Environmental O Assessment/Analysis % Reports Report E0040 China - Liaoning Environmental Pro ect EA Category B Environmental Assessment 8 of 12 September 1993 This report has been prepared by the Borrower or its Consultant 311.0luumq|A13 .bie t. /c 2lsl JUN o 9 1994 RZ-Ckzf., ENVIRONMX TAL. ASSMSSMNrT RE:CrT FIOR TANSSSSIOC: PIPEL:NE WORKS OF DISTRICT CIJTRRAI HEATING SYSTEw4 MN AARE:A, BE:N Beijing Environment Assessment Corporation Oct. 1992 Beijing The Beijina Environrmental Assessmrent,Corporation are responsible for preparation of this EA sul-report of Benx. proposed project (compiling an.d checking) . The key personnel in charge of this work are to be as following: Written By: llu Taiqin & Zhang Yongming Checked By: Li Zaigong Technical chief: Zhang Yongming Project Manager: Mu Taiqing General Manager: Wu Zhicheng The anticipates attended to this work and their qualification are listed as below: flame Professional position Specialty Li Zaigong director engineer Environmental senior engineer Assessment Zhang Yonm.ing senior engineer --Environmental Engineering Li Youliang senior engineer Environmental management vauJufEtutU puU isoII@JJ Laded ploAmJ COUITTrlT 1. Introduction --------------------------------- 1 2. Relative Policies, Standards and Management System1 ---l 3. Description of Proposed Project---------------------------2 3.1 General of the Proposed Project
Группа Всемирного банка · Environmental Assessment
China - Liaoning Environmental Project : environmental assessment (Vol. 8 of 12) : Report on EI : transmission pipeline works of district central heating system in Dongfen area, Benxi
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Environmental Assessment
Страна
Китай
Источник
Всемирный банк