Document of The World Bank FOR OFFICIAL USE ONLY Report No. P-6673-MOt MMEMORANDUM AND RECOMMENDATION OF THE PRESIDENT OF THE INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT TO THE EXECUTIVE DIRECTORS ON A PROPOSED SINGLE CURRENCY LOAN WITH A US DOLLAR TRANCHE IN AN AMOUNT OF US$50 MILLION AND A FRENCH FRANC TRANCHE IN AN AMOUNT OF FRF 240 MILLION TO THE KINGDOM OF MOROCCO FOR AN EMERGENCY DROUGHT RECOVERY PROJECT AUGUST 8, 1995 This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. CURRENCY EQUIVALENTS Currency Unit = Dirhams (Dh) U$1 = Dh 8.5 US$1 = French francs (FRF) 4.8 FISCAL YEAR January 1 - December 31 WEIGHT AND MEASURES Metric System ABBREVIATIONS AND ACRONYMS CNCA National Agriculture Credit Bank DCEC Department of Roads and Road Transport DDF Forestry Department DE Department of Livestock, Ministry of Agriculture DGH Department of Hydraulics, Ministry of Public Works DGR Department of Rural Works, Ministry of Agriculture DPA Provincial Office of Agriculture DRTP Regional Office for Public Works FRSCL Fixed Rate Single Currency Loan GOM Government of Morocco MAMVA Ministry of Agriculture MTP Ministry of Public Works MSP Ministry of Public Health OCC Opportunity Cost of Capital ODEP National Port Authority ONCF National Railways Office ONEP National Water Supply Authority ONICL National Cereals Office ORMVA Regional Irrigation Authority SONACOS Moroccan National Seeds Marketing Company SPTP Regional Services for Public Works, MTP VLR Variable Lending Rate MOROCCO EMERGENCY DROUGHT RECOVERY PROJECT LOAN AND PROJECT SUMMARY FOR OFFICIAL USE ONLY Borrower: Kingdom of Morocco Amount: A fixed rate loan package (US$100 Million equivalent) comprising of: (a) a US$50 million tranche, and (b) a French franc 240 million tranche. Terms: Fixed rate single currency loan for up to 15 years. For each loan currency tranche, each semester's aggregate disbursements will have a grace period of 3 years and a final maturity of 12 years, both beginning from the rate fixing date for such disbursed amount. Interest payment and rate fixing dates: January 15 and July 15. Commitment fee: 0.75% on undisbursed loan balances, beginning 60 days after signing, less any waiver US$ Million Financing Plan: Government of Morocco 147.4 Beneficiaries 86.4 IBRD Proposed Loan 100.0 TOTAL 333.8 Net Present Value: Not applicable. However a cost/benefit analysis for the livestock component (25% of project cost) shows NPV of about US$340 million. Staff Appraisal Report: None. Technical Annex Report No. T-6673 MOR Map: IBRD 24657 This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. MEMORANDUM AND RECOMMENDATION OF THE PRESIDENT OF THE INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT TO THE EXECUTIVE DIRECTORS ON A PROPOSED LOAN TO THE KINGDOM OF MOROCCO FOR AN EMERGENCY DROUGHT RECOVERY PROJECT 1. I submit for your approval the following memorandum and recommendation on a proposed Emergency Drought Recovery Loan to the Kingdom of Morocco in an amount equivalent to US$100 million in support of the Government's drought recovery and relief program. The fixed rate single currency loan package will comprise two tranches: a US$50 million US dollar tranche and a FRF 240 million French franc tranche, for up to 15 years. For each loan currency tranche, each semester's aggregate disbursements (disbursed amount) will have a grace period of 3 years and a final maturity of 12 years, both beginning from the rate fixing date for such disbursed amount. Background on the Drought Situation 2. Morocco is currently suffering from a severe drought which is considered to be one of the worst droughts of this century. The total rainfall of the 1994-1995 agricultural year was exceptionally low throughout the country, averaging only about 47 percent of normal levels. Except for the Oriental Region (Map), the entire country has been severely affected. Rainfall was fairly normal until the end of October 1994, but during the critical agricultural month of November 1994 the average rainfall was one third of normal levels, and this was followed by zero rainfall in December 1994 and January 1995. By the end of May 1995, the total water inflow into the 20 main reservoirs reached only 28 percent of the average annual inflow. The major cities of Tanger, Oujda, Marrakech and Agadir are located in the worst affected regions. Ground water levels are also well below normal. For example, the aquifer supplying Tanger has fallen 11 meters below normal. 3. Impact on Agriculture. Agricultural GDP is estimated to have fallen by 45 percent over 1994. Cereals and pulses normally contribute 36 percent of agricultural GDP and livestock 30 percent and these have been especially hard hit. Only 60% of the five M ha of cereal areas were cultivated. The available harvest is primarily from irrigated areas (total 800,000 ha). The total cereal harvest is estimated at 1.6 million tons (MT) compared to last year's 9.4 MT. This is 81 percent below the 1994 level and 71 percent below the last five years' annual average of 5.5 MT. Harvests from the main spring crops, maize and sunflower were also mediocre. Maize harvest fell by 30 percent and sunflower, by 40 percent. With respect to livestock, it is estimated that the loss of sheep will be 25 percent, and of cattle 20 percent, unless urgent action is taken to assure feed and water supplies. 4. Impact on the Overall Economy. The dramatic fall in agricultural output necessarily entails a direct loss of employment and incomes, especially by landless wage earners, and small and medium farmers. Agriculture provides employment to at least 40 percent of Morocco's population and within rural areas, agriculture provides 81 percent of total employment. Small and medium farmers constitute the majority (80 percent) of rural workforce. A rough estimate of agricultural jobs lost is 100 million work days, equivalent to an income loss of about 5 billion Dh (about US$600 million). At the sectoral level, given that agriculture (including agro-industries, forestry and fisheries) constitutes about 23 percent of GDP, the estimated 45 percent fall in agricultural output has caused a 5% reduction in GDP. The current account deficit is projected to deteriorate to about 3.5 percent in 1995 due to increased import demand for foodstuffs and investment goods. The budget deficit (before privatization receipts) is projected to deteriorate to about 4.7% in 1995 compared with 3.8% in 1994. While the Government of Morocco (GOM) is taking steps to control expenditures and raise revenues, the current severe drought makes the task difficult. -2- 5. The Government's Response. GOM's response to the crisis, though initially slow, has now gathered momentum. It has formulated an Emergency Drought Relief and Recovery Program (EDRRP) and put into place institutional mechanisms to handle the crisis. The Program consists of the following main activities: (a) Transport of potable water in tanker vessels and tanker trucks to urban centers, including Taza, and Azilah; (b) Debt relief and rescheduling by the Agriculture Credit Bank (CNCA) in rural areas; (c) Stabilizing the livestock herd through the provision of water, imported feed, and vaccination; (d) Provision of seeds; (e) Provision of rural public works to build up capacity to mitigate current and future droughts while providing current income to the most affected rural populations; and (f) Formulation of a longer-term drought preparedness strategy. 6. In addition, GOM intends to import about 2.8 million tons of soft wheat. For the most part, GOM intends to finance the program with local resources and bilateral credits, and through accelerated disbursement of about US$ 100 million from existing World Bank agricultural and rural sector loans. In addition, it has requested a loan of about US$100 million targeted at some key components of the Program to ensure a successful recovery of agricultural production while building up the capacity to mitigate the impact of future droughts. These key components, which constitute the proposed project, are described below. The Proposed Project 7. Project Objectives and Strategy. The proposed project will fund specific components of GOM's EDRRP, which has been prepared with assistance from the FAO Cooperative Program. The main objectives are to: (a) alleviate the impact of current drought through measures to regenerate productive capacity in crop and livestock production, improve rural roads and potable water supply, which while generating current income for the affected populations, will also strengthen the capacity of GOM to mitigate the impact of future droughts; and (b) assist in enhancing institutional capacity for drought management. The long-term strategy will be to begin the process of reducing the vulnerability of rural populations to severe drought. This will be achieved through improved preparedness, better rural infrastructure to allow Government to reach affected populations quicker with food, water, and agricultural inputs, more reliable drinking water supplies, and better management of natural resources. The drought preparedness and rural roads components will make a small but important contribution to this long term strategy. 8. Project Description. The main criteria used to determine the components for financing are: (a) ability to target a package of investments to benefit victims of the drought; (b) execution of key actions within a project period of about two years (28 months), and disbursement within a three year time period; (c) responsiveness to Government's EDRRP; and (d) incrementality to the ongoing and planned Government and donor assistance. The project will be targeted to rural areas, particularly in the north and west, where the drought is most severe. Similarly the water supply component was reduced in size as bilateral French assistance is available and other donor assistance is planned. Consequently, the project will have the following components, which are described in greater detail in the Technical Annex -3- and working papers: (i) Agricultural Inputs. The drought has drastically reduced supplies of certified seeds for cereal cultivation during the next agricultural campaign. The project will provide for acquisition of about 70,000 tons of barley and wheat seeds. Local distribution will also be facilitated through 350 National Seeds Marketing Company (SONACOS) selling points. (Details in the Technical Annex and Working Paper II - A). (ii) Livestock Production. To maintain productivity of the important livestock sector, Morocco normally imports only about 264,000 tons of feed, since it has ample local production of barley and also availability of rangeland forage. Because of drought however, local production of feed has fallen by 70 to 80%. There is a serious danger that the national livestock inventory will be severely depleted and rebuilding of household flocks will take several years. Therefore, Morocco intends to increase feed imports to limit destocking to a maximum of 10 percent. The project will provide for about 500,000 tons of incremental feed, of which about 350,000 tons will be Bank-financed. GOM and beneficiaries will finance the balance. Provision of water and vaccination for the livestock will also be intensified. (Details in the Technical Annex and Working Paper II-B). (iii) Water. To alleviate the impact of the current as well as future droughts, the project will include construction of about 1,850 wells in rural areas, 650 boreholes, 170 rain harvesting points, and rehabilitation of 500 springs. Supply of potable water will also be improved to 56 rural centers and 250 villages hardest hit by the drought, especially in the North-west and North-central regions. This component will be limited to those centers that are most seriously affected and where sufficient investigations have already been carried out to verify ground water availability. Labor-intensive, traditional techniques for well digging will be used whenever possible to increase income. (Details in the Technical Annex and Working Paper III). (iv) Rural Roads. To alleviate the drought impact, the rural roads component will improve the access of rural populations to social services and will ensure speedy and economical food and feed transport. The rural roads network comprises about 38,000 kms. It is proposed under the project to rehabilitate 600 kms of these and to upgrade about 900 kms of existing tracks. Drought-prone areas with limited access will be targeted. (Details in the Technical Annex and Working Paper IV). (v) Improving Future Drought Preparedness. Some of the components mentioned above, such as the digging of wells, will improve overall capacity of the country to meet future droughts. In addition, an early warning system will be developed to provide farmers with advice regarding alternative cropping strategies in the event drought appears imminent. The project will strengthen GOM's agricultural monitoring system, in particular to monitor the agricultural and environmental impacts of drought, and based on this, to develop strategies and actions to mitigate the impact of future droughts. It will focus particularly on the development of a better livestock management strategy. To reduce the risk of disruptions in seed supply, the program of seed production in irrigated areas will be strengthened. (Details in the Technical Annex and Working Paper V). 9. Project Financing. The project cost of about US$334 million will be financed by the proposed fixed rate single currency loan (FRSCL) package of US$100 million equivalent comprising two equal tranches in US dollars and French francs (para. 1). GOM is eligible for single currency loan terms, since -4- it has authorized conversion of all its VLR82 loans. Including the proposed loan, single currency loans to Morocco will aggregate to US$350 million equivalent, about 47% percent of Bank's planned FY96 lending to Morocco of about US$750 million. GOM has considered the Bank's alternative loan terms-- Currency Pool Loan, LIBOR-Based Single Currency Loan, and FRSCL - and has selected FRSCL in US$ and FRF in order to improve the management of its external liabilities. The choice of the two currencies reflects the weight of the currencies (about 35% each) in Morocco's foreign exchange receipts. The choice of fixed rate reflects GOM's desire to limit exposure to interest rate volatility in view of its current exposure in floating rate loans, which account for 45% of its external debt. GOM and beneficiaries will finance US$234 million. A breakdown of costs and the financing plan are shown in Schedule A. Amounts and methods of procurement and disbursement are shown in Schedule B, and the procedures are discussed in the Technical Annex. A timetable of key processing events and the status of Bank Group Operations in Morocco are given in Schedules C and D, respectively. Procurement actions have already been started and some contracts for livestock feed, wells, and boreholes awarded. Retroactive financing of up to 20% of the loan amount for eligible payments made within four months of the date of loan signing would be permitted. The proposed procurement arrangements for the project are described in Schedule B to the MOP. 10. Project Implementation. The proposed project will be implemented under the supervision of a high level Inter-ministerial Commission chaired by the Prime Minister with key ministers as its members, including those for Finance, Agriculture, Public works, Public Health and Interior. The Commission has already been constituted and has met several times. The Ministry of Agriculture (MAMVA) will provide the secretariat for the Commission, and the secretariat has already been constituted with adequate staff. A special supervision and monitoring unit has been set up directly under the MAMVA's Secretary General to follow the progress of the EDRRP. It will be responsible for implementing all components of the project except rural water supply and rural roads components, which will be managed by the Ministry of Public Works (MTP) and the National Water Supply Authority (ONEP). Under the supervision of MAMVA, SONACOS will be responsible for seeds procurement and the National Cereals Marketing Agency (ONICL) is responsible for coordination and overall monitoring of livestock feed imports. They have long experience with such activities and sufficient capacity to implement the program. The detailed project implementation plan is included in the Technical Annex. 11. Lssons Learned. The project has drawn on the experience of other recent emergency operations. The main lessons, which have been incorporated into the project design are: (a) emergency operations should be a part of a comprehensive Government recovery program being assisted by donors; (b) investments should be targeted to the most affected regions; (c) Government organizational structure should be adapted and a high level co-ordination commission should be set up; and (d) early procurement actions should be initiated. The high level commission under the Prime Minister for coordination of EDRRP has already been set up and more than 50% of tenders have been launched. This should ensure timely implementation. 12. Rationale for Bank Involvement. Morocco is facing its worst drought of the century, which has resulted in a 5% decline in GDP. A disproportionate burden of the drought has fallen on the agriculture-based rural areas, where most of the country's poor reside. GOM's ability to cope with the drought is constrained by deteriorating current account and budget deficits. Bank support for the proposed project is justified for the following reasons. First, it will allow GOM to protect and restore the productive capacity of the rural population. Second, by improving potable water supply and rural roads, the project would strengthen GOM's capacity to supply water and food to rural communities during future droughts. And, third, the project would enable the Bank to assist the GOM to strengthen the institutional framework for improving drought preparedness. This is important, because droughts in Morocco are occurring with increasing frequency. -5- 13. Agreed Actions. During appraisal, agreement was reached that livestock feed will be imported by the private sector under ONICL coordination, and seeds procured by SONACOS, both of which have requisite capacity. Feed and seeds will be targeted to the most drought affected rural areas, where most of Morocco's poor live. Agreement was reached that only those rural works components that have been identified previously under feasibility studies and where procurement actions can be completed quickly will be included in the project so that the project can be completed quickly. 14. Environmental Aspects. The drought is having a negative impact on the fragile natural resource base in the affected areas. Reduced soil cover accelerates soil erosion and reduced water flow in the rivers concentrates pollution. These problems require longer-term actions, which will be included in regular investment projects now under preparation. A proposed Watershed Management Project will include measures to protect soil from erosion, and the proposed Environmental Management II and Water Sector Investment Loans will include measures to reduce water pollution. Potable water wells will be designed with adequate covers to avoid pollution. Exploratory drilling will be made to assure that adequate water resources of potable quality exist before digging begins. Proper drainage facilities will be provided to the new rural roads so as to avoid soil erosion. 15. Benefits. The project will protect and restore the productive capacity of the rural population by ensuring that sufficient, quality seed be available before the next rains, which are expected between October and December 1995. Furthermore, improved livestock feed supplies will limit the reduction in flock/herd to less than 10% of current levels. A cost-benefit analysis of this component shows a net present value of about US$ 340 million (at 10% OCC). The rural potable water supply will ensure that the population does not depend on poor quality surface drinking water, which has further deteriorated because of the concentration of pollution resulting from the drought. Better health of the rural population will have the additional benefit of maintaining their productivity. It has important social benefits also. A recently completed study of the role and status of women in rural Morocco has shown that women, especially young girls, spend a major part of their time collecting water and this prevents them from attending schools. More secure supplies of water nearer their homes will allow more young girls to attend school. For the rural roads component, cost/benefit analysis done prior to the emergency, and excluding drought related benefits show economic rates of return of above 30%, and highly positive net present values. Drought related benefits have not been included in the analysis because they are difficult to quantify. 16. Risks. The main project risk will be the continuation of the drought for another year. In that case the project will need to give more emphasis to the rural potable water component. Another risk will be delay in project implementation. This risk has been mitigated by identifying project components, that can be implemented quickly and by taking early actions on procurement for works. More than half of the program has already been tendered. 17. Recommendation. I am satisfied that the proposed Loan complies with the Articles of Agreement of the Bank, and I recommend that the Executive Directors approve the Loan. James D. Wolfensohn President Attachments Washington D.C. August 8, 1995 -6- Schedule A MOROCCO - EMERGENCY DROUGHT RECOVERY PROJECT PROJECT FINANCING Estimated Costs and Financing Plan (In US$ Million) Expenditure Local Foreign Total Seeds 23.8 4.2 28.0 Rural Roads 42.2 42.2 84.4 Water Supply 65.6 58.6 124.2 Livestock - Feed 11.1 74.1 85.2 - Water Supply 4.9 2.3 7.2 - Veterinary Services 0.6 2.2 2.8 Technical Assistance 1.0 1.0 2.0 Total Project Cost 149.2 184.6 333.8 Financing Plan IBRD 35.0 65.0 100.0 GOM & Beneficiaries 'a 114.2 119.6 233.8 Total Financing 149.2 184.6 333.8 la Co-financing is being sought for about $120 million -7- Schedule B Page 1 of 2 MOROCCO - EMERGENCY DROUGHT RECOVERY PROJECT Summary of Procurement Arrangements (US$ Million) Procurement Method Total Expenditure Category ICB NCB Other NBF Cost Civil Works 66.3 6.3 112.2 /d 184.8 (53.0) (2.0)'& (58.0) (3.0) b Equipment 0.7 0.7 32.4' 33.8 (0.50) (0.50) (1.0) Animal Feed and Seed 41.0 ' 72.2'd 113.2 (41.0) 'c (41.0) Technical Assistance 2.01c 2.0 TOTAL 0.7 67.0 47.3 218.8 333.8 (0.5) (53.5) (46.0) (100.0) Note: Figures in parentheses are the respective amounts to be financed by the Bank NBF: Not Bank Financed /a Local shopping /b Force account /c Imports in accordance with local commercial practice /d Procured under GOM procedures /e Procured under GOM or bilateral procedures -8- Schedule B Page 2 of 2 MOROCCO - EMERGENCY DROUGHT RECOVERY PROJECT DISBURSEMENT SCHEDULE Amount of Loan EMpenditure to be Loan Category -Allocated- Fnaced (Percent) (US$ Million) Civil Works 56.0 80% of local exp. Equipment 1.0 80% of local exp. Feed and Seed Imports 33.0 100% of foreign exp. Unallocated 10.0 TOTAL 100.0 Estimated disbursement (US$100 Million equivalent) Vank FY Semester Annual Cumulative 1996 1 25.0 25.0 2 20.0 45.0 1997 1 20.0 65.0 2 15.0 80.0 1998 1 10.0 90.0 2 10.0 100.0 Proposed Loan closing date: June 30, 1998 Note: The disbursements are in US$ equivalent based on equal disbursements of US$ and FRF, with FRF disbursements converted to US$ equivalent at I US$ = 4.8 FRF -9- Schedule C MOROCCO - EMERGENCY DROUGHT RECOVERY PROJECT Timetable of Key Processing Events Time taken to prepare: 6 weeks Prepared by : GOM and FAO Appraisal Mission: June 30 - July 18, 1995 Negotiations: July 20, 1995 Planned date of effectiveness: September 7, 1995 -10- Schedule D The Status of Bank GrouP OPerations in Morocco (Pag. 1 Of 2) Statement of Bank Loans and 11A Credits (As of June 30, 1995) US$ Million Amount Loan or Fiscal (less cancellations) Credit No. Year Borrower Purpose Bank 1DA Undisbursed Seventy-six loans and five credits flly disbursed 4,168.03 45.16 Of which SALs. SECALS, and Program Loans /a 2377 1984 Kingdom of Morocco Industrial Trade Policy (SAP) 150.40 2590 1985 Kingdom of Morocco Agriculture Sector 1 100.00 2604 1986 Kingdom of Morocco Industrial Trade Policy Adjustment 11 200.00 2684 1986 Kingdom of Morocco Education Sector I 150.00 3001 1989 Kingdom of Morocco SAL I 200.00 2820 1987 Kingdom of Morocco PERIL 1 239.56 2885 1988 Kingdom of Morocco Agriculture Sector II 225.00 3365 1991 Kingdom of Morocco Financial Sector Development 125.00 3463 1992 Kingdom of Morocco SAL II 275.00 Sub-Iolal 1664.96 Disbursing Loans 2798 1987 ONPT Telecommunications I 116.00 5.35 2806 1987 BNDE. BCM, BMCE Industrial Export Rnance I 68.67 271 2825 1987 Kingdom of Morocco National Water Supply Reta. 60.00 13.28 2826 1987 Kingdom of Morocco Greater Casablanca Sewerage 60.00 22.68 2910 1988 Kingdom of Morocco Power Distribution 90.00 48.41 2954 1988 Kingdom of Morocco Small & Medium Irrigation 11 23.00 11.32 3026 1989 Kingdom of Morocco Rural Primary Education 83.00 27.91 3036 1989 Kingdom of Morocco Agricultural Research & Extension 28.00 13.14 3048 1989 Kingdom of Morocco Public Administration Support 23.00 10.71 3121/22 1990 Kingdom of Morocco, CIH Housing Finance II 80.50 2.40 3136 1990 BNDE, BCM. BCME, COM, Industrial Finance 169.46 7.58 WAFA 3156 1990 Kingdom of Morocco Forestry Development II 49.00 25.15 3168 1990 Kingdom of Morocco Highway V (Sector) 79.00 4.33 3171 1990 Kingdom of Morocco Health Sector Investment 104.00 56.82 3262 1991 Kingdom of Morocco Rural Electrification II 114.00 103.23 3283/84 1991 Kingdom of Morocco/ODEP Port Sector 132.00 56.95 3295 1991 Kingdom of Morocco Rural Basic Education Development 145.00 120.23 3365-73 * 1991 BNDE, BCP, SGMB, CDM Financial Sector Development 103.83 35.31 8MCE, BCM. BMCI 3557 1993 ONPT Telecommunication Restructuring 100.00 85.49 3587 1993 Kingdom of Morocco Second Large Scale Irrigation Impr. 215.00 207.35 3618/21 1993 Kingdom of Morocco. CIH. SGMB Land Development 118.00 78.75 3616/17 1993 Kingdom of Morocco, FEC Municipal Finance 1 104.00 77.67 3647 1994 Kingdom of Morocco Environment Management 6.00 6.00 3662 1994 CNCA National Rural Finance 100.00 100.00 3664/5 1994 Kingdom of Morocco/ONEP Water Supply V 160.00 168.13 3688 1994 Kingdom of Morocco Irrigated Areas Agric. Services 25.00 25.00 3765 1994 Kingdom of Morocco ASIL 11 121.00 121.00 3901 1995 KIngdom of Morocco Secondary Roads \b 5760 57.60 TOTAL 6.703.09 45.16 1,484.50 Of which has been repaid (only amortization) 2.07271 11.18 Total held by BanK and IDA 4.630.38 33.98 Amount sold 20.11 of which repaid 20.11 Total Undisbursed 1,484.50 SAL, SECAL or Program Loan \a Approved after FY80 \b Not yet signed -11 - ScheduleD (Page 2 of 2) Statement of IFC Investmenis In Morocco (As of June 30, 1996) Fiscal Year Oiginal Gross Commitment (US$MillIon) Otiluator Twpe of Business Loan E Totl* 1963 Banque Nationale pour le Dev. Development Finance 44.25 2.70 46.95 1978 Econ. (BNDE) 1984 1986 1980 Societe Miniere du Bou-Gafer Mines 12.99 2.35 15.34 (SOMIFER) 1987/ Credit Immobiller et Hoteller (CIH) Tourism 67.50 - 67.50 1990 1988/ Settal Filature (SETAFIL) Textile Factory 3.47 1.67 5.14 1993 1989 Compagnie Maritime Maroco- Ferry Service 4.30 - 4.30 Norveglenne (COMARIT) 1991 Cerame Afrique Industries (CAI) Ceramics 3.75 1.69 5.44 1991 Societe ENNASR do Peche Agro-Industby 2.46 - 2.48 1992/ Clments du Maroc Cement 28.65 - 28.65 1994 (formerly CIMASFI) 1992 Banque Commerciale do Maroc Capital Markets 12.00 - 12.00 1992 (8CM) 1992 Banque Marocalne du Commerce Capital Markets 12.00 - 12.00 Exteneur (BMCE) 1992 Credit du Maroc (CDM) Capital Markets 8.00 - 8.00 1994 International de Financement et Financial Services - 3.86 3.85 et do Participation (INTERFINA) 1995 Societe Marocalne Caplial Markets - 0.50 0.50 1996 Siparex-Wafa Dev. Financial Services - 4.00 4.00 Socl64b Financibre Siparex Financial Services - 0.10 0.10 Total gross commitments 199.37 16.86 216.23 Less cancellations, terminations, repayments, sales and exchange adjustments 68.14 5.38 73.52 Total commitments held by IFC 131.23 11.48 142.71 of which undisbursed 0.00 5.49 5.49 IFC net. Does not include participants from commercial banks 12° 8° 4° Tonger Теlоиап � �QM'Diq � Е1 N Hoceima • Nodor � 1aбha �s Wrache Choouen • .,,,Q КоЬдппа Ksor в1 Keбir моRоссо - . fi � юг�гте� Оиег пе � pujdo 5ouk е1 Агоаа , Mechra-Be1- Тооипо�е j � �пkа 1orf Е1 elha ('� � 'di i Тохо Taourirt Кепitrп • i� 5о1а � • RABAT • Ain Аоида . \. е• Mohammedio д"j '7 ,- 5idi Моитеп eknes �_,���.,1 � � , , СаsаЫапгя Slrmane � Khemissei � 1 г.> 1.5 -.. i� Е1 ег Капдт �, %�! 1'. i�, /�i;_ Doua��•.. . , _ -� Haieb •Uтпе ' � 5вьои�iо , �� Медiоппи ,Е1 1од Lдsfur lodida Khou Во • Khenifio � 5епа� Oued-Zem 5ido и� MidaN Ваюгiа 32° Fkih Веп �fi 5a1oh Benguenr . Beni �oh Eigиg Е1 Кеlаа Ма11а1 � ' � � ` - 32° дег 5гurhno • Azi1a1 � Demnale Goulmimo • Errochidio � rв � Essaoulm Murmkech Erfoud� � Tinghir lmin Тапоиl ` Е1 1свlоо 1 Оиагю дед МВоипо � � �в MA10R ROAC)5 � в+' SECONDARY ROADS иlпд Т ��� , LОСц ROADS �д.г . Taimo � �--� wvEкon�s This пюр has Ьееп ргеропд 7агоидаппl Zogoгo , а� тмв wогю mnk•� г+он а, м.иоиi ��о� р гкоиисЕ cnriTUs епЭиьпеlу !w �he conven�ence о( геодегг ппд is 1ог fhe , ® NAT10Nц САР1Тц 'мМгю! ию of The Wor1d Bank ог�иr� ��пг++�п � �� О rowиs ли� стЕS оп IhiьпюрΡ дп гюf imрΡ�; оп Ню ��. О�е ором пи(dдThе Woro gon(г Group, • Ггпi1 ' Тпга �_-� �Prnt�m ELEVATION ABOVE 1000 METERS sгйиё а7 onr �епiмгу ы ауΡ � ECONOMIC REG10N BOUNDARIES епдогsнгмпl ог аперЮпсг of � якh Ьоипдопеа. •'� в� 1NTERNAT10Nц 80UNDARIES � � � � 1NTERNATIONAL BOUNDARY ' (орргомтаlе) Guelmim ' о so ioo �ю ' ' pLOMETERS' 28° � Гоп-Топ - а о < 28° � Tafa ео 4° ' о й
Группа Всемирного банка · Memorandum & Recommendation of the President
Morocco - Emergency Drought Recovery Project
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Memorandum & Recommendation of the President
Страна
Марокко
Источник
Всемирный банк