Public Disclosure Copy The World Bank Implementation Status & Results Report ODRA-VISTULA FLOOD MANAGEMENT PROJECT (P147460) ODRA-VISTULA FLOOD MANAGEMENT PROJECT (P147460) EUROPE AND CENTRAL ASIA | Poland | Water Global Practice | IBRD/IDA | Investment Project Financing | FY 2016 | Seq No: 3 | ARCHIVED on 11-Nov-2016 | ISR25552 | Implementing Agencies: Ministry of Environment, Ministry of Interior and Administration Key Dates Key Project Dates Bank Approval Date:23-Jul-2015 Effectiveness Date:04-Nov-2015 Planned Mid Term Review Date:15-Dec-2019 Actual Mid-Term Review Date:-- Original Closing Date:15-Dec-2023 Revised Closing Date:15-Dec-2023 Project Development Objectives Project Development Objective (from Project Appraisal Document) The project development objectives are to increase access to flood protection for people living in selected areas of the Odra Riverand the Upper Vistula River basins and to strengthen the institutional capacity of the Borrower to mitigate the impact of floods more effectively. Has the Project Development Objective been changed since Board Approval of the Project Objective? No PHRPDODEL Components Name Component 1: Flood Protection of the Middle and Lower Odra:(Cost $542.00 M) Component 2: Flood Protection of the Nysa Kłodzka Valley:(Cost $290.00 M) Component 3: Flood Protection of the Upper Vistula:(Cost $242.00 M) Component 4: Institutional strengthening and Enhanced Forecasting:(Cost $141.00 M) Component 5: Project management and studies:(Cost $95.00 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory 11/11/2016 Page 1 of 8 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report ODRA-VISTULA FLOOD MANAGEMENT PROJECT (P147460) Overall Risk Rating Moderate Moderate Implementation Status and Key Decisions Overall Summary: Since the last mission in March 2016, the pace of progress is accelerating. Preparation of necessary documentation for the first year investments, though initially delayed, is now advancing. It is planned that out of 10 ongoing tender procedures (total value of 370 million EUR), 4 contracts will be signed within the next 3 months (representing a commitment of around 110 million EUR). By June 2017 (FY16 close), an additional 3 contracts may be signed bringing the total committed amount in contracts to 205 million EUR. PIUs are ready to implement programs and are mostly staffed appropriately. Some initial challenges were faced with agreeing to the flow of fund arrangements, but these appear to be resolved. The conclusion of financing agreements with each of the Marshals is urgent. Continued pro-activity in implementing the requirements of the Bank vis-à-vis environmental and social safeguard compliance requirements is needed, particularly with respect to land acquisition and environmental impact selection criteria. Complaints from environmental NGOs and others will be monitored closely and discussions between these groups and the PCU/PIUs and Ministry staff will be facilitated. For the RZGW Wroclaw programs, confirmation is needed from the Ministry of Maritime Economy Inland Navigation (MEIN) and the Ministry of Environment (MoE) to proceed with the agreed work programs. Finally, given the importance of Component 4 (IMGW) to the overall success of the project, acceleration is needed and procurements related to the technical support consultancy and operational flood centers are priorities. New Polish Water Law. The Polish Water Law has reached Polish Parliament for discussion. This change to the law and institutional arrangements are to meet the ex-ante European Commission (EC) requirements complying with the Water Framework Directive (WFD) . Complying with this condition is important to secure the use of EU funds (200 million EUR) for the OVFMP. Risks Systematic Operations Risk-rating Tool 11/11/2016 Page 2 of 8 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report ODRA-VISTULA FLOOD MANAGEMENT PROJECT (P147460) Risk Category Rating at Approval Previous Rating Current Rating Political and Governance Moderate Substantial Substantial Macroeconomic Moderate Moderate Moderate Sector Strategies and Policies Moderate Moderate Moderate Technical Design of Project or Program Substantial Substantial Substantial Institutional Capacity for Implementation and Sustainability Moderate Moderate Moderate Fiduciary Moderate Moderate Moderate Environment and Social Moderate Moderate Substantial Stakeholders Substantial Substantial Substantial Other -- -- -- Overall Moderate Moderate Moderate Results Project Development Objective Indicators PHINDPDOTBL Total area in the 1% flood plain benefiting from enhanced protection and operational forecasts (Hectare(Ha), Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 81626.00 Date 26-Jan-2015 14-Apr-2016 01-Nov-2016 15-Dec-2023 PHINDPDOTBL Total population benefiting from enhanced protection and operational forecasts (gender disaggregated) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 12400000.00 Date 26-Jan-2015 14-Apr-2016 01-Nov-2016 15-Dec-2023 PHINDPDOTBL Flood Operation Centers established and functional (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2.00 11/11/2016 Page 3 of 8 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report ODRA-VISTULA FLOOD MANAGEMENT PROJECT (P147460) Date 15-Feb-2015 14-Apr-2016 01-Nov-2016 15-Dec-2023 PHINDPDOTBL Direct project beneficiaries (Number, Core) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 12400000.00 Date 26-Jan-2015 14-Apr-2016 01-Nov-2016 15-Dec-2023 PHINDPDOTBL Female beneficiaries (Percentage, Core Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 100.00 Overall Comments Intermediate Results Indicators PHINDIRITBL Length of enhanced protection in the Zachodniopomorskie Province (Component 1A) (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 9.80 Date 26-Jan-2015 14-Apr-2016 01-Nov-2016 15-Dec-2023 11/11/2016 Page 4 of 8 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report ODRA-VISTULA FLOOD MANAGEMENT PROJECT (P147460) PHINDIRITBL Modernizing and reconstructing the middle and lower Odra river systems to upgrade to a Class III waterway (Component 1B) (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value N N N Y Date 26-Jan-2015 14-Apr-2016 01-Nov-2016 15-Dec-2023 PHINDIRITBL Extension and construction of flood embankments to protect Slubice City (Component 1C) (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 12.80 Date 26-Jan-2015 14-Apr-2016 01-Nov-2016 15-Dec-2023 PHINDIRITBL Construction of dry polders in the Nysa Kłodzka Valley (Component 2A) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 4.00 Date 26-Jan-2015 14-Apr-2016 01-Nov-2016 15-Dec-2023 PHINDIRITBL Length of enhanced protection in the Nysa Kłodzka Valley (Component 2B) (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 177.00 Date 26-Jan-2015 14-Apr-2016 01-Nov-2016 15-Dec-2023 11/11/2016 Page 5 of 8 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report ODRA-VISTULA FLOOD MANAGEMENT PROJECT (P147460) PHINDIRITBL Construction of dry polders to protect Upper Vistula towns and Kraków (Component 3A) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 3.00 Date 26-Jan-2015 14-Apr-2016 01-Nov-2016 15-Dec-2023 PHINDIRITBL Length of enhanced protection for Sandomierz and Tarnobrzeg (Component 3B) (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 46.34 Date 26-Jan-2015 14-Apr-2016 01-Nov-2016 15-Dec-2023 PHINDIRITBL Length of enhanced protection for the Raba sub-basin (Component 3C) (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 19.77 Date 26-Jan-2015 14-Apr-2016 01-Nov-2016 15-Dec-2023 PHINDIRITBL Length of enhanced protection for the San sub-basin (Component 3D) (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 1.60 Date 26-Jan-2015 14-Apr-2016 01-Nov-2016 15-Dec-2023 11/11/2016 Page 6 of 8 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report ODRA-VISTULA FLOOD MANAGEMENT PROJECT (P147460) PHINDIRITBL Flash flood systems for sub-basins operational (Component 4B) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2.00 Date 26-Jan-2015 14-Apr-2016 01-Nov-2016 15-Dec-2023 PHINDIRITBL River Basin Management Plans or Investment Prioritization Plans drafted for Vistula sub-basins (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2.00 Date 26-Jan-2015 14-Apr-2016 01-Nov-2016 15-Dec-2023 PHINDIRITBL % of project-supported RBMPs and investments informed by citizen feedback through consultations (disaggregated by gender) (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 100.00 Date 26-Jan-2015 14-Apr-2016 01-Nov-2016 15-Dec-2023 Overall Comments Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed P147460 IBRD-85240 Effective USD 504.04 504.04 0.00 59.88 445.25 12% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P147460 IBRD-85240 Effective 23-Jul-2015 10-Sep-2015 04-Nov-2015 15-Dec-2023 15-Dec-2023 11/11/2016 Page 7 of 8 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report ODRA-VISTULA FLOOD MANAGEMENT PROJECT (P147460) Cumulative Disbursements Restructuring History There has been no restructuring to date. Related Project(s) There are no related projects. 11/11/2016 Page 8 of 8 Public Disclosure Copy
Группа Всемирного банка · Implementation Status and Results Report
Poland - ODRA-VISTULA FLOOD MANAGEMENT PROJECT : P147460 - Implementation Status Results Report : Sequence 03
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Implementation Status and Results Report
Страна
Польша
Источник
Всемирный банк