DOM1t Of The World Bank FOR OFFICAL USE ONLY Report No. 6268b-EC STAFF APPRAISAL REPORT ECUADOR SECOND GUAYAQUIL AND GUAYAS PROVINCE WATER SUPPLY PROJECT November 24, 1986 Projects Department Latin America and the Caribbean Regional Office This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. CURRENCY EOUIVALENTS Currency Unit = Sucre (S/.) Annual Average 1985 US$1 - S/.91.5 Since August 14, 1986, the Ecuadorian currency has been floating. As of October 15 the rate was as shown below. US$1 = SI.140.0 S/.] - US$0.007 S/.I1,000 = US$7.1 WEIGHTS AND MEASURES Metric System FISCAL YEAR January 1 - December 31 ABBREVIATIONS AND ACRONYMS BEDE - Banco de Desarrollo del Ecuador (Ecuadorian Development Bank) CDC - Commonwealth Development Corporation CC - Contraloria General de la Nacion (National Controller General) CONADE - Conseio Nacional de Desarrollo (National Development Council) EMA-G - Empresa Municipal de Alcantarillado de Guayaquil (Guayaquil Municipal Sewerage Company) EMAP-G - Empresa Municipal de Agua Potable de Guayaquil (Guayaquil Municipal Water Supply Company) IDB - Banco Irteramericano de Desarrollo (Inter-American Development Bank) IEOS - Instituto Ecuatoriano de Obras Sanitarias (National Sanitary Works Institute) INERHI - Instituto Ecuatoriano de Recursos Hidraulicos (Ecuadorian Water Resources Institute) NDP - Plan Na^ional de Desarrollo (National Development Plan) -
Группа Всемирного банка · Staff Appraisal Report
Ecuador - Second Guayaquil and Guayas Province Water Supply Project
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Staff Appraisal Report
Дата
Страна
Эквадор
Источник
worldbank_document