ithout JRR in 2010 (%) Pollutants Without JRR (.A i NN ith .JRR (B) Difference (B-A) CO 45.39 11 43 -33.96 NO 57.7 9.5 -28.18 HC 48.32 16.11 -32.21 Note: NO, value is the same as No, value. 7.3 Negative Impact In construction phase, normal traveling of vehicle and pedestrians will be negatively, impacted. and the living of the residents near the construction site will also be affected. The project will occupy 44350 m2 cultivated land which can never be restored, and 103231 m green area (among which 57.38% of trees to be cut down are over 25 years old) will be destroyed. When the project is completed, it is not convenient for the public to cross the street. Due to increased vehicle flow and speed, the impact of traffic noise on buildings adjacent to the road sides will be more serious than the existing situation. The density of air pollutants in the area of Laodong Road will be higher than that of without JRR in 2010. The negative impact in the view of vibration, surface water and sunshine will not be greater than that of without JRR, and the impact of solid waste disposal during construction phase on environment is very little. 7.4 Mitigation Measures for Serious Impacts 7.4.1 Design Phase * Traffic light for pedestrians crossing street shall be added at the intersections where the public crosses the street frequently. Traffic policeman box shall be added on Jianguo Road section in front of gate of Sifangtai Fruit Wholesale Market where there is heavy flow of customers and vehicles to facilitate the pedestrians crossing street and vehicles turning left. * By many times of discussions and agreement with ARPO, Anshan Urban and Countryside Planning Institute and Beijing Municipal Project Design & Research Institute, two sound barriers 3 m high and 250 m long shall be installed respectively on the both sides of approach of Wuyi Road Interchange's section near Wuyi Road Primary School. * 91 air-conditioners shall be installed in the patient ward and diagnosis room of three hospitals such as Hospital of Grain Bureau etc.: 262 air conditions shall be installed in 136 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment the classrooms of 5 schools neighboring the project road; 5094 air-conditioners shall be installed in the residential buildings neighboring the project road in order to reduce noise pollution in summer when the windows open for ventilation. * By agreement with the design institution, the original space of 5 m between the trees on both sides of the street shall be changed to 2.5 m, in order to restore the green area destroyed by the project as soon as possible. In 2010 all the destroyed green area can be restored. 7.4.2 Construction Phase APRO must clarify the environmental protection responsibility during the construction and transportation while vntrusting the contractor with the project and must incorporate the responsibility in the contract. The construction shall be accomplished section by section and half by half at main places such as AISC entrance; temporary passageways shall be set up during construction phase. Designated person shall fetch pupils to cross the street when construction is being made near schools. The construction time shall be shortened; construction at night shall be avoided; construction equipment and facilities of lower noise shall be used; operation at night of machinery with high noise and vibration must be approved by Anshan Environment Protection Bureau. By bulk transportation, the material must be covered and the transportation should avoid peak hours of traffic; water sprinkling times should be added on the way; the site of construction should have temporary store houses for bulk material; when old buildings or structures are dismantled, plastic fence should be set up around building in order to suppress dust emission to the environment. In construction phase, Anshan Environmental Monitoring Center must carry out monitoring of noise, air, surface water and so on during construction phase. 7.4.3 Operational Phase Anshan City has solemnly promised to develop and implement motor vehicle emission control strategy (MVECS) to avoid deterioration of environment resulting from increase of vehicles after 2010. According to the traffic control program of the project. traveling of vehicles of extra large size on the road must be restricted and the vehicle speed at night must be limited. According to national technical strategy. lead-free petrol for vehicles should be soon applied in the whole country before 2000: clean energy will be spread progressively; vehicles of high pollution shall be eliminated: public traffic will be further developed; in proper time. the existing tramcar line shall be partially changed into subway and the whole line into light tracks. Vehicles must be inspected annually and randomly: the vehicles of high noise and emission 137 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment which are beyond standard must be brought under control within the specified time. The vehicles of high noise and emission which are beyond standard must not run. Anshan Environmental Monitoring Center will carrN out monitoring of noise. air. vibration and surface water related to the project. The city arrangement program must be improved futher: the buildings adjacent to roadsides will not be used as residence. school or hospital. 7.4.4 Summary By many discussions With ARPO and design institute. the above mentioned mitigation have been included in the &sign documents: During construction and operational phases, ARPO will carry out concrete execution of the above mentioned mitigation measures. Since the mitigation measures are favorable to protect Anshan urban environment, suppress environmental further deterioration, they are feasible to be realized. After the mitigation measures have been put into effect, the environment quality along the road will be accordingly improved and the negative impact on the public will be reduced to a certain extent. Two public investigations have been carried out in EIA. The second social investigation to the public demonstrates that 97.8% of 456 persons including peddlers to be moved from Yongchang Market to Sandao Street Market think the impact of the project on them will be reduced to the acceptable degree if the mitigation measures are executed. The other 2.2% express indifferent attitude to the mitigation measures. Anshan Environment Monitoring Center who will carry out environmental monitoring and vehicle inspecting of this project is one of the best environmental organization with rich experience and modem equipment in Liaoning Province and is able to complete the above mentioned work. By consultation with Anshan municipal government, the environmental administrative organization recommended in EIA report during construction and operational phase is feasible. 7.5 Recommended Alternatives Because the alternative B (the existing Shahe Street substitutes for Hebei Road construction) has remarkable environmental profit in reducing occupation of cultivated land and avoiding displacement of Shahe Village residents, it is recommended by EIA report. Since the negative impact on environment of other alternatives is larger than or equal to that of the preferred alignment, other alternatives are not recommended. 7.6 SUMMARY OF ASSESSMENT CONCLUSION Based on achievement in different topics, the EIA report recognizes that the positive impact on environment of JRR project is greater than the negative one. The project has reasonable effect to improve environmental quality of Anshan City. The selected alignment of the project is reasonable, the prc.ct is feasible from the view of environmental protection. 138 10 10 Section Title Section Length No. 4.25 7.0 2.0 23.5 2.0 7.0 4.25 1-3 Yuc,nUn RoQd J1efang Roa5d - 150 South Ring Road 1 3- eblRodZinongcHang Raftway 4.2 3-1 HebeiRoad Zhahe Square 1270 4.25 6,5 2.0 16.5 2.0 6.5 425 2-3 Yongchang Street Jianguo Road - Yuanlin Road 1550 t C2.0 2-1 Huangang Road Mnsheng Road 2150 3.75 6.0 2.0 16.5 2.0 6,0 3.75 3-2 Roodong Road Hebel Road - 1R670Rd. 3- aeogRal East Janquo Road 40.01 3-3 East Janguo Road- 2740 4.25 7.0 2.0 23.5 2.0 7.0 4.25 -- Jianquo Roo Heping Road -5- Jin9o Rod50,0 3 3-52 Minsheng Road - 3080 3-_6 South Ring Road Uniti m Fig, iRood tronsverse section of JRRG)CD Section Non Ttle Section Length South Ring Glassworks - Road Yuanlin Road 1340 3.5 6.5 2.0 12.0 2.0 12.0 2.0 6.5 3 5 50.0 1-2 Zhonghua South Changdian Street - 620 Road South Ring Road 8.0 24.0 8.0 40.0 Fig< 2 Road transverse section of JRRCII) UnWm Secton Titte Section Length No, Jianguo Heping Road 2200 Rooa d 219 Road 4.25-67.0 3. 70 4.25-6.25 46.0-50.0 Jianguo 219 Road Road Minsheng Road 4.25 7.0 2.0 23.5 7.0 4.25 3 48.0 Fig. 3 Road transverse section of JRR(II) Umtim Section Non Title Section Length L Shahe Loodong Road - 3-1 Street Shengli Road 75 15.0 7,5 30,0 3W~uyi Roa~dV Jianquo (interchange) npgod |4200 f-M M 3--1 Roadl 3-4 4 1 Zhongchang Raflway tran line South end of E Lo.odong Road changed 170 changed 1.0 Unit:m Fig.4 Road transverse section of alterna-tive scheme of JRR Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment nong UnderpassI Yon9chan' St,eet Vuy1 Rood 0 Fig.5 Project location before and after trar line change in front of Anshon Railway Station After changing Project Road 0 Interchange tram ine Before changing ---Raitway --trom tine 0 250 500m 141 Shui uan Street ir -Before tram o line changed Un sn/ 0 ad Fig, 6 Project location before and after changing tram line in Anquan Street After changing Project Road 0 Interchange - ftrac aine Railway Before changing tram line 25 143 Liaoning Urban Transport Project-An0han Subproject Enmironmental Impact Assessment Annex 1: Environmental Standard adopted by the Environmental Impact Assessment of Traffic and Transportation Project of Anshan 1. Discharging Standard (construction period) 1.1 Noise (Leq) Refer to the earthirork of Noise Limits for Constructifn Site, GB12523-90 1.2 Air pollutant Integrated Emission Standard ofAir Pollinates GB16297-96 1.3 Sewage (SS * Petroleum) Class 2 * Construction. Evtension and Reconstruction of Sewage and Waste Gas Emission Standard of Liaoning Province. DB21-60-89 2 Environmental Quality Standard 2.1 Noise (Leq) ClassI, 2, 3 and 4 of Standard of Environmental Noi.%e of Urban Area, GB3096-93 2.2 Air (No, * CO) Class 2 (Total hydrocarbon) of Ambient Air Ouality Standard Refer to May. Ground Concentration of Sewage and Waste Gas Emission Standard of Liaoning Province, DB21-60-89 2.3 Vibration (VL.q) Area at Both Sides o Traffic Artery of Standard of Environmenial Vibration in Urban Area. GB10070-88 2.4 Surface water (pH * DO * COD * NH3 *Petroleum) Class V of Environmental Quality Standard fir Sfwace Water, Gb3838-88 Whether Gb16297-96 or DB21-60-89 to be adopted as the waste gas discharging standard shall be up to the Environmental Protection Agency of Liaoning Province. Environmental Protection Agency of Liaoning Province (stamp) Nov. 20,1996 144 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Annex 2: Environmental Standard adopted by the Environmental Impact Assessment of Urban Transport Project of Liaoning Province Project Office of Urban Construction & Renewal Project of Liaoning Province: The following standards shall be adopted for the Environmental Impact Assessment of Urban Transport Project of Liaoning Province: 1. Standard 1.1 Noise A Noise Limits for Construction Site, GB12523-90 1.2 Waste gas Integrated Emission Standard ofAir Pollutants. GB 16297-96 Sewage and Waste Gas Emission Standard of Liaoning Province, DB21-60-89 Emission Standard for Exhaust Pollutants fom Light-Duty Vehicle, GB14761.1-93 Emission Standard fbr Exhaust Pollutants from Gasoline Engine of Vehicle, GB14761.1-93 Emission Standardfor Pollutants at Idle Speedfrom Vehicle with Petrol Engine, GB14761. 1-93 Emission Standard for Smoke at Free Acceleration from Vehicle with Diesel Engine, GB14761.1-93 Emission Standard .Or smoke at Full Load from Diesel Engine of Vehicle, GB14761.1-93 1.3 Sewage (SS * Petroleum) Class 2 - Construction, Extension and Reconstruction of Sewage and Waste Gas Emission Standard of Liaoning Province, DB21-60-N9 2 Environmental quality standard 2.1 Noise Standard of Environmental Noise of Lrban 4rea. GB3096-93 2.2 Air Class 2 of Ambient -ir Quality Standard GB3095-96 Total hydrocarbon-Alar. Ground Concentration of Sewage and Waste Gas Emission Standard of Liaoning Province. DB21-60-89 2.3 Vibration Area at Both Sides of ba/tic Arterv of Stanclard of Environmental Vibration in Lrhan Area. GBl00'0-WY 2.4 Surface water Environmental Qualiti Standard/or Surface Water. GB3838-88 (except N H--N) Standard for NI-N: 0.5mg'l (.0m-'l for Medium and small rivers near the city) as per Zmg Zhan Zoni Zi. t96 022 Environmental Protection Auenc\ of liaoning Province (stamp) Dec.2.1996 145 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment Annex 3: LIAONING URBAN TRANSPORT PROJECT OUTLINE OF TECHNICAL ASSISTANCE FOR DEVELOPMENT OF MOTOR VEHICLE EMISSION CONTROL STRATEGY Draft June 1998 Liaoning Urban Construction & Renewal Project Office Post, Buckley International. Inc. 146 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment I Introduction The implementation of Liaoning Urban Transport Project (LUTP) will result in increased traffic and motor vehicle emissions, leading to deterioration of air quality along the project roads. Over the long term, the benefit brought by the project on air quality from a city perspective will be offset by the expanded motor vehicle fleet. Eventually, motor vehicle speeds on a city wide basis will slow down again and air quality in the project cities will worsen. Although several quickly designed mitigation actions will be taken during the operation phase, they are not able to fully address the fundamental cause of the long term air quality impact by the project due to the complex nature of the issue. The mitigation of the long term project impacts on air quality and, ultimately, sustained improvement of air quality in the project cities call for a well researched and structured motor vehicle emission control strategy (MVECS). The MVECS is to provide the accurate assessment of present situation on motor vehicle emissions in the projects cities as well as the trends in the future. Best available motor vehicle emission technologies and successful experience in control motor vehicle emissions at home and from abroad will be evaluated for their potential application in the project cities. On this basis, the MVECS will specify a series of effective, site specific, integrated and goal oriented control, mitigation and remediation measures to tackle the long term impact of the project on air quality. Major efforts will be required in developing MVECS for each of the three project cities. A technical assistance is therefore needed for necessary and appropriate technical and financial resources. This document outlines the main scope and key elements in the proposed TA, including responsible organizations, the means of TA, the contents of TA, estimated costs for the TA and the TA implementation. 2 The Responsible Organizations LUCRPO and project offices in each city will be respo-sible for the implementation of this strategy. A capable and experienced institute will be responsible for overal! integration. Local and foreign experts will be recruited as consultants. One research institute in each city will be needed to be responsible for the strategy development, and this institute will be selected in accordance with certain procedures based on the TOR. 3 Means of Technical Assistance 3.1 Consulting Services Consultants experienced with motor vehicle emission reduction will be retained. The lead consultant will be responsible for development of MVECS, and supported by research institutes from Shenyang, Anshan and Fushun which are most familiar with motor vehicle fleet, air quality, urban and industrial development and local policies in air quality control and environmental protection in general in their respective cities. Since the local teams are limited b\ their experience in dealing with complicated strategies for motor vehicle emission control and latest development in motor emission control technologies, out-of-province consultants who are with these experience will be retained to provide assistance and guidance in MVECS development. 147 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessment 3.2 Technical Workshop A technical workshop will be held at the keN stage of the MVECS development. At the workshop. the local and out-off-province consultants will present the findings from their initial study on the present motor vehicle issues in the project cities, trends in the future in motor vehicle fleet and emissions. current mitigation measures and their effectiveness, and local regulator framework related to air qualitN in general and motor vehicle emission in specific. Leading experts in this area will be invited to participate in the %%orkshop primarily those from cities which ha%e successfully developed and implemented an MVECS and improved their air quality because of it. The experts are to provide their views anqd recommendations on the problems presented to them and share their successes and learn from their lessons. The objectives of the workshop will be exchange ideas, focusing on the specific issues facing the project cities. The workshop will be organized as such that various motor vehicle emission control measures will be discussed and debated for their effectiveness in addressing the motor vehicle emissions and air quality issues unique to each of the project cities. 3.3 Overseas Study and Inspection The provincial consultants as well as officials from the project cities responsible for developing, adoption and implementing the MVECS will travel aboard to study similar MVECS in countries such as the US or Canada. The study and inspection tour will be in cities which already have include meetings with MVECS development and implementing agencies, MVECS facilities, institutes or companies involved in motor vehicle emission control technology research and application, and regulatory agencies directly relevant to air quality control. particularly motor vehicle emission control. 4 Contents of Technical Assistance 4.1 Information collection and current situation assessment Information on the present situation on motor vehicle emissions in each of the project cites will be collected and compiled. Assessment of the collected information will be made to produce a clear and full understanding of various aspects of the motor vehicle emission issue and its relation to air quality. 4.2 Research of the trends of the future Future trends on the motor vehicle fleet. emission control technologies and other factors which may affect the growth of motor vehicles such as population, urban development and standard of living in the future will be researched. The objectives are to predict the variation in motor vehicle emissions, air pollution load, and air quality in the future in the project cities. 148 Liaoning Urban Transport Project-Anshan Subproject E.vironmental Impact Assessment 4.3 Study of advanced motor vehicle control technologies and programs Various technologies in motor vehicle emission control and reduction will be studied. The focus will be on their effectiveness and success in application. .4.4 Development control measures On the basis of a clear understandin2 of the issues facing the project cities, the trends of motor vehicle growth and impact of the emissions on air quality. and knowledge of motor vehicle emission control technologies and programs, a series of motor vehicle control measures will be developed as the core of the strategy. These measures will include, big not be limited to: stringent motor vehicle emission control standard and regulations: promote unleaded fuel; vehicle inspection and maintenance program: catalytic purification facilities; engine improvement; retirement of aged vehicles; monitor and enforcing the motor vehicle emission standards; promote public transportation; increase motor vehicle speeds; motor vehicle quantity control in urban centers; and develop clean or alternative fuel technologies. 4.5 Establishment of the implementing details A detailed plan will be developed to ensure the strategy will be adopted and implemented. The details may include designate executing/responsible agencies, implementing schedule, budget allocation, monitoring and reporting procedures, and feedback system. 4.6 Reporting A report will be prepared as the deliverable from the consultants for developing the MVECS. While in a single volume, the report will cover all three project cities and specify. where appropriate, the unique measures and policies for each of the project cities. The report will provide full details of the MVECS and can be readily used as guide for strategy implementation and progress monitoring by relevant organizations. 5 Costs and Implementation 5.1 Cost The estimated cost for the technical a,,sistance to develop an MVECS covering the three project cities is presented in the following table. It should be pointed out that more refined cost for the TA will be developed when a full terms of reference for MVECS development is prepared. 1 49 Liaoning Urban Transport Project-Anshan Subproject Environmental Impact Assessmet Items Level of Effort Estimated Cost Local Consultants 40 man-months Out-of-province Consultants 15 man-months Workshop Organization Cost Expert Invitation Overseas study and inspection 8 persons for 2 weeks Total 150,000 US Dollars 5.2 Implementing schebule The key milestones for developing MVECS are: Date Effort July 1999 Commencement of MVECS development July 2001 Completion of MVECS development July 2002 Adoption and implementation of MVECS Annually prior to 2002 Reporting on progress Annually after 2002 Reporting on performance of MVECS 150

Основные сведения
Тип документа Environmental Assessment
Дата принятия
Страна Китай
Источник Всемирный банк