Группа Всемирного банка · Staff Appraisal Report

Tunisia - Greater Tunis Sewerage and Reuse Project

Тунис Всемирный банк
Открыть оригинал документа

Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.

Полный текст

DOCUMENT OF The World Bank Report No. 15432-TUN STAFF APPRAISAL REPORT REPUBLIC OF TUNISIA GREATER TUNIS SEWERAGE AND REUSE PROJECT May 6, 1997 Private Sector Development, Finance and Infrastructure Operations Division Maghreb and Iran Department Middle East and North Africa Region CURRENCY EQUIVALENTS (April 1997) Tunisian Dinar, TD 1,000 millimes TD I = US$0 9367 US$1 = TD 1.0676 TD I= FRF 5.305 FRF I TD 0.1885 ABBREVIATIONS ft = foot m = meter ha hectare mm = millimeter km = kilometer Mm3 = million of cubic meters inh = inhabitant m3/sec = cubic meters per second lcpd = liters per capita per day min = minute MEASURES AND EQUIVALENTS Metric System U.K. Svstem Kilometer (km) = 0.62 mile (mi) Meter (m) = 3.28 feet (ft) Cubic meter (m3) = 220 gallons (g) Million cubic meters/year (Mm3/year) 0.603 million gallons/day (Mgd) Liter (1) = 0.220 gallon (g) Liters per second (1/sec) = 19,000 gallons per day (gd) Vice President Kemal Dervi

Основные сведения
Тип документа Staff Appraisal Report
Дата принятия
Страна Тунис
Источник Всемирный банк