Группа Всемирного банка · Staff Appraisal Report

Rwanda - Second Phase of the Bugesera Gisaka Mogongo Rural Services Project : Rwanda - Second Phase of the Bugesera Gisaka Mogongo Rural Services Project

Руанда Всемирный банк
Открыть оригинал документа

Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.

Полный текст

Document of t The World Bank FOR OFFICIAL USE ONLY Report No. 3853-RW STAFF APPRAISAL REPORT RWANDA BUGESERA GISAKA MIGONGO RURAL SERVICES PROJECT - PHASE May 28, 1982 Eastern African Region Central Agriculture Division This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without Worid Bank authorization. CURRENCY EQUIVALENTS Currency Unit Franc Rwandais (RF) US$l.00 RF 91.91 RF 100 = US$1.09 WEIGHTS AND MEASURES Metric System Metric British/US Equivalents 1 meter (m) = 3.3 feet 1 hectare (haA = 2.47 acre 1 acre (100 m ) = 0.02 acres 1 kilometer km) - 0.62 miles 1 are (100 mZ) = 0.01 hectares 1 square kilometer (km2) = 0.39 square miles (sq.mi.) 1 kilogram (kg) = 2.2 pounds (lb) 1 liter (1) = 0.26 US gallons (gal) 1 metric ton (m ton) = 2,204 pounds (lb) GLOSSARY AND ABBREVIATIONS BGM - Bugesera Gisaka Migongo Project BADEA - Banque Arabe pour le D

Основные сведения
Тип документа Staff Appraisal Report
Дата принятия
Страна Руанда
Источник Всемирный банк