Document of FILE COPY The World Bank FOR OFFICIAL USE ONLY Report No. P-2445-HA REPORT AND RECOMMENDATION OF THE PRESIDENT OF THE INTERNATIONAL DEVELOPMENT ASSOCIATION TO THE EXECUTIVE DIRECTORS ON A PROPOSED DEVELOPMENT CREDIT AND EEC SPECIAL ACTION CREDIT TO THE REPUBLIC OF HAITI FOR A SECOND POWER PROJECT April 4, 1979 Thls document bas a resticted distibutiom and my be sed by recipiets ly in the performance of their offie dutis. Its cotents may ao otherwise be disclosed without Wodd Bank autboriation. CURRENCY EQUIVALENTS (January 1979) Currency - Gourde (G) Gl = 100 centimes (c) G5 = US$1 G1,000 US$200 G1,000,O000 US$200,000 US$1,000,000 = G 5,000,000 US$1 C 5 Can$1,000 = US$850 DM1,000 = US$1,900 (The Gourde has, since 1919, been pegged to the dollar at the rate of G 5 = US$1.0) WEIGHTS AND MEASURES 1 meter (m) = 3.28 (ft) 3 1 cubic meter (m) = 35.31 cubic feet (ft ) 1 cubic meter (m ) = 264.2 gallon (gal) 1 cubic meter (m ) = 6.29 barrels (bbl) 1 kilogram (kg) = 2.21 pounds (lb) i metric ton (1,000 kg) 1.1 short tons (sh. ton) 1 kilowatt (kW) = 1,000 watts (103 W) 1 megawatt (MW) 1,000 kW (106 W) 1 kilowatt-hour (kWh) - 1,000 watt-hours (103 Wh) ABBREVIATIONS EEC = European Economic Community CIDA = Canadian International Development Agency EdH = Electricite d'Haiti (Haitian Power Company) KfW = Kreditanstalt fur Wiederaufbau OAS = Organization of American States ODN Organisme du Developpement du Nord (Regional Development Organization for the North) ONA = Office Nationale d'Assurance (National Insurance Company) SOFRELEC = Societe Francaise d'Etude et de Realisation d'Equipements Electriques UNCDF = United Nations Capital Development Fund UNDP = United Nations Development Programme FISCAL YEAR October 1 - September 30 FOR OFFICIAL USE ONLY HAITI SECOND POWER PROJECT Credit, Special Action Credit and Project Summary Borrower: Republic of Haiti Beneficiary: Electricite d'Haiti (EdH) Amount: US$16.5 million equivalent from IDA US$6.0 million equivalent from the EEC Special Action Credit Terms: Standard IDA terms Relending Terms: The proceeds of the credit would be relent by the Government to EdH for a period of 20 years, including 4 years of grace, at an interest rate of 8 percent per annum. Project Description: The proposed IDA credit would finance 38 percent, and the proposed EEC Special Action Credit 14 percent, of the costs of a project that includes: (i) the expansion of the Varreux power station at Port-au-Prince by the addition of 22-23 MW of diesel capacity, addition of 3.5 MW of capacity to the Cap Haitien power station, 1 MW for Port-de-Paix and 250 kW for a new power station at Miragoane; (ii) expansion of seven substations constructed under the First Project, construction of three new sub- stations and acquisition of telecommunications equipment; (iii) construction of 27 km of distribution lines, rehab- ilitation of about 30 percent of the distribution network in Port-au-Prince and expansion of the distribution networks in Port-de-Paix (16 km), Les Cayes (10 km) and Miragoane (18 km); (iv) staff training; and (v) related consultant services for the project, for the design of a new headquarters building for EdH, and for studies related to the management and operations of EdH and to the mainte- nance and monitoring of the dam at Peligre. EdH's staff is still too small and inexperienced to ensure minimal risks in carrying out the project: EdH will, therefore, be assisted by consultants during project execution, although EdH staff participation will be more extensive than under the First Project. This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disObsed without World Bank authorization. - ii - Estimated Costs: Local Foreign Total ---------US$1,000-------- Generation (Port-au-Prince) 2,300 10,500 12,800 Generation (Provinces) 260 1,520 1,780 Substations (Port-au-Prince) 1,040 6,200 7,240 Transmission lines and telecommunications 340 1,820 2,160 Distribution (Port-au-Prince) 1,080 3,510 4,590 Distribution (Provinces) 110 270 380 Consultants 460 3,830 4,290 Training - 370 370 Subtotal base cost 5,590 28,020 33,610 Physical contingency 560 2,200 2,760 Price contingency 1,268 5,313 6,581 Total Project Cost 7,418 35,533 42,951 Financing Plan: Local Foreign Total Percentage

Основные сведения
Дата принятия
Страна Гаити
Источник Всемирный банк