Document of The World Bank FOR OFFICIAL USE ONLY Report No. 4494 PROJECT COMPLETION REPORT UPPER VOLTA THIRD HIGHWAY PROJECT (CREDIT 653-V - EEC SPECIAL ACTION CREDIT 38-UV) May 16, 1983 Western Africa Regional Office This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. FOR OFFICIAL USE ONLY PROJECT COMPLETION REPORT UPPER VOLTA THIRD HIGHWAY PROJECT (CREDIT 653-UV - EEC SPECIAL ACTION CREDIT 38-UV) TABLE OF CONTENTS Page No. Preface . . . . . . . . . . . . . . . . . . . . . . . . . .i Basic Data Sheet . . . . . . . . . . . . . . . . . . . . .ii Abbreviations and Acronyms . . . . . . . . . . . . . . . . iv Highlights . . . . . . . . . . . . . . . . . . . . . . . . v I. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . 1 II. PROJECT PREPARATION AND APPRAISAL . . . . . . . . . . . . . 2 III. PROJECT IMPLEMENTATION AND COST . . . . . . . . . . . . . . 5 IV. ECONOMIC RE-EVALUATION . . . . . . . . . . . . . . . . . . 12 V. INSTITUTIONAL DEVELOPMENT . . . . . . . . . . . . . . . . . 12 VI. PERFORMANCE OF GOVERNMENT, ASSOCIATION, AND CONSULTANTS . . 13 VII. CONCLUSIONS . . . . . . . . . . . . . . . . . . . . . . . . 14 Table Actual and Appraisal Estimates of Project Cost EThis document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. - i - PREFACE The following is a Project Completion Report on the Third Highway Project in Upper Volta, prepared in June 1982, for which Credit 653-UV, in the amount of US$20 million, was approved by the Executive Directors on July 1, 1976. The Credit was closed on December 31, 1981 when funds were fully disbursed. Cofinancing was provided by the OPEC Flnd (US$2.1 million equivalent) and by the EEC (US$3.5 million equi- valent Special Action Credit). This Completion Report was prepared by the West Africa Projects Department and is based on information obtained from the West Africa Information Center, Appraisal Report No. 1135b-UV, staff supervision reports, consultant reports and discussions with Government officials. In accordance with revised procedures for project performance audit reporting, this PCR was read by the Operations Evaluation Department but the project was not audited by OED staff. The draft PCR was sent to the Borrower and the EEC Resident Representative in Upper Volta for comments; however, none were received. - ii - BASIC DATA SHEET KEY PROJECT DATA Appraisal Actual or Current Estimate Item Expectation (04/30/82) Total Project Cost (US$ million) 29.2 31.9 Overrun (US$ million) 2.7 Overrun (%) 9.2 Credit Amnount (US$ million) 20.0 23.5 1/ Credit Amount Disbursed at 04/30/82 22.1 Cancelled 0 Repaid 0 Date Physical Components Completed 12/79 6/82 Propostion Completed (%) 100 99 Proportion of Time Overrun (%) 83 Economic Rate of Return (%) n.a. Institutional Performance fair Cumulative Estimates and Actual Disbursements IDA/OPEC FY77 FY78 FY79 FY80 FY81 FY82 FY83 Estimate (US$ million) .1;l 15.4 19.7 20 -- -- Actual (US$ million) 1.1 8.0 18.0 20 21.4 22.1 Actual/Estimate (%) 14 52 91 100 -- -- EEC Estimate Actual (US$ million equiv.) 1.4 1.4 2.5 3/ Actual/Estimate (M) OTHER PROJECT DATA Original Plan Actual or Estimated Actual First Mention in Files or Timetable 02/19/75 Government 's Application n.a. Negotiations 05/76 Board Approval 07/01/76 Loan/Credit Agreement Date 07/15/76 Effectiveness Date 12/15/76 Closing Date 12/31/81 2/ Borrower Government of Upper Volta Executing Agency Ministry of Public Works, Transport and Urban Development Fiscal Year of Borrower January 1 - December 31 Follow-cn Project Fourth Highway Project Credit Number 1164-UV Credit Amount (US$ million) 40 Credit Agreement Date 02/2S/

Основные сведения
Тип документа Project Completion Report
Дата принятия
Источник Всемирный банк