Page 1 Mr. Shahid Javed Burki Regional Vice President Latin America and the Caribbean Region International Bank for Reconstruction and Development 1818 H Street, N.W. Washington, D.C. 20433 Re: Loan No. 4163-AR (Buenos Aires Urban Transport Project) Implementation Letter Dear Mr. Burki: This letter, with attachments, constitutes the Implementation Letter defined in Section 1.02 (b) of the Loan Agreement of even date herewith between the Argentine Republic and International Bank for Reconstruction and Development for the above-mentioned Loan. Sincerely yours, ARGENTINE REPUBLIC By: _______________________ Authorized Representative CONFIRMED: INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT By: ______________________ Authorized Representative
Группа Всемирного банка · Side Letter
Conformed Copy - L4163 - Buenos Aires Urban Transport Project - Supplemental Letter
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Side Letter
Страна
Аргентина
Источник
Всемирный банк