Группа Всемирного банка · Project Completion Report

India - Third Calcutta Urban Development Project

Индия Всемирный банк
Открыть оригинал документа

Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.

Полный текст

Docum_t of The World Bank FOR OMCLAL USE ONLY Repwt No. 12146 PROJECT COMPLETION REPORT INDIA THIRD CALCUTTA URBAN DEVELOPMENT PROJECT (CREDIT 1369-IN) JUNE 30, 1993 MICROGRAPHICS Report No: 12146 Type: PCR Infrastructure Operations Division Country Department II South Asia Regional Office This document has a restricted distribution and may be used by reipients only in th performance of their offidal duties. Its contents may not othenvise be disclosed without World Bank authorization. CURRENCY EQUIVALENTS Rs 1.00 - USS 0.11 at appraisal (May 1983) Rs 9.50 - US$ 1.00 at appraLial (Nay 1983) Rs 1.00 = US$ 0.039 at project close (March, 1992) Rs 25.5 * USS 1.00 at project close (March, 1992) GOI/GOWB FISCAL YEAR April 1 - March 31 MEASURES AND EQUIVALENTS 1 millimeter (mm) u 0.0394 inches (in) 1 meter (a) a 3.2808 feet (ft) 1 kilometer (km) 0.6214 mile (mi) 1 square meter (m2) * 10.7639 square feet (sq ft) 1 square kilometer (km2) - 0.3861 square mile (uq mi) 1 hectare (ha)-0.01km2 2.47il acres (ac) or 10,000 sq m 1 liter (1) a 1.0567 quarts liquid or 0.2642 US gallon (gal) or 0.9081 Us quart dry (qt) I cubic meter (m3) 35.3147 cubic feet (cu ft) 1 liter per capita - 0.2642 US gallons per day per day (lcd) capita per day (gcpd) 1 cubic meter per second - 264.1721 US gallons per (aS/sec) second (gal/sec) PRINCIPAL AbPRhVIATIONS AND ACRONYMS AMEU Appraisal, Monitoring and Evaluation Unit of CMDA CHIP Calcutta-Howrah Investmont Program CIT Calcutta Improvement. Trust CZA Calcutta Metropolitan Area CMC Calcutta Municipal Corporation CMDA Calcutta Metropolitan Development Authority CMACP CMA-wide Complementary Programs CMWSA Calcutta Metropolitan Water and Sewerage Authority CUDP I First Calcutta Urban Development Project (Cr 427-IN) CUDP II Second Calcutta Urban Development Project (Cr 756-IN) EWS Economically Weaker Section GOWM Governmeat of West Bengal HIT Howrah Improvement Trust HMC Howrah Municipal Corporation HDFC Housing Development Finance Corporation HUDCO Housing and Urban Development Corporation LGUDD Local Government and Urban Development Department -GOWB MDP Municipal Development Program TRIP Transamunicipal Infrastructure Program FOR OFFICIL USE ONLY THE WORLD BANK Wasfgtn D.C. 20433 U.SA Office of Dtzctorz4eeral Operation* vwaluatio June 30, 1993 MEMORANDM TO MNE EXCUTIVE D,IRCTORS All TEE PRESIDT SUBJECT: Project Completion Report oa India Third Calcutta Urban DevelouMent Prolect (Credit 1369-IN) Attached is the "Project Completion Report on India - Third Calcutta Urban Develo.ent Project (Credit 1369-IN),In prepared by the Infrastructure Operations Division, Country Department 2, of the South Asia Rg4ional Office, with Part II contributed by the Borrower. This project was prepared as a follow-on to two previous urban development projects in Calcutta but with a stronger than before emphasis on institutional and financial reforms. The project proved too complex with an overly optimistic implementation schedule. Its components spread through four sub-programs, involving five major metropolitan organixations, 37 municipalities and a number of local level governments. - After a delay of three years, only about two thirds of the project's physical comporsnto were completed. Main reasons for the delay and less than full-scale completion are project design problems, land acquisit.io, and procurement complexities. Achievement of institutional and policy objectives were very limited. There were no improvtments in cost recovery. Overall, the project outcome is Tated as unsatiesfactory mostly on account of its failure to make progress in institutional and financial aspects, expected from a ropeater project. Its institutional achievements are rated as negligible, and the sustainability of its benefits as unlikely. The Project Completion Report is of good quality. It provides an interesting discussion on the complexity of the project and related implementation issues. The project may be audited. This document has a restricted distribution and may be used by recipients only fn the performance of thefr official duties. its contents my not otherwise be dfsclosed without old Sank authorization. FOR OMCAL USE ONLY PROJECT COMPLETION REPORT INDIA THIRD CALCUTTA URBAN DEVELOPMENT PROJECT (CREDIT 1369-IN) TABLE OF CONTENTS Paase No. Preface ........................................................... i Evaluation Summary ......... ...... .** ................ ii PART It PROJECT REVIEW FROM BAUK'S PERSPECTIVE .......... ,, 1 1. Project Identity ..... ...... ........ 1 2. sackground .................. 1 context ..........****Q************.........,......... 1 Previous IDA Assistance in the Sector ................ 2 Sector Policy Objectives ..** ................ .......... 2 3. Project Objectives and Description ............. -ooooo. 2 Primary Objectives ... *........o ..................... * * *. 2 Secondary Objectives ................................ 2 Project Description . ..................... .. ..... .. .. 3 4. Project Design and organization ......................... 3 5. Project Implementation ..* ............................... 4 Implementation .... ***.............. *.................. 4 Project Risks *....................................... 6 6. Project Results ........... ........................... ... 7 Physical Performance ...... ... *......... ......*.. 7 Health Program ..................... .......... . 8 Economic Rate of Return (ERR) Comparisons ............ 9 7. Project Sustainability ........ . . . . *....... . . . . . ......... 9 Project Restructuring, Credit Extensions, and Borrower Relations .......... .. . .. ........ .. ..... 10 8. Bank Performance .....**..*.. * ............................ 11 9. Borrower Performance .......... . .. 11 10. Project Relationship .................*.......*......... 12 11. Consulting Services ...... . .... ....... ......... .... . 12 12. Project Documentation and Data ......................... 12 This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. PRTf XU, U20a ItEVIEW PROH THE BORROWER'S PERSPECTIVE ... 13 1. Project Design ......

Основные сведения
Тип документа Project Completion Report
Дата принятия
Страна Индия
Источник Всемирный банк