Documen; of The World Bank FOR OFFICIAL USE ONLY Report No. 10754-HO STAFF APPRAISAL REPORT HONDURAS MORAZAN DAM EMERGENCY PROJECT JULY 10, 1992 Country Department II Infrastructure and Energy Operations Division Latin America and the Caribbean Regional Office This document has a restricted distribution and may be used bv recipients only in the performance of their ofricial duties. Its contents may not otherwise be disclosed without World Bank authorization. CURRENCY EQUIVALENTS (as of July 10, 1992) Currency Unit = Lempira US$1.0 = L5.55 L1.0 = US$0.18 SDR 1.0 = US$1.36 On June 18, 1992 the Central Bank introduced a freely floating exchange rate regime. FISCAL YEAR January 1 to December 31 MEASURES AND EQUIVALENTS kVA = Kilovolt Ampere kW = Kilowatt kWh = Kilowatt hour GlWh (Gigawatt hour) = 1,000,000 kWh kV (Kilovolt) = 1,000 Volts MW = 1,000 kW GLOSSARY OF ACRONYMS AND ABBREVIATIONS CNA National Energy Commission (Comisi6n Nacional de Energia) ENEE National Power Company (Empresa Nacional de Energia El6ctrica) ENP National Port Authority (Empresa Nacional Portuaria) ESAP Energy Sector Adjustment Program UOH Government of Honduras HONDUTEI. National Telecommunications Company (Empresa Hondurena de Telecomunicaciones) ICB International Competitive Bidding IDA International Development Association IDB Interamerican Development Bank LRMC Lcng Run Marginal Cost MORP Management and Operations Restructuring Program PCR Project Completion Report PLP Petroleum Liberalization Program PPAR Project Performance Audit Report PSD Panel for the Security of the Dam SANAA National Water Company (Servicio Aut6nomo de Acueductos y Alcantarillados) STENEE Workers Union of ENEE (Sindicato de Trabajadores de ENEE) FOR OFFICIAL USE ONLY HONDURAS MORAZAN DAM EMERGENCY PROJECT STAFF APPRAISAL REPORT Table of Contents CREDIT AND PROJECT SUMMARY .
Группа Всемирного банка · Staff Appraisal Report
Honduras - Morazan Dam Emergency Project
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Staff Appraisal Report
Страна
Гондурас
Источник
Всемирный банк