Группа Всемирного банка · Agreement

Official Documents- Amendment No. 3 to the Advisory Services Agreement with Road Infrastructure Agency of Bulgaria Ref. P143668

Болгария Всемирный банк
Открыть оригинал документа

Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.

Полный текст

OFFICIAL DOCUMENTS AMENDMENT No. 3 TO THE AGREEMENT FOR PROVISION OF ADVISORY SERVICES BETWEEN THE BULGARIAROAD INFRASTRUCTURE AGENCY AND THE INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT, DATED OCTOBER 25,2012 This amendment is made on the day 1 of E((1, 2015, between the ROAD INFRASTRUCTURE AGENCY (the "Recipient" or "RIA") and the INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT (the "Bank"), jointly referred to as "the Parties", to the Agreement for Provision of Advisory Services between the Parties dated October 25, 2012 (the "Agreement"), as amended. This Amendment No.3 is made in accordance with Article 17 of the Agreement. NOW THEREFORE, the Parties agree that the Agreement shall be amended to read as follows: Art 1. Art. 11 (a) from the Agreement is amended as follows: Art. 11.(a) The Recipient shall pay the Bank an amount not exceeding BGN 6,407,000 (six million four hundred and seven thousand Leva) for the approved outputs reflected in the Schedule of Outputs as per Article 1 of the Schedule to this Advisory Services Agreement. Art. 2. Art 13 (a) from the Agreement is amended as follows: Art 13(a) This Agreement shall expire on December 31, 2015." Art.3. Art. 1. Para 6, second bullet in the SCHEDULE of the "Description of the advisory services" is amended as follows: "Preparation of Terms of Reference (ToR) and survey questionnaire to undertake road user satisfaction survey". Art 4. A new Para 8 is inserted in the SCHEDULE of the "Description of the advisory services" to the Agreement and reads as follows: "8. Development of a Comprehensive Vision for the Introduction of the Electronic System for Provision of the European Electronic Toll Service (EETS), with deliverables: 8 A: Inception report and detailed work plan for electronic collection of road taxes. "8B: Report: Analysis of the opportunities and options to transform existing Vignette system into an Electronic Toll Collection System. Development of a detailed specification for the Electronic System for the provision of EETS. 8C: Report: Development of Strategy, Business model and financial planning for the implementation of the Electronic System for the provision of EETS. Except as amended herein, all the other provisions of the Agreement shall remain in full force and effect. This Amendment shall become effective upon it being duly signed by both Parties and as of the day the Bank has received a legal opinion from an authorized official that all legally required national procedures for the entry into force of this Amending Agreement have been fulfilled. As part of this amendment is a revised schedule for implementation of the activities. IN Witness WHEREOF, the Parties hereto, acting through their duly authorized representatives, have caused this Amendment to be signed in their respective names and on the date mentioned above in four authentic counterparts - two in Bulgarian language and two in English language. ROAD INFRAST UCT AGENCY INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT, By: By: Authorized Rep esentative Authorized Representative Name: 1 Of Name: ' Til: aiTitle: AT-L V . Date: ,41~12 O5~Date: og 1< SCHEDULE OF IMPLEMENTATION OF THE ACTIVITIES No Name of the result Deadline for Amount Deduct of implementation (BGN) the advance payment Review of the Roads Sector Strategy 1 (i) Review Report on the Roads January 4, BGN BGN Sector Strategy, Adjustments 2013 251,000 50,000 Proposals December 1, (ii)TOR for Environment Assessment 2012 (EA) and 3 months after (iii) Review of the EA EA is completed (ii) Establishment of Strategic Business Plan for RIA 2 Strategic Business Plan including Policy April 26, 2013 BGN BGN for Transparency and Disclosure of 879,000 180,000 Information I Development of Road Safety Action Plan 2013-2020 3. Road Safety Action Plan Based on Road March 26, BGN BGN A Safety Strategy 2013 159,000 30,000 3. Report on Assistance in Implementation of March 1, 2014 BGN BGN B Road Safety Action Plan 548,000 113,000 Preparation of Medium-Term Operational Program for Roads 4. 5-year Roads Management and April 26, 2013 BGN BGN A Development Program and 704,000 140,000 Report on Evaluation of Multiannual Planning and Recommended Adjustments 4. Report with Proposed Improvements of April 16, 2014 BGN BGN B Administrative Procedures for Planning 345,000 70,000 and Budgeting for Projects Establishment Road Asset management Practice 5. Report on Organization and Management April 26, 2013 BGN BGN A of Road Maintenance and Rehabilitation 209,000 40,000 including Proposals for Maintenance Financing and network classification 5. OPRC Scoping Report, Bid Documents November 26, BGN BGN B and follow up with Road Asset 2013 427,000 90,000 Management Providing Operational Support to RIA's Departments 6. Report on Proposal for Improvement of April 26, 2013 BGN BGN A Traffic Management 298,000 60,000 6. (i) Short Reports on Assistance in (i) January 16, BGN BGN B Preparing TOR and Application Form to 2013 120,000 40,000 Undertake Road User Satisfaction Survey 6. Short Report on Traffic Forecast and January 26, BGN BGN C Traffic Statistics Review 2014 1 50,000 264,000 6. Proposed Design Standards and Technical April 26, 2013 BGN BGN D Specifications 205,000 40,000 6. Developed ToR for creation of Spatial data February 16, BGN BGN E 2013 136,000 30,000 6. Developed ToR for creation of GIS January 16, BGN BGN F 2013 120,000 20,000 Preparation of IT Strategy 7 H Strategy April 26, 2013 BGN BGN 1 273,000 50,000 Development of a comprehensive vision for the introduction of the Electronic System for provision of the European Electronic Toll Service (EETS) 8 Inception report and detailed work plan for 31 March, BGN A electronic collection of road taxes 2015 77, 000 8. Analysis of the opportunities and options July 15, 2015 BGN B to transform existing Vignette system into 600,000 an Electronic Toll Collection System. Development of a detailed specification for the Electronic System for the provision of EETS 8. Development of Strategy, Business model October 30, BGN C and financial planning for the 2015 792,000 implementation of the Electronic System for the provision of EETS. Total 6,407,000 1,003,000

Основные сведения
Тип документа Agreement
Дата принятия
Страна Болгария
Источник Всемирный банк