Группа Всемирного банка · Environmental Assessment

China - Guigang Multi-Purpose Navigation Project : environmental action plan and environmental monitoring plan (Vol. 7 of 12) : Summary of impact assessment

Китай Всемирный банк
Открыть оригинал документа

Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.

Полный текст

--vot*-',',,,5O2HOANG INL-AND WATERWAYS PROJECT 1 d SUMMARY 6k) Z OF ENVIRONMENT IMPACT ASSESSMENT 'cn (i C- Zhejiang Inland Waterways Project Administration Ofice Msy 18,1995 COIrrENTS 1. General 1.1. Policy for organization work 1.2. Bases amni stadaards of i"virousent impact assessment 1.3. Target of environment ispact assessaent report vork 2. Brief project introduction 2.1. Purpose 2.2 latroduction 3. BaseLine eAviroojeutal conditioDns 3.1 Topography and Geology 3.2 Cliaate 3.3 SociaL econoay 3.4 Traffic transportation 3.5 Bistory culture 4. Environment quatity situation 4.1. Water quality 4.2 Noise 4.3 Atmosphere quality 4.4 Bottom mud 5. Environment impact assessment and protection measures 5.1 Clarification of Environment impact problems 5.2 Impact on Local economy 5.3 Impact daring constraction 5.4 impact after operation 6. Environment protection organization and environment monitoring 6.1 Enviroament protection organization 6.2 Environment aonitoring .Ivestaent for prevention measures of environaent impact 8. Training plan for environment protection staff 9. Main points of eavironment protection action plan (see Annex) I\ ;. General The outline of the enviroment impact assessment ( EIA) report for the Zbej iaag Province Inland laterway Network Recwistruction Project was prepared by the Zhej iang Provincial Eaviroment Protection Research Institute (with class A certificate approved by the Natiomal Environmet Protection Agency (HEPA)). The report was reviewed and approved by the IEPA aAd Zhejiang Provincial Enviroweat Protection Bureau in November 192. The EIA as oart of the preliminary desig report was finished between December 1P92 and March 1993 and meets the National Environment Protection Agency condi ions. In April 1993, during the lB wission to laanznu, the Zheiiang Provincial Department of Coiunication(ZPDI) subuitte 7 subprojects environkent impact assesssent reports in English. According to the requirement of the Aide -senoire, ZPBIC coapiled 7 enviroment protection action plans in English and submitted these to the World Bank i. October, 1113. 1. 1 Policy for organization work The donestic procedures for Zhejiang Province InaEnd Waterway Network Reconstruction Project have been conpteted. 1.2 Bases and standards of EIA The EIA for the project is in terTs of the following bases and standards: (1). Bases a. Environment protection law of People's Republic of China. b. Water pollation prevention law of People's Republic of China. c. Environment protection administration law for traffic project. 2 d. Eawiroumentat protection managenent law f\r constrnctioa project (). Stardands z% Surface water environmet quatity stardand b. Atmosphere eaviroment quatity standard c. Urban enviroment noise statdard d. Regional Enviroa..'t noise stardads for urban port 3Rd river banks e. Pollttant controt stardag for agricultural md. f. Ship pottutant discharge standard. 1.3 Target of environment impact assessment report work ('). fhaael reconstruction works a. later quality: construction period: disturbance by dredging of underwater sediments. operation period: Waste discharged by shipping. 6. Vaste soi L'sediment. construction period4 froe chanmel widenaingAleepening and disposat of dredged sediment. c. Noise: construction period; non--continuous nacbinert noise opersttion period: random and not steady noise from aechanic ships. o. Port works constraction period: dust operation period: coal dust. b. later quatity: 3 construction period: rain water discharge operation peried: port area rain water nd sewerage water discharge. c. Noise: coastruction period: nonR- itinuous machinery noise operation period: handling machinary operational noise. 2. Brief project introduction 2. I Prpose Zhej itg province inland watetway reconstruction project includes: Hangzhou-eij ing Grand Canal( 53. 9gk) , Chaagxing-Ruzhoa-Shanshai Channel( 12. 51k) , lanszhou-Shanghai ChannekC 72. 3km) Zhapu-1iaxing-Suzhou-Chann l (42.1ka) (within Zhejiang province, thirteen contracts) , constrWc;ioa of terainats at liaxing railway-waterway tansfer port district ( 13 berths for 1D

Основные сведения
Тип документа Environmental Assessment
Дата принятия
Страна Китай
Источник Всемирный банк