Bangladesh - Clean Air and Sustainable Environment Project : P098151 - Implementation Status Results Report : Sequence 07

Бангладеш Всемирный банк
Открыть оригинал документа

Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.

Полный текст

 The World Bank Report No: ISR8104 Implementation Status & Results Bangladesh Clean Air and Sustainable Environment Project (P098151) Public Disclosure Copy Operation Name: Clean Air and Sustainable Environment Project (P098151) Project Stage: Implementation Seq.No: 7 Status: ARCHIVED Archive Date: 19-Dec-2012 Country: Bangladesh Approval FY: 2009 Product Line: IBRD/IDA Region: SOUTH ASIA Lending Instrument: Specific Investment Loan Implementing Agency(ies): Dhaka Transport Coordination Board, Dhaka City Corporation, Ministry of Environment and Forest Key Dates Board Approval Date 12-May-2009 Original Closing Date 31-Dec-2014 Planned Mid Term Review Date 17-Jan-2013 Last Archived ISR Date 10-Apr-2012 Effectiveness Date 19-Aug-2009 Revised Closing Date 31-Dec-2014 Actual Mid Term Review Date Project Development Objectives Project Development Objective (from Project Appraisal Document) To improve air quality and safe mobility in Dhaka through the implementation of demonstration initiatives in urban transport and brick making Has the Project Development Objective been changed since Board Approval of the Project? Yes No Component(s) Component Name Component Cost Component 1: Environment (DOE) 16.23 Component 2A Transport (DCC) 39.30 Component 2B Transport (DTCB) 6.67 Overall Ratings Previous Rating Current Rating Satisfactory Moderately Satisfactory Public Disclosure Copy Progress towards achievement of PDO Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Implementation Status Overview Overall project activities are progressing although at a slower pace then anticipated. The Department of Environment (DOE) has taken measures to improve air quality management. Eleven Continuous Air Quality Monitoring Stations (CAMS) have now been installed in 8 cities in Bangladesh. They have the capacity to monitor major air pollutant (such as PM10, PM2.5, CO, SO2, NOx and O3). In addition, Air Quality Monitoring Reports and Vehicular Emission Monitoring Reports are being produced regularly. A revision of the Vehicular Emission Standards has been prepared and is currently under review. Piloting of new and cleaner technologies in the brick sector is underway. The conversion of an old technology (Fixed Chimney Kiln) into Zig-Zag Kiln is now completed and will be in operation in Page 1 of 5 The World Bank Report No: ISR8104 the next dry season. This conversion will lower emissions of pollutants. The Dhaka City Corporation (DCC) has been divided into Dhaka North City Corporation (DNCC) and Dhaka South City Corporation (DSCC) through a Government Gazette order on December 12, 2011. Significant progress has been achieved under the transport component they are overseeing. To ensure safer mobility to pedestrians, the project has constructed Public Disclosure Copy 5 foot over bridges (FOB) and 8 more are under construction. Also, 20 km of sidewalk and road improvement have been completed in Mohammadpur, 14.5 km are on-going in Tejgaon and 21 intersections are being improved The third implementing agency Dhaka Transport Coordination Authority (DTCA) has been focusing on improving public transport planning in Dhaka city. The feasibility study of a Bus Rapid Transit (BRT) for a 20 km corridor from Uttara- Mohakhali - Ramna– Sadar Ghat has been completed. A Bus Restructuring Study is underway and is aimed at improving overall bus route management in Dhaka city. Locations Country First Administrative Division Location Planned Actual Bangladesh Not Entered Tejgaon Bangladesh Dhaka Division Dhaka Bangladesh Not Entered Khilgaon Bangladesh Not Entered People's Republic of Bangladesh Bangladesh Dhaka Division Dhaka Division Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Decrease in particulate emissions by 20 to 30 Percentage Value 100.00 100.00 80.00 % per brick kiln adopting a cleaner technology Date 09-Nov-2009 27-Nov-2012 31-Dec-2014 Comments Current emission are above 1 clean technology (VSBK) Targeted emissions 800 mg/ 1000 mg/m3 successfully introduced. m3 in 20 brick kilns Construction of conversion of Public Disclosure Copy FCK to Zig-zag completed. Others under progress. underimplementation. Improved traffic flow in locations of intervention Percentage Value 0.00 10.00 because of reduced congestion, as measured Date 09-Nov-2009 27-Nov-2012 31-Dec-2014 by increase of vehicular traffic throughput. Comments Traffic volume indicators will be collected as soon as construction is over. Page 2 of 5 The World Bank Report No: ISR8104 Reduction in the number of traffic accidents in Percentage Value 38.00 38.00 10.00 locations of intervention. Date 31-Dec-2010 27-Nov-2012 31-Dec-2014 Comments Officially recorded accidents As soon as data for 2011 are Public Disclosure Copy for Dhaka Metro area: 359 available they will be collected for Mirpur corridor: 38 and reported. (Actual numbers are likely to be much higher). Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target Construction of Foot Over Bridge Kilometers Value 0.00 5.00 25.00 Date 09-Nov-2009 16-Sep-2012 31-Dec-2014 Comments Construction of 5 is completed (DCC-W6) Construction of another 8 is on-going. Contracting for another 10 is under progress. New sidewalks with surface drainage Kilometers Value 0.00 12.00 70.00 constructed Date 09-Nov-2009 16-Sep-2012 31-Dec-2014 Comments Construction of Mohamadpur East (W1) completed and Tejgaon is underway. Improvement of streets in old Dhaka Kilometers Value 0.00 0.00 20.00 Date 09-Nov-2009 16-Sep-2012 31-Dec-2014 Comments DPP needs to be revised to be able to finalize procurement of this contract. Public Disclosure Copy Traffic safety campaign Number Value 0.00 0.00 2.00 Date 09-Nov-2009 27-Nov-2012 30-Dec-2014 Comments Inception report submitted. Communication Materials submitted. Corridors of separation of MV and NMV traffic Number Value 0.00 0.00 2.00 Date 09-Nov-2009 27-Nov-2012 30-Dec-2014 Comments Work is under way (DCC-W5) Page 3 of 5 The World Bank Report No: ISR8104 Traffic signals installed (DCC-G2) Number Value 0.00 0.00 30.00 Date 09-Nov-2009 23-Sep-2012 30-Dec-2014 Comments Contract awarded. Public Disclosure Copy DTCB act empowering DTCB to franchise, Text Value Revision initiated Revised DTCB Act adopted presented to the Cabinet for approval by the Parliament Date 27-Dec-2011 12-Feb-2012 Comments Completed Feasibility study for (i) BRT and (ii) bus route Text Value 0 BRT study is being revised Studies completed network Sub Type (following workshop/VC discussion). Breakdown Date 27-Nov-2012 31-Dec-2014 Comments Revision of MV act for emission reduction Text Value None Revised MV Act adopted by presented to the Cabinet the Parliament Date 19-Jan-2012 31-Dec-2014 Comments At least 2 staff trained in project implementation Text Value None 20 2 Date 27-Dec-2011 Comments Training on procurement, FM, Completed. project monitoring, BRT, solar panels etc have already taken place Data on Financial Performance (as of 21-Nov-2012) Financial Agreement(s) Key Dates Project Ln/Cr/Tf Status Approval Date Signing Date Effectiveness Date Original Closing Date Revised Closing Date P098151 IDA-45810 Effective 12-May-2009 27-May-2009 19-Aug-2009 31-Dec-2014 31-Dec-2014 Public Disclosure Copy Disbursements (in Millions) Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P098151 IDA-45810 Effective XDR 42.20 42.20 0.00 11.57 30.63 27.00 Disbursement Graph Page 4 of 5 The World Bank Report No: ISR8104 Public Disclosure Copy Key Decisions Regarding Implementation Since the last supervision mission in January 2012; regular review meetings are held with the 3 implementing agencies. In addition, a partial supervision mission of the Brick component has taken place in September 2012. The team visited the brick industries and discussed the progress of each of the 16 pilots under way. Overall, 9 pilots are on track. For the remaining 7 a detail plan of action has been agreed with the implementing agency to enable a faster implementation. Regarding the split of Dhaka City Corporation, it was agreed that that project will continue to be implemented by the same project implementation unit under the leadership of one project director; but that the project implementation unit will report administratively to both City Corporations depending on the geographical intervention of contracts. Restructuring History There has been no restructuring to date. Related Projects There are no related projects. Public Disclosure Copy Page 5 of 5

Основные сведения
Тип документа Implementation Status and Results Report
Дата принятия
Страна Бангладеш
Источник Всемирный банк