* e Document of For Reference The World Bank No: to be taken from this room FOR OFFICIAL USE ONLY Report No. 7065-CD STAFF APPnAISAL REPORT REPUBLIC OF CHAD ROAD RECONSTRUCTION PROJECT March 21, 1988 Africa Region, Sahelian Department Infrastructure Operations Division This document has a restricted distribution and may be used by reipients only in the perfonnance ol their official duties. Its contents may not otherwise be disclosed withoui Worid Ban authorization. CURRUNCY EQUIVALENTS Currency Unit - CFA Franc US$1 - CFAF 280 CFAF 1 - US$0.003 CFAF 1 million - US$3,571 FISCAL YEAR January 1 - December 31 SYSTEN OF WEIGHTS AND MEASURMS: MET_IC 1 meter (m) - 3.28 feet (ft) 1 kilometer (km) = 0.62 mile (mi) I square kilometer (kmZ) = 0.39 square mile (mg) 1 metric ton (t) = 2.205 pounds (lbs) ABBREVIATIONS AND ACRONYMS AFDB - African Development Bank CTT - Coop
Группа Всемирного банка · Staff Appraisal Report
Chad - Road Reconstruction Project
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Staff Appraisal Report
Страна
Чад
Источник
Всемирный банк