Document of O. I, The World Bank FILE GOi FOR OFFICIAL USE ONLY Report No. P-2740-To REPORT AND RECOMMENDATION OF THE PRESIDENT OF THE INTERNATIONAL DEVELOPMENT ASSOCIATION TO THE EXECUTIVE DIRECTORS ON A PROPOSED DEVELOPMENT CREDIT TO THE REPUBLIC OF TOGO FOR A FIRST EDUCATION PROJECT April 21, 1980 This document has a restricted dIstrIbution and may be used by recipients only in the performance of their official duties. Its contents may not stherwise be disclosed without World ank asuthorization. CURRENCY EQUIVALENTS Currency Unit = CFA franc (CFAF) US$1.00 = CFAF 210 CFAF 1 million = US$4,545 Fiscal Year January 1 - December 31 System of Weights and Measures: Metric Metric US Equivalents 1 meter 3.28 feet (ft) 1 square meter (m2) 10.76 square feet (sq ft) 1 cubic meter (m3) 35.30 cubic feet (cu ft) i kilometer (km) 0.62 mile (mi) 1 square kilometer (km2) 0.39 square mile (sq mi) 1 hectare (ha) 2.47 acres 1 metric ton (t) 2,205 pounds (lb) Abbreviations and Acronynms CNFPA Centre National de Formation Professionnelle Agricole a Tove (to be renamed INFA) DIFOP Direction de la Formation Permanente de l'Action et de la Recherche Pedagogiques ENS Ecole Normale Superieure FAC French Fonds d'Aide et de Cooperation INFA Institut National de Formation Agricole MENRS Minist6re de l'Education Nationale et de la Recherche Scientifique CIMAO Ciments d'Afrique de l'Ouest -i - FOR OFFICIAL USE ONLY TOGO FIRST EDUCATION PROJECT Project Summary Borrower: The Republic of Togo Amount: US$11.0 million Terms: Standard IDA Project The proposed project would provide for the construction Description: of two teacher training colleges at Notse (in the south) and Lama-Kara (in the north) with 360 places each; the strengthening of the Directorate of Educational Research and Teacher Training (DIFOP) in the Ministry of Education, in charge of preparing the primary and secondary schools curricula; the expansion of the National Institute of Agricultural Training (INFA) to train middle- and high-level agricultural staff and agriculture teachers for primary and secondary schools; and the strengthening of the Unit in charge of the implementation of the pro- posed project and the Government's project preparation capacity. There is a risk that the various institutions in charge of implementing the project lack the necessary capacity to manage a project of this magnitude. However, this risk would be minimized by the technical assistance provided under the project. Also the advanced stage of preparation of the project should help reduce the risk of delays in its implementation. Due to the presently severe constraints on the budgetary and balance of payments situation, there is the risk that the Government would have difficulty in providing the counterpart funds. This risk has been alleviated by a high percentage of foreign financing. This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. - ii - Estimated Cost: ----------- US$ million ------------ Local Foreign Total Primary Education 5.2 5.0 10.2 Teachers colleges (4.3) (3.8) (8.1) DIFOP Extension (0.9) (1.2) (2.1) Agriculture Staff and Instructor Training 2.0 2.1 4.1 Project Management 0.4 0.6 1.0 (including project preparation) TOTAL BASE COSTS 7.6 7.7 15.3 Physical Contingencies 0.8 0.6 1.4 Expected Price Increases 1.6 1.7 3.3 TOTAL PROJECT COST 10.0 10.0 20.0 Taxes 3.2 TOTAL PROJECT COST (net of 6.8 10.0 16.8 taxes) Financing Plan: =---------- US$ million -------
Группа Всемирного банка · Memorandum & Recommendation of the President
Togo - Education Project
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Memorandum & Recommendation of the President
Дата
Страна
Того
Источник
worldbank_document