The Wo; FOR OFFMCL Rpt No. 9922 PROJECT COMPLETION REPORT TANZANIA FOURTH TECHNICAL ASSISTANCE PROJECT (CREDIT 1524-TA) OCTOBER 4, 1991 Agriculture Operations Division Southern Africa Department Africa Regional O'fice This document has a restricted distribution and ma! be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. CURRENCY ECUIVALEO4T Current Unit = Tanzania Shilling (Tsh) = US$ 1.00 = Tsh 17 (June 1984) = SDR 1.03967 US$ 1.00 = Tsh 120 (May 1989) SDR 1.26560 US$ 1.00 = Tsh 190 (January 1990) = SDR 1.31850 ABBREVIATIONS AND ACRONYMS BFU Budget and Finance Unit FAO Food and Agricultur- Organization of the United Nations FAO/CP Food and Agriculture Organization of the United Nations/World Bank Cooperative Program GOT : Government of Tanzania IDA International Development Association MDB : Marketing Development Bureau MOA : Ministry of Agriculture and Livestock Development PCR Project Completion Report PMU Project Monitoring Unit PPMB Project Preparation and Monitoring Bureau PPU Project Preparation Unit SP : Sectoral Planning TA : Technical Assistance TANAA Agricultural Adjustment Program TCMB Tanzania Cotton Marketing Board TA IV Fourth Technical Assistance Project TA III Third Technical Assistance Project TARO Tanzania Agricultural Research Organization UTF United Trust Fund URT : United Republic of Tanzania UNDP United Nations Development Programme WB : World Bank FISCAL YEAR OF BORROWER July 1 - June 30 FM OFTIAL US ONLY Tr* WORLD BANK WsJhingtiofl DC 20433 OUt. n of ctlW-C~& O,s.Muiin fvai*.ii4,E October 4. 1991 MEMORANDUM TO THE EXECUTIVE DIRECTORS AND THE PRESIDENT SUBJECT: Project Completion Report - Tanzania Fourth Technical Assistance Project (Credit 1524-TA Attached, for your information, is a copy of a report entitled 'Project Completion Report - Fourth Technical Assistance Project (Credit 1524-TA)", prepared by the Africa Regional Office with Part II of the report contributed by the Borrower. No audit of this project has been made by the Operations Evaluation Department at this time. Attachment - This document has rsstnctd distbution sisd wf v bc byr rIv 'OR OFFICIAL USE ONLY PROJECT COhPLETION REPORT TANZANIA FOURTH TECHNICAL ASSISTANCE PROJECT 'Credit 1524-TA) TABLE OF CONTENTS Paage PREFACE ..................... i EVALUATION SUMMARY ................... iii PART I: PROJECT REVIEW FROM BANK'S PERSPECTIVE.. 1 Project Identity. 1 Background .........2....... ..... ............................. 1 Project Objectives and Descriptior ................................ 2 Project Design and Organization .............................. 4 Project Implementation ............................................ 5 Project Results .............................. 6 Project Sustainability and Follow-up .............................. 9 Bank Performance .............................. 10 Borrower Performance .............................. 11 Project Relationship and Consulting Services .12 Project Documentation and Data .12 PART II: PROJECT REVIEW FROM BORROWER'S PERSPECTIVE .13 PART III: STATISTICAL INFORMATICN .14 Table 1: Related Bank Credits/Loans .14 Table 2: Project Time Table .16 Table 3: Estimated and Actual Disbursements per Year .17 Table 4: Actual and Estimated Project Costs .18 Table 5: Project Implementation and Results .19 Table 6: Status of Major Covenants .20 Table 7: Use of Staff Resources - Supervision Missions .21 ANNEX I Table la: Project Implementation and Results - PPMB .22 Table lb: Project Implementation and Results - MDB .23 Table lc: Project Implementation and Results - Crop Research . 24 Table ld: Project Implementation and Results - Sectoral Planning . .25 Table 2a: Project Cost PPMB ..26 Table 2b: Project Cost MDB ..27 Table 2c: Project Cost Crop Research. .28 Table 2d: Project Cost Sectoral Planning . . 29 MAP IBRD 22919 This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. PROJECT COMPLETION REPORT TANZANIA FOURTH TECHNICAL ASSISTANCE PROJECT (Credit 1524-TA) PREFACE This is the Project Completion Report (PCR) for the Fourth Technical Assistance Project in Tanzania, for which Credit 1524-TA in the amount of SDR 9.9 million was approved on October 9, 1984 and which became effective on April 19, 1985. The credit was closed on June 30, 1989, one year behind schedule. The credit was fully disbursed, and the last disbursement was on August 3, 1989. The PCR was jointly prepared by the Agricultural Operations Division of the Southern Africa Department and the FAO/World Bank Cooperative Programme (Preface, Evaluation Summary, Parts I and III), and the Borrower (Part II). Preparation of this PCR -as started during the Bank's final supervision mission of the project in January 1989, followed by a FAO/CP mission in January 1990, and is based, inter alia, on the Staff Apprais- al Report; the Loan, Guarantee, and Project Agreements; supervision reports; correspondence between the Bank and the Borrower; and internal Bank memoranda. - iii - PROJECT COMPLETIION REPORT TANZANIA FOURTH TECHNICAL ASSISTANCE PROJECT (Credit 1524-TA) EVALUATION SUMMARY Background 1. In the early 1980's, the Government and the Bank initiated an assessment of the disappointing perform.ance of Bank financed agricultur- al projects in Tanzania. Both the Government and the Bank relied heavily on studies carried out by the Project Preparation and Monitoring Bureau (PPMB) and the Marketing Development Bureau (MDB). It was then felt that both agencies, as wel' as the Sectoral Planning Unit, needed additional support to strengther their capacity to desig.x and implement development policies, and produce the objective factual studies neces- sary for further dialogue. 2. In response to this need, the Fourth Technical Assistance project (TA IV) was formulated and it was appraised in October 1983. The project was expected to cost US$ 11.9 million over a three year imple- mentation period. An IDA credit of SDR 9.9 million (US$ 10.0 million) was approved in October 1984 and became effective in April 1985. The project continued previous Bank suppuLL to the same agencies under the National Maize, and Grain Storage and Milling projects, and followed the Third Technical Assistance project, which provided support for other units in the Ministry of Agriculture (MOA). (The first two Technical Assistance projects supported the industrial sector). Objectives 3. TA IV was formulated with the specific objective of strengthening MOA's capacity to provide the analytical foundations to: (i) improve agricultural pricing, (ii) monitor project and parastatal performance in the agricultural sector, and (iii) improve agricultural research. It would assist GOT to design and implement its program to review and revise policies and institutional arrangements in the agricultural sector by extending financing for MDB (the major policy analysis body), PPMB (the financial monitoring institution) and the Sectoral Planning Unit, and to begin to coordinate the fragmented agricultural research system. 4. In order to achieve its objectives, the project would provide long- and short-term technical assistance, long- and short-term fellow- ship training, equipment, and operating expenses. During a Tri-partite Review meeting in May 1987, it was decided to continue under TA IV the financing of some components of a Sectoral Planning Assistance project, which had previously been financed under TA III. - iv - 5. The Government asked FAO to provide the projec. inputs under a Unilateral !rust Fund (UTF) financing arrangement. For this purpose four individual project documents, one for each component, were agreed upon between GOT and FAO. This followed similar, well known arrange- ments made under previous projects. Implementation Experience 6. The project did not suffer from the initial implementation difficulties that had been experienced by the TA III project, firstly because the project was a follow-up exercise using well-proven institu- tional arrangements, and secondly because the project concept was much simpler. Some delays were encountered, however, regarding the recruit- ment of some of the international consultants and the organization of the fellowships. Yet, these delays did not seriously affect project results. 7. The research component suffered from entirely different implemen- tation difficulties, emanating mainly from the organizational disarray in which agricultural research was at the time of the project (subse- quently addressed under a research rehabilitation project, currently under implementation). Results 8. With the exception of the research component, the project achieved its objectives of strengthening MOA's capacity to provide the analytical foundations to improve agricultural pricing policy and to monitor project and parastatal performance in the agricultural sector. Studies and documents produced by the supported agencies are of high quality and have proved most helpful in preparing new policy directions for Tanzania and the subsequent Agricultural Adjustment Program. Measuring the progress achieved is difficult, however, due to the very nature of the assistance provided, and to the poor definition of objectives and outputs in the project documents. 9. By agreeing to finance TA IV, the International Development Association contributed to the long-term strengthening of key institu- tions in the agricultural sector. This continuity in assistance has been one of the most important reasons for the success achieved by the Bank-assisted Technical Assistance program. 10. Although the research component failed to achieve its main objective of improving research-extension linkages, some tangible results can be reported in the preparation of crop research reviews and farming systems analysis. Sustainability 11. Most of the progress achieved may be considered sustainable as the project concentrated more on longer-term institution building goals rather than on immediate outputs from technical assistance. Long-term v sustainability will depend, however, on whether: (1) the staff that so far has been trained will continue to work in a policy advisory role; (2) GOT will maintain an environment conducive to carrying out such a role; and (3) GOT will ensure the provision of adequate operating expenses and facilities to the institutions involved. Past performance has been encouraging. Most staff trained during the 1980s, continue w3rkiai,7 in their institutions, or were transferred or pror,oted to other pol4cy decision positions in Government. 12. The liberalization of the economy in Tanzania currently under way has demanded shifts in the types of policy advice required by Govern- ment. This development necessitated supplementary technical assistance, which is being provided under the Agricultural Adjustment Program, currently under implementation (Credit 2116-TA). Findings and Lessons Learned 13. Although not all project components were successfully implemented, overall the project results were satisfactory. The following lessons may be learned from the implementation of TA IV: (a) True institution building and manpowez development requires long-term assistance and continuity in its implementation; (b) Government's commitment, especially regarding counterpart staffing, both in terms of overall levels and continuity, is essential to institution building; (c) Overseas fellowship G ;ree training requires, in most cases, to be followed up by a substantial period of practical on- the-job training; (d) Good working conditions and overseas training made it attractive for national staff to remain in the supported agencies, and (e) Technical assistance and institution building, by their nature, do not lend themselves easily to quantification of project objectives and outputs. Yet, an effort should be made in the appraisal of such projects to ensure the setting of clear and realistic objectives that are attainable within the proposed implementation period. PROJECT COMPLETION REPORT TANZANIA FOURTH TECHNICAL ASSISTANCE PROJECT (Credit 1524-TA) PART I: PROJECT REVIEW FROM BANK'S PERSPECTIVE 1. Proiect Identity Name Fourth Technical Assistance Project Credit Number 1524 - TA RVP Unit AF6AG Country : Tanzania Sector Agriculture 2. Background 2.1 In 1980, the World Bank Group (WB) virtually stopped project lending for agriculture, following the disappointing performance of WB financed projects in Tanzania. At the same time, the WB and the Government of Tanzania (GOT) initiated an assessment of the causes of the increasingly poor performance of the agricultural sector. During the early 1980s this reassessment culminated in the Bank's "Tanzania Agricultural Sector Report" and the Government's White Paper on "Agricultural Policy in Tanzania". 2.2 During the preparation of the above mentioned analyses and the subsequent intensive discussions, both the WB and GOT had relied heavily on studies carried out by two agencies within the Ministry of Agriculture (MOA), the Marketing Development Bureau (MDB); and the Project Preparation and Monitoring Bureau (PPMB). Both Bureaus had previously been supported by the Bank Group and had received technical assistance from FAO. 1/ This technical assistance support had had considerable success as could be assessed by the improvement, both in quantity and quality, of work undertaken by MDB and PPMB as well as by the adoption of a number of policy initiatives stimulated by studies conducted by both institutions. Therefore, it was felt that GOT needed 1/ This assistance had been organized through three FAO-executed projects: (i) UTF/URT/057 "Strengthening of MDB"; (ii) UTF/URT/061 "Strengthening of PPMB"; and (iii) UTF/URT/064 "Strengthening of Sectoral Planning". All three projects had been financed from Technical Assistance III (Cr. 1206 TA) funds. Before that, PPMB and MDB had been supported by FAO-executed technical assistance projects financed under the National Maize -Project (Cr. 606 TA) and Grain Storage and Milling Project (Cr. 1015 TA). - 2- continued support to sustain in depth economic and policy analytical work necessary to: (i) develop a realistic agricultural recovery strategy, and (ii) support the continued policy dialogue between the Bank and GOT, as this dialogue had led to substantial agreement between the Bank and GOT on the nature and the seriousness of the problems in the agricultural sector. The need for substantial external technical assistance in support of agricultural research in order not to lose essential research data while the sector was being reorganized, had alread- been identified in this context. 2.3 Subsequently, the Fourth Technical Assistance project (TA IV) 2/ was formulated. GOT prepared the MDB and PPMB components and, with assistance of the Bank, the research component. An appraisal missien visited Tanzania in October 1983 and a brief post-appraisal mission followed in February 1984. The project was expected to cost US$11.9 million over a three year implementation period. In support of this, en IDA credit of SDR 9.9 mi'lion (then equivalent to US$ 10.0 million) was approved in October 1984 (President's Report "o. F-3731-TA of August 16, 1984). TA IV became effective in April 1985. 3. Project Objectives and Description 3.1 Project Obiectives: TA IV was formulated with the specific objective of strengthening MOA's capacity to provide the analytical foundations (i) to improve agricultural pricing policy, (ii) to mcnitor project and parastatal performance in the agricultural sector, and (iii) to improve agricultural research. It would assist GOT to design and implement its program to review and r3vise policies and institutional arrangements in the agricultural sector by extending fina)icing for MDB (the major policy analysis body) and PPMB (the major financial monitoring institution), and to begin to coordinate the fragmented agricultural research system. 3.2 Project Description: Specific components of the project were: (i) Assistance to the MDB: (a) five advisors for long term consultancies of thirty staff months each, and short term consultancies totaling seven staff months; (b) ten staff years of overseas fellowship training; 2/ Of the previous three Bank-assisted TA projects, the first two had been implemented by the Tanzania Investment Bank and were not geared to the agricultural sector. The Third project (Cr. 1206- TA) was a line of credit to finance training and specific Technical Assistance for a whole range of institutions in the agricultural sector with the objective of eliminating specific bottlenecks arising from the shortage of specialized staff in the sector. See the PCR of TA III, dated December 2', 1989. -3- (c) vehicles and equipment; and (d) support staff and operating assistance. (ii) Assistance to the PPMB: (a) Eleven advisors for long term consultancies totalling 252 staff months, and short term consultaticies for a total of seven staff months; (b) nine staff years of overseas training and 50 staff months of local training; (c) vehicles and equipment; (d) support staff and operating assistance; and (e) special studies on: (1) the effectiveness of Technical Assistance and the use of skilled agricultural manpower, and (2) the design of a strategy for training and for infrastructure development at the Sokoine University of Agriculture. (iii) Assistance to the Department of Research: (a) Five long term advisors for 30 staff months each; (b) vehicles and equipment; and (c) support staff and operating assistance. (iv) Under the TA III project, assistance to the Sectoral Planning Unit, in the Planning Division, had been provided. During the TA IV Tri-partite Review meeting of May 1987, the Government, FAO and IDA decided to continue under TA IV for a short, fixed term the financing of a few long term consultants which had previously been financed tinder TA III. This second, much more limited, phase started in January 1988. 3/ 3.3 The technical assistance to be provided under TA IV was executed by FAO under Unilateral 'rust Fund (UTF) financing arrangements. For this purpose, the following four FAO/GOT project documents, one for each component, were agreed upon between GOT and FAO. 3/ The previous component had also been implemented by FAO as UTF/URT/064 and was the main component of the TA III project. The follow-up phase also included a small component financing accountancy assistance to the Tanzania Sisal Authority. -4- FAO Priect title FAO proiect code 1. Strengthening of Project Preparation UTF/URT/078 and Monitoring Unit (PPMB, phase III) 2. Agricultural crop research project UTF/URT/081 3. Strengthening of Marketing Service UTF/URT/083 (MDB, phase V) 4. Strengthening of the Sectoral Planning UTF/UKT/095 in MOA (SP, phase II) 4. Project Design and Organization 4.1 The project objectives and procedures were clearly understood by all parties. This was mainly due to the fact that the PPMB, MDB and SP components were follow-up activities to ongoing ones, for which the institutional arrangements, as well as local and some international staff, were already in place. These institutions had furthermore been responsible for the design of the individual components. The same was true for the implementing agency, FAO, for whom the various components were part of their ongoing Technical Assistance program in the sector, and for the Bank, which had already funded similar activities under previous projects. 4.2 Perhaps as a result of this familiarity, little attempt was made to explicitly and comprehensively list the project's objectives nor to quantify the expected outputs. This is well illustrated by the statement of objectives of the FAO project documient on SP in which the objectives are vaguely formulated as: "to continue and strengthen the delivery of technical assistance to MOA in the field of agricultural and livestock sector planning". This statement obviously did not provide adequate guidance to MOA and project staff about the project's objectives or likely project activities, nor does it allow for an ex- post evaluation of the component's performance. 4.3 The origin and justificaticn of the crop research component remain unclear. Apparently, the institutional fragmentation of agricultural research 4/ did not allow for a clear identification of its main constraints. Furthermore, the project had been prepared within MOA but it was to be implemented by the Tanzania Agricultural Research 4/ At the time, agricultural research was organized in at least 4 parastatals besides MOA. These were merged into a single MOA Department under the National Agricultural and Livestock Research Rehabilitation Project, currently under implementation (Cr. 1970- TA). Organization (TARO), which had hardly been involved in its preparation. Consequently, the objectives of the project remained poorly defined ("to strengthen linkages between research and extension") and were not considered adequate by those responsible for its implementation. As a result, the foreseen technical assistance proved to be insufficient to overcome the institutional constraints. 5. Project Implementation 5.1 The project did not suffer from the same initial implementation difficulties that had been experienced by the previous Technical Assistance III project. Firstly, because the project was similar to the previous technical assistance operations, using established and well- proven institutional arrangements. Secondly, because the project concept was simpler, concentrating technical assistance efforts on only t'%ree agencies. all based in Dar es Salaam and under the same MOA Department. 5.2 Some delays in implementation were encountered, however, with regard to the recruitment of international consultants and to the organization of fellowships. FAO found it difficult at times to identify suitably qualified professionals. In some instances, these delays were quite substantial. In other instances, delays went parallel to slower-than-expected recruitment of counterpart staff, so that these delays were actually beneficial to project implementation as they allowed Technical Assistance staff to be available when the newly trained staff returned from their fellowship training and required on- the-job training. Delays in recruitment of technical assistance staff was more serious in those cases where they had to be involved in filling expertise gaps such as in the Budget and Finance Unit of PPMB. In those cases recruitment delays resulted in under-performance of the institution during the waiting period. 5.3 The research component suffered from entirely different implementation difficulties, emanating mainly from the organizational disarray in which agricultural research found itself at the time of the start of the project. It soon became apparent that there was little research that could not already be made available in an acceptable form to the extension service, but that due to the organizational constraints these were not fully utilized. As a result, the main objective of this component was reformulated and the notion of a comprehensive program of on-farm field trials/demonstration using hitherto "unused' research was abandoned. The project objectives statements were not changed; instead, revised Terms of Reference were prepared in June 1987. 5.4 It had already been agreed during TA III to construct office space for the Planning Division of MOA (i.e. PPMB, MDB, and SP) *o overcome the poor working conditions faced by the agencies and to allow them to benefit from common facilities such as data bases and communication facilities. Funds totalling around US$ 1 million were available from UNDP sources. Although all parties agreed at the Tri-partite Review meeting in 1987 to proceed with the construction of th0 new facilities, no further actioni was ever taken by the Government. -6- 6. Proiect Results 6.1 General. With exception of the research component, the project achieved its objectives of strengthening MOA's capacity to provide the analytical foundations to improve agricultural pricing policy and to monitor project and parastatal performance in the agricultural sector. Measuring the progress achieved is rendered difficult, however, because of the rather vague description of project objectives and output in the Presi.dent's Report (Para 4.2). 6.2 When evaluating project impact, TA IV should not be considered in isolation, but as part of the ongoing WB/FAO support program to the institutions involved. Apart from the essential recuisite of a generally positive policy and institutional environment, basically three factors can be identified as having had a major impact on achieving the overall loncer-term objectives of increasing the institutions' capacity to carry out their respective mandates: (1) the duration of the total assistance program; (2) the level of counterpart staffing; and (3) national staff working conditions. 6.3 Regarding the first point, there is a clear association between the duration of technical assistance program and the progress achieved in each of the institutions concerned. For example, MDB was established in the early 1970s and has received continuous assistance since then. Therefore, MDB had the opportunity to attract a full contingent of staff and send them on advanced fellowship training followed by up to five years on-the-job training and supervision by technical assistance staff. The result is that most tasks are presently carried out under the full responsibility of local staff 5/. The Sectoral Planning unit, in contrast, had not received assistance under the previous projects and thus was, in this respect, only in the initial phase, with few staff having received adequate overseas training. 6.4 Secondly, there also is a clear association between the level of deployment of national (counterpart) staff and progress achieved. Those inst.ftutions where GOT had difficulties in employing capable staff and retaining them have made least progress. Thirdly, the general working conditions of government staff, as reflected in salary levels, office accommodation and career development prospects, deteriorated substantially during the 1980s. These developments rendered the employment and retention of staff difficult, especially in those areas where there is competition from the private sector, such as accountants, economists and project analysts. The better working conditions for national staff in the agencies supported by externally funded projects (transport, office supplies, etc.), in addition to the overseas fellowship program, made staying in the MDB, PPMB and SP attractive to staff and contributed to the generally positive performance of counterpart staff and the low level of staff rotation. This, in turn, 5/ The number of expatriate staff has been reduced from 7 in 1984 to 2 in 1989. -7- allowed a longer training of staff and more sustainable institution building. 6.5 Results per Institution. During the fifth phase of its Technical Assistance support, MDB continued to play an important role in supporting MOA by providing agricultural policy and pricing analyses. The Price Review Unit undertook price analyses on a regular basis with minimal technical assistance input. The Market Information Unit carried out a series of costs of production surveys based on farming systems and undertook training programs for national staff, including regional workshops on agricultural marketing. The quality of the market information has recently been improved by the introduction of a radio market information service with weekly nationwide broadcastings. The Operational Efficiency Unit has had a major input into the Government Task Force examining improvements to export marketing efficiency. The Livestock Section has carried out regular and ad hoc price reviews (monthly and weekly livestock market information) and sector reviews. MDB has also been involved in the major policy reforms implemented recently in the agricultural sector. Its participation was particularly active in the preparation of the 1987 Agricultural Sector Review prepared by FAO and the Bank, and of the WB-supported Economic Recovery Program and Agricultural Adjustment Program. MDB staff is presently participating in a task force on Food Distribution Systems which should form the basis for new policy initiatives. 6.6 The third phase of its technical assistance support enabled PPMB to continue to increase its capacity to carry out its mandate. Both in terms of output and quality, noticeable progress was made by the Project Preparation Unit (PPU) and the Project Monitoring Unit (PMU). In the Budget and Finance Unit (BFU), the most recently created unit, less progress was made, mainly due to slow recruitment of local staff. During the project implementation period, PPU prepared 44 project feasibility studies and reviewed 201 projects prepared by other institu- tions. 6/ PPMB cooperated with other institutions, such as MDB and SP, in the preparation of 10 agricultural development programs. 7/ The quality of the project preparation and review activities has improved, while the number of international staff participating in these activi- ties decreased. 6/ Major projects prepared include the 'Coconut Coir project; Cassava Meal Bug Control project; Southern Highlands Smallholder Wheat project, twe livestock projects; and the Smallholder Fire-cured Tobacco Projection Project. PPU staff participated in the prepa- ration of the IDA-financed Agricultural Extension Rehabilitation project, Cashewnut Improvement project and Coconut Development project (The latter two are presently being financed as the Tree Crops Development project). 7/ Amongst others: the Coffee Expansion Program; Sisal Industry Development program, and the Cotton Development Program. PPMB staff also participated in the preparation of the Livestock Development Program. -8- 6.7 The progress achieved is even more impressive in the PMU. The unit presently has a full contingent of trained and experienced staff capable to carry out its mandate with minimal technical assistance. The Unit's work centers on fiscal and financial monitoring of development projects in the government budget (123 in 1989/90 with a total budget of TSh 20,822 million of which 92Z externally financed). In addition, the Unit has carried out a number of special assignments and policy reviews in which technical assistance support has been more pronounced. 6.8 Parastatal monitoring activities carried out by BFU have centered on analyzing financial returns of parastatal companies. These monitor- ing activities have greatly assisted GOT and the parastatals involved in improving their management and reducing their cost. The quality of accounting in most parastatals has improved during the period under review 8/. The Unit has also been responsible for preparing a number of important policy papers and in-depth reviews of certain industries. Most of the work was, however, carried out by technical assistance staff; due to the slow recruitment of local staff only limited progress could be made towards institution building. 6.9 The two studies were undertaken by independent locally recruited consultants under overall PPMB management - the Tanzania High Level Agricultural Manpower Study and the Study of the Sokoine Infrastructural Requirements. 9/ Both studies were undertaken with considerable delays and were still under review at the time of PCR preparation. Their quality seems appropriate, but the impact of the studies was still unclear. PPMB carried this work without expatriate technical assistance personnel. 6.10 Support to SP under the TA IV project did not benefit from the longer-running support to MDB and PPMB. The second phase of technical assistance support for SP, financed under TA IV, started only in January 1988 and was mainly limited to continuing the overseas training program 8/ Also assisted by specific accountancy assistance provided to parastatals under a number of Bank-assisted projects. 9/ The Agricultural Manpower Study assessed the historical supply and deployment of graduates employed in the agricultural sector and the utilization of technical assistance personnel since 1961. The study reviewed the manpower requirements up to the year 2000 and identified a continued shortage of graduate manpower in the sector due to limited capacity of the Agricultural University. A contin- ued use of technical assistance personnel would therefore be required. A program of in-service training was also identified. The Sokoine University Infrastructural Requirements Study recom- mends to expand the capacity of the agricultural university to fulfill the needs of the sector and proposes an investment program to undertake the expanded program. Expatriate consultants helped the local consultants in the Sokoine Study (See part II). For abstracts of the two studies see draft Terminal Report of UTF/ URT/078, Rome 1989. and some technical assistance in the field of livestock economics. 10/ Since April 1989, only a livestock economist was employed as a long-term technical assistance staff. This econo.nist was responsible for the main output of the second phase of the project: the preparation of a medium-term Livestock Development Program. However, the essential task of providing on-the job-training for SP staff returning from overseas fellowship training could not adequately be carried out by a single technical assistance staff. Yet, as a result of the overseas training program, distinctive progress was made towards the strength- ening of the SP during the two consecutive phases of the project. 6.11 Although the agricultural research component failed to achieve its main objective (i.e. improvement of research-extension linkages), some tangible results can be observed in specific topics. Several research reviews (tobacco, coffee, maize, sorghum/millet, grain legumes) were prepared and farming system analysis undertaken. These activities contributed to the collection of data and information that had previous- ly been scattered among various institutions. Unfortunately, few practical recommendations to farmers resulted from this work, mainly because of the lack of communication between the various institutions. One major output of the research component was the contribution of one zonal agronomist to the improvement of the vegetative propagation of cashew, which was the subject of a pilot phase under the IDA-assisted cashew rehabilitation project. This work should play an important role in establishing a network of cashew propagation centers under the next phase of the project, presently under implementation. 7. Proiect Sustainability and Follow-up 7.1 A lot of the progress achieved may be considered sustainable. The project correctly concentrated more on long-term institution building than on immediate outputs. Long-term sustainability will however depend on whether (1) the staff that so far has been trained will continue to work in a policy advisory capacity; (2) GOT will maintain an environment conducive to carrying out such a role; and (3) GOT will ensure the provision of adequate operating expenses and facilities to the institu- tions involved. Regarding the first aspect, past performance has been encouraging. Most staff trained during the 1980s were retained by their institutions, and the majority of those not retained by them were transferred or promoted to policy-making positions in Government and parastatal companies. Regarding the policy environment, in recent years there has been a marked improvement over the already positive trend that could be detected from the early 1980s onwards. Given budget limita- tions, however, the provision of adequate facilities and operating expenses will continue to remain a constraint if further external assistance is not secured. 10/ In addition, short-term technical assistance was foreseen for TCMB's cotton solvent extraction plant and agricultural statis- tics. - 10 - 7.2 Specific follow-up requirements differ per institution, depending mostly on the length of time they have benefitted from external support. MDB has had the longest assistance and follow-up would therefore be limited; yet, future assistance will depend to a large extent on the institutional changes and political reforms to be introduced by the Goverrment and the new responsibilities those would entail for MDB. I the longer term, policy decisions leading to market deregulation should reduce MDB's central role in formulating agricultural price levels for Government and change its mandate to assisting MOA in defining new policy in relation to food marketing, export marketing and market information under these new conditions. 7.3 PPMB follow-up requirement will be different for each Unit. Most staff of the Monitoring Unit have been fully trained, and would at most require additional on-the-job assistance. Due to late and more unbal- anced staff allocation, the Project Preparation Unit would require more technical assistance and some fellowship training. It may be expected that this assistance will be largely phased out over a two to three year period. Due to the difficulties in recruiting staff with satisfactory professional background, a full-scale staff training program is still required to continue to carry out the Budget and Finance Unit's mandate and to follow-up on-the-job training. The Sectoral Planning unit will continue to need technical assistance as well as formal and on-the-job training program for a period of at least five years. Agricultural Research is presently being supported by two World Bank projects 11/. 8. Bank Performance 8.1 By agreeing to finance TA IV, the Bank contributed to the long- term strengthening of key institutions in the agricultural sector. The responsibility for providing continuity in the technical assistance and fellowship assistance, essential for a long-term institution building, was fully assumed by the Bank. To cater for additional responsibilities vested by the Government on the MDB, PPMB and SP under the Economic and Social Action program, and to help all three units to consolidate their development, further assistance is being provided under the Agricultural Adjustment Program, currently under implementation. This long-term continuity in assistance has been one of the most important reasons for the quite significant results that have been achieved by the Bank- assisted Technical Assistance program. 8.2 Generally speaking, the WB has been adequately flexible in supporting the implementation of the project. For example, during implementation of TA III it had already been agreed to allow FAO accounting and purchasing procedures to be used for the project instead of the standard Bank procedures, a decision reiterated under TA IV. Another example is the changes in the terms of reference's for the research component once it became obvious that the institutional 11/ The National Agricultural and Livestock Research Rehabilitation Project, and the Tree Crops Development Project (Credits 1970-TA and 2050-TA, respectively). constraints would not allow the original project objectives to be attained; further assistance was organized under a separate project. The flexible attitude regarding requests for extension on the Bank's side, and regarding project implementation on FAO's side, ensured good coordination between the various agencies. 8.3 Eight supervision missions were undertaken during the project implementation period. Most of the missions were carried out by a single bank staff and were usually combined with other duties. As the project was generally considered to be relatively problem free and under the direct management of FAO, supervision missions were not as frequent as otherwise would have been the case. This did not negatively affect project implementation (See also para 10.3). 8.4 The following lessons may be learned from the implementation of TA IV: (a) Institution building and manpower development requires long- term assistance and continuity in its implementation; (b) Government's commitment especially regarding counterpart staffing, both in terms of overall levels and continuity, is essential to institution building; (c) Overseas fellowship degree training requires, in most cases, to be followed up by a period of practical on-the-job train- ing; (d) Good working conditions and overseas training made attrac- tive for national staff to remain in the supported agencies; and (e) Technical assistance and institution building, by their nature, do not lead themselves easily to quantification of project objectives and outputs. Yet, an effort should be made in the appraisal of such projects to ensure the setting of clear and realistic objectives that are attainable within the proposed implementation period. 9. Borrower Performance 9.1 The project was implemented during a period of serious economic difficulties and a general searching for new economic policy directions. This placed great demands on the analytical skills of the institutions assisted by the project. The results achieved in terms of providing government with background studies and other policy support has there- fore been all the more impressive. GOT solicited the preparation of this information and background studiec, and clearly used them in the formulation of agricultural policy. 9.2 GOT has significantly contributed to the functioning of the institutions by providing staff, office space and operational expenses. The difficulties encountered in attracting qualified staff in PPMB have - 12 - been attributable more to a general deterioration of working conditions in government service and general lack of qualified staff in the required disciplines than on a lack of GOT commitment to the project. On the other hand, GOT will have to assume a larget share of operational and replacement costs in view of the diminishing external support to the agencies. 9.3 Office space for all three supported agencies is barely adequate and of generally poor quality. The Government, however, did not follow- up on the construction of office facilities for them even though funding was available. 10. Project Relationship and Consulting Services 10.1 TA IV stood in the middle of the continuing dialogue of the WB and GOT on agricultural policy. This sometimes led to stress in Bank-GOT relations. The basic commitment of the Bank to longer-term institution building in the agricultural sector, however, remains strong. Further, the frequent contacts between GOT staff employed in the three agencies and Bank staff proved beneficial, not only to the implementation of TA IV but for the Bank program as a whole. 10.2 FAO-GOT relationship was particularly good in implementing the PPMB, MDB and SP components, mostly due to the involvement of FAO staff in previous phases of the various components. FAO technical backstopp- ing was particularly effective with regard to the MDB and the Project Preparation and Monitoring units of PPMB. Technical backstopping was less effective for the BFU of PPMB, mostly due to their highly technical accounting role. 10.3 The project design envisaged frequent dialogue on project imple- mentation in the form of annual tri-partite reviews. Such reviews were organized up to 1987, but smooth project implementation thereafter made additional reviews unnecessary. 11. Project Documentation & Data 11.1 The Development Credit Agreement and the President's Report were straightforward and focussed on the right issues, even though they did not clearly identify project goals. FAO project documents were more detailed but also often lacked clearly focussed project objectives. Dartly due to this shortcoming in the basic project documents, supervi- sion reports rarely attempted to assess project results in those terms. At the time of PCR preparation only one agency (PPMB) had prepared a Terminal Report; MDB and SP were expected to do so later on. - 13 - PART II: PROJECT REVIEW FROM BORROWER'S PERSPECTIVE a. General The Government (except where it is indicated below) is in general agreement with the views expressed by the World Bank in Part I. B. Project Formulation As pointed out by world Bank, with the exception of the research component, the project was clearly understood by all parties as PPMB, MDB and SP components were a continuation of activities for which the institutional arrangements and staff were already in place and these institutions were responsible for the project design. The institutional building objectives are well known. The FAO/GOT Plan of Operation clearly maps out the level of inputs (personnel, equipment, consumables, training and administrative support) and outputs in terms of staff to be trained, projects/plans/programmes to be followed up/formulated etc. The Plan of Operations is continuously reviewed and revised according to prevailing conditions and six monthly reports are issued to gauge progress of project components. C. Snecial Studios by PPM1 While the Tanzania High-Level Agricultural Man-Power Study was done using only local consultants, the Study of the Sokoine Infrastructural Requirements was completed using both local and expatriate consultants (Refer to para 6.9 of Part I) D. Borrowers Performance Refer to para 9.2 Government has encountered problems in recruiting professional Accountants for PPMB, and not as generally depicted (in the para) that this was a general problem for all categories of staff. B. Part XX! - Statistical Information Table 4 : Reworked - attached Table 5 Reworked - attached Annex 1 Table 1(a) - attached Table l(b) - attached Table 2(b) - attached - 14 - PART III. STATISTICAL INFORMATION Table 1: Related Bank Credits/Loans loan/Cdlt Pulose Date o Status&amments Effmt, First Technical The project, which was 14-9-76 At Credit closing (31-12- Assistance implemented by TIB 1982; 30 months delay) project' financed training for USS 5.2 million was (Cr. 601 - TA) 389 management staff disbursed. In general the as well as for 33 project succeeded in studies. (US$ 6.0 attaining its primary Million) objective of preparing a pipeline of investment projects in the prod. sectors. Second Largely a follow-up to 10-2-81 At Credit closing (30--88; Technical the first project also 36 months delay) SDR 6.7 Assistance financed studies and million was disbursed. Project'. training and was Although slow to start a (Cr. 1060 - TA) implemented by TIB. total of 39 sub-projects The project focussed on were financed of which 19 industrial and had led to projects at the manufacturing sectors. time of PCR preparation (SDR 8.4 M.) (1989) Third Technical The objective was to 14-82 At Credit closing (30-688; Assistance eliminate bottlenecks 12 months delay) the entire Project3. arising from shortage of Credit had been disbursed. (Cr. 1206 - TA) specialized staff in 38 long-term advisors and - 15 - existing institutions and short-term consultancies for thereby assisting in the 20 GOT in 19 different rehabilitation of the locations had been agricultural sector. provided, as well as training (SDR 10.2 M.) (of which 111 fellowships abroad) and workshops. National 2-8-89 Agricultural and Implement the first Lvestock stage of a long-term Research program to strengthen Rehabilitation Tanzanian research. Project (US$ 8.3 M.) (Cr 1970-TA) Cashew and Jan.1990 coconut tree To achieve long term crop project growth by increasing (Cr 2050-TA) the national production of cashewnuts for export and the production of coconuts for the domestic vegetable oil rrrket (USS 25.1 M.) Sec P2oje Completion Report N- 6732, dated 8 April 1987. 2 See daft Prlet Completio Report, dated 29 August 1989. 3 hjea SWbet ha_ peenf *eM da 31. MSay M9. -16- Table 2 Project Time Table Item Planned date' Revied date Actul date Initiating Project Brief 12 July 1983 Government Request for appraisal 12 October 1983 Apprsl2 October 1983 Issues Paper 14 Dec. 1983 Post-appraisal February 1984 Decision Memorandum 27 March 1984 Credit negotiations 3-6 August 1984 Board approval 9 October 1984 Credit signature 5 February 1985 Credit effectiveness 19 April 1985 Project Completion 12 Dec. 1987 30 June 19903 Credit closing 30 June 1988 30 June 1989' 30 June 1989 As pea Apprasa es2imatem 2 orpprmed with PAO anisance, the MDB and PPMB compontw and, with Bank sianaw, the mearcd opoeent. No formal appaisal rpofp ws prepard for the proect. 3 -ted wimpeto date of PAO proctus. As per tekx dated 24 May 1M from Diaor AF6. 17 7 Table 3 Estimated and actual disbursements per year $4/85 wm W A. Estima,t d at appraisal (M SDR) - Annual 1.9 4.0 3.3 0.8 0.0 0.0 - Cumulative 1.9 5.9 9.2 9.9 9.9 9.9 B. Actual (M SDR) - Annual 0.0 2.7 4.0 1.7 1.5 0.1 - Cumulative 0.0 2.7 6.7 8.4 9.9 9.9 C. Actual, cum, as % of Est, 0 46 74 85 100 100 Note: Tot" may not add up due to rounding 1e wuftr 0 WoM Dan Group Thsal y&r (July-June). - 18 - Table 4: Actual and Estimated Pro;ject Costs ('000 U.S.$) PFov. Est. Est. Calendar year 1985 86 87 88 89 90 TOTAL A. A1ppraisal Estimate' 1. PPMB 1578.5 2152.7 2117.6 0.0 0.0 0.0 5848.8 2. MDB 737.2 1559.0 1673.0 0.0 0.0 0.0 3969.2 3. Crop Research 279.5 755.1 840.7 197.2 0.0 0.0 2072.5 TOTAL 2595.2 4466.8 4631.3 197.2 0.0 0.0 11890.5 B. Atual2 1. PPMIB (078) 806.7 1405.5 1275.1 1400.0 1587.6 750.9 7225.9 2. MDB (083) - 866.8 828.5 732.9 617.9 388.9 3435.0 3. Research (081) - 187.1 500.2 518.9 221.8 92.1 1520.1 4. Sectoral Planning (095) - - - 622.8 593.2 319.0 1535.0 TOTAL3 806.7 2459.4 2603.8 3274.6 3020.5 1550.9 13715.9 A. al as Ys of appraisal estimates 105.3 Noac: Th mn ot add Wm dwe tg w_ndi TotaL estimate, incLuding GOT contribution. Source: President's report. Including price but not physicaL contingencies. 2IDA contribution only, as no data available on GOT contribution. Source: FAO, latest Budget Revisions at the time of PCR. See aLso TabLe 2 of Annex 1. 3Including accrued interest. Disbursements were made in advance to FAO, which then financed proeict-related expenditures as they came due. 19 - Table S Project Implementation and Results1 Actual as Unit/Indicator Appraisal Actual % of Estimate 2 Estimate Appraisal Timing: Starting date n/a 15.4.1985 Completion date 31.12.1987 30.6.1990 Stafflng: Local:3 PPMB 27 24 89 MDB 20 15 75 Research n/a n/a n/a SP n/a n/a n/a International: PPMB (staff) 14 15 107 MDB (mm) 150 249 166 Research (mm) 150 155 103 SP (mm) n/a 68 n/a Overseas Fellowships (Long-term m/y) PPMB 9 30 333 MDB 10 10 100 Research n/a n/a n/a SP n/a 9 n/a Other Major Outputs: . See Tables la to ld of Annex 1 1Souuee: Tabls Ia to id of Anac 1. 2As per Peideots RAport. SP wuponent we induded only later so that no sa"mish estimte is ilvea. Post Gled. Tablp 6 Status of Major Covenants Covenant Description Deadline Status for compliance D.C.A. section GOT should submit to 10/01/85 Completed, 3.05 IDA the results of the August 1988 study on the effectiveness of T.A. and the use of skilled agricultural manpower D.C.A. section GOT shall (i) 04/01/85 Completed 3.06 commence a study to design a strategy for training and infrastructure development at the Sokoine University (ii) Submit the study 11/01/85 Completed results to the Association D.C.A. section GOT would ensure -Mutual 4.01 that the project agreement was accounts are audited reached between by independent World Bank, auditors not later than GOT, and FAO six month after the that FAO end of each fiscal year standard accounting procedures would be used although this does not conform to the GOT fiscal year _ 21 - Table 7: Use of Staff Resources A. Suevso ison* No. Month/ Number of Days SpecaL Putomance' Year Persons In fleld epresente 1. 01/85_ 1 7 (.) 2 Z. 08/85' 1 7 (c) 2 3. 11/85' 1 9 (c) 2 4. 04/86' 1 4 (a) 2 5. 12/86' 1 10 (a) I 6. 05/87' 1 3 (b) 1 7. 04/884 1 n/a (d) n/a 8. 11/88, 1 15 (d) I 9. 01/896 2 14 (a)(c) 1 B. Staff Inputs 1984 1986 1988 1987 1988 1989 1990 Total Pr.appraival 2.2 2.2 Appraisal 19.4 19.4 Negotiation 2.9 2.3 6.2 Supervision 2.6 6.1 15.1 7.9 8.7 9.9 50.3 Other 4.9 2.2 .0 7.2 Total 29.4 7.2 6.1 16.1 7.9 8.7 9.9 84.8 . 1 *& n E (b) APmirJ CAM 1 (e) A5 (d) A& A _1 sw TAm A TA IV 4 C P- _ - 22 - Annex I Page 1 of 8 Table la . Project Implementation and Results - PPMB Indicator Appraisal Actual Actual as Estimate (FAO) % of App. Est. 1. Prgect lEMJing Starting Date 1.3.1985 1.3.1985 NTE Date 31.12.1987 30.6.1990 2. Staffing National: Posts established 27 (?) 40 148 Posts filled 27 24 89 International(staff) 11+31 12+32 107 Abroad: L-ong-term (m/y)3 9 30 333 short-term (no)4 n/a 18 n/a local: (staff) n/a 5 n/a 4. Other Major Outputs Projects prepared n/a 30 n/a Programmes prep. n/a 8 n/a Monitoring: Dev. projects n/a 90 n/a Parastatals n/a 150 n/a Workshops: n Planning econ. n/a &0 partic. n/a Issues in project planning 6 n/a 7 workshops n/a I Including thmeT UN voluntects. 2 Ten was the bighs staff level (31 Dcewmber 1987). Pcsntly there ae 7 inteational saff of which 2 UNV's. 3 22 national staff benefitted from long-term degree taining of wbich 3 did not return to PPMB but found employment elewher in GOT. 4 Fellowhp of ks than 6 months. S Hed at IDM at Morogoro for planning enomiss from MALW paratls and departmentL Dumtion of worshop 3 moths. 6 Mhs wobrksps, which were limited to 30 paicipants, were basically a folow-up to the above _m ed coW us in project planning and managmn:t. - 23 Annex I Page 2 of 8 Table lb : Project Implementation and Results - MDB Indicator Appraisal PCR estimates' Actual as Estimate2 % of App. Est. 1. Project 7ming Starting Date 05/02/83 01/01/86 NTE Date 30/06/883 20/06/90 2. StaMlng Local Staff Posts Established 204 n/a n/a Posts filled 20 15 75 Interational Long term (m/m) 15(~ 249 166 3. FellowshiRs (m/y) 10 10 100 4. Other MaQr Oututs6 . Annual price reviews (a) . Market research (a) . Market information (a) . Farm management/production economics (a) N National professionals training (b) (a) otojct achieved a/or wrious docment ai, aabl thn tcpiom (b) Semin06 oU aricultru martinsg hw ben organzed tfa naton gaff. 1 Sor:c FAO, udget Rvsui 4 an progSm rport 2 Sourc: Praiat Repot and DCA dated S Februay 16M. Crdit doming date. Al the beginning of the project 8 xaJ aff were bsed in Dar Es Salaam ad 6 we oa feiowshp training Ibhe i Pfeddent's fcportnoted that 6 additional national staff s d be mruited during the pres life. 5Fne adhsev for log t eanmsu a ca thirty mOnths 4 No quaniflation ot thae objeive in the Print's Repon - 24 - Anex I Page 3 of 8 Table lc Project Implementation and Results - Crop Research Indicator Appraisal PCR Estimates' Actual as Estimate2 (FAO) % of App. Est. 1. PJoLc TminS Starting Date 05/02/83 27/11/85 NTE Date 30/06/883 30/06/90 2. Staffmn Local Staff Posts Established n/a n/a Posts filled n/a n/a International Long term 150 1.55 103 Short term 0 3 3, Fellowships 0 0 4. Other Major Outmuts4 . Review of zonal research (a) . Recommendations for extension services (c) . Technical guidance for research oriented problems (b) (a) Completed (b) PartiaLUy cmpleted (C) Not completed Source FAO, budget revision D and progress epons. 2 Sourve President Repon and DCA dated S Febrary 1985. 3 Cedit closing date. No quantifmtion do these objecti in the Psidaent's Report. - 25 - 2 n51 Page 4 of 8 Table ld : Project Implementation and Results - Sectoral Planning Indicator Appraisal Actual Actual as Estimate 1 (FAO) % of App. Est. 1. ect MMg Starting Date 1.1.1988 NTE Date 30.6.1990 2. StaMn International (mm) 68 n/a 3. Fellowships Long-term 2 13 n/a short-term 3 9 n/a 4. Other Major- OutDts Medium-term Livestock Development Plan n/a Consultancy to TCMB's Cotton seed solvent extraction plant S n/a 1his omponent was not included in the original project design. 2 Dusutioo between 8 and 12 months. 3Durtion aound 3 months. - 26 - Annex I Page 5 of 8 Table 2a . Project Cost PPMB ('000 US$) 85 86 87 88 89 90 TOTAL prov. es. es. A. Appraisal Estgmates Base Cost 1578.5 1976.5 1777.9 5332.9 Price Cont. 176.2339.7 515.9 TOTAL 1578.5 2152.72117.6 5848.8 B. BudgetLFAQ1 UTF/URT/078JURT Original BudfWet1 2032.4 1734.9 742.7 4510.0 Budg. Rev. I 1613.4 1958.7 937.9 4510.0 Budg. Rev. I14 806.7 2152.1 1551.3 4510.0 Budg. Rev. Es 806.7 1405.5 2580.1 4760.3 Budg. Rev. IV' 806.7 1405.5 2354.9 1078.0 58383 Budg. Rev. V7 806.7 1405.5 1275.1 1790.1 560.3 5838.3 Budg. Rev. V18 806.7 1405.5 1275.1 1764.9 1225.1 6477.3 Budg. Rev. VII9 806.7 1405.5 1275.1 1400.0 1587.6 750.9 7225.9 For latUS budpt rcvision expenditus up 1988 are actual; 1989 prvsona at the time of preparing the PCRM and ceiated for the fist six month of 1990. Source: FAO/Got Proec Aeem ent signed on 20/05/8S for a projet duration of 30 months (up to 30 june 1987). Revuso 1 wa siped by Got on 22/01/86. Te purpew of this tvio ws to -phase prec activities witdin the approved budgt aiLoation 4 Revis.io II s sgsed on 13J08//L Revision DM prvided an inae of the crent budgept al tios by US$ 250.234. It ma sped o 12 May 1987. RevWo IV proWded for an etunsion of the projec up to december 1988 d an aodditinal mount of USS L078,020. Ic was signd an November 1987. 7 ReVioa V pided for an bin of the budget by USS 184,00 and an exten ot the pioect by six aoth up to deamber 19G& I wa iaped by april 196L 8 Rvini VI proWed for an extensin of the projec fom july to december 1989 with an brea ailoaio of USS 639,040. It ws appsvd by FAO by march 1989. Budget revuico Vll proded additionl funds to mer an estension of the praject up to 30.690. Mem additional funds required mm cwd fron TA m (USS 526,580), from unuuihzed funds fho TA IV (US$ 2.368) and from prect MIP/URT/061/URT (USS 19,S92). It was appoved by FAO by decmber 1989. - 27 - Annex I Table 2b : Project Cost MB Page 6 of 8 ('000 USS) 85 86 87 88 89 90 TOTAL prov. es es. A. Appraisal Estimates' Base Cost 737.2 1431.3 1403.1 3571.6 Price Cont.2 127.7 269.9 397.6 TOTAL 737.2 1559.0 1673.0 39692 B. Budget EAQo UTF/TRT/083/URT Original Budget4 1177 1112.0 2289.0 Budg. Rev. 15 866.8 968.4 878.0 2713.4 Budg. Rev. 26 866.8 828.5 733.4 597.7 3026.4 Budg. Rev. 37 866.8 828.5 732.9 588.6 167.0 3183.8 Budg. Rev. 48 866.8 828.5 732.9 617.9 388.6 3434.7 1 Source : Peesident' Report 2 Lcal a t 12 % annually; foreip ehange cog* at 85% an scond year and 9% thereafter. 3For late budget rvjon. cpendituars up 1988 are actual; 1989 provisional at the time of prepmring the PCR; and csimated for the GM as month of 1990. 4Sourc : PAO/Got Prjct ASmemt signed on 04/02/86 for a prect duntio of 24 mth. Revision 1 inlude.: extnsion of the prje from 31 de.8 to 31 dec. 8; Uan hem of USs 307.S47 of the orinal budgt and atioal USS 116,820 alloted from TA m (CR. lOIS TA and UYF/URT/057/URT). Reed pject documwAt we signed in ow. 1987. 6 Budget Revision 2 provie for an extenson of the pject thug o June 1989 and an incae of USS 31.,010 to the budget allotin 'De budget rvion ws sigcd an March 1989. Revio 3 pfovdes for an extnin of the proect until the 31 Au t 1990 and an inr of USS IS7,427 to the budget alltio provd by TA m (Cr. 101S-TA and EIF/URT/I57/URT) B Revi 4 p Wdes fot an eztensio of the project tr i to 31 deamber 1990 and for an nca of USS 250,717 the ocumrnt budget allocaon. hse additioal funds mm partly awed fro TA m (US$16185). 28 - Anex1 I Page 7 of 8 Table 2c : Project Cost Crop Research ('000 US$) 85 86 87 88 89 90 TOTAL prov. es. es. A. Appraisal Estimates Base Cost 279.5 691.0 701.0 153.4 1824.9 Price Cont. 64.1 139.7 43.8 247.6 TOTAL 279.5 755.1 840.7 197.2 2072.5 B. Bue EAO' UTF/URT/081/URT Original Budget2 632.8 795.2 1428.0 Budg. Rev. B3 187.1 662.4 578.5 1428.0 Budg. Rev. C 187.1 500.2 565.6 175.1 1428.1 Budg. Rev. D' 187.1 500.2 518.9 221.8 92.1 1520.1 For latest budget revion, expenditures up 1988 are actual; 1989 proional at the time of preparing the PCRi and estimated for the first six month of 1990. 2 Source: FAO/Got Project Agment sined on 27/11/8S for a project duration of 30 montbL No riion A was available. Revision B prvided for an extension of the projct until the end of 1988. It w signed oan 14/07/87. 4Rvson C poided for an xtension of the project through to Dember 1989. It was ubmitted to FAO in noenmber 1988. S Revso D provides for an extension of the project tough to June 90 with an dnas of USS 92,147 of which 2,474 wer provided from unallocated funds fhom FAO project UI/URT/07S/URT. - 29 - Annex 1 Table 2d Project Cost Sectoral Planning Page 8 of 8 ('000 USS) 85 86 87 88 89 90 TOTAL prov. es* es. A. Appraisal EstiMates Base Cost - Price Cont. TOTAL - B. Budezet FAOi' 'UTF/URT/081/ URT Original Budget' 1024.9 1024.9 Budg. Rev. A3 776.9 248.0 1024.9 Budg. Rev. B4 662.9 673.3 1296.1 Budg. Rev. C- 662.8 703.2 1326.0 Budg. Rev. D6 622.8 593.2 319.0 1535.0 Por latest budget reviion, epeditm up 198 an au; 1989 provol the tme of pgpai th PCt ad esumted for the first six emtb of 1990. 2 Souee: FAO/ Got Pect Aegmnt siped on 2S/10/87 for a p*oct dwation d 12 mooth. 3Rcvio A povde for an eoenrn of the poet life thugb gmolwn1989. It we ceaed by FAO oan 26/0S/1L 4 Rvim B provided for an inbe of the u budget aileon by USS 27000 and for an aemos a( projct life up to decmber 1989. Rvio C prvdd for an nuea of the budet alkeLto by USS 29,2 6 Rvkio D prvde for an e_enso of the poet thro to jame im am aMdI1 ANds mwd patI by unutiid Nds frxi TA m (US$ 209,t0)0 IM[PJ 22 1_9 ,,+N
Группа Всемирного банка · Project Completion Report
Tanzania - Fourth Technical Assistance Project
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Project Completion Report
Страна
Танзания
Источник
Всемирный банк