Группа Всемирного банка · Implementation Status and Results Report

Grenada - Small Farmer Vulnerability Reduction Initiative : P124107 - Implementation Status Results Report : Sequence 02

Гренада Всемирный банк
Открыть оригинал документа

Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.

Полный текст

 The World Bank Report No: ISR7172 Implementation Status & Results Grenada Small Farmer Vulnerability Reduction Initiative (P124107) Public Disclosure Copy Operation Name: Small Farmer Vulnerability Reduction Initiative (P124107) Project Stage: Implementation Seq.No: 2 Status: ARCHIVED Archive Date: 07-Sep-2012 Country: Grenada Approval FY: 2011 Product Line: Recipient Executed Activities Region: LATIN AMERICA AND CARIBBEAN Lending Instrument: Emergency Recovery Loan Implementing Agency(ies): Ministry of Finance, Planning, Economy, Energy and Cooperatives, Ministry of Agriculture Key Dates Board Approval Date 14-Oct-2010 Original Closing Date 08-Dec-2014 Planned Mid Term Review Date 15-Oct-2012 Last Archived ISR Date 05-Jan-2012 Effectiveness Date 08-Dec-2010 Revised Closing Date 08-Dec-2014 Actual Mid Term Review Date Project Development Objectives Project Development Objective (from Project Appraisal Document) The objective of the Grant is to provide immediate and urgent assistance to at least 1100 small farmers in Grenada to cope withtherecent global financial and food crisis and weather fluctuations through the provision of incentives for purchasing improvedagriculture input, water management technology, and adoption of improved livestock practices. Has the Project Development Objective been changed since Board Approval of the Project? Yes No Component(s) Component Name Component Cost Part 1: Incentives for the Adoption of Improved Technologies and On-farm Capitalization 0.84 Part 2: Project Monitoring and Evaluation 0.05 Part 3: Project Management 0.10 Overall Ratings Public Disclosure Copy Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Low Implementation Status Overview The JSDF Small Farmer Vulnerability Reduction Initiative Project was approved on October 14, 2010, signed on December 8, 2010 andofficially launched, in the presence of Prime Minister Tillman Thomas on September 15, 2011. The Grant provides incentives to atleast 1100 farmers to purchase improved agriculture input, water management technology, and adoption of improved livestockpractices. Through this kind of system, the beneficiaries with support of extension officers can chose from a list of options, theinputs, which cover best their needs, and they also have the option to choose among various participating input suppliers. Page 1 of 4 The World Bank Report No: ISR7172 TheProject started with a pilot round. During a first window of application in November 2011, the farmers could apply for theincentives. From the pool of applicants, 36 small farmers were selected by the Selection Committee and received the vouchers inFebruary of 2012. These were redeemed by the benefiting producers at the participating input suppliers. The pilot phase allowed theProject Management to identify bottlenecks and shortcomings. During the following two months the necessary adjustments wereundertaken and extension Public Disclosure Copy officers and input suppliers were trained to improve the quality and speed of the incentive mechanism.From May 2012 on, the Selection Committee has met regularly and by end of July 2012, 235 vouchers were provided to the benefitingfarmers. Locations No Location data has been entered Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Increase of agriculture incomes of small Percentage Value 5.00 farmers Date 22-Feb-2012 30-Jul-2012 08-Dec-2013 Comments The baseline is done with the information that is provided on the application form and which is verified by the extension officers.The baseline will be finished once that all the beneficiaries will be selected. Increase of agriculture productivity for crops Percentage Value 5.00 Date 22-Feb-2012 30-Jul-2012 08-Dec-2013 Comments The baseline is done with the information that is provided on the application form and which is verified by the extension officers.The Public Disclosure Copy baseline will be finished once that all the beneficiaries will be selected. Increase of agriculture productivity for livestock Percentage Value 10.00 Date 22-Feb-2012 30-Jul-2012 08-Dec-2013 Comments The baseline is done with the information that is provided on the application form and which is verified by the extension officers.The Page 2 of 4 The World Bank Report No: ISR7172 baseline will be finished once that all the beneficiaries will be selected. Increase of water availability and accessability Percentage Value 15.00 Public Disclosure Copy for small ruminants Date 22-Feb-2012 30-Jul-2012 08-Dec-2013 Comments The baseline is done with the information that is provided on the application form and which is verified by the extension officers.The baseline will be finished once that all the beneficiaries will be selected. Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target 1100 farmers receiving input subsidies Number Value 0.00 235.00 1100.00 Date 20-Dec-2011 30-Jul-2012 08-Dec-2013 Comments A baseline study and an impact evaluation Text Value study Date 30-Jul-2012 08-Dec-2013 Comments The baseline is done with the information that is provided on the application form and which is verified by the extension officers.The baseline will be finished once that all the beneficiaries will be selected. Periodic required financial and procurement Text Value reporting as per Grant Agreement. Public Disclosure Copy Date Comments IFR received on time, external audit was postponed to September 2012. Data on Financial Performance (as of 12-Apr-2012) Financial Agreement(s) Key Dates Project Ln/Cr/Tf Status Approval Date Signing Date Effectiveness Date Original Closing Date Revised Closing Date P124107 TF-97967 Effective 01-Dec-2010 08-Dec-2010 08-Dec-2010 08-Dec-2014 08-Dec-2014 Page 3 of 4 The World Bank Report No: ISR7172 Disbursements (in Millions) Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P124107 TF-97967 Effective USD 1.00 1.00 0.00 0.27 0.73 27.00 Public Disclosure Copy Disbursement Graph Key Decisions Regarding Implementation None Restructuring History There has been no restructuring to date. Public Disclosure Copy Related Projects There are no related projects. Page 4 of 4

Основные сведения
Тип документа Implementation Status and Results Report
Дата принятия
Страна Гренада
Источник Всемирный банк