Группа Всемирного банка · Loan Agreement

Conformed Copy - L3907 - Second Madras Water Supply Project - Agreement Amending Loan Agreement

Марокко Всемирный банк
Открыть оригинал документа

Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.

Полный текст

Page 1 CONFORMED COPY LOAN NUMBER 3907- IN (Amendment) Agreement Amending Loan Agreement (Second Madras Water Supply Project) between INDIA and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Dated June 12, 1997 LOAN NUMBER 3907 IN (Amendment) AGREEMENT AMENDING LOAN AGREEMENT AGREEMENT, dated June 12, 1997, between INDIA, acting by its President (hereinafter called the Borrower) and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT (hereinafter called the Bank). WHEREAS (A) by the Loan Agreement dated November 20, 1995, as amended to date, (hereinafter called the Loan Agreement) between the Borrower and the Bank, the Bank has agreed to make available to the Borrower an amount in various currencies equivalent to two hundred seventy five million eight hundred thousand dollars ($275,800,000) to carry out the Project described in Schedule 2 to the Loan Agreement; (B) by a Project Agreement dated November 20, 1995, between the Bank and Tamil Nadu (hereinafter called the Tamil Nadu Agreement), Tamil Nadu has agreed to undertake certain obligations in respect of the carrying out of the Project; (C) Tamil Nadu has advised the Bank that the name

Основные сведения
Тип документа Loan Agreement
Дата принятия
Страна Марокко
Источник Всемирный банк