Maharashtra Water Sector Improvement Project 59870 Procurement Plan and Implementation Schedule for Civil Works of Participato Financial Implementation Schedule Revision R4 (Rs in Millions) Sr. Name of Package Nos. Description of Works/goods Estimated Method of No Project cost Procurement (Rs. in ICB/NCB Million) PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 1 2 3 4 5 6 7 8 9 10 11 12 1 Kal Kal-2 Rehabilitation of main & branch canals 189.32 NCB 9.47 47.33 66.26 47.33 18.93 R Kal-2 Rehabilitation of main & branch canals 186.34 NCB 18.63 55.90 65.22 37.27 9.32 A Kal-2 Rehabilitation of main & branch canals 255.95 NCB A1 Kal-2 Rehabilitation of main & branch canals 255.95 NCB R2 Kal-2/1 Rehabilitation of main,KLBC &Roha branch 48.28 NCB* 7.24 14.48 19.31 7.24 A2 Kal-2/1 Rehabilitation of main,KLBC &Roha branch 48.28 NCB* A2/1 Kal-2/1 Rehabilitation of main,KLBC &Roha branch 52.41 NCB* R3 Kal-2 Pkg1 Rehabilitation of Kal main canal Kundalika 61.33 NCB* 24.53 36.80 1/1 LBC & Roha Br canal. Kal-2 Pkg1 Rehabilitation of Kal main canal Kundalika A3 70.844 NCB* 42.51 28.34 1/1 LBC & Roha Br canal. R2 Kal-2/2 Rehabilitation of Kal canal ,Morba branch NCB* 44.77 6.72 13.43 17.91 6.72 canals A2 Kal-2/2 Rehabilitation of Kal canal ,Morba branch NCB* 44.77 canals A2/1 Kal-2/2 Rehabilitation of Kal canal ,Morba branch NCB* 57.34 canals R3 Kal-2 Pkg1 Rehabilitation of Kal canal ,Morba branch NCB* 68.03 27.21 40.82 1/2 canals Kal-2 Pkg1 Rehabilitation of Kal canal ,Morba branch NCB* A3 82.548 49.53 33.02 1/2 canals Kal-2/3 Rehabilitation of Kal canal, Mangaon & 99.04 NCB* R2 14.86 29.71 39.62 14.86 Goregaon branch Kal-2/3 Rehabilitation of Kal canal, Mangaon & NCB* A2 120.576 14.86 6.98 52.72 46.02 Goregaon branch Kal-2/4 Rehabilitation of KRBC, Amba main & Amba 70.12 NCB* R2 10.52 21.04 28.05 10.52 LBC Kal-2/4 Rehabilitation of KRBC, Amba main & Amba 70.12 NCB* A2 LBC Kal-2/4_1 Rehabilitation of KRBC (1 to 8) & Amba main 58.32 NCB* A2/1 (1 to 5) Kal-2 Pkg 2 Rehabilitation of kal main canal Kundalika NCB* R3 70.33 28.13 42.20 2/1 RBC (1 to 8) & Amba main (1 to 5) Kal-2 Pkg 2 Rehabilitation of kal main canal Kundalika NCB* A3 70.33 2/1 RBC (1 to 8) & Amba main (1 to 5) Kal-2 Pkg 2 Rehabilitation of Kundalika Right Bank Canal R4 79.2 NCB 25.00 54.20 2/1 & Amba Main Canal Km no. 1 to 5, Tal:- Roha, 2/24/2011 PRM_R4 13 Maharashtra Water Sector Improvement Project Sr. Name of Package Nos. Description of Works/goods Estimated Method of No Project cost Procurement (Rs. in ICB/NCB Million) PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 1 2 3 4 5 6 7 8 9 10 11 12 Kal-2/4_2 Rehabilitation of KRBC (6 to 9),ALBC (1 to NCB* A2/1 20.25 5),AshtamiBC (9to 20) Kal-2 Pkg 2 Rehabilitation of Kal main canal ,Amba main NCB* R3 23.91 9.56 14.35 2/2 canal (6 to 9),ALBC (1 to 5),AshtamiBC (9to Kal-2 Pkg 2 Rehabilitation of Kal main canal ,Amba main A3 30.66 NCB* 18.40 12.27 2/2 canal (6 to 9),ALBC (1 to 5),AshtamiBC (9to 2 Pench Pch-2 Rehabilitation of RBC and branches 302.00 NCB 15.10 60.40 75.50 105.70 45.30 R Pch-2 Rehabilitation of RBC and branches 302.68 NCB 30.27 75.67 105.94 75.67 15.13 A Pch-2 Rehabilitation of RBC and branches NCB A1 Pch-2 Rehabilitation of RBC 0 to 22 km and branches NCB R2 Pch-2/1 Rehabilitation of PRBC 0 to 22 km( 265.45 ICB* 39.82 79.64 106.18 39.82 Khaparkheda & Dy.) A2 Pch-2/1 Rehabilitation of PRBC 0 to 22 km( 316.22 ICB* 57.83 36.87 150.00 71.52 Khaparkheda & Dy.) Pench Pch-3 Rehabilitation of LBC and branches 362.78 NCB 90.70 90.70 72.56 R Pch-3 Rehabilitation of LBC and branches 366.26 NCB 91.57 128.19 91.57 18.31 A Pch-3 Rehabilitation of LBC and branches NCB A1 Pch-3 Rehabilitation of LBC and branches 437.01 NCB R2 Pch-3/1 Rehabilitation of PLBC 0 to 16 km,branches & 228.51 ICB* 34.28 68.55 91.40 34.28 Dy. A2 Pch-3/1 Rehabilitation of PLBC 0 to 16 km,branches & 250.72 ICB* 25.35 110.38 95.73 12.84 6.42 Dy. R2 Pch-3/2 Rehabilitation of PLBC 16 to 32.85 196.81 ICB* 29.52 59.04 78.72 29.52 km,branches & Dy. A2 Pch-3/2 Rehabilitation of PLBC 16 to 32.85 216.48 ICB* 43.70 62.56 37.53 48.46 24.23 km,branches & Dy. Pench Pch-4 Rehabilitation of all distributaries on PRBC 87.43 NCB 4.37 21.86 26.23 34.97 R Pch-4 Rehabilitation of all distributaries on PRBC 87.62 NCB 8.76 21.91 35.05 17.52 4.38 A Pch-4 Rehabilitation of all distributaries on PRBC 87.62 NCB A1 Pch-4 Rehabilitation RBC 22 km to 48.5 km.Tail 373.05 NCB 45.07 67.14 91.07 169.77 branch canal &distributaries Pench Pch-5 Rehabilitation of all distributaries on PLBC 385.00 NCB 19.25 38.50 77.00 96.25 115.50 38.50 R Pch-5 Rehabilitation of all distributaries on PLBC 375.00 NCB 37.50 93.75 150.00 75.00 18.75 A Pch-5 Rehabilitation of all distributaries on PLBC 375.00 NCB 2/24/2011 PRM_R4 14 Maharashtra Water Sector Improvement Project Sr. Name of Package Nos. Description of Works/goods Estimated Method of No Project cost Procurement (Rs. in ICB/NCB Million) PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 1 2 3 4 5 6 7 8 9 10 11 12 * A1 Pch_5B Rehabilitation of all distributaries on PLBC 315.29 NCB 116.70 87.86 93.72 17.01 Kandri branch canal & Dy. * A1 Pch_5A Rehabilitation of all distributaries on PLBC NCB Ramtek branch canal & Dy. R2 Pch_5A/1 Rehabilitation of Ramtek branch canal & Dy. 260.232 ICB* 39.03 78.07 104.09 39.03 A2 Pch_5A/1 Rehabilitation of Ramtek branch canal & Dy. 281.755 ICB* 50.10 108.20 42.13 54.22 27.11 R2 Pch_5A/2 Rehabilitation of D & A sub branch & Dy. 212.712 ICB* 31.91 63.81 85.08 31.91 A2 Pch_5A/2 Rehabilitation of D & A sub branch & Dy. 232.478 ICB* 13.25 8.34 105.44 105.44 3 Mula Mul-2 Rehablitation of MRBC, Branches I,II, PBC 226.18 NCB 22.62 45.24 45.24 56.55 56.55 R Mul-2 Rehablitation of MRBC, Branches I,II, PBC 232.54 NCB 23.25 58.14 81.39 46.51 23.25 A Mul-2 Rehablitation of MRBC, Branches I,II, PBC 325.51 NCB 0.00 0.00 192.44 146.30 27.74 96.62 0.00 Mula Mul-3 Rehabilitation of MLBC, and its distributaries 97.00 NCB 19.40 19.40 29.10 19.40 9.70 R Mul-3 Rehabilitation of MLBC, and its distributaries 112.77 NCB 22.55 28.19 33.83 28.19 A Mul-3 Rehabilitation of MLBC, and its distributaries 142.51 NCB 0.00 0.00 54.78 42.31 45.93 0.00 0.00 Mula Mul-4 Rehabilitation of distributaries of MRBC 343.00 NCB 17.15 34.30 68.60 85.75 102.90 34.30 R Mul-4 Rehabilitation of distributaries of MRBC 169.47 NCB 16.95 42.37 67.79 33.89 8.47 A Mul-4 Rehabilitation of distributaries of MRBC NCB A1 Mul-4 Rehabilitation of distributaries of MRBC 253.82 NCB (Sonai ) R2 Mul-4/1 Rehabilitation of distributaries of MRBC (1 to 163.27 ICB* 24.49 89.80 48.98 5) & Sonai dy. A2 Mul-4/1 Rehabilitation of distributaries of MRBC (1 to 163.27 ICB* 5) & Sonai dy. A2/1 Mul-4/1 Rehabilitation work of dy 1 to 5 sonai dy & 65.54 NCB 0.00 0.00 0.00 0.00 20.36 20.00 25.18 dy 1 to 5 of br 1 MRBC. dy. R2 Mul-4/2 Rehabilitation of Mula RBC, Branch 117.57 ICB* 17.64 64.66 35.27 1,distributaries 1 to 5 A2 Mul-4/2 Rehabilitation of Mula RBC, Branch 117.57 ICB* 1,distributaries 1 to 5 A2/1 Mul-4/2 Rehabilitation of Dy.4 to dy.5 Sonai Dy of 102.5 NCB 25.63 51.25 25.63 Mula Rignt bank canal. A2/1 Mul-4/3 Rehabilitation of Dy.1 to dy.5 of Br.1 of Mula 118.91 NCB 29.73 59.46 29.73 Rignt bank canal. Mula Mul-5 Rehabilitation of distributaries of MRBC 419.00 NCB 20.95 41.90 83.80 104.75 125.70 41.90 2/24/2011 PRM_R4 15 Maharashtra Water Sector Improvement Project Sr. Name of Package Nos. Description of Works/goods Estimated Method of No Project cost Procurement (Rs. in ICB/NCB Million) PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 1 2 3 4 5 6 7 8 9 10 11 12 R Mul-5 Rehabilitation of distributaries of MRBC 233.46 NCB 35.019 58.365 81.711 58.365 A Mul-5 Rehabilitation of distributaries of MRBC NCB A1 Mul-5 Rehabilitation of distributaries of MRBC 254.76 NCB (Pathardi) R2 Mul-5/1 Rehabilitation of Mula RBC, Branch 120.14 ICB* 18.02 66.08 36.04 2,distributaries 1 to 4 A2 Mul-5/1 Rehabilitation of Mula RBC, Branch 120.14 ICB* 2,distributaries 1 to 4 A2/1 Mul-5/1 Rehabilitation of Mula RBC, Branch 122.15 NCB 30.54 61.08 30.54 2,distributaries 1 to 4 R2 Mul-5/2 Rehabilitation of distributaries of MRBC & 155.61 ICB* 23.34 85.59 46.68 Pathardi. A2 Mul-5/2 Rehabilitation of distributaries of MRBC & 155.61 ICB* Pathardi. A2/1 Mul-5/2 Rehabilitation of Dy.1 of Pathardi br canal & 83.33 NCB 20.83 41.67 20.83 tail dyof Mula RBC A2/1 Mul-5/3 Rehabilitation of Dy.2 to dy.3 & tail Dy of 76.95 NCB 19.24 38.48 19.24 pathardi br canal of Mula RBC. R3 Mul-4/1 Rehabilitation & Modernization of Sonai NCB Distributory, Dy.No.4 to Dy.No.5 Mula Right 186.77 93.39 93.39 Bank Canal & Dy.No.1 &2 of Branch 1 (Slice 4/1B/1 , Slice 4/1B/2 , Slice 4/1B/3) A3 Mula 4/1B / 1 Rehabilitaion work of of Sonai Dy of Mula Right Bank Canal of Mula Project 60.57 NCB 36.34 24.23 A3 Mula 4/1B / 2 Rehabilitaion work of of Dy 4 & 5 of MRBC 48.28 NCB 28.97 19.31 , A3 Mula 4/1B / 3 Rehabilitaion work of of Dy 1 & 2 of Br 1 of 47.199 NCB 28.32 18.88 MRBC. R3 Mula-4/2 Rehabilitation & Modernization of Dy.No.3 to NCB Dy.No.5 of Branch No.1 & Dy no 1 to 4 of 218.58 109.29 109.29 Branch II of Mula Right Bank Canal A3 Mula-4/2/1 Rehabilitaion work of Dy 3 & 5 of Branch I of 32.91 NCB 19.75 13.16 Mula Right Bank Canal of Mula Project A3 Mula-4/2/2 Rehabilitaion work of Mula Right Bank Canal 30.94 NCB 18.56 12.38 Br 1 Dy 4. A3 Mula-4/2/3 Rehabilitaion work of Dy 2 of Branch II of 43.99 NCB 26.39 17.60 Mula Right Bank Canal of Mula Project A3 Mula-4/2/4 Rehabilitaion work of Dy 3 of Branch II of 29.52 NCB 17.71 11.81 Mula Right Bank Canal of Mula Project A3 Mula-4/2/5 Rehabilitaion work of Dy 1 &4 of Branch II of 46.11 NCB 27.67 18.44 Mula Right Bank Canal of Mula Project 2/24/2011 PRM_R4 16 Maharashtra Water Sector Improvement Project Sr. Name of Package Nos. Description of Works/goods Estimated Method of No Project cost Procurement (Rs. in ICB/NCB Million) PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 1 2 3 4 5 6 7 8 9 10 11 12 R3 Mula- 4/3 Rehabilitation & Modernization of tail NCB distributory of MRBC & dy no 1 -3 & tail dy of 187.03 93.52 93.52 Pathardi Branch Canal A3 Mula- 4/3/1 Rehabilitaion work of Tail Dy of Mula Right 64.51 NCB 38.71 25.80 Bank Canal of Mula Project A3 Mula- 4/3/2 Rehabilitaion work of Dy 1 & 2 of Pathardi 25.51 NCB 15.30 10.20 Branch Canal of Mula Right Bank Canal A3 Mula- 4/3/3 Rehabilitaion work of Dy 3 and Tail Dy of 52.83 NCB 31.70 21.13 Pathardi Branch Canal of MRBC. 4 Hatnur Hat-2 Rehabilitation of Hatnur Canal 123.35 NCB 6.17 30.84 43.17 30.84 12.34 R Hat-2 Rehabilitation of Hatnur Canal 123.35 NCB 12.34 37.01 43.17 24.67 6.17 A Hat-2 Rehabilitation of Hatnur Canal NCB A1 Hat-2 Rehabilitation of Hatnur Canal & distributaries 219.92 NCB R2 Hat-2/1 Rehabilitation of Hatnur RBC ( 0 to 23 km)Dy 92.71 NCB* 13.91 37.08 27.81 13.91 No 1 A2 Hat-2/1 Rehabilitation of Hatnur RBC ( 0 to 23 km)Dy NCB* 104.87 0.60 20.73 83.54 No 1 R2 Hat-2/2 Rehabilitation of Hatnur RBC( 23 to 56 77.73 NCB* 11.66 31.09 23.32 11.66 km)Dy2 to 7 A2 Hat-2/2 Rehabilitation of Hatnur RBC( 24 to 49 NCB* 119.50 45.98 38.60 34.92 km)Dy1 to 4 R2 Hat-2/3 Rehabilitation of Hatnur RBC (56 to 92 km)Dy 86.12 NCB* 12.92 34.45 25.84 12.92 8 to 19 A2 Hat-2/3 Rehabilitation of Hatnur RBC (50 to 92 km)Dy NCB* 126.81 11.65 59.25 55.91 5 to 19 5 Ghod Gd-2 Rehabilitation to Ghod Right Bank Canal + 111.55 NCB 5.58 27.89 39.04 27.89 11.15 Ghod Left Bank Canal R Gd-2 Rehabilitation to Ghod Right Bank Canal + 113.60 NCB 17.04 51.12 34.08 11.36 Ghod Left Bank Canal A Gd-2 Rehabilitation to Ghod Right Bank Canal + 113.60 NCB Ghod Left Bank Canal Ghod Gd-3 Rehabilitation of distributaries of Ghod Right 160.85 NCB 24.13 32.17 64.34 24.13 16.09 Bank Canal & Ghod Left Bank Canal R Gd-3 Rehabilitation of distributaries of Ghod Right 59.63 NCB 8.94 26.83 17.89 5.96 Bank Canal & Ghod Left Bank Canal A Gd-3 Rehabilitation of distributaries of Ghod Right 83.30 NCB Bank Canal & Ghod Left Bank Canal A1 Gd-2 Rehabilitation of Ghod Right Bank Canal , 234.05 NCB 19.77 85.71 34.90 93.66 0.00 Ghod Left Bank Canal & itsdistributaries 6 Kukadi Kuk-3 Rehabilitation of Kukadi left bank canal KM 0 229.92 NCB 11.50 45.98 45.98 57.48 45.98 22.99 to110 2/24/2011 PRM_R4 17 Maharashtra Water Sector Improvement Project Sr. Name of Package Nos. Description of Works/goods Estimated Method of No Project cost Procurement (Rs. in ICB/NCB Million) PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 1 2 3 4 5 6 7 8 9 10 11 12 R Kuk-3 Rehabilitation of Kukadi left bank canal KM 0 240.50 NCB 24.05 60.13 84.18 60.13 12.03 to110 A Kuk-3 Rehabilitation of Kukadi left bank canal KM 0 298.20 NCB 0 36.275 16.224 34.88 80.6 96.55 64.5 to110 Kukadi Kuk-4 Rehabilitation of Meena Feeder canal, Meena 54.56 NCB 5.46 27.28 16.37 5.46 branch canal under Kukadi Project R Kuk-4 Rehabilitation of Meena Feeder canal, Meena 56.72 NCB 5.67 17.02 19.85 11.34 2.84 branch canal under Kukadi Project A Kuk-4 Rehabilitation of Meena Feeder canal, Meena 71.00 NCB 0.00 0.00 24.85 30.21 28.40 4.03 0.00 branch canal under Kukadi Project Kukadi Kuk-5 Rehabilitation of distribuatries in the reach of 83.00 NCB 12.45 16.60 33.20 12.45 8.30 Kukadi left bank canal Km 0 to 110 R Kuk-5 Rehabilitation of distribuatries in the reach of 56.72 NCB 5.67 14.18 22.69 11.34 2.84 Kukadi left bank canal Km 0 to 110 A Kuk-5 Rehabilitation of distribuatries in the reach of 57.031 NCB Kukadi left bank canal Km 0 to 110 0.00 0.00 32.10 15.25 6.79 6.02 0.00 Kukadi Kuk-6 Rehabilitation of distributaries under Meena 42.88 NCB Feeder canal Meena branch canal .Ghod 6.43 10.72 17.15 8.58 branch, manikdoh lbc R Kuk-6 Rehabilitation of distributaries under Meena 49.02 NCB Feeder canal Meena branch canal .Ghod 7.353 12.255 17.157 12.255 branch, manikdoh lbc A Kuk-6 Rehabilitation of distributaries under Meena 51.41 NCB Feeder canal Meena branch canal .Ghod 11.17 39.46 64.59 34.78 0.00 branch, manikdoh lbc 7 Manar Man-2 Rehablitation of main canal 102.22 NCB 20.44 20.44 30.67 20.44 10.22 R Man-2 Rehablitation of main canal 120.00 NCB 18.00 54.00 36.00 12.00 A Man-2 Rehablitation of main canal 196.57 NCB 0 20.31 27.9 9.74 23.51 105.00 10.11 8 Upper Pus Pus-2 Rehablitation of main canal 57.14 NCB 11.43 28.57 11.43 5.71 R Pus-2 Rehablitation of main canal 83.04 NCB 12.46 37.37 24.91 8.30 A Pus-2 Rehablitation of main canal 83.04 NCB A1 Pus-2 Rehablitation of main canal 83.04 NCB R2 Pus-2 Rehablitation of main canal 142.82 NCB A2 Pus-2 Rehablitation of main canal 149.82 NCB 11.17 39.46 64.59 34.78 9 Itiadoh Iti-2 Rehablitation of main canal 94.98 NCB 19.00 47.49 19.00 9.50 R Iti-2 Rehablitation of main canal 220.51 NCB 33.08 99.23 66.15 22.05 A Iti-2 Rehablitation of main canal NCB A1 Iti-2 Rehablitation of main canal 207.4 NCB R2 Iti-2/1 Rehabilitation of main canal 0 to40 km,branch 214.96 ICB* canals & Dy 2/24/2011 PRM_R4 18 Maharashtra Water Sector Improvement Project Sr. Name of Package Nos. Description of Works/goods Estimated Method of No Project cost Procurement (Rs. in ICB/NCB Million) PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 1 2 3 4 5 6 7 8 9 10 11 12 A2 Iti-2/1 Rehabilitation of main canal 0 to40 km,branch ICB* canals & Dy A2/1 Iti-2/1 Rehabilitation of main canal 0 to 14 km,branch 89.850 NCB 19.20 70.65 canals & Dy A2/1 Iti-2/2 Rehabilitation of main canal 14 to 24 km,branch 90.102 NCB 3.01 87.09 canals & Dy A2/1 Iti-2/3 Rehabilitation of main canal 24 to 40 km, of 82.884 NCB 29.37 53.07 Itiadoh Project. A2/1 Iti-2/4 Rehabilitation of main canal40 to 60 km, of 65.210 NCB 28.55 36.66 Itiadoh Project. Itiadoh Iti-3 Rehabilitation of distributaries 173.00 NCB 34.60 34.60 51.90 34.60 17.30 R Iti-3 Rehabilitation of distributaries 78.00 NCB 11.70 35.10 23.40 7.80 A Iti-3 Rehabilitation of distributaries NCB A1 Iti-3 Rehabilitation of distributaries 220.53 NCB R2 Iti-3/1 Rehabilitation of main canal 40 to 72 km,branch 131.32 ICB* 19.70 39.40 52.53 19.70 canals & dy A2 Iti-3/1 Rehabilitation of main canal 40 to 72 km,branch ICB* canals & dy A2/1 Iti-3/1 Rehabilitation of main canal 61 to 72 km, of 57.584 NCB 17.50 40.08 Itiadoh Project. A2/1 Iti-3/2 Rehabilitation of wainganga br canal 1 to 12.4 74.356 NCB 17.23 57.12 of Itiadoh Project. R2 Iti-3/2 Rehabilitation of Wainganga branch canals & 168.31 ICB* 25.25 50.49 67.32 25.25 dy on it A2 Iti-3/2 Rehabilitation of Wainganga branch canals & ICB* dy on it A2/1 Iti-3/3 Rehabilitation of wainganga br canal 12.41 to 63.278 NCB 13.34 49.93 21,Puyar br of Itiadoh Pro. A2/1 Iti-3/4 Rehabilitation of wainganga br canal 22 to 37.1 77.540 NCB 53.17 24.37 Kurud Dy of Itiadoh Pro. 287 Krishna canal KRI-1 Rehablitation of main canal Nil Nil R KRI-1 Rehablitation of main canal 101.08 NCB 5.05 25.27 50.54 20.22 A KRI-1 Rehablitation of main canal 145.22 NCB 36.07 76.65 59.32 48.96 288 Nira LBC NLB-1 Rehablitation of L.B.C. Nil Nil R NLB-1 Rehablitation of L.B.C. 232.30 NCB 11.62 58.08 116.15 46.46 R2 NLB-1 Rehablitation of L.B.C. 232.30 NCB 11.62 69.69 92.92 58.08 R3 NLB-1 Rehablitation of L.B.C. 172.00 NCB 43.00 86.00 43.00 R4 NLB-1/1 Rehablitation of Dy no 16 of N.L.B.C. 5.91 NCB 4.00 1.91 R4 NLB-1/2 Rehablitation of Dy no 18 of N.L.B.C. 13.62 NCB 10.00 3.62 R4 NLB-1/3 Rehablitation of Dy no 22 of N.L.B.C. 14.77 NCB 10.00 4.77 R4 NLB-1/4 Rehablitation of Dy no 24 of N.L.B.C. 56.29 NCB 30.00 26.29 2/24/2011 PRM_R4 19 Maharashtra Water Sector Improvement Project Sr. Name of Package Nos. Description of Works/goods Estimated Method of No Project cost Procurement (Rs. in ICB/NCB Million) PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 1 2 3 4 5 6 7 8 9 10 11 12 R4 NLB-1/5 Rehablitation of Dy no 30 of N.L.B.C. 13.06 NCB 10.00 3.06 R4 NLB-1/6 Rehablitation of Dy no 36 of N.L.B.C. 15.15 NCB 10.00 5.15 R4 NLB-1/7 Rehablitation of Dy no 43 of N.L.B.C. 9.72 NCB 5.00 4.72 R4 NLB-1/8 Rehablitation of Dy no 46 of N.L.B.C. 19.73 NCB 12.00 7.73 289 Nira RBC NLB-1 Rehablitation of R.B.C. Nil Nil R NRB-1 Rehablitation of R.B.C. 221.31 NCB 11.07 55.33 110.66 44.26 R2 NRB-1 Rehablitation of R.B.C. 221.31 NCB 11.07 66.39 88.52 55.33 R3 NRB-1 Rehablitation of R.B.C. 172.00 NCB 43.00 86.00 43.00 R4 NRB-1/2 Rehablitation of Dy 13 of N.R.B.C. 10.359 NCB 5.00 5.36 R4 NRB-1/3 Rehablitation of Dy 18 of N.R.B.C. 12.343 NCB 9.00 3.34 R4 NRB-1/4 Rehablitation of Dy 20 of N.R.B.C. 8.175 NCB 5.00 3.18 R4 NRB-1/5 Rehablitation of Dy 24 of N.R.B.C. 4.013 NCB 2.00 2.01 R4 NRB-1/6 Rehablitation of Dy 26 of N.R.B.C. 13.067 NCB 6.00 7.07 R4 NRB-1/7 Rehablitation of Dy 29 of N.R.B.C. 5.394 NCB 3.00 2.39 R4 NRB-1/8 Rehablitation of Dy 32 of N.R.B.C. 10.949 NCB 5.00 5.95 R4 NRB-1/9 Rehablitation of Dy 34 of N.R.B.C. 21.827 NCB 10.00 11.83 R4 NRB-1/10 Rehablitation of Dy 36 of N.R.B.C. 8.408 NCB 4.00 4.41 R4 NRB-1/11 Rehablitation of Dy 39 of N.R.B.C. 39.112 NCB 13.00 26.11 R4 NRB-1/12 Rehablitation of Dy 44 of N.R.B.C. 31.376 NCB 31.376 14.00 17.38 R KDK-1 Rehablitation of main canal. 428.48 NCB 10.71 96.41 149.97 107.12 64.27 R2 KDK-1 Rehablitation of main canal. 428.48 NCB 21.42 128.54 171.39 107.12 R3 KDK-1 Rehablitation of main canal. 72.00 NCB 18.00 36.00 18.00 R4 KDK-1/1 Rehablitation of Dy27 of main canal. 16.55 NCB 9.00 7.55 R4 KDK-1/2 Rehablitation of Motoba canal. 10.73 NCB 6.00 4.73 10 Katepurna Kat-2 Rehabilitation of main canal and branches 62.16 NCB 6.22 31.08 18.65 6.22 R Kat-2 Rehabilitation of main canal and branches 62.90 NCB 9.44 28.31 18.87 6.29 A Kat-2 Rehabilitation of main canal and branches 62.90 NCB A1 Kat-2 Rehabilitation of main canal and branches 103.37 NCB 34.63 46.06 49.52 11 Koradi Nala Kor-2 Rehabilitation of main canal and branches 63.86 NCB 6.39 31.93 19.16 6.39 R Kor-2 Rehabilitation of main canal and branches 63.81 NCB 9.57 28.71 19.14 6.38 A Kor-2 Rehabilitation of main canal and branches 63.81 NCB A1 Kor-2 Rehabilitation of main canal and branches 143.5 NCB 78.20 69.64 32.16 12 Sukhana Suk-2 Rehabilitation of main canal and branches 17.61 NCB 1.76 8.80 5.28 1.76 R Suk-2 Rehabilitation of main canal and branches 18.60 NCB 2.79 4.65 9.30 1.86 A Suk-2 Rehabilitation of main canal and branches 18.60 NCB A1 Suk-2 Rehabilitation of main canal and branches 27.787 NCB 0.00 0.00 9.02 13.01 4.48 3.00 13 Waghad Wag-2 Rehabilitation of main canal and branches 100.87 NCB 5.04 25.22 35.31 25.22 10.09 R Wag-2 Rehabilitation of main canal and branches 100.66 NCB 15.10 25.17 50.33 10.07 2/24/2011 PRM_R4 20 Maharashtra Water Sector Improvement Project Sr. Name of Package Nos. Description of Works/goods Estimated Method of No Project cost Procurement (Rs. in ICB/NCB Million) PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 1 2 3 4 5 6 7 8 9 10 11 12 A Wag-2 Rehabilitation of main canal and branches 129.956 NCB 0.00 2.72 12.61 35.69 53.50 25.44 0.00 14 Ghatshill Gha-2 Rehabilitation of main canal and branches 12.81 NCB 1.28 6.40 3.84 1.28 Pargaon R Gha-2 Rehabilitation of main canal and branches 12.81 NCB 1.92 3.20 6.40 1.28 A Gha-2 Rehabilitation of main canal and branches 11.752 NCB 0.00 0.00 4.25 5.03 3.35 0.00 0.00 15 Mangi Mng-2 Rehabilitation of main canal and branches 44.60 NCB 4.46 22.30 13.38 4.46 R Mng-2 Rehabilitation of main canal and branches 44.10 NCB 6.62 11.03 22.05 4.41 A Mng-2 Rehabilitation of main canal and branches 44.10 NCB A1 Mng-2 Rehabilitation of main canal and branches 60.75 NCB 6.47 3.94 48.34 2.00 16 Gharni Ghr-2 Rehabilitation of main canal and branches 24.57 NCB 2.46 12.28 7.37 2.46 R Ghr-2 Rehabilitation of main canal and branches 24.57 NCB 3.69 11.06 7.37 2.46 A Ghr-2 Rehabilitation of main canal and branches 24.57 NCB A1 Ghr-2 Rehabilitation of main canal and branches 32.83 NCB 4.92 11.49 11.49 4.92 R2 Ghr-2 Rehabilitation of main canal and branches 35.68 NCB A2 Ghr-2 Rehabilitation of main canal and branches 37.458 NCB 0.00 0.00 5.55 6.22 14.91 10.77 0.00 20 Panzara Pan-2 Rehabilitation of main canal and branches 45.94 NCB 4.59 22.97 13.78 4.59 R Pan-2 Rehabilitation of main canal and branches 45.94 NCB 6.89 11.49 22.97 4.59 A Pan-2 Rehabilitation of main canal and branches 38.73 NCB 4.40 10.56 2.59 21 Kanholi Kan-2 Rehabilitation of main canal and branches 30.15 NCB 3.02 15.08 9.05 3.02 R Kan-2 Rehabilitation of main canal and branches 30.15 NCB 4.52 13.57 9.05 3.02 A Kan-2 Rehabilitation of main canal and branches 30.15 NCB A1 Kan-2 Rehabilitation of main canal and branches 57.87 NCB 10.40 24.74 15.08 7.65 Newly included packages for Providing & Fixing of Measuring Devices Mangi Man-1/1 Providing & fixing measuring devices on LBC 1.67 Shopping 1.67 & RBC A Man-1/1 Providing & fixing measuring devices on LBC 1.75 Shopping c 0.00 1.59 0.17 & RBC . Man-1/2 C.C lining U/S & D/S of measuring devices on 0.75 Shopping 0.75 Mangi RBC & LBC A Man-1/2 C.C lining U/S & D/S of measuring devices on 0.78 Shopping c 0.78 Mangi RBC & LBC Ghod Gd-4/1 Providing & fixing SWF / CTF on distributaries 2.13 Shopping 2.13 of LBC (Km 28 to 44 ) A Gd-4/1 Providing & fixing SWF / CTF on distributaries 2.13 Shopping 2.18 0.01 0.04 of LBC (Km 28 to 44 ) 2/24/2011 PRM_R4 21 Maharashtra Water Sector Improvement Project Sr. Name of Package Nos. Description of Works/goods Estimated Method of No Project cost Procurement (Rs. in ICB/NCB Million) PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 1 2 3 4 5 6 7 8 9 10 11 12 GD-4/2 Providing & fixing SWF / CTF on distributaries 1.63 Shopping 1.63 of LBC (Km 1 to 24) ) A Providing & fixing SWF / CTF on distributaries Shopping 0.00 of LBC (Km 1 to 24) ) Gd-4/3 Providing & fixing SWF / CTF on distributaries 1.63 Shopping of LBC & RBC (Excluding Km 25 to 27 ) 11.20 A Providing & fixing SWF / CTF on distributaries Shopping of LBC & RBC (Excluding Km 25 to 27 ) 0.00 GD-4/4 Providing & fixing SWF / CTF on distributaries 2.20 Shopping 2.20 of LBC (Km 45 to 58 ) A Providing & fixing SWF / CTF on distributaries Shopping 0.00 of LBC (Km 45 to 58 ) GD-4/5 Providing & fixing SWF / CTF on distributaries 2.06 Shopping 2.06 of LBC (Km59 to 84 ) A Providing & fixing SWF / CTF on distributaries Shopping 0.00 of LBC (Km59 to 84 ) GD-4/6 Providing & fixing SWF / CTF on distributaries 2.23 Shopping 2.23 of RBC (Km0 to 30 ) Providing & fixing SWF / CTF on distributaries Shopping 0.00 A of RBC (Km0 to 30 ) R2 GD-4/2 Providing & fixing SWF / CTF on distributaries 11.20 NCB of LBC (Km 1 to 27 & 45 to 84) & RBC (0 to 11.2 30) R3 GD-4/2 Providing & fixing SWF / CTF on distributaries 14.45 Shopping of LBC (Km 1 to 27 & 45 to 84) & RBC (0 to (12) 14.45 30) for 12 shopping works Construction of CTF in the Jurisdiction of wua R4 Gd-4/2/1 no.39 to 47 of GRBC 1.359 Shopping 0.2 1.159 Construction of CTF in the Jurisdiction of wua R4 Gd-4/2/2 no.24 to 31 of GLBC 1.208 Shopping 0.2 1.008 Construction of CTF in the Jurisdiction of wua R4 Gd-4/2/3 no.9 to 17 & 18 of GLBC 1.086 Shopping 0.2 0.886 R2 Total for Schemes 6600.150 0.000 85.911 1183.540 2359.052 2290.294 681.353 R3_Total for Schemes 6592 85.91 841.59 1960.45 2515.43 1188.59 R4_Total for Schemes 6501 0.00 59.30 890.74 1490.24 1677.12 1977.34 813.84 For Buildings 2/24/2011 PRM_R4 22 Maharashtra Water Sector Improvement Project Sr. Name of Package Nos. Description of Works/goods Estimated Method of No Project cost Procurement (Rs. in ICB/NCB Million) PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 1 2 3 4 5 6 7 8 9 10 11 12 Ren-QC1 Renovation to building of Quality Control Circle 6.25 NCB 2.50 3.75 at Pune R Ren-QC1/1 Renovation of lab at Narayangaon 1.59 Shopping 0.95 0.64 c A Ren-QC1/1 Renovation of lab at Narayangaon 1.648 Shopping 0.98 0.65 R Ren-QC1/2 Renovation of labs in Solapur 1.28 Shopping 0.77 0.51 c A Ren-QC1/2 Renovation of labs in Solapur 1.225 Shopping 0.58 0.46 R Ren-QC1/3 Renovation of labs in Kolhapur 1.39 Shopping 0.83 0.56 c A Ren-QC1/3 Renovation of labs in Kolhapur 1.38 Shopping 0.47 0.38 R Ren-QC1/4 Renovation of labs in Pune 0.81 Shopping 0.49 0.32 c A Ren-QC1/4 Renovation of labs in Pune 0.752 Shopping 0.54 0.12 R Ren-QC1/5 Renovation of labs in Satara 0.934 Shopping 0.56 0.37 c A Ren-QC1/5 Renovation of labs in Satara 0.883 Shopping 0.64 Ren-QC2 Renovation to building of Quality Control Circle 6.25 NCB 2.50 3.75 at A'bad R Ren-QC21 Renovation of labs under Nagpur Division 1.7 Shopping 1.02 0.68 A Ren-QC21 Renovation of labs under Nagpur Division 1.75 Shopping 1.05 0.70 c A1 Ren-QC21 Renovation of labs under Nagpur Division 1.75 Shopping 0.78 0.16 0.06 R Ren-QC22 Renovation of labs under Amravati Division 1.3 Shopping 0.78 0.52 A Ren-QC22 Renovation of labs under Amravati Division 1.3 Shopping R2 Ren-QC22 Renovation of labs under Amravati Division 1.3 Shopping 0.78 0.52 c A2 Ren-QC22 Renovation of labs under Amravati Division 1.58 Shopping 1.84 R Ren-QC23 Renovation of labs under Dhule Division 1.31 Shopping 0.79 0.52 A Ren-QC23 Renovation of labs under Dhule Division 1.435 Shopping R2 Ren-QC23 Renovation of labs under Dhule Division 1.435 Shopping 0.86 0.57 A2 Ren-QC23 Renovation of labs under Dhule Division 1.435 Shopping R4 Ren-QC23 Renovation of labs under Dhule Division 1.306 Shopping 0.71 0.60 R Ren-QC24 Renovation of labs under Nanded Division 1.62 Shopping 0.97 0.65 A Ren-QC24 Renovation of labs under Nanded Division 1.67 Shopping R2 Ren-QC24 Renovation of labs under Nanded Division 1.67 Shopping 1.00 0.67 c A2 Ren-QC24 Renovation of labs under Nanded Division Shopping 1.52 0.17 0.25 1.17 Total for Buildings 12.5 0.00 8.60 13.11 1.61 0.00 0.00 R 11.934 0 7.1604 4.7736 1.766 0.06 0.706 R2 Total for Buildings 12.068 0 7.2408 4.8272 0 0 0 R3 Total for Buildings 12.044 4.58 4.23 1.92 1.44 R4 Total for Buildings 12.04 0.00 0.00 5.99 2.02 1.23 0.71 0.60 R2 Grand Total for PRM 6705 0 114 1216 2383 2304 688 2/24/2011 PRM_R4 23 Maharashtra Water Sector Improvement Project Sr. Name of Package Nos. Description of Works/goods Estimated Method of No Project cost Procurement (Rs. in ICB/NCB Million) PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 1 2 3 4 5 6 7 8 9 10 11 12 R3 Grand TotaR3 Grand Total for PRM (Excluding Drainage Schemes) 6604 0 90 846 1972 2545 1244 R4 R4 G Grand Total for PRM (Excluding Drainage Schemes Plan for Drainage sc 6513 0 59 897 1492 1678 1978 814 Note: ICB*/NC Note There is change in the earlier reported expenditure figures. Expenditure figures reported in R4 revision are th field record as against the probable expenditure reported earlier. 2/24/2011 PRM_R4 24 Maharashtra Water Sector Improvement Project Procurement Plan and Implementation Schedule for Civil Works of Participato Revision R4 Sr. Name of Package Nos. Description of Works/goods Estimated Method of No Project cost Procurement (Rs. in ICB/NCB Million) Total 1 2 3 4 5 6 13 1 Kal Kal-2 Rehabilitation of main & branch canals 189.32 NCB 189.32 R Kal-2 Rehabilitation of main & branch canals 186.34 NCB 186.34 A Kal-2 Rehabilitation of main & branch canals 255.95 NCB A1 Kal-2 Rehabilitation of main & branch canals 255.95 NCB R2 Kal-2/1 Rehabilitation of main,KLBC &Roha branch 48.28 NCB* 48.28 A2 Kal-2/1 Rehabilitation of main,KLBC &Roha branch 48.28 NCB* A2/1 Kal-2/1 Rehabilitation of main,KLBC &Roha branch 52.41 NCB* R3 Kal-2 Pkg1 Rehabilitation of Kal main canal Kundalika 61.33 NCB* 61.33 1/1 LBC & Roha Br canal. Kal-2 Pkg1 Rehabilitation of Kal main canal Kundalika A3 70.844 NCB* 70.84 1/1 LBC & Roha Br canal. R2 Kal-2/2 Rehabilitation of Kal canal ,Morba branch NCB* 44.77 44.77 canals A2 Kal-2/2 Rehabilitation of Kal canal ,Morba branch NCB* 44.77 canals A2/1 Kal-2/2 Rehabilitation of Kal canal ,Morba branch NCB* 57.34 canals R3 Kal-2 Pkg1 Rehabilitation of Kal canal ,Morba branch NCB* 68.03 68.03 1/2 canals Kal-2 Pkg1 Rehabilitation of Kal canal ,Morba branch NCB* A3 82.548 82.55 1/2 canals Kal-2/3 Rehabilitation of Kal canal, Mangaon & 99.04 NCB* R2 99.04 Goregaon branch Kal-2/3 Rehabilitation of Kal canal, Mangaon & NCB* A2 120.576 120.58 Goregaon branch Kal-2/4 Rehabilitation of KRBC, Amba main & Amba 70.12 NCB* R2 70.12 LBC Kal-2/4 Rehabilitation of KRBC, Amba main & Amba 70.12 NCB* A2 LBC Kal-2/4_1 Rehabilitation of KRBC (1 to 8) & Amba main 58.32 NCB* A2/1 (1 to 5) Kal-2 Pkg 2 Rehabilitation of kal main canal Kundalika NCB* R3 70.33 70.33 2/1 RBC (1 to 8) & Amba main (1 to 5) Kal-2 Pkg 2 Rehabilitation of kal main canal Kundalika NCB* A3 70.33 2/1 RBC (1 to 8) & Amba main (1 to 5) Kal-2 Pkg 2 Rehabilitation of Kundalika Right Bank Canal R4 79.2 NCB 79.20 2/1 & Amba Main Canal Km no. 1 to 5, Tal:- Roha, 2/24/2011 PRM_R4 25 Maharashtra Water Sector Improvement Project Sr. Name of Package Nos. Description of Works/goods Estimated Method of No Project cost Procurement (Rs. in ICB/NCB Million) Total 1 2 3 4 5 6 13 Kal-2/4_2 Rehabilitation of KRBC (6 to 9),ALBC (1 to NCB* A2/1 20.25 5),AshtamiBC (9to 20) Kal-2 Pkg 2 Rehabilitation of Kal main canal ,Amba main NCB* R3 23.91 23.91 2/2 canal (6 to 9),ALBC (1 to 5),AshtamiBC (9to Kal-2 Pkg 2 Rehabilitation of Kal main canal ,Amba main A3 30.66 NCB* 30.66 2/2 canal (6 to 9),ALBC (1 to 5),AshtamiBC (9to 2 Pench Pch-2 Rehabilitation of RBC and branches 302.00 NCB 302.00 R Pch-2 Rehabilitation of RBC and branches 302.68 NCB 302.68 A Pch-2 Rehabilitation of RBC and branches NCB A1 Pch-2 Rehabilitation of RBC 0 to 22 km and branches NCB R2 Pch-2/1 Rehabilitation of PRBC 0 to 22 km( 265.45 ICB* 265.45 Khaparkheda & Dy.) A2 Pch-2/1 Rehabilitation of PRBC 0 to 22 km( 316.22 ICB* 316.22 Khaparkheda & Dy.) Pench Pch-3 Rehabilitation of LBC and branches 362.78 NCB 362.78 R Pch-3 Rehabilitation of LBC and branches 366.26 NCB 366.26 A Pch-3 Rehabilitation of LBC and branches NCB A1 Pch-3 Rehabilitation of LBC and branches 437.01 NCB R2 Pch-3/1 Rehabilitation of PLBC 0 to 16 km,branches & 228.51 ICB* 228.51 Dy. A2 Pch-3/1 Rehabilitation of PLBC 0 to 16 km,branches & 250.72 ICB* 250.72 Dy. R2 Pch-3/2 Rehabilitation of PLBC 16 to 32.85 196.81 ICB* 196.81 km,branches & Dy. A2 Pch-3/2 Rehabilitation of PLBC 16 to 32.85 216.48 ICB* 216.48 km,branches & Dy. Pench Pch-4 Rehabilitation of all distributaries on PRBC 87.43 NCB 87.43 R Pch-4 Rehabilitation of all distributaries on PRBC 87.62 NCB 87.62 A Pch-4 Rehabilitation of all distributaries on PRBC 87.62 NCB A1 Pch-4 Rehabilitation RBC 22 km to 48.5 km.Tail 373.05 NCB 373.05 branch canal &distributaries Pench Pch-5 Rehabilitation of all distributaries on PLBC 385.00 NCB 385.00 R Pch-5 Rehabilitation of all distributaries on PLBC 375.00 NCB 375.00 A Pch-5 Rehabilitation of all distributaries on PLBC 375.00 NCB 2/24/2011 PRM_R4 26 Maharashtra Water Sector Improvement Project Sr. Name of Package Nos. Description of Works/goods Estimated Method of No Project cost Procurement (Rs. in ICB/NCB Million) Total 1 2 3 4 5 6 13 * A1 Pch_5B Rehabilitation of all distributaries on PLBC 315.29 NCB 315.29 Kandri branch canal & Dy. * A1 Pch_5A Rehabilitation of all distributaries on PLBC NCB Ramtek branch canal & Dy. R2 Pch_5A/1 Rehabilitation of Ramtek branch canal & Dy. 260.232 ICB* 260.23 A2 Pch_5A/1 Rehabilitation of Ramtek branch canal & Dy. 281.755 ICB* 281.76 R2 Pch_5A/2 Rehabilitation of D & A sub branch & Dy. 212.712 ICB* 212.71 A2 Pch_5A/2 Rehabilitation of D & A sub branch & Dy. 232.478 ICB* 232.48 3 Mula Mul-2 Rehablitation of MRBC, Branches I,II, PBC 226.18 NCB 226.18 R Mul-2 Rehablitation of MRBC, Branches I,II, PBC 232.54 NCB 232.54 A Mul-2 Rehablitation of MRBC, Branches I,II, PBC 325.51 NCB 463.10 Mula Mul-3 Rehabilitation of MLBC, and its distributaries 97.00 NCB 97.00 R Mul-3 Rehabilitation of MLBC, and its distributaries 112.77 NCB 112.77 A Mul-3 Rehabilitation of MLBC, and its distributaries 142.51 NCB 143.02 Mula Mul-4 Rehabilitation of distributaries of MRBC 343.00 NCB 343.00 R Mul-4 Rehabilitation of distributaries of MRBC 169.47 NCB 169.47 A Mul-4 Rehabilitation of distributaries of MRBC NCB A1 Mul-4 Rehabilitation of distributaries of MRBC 253.82 NCB (Sonai ) R2 Mul-4/1 Rehabilitation of distributaries of MRBC (1 to 163.27 ICB* 163.27 5) & Sonai dy. A2 Mul-4/1 Rehabilitation of distributaries of MRBC (1 to 163.27 ICB* 5) & Sonai dy. A2/1 Mul-4/1 Rehabilitation work of dy 1 to 5 sonai dy & 65.54 NCB 65.54 dy 1 to 5 of br 1 MRBC. dy. R2 Mul-4/2 Rehabilitation of Mula RBC, Branch 117.57 ICB* 117.57 1,distributaries 1 to 5 A2 Mul-4/2 Rehabilitation of Mula RBC, Branch 117.57 ICB* 1,distributaries 1 to 5 A2/1 Mul-4/2 Rehabilitation of Dy.4 to dy.5 Sonai Dy of 102.5 NCB 102.50 Mula Rignt bank canal. A2/1 Mul-4/3 Rehabilitation of Dy.1 to dy.5 of Br.1 of Mula 118.91 NCB 118.91 Rignt bank canal. Mula Mul-5 Rehabilitation of distributaries of MRBC 419.00 NCB 419.00 2/24/2011 PRM_R4 27 Maharashtra Water Sector Improvement Project Sr. Name of Package Nos. Description of Works/goods Estimated Method of No Project cost Procurement (Rs. in ICB/NCB Million) Total 1 2 3 4 5 6 13 R Mul-5 Rehabilitation of distributaries of MRBC 233.46 NCB 233.46 A Mul-5 Rehabilitation of distributaries of MRBC NCB A1 Mul-5 Rehabilitation of distributaries of MRBC 254.76 NCB (Pathardi) R2 Mul-5/1 Rehabilitation of Mula RBC, Branch 120.14 ICB* 120.14 2,distributaries 1 to 4 A2 Mul-5/1 Rehabilitation of Mula RBC, Branch 120.14 ICB* 2,distributaries 1 to 4 A2/1 Mul-5/1 Rehabilitation of Mula RBC, Branch 122.15 NCB 122.15 2,distributaries 1 to 4 R2 Mul-5/2 Rehabilitation of distributaries of MRBC & 155.61 ICB* 155.61 Pathardi. A2 Mul-5/2 Rehabilitation of distributaries of MRBC & 155.61 ICB* Pathardi. A2/1 Mul-5/2 Rehabilitation of Dy.1 of Pathardi br canal & 83.33 NCB 83.33 tail dyof Mula RBC A2/1 Mul-5/3 Rehabilitation of Dy.2 to dy.3 & tail Dy of 76.95 NCB 76.95 pathardi br canal of Mula RBC. R3 Mul-4/1 Rehabilitation & Modernization of Sonai NCB Distributory, Dy.No.4 to Dy.No.5 Mula Right 186.77 186.77 Bank Canal & Dy.No.1 &2 of Branch 1 (Slice 4/1B/1 , Slice 4/1B/2 , Slice 4/1B/3) A3 Mula 4/1B / 1 Rehabilitaion work of of Sonai Dy of Mula Right Bank Canal of Mula Project 60.57 NCB 60.57 A3 Mula 4/1B / 2 Rehabilitaion work of of Dy 4 & 5 of MRBC 48.28 NCB 48.28 , A3 Mula 4/1B / 3 Rehabilitaion work of of Dy 1 & 2 of Br 1 of 47.199 NCB 47.20 MRBC. R3 Mula-4/2 Rehabilitation & Modernization of Dy.No.3 to NCB Dy.No.5 of Branch No.1 & Dy no 1 to 4 of 218.58 218.58 Branch II of Mula Right Bank Canal A3 Mula-4/2/1 Rehabilitaion work of Dy 3 & 5 of Branch I of 32.91 NCB 32.91 Mula Right Bank Canal of Mula Project A3 Mula-4/2/2 Rehabilitaion work of Mula Right Bank Canal 30.94 NCB 30.94 Br 1 Dy 4. A3 Mula-4/2/3 Rehabilitaion work of Dy 2 of Branch II of 43.99 NCB 43.99 Mula Right Bank Canal of Mula Project A3 Mula-4/2/4 Rehabilitaion work of Dy 3 of Branch II of 29.52 NCB 29.52 Mula Right Bank Canal of Mula Project A3 Mula-4/2/5 Rehabilitaion work of Dy 1 &4 of Branch II of 46.11 NCB 46.11 Mula Right Bank Canal of Mula Project 2/24/2011 PRM_R4 28 Maharashtra Water Sector Improvement Project Sr. Name of Package Nos. Description of Works/goods Estimated Method of No Project cost Procurement (Rs. in ICB/NCB Million) Total 1 2 3 4 5 6 13 R3 Mula- 4/3 Rehabilitation & Modernization of tail NCB distributory of MRBC & dy no 1 -3 & tail dy of 187.03 187.03 Pathardi Branch Canal A3 Mula- 4/3/1 Rehabilitaion work of Tail Dy of Mula Right 64.51 NCB 64.51 Bank Canal of Mula Project A3 Mula- 4/3/2 Rehabilitaion work of Dy 1 & 2 of Pathardi 25.51 NCB 25.51 Branch Canal of Mula Right Bank Canal A3 Mula- 4/3/3 Rehabilitaion work of Dy 3 and Tail Dy of 52.83 NCB 52.83 Pathardi Branch Canal of MRBC. 4 Hatnur Hat-2 Rehabilitation of Hatnur Canal 123.35 NCB 123.35 R Hat-2 Rehabilitation of Hatnur Canal 123.35 NCB 123.35 A Hat-2 Rehabilitation of Hatnur Canal NCB A1 Hat-2 Rehabilitation of Hatnur Canal & distributaries 219.92 NCB R2 Hat-2/1 Rehabilitation of Hatnur RBC ( 0 to 23 km)Dy 92.71 NCB* 92.71 No 1 A2 Hat-2/1 Rehabilitation of Hatnur RBC ( 0 to 23 km)Dy NCB* 104.87 104.87 No 1 R2 Hat-2/2 Rehabilitation of Hatnur RBC( 23 to 56 77.73 NCB* 77.73 km)Dy2 to 7 A2 Hat-2/2 Rehabilitation of Hatnur RBC( 24 to 49 NCB* 119.50 119.50 km)Dy1 to 4 R2 Hat-2/3 Rehabilitation of Hatnur RBC (56 to 92 km)Dy 86.12 NCB* 86.12 8 to 19 A2 Hat-2/3 Rehabilitation of Hatnur RBC (50 to 92 km)Dy NCB* 126.81 126.81 5 to 19 5 Ghod Gd-2 Rehabilitation to Ghod Right Bank Canal + 111.55 NCB 111.55 Ghod Left Bank Canal R Gd-2 Rehabilitation to Ghod Right Bank Canal + 113.60 NCB 113.60 Ghod Left Bank Canal A Gd-2 Rehabilitation to Ghod Right Bank Canal + 113.60 NCB Ghod Left Bank Canal Ghod Gd-3 Rehabilitation of distributaries of Ghod Right 160.85 NCB 160.85 Bank Canal & Ghod Left Bank Canal R Gd-3 Rehabilitation of distributaries of Ghod Right 59.63 NCB 59.63 Bank Canal & Ghod Left Bank Canal A Gd-3 Rehabilitation of distributaries of Ghod Right 83.30 NCB Bank Canal & Ghod Left Bank Canal A1 Gd-2 Rehabilitation of Ghod Right Bank Canal , 234.05 NCB 234.04 Ghod Left Bank Canal & itsdistributaries 6 Kukadi Kuk-3 Rehabilitation of Kukadi left bank canal KM 0 229.92 NCB 229.92 to110 2/24/2011 PRM_R4 29 Maharashtra Water Sector Improvement Project Sr. Name of Package Nos. Description of Works/goods Estimated Method of No Project cost Procurement (Rs. in ICB/NCB Million) Total 1 2 3 4 5 6 13 R Kuk-3 Rehabilitation of Kukadi left bank canal KM 0 240.50 NCB 240.50 to110 A Kuk-3 Rehabilitation of Kukadi left bank canal KM 0 298.20 NCB 329.03 to110 Kukadi Kuk-4 Rehabilitation of Meena Feeder canal, Meena 54.56 NCB 54.56 branch canal under Kukadi Project R Kuk-4 Rehabilitation of Meena Feeder canal, Meena 56.72 NCB 56.72 branch canal under Kukadi Project A Kuk-4 Rehabilitation of Meena Feeder canal, Meena 71.00 NCB 87.49 branch canal under Kukadi Project Kukadi Kuk-5 Rehabilitation of distribuatries in the reach of 83.00 NCB 83.00 Kukadi left bank canal Km 0 to 110 R Kuk-5 Rehabilitation of distribuatries in the reach of 56.72 NCB 56.72 Kukadi left bank canal Km 0 to 110 A Kuk-5 Rehabilitation of distribuatries in the reach of 57.031 NCB Kukadi left bank canal Km 0 to 110 60.16 Kukadi Kuk-6 Rehabilitation of distributaries under Meena 42.88 NCB Feeder canal Meena branch canal .Ghod 42.88 branch, manikdoh lbc R Kuk-6 Rehabilitation of distributaries under Meena 49.02 NCB Feeder canal Meena branch canal .Ghod 49.02 branch, manikdoh lbc A Kuk-6 Rehabilitation of distributaries under Meena 51.41 NCB Feeder canal Meena branch canal .Ghod 150.00 branch, manikdoh lbc 7 Manar Man-2 Rehablitation of main canal 102.22 NCB 102.22 R Man-2 Rehablitation of main canal 120.00 NCB 120.00 A Man-2 Rehablitation of main canal 196.57 NCB 196.57 8 Upper Pus Pus-2 Rehablitation of main canal 57.14 NCB 57.14 R Pus-2 Rehablitation of main canal 83.04 NCB 83.04 A Pus-2 Rehablitation of main canal 83.04 NCB A1 Pus-2 Rehablitation of main canal 83.04 NCB R2 Pus-2 Rehablitation of main canal 142.82 NCB A2 Pus-2 Rehablitation of main canal 149.82 NCB 150.00 9 Itiadoh Iti-2 Rehablitation of main canal 94.98 NCB 94.98 R Iti-2 Rehablitation of main canal 220.51 NCB 220.51 A Iti-2 Rehablitation of main canal NCB A1 Iti-2 Rehablitation of main canal 207.4 NCB R2 Iti-2/1 Rehabilitation of main canal 0 to40 km,branch 214.96 ICB* canals & Dy 2/24/2011 PRM_R4 30 Maharashtra Water Sector Improvement Project Sr. Name of Package Nos. Description of Works/goods Estimated Method of No Project cost Procurement (Rs. in ICB/NCB Million) Total 1 2 3 4 5 6 13 A2 Iti-2/1 Rehabilitation of main canal 0 to40 km,branch ICB* canals & Dy A2/1 Iti-2/1 Rehabilitation of main canal 0 to 14 km,branch 89.850 NCB 89.85 canals & Dy A2/1 Iti-2/2 Rehabilitation of main canal 14 to 24 km,branch 90.102 NCB 90.10 canals & Dy A2/1 Iti-2/3 Rehabilitation of main canal 24 to 40 km, of 82.884 NCB 82.44 Itiadoh Project. A2/1 Iti-2/4 Rehabilitation of main canal40 to 60 km, of 65.210 NCB 65.21 Itiadoh Project. Itiadoh Iti-3 Rehabilitation of distributaries 173.00 NCB 173.00 R Iti-3 Rehabilitation of distributaries 78.00 NCB 78.00 A Iti-3 Rehabilitation of distributaries NCB A1 Iti-3 Rehabilitation of distributaries 220.53 NCB R2 Iti-3/1 Rehabilitation of main canal 40 to 72 km,branch 131.32 ICB* 131.32 canals & dy A2 Iti-3/1 Rehabilitation of main canal 40 to 72 km,branch ICB* canals & dy A2/1 Iti-3/1 Rehabilitation of main canal 61 to 72 km, of 57.584 NCB 57.58 Itiadoh Project. A2/1 Iti-3/2 Rehabilitation of wainganga br canal 1 to 12.4 74.356 NCB 74.36 of Itiadoh Project. R2 Iti-3/2 Rehabilitation of Wainganga branch canals & 168.31 ICB* 168.31 dy on it A2 Iti-3/2 Rehabilitation of Wainganga branch canals & ICB* dy on it A2/1 Iti-3/3 Rehabilitation of wainganga br canal 12.41 to 63.278 NCB 63.28 21,Puyar br of Itiadoh Pro. A2/1 Iti-3/4 Rehabilitation of wainganga br canal 22 to 37.1 77.540 NCB 77.54 Kurud Dy of Itiadoh Pro. 287 Krishna canal KRI-1 Rehablitation of main canal Nil Nil R KRI-1 Rehablitation of main canal 101.08 NCB 101.08 A KRI-1 Rehablitation of main canal 145.22 NCB 221.00 288 Nira LBC NLB-1 Rehablitation of L.B.C. Nil Nil R NLB-1 Rehablitation of L.B.C. 232.30 NCB 232.30 R2 NLB-1 Rehablitation of L.B.C. 232.30 NCB 232.30 R3 NLB-1 Rehablitation of L.B.C. 172.00 NCB 172.00 R4 NLB-1/1 Rehablitation of Dy no 16 of N.L.B.C. 5.91 NCB 5.91 R4 NLB-1/2 Rehablitation of Dy no 18 of N.L.B.C. 13.62 NCB 13.62 R4 NLB-1/3 Rehablitation of Dy no 22 of N.L.B.C. 14.77 NCB 14.77 R4 NLB-1/4 Rehablitation of Dy no 24 of N.L.B.C. 56.29 NCB 56.29 2/24/2011 PRM_R4 31 Maharashtra Water Sector Improvement Project Sr. Name of Package Nos. Description of Works/goods Estimated Method of No Project cost Procurement (Rs. in ICB/NCB Million) Total 1 2 3 4 5 6 13 R4 NLB-1/5 Rehablitation of Dy no 30 of N.L.B.C. 13.06 NCB 13.06 R4 NLB-1/6 Rehablitation of Dy no 36 of N.L.B.C. 15.15 NCB 15.15 R4 NLB-1/7 Rehablitation of Dy no 43 of N.L.B.C. 9.72 NCB 9.72 R4 NLB-1/8 Rehablitation of Dy no 46 of N.L.B.C. 19.73 NCB 19.73 289 Nira RBC NLB-1 Rehablitation of R.B.C. Nil Nil R NRB-1 Rehablitation of R.B.C. 221.31 NCB 221.31 R2 NRB-1 Rehablitation of R.B.C. 221.31 NCB 221.31 R3 NRB-1 Rehablitation of R.B.C. 172.00 NCB 172.00 R4 NRB-1/2 Rehablitation of Dy 13 of N.R.B.C. 10.359 NCB 10.36 R4 NRB-1/3 Rehablitation of Dy 18 of N.R.B.C. 12.343 NCB 12.34 R4 NRB-1/4 Rehablitation of Dy 20 of N.R.B.C. 8.175 NCB 8.18 R4 NRB-1/5 Rehablitation of Dy 24 of N.R.B.C. 4.013 NCB 4.01 R4 NRB-1/6 Rehablitation of Dy 26 of N.R.B.C. 13.067 NCB 13.07 R4 NRB-1/7 Rehablitation of Dy 29 of N.R.B.C. 5.394 NCB 5.39 R4 NRB-1/8 Rehablitation of Dy 32 of N.R.B.C. 10.949 NCB 10.95 R4 NRB-1/9 Rehablitation of Dy 34 of N.R.B.C. 21.827 NCB 21.83 R4 NRB-1/10 Rehablitation of Dy 36 of N.R.B.C. 8.408 NCB 8.41 R4 NRB-1/11 Rehablitation of Dy 39 of N.R.B.C. 39.112 NCB 39.11 R4 NRB-1/12 Rehablitation of Dy 44 of N.R.B.C. 31.376 NCB 31.38 R KDK-1 Rehablitation of main canal. 428.48 NCB 428.48 R2 KDK-1 Rehablitation of main canal. 428.48 NCB 428.48 R3 KDK-1 Rehablitation of main canal. 72.00 NCB 72.00 R4 KDK-1/1 Rehablitation of Dy27 of main canal. 16.55 NCB 16.55 R4 KDK-1/2 Rehablitation of Motoba canal. 10.73 NCB 10.73 10 Katepurna Kat-2 Rehabilitation of main canal and branches 62.16 NCB 62.16 R Kat-2 Rehabilitation of main canal and branches 62.90 NCB 62.90 A Kat-2 Rehabilitation of main canal and branches 62.90 NCB A1 Kat-2 Rehabilitation of main canal and branches 103.37 NCB 130.21 11 Koradi Nala Kor-2 Rehabilitation of main canal and branches 63.86 NCB 63.86 R Kor-2 Rehabilitation of main canal and branches 63.81 NCB 63.81 A Kor-2 Rehabilitation of main canal and branches 63.81 NCB A1 Kor-2 Rehabilitation of main canal and branches 143.5 NCB 180.00 12 Sukhana Suk-2 Rehabilitation of main canal and branches 17.61 NCB 17.61 R Suk-2 Rehabilitation of main canal and branches 18.60 NCB 18.60 A Suk-2 Rehabilitation of main canal and branches 18.60 NCB A1 Suk-2 Rehabilitation of main canal and branches 27.787 NCB 29.51 13 Waghad Wag-2 Rehabilitation of main canal and branches 100.87 NCB 100.87 R Wag-2 Rehabilitation of main canal and branches 100.66 NCB 100.66 2/24/2011 PRM_R4 32 Maharashtra Water Sector Improvement Project Sr. Name of Package Nos. Description of Works/goods Estimated Method of No Project cost Procurement (Rs. in ICB/NCB Million) Total 1 2 3 4 5 6 13 A Wag-2 Rehabilitation of main canal and branches 129.956 NCB 129.96 14 Ghatshill Gha-2 Rehabilitation of main canal and branches 12.81 NCB 12.81 Pargaon R Gha-2 Rehabilitation of main canal and branches 12.81 NCB 12.81 A Gha-2 Rehabilitation of main canal and branches 11.752 NCB 12.63 15 Mangi Mng-2 Rehabilitation of main canal and branches 44.60 NCB 44.60 R Mng-2 Rehabilitation of main canal and branches 44.10 NCB 44.10 A Mng-2 Rehabilitation of main canal and branches 44.10 NCB A1 Mng-2 Rehabilitation of main canal and branches 60.75 NCB 60.75 16 Gharni Ghr-2 Rehabilitation of main canal and branches 24.57 NCB 24.57 R Ghr-2 Rehabilitation of main canal and branches 24.57 NCB 24.57 A Ghr-2 Rehabilitation of main canal and branches 24.57 NCB A1 Ghr-2 Rehabilitation of main canal and branches 32.83 NCB 32.83 R2 Ghr-2 Rehabilitation of main canal and branches 35.68 NCB A2 Ghr-2 Rehabilitation of main canal and branches 37.458 NCB 37.45 20 Panzara Pan-2 Rehabilitation of main canal and branches 45.94 NCB 45.94 R Pan-2 Rehabilitation of main canal and branches 45.94 NCB 45.94 A Pan-2 Rehabilitation of main canal and branches 38.73 NCB 17.55 21 Kanholi Kan-2 Rehabilitation of main canal and branches 30.15 NCB 30.15 R Kan-2 Rehabilitation of main canal and branches 30.15 NCB 30.15 A Kan-2 Rehabilitation of main canal and branches 30.15 NCB A1 Kan-2 Rehabilitation of main canal and branches 57.87 NCB 57.87 Newly included packages for Providing & Fixing of Measuring Devices Mangi Man-1/1 Providing & fixing measuring devices on LBC 1.67 Shopping 1.67 & RBC A Man-1/1 Providing & fixing measuring devices on LBC 1.75 Shopping c 1.75 & RBC . Man-1/2 C.C lining U/S & D/S of measuring devices on 0.75 Shopping 0.75 Mangi RBC & LBC A Man-1/2 C.C lining U/S & D/S of measuring devices on 0.78 Shopping c 0.78 Mangi RBC & LBC Ghod Gd-4/1 Providing & fixing SWF / CTF on distributaries 2.13 Shopping 2.13 of LBC (Km 28 to 44 ) A Gd-4/1 Providing & fixing SWF / CTF on distributaries 2.13 Shopping 2.24 of LBC (Km 28 to 44 ) 2/24/2011 PRM_R4 33 Maharashtra Water Sector Improvement Project Sr. Name of Package Nos. Description of Works/goods Estimated Method of No Project cost Procurement (Rs. in ICB/NCB Million) Total 1 2 3 4 5 6 13 GD-4/2 Providing & fixing SWF / CTF on distributaries 1.63 Shopping 1.63 of LBC (Km 1 to 24) ) A Providing & fixing SWF / CTF on distributaries Shopping 0.00 of LBC (Km 1 to 24) ) Gd-4/3 Providing & fixing SWF / CTF on distributaries 1.63 Shopping of LBC & RBC (Excluding Km 25 to 27 ) 11.20 A Providing & fixing SWF / CTF on distributaries Shopping of LBC & RBC (Excluding Km 25 to 27 ) 0.00 GD-4/4 Providing & fixing SWF / CTF on distributaries 2.20 Shopping 2.20 of LBC (Km 45 to 58 ) A Providing & fixing SWF / CTF on distributaries Shopping 0.00 of LBC (Km 45 to 58 ) GD-4/5 Providing & fixing SWF / CTF on distributaries 2.06 Shopping 2.06 of LBC (Km59 to 84 ) A Providing & fixing SWF / CTF on distributaries Shopping 0.00 of LBC (Km59 to 84 ) GD-4/6 Providing & fixing SWF / CTF on distributaries 2.23 Shopping 2.23 of RBC (Km0 to 30 ) Providing & fixing SWF / CTF on distributaries Shopping 0.00 A of RBC (Km0 to 30 ) R2 GD-4/2 Providing & fixing SWF / CTF on distributaries 11.20 NCB of LBC (Km 1 to 27 & 45 to 84) & RBC (0 to 11.20 30) R3 GD-4/2 Providing & fixing SWF / CTF on distributaries 14.45 Shopping of LBC (Km 1 to 27 & 45 to 84) & RBC (0 to (12) 14.45 30) for 12 shopping works Construction of CTF in the Jurisdiction of wua R4 Gd-4/2/1 no.39 to 47 of GRBC 1.359 Shopping 1.36 Construction of CTF in the Jurisdiction of wua R4 Gd-4/2/2 no.24 to 31 of GLBC 1.208 Shopping 1.21 Construction of CTF in the Jurisdiction of wua R4 Gd-4/2/3 no.9 to 17 & 18 of GLBC 1.086 Shopping 1.09 R2 Total for Schemes 6600.150 6600.150 R3_Total for Schemes 6592 6591.97 R4_Total for Schemes 6501 6908.58 For Buildings 2/24/2011 PRM_R4 34 Maharashtra Water Sector Improvement Project Sr. Name of Package Nos. Description of Works/goods Estimated Method of No Project cost Procurement (Rs. in ICB/NCB Million) Total 1 2 3 4 5 6 13 Ren-QC1 Renovation to building of Quality Control Circle 6.25 NCB 6.25 at Pune R Ren-QC1/1 Renovation of lab at Narayangaon 1.59 Shopping 1.59 c A Ren-QC1/1 Renovation of lab at Narayangaon 1.648 Shopping 1.63 R Ren-QC1/2 Renovation of labs in Solapur 1.28 Shopping 1.28 c A Ren-QC1/2 Renovation of labs in Solapur 1.225 Shopping 1.04 R Ren-QC1/3 Renovation of labs in Kolhapur 1.39 Shopping 1.39 c A Ren-QC1/3 Renovation of labs in Kolhapur 1.38 Shopping 0.85 R Ren-QC1/4 Renovation of labs in Pune 0.81 Shopping 0.81 c A Ren-QC1/4 Renovation of labs in Pune 0.752 Shopping 0.65 R Ren-QC1/5 Renovation of labs in Satara 0.934 Shopping 0.93 c A Ren-QC1/5 Renovation of labs in Satara 0.883 Shopping 0.64 Ren-QC2 Renovation to building of Quality Control Circle 6.25 NCB 6.25 at A'bad R Ren-QC21 Renovation of labs under Nagpur Division 1.7 Shopping 1.70 A Ren-QC21 Renovation of labs under Nagpur Division 1.75 Shopping 1.75 c A1 Ren-QC21 Renovation of labs under Nagpur Division 1.75 Shopping 1.00 R Ren-QC22 Renovation of labs under Amravati Division 1.3 Shopping 1.30 A Ren-QC22 Renovation of labs under Amravati Division 1.3 Shopping R2 Ren-QC22 Renovation of labs under Amravati Division 1.3 Shopping 1.3 c A2 Ren-QC22 Renovation of labs under Amravati Division 1.58 Shopping 1.84 R Ren-QC23 Renovation of labs under Dhule Division 1.31 Shopping 1.31 A Ren-QC23 Renovation of labs under Dhule Division 1.435 Shopping R2 Ren-QC23 Renovation of labs under Dhule Division 1.435 Shopping 1.435 A2 Ren-QC23 Renovation of labs under Dhule Division 1.435 Shopping R4 Ren-QC23 Renovation of labs under Dhule Division 1.306 Shopping 1.31 R Ren-QC24 Renovation of labs under Nanded Division 1.62 Shopping 1.62 A Ren-QC24 Renovation of labs under Nanded Division 1.67 Shopping R2 Ren-QC24 Renovation of labs under Nanded Division 1.67 Shopping 1.67 c A2 Ren-QC24 Renovation of labs under Nanded Division Shopping 1.52 1.59 Total for Buildings 12.5 23.32 R 11.934 14.47 R2 Total for Buildings 12.068 12.068 R3 Total for Buildings 12.044 12.17 R4 Total for Buildings 12.04 10.54 R2 Grand Total for PRM 6705 6705 2/24/2011 PRM_R4 35 Maharashtra Water Sector Improvement Project Sr. Name of Package Nos. Description of Works/goods Estimated Method of No Project cost Procurement (Rs. in ICB/NCB Million) Total 1 2 3 4 5 6 13 R3 Grand TotaR3 Grand Total for PRM (Excluding Drainage Schemes) 6604 6679 R4 R4 G Grand Total for PRM (Excluding Drainage Schemes Plan for Drainage sc 6513 6919 Note: ICB*/NC Note There is change in the earlier reported expenditure figures. Expenditure figures reported in R4 revision are th field record as against the probable expenditure reported earlier. 2/24/2011 PRM_R4 36 Maharashtra Water Sector Improvement Project Procurement Packaging Plan and Implementation Schedule for civil works Of Dam Safety component Revision No 4 Rs In Millions Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document 1 2 3 4 5 6 7 8 9 10 11 12 Major Projects I Kukadi Kuk-1 Leakage control treatment on U/S face 99.75 ICB 12/31/2006 1/31/2007 2/28/2007 4/15/2007 7/31/2007 6/30/2010 of Manikdoh Dam Leakage control treatment on U/S face R Kuk-1 of Manikdoh Dam 99.75 ICB 6/30/2007 7/30/2007 8/30/2007 9/30/2007 12/30/2007 11/30/2010 Leakage control treatment on U/S face R2 Kuk-1 of Manikdoh Dam 99.75 ICB 12/31/2007 1/31/2008 2/29/2008 3/29/2008 6/29/2008 5/29/2011 R3 Kuk-1 1) Manikdoh Dam Stage-1 233.4 NCB 7/19/2008 9/30/2009 10/31/2009 PAR 2/1/2010 9/30/2011 283 Leakage control on u/s face Manikdoh dam & dam safety R4 Kuk-1 / M-1 remedial works of Manikdoh Dam 140.53 NCB 30 Sept.09 9/30/2009 31-Oct-10 31-Dec-10 28-Feb-11 28-Feb-14 Stage-I Survey, Investigation 1 Kal Kal-1 Dam Safety remedial works 70.62 NCB 6/30/2006 7/30/2006 8/30/2006 9/30/2006 12/30/2006 12/30/2009 R Kal-1 Dam Safety remedial works 70.62 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 8/30/2010 R2 Kal-1 Dam Safety remedial works 70.62 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 3/2/2011 R3 Kal-1 Dam Safety remedial works 70.62 NCB 8/31/2008 10/2/2008 1/2/2009 PAR 7/27/2009 9/27/2011 Const.of Guide wall and R4 Kal-1 strengthening of NOF section by 33.68 NCB 19-Dec-08 butleresses to Dolwahal weir @ 2 Pench Pch-1 Dam Safety remedial works for Pench 75.08 NCB 6/30/2006 7/30/2006 8/30/2006 9/30/2006 12/30/2006 12/30/2009 R Pch-1 Dam Safety remedial works for Pench 75.08 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 8/30/2010 R2 Pch-1 Dam Safety remedial works for Pench 75.08 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 3/2/2011 R3 Pch-1 Dam Safety Civil Works 62.55 NCB 7/21/2008 6/30/2008 7/31/2009 PAR 11/30/2009 9/30/2011 (A) Remadial work of Dam Safty for R4 Pch-1 Pench Hydro Electri Project 103.30 NCB 1-May-08 14-Jan-10 8-Apr-10 PAR 10-Jul-10 9-Jul-12 (A) Totaladoh of civil part 284 R3 Pch-1 Dam Safety Mechanical Works 46.56 NCB 7/21/2008 6/30/2008 7/31/2009 PAR 11/30/2009 9/30/2011 (B) R4 Remadial work of Dam Safty for Pch-1 Pench Hydro Electri Project 36.07 NCB 1-May-08 15-Oct-10 30-Oct-10 PAR 30-Dec-10 29-Dec-12 (B) Totaladoh of Mechanical part R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 1 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document 285 R3 Pch-1 (C) Dam Safety Civil Works 213.96 NCB 12/9/2008 6/30/2008 7/31/2009 PAR 11/30/2009 9/30/2011 R4 Rehabiliation & Dam Safety work of PCH-1 (C) Pench Navegaon Khairy Dam Tq. 286.65 NCB 12/9/2008 30-May-10 30-Jul-10 PAR 15-Dec-10 14-Dec-12 Parseoni Distt. Nagpur 286 R3 Pch-1 (D) Dam Safety Videography 2.26 NCB 12/9/2008 30-Jun-08 31-Jul-09 PAR 30-Nov-09 30-Sep-11 A3 Dam Safety work - Under Water Pch-1 (D) Vidiography of U/S of Pench 2.285 Shopping 9-Dec-08 19-Sep-09 3-Oct-09 PAR 18-Mar-10 Navegaon Khairy Dam. 287 R3 Pch-1 (E) Dam Safety Mechanical Works 15.69 NCB 12/9/2008 6/30/2008 7/31/2009 PAR 11/30/2009 9/30/2011 R4 Dam Safety Mechanical work of Pch-1 (E) Pench Navegaon Khairy Dam Tq. 49.190 NCB 9-Dec-08 30-May-10 30-Jul-10 PAR 15-Dec-10 14-Dec-12 Parseoni Distt. Nagpur 288 R3 Pch-1 (E-1) Dam Safety Electrical Works 3.240 NCB 12/9/2008 6/30/2008 7/31/2009 PAR 11/30/2009 9/30/2011 R4 Dam Safety Electrical work of Pench Pch-1 (E-1) Navegaon Khairy Dam Tq. Parseoni 3.240 NCB 9-Dec-08 30-May-10 30-Jul-10 PAR 15-Dec-10 14-Dec-12 Distt. Nagpur 3 Mula Mul-1 Dam Safety remedial works for Mula 16.94 NCB 6/30/2006 7/30/2006 8/30/2006 9/30/2006 12/30/2006 12/30/2008 R Mul-1 Dam Safety remedial works for Mula 16.94 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 8/30/2010 R2 Mul-1 Dam Safety remedial works for Mula 16.94 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 3/2/2011 R3 Mul-1 Dam Safety remedial works for Mula 18.27 NCB 5/30/2007 5/17/2008 5/4/2009 PAR 10/1/2009 9/30/2010 A3 Remedial work of Dam Safety for Mul-1 17.20 NCB 15-Oct-01 17-May-08 5-Aug-08 PAR 31-Aug-09 Mula Dam 4 Hatnur Dam Safety remedial works for Hat-1 10.37 NCB 6/30/2006 7/30/2006 8/30/2006 9/30/2006 12/30/2006 12/30/2008 Hatnur R Dam Safety remedial works for Hat-1 10.37 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 8/30/2010 Hatnur R2 Dam Safety remedial works for Hat-1 10.37 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 3/2/2011 Hatnur R3 Dam Safety remedial works for Hat-1 102.2 NCB 11/24/2008 7/30/2009 8/30/2009 PAR 9/30/2009 9/30/2011 Hatnur R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 2 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document A3 Dam Safety remedial works for Hat-1 102.2 NCB 11/24/2008 7/30/2009 8/30/2009 PAR Rejected Rejected Hatnur A3/1 Dam Safety remedial works for Hat-1/1 1.64 Shopping 11/24/2008 7/30/2009 2/28/2010 PAR Rejected Rejected Hatnur A) Civil Works A3/2 Dam Safety remedial works for Hat-1/1 1.10 Shopping 5/31/2009 6/16/2009 6/16/2009 PAR Rejected Rejected Hatnur A) Civil Works A3/3 Dam Safety remedial works for Hat-1/1 1.10 Shopping 5/31/2009 6/16/2009 6/16/2009 PAR Rejected Rejected Hatnur A) Civil Works R4 Dam Safety remedial works for Hat-1/1 1.10 Shopping 5/31/2009 6/16/2009 6/16/2009 PAR 6/30/2010 3/31/2011 Hatnur A) Civil Works 289 R4 Dam Safety remedial works for Hat-1/2 Hatnur B) Electrical & Mechanical 27.38 NCB 11/24/2008 7/30/2009 2/28/2010 PAR 3/30/2010 Works 5 Ghod Gd-1 Dam Safety remedial works for Ghod 17.99 NCB 6/30/2006 7/30/2006 8/30/2006 9/30/2006 12/30/2006 12/30/2008 R Gd-1 Dam Safety remedial works for Ghod 17.99 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 8/30/2010 R2 Gd-1 Dam Safety remedial works for Ghod 17.99 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 3/2/2011 R3 Gd-1 Dam Safety remedial works for Ghod 16.77 NCB 8/31/2008 9/30/2009 10/31/2009 PAR 2/1/2010 9/30/2011 R4 Dam safety Remedial works of Ghod Gd-1 / S-1 13.66 NCB dam Stage-I 290 R4 Dam safety Remedial works of Ghod Gd-1 / S-2 dam Stage-II Leakage control & 152.44 NCB 31-May-10 30-Sep-10 15-Oct-10 31-Dec-10 1-Apr-11 30-Sep-11 other works 6 Kukadi Dam Safety remedial works for Kuk-2 Manikdoh dam,Yedgaon dam, and 168.30 NCB 6/30/2006 7/30/2006 8/30/2006 9/30/2006 12/30/2006 12/30/2009 Wadaj dam under Kukadi Project R Dam Safety remedial works for Kuk-2 Manikdoh dam,Yedgaon dam, and 168.30 NCB 2/28/2007 3/30/2007 4/30/2007 6/1/2007 8/30/2007 8/30/2010 Wadaj dam under Kukadi Project R2 Dam Safety remedial works for Kuk-2 Manikdoh dam,Yedgaon dam, and 168.30 NCB 8/31/2007 10/2/2007 11/2/2007 12/4/2007 3/2/2008 3/2/2011 Wadaj dam under Kukadi Project R3 Kuk-2/1 1) Yedgaon Dam Stage-1 22.38 NCB 7/19/2008 9/30/2009 10/31/2009 PAR 2/1/2010 9/30/2011 R3 Kuk-2/2 1) Wadaj Dam Stage-1 13.9 NCB 8/31/2008 9/30/2009 10/31/2009 PAR 2/1/2010 9/30/2011 Leakage control on u/s face Manikdoh dam & dam safety R4 Kuk-2 / M-2 remedial works of Manikdoh Dam 302.35 NCB 31-May-10 30-Sep-10 15-Oct-10 31-Dec-10 1-Apr-11 30-Sep-11 Stage-II Leakage control & other works R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 3 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document 291 Dam safety Remedial works Wadaj R4 Kuk-2 / W-1 10.34 NCB 30-Sep-09 31-Jul-10 30-Sep-10 30-Nov-10 30-Nov-12 dam Stage-I 292 Dam safety Remedial works Wadaj R4 Kuk-2 / W-2 dam Stage-II Leakage control & 117.02 NCB 31-May-10 30-Sep-10 15-Oct-10 31-Dec-10 1-Apr-11 30-Sep-11 other works 293 Dam safety Remedial works Yedgaon R4 Kuk-2 / Y-1 15.93 NCB 30-Sep-09 31-Jul-10 30-Sep-10 30-Nov-10 30-Nov-12 dam Stage-I 294 Dam safety Remedial works Yedgaon R4 Kuk-2 / Y-2 dam Stage-II Leakage control & 134.7 NCB 31-May-10 30-Sep-10 15-Oct-10 31-Dec-10 1-Apr-11 30-Sep-11 other works 7 Manar Man-1 Dam Safety remedial works Manar 9.50 NCB 6/30/2006 7/30/2006 8/30/2006 9/30/2006 12/30/2006 6/30/2008 R Man-1 Dam Safety remedial works Manar 9.50 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 8/30/2010 R2 Man-1 Dam Safety remedial works Manar 9.50 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 3/2/2011 R3 Man-1 Dam Safety remedial works Manar 34.38 NCB 6/30/2007 12/26/2008 5/30/2009 PAR 7/31/2009 7/31/2011 A3 Dam safty work of Manar Major 31-Dec-07 26-Dec-08 12-Jan-09 PAR 24-Feb-10 Man-1 36.26 NCB Project 8 Upper Pus Dam Safety remedial works Upper Pus-1 5.31 NCB 6/30/2006 7/30/2006 8/30/2006 9/30/2006 12/30/2006 6/30/2008 Pus R Pus-1 Dam Safety remedial works Upper 5.31 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 8/30/2010 Pus R2 Dam Safety remedial works Upper Pus-1 5.31 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 3/2/2011 Pus R3 Dam Safety remedial works Upper Pus-1 3.31 NCB 7/13/2007 2/27/2009 4/1/2009 PAR 5/15/2009 5/14/2010 Pus A3 Dam Safety remedial works Upper Pus-1 3.47 NCB 13-Jul-07 27-Feb-09 1-Apr-09 PAR 18-May-09 20-Apr-10 Pus 9 Itiadoh Iti-1 Dam Safety remedial works Itiadoh 8.85 NCB 6/30/2006 7/30/2006 8/30/2006 9/30/2006 12/30/2006 6/30/2008 R Iti-1 Dam Safety remedial works Itiadoh 8.85 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 8/30/2010 R2 Iti-1 Dam Safety remedial works Itiadoh 8.85 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 3/2/2011 R3 Iti-1 Dam Safety Works 22.810 NCB 7/1/2008 5/8/2008 7/31/2009 8/31/2009 11/30/2009 9/30/2011 A3 Remidial works of Dam Safety of Iti-1 18.622 NCB 4-Apr-09 8-May-09 21-May-09 PAR 30-Nov-09 Itiadoh Project Total For Major Projects 482.72 R Total for Minor Projects 482.72 R2 Total for Minor Projects 482.72 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 4 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document R3 Total For Major Projects 882.31 R4 Total For Major Projects 1,505.42 Medium Projects 10 Katepurna Kat-1 Dam Safety remedial works 8.29 NCB 6/30/2006 7/30/2006 8/30/2006 9/30/2006 12/30/2006 6/30/2008 R Kat-1 Dam Safety remedial works 8.29 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 8/30/2010 R2 Kat-1 Dam Safety remedial works 8.29 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 3/2/2011 R3 Kat-1 Dam Safety remedial works 8.23 NCB 12/7/2008 2/26/2009 5/22/2009 PAR 6/30/2009 6/29/2010 A3 Kat-1 Dam Safety remedial works 8.23 NCB 7-Dec-08 26-Feb-09 22-May-09 PAR 10-Jul-09 11 Koradi Nala Kor-1 Dam Safety remedial works 1.22 Shopping 12/31/2005 1/31/2006 3/30/2006 4/30/2006 7/31/2006 1/31/2008 R Kor-1 Dam Safety remedial works 1.22 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 Kor-1 Dam Safety remedial works 1.22 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 Kor-1 Dam Safety remedial works 20.24 NCB 7/13/2007 6/15/2009 6/25/2009 PAR 8/15/2009 8/14/2010 A3 Kor-1 Dam Safety remedial works 19.51 NCB 13-Jul-07 15-Jun-09 25-Jun-09 PAR 5-Nov-09 12 Sukhana Suk-1 Dam Safety remedial works 2.32 NCB 12/31/2005 1/31/2006 3/30/2006 4/30/2006 7/31/2006 1/31/2008 R Suk-1 Dam Safety remedial works 2.32 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 6/30/2007 6/30/2009 R2 Suk-1 Dam Safety remedial works 2.32 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 1/2/2008 1/2/2010 R3 Suk-1 Dam Safety remedial works 82.95 NCB 2/28/2008 6/15/2009 6/30/2009 PAR 8/30/2009 8/30/2011 R4 Suk-1 Dam Safety remedial works 55.21 NCB 28-Feb-08 31-Aug-09 18-Aug-09 PAR 30-Jun-09 13 Waghad Wag-1 Dam Safety remedial works 12.83 NCB 6/30/2006 7/30/2006 8/30/2006 9/30/2006 12/30/2006 12/30/2008 R Wag-1 Dam Safety remedial works 12.83 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 8/30/2010 R2 Wag-1 Dam Safety remedial works 12.83 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 3/2/2011 R3 Wag-1 Dam Safety remedial works 13.80 NCB 5/29/2007 9/12/2007 10/10/2008 PAR 10/1/2008 9/30/2010 A3 Dam Safety remedial works A) civil Wag-1/1 15.17 NCB 20-Mar-08 15-May-08 19-Jul-08 PAR 6 Dec.08 5-Jun-10 Works 295 A3 Dam Safety remedial works B) Wag-1/2 2.38 NCB 31-Jan-09 12-Feb-09 19-Jul-08 PAR 31 Aug.09 Mechanical works 296 A3 Dam Safety remedial works C) Wag-1/3 1.04 Shopping 30-Sep-09 5-Dec-09 11-Dec-09 PAR 23 Feb.10 7/31/2010 Electrical works 14 Ghatshill Pargaon Gha-1 Dam Safety remedial works 0.88 Shopping 12/31/2005 1/31/2006 3/30/2006 4/30/2006 7/31/2006 1/31/2008 R Gha-1 Dam Safety remedial works 0.88 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 Gha-1 Dam Safety remedial works 0.88 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 Gha-1 Dam Safety remedial works 0.95 Shopping 5/29/2007 6/15/2008 5/13/2009 PAR 10/1/2009 9/30/2010 A3 Remedial works of Dam safety works Gha-1 0.82 Shopping 8-Jun-07 4-Oct-08 11-Jun-09 PAR 12-Aug-09 Ghatshil Pargaon Medium Project 15 Mangi Mng-1 Dam Safety remedial works 1.35 Shopping 12/31/2005 1/31/2006 3/30/2006 4/30/2006 7/31/2006 1/31/2008 R Mng-1 Dam Safety remedial works 1.35 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 5 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document R2 Mng-1 Dam Safety remedial works 1.35 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 Mng-1 Dam Safety remedial works 7.12 NCB 9/27/2008 6/30/2009 7/30/2009 PAR 10/30/2009 10/30/2010 R4 Mng-1 Dam Safety remedial works 7.05 NCB 27-Sep-08 30-Apr-10 30-May-10 PAR 15-Jul-10 14-Jul-11 16 Gharni Ghr-1 Dam Safety remedial works 1.53 Shopping 12/31/2005 1/31/2006 3/30/2006 4/30/2006 7/31/2006 1/31/2008 R Ghr-1 Dam Safety remedial works 1.53 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 Ghr-1 Dam Safety remedial works 1.53 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 Ghr-1 Dam Safety remedial works 84.35 NCB 7/27/2008 8/1/2009 9/30/2009 PAR 1/31/2009 1/31/2011 R4 Ghr-1 Dam Safety remedial works 89.65 NCB 7/27/2008 3-Dec-09 30-Dec-09 PAR 27-Apr-10 26-Oct-11 18 Kambli Kam-1 Dam Safety remedial works 0.14 Shopping 12/31/2005 1/31/2006 3/30/2006 4/30/2006 7/31/2006 1/31/2008 R Kam-1 Dam Safety remedial works 0.14 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 Kam-1 Dam Safety remedial works 0.14 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 Kam-1 Dam Safety remedial works 1.44 Shopping 7/27/2008 6/15/2009 6/30/2009 PAR 9/15/2009 9/15/2010 A3 Kam-1 Dam Safety remedial works 1.91 NCB 27-Jul-08 31-Jul-09 4-Aug-09 PAR 4-Feb-10 19 Terna Ter-1 Dam Safety remedial works 3.00 NCB 12/31/2005 1/31/2006 3/30/2006 4/30/2006 7/31/2006 1/31/2008 R Ter-1 Dam Safety remedial works 3.00 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 2/28/2010 R2 Ter-1 Dam Safety remedial works 3.00 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 9/2/2010 R3 Ter-1 Dam Safety remedial works 3.00 NCB 9/27/2008 6/30/2009 7/30/2009 PAR 10/30/2009 10/30/2010 Deleted Deleted 20 Panzara Pan-1 Dam Safety remedial works 0.48 Shopping 12/31/2005 1/31/2006 3/30/2006 4/30/2006 7/31/2006 1/31/2008 R Pan-1 Dam Safety remedial works 0.48 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 Pan-1 Dam Safety remedial works 0.48 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 Pan-1 Dam Safety remedial works 10.65 NCB 8/31/2008 5/26/2009 6/15/2009 PAR 8/10/2009 7/10/2010 Pan-1 Dam Safety remedial works 0.55 Shopping 1-Oct-06 25-May-09 28-May-09 PAR Rejected Rejected R4 Pan-1 Dam Safety remedial works 0.55 Shopping 1-Oct-06 25-May-09 28-May-09 PAR 30-Apr-10 31-Jan-11 21 Kanholi Kan-1 Dam Safety remedial works 0.62 Shopping 12/31/2005 1/31/2006 3/30/2006 4/30/2006 7/31/2006 1/31/2008 R Kan-1 Dam Safety remedial works 0.62 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 Kan-1 Dam Safety remedial works 0.62 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 Kan-1 Dam Safety Works 9.77 NCB 7/13/2007 6/30/2009 7/31/2009 PAR 11/30/2009 5/31/2011 A3 Rehabiliation & Dam Safety work of Kan-1 Kanholi Medium Proj. Tq. Hingna 8.272 NCB 7/13/2007 17-Aug-09 10-Aug-09 PAR 5-Mar-10 Distt. Nagpur 297 Tekepar Tek-1 Dam Safety Works R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 6 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document R3 Tek-1 Dam Safety Works 0.000 - - 6/30/2009 7/31/2009 8/31/2009 11/30/2009 5/31/2011 A3 Repairs to Head Works of Tekepar Tek-1 L.I.S. 3.16 NCB 11-May-2009 24-Aug-2009 25-Aug-2009 PAR 21-Jan-2010 Tah.Bhandara Dist.Bhandara 298 Pakadiguddam Dam Safety works of Pakadiguddam R4 PAK-1 Medium Project Tq. Korpana 0.8 Shopping 28-Feb-10. 31-Oct-10. 31-Nov-10. PAR 31-Dec-10. 31-Dec-11. Distt Chandrapur Total For Medium Projects 36.39 R Total For Medium Projects 32.65 R2 Total For Medium Projects 32.66 R3 Total For Medium Projects 242.50 R4 Total For Medium Projects 213.76 Minor Projects 28 Zapade ZAP-1 Dam Safety remedial works 13.02 NCB 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 12/31/2008 R ZAP-1 Dam Safety remedial works 13.02 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 8/30/2010 R2 ZAP-1 Dam Safety remedial works 13.02 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 3/2/2011 R3 ZAP-1 Dam Safety remedial works 35.88 NCB 8/31/2008 10/2/2008 1/2/2009 PAR 7/2/2009 5/2/2011 R4 ZAP-1 Dam Safety remedial works 29.68 NCB 15-Jan-2010 28-Jan-2010 26-Mar-2010 PAR 30-Jun-2010 29-Jun-2012 29 Tithavali TTH-1 Dam Safety remedial works 10.15 NCB 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 12/31/2008 R TTH-1 Dam Safety remedial works 10.15 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 8/30/2010 R2 TTH-1 Dam Safety remedial works 10.15 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 3/2/2011 R3 TTH-1 Dam Safety remedial works 2.00 NCB 8/31/2008 10/2/2008 1/2/2009 PAR 5/2/2009 5/2/2010 R4 TTH-1 Dam Safety remedial works 20.69 NCB 15-Feb-2010 4-Mar-2010 30-Apr-2010 PAR 29-Jul-2010 28-Jul-2012 84 Yerawaghu YRW-1 Dam Safety remedial works 12.79 NCB 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 12/31/2008 R YRW-1 Dam Safety remedial works 12.79 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 8/30/2010 R2 YRW-1 Dam Safety remedial works 12.79 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 3/2/2011 R3 YRW-1 Dam Safety remedial works 12.79 NCB 8/31/2008 10/2/2008 2/2/2009 PAR 6/2/2009 8/2/2010 Deleted # 23 Thakurwadi THK-1 Dam Safety remedial works 2.68 NCB 12/31/2005 1/31/2006 2/28/2006 Not Reqd 7/31/2006 1/31/2008 R THK-1 Dam Safety remedial works 2.68 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 2/28/2010 R2 THK-1 Dam Safety remedial works 2.68 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 9/2/2010 R3 THK-1 Dam Safety remedial works 8.48 NCB 12/15/2008 7/31/2009 8/31/2009 PAR 1/31/2010 7/31/2011 A3 THK-1 Dam Safety remedial works 5.83 NCB 31-Mar-09 16-Jul-09 9 Nov. 09 PAR 9 Feb. 2010 24 Raitale RAI-1 Dam Safety remedial works 2.02 NCB 12/31/2005 1/31/2006 2/28/2006 Not Reqd 7/31/2006 1/31/2008 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 7 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document R RAI-1 Dam Safety remedial works 2.02 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 8/30/2009 R2 RAI-1 Dam Safety remedial works 2.02 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 3/2/2010 R3 RAI-1 Dam Safety remedial works 5.37 NCB 8/31/2008 10/2/2008 1/2/2009 PAR 6/2/2009 6/2/2010 R4 Remadial work of Dam Safety work RAI-1 of Raitale M.I. Scheme, Tal. Dahanu, 20.27 NCB 11 Dec. 09 30-Sep-10 31-Oct-10 PAR 31-Dec-10 30-Jun-12 Dist. Thane 25 Shrigaon SHR-1 Dam Safety remedial works 0.44 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R SHR-1 Dam Safety remedial works 0.44 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 SHR-1 Dam Safety remedial works 0.44 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 SHR-1 Dam Safety remedial works 0.13 Shopping 4/23/2008 4/15/2009 5/28/2009 PAR 8/1/2009 7/31/2010 A3/1 Dam Safety remedial work of SHR-1 0.03 Shopping 1-Apr-09 15-Apr-09 5-Jun-09 PAR Rejected Rejected Shrigaon M.I.Scheme, Tal:- Alibag A3/2 Dam Safety remedial work of SHR-1 0.03 Shopping 1-Apr-09 15-Apr-09 PAR Rejected Rejected Shrigaon M.I.Scheme, Tal:- Alibag R4 Dam Safety remedial work of SHR-1 0.03 Shopping 1-Apr-09 15-Apr-09 20-Jun-10 PAR 30-Aug-10 3-Mar-12 Shrigaon M.I.Scheme, Tal:- Alibag 26 Kondgaon KDG-2 Dam Safety remedial works 0.45 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R KDG-2 Dam Safety remedial works 0.45 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 KDG-2 Dam Safety remedial works 0.45 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 KDG-2 Dam Safety remedial works 1.10 Shopping 4/23/2008 4/15/2009 5/28/2009 PAR 8/1/2009 7/31/2010 A3/1 Dam Safety remedial work of KDG-2 Kondgaon M.I.Scheme, Tal:- 1.003 Shopping 1-Apr-09 15-Apr-09 5-Jun-09 PAR Rejected Rejected Sudhagad Dist:- Raigad. A3/2 Dam Safety remedial work of KDG-2 Kondgaon M.I.Scheme, Tal:- 1.003 Shopping 1-Apr-09 15-Apr-09 5-Jun-09 PAR Rejected Rejected Sudhagad Dist:- Raigad. R4 Dam Safety remedial work of KDG-2 Kondgaon M.I.Scheme, Tal:- 1.003 Shopping 1-Apr-09 15-Apr-09 20-Jun-10 PAR 30-Aug-10 3-Mar-12 Sudhagad Dist:- Raigad. 27 Gawane GAW-1 Dam Safety remedial works 1.72 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R GAW-1 Dam Safety remedial works 1.72 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 GAW-1 Dam Safety remedial works 1.72 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 GAW-1 Dam Safety remedial works 5.00 NCB 8/31/2008 10/2/2008 2/2/2009 PAR 6/2/2009 6/2/2010 R4 GAW-1 Dam Safety remedial works 6.89 NCB 10-May-2010 15-May-2010 31-May-2010 PAR 31-Aug-2010 30-Aug-2012 30 Shirval SHI-11 Dam Safety remedial works 2.76 NCB 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R SHI-11 Dam Safety remedial works 2.76 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 2/28/2010 R2 SHI-11 Dam Safety remedial works 2.76 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 9/2/2010 R3 SHI-11 Dam Safety remedial works 32.50 NCB 8/31/2008 10/2/2008 2/2/2009 PAR 6/2/2009 6/2/2011 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 8 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document R4 SHI-11 Dam Safety remedial works 50.70 NCB 11-Feb-2010 15-May-2010 31-May-2010 PAR 31-Aug-2010 30-Aug-2012 31 Amboli AMB-1 Dam Safety remedial works 0.61 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R AMB-1 Dam Safety remedial works 0.61 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 AMB-1 Dam Safety remedial works 0.61 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 AMB-1 Dam Safety remedial works 0.61 Shopping 10/31/2008 11/30/2008 2/28/2009 PAR 6/28/2009 4/28/2010 Deleted # 32 Mahirawani MHR-1 Dam Safety remedial works 0.43 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R MHR-1 Dam Safety remedial works 0.43 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 MHR-1 Dam Safety remedial works 0.43 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 MHR-1 Dam Safety remedial works 0.28 Shopping 11/22/2008 3/2/2009 5/25/2009 PAR 10/1/2009 9/30/2010 A3 Remidial Work of Dam Sefety of MHR-1 MAHIRAVANI Dam Tq. Nashik 0.28 Shopping 31-Dec-06 2-Mar-09 30-May-09 Not Reqd 12-Nov-09 Dist.Nashik 33 Ratnapur RAT-1 Dam Safety remedial works 3.11 NCB 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R RAT-1 Dam Safety remedial works 3.11 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 2/28/2010 R2 RAT-1 Dam Safety remedial works 3.11 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 9/2/2010 R3 RAT-1 Dam Safety remedial works 10.29 NCB 2/13/2008 5/31/2009 6/20/2009 PAR 7/15/2009 7/14/2011 A3 Remedial work of Dam Safety Work RAT-1 7.78 NCB 1/Apr/09 7/Oct/09 5/Nov/09 PAR 7/Jan/10 of Ratnapur M. I. Tank, Tal. Jamkhed 34 Belapur Badgi BBD-1 Dam Safety remedial works 1.18 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R BBD-1 Dam Safety remedial works 1.18 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 BBD-1 Dam Safety remedial works 1.18 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 BBD-1 Dam Safety remedial works 1.26 Shopping 5/24/2008 11/30/2008 5/25/2009 PAR 10/1/2009 9/30/2010 A3 Remedial works of Dam safety works 1.269 BBD-1 Shopping 3-Jun-08 25-Nov-08 11-Jun-09 PAR 17-Aug-09 Belapur Badgi M.I.Project 35 Nimgul NIM-1 Dam Safety remedial works 0.23 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R NIM-1 Dam Safety remedial works 0.23 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 NIM-1 Dam Safety remedial works 0.23 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 NIM-1 Dam Safety remedial works 0.67 Shopping 8/31/2008 5/26/2009 6/15/2009 PAR 8/10/2009 6/10/2010 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 9 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document A3/1 NIM-1 Dam Safety remedial works 0.63 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected A3/2 NIM-1 Dam Safety remedial works 0.66 Shopping 5-May-08 25-May-09 28-May-09 PAR 11-Mar-10 36 Methi MTH-1 Dam Safety remedial works 0.63 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R MTH-1 Dam Safety remedial works 0.63 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 MTH-1 Dam Safety remedial works 0.63 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 MTH-1 Dam Safety remedial works 0.72 Shopping 8/31/2008 5/26/2009 6/15/2009 PAR 8/10/2009 7/10/2010 A3/1 MTH-2 Dam Safety remedial works 0.72 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected A3/2 MTH-2 Dam Safety remedial works 0.72 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected A3/3 MTH-2 Dam Safety remedial works 0.76 Shopping 5-May-08 25-May-09 28-May-09 PAR 11-Mar-10 37 Hatgaon No.1 HGN-1 Dam Safety remedial works 0.94 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R HGN-1 Dam Safety remedial works 0.94 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 HGN-1 Dam Safety remedial works 0.94 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 deleted # deleted 38 Galan GLN-1 Dam Safety remedial works 2.07 NCB 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R GLN-1 Dam Safety remedial works 2.07 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 8/30/2009 R2 GLN-1 Dam Safety remedial works 2.07 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 3/2/2010 R3 GLN-1 Dam Safety remedial works 1.24 Shopping 4/30/2008 5/25/2009 5/27/2009 PAR 7/30/2009 3/30/2010 A3 GLN-1 Dam Safety remedial works 1.19 Shopping 4/30/2008 5/25/2009 8-Jun-09 PAR 20-Aug-09 19-Mar-10 39 Khaparkheda KPK-1 Dam Safety remedial works 0.60 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R KPK-1 Dam Safety remedial works 0.60 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 KPK-1 Dam Safety remedial works 0.60 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 KPK-1 Dam Safety remedial works 0.53 Shopping 11/24/2008 5/26/2009 6/15/2009 PAR 8/10/2009 6/10/2010 A3/1 KPK-1 Dam Safety remedial works 0.53 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected A3/2 KPK-1 Dam Safety remedial works 0.53 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected A3/3 KPK-1 Dam Safety remedial works 0.53 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected A3/4 KPK-1 Dam Safety remedial works 0.53 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected R4 KPK-1 Dam Safety remedial works 0.53 Shopping 5-May-08 25-May-09 28-May-09 PAR 31-May-10 28-Feb-11 40 Kodhawal KOD-1 Dam Safety remedial works 0.29 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R KOD-1 Dam Safety remedial works 0.29 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 KOD-1 Dam Safety remedial works 0.29 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 KOD-1 Dam Safety remedial works 0.333 Shopping 11/24/2009 5/26/2009 6/15/2009 PAR 8/10/2009 7/10/2010 A3/1 KOD-1 Dam Safety remedial works 0.33 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected A3/2 KOD-1 Dam Safety remedial works 0.33 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 10 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document A3/3 KOD-1 Dam Safety remedial works 0.33 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected A3/4 KOD-1 Dam Safety remedial works 0.33 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected R4 KOD-1 Dam Safety remedial works 0.33 Shopping 5-May-08 25-May-09 28-May-09 PAR 31-May-10 28-Feb-11 41 Wafgaon WAF-1 Dam Safety remedial works 0.53 Shopping 12/31/2005 1/31/2006 2/28/2006 Not Reqd 7/31/2006 1/31/2008 R WAF-1 Dam Safety remedial works 0.53 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 WAF-1 Dam Safety remedial works 0.53 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 WAF-1 Dam Safety remedial works 3.96 NCB 3/13/2008 5/31/2009 7/7/2009 PAR 7/31/2009 6/30/2011 R4 Remedial works of Dam Safety work WAF-1 of Wafgaon M.I. Tank Tal. Khed, 3.89 NCB 1-Oct-09 15-Oct-09 1-Nov-09 PAR 2-May-10 1-May-11 Dist. Pune 42 Shirsuphal SUP-1 Dam Safety remedial works 3.68 NCB 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R SUP-1 Dam Safety remedial works 3.68 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 2/28/2010 R2 SUP-1 Dam Safety remedial works 3.68 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 9/2/2010 R3 SUP-1 Dam Safety remedial works 10.15 NCB 6/24/2008 5/31/2009 6/20/2009 PAR 7/15/2009 7/14/2011 A3 Remedial work of Dam Safety Work SUP-1 7.49 NCB 15/May/09 1/Aug/09 13/Aug/09 PAR 1/Nov/09 of Shirsuphal M. I. Tank, Tal. Daund 43 Aatpadi AAT-1 Dam Safety remedial works 0.72 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R AAT-1 Dam Safety remedial works 0.72 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 AAT-1 Dam Safety remedial works 0.72 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 AAT-1 Dam Safety remedial works 1.98 NCB 10/20/2008 5/25/2009 5/31/2009 PAR 7/31/2009 7/31/2010 A3 Remedial Work of Dam safety work AAT-1 1.79 Shopping 24-Oct-08 26-May-09 23-Jun-09 PAR 21-Aug-09 for M.I.Tank Atpadi Dist. Sangli 44 Shegaon SHE-1 Dam Safety remedial works 0.36 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R SHE-1 Dam Safety remedial works 0.36 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 SHE-1 Dam Safety remedial works 0.36 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 SHE-1 Dam Safety remedial works 0.40 Shopping 10/20/2008 5/25/2009 5/31/2009 PAR 7/31/2009 7/31/2010 A3 Remedial Work of Dam safety work SHE-1 0.25 Shopping 24-Oct-08 26-May-09 23-Jun-09 PAR 21-Aug-09 for M.I.Tank Shegaon Dist. Sangli 45 Hingangaon HIN-1 Dam Safety remedial works 0.19 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R HIN-1 Dam Safety remedial works 0.19 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 HIN-1 Dam Safety remedial works 0.19 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 11 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document R3 HIN-1 Dam Safety remedial works 1.12 Shopping 3/13/2008 6/6/2009 6/30/2009 PAR 8/16/2009 10/15/2010 A3 Remedial work of Dam Safety Work HIN-1 of Hingangaon M. I. Tank, Tal. 1.42 Shopping 10/Mar/09 17/Apr/09 7/Dec/09 PAR 27/Jan/10 Phaltan 46 Satewadi SAT-1 Dam Safety remedial works 0.93 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R 0.93 SAT-1 Dam Safety remedial works Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 SAT-1 Dam Safety remedial works 0.93 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 SAT-1 Dam Safety remedial works 1.12 Shopping 9/1/2007 8/7/2009 8/20/2009 PAR 10/6/2009 1/5/2011 R4 Remedial works of Dam Safety work SAT-1 of Satewadi M.I. Tank Tal. Khatau, 7.00 NCB 30/Apr/10 30/Jul/10 20/Mar/10 PAR 30/Oct/10 29/Oct/11 Dist. Satara 47 Hotgi HOT-1 Dam Safety remedial works 0.44 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R HOT-1 Dam Safety remedial works 0.44 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 HOT-1 Dam Safety remedial works 0.44 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 HOT-1 Dam Safety remedial works 0.40 Shopping 6/28/2008 10/16/2008 5/20/2009 PAR 7/31/2009 1/31/2010 A3 HOT-1 Dam Safety remedial works 0.31 Shopping 26-Jun-08 16-Oct-08 15-May-09 PAR 4-Aug-09 26-Feb-10 48 Pathri PTH-1 Dam Safety remedial works 0.20 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R PTH-1 Dam Safety remedial works 0.20 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 PTH-1 Dam Safety remedial works 0.20 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 PTH-1 Dam Safety remedial works 0.18 Shopping 12/20/2008 10/16/2008 5/20/2009 PAR 7/31/2009 1/31/2010 A3 PTH-1 Dam Safety remedial works 0.03 Shopping 15-Dec-08 16-Oct-08 15-May-09 PAR 10-Aug-09 24-Jan-10 49 Shendri SHN-1 Dam Safety remedial works 0.18 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R SHN-1 Dam Safety remedial works 0.18 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 SHN-1 Dam Safety remedial works 0.18 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 SHN-1 Dam Safety remedial works 0.18 Shopping 5/21/2008 5/20/2009 5/31/2009 PAR 7/31/2009 6/31/2010 A3 Dam Safety Remedial works of Shendri M. I. Project Tal : SHN-1 0.03 Shopping 5-Aug-07 20-May-09 22-Jun-09 PAR 17-Aug-09 Gadhinglaj, Dist : Kolhapur for Kalbhairav WUA Shendri 50 Kandalgaon KDL-1 Dam Safety remedial works 0.48 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 12 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document R KDL-1 Dam Safety remedial works 0.48 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 KDL-1 Dam Safety remedial works 0.48 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 KDL-1 Dam Safety remedial works 0.49 Shopping 5/21/2008 5/20/2009 5/31/2009 PAR 7/31/2009 6/31/2010 A3 Dam Safety Remedial works of KDL-1 Kandalgaon M. I. Project Tal 0.33 Shopping 5-Aug-07 20-May-09 22-Jun-09 PAR 17-Aug-09 51 Ranjangaon RJN-1 Dam Safety remedial works 0.51 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R RJN-1 Dam Safety remedial works 0.51 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 RJN-1 Dam Safety remedial works 0.51 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 RJN-1 Dam Safety remedial works 0.38 Shopping 9/7/2008 9/7/2008 5/11/2009 PAR 6/27/2009 6/26/2010 A3/1 RJN-1 Dam Safety remedial works 0.38 Shopping 30-Jun-07 7-Sep-08 11-May-09 PAR Rejected Rejected A3/2 RJN-1 Dam Safety remedial works 0.60 Shopping 30-Jun-07 7-Sep-08 11-May-09 PAR 27-Jun-09 52 Champaner CHA-1 Dam Safety remedial works 1.02 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R CHA-1 Dam Safety remedial works 1.02 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 CHA-1 Dam Safety remedial works 1.02 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 CHA-1 Dam Safety remedial works 0.32 Shopping 11/14/2008 11/14/2008 5/22/2009 PAR 7/10/2009 6/9/2010 A3/1 CHA-1 Dam Safety remedial works 0.32 Shopping 18-Aug-08 22-May-09 22-May-09 PAR Rejected Rejected A3/2 CHA-1 Dam Safety remedial works 0.32 Shopping 18-Aug-08 22-May-09 22-May-09 PAR 10-Jul-09 53 Dawargaon DAW-1 Dam Safety remedial works 0.24 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R DAW-1 Dam Safety remedial works 0.24 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 6/30/2007 6/30/2009 R2 DAW-1 Dam Safety remedial works 0.24 Shopping 6/30/2007 7/30/2007 8/30/2007 PAR 1/1/2008 1/1/2010 R3 DAW-1 Dam Safety remedial works 0.23 Shopping 11/11/2008 11/11/2008 5/22/2009 PAR 7/10/2009 6/9/2010 A3/1 DAW-1 Dam Safety remedial works 0.23 Shopping 28-Jun-08 22-May-09 22-May-09 PAR Rejected Rejected A3/2 DAW-1 Dam Safety remedial works 0.23 Shopping 28-Jun-08 22-May-09 22-May-09 PAR 10-Jul-09 54 Bharaj BHA-1 Dam Safety remedial works 0.29 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 13 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document R BHA-1 Dam Safety remedial works 0.29 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 BHA-1 Dam Safety remedial works 0.29 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 BHA-1 Dam Safety remedial works 0.22 Shopping 12/19/2008 1/27/2009 5/11/2009 PAR 6/27/2009 6/26/2010 A3 BHA-1 Dam Safety remedial works 0.22 Shopping 19-Dec-08 27-Jan-09 11-May-09 PAR Rejected Rejected A3/1 BHA-1 Dam Safety remedial works 0.22 Shopping 19-Dec-08 27-Jan-09 11-May-09 PAR 27-Jun-09 55 Pimparala PPL-1 Dam Safety remedial works 1.48 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R PPL-1 Dam Safety remedial works 1.48 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 PPL-1 Dam Safety remedial works 1.48 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 PPL-1 Dam Safety remedial works 2.40 Shopping 7/31/2007 7/1/2009 8/1/2009 PAR 10/15/2009 4/15/2011 A3 PPL-1 Dam safty work Pimprala M.I.Project 1.49 Shopping 1-Mar-09 30-Jul-09 31-Aug-08 PAR 7-Dec-09 56 Nichpur NCH-1 Dam Safety remedial works 1.37 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R NCH-1 Dam Safety remedial works 1.37 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 NCH-1 Dam Safety remedial works 1.37 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 NCH-1 Dam Safety remedial works 3.13 NCB 9/27/2008 8/1/2009 8/15/2009 PAR 10/31/2009 4/30/2011 A3 NCH-1 Dam safty work Nitchpur M.I.Project 2.92 NCB 1-Apr-2009 25-Sep-2009 12-Jan-2009 PAR 27-Jun-2010 57 Tandulwadi TAN-1 Dam Safety remedial works 1.13 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R TAN-1 Dam Safety remedial works 1.13 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 TAN-1 Dam Safety remedial works 1.13 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 TAN-1 Dam Safety remedial works 0.57 Shopping 12/20/2008 5/7/2009 5/7/2009 PAR 6/26/2009 6/25/2010 A3 TAN-1 Dam Safety remedial works 0.57 Shopping 20-Dec-2008 7-May-2009 8-May-2009 PAR 31-Aug-2009 58 Mandvi MDV-1 Dam Safety remedial works 0.34 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R MDV-1 Dam Safety remedial works 0.34 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 14 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document R2 MDV-1 Dam Safety remedial works 0.34 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 MDV-1 Dam Safety remedial works 0.34 Shopping 2/29/2008 5/15/2008 5/7/2008 PAR 6/26/2009 6/25/2010 A3 MDV-1 Dam Safety remedial works 0.34 Shopping 29-Feb-2008 15-May-2008 7-May-2008 PAR 24-Aug-2009 59 Walki WLK-1 Dam Safety remedial works 0.53 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R WLK-1 Dam Safety remedial works 0.53 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 WLK-1 Dam Safety remedial works 0.53 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 WLK-1 Dam Safety remedial works 0.57 Shopping 1/28/2008 6/26/2008 5/13/2008 PAR 7/31/2009 6/30/2010 A3 Remedial works of Dam Safety for Walki M.I.Tank, Tq.Aundha (N) Dist. WLK-1 0.58 Shopping 31-Jan-08 2008-09 13-May-08 PAR 29-Dec-09 Hingoli for Shri Krapa W.U.A. Ltd., Walki 60 Kalamnuri KLM-1 Dam Safety remedial works 1.09 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R KLM-1 Dam Safety remedial works 1.09 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 KLM-1 Dam Safety remedial works 1.09 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 KLM-1 Dam Safety remedial works 1.17 Shopping 9/25/2008 6/6/2009 6/6/2009 PAR 7/31/2009 7/31/2010 A3 Remedial works of Dam Safety for Kalamnuri M.I.Tank Tq.Kalamnuri KLM-1 1.23 SHOPPING 27-Sep-08 2009-10 6-Jun-09 PAR 17-Feb-10 Dist.Hingoli for Shri Sant Dudhari W.U.A.Ltd, Salegaon. 61 Belgaon BEL-1 Dam Safety remedial works 1.19 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R BEL-1 Dam Safety remedial works 1.19 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 BEL-1 Dam Safety remedial works 1.19 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 BEL-1 Dam Safety remedial works 1.11 Shopping 7/27/2008 11/7/2008 6/15/2009 PAR 7/31/2009 7/31/2010 A3/1 BEL-1 Dam Safety remedial works 1.11 Shopping 27-Jul-08 7-Nov-08 18-Jun-09 PAR Rejected Rejected A3/2 BEL-1 Dam Safety remedial works 1.06 Shopping 27-Jul-08 7-Nov-08 18-Jun-09 PAR 23-Mar-10 62 Golangari GOL-1 Dam Safety remedial works 0.10 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R GOL-1 Dam Safety remedial works 0.10 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 GOL-1 Dam Safety remedial works 0.10 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 GOL-1 Dam Safety remedial works 4.00 NCB 6/30/2007 5/31/2009 6/15/2009 PAR 7/31/2009 1/31/2011 A3 GOL-1 Dam Safety remedial works 2.85 NCB 30-Jun-07 5-Nov-09 23-Nov-09 PAR 8-Feb-10 63 Bhutekarwadi BKD-1 Dam Safety remedial works 0.07 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R BKD-1 Dam Safety remedial works 0.07 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 BKD-1 Dam Safety remedial works 0.07 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 15 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document R3 BKD-1 Dam Safety remedial works 0.49 Shopping 6/28/2008 6/15/2009 6/30/2009 PAR 8/15/2009 8/15/2010 A3 BKD-1 Dam Safety remedial works 1.78 Shopping 28-Jun-08 25-Aug-09 31-Aug-09 PAR 7-Jan-10 64 Badur BAD-1 Dam Safety remedial works 0.18 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R BAD-1 Dam Safety remedial works 0.18 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 BAD-1 Dam Safety remedial works 0.18 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 BAD-1 Dam Safety remedial works 0.32 Shopping 7/27/2008 6/15/2009 6/30/2009 PAR 8/15/2009 8/15/2010 A3 BAD-1 Dam Safety remedial works 0.19 Shopping 27-Jul-08 15-Jun-09 30-Jun-09 PAR 16-Nov-09 65 Bagalwadi BAG-1 Dam Safety remedial works 0.57 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R BAG-1 Dam Safety remedial works 0.57 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 BAG-1 Dam Safety remedial works 0.57 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 BAG-1 Dam Safety remedial works 0.42 Shopping 6/28/2008 11/15/2008 6/15/2009 PAR 7/31/2009 6/30/2010 A3 BAG-1 Dam Safety remedial works 0.44 Shopping 28-Jun-08 15-Nov-08 15-Jun-09 PAR 27-Jan-10 66 Yemai YEM-1 Dam Safety remedial works 0.15 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R YEM-1 Dam Safety remedial works 0.15 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 YEM-1 Dam Safety remedial works 0.15 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 YEM-1 Dam Safety remedial works 0.15 Shopping 7/27/2008 5/19/2009 6/15/2009 PAR 7/31/2009 6/30/2010 A3 YEM-1 Dam Safety remedial works 0.16 Shopping 27-Jul-08 19-May-09 15-Jun-09 PAR 27-Jan-10 67 Shekdari SHK-1 Dam Safety remedial works 2.45 NCB 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R SHK-1 Dam Safety remedial works 2.45 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 8/30/2009 R2 SHK-1 Dam Safety remedial works 2.45 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 3/2/2010 R3 SHK-1 Dam Safety remedial works 2.21 NCB 7/13/2007 2/5/2009 4/4/2009 PAR 6/5/2009 6/4/2010 A3 SHK-1 Dam Safety remedial works 2.31 NCB 13-Jul-07 5-Feb-09 4-Apr-09 PAR 30-Jul-09 68 Mozari MOZ-1 Dam Safety remedial works 1.36 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R MOZ-1 Dam Safety remedial works 1.36 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 MOZ-1 Dam Safety remedial works 1.36 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 MOZ-1 Dam Safety remedial works 1.35 Shopping 6/3/2008 3/19/2009 5/15/2009 PAR 6/20/2009 6/19/2010 A3 MOZ-1 Dam Safety remedial works 1.42 Shopping 3-Jun-08 19-Mar-09 15-May-09 PAR 25-Jun-09 30-Dec-09 69 Singdoh SIN-1 Dam Safety remedial works 0.44 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R SIN-1 Dam Safety remedial works 0.44 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 SIN-1 Dam Safety remedial works 0.44 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 SIN-1 Dam Safety remedial works 0.51 Shopping 10/13/2008 3/20/2009 4/30/2009 PAR 7/31/2009 3/31/2010 A3 Singdoh M. I. Project Dam SIN-1 0.46 Shopping 22-Mar-08 20-Mar-09 25-May-09 PAR 5-Aug-09 Safty Work 70 Vyagra VYG-1 Dam Safety remedial works 2.65 NCB 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R VYG-1 Dam Safety remedial works 2.65 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 9/2/2010 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 16 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document R2 VYG-1 Dam Safety remedial works 2.65 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/20/2011 R3 VYG-1 Dam Safety remedial works 2.44 NCB 8/9/2008 3/4/2009 4/30/2009 PAR 6/20/2009 12/19/2010 A3 VYG-1 Dam Safety remedial works 2.56 NCB 9-Aug-08 4-Mar-09 30-Apr-09 PAR 1-Aug-09 71 Vidrupa VDR-1 Dam Safety remedial works 0.79 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R VDR-1 Dam Safety remedial works 0.79 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 VDR-1 Dam Safety remedial works 0.79 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 Deleted # 71 Manjra MJR-1 Dam Safety remedial works 0.17 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R MJR-1 Dam Safety remedial works 0.17 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 MJR-1 Dam Safety remedial works 0.17 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 MJR-1 Dam Safety remedial works 12.90 Shopping 6/8/2008 6/30/2009 7/31/2009 PAR 10/31/2009 10/31/2010 R4 MJR-1 Dam Safety remedial works 82.29 NCB 72 Wai WAI-1 Dam Safety remedial works 1.13 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R WAI-1 Dam Safety remedial works 1.13 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 WAI-1 Dam Safety remedial works 1.13 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 WAI-1 Dam Safety remedial works 1.10 Shopping 3/15/2008 1/6/2009 5/11/2009 PAR 10/31/2009 8/31/2010 A3 WAI-1 Dam Safety remedial works 1.100 Shopping 05-Feb-09 27-Mar-09 11-May-09 PAR 01-Aug-09 74 Zilpa ZIL-1 Dam Safety remedial works 0.37 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 5/31/2007 R ZIL-1 Dam Safety remedial works 0.37 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 ZIL-1 Dam Safety remedial works 0.37 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 ZIL-1 Dam Safety remedial works 0.24 Shopping 7/21/2008 6/30/2009 7/15/2009 PAR 11/15/2009 11/15/2010 R4 Rehabiliation & Dam Safety work of ZIL-1 Zilpa M.I. Proj. Tq. Katol Distt. 3.069 NCB 7/21/2008 21-Mar-09 7-Dec-09 PAR 25-May-10 24-May-11 Nagpur 75 Ukarwahi UKR-1 Dam Safety remedial works 0.26 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R UKR-1 Dam Safety remedial works 0.26 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 UKR-1 Dam Safety remedial works 0.26 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 MID_Ng R3 Ukr-1 Dam Safety Works 1.99 NCB 7/13/2007 3/16/2009 7/15/2009 PAR 11/15/2009 5/31/2011 A3 Rehabiliation & Dam Safety work of Ukr-1 Ukarwahi M.I. Proj. Tq. Umred 0.273 Shopping 15-Jan-09 16-Mar-09 27-May-09 PAR 27-Oct-09 Distt. Nagpur 76 Dodmazari DOD-1 Dam Safety remedial works 0.43 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R DOD-1 Dam Safety remedial works 0.43 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 DOD-1 Dam Safety remedial works 0.43 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 DOD-1 Dam Safety remedial works 0.52 Shopping 2/29/2008 6/30/2009 7/31/2009 PAR 11/30/2009 6/30/2010 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 17 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document A3 Rehabilitation and modernization of Dam Safety Work of Dodmazari DOD-1 0.44 Shopping 15-Jun-2009 22-Jun-2009 29-Jun-2009 PAR 16-Sep-2009 M.I.Tank , Tah.Bhandara, Dist. Bhandara 77 Saleburdi SAL-1 Dam Safety remedial works 0.28 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R SAL-1 Dam Safety remedial works 0.28 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 SAL-1 Dam Safety remedial works 0.28 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 SAL-1 Dam Safety remedial works 0.51 Shopping 7/18/2008 6/30/2009 7/31/2009 PAR 11/30/2009 6/30/2010 A3 Rehabilitation and modernization of SAL-1 Dam Safety Work of Salebardi 0.54 Shopping 15-Jun-2009 20-Jun-2009 3-Jul-2009 PAR 16-Sep-2009 M.I.Tank , 78 Gadmaushi GAD-1 Dam Safety remedial works 0.16 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R GAD-1 Dam Safety remedial works 0.16 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 GAD-1 Dam Safety remedial works 0.16 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 GAD-1 Dam Safety remedial works 5.35 NCB 6/3/2008 6/15/2009 6/30/2009 PAR 8/30/2009 8/30/2010 A3 Dam Safety works of Gadmoushi M.I. GAD-1 3.019 NCB 30-Jun-09. 10-Aug-09. 14-Aug-09. PAR 29-Jan-10. Project Tq. Nagbhid 79 Itoli GAD-2 Dam Safety remedial works 0.14 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R ITO-1 Dam Safety remedial works 0.14 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 ITO-1 Dam Safety remedial works 0.14 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 ITO-1 Dam Safety remedial works 3.13 NCB 6/3/2008 6/15/2009 6/30/2009 PAR 8/30/2009 8/30/2010 A3 Dam Safety works of Itoli M.I. ITO-1 Project Tq. Ballarpur Distt. 2.079 Shopping 30-Jun-09. 11-Aug-09. 14-Aug-09. PAR 31-Dec-09. Chandrapur 80 Kunghada KUN-1 Dam Safety remedial works 0.36 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R KUN-1 Dam Safety remedial works 0.36 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 KUN-1 Dam Safety remedial works 0.36 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 KUN-1 Dam Safety remedial works 0.36 NCB 12/9/2008 6/15/2009 6/30/2009 PAR 8/30/2009 6/30/2010 A3 Dam Safety works of Kunghada M.I. KUN-1 Project Tq. Chamorshi 11.28 NCB 30-Jun-09. 17-Aug-09. 17-Aug-09. PAR 18-Dec-09. Distt.Gadchiroli 81 Ashti ASH-1 Dam Safety remedial works 0.91 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R ASH-1 Dam Safety remedial works 0.91 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 18 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document R2 ASH-1 Dam Safety remedial works 0.91 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 ASH-1 Dam Safety remedial works 0.61 Shopping 5/2/2008 11/12/2008 4/30/2009 PAR 8/30/2009 6/30/2010 A3 Dam Safety works of Asti M.I. Tq. ASH-1 0.616 Shopping 30-Sept-08. 12-Dec-08. 30-Apr-09. PAR 24-Jul-09. Ashti, Dist. Wardha 82 Savangi SAV-1 Dam Safety remedial works 0.99 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R SAV-1 Dam Safety remedial works 0.99 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 SAV-1 Dam Safety remedial works 0.99 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 SAV-1 Dam Safety remedial works 0.93 Shopping 5/2/2008 11/12/2008 4/30/2009 PAR 8/30/2009 8/30/2010 A3 Dam Safety works of Sawangi M.I. SAV-1 0.942 Shopping 30-Sept-08. 12-Dec-08. 30-Apr-09. PAR 24-Jul-09. Project Tq. Arvi Distt. Wardha 83 Bhadbhadya BDY-1 Dam Safety remedial works 1.43 Shopping 12/31/2005 1/31/2006 2/28/2006 PAR 7/31/2006 1/31/2008 R BDY-1 Dam Safety remedial works 1.43 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 BDY-1 Dam Safety remedial works 1.43 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 BDY-1 Dam Safety remedial works 1.48 Shopping 10/14/2008 6/30/2009 7/15/2009 PAR 11/15/2009 11/15/2010 A3 Construction of Remedial work of BDY-1 dam safety work for Bhadbhadya 5.067 NCB 30-Nov-07 30-Nov-09 8-Dec-09 PAR 23-Apr-10 M.I.Project. 85 Muthewadgaon MUT-1 Dam Safety remedial works 0.82 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R MUT-1 Dam Safety remedial works 0.82 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 MUT-1 Dam Safety remedial works 0.82 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 MUT-1 Dam Safety remedial works 0.65 Shopping 5/24/2008 11/30/2008 5/25/2009 PAR 10/1/2009 9/30/2010 A3 Remedial works of Dam safety works MUT-1 0.69 Shopping 3-Jun-08 25-Nov-08 11-Jun-09 PAR 12-Aug-09 Muthe Vadgaoni M.I.Project 86 Ambhore ABH-1 Dam Safety remedial works 0.90 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R ABH-1 Dam Safety remedial works 0.90 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 ABH-1 Dam Safety remedial works 0.90 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 ABH-1 Dam Safety remedial works 0.42 Shopping 5/24/2008 11/30/2008 5/25/2009 PAR 10/1/2009 9/30/2010 A3 Remedial works of Dam safety works ABH-1 0.39 Shopping 3-Jun-08 25-Nov-08 11-Jun-09 PAR 12-Aug-09 Ambhore M.I.Project 87 Bhalawani BLW-1 Dam Safety remedial works 1.42 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R BLW-1 Dam Safety remedial works 1.42 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 BLW-1 Dam Safety remedial works 1.42 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 BLW-1 Dam Safety remedial works 1.50 Shopping 5/29/2007 6/15/2008 5/20/2009 PAR 10/1/2009 9/30/2010 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 19 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document A3 Remedial works of Dam safety works 1.33 BLW-1 Shopping 8-Jun-07 22-Sep-08 11-Jun-09 PAR 12-Aug-09 Bhalwlani M.I.Project 88 Sakur SAK-1 Dam Safety remedial works 0.95 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R SAK-1 Dam Safety remedial works 0.95 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 SAK-1 Dam Safety remedial works 0.95 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 SAK-1 Dam Safety remedial works 1.93 NCB 11/22/2008 5/25/2009 5/28/2009 PAR 10/1/2009 9/30/2010 A3 Remedial works of Dam safety works SAK-1 1.90 NCB 3-Dec-08 1-Jun-09 10-Jul-09 PAR 31-Aug-09 Sakur M.I.Project 89 Tikhol TIK-1 Dam Safety remedial works 1.00 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R TIK-1 Dam Safety remedial works 1.00 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 TIK-1 Dam Safety remedial works 1.00 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 TIK-1 Dam Safety remedial works 1.06 Shopping 5/29/2007 6/15/2008 5/20/2009 PAR 10/1/2009 9/30/2010 A3 Remedial works of Dam safety works TIK-1 0.95 Shopping 8-Jun-07 22-Sep-08 11-Jun-09 PAR 12-Aug-09 Tikhol M.I.Project 90 Mohari Pathardi MHP-1 Dam Safety remedial works 0.63 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R MHP-1 Dam Safety remedial works 0.63 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 MHP-1 Dam Safety remedial works 0.63 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 MHP-1 Dam Safety remedial works 0.68 Shopping 5/29/2007 6/15/2008 5/20/2009 PAR 10/1/2009 9/30/2010 A3 Remedial works of Dam safety works MHP-1 0.57 Shopping 11-Oct-06 22-Sep-08 11-Jun-09 PAR 12-Aug-09 Mohori M.I.Project 91 Dastapur DAS-1 Dam Safety remedial works 0.89 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R DAS-1 Dam Safety remedial works 0.89 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 DAS-1 Dam Safety remedial works 0.89 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 DAS-1 Dam Safety remedial works 0.76 Shopping 6/3/2008 11/28/2008 4/4/2009 PAR 7/5/2009 6/4/2010 A3 DAS-1 Dam Safety remedial works 0.80 Shopping 3-Jun-08 28-Nov-08 4-Apr-09 PAR 12-Jun-09 92 Malkhed MAL-1 Dam Safety remedial works 4.03 NCB 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R MAL-1 Dam Safety remedial works 4.03 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 2/28/2010 R2 MAL-1 Dam Safety remedial works 4.03 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 9/2/2010 R3 MAL-1 Dam Safety remedial works 4.02 NCB 7/13/2007 1/23/2009 4/4/2009 PAR 7/5/2009 8/4/2010 A3 MAL-1 Dam Safety remedial works 4.21 NCB 13-Jul-07 23-Jan-09 4-Apr-09 PAR 5-Jun-09 93 Satnoor STN-1 Dam Safety remedial works 0.77 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R STN-1 Dam Safety remedial works 0.77 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 STN-1 Dam Safety remedial works 0.77 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 STN-1 Dam Safety remedial works 0.77 Shopping 6/3/2008 12/10/2008 4/4/2009 PAR 7/5/2009 6/4/2010 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 20 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document A3 STN-1 Dam Safety remedial works 0.81 Shopping 3-Jun-08 10-Dec-08 4-Apr-09 PAR 30-Jul-09 94 Saraswati SAR-1 Dam Safety remedial works 0.66 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R SAR-1 Dam Safety remedial works 0.66 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 SAR-1 Dam Safety remedial works 0.66 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 SAR-1 Dam Safety remedial works 0.62 Shopping 12/7/2008 1/27/2009 4/4/2009 PAR 7/5/2009 6/4/2010 A3 SAR-1 Dam Safety remedial works 0.65 Shopping 7-Dec-08 27-Jan-09 4-Apr-09 PAR 9-Jun-09 95 Kachner KAC-1 Dam Safety remedial works 1.11 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R KAC-1 Dam Safety remedial works 1.11 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 KAC-1 Dam Safety remedial works 1.11 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 KAC-1 Dam Safety remedial works 0.40 Shopping 8/29/2008 8/29/2008 5/22/2009 PAR 7/10/2009 6/9/2010 A3/1 KAC-1 Dam Safety remedial works 0.40 Shopping 28-Jun-08 22-May-09 22-May-09 PAR Rejected Rejected A3/2 KAC-1 Dam Safety remedial works 0.40 Shopping 28-Jun-08 22-May-09 22-May-09 PAR 10-Jul-09 96 Pardeshwadi PAR-1 Dam Safety remedial works 1.02 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R PAR-1 Dam Safety remedial works 1.02 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 PAR-1 Dam Safety remedial works 1.02 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 PAR-1 Dam Safety remedial works 1.16 Shopping 10/14/2008 10/14/2008 5/11/2009 PAR 6/27/2009 6/26/2010 A3/1 PAR-1 Dam Safety remedial works 1.16 Shopping 30-Jun-07 14-Oct-08 11-May-09 PAR Rejected Rejected A3/2 PAR-1 Dam Safety remedial works 1.16 Shopping 30-Jun-07 14-Oct-08 11-May-09 PAR 27-Jun-09 97 Banoti BAN-1 Dam Safety remedial works 1.86 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 5/30/2009 R BAN-1 Dam Safety remedial works 1.86 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 12/2/2009 R2 BAN-1 Dam Safety remedial works 1.86 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 6/26/2010 R3 BAN-1 Dam Safety remedial works 0.62 Shopping 9/2/2008 9/2/2008 5/11/2009 PAR 6/27/2009 6/30/2008 A3/1 BAN-1 Dam Safety remedial works 0.62 Shopping 28-Jun-08 2-Sep-08 11-May-09 PAR Rejected Rejected A3/2 BAN-1 Dam Safety remedial works 0.62 Shopping 28-Jun-08 2-Sep-08 11-May-09 PAR 27-Jun-09 98 Kelgaon KEL-1 Dam Safety remedial works 1.29 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R KEL-1 Dam Safety remedial works 1.29 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 KEL-1 Dam Safety remedial works 1.29 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 KEL-1 Dam Safety remedial works 0.82 Shopping 7/3/2008 7/3/2008 5/11/2009 PAR 6/27/2009 6/26/2010 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 21 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document A3/1 KEL-1 Dam Safety remedial works 0.82 Shopping 29-Feb-08 3-Jul-08 11-May-09 PAR Rejected Rejected A3/2 KEL-1 Dam Safety remedial works 0.82 Shopping 29-Feb-08 3-Jul-08 11-May-09 PAR 27-Jun-09 99 Nirgudi NIR-1 Dam Safety remedial works 2.01 NCB 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R NIR-1 Dam Safety remedial works 2.01 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 8/30/2009 R2 NIR-1 Dam Safety remedial works 2.01 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 3/2/2010 R3 NIR-1 Dam Safety remedial works 0.30 Shopping 12/19/2008 1/23/2009 5/22/2009 PAR 7/10/2009 6/9/2010 A3/1 NIR-1 Dam Safety remedial works 0.30 Shopping 19-Dec-08 22-May-09 22-May-09 PAR Rejected Rejected A3/2 NIR-1 Dam Safety remedial works 0.30 Shopping 19-Dec-08 22-May-09 22-May-09 PAR 10-Jul-09 100 Gadhe Pimpalgaon GPG-1 Dam Safety remedial works 0.74 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R GPG-1 Dam Safety remedial works 0.74 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 GPG-1 Dam Safety remedial works 0.74 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 GPG-1 Dam Safety remedial works 0.53 Shopping 11/14/2008 11/14/2008 5/22/2009 PAR 7/10/2009 6/9/2010 A3/1 GPG-1 Dam Safety remedial works 0.53 Shopping 26-Sep-08 22-May-09 22-May-09 PAR Rejected Rejected A3/2 GPG-1 Dam Safety remedial works 0.53 Shopping 26-Sep-08 22-May-09 22-May-09 PAR 10-Jul-09 101 NimgaonChoba NGC-1 Dam Safety remedial works 2.84 NCB 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R NGC-1 Dam Safety remedial works 2.84 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 2/28/2010 R2 NGC-1 Dam Safety remedial works 2.84 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 9/2/2010 Deleted Deleted # 102 Chandapur CPR-1 Dam Safety remedial works 1.84 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R CPR-1 Dam Safety remedial works 1.84 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 CPR-1 Dam Safety remedial works 1.84 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 CPR-1 Dam Safety remedial works 0.42 Shopping 10/18/2008 11/7/2008 6/15/2009 PAR 7/31/2009 6/30/2010 A3/1 CPR-1 Dam Safety remedial works 0.42 Shopping 18-Oct-08 7-Nov-08 17-Jun-09 PAR Rejected Rejected R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 22 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document A3/2 CPR-1 Dam Safety remedial works 0.40 Shopping 18-Oct-08 7-Nov-08 17-Jun-09 PAR 23-Mar-10 103 Govindwadi GVW-1 Dam Safety remedial works 0.72 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R GVW-1 Dam Safety remedial works 0.72 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 GVW-1 Dam Safety remedial works 0.72 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 GVW-1 Dam Safety remedial works 0.70 Shopping 10/18/2008 4/6/2009 6/15/2009 PAR 10/30/2009 10/30/2010 A3/1 GVW-1 Dam Safety remedial works 0.70 Shopping 18-Oct-08 6-Apr-09 15-Jun-09 PAR Rejected Rejected A3/2 GVW-1 Dam Safety remedial works 0.60 Shopping 18-Oct-08 6-Apr-09 15-Jun-09 PAR 23-Mar-10 104 Murambi MUR-1 Dam Safety remedial works 2.65 NCB 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R MUR-1 Dam Safety remedial works 2.65 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 2/28/2010 R2 MUR-1 Dam Safety remedial works 2.65 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 9/2/2010 R3 MUR-1 Dam Safety remedial works 0.34 Shopping 10/18/2008 11/7/2008 6/15/2009 PAR 7/31/2009 6/30/2010 A3/1 MUR-1 Dam Safety remedial works 0.34 Shopping 18-Oct-08 7-Nov-08 16-Jun-09 PAR Rejected Rejected A3/2 MUR-1 Dam Safety remedial works 0.33 Shopping 18-Oct-08 7-Nov-08 16-Jun-09 PAR 23-Mar-10 105 Kharshipar KHA-1 Dam Safety remedial works 1.24 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R KHA-1 Dam Safety remedial works 1.24 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 KHA-1 Dam Safety remedial works 1.24 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 KHA-1 Dam Safety remedial works 1.79 Shopping 7/18/2008 6/30/2009 7/15/2009 PAR 11/15/2009 11/15/2010 A3 Rehabilitation and modernization of Dam Safety Work of Khursipar KHA-1 4.95 NCB 14-Jul-2009 20-Jul-2009 19-Aug-2009 PAR 18-Mar-2010 M.I.Tank , Tah.Lakhani, Dist. Bhandara 106 Kotha KOT-1 Dam Safety remedial works 2.05 NCB 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R KOT-1 Dam Safety remedial works 2.05 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 8/30/2009 R2 KOT-1 Dam Safety remedial works 2.05 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 3/2/2010 R3 KOT-1 Dam Safety remedial works 2.10 NCB 8/9/2007 11/27/2008 7/15/2009 PAR 11/15/2009 5/31/2011 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 23 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document A3 Rehabilitation and modernization of Dam Safety Work of Rengepar/Kotha KOT-1 2.14 NCB 20-Nov-2008 27-Nov-2008 10-Jul-2009 PAR 1-Jan-2009 M.I.Tank , Tah.Lakhani, Dist. Bhandara 107 Kawlewada KWW-1 Dam Safety remedial works 0.70 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R KWW-1 Dam Safety remedial works 0.70 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 KWW-1 Dam Safety remedial works 0.70 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 KWW-1 Dam Safety remedial works 1.62 Shopping 10/14/2008 6/30/2009 7/15/2009 PAR 11/15/2009 11/15/2010 A3 Rehabilitation and modernization of Dam Safety Work of Kawalewada KWW-1 0.754 Shopping 1-Aug-2009 14-Aug-2009 25-Aug-2009 PAR 5-Dec-2009 M.I.Tank , Tah.Tumsar, Dist. Bhandara 108 Wahi WAH-1 Dam Safety remedial works 0.77 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R WAH-1 Dam Safety remedial works 0.77 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 WAH-1 Dam Safety remedial works 0.77 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 WAH-1 Dam Safety remedial works 1.70 Shopping 7/13/2007 7/30/2009 7/15/2009 PAR 11/15/2009 11/15/2010 A3 Rehabilitation and modernization of WAH-1 Dam Safety Work of Wahi M.I.Tank , 1.82 NCB 14-Jun-2009 24-Jun-2009 17-Jul-2009 PAR 3-Dec-2009 Tah.Paoni, Dist. Bhandara 109 Nagthana NAG-1 Dam Safety remedial works 0.94 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R NAG-1 Dam Safety remedial works 0.94 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 NAG-1 Dam Safety remedial works 0.94 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 NAG-1 Dam Safety remedial works 0.26 Shopping 10/31/2008 11/30/2008 3/30/2009 PAR 7/30/2009 5/30/2010 A3/1 NAG-1 Dam Safety remedial works 0.26 Shopping 29-Mar-2008 30-Oct-2008 15-Jun-2009 PAR Rejected Rejected A3/2 NAG-1 Dam Safety remedial works 0.25 Shopping 29-Mar-2008 30-Oct-2008 15-Jun-2009 PAR 22-Jan-2010 110 Amgaon AMG-1 Dam Safety remedial works 1.03 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R AMG-1 Dam Safety remedial works 1.03 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 24 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document R2 AMG-1 Dam Safety remedial works 1.03 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 AMG-1 Dam Safety remedial works 1.06 Shopping 7/18/2008 6/30/2009 7/31/2009 PAR 11/30/2009 11/30/2010 A3 Rehabilitation and modernization of Dam Safety Work of Amgaon AMG-1 1.04 Shopping 15-Jun-2009 22-Jun-2009 10-Jul-2009 PAR 17-Sep-2009 M.I.Tank , Tah.Bhandara, Dist. Bhandara 111 Andhera AND-1 Dam Safety remedial works 0.49 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R AND-1 Dam Safety remedial works 0.49 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 AND-1 Dam Safety remedial works 0.49 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 AND-1 Dam Safety remedial works 0.26 Shopping 9/30/2008 12/10/2008 4/30/2009 PAR 7/20/2009 6/19/2010 A3 AND-1 Dam Safety remedial works 0.27 Shopping 30-Sep-08 10-Dec-08 30-Apr-09 PAR 17-Jul-09 112 Garkhed GAR-1 Dam Safety remedial works 0.93 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R GAR-1 Dam Safety remedial works 0.93 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 GAR-1 Dam Safety remedial works 0.93 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 GAR-1 Dam Safety remedial works 0.83 Shopping 10/13/2008 12/10/2008 4/30/2009 PAR 7/20/2009 6/19/2010 A3 GAR-1 Dam Safety remedial works 0.86 Shopping 13-Oct-08 10-Dec-08 30-Apr-09 PAR 17-Jul-09 113 Titvi TIT-1 Dam Safety remedial works 1.41 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R TIT-1 Dam Safety remedial works 1.41 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 TIT-1 Dam Safety remedial works 1.41 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 TIT-1 Dam Safety remedial works 1.36 Shopping 9/30/2008 12/10/2008 4/30/2009 PAR 7/20/2009 7/19/2010 A3 TIT-1 Dam Safety remedial works 1.42 Shopping 30-Sep-08 10-Dec-08 30-Apr-09 PAR 17-Jul-09 31-Mar-10 114 Zari ZAR-1 Dam Safety remedial works 0.59 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R ZAR-1 Dam Safety remedial works 0.59 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 ZAR-1 Dam Safety remedial works 0.59 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 ZAR-1 Dam Safety remedial works 0.56 Shopping 9/30/2008 12/10/2008 4/30/2009 PAR 7/20/2009 6/19/2010 A3 ZAR-1 Dam Safety remedial works 0.59 Shopping 30-Sep-08 10-Dec-08 30-Apr-09 PAR 17-Jul-09 115 Telhara TEL-1 Dam Safety remedial works 0.92 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R TEL-1 Dam Safety remedial works 0.92 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 TEL-1 Dam Safety remedial works 0.92 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 TEL-1 Dam Safety remedial works 0.20 Shopping 9/30/2008 12/10/2008 4/30/2009 PAR 7/20/2009 6/19/2010 A3 TEL-1 Dam Safety remedial works 0.21 Shopping 30-Sep-08 10-Dec-08 30-Apr-09 PAR 17-Jul-09 31-Mar-10 116 Mudza MUD-1 Dam Safety remedial works 0.97 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R MUD-1 Dam Safety remedial works 0.97 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 MUD-1 Dam Safety remedial works 0.97 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 MUD-1 Dam Safety remedial works 6.71 NCB 6/3/2008 6/15/2009 6/30/2009 PAR 8/30/2009 8/30/2010 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 25 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document A3 Dam Safety works of Mudza M.I. MUD-1 Project Tq. Bramhapuri Distt. 4.36 NCB 30-Jun-09. 10-Aug-09. 14-Aug-09. PAR 28-Jan-10. Chandrapur 117 Janala JNL-1 Dam Safety remedial works 1.98 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R JNL-1 Dam Safety remedial works 1.98 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 JNL-1 Dam Safety remedial works 1.98 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 JNL-1 Dam Safety remedial works 1.98 NCB 5/2/2008 11/18/2008 6/30/2009 PAR 8/30/2009 8/30/2010 A3 Dam Safety works of Janala M.I. JNL-1 Project Tq. Mul Distt. Chandrapur for 2.020 Shopping 30-Sept-08. 18-Nov-08. 20-Jun-09. PAR 3-Nov-09. Jalvikas Pani Wapar Sanstha Janala 118 Sondo SON-1 Dam Safety remedial works 1.89 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R SON-1 Dam Safety remedial works 1.89 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 SON-1 Dam Safety remedial works 1.89 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 SON-1 Dam Safety remedial works 3.91 NCB 12/9/2008 6/15/2009 6/30/2009 PAR 8/30/2009 8/30/2010 A3 Dam Safety works of Sondo M.I. SON-1 2.59 NCB 30-Jun-09. 11-Aug-09. 14-Aug-09. PAR 3-Dec-09. Project Tq. Rajura Distt.Gadchiroli 119 Dongargaon DOG-1 Dam Safety remedial works 1.37 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R DOG-1 Dam Safety remedial works 1.37 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 DOG-1 Dam Safety remedial works 1.37 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 DOG-1 Dam Safety remedial works 1.52 Shopping 7/13/2007 11/12/2008 4/30/2009 PAR 8/30/2009 8/30/2010 A3 Dam Safety works of Dongargaon DOG-1 1.55 Shopping 30-Sept-08. 12-Dec-08. 30-Apr-09. PAR 24-Jul-09. M.I. Project Tq. Seloo Dist. Wardha 120 Kusarla KUS-1 Dam Safety remedial works 1.12 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R KUS-1 Dam Safety remedial works 1.12 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 KUS-1 Dam Safety remedial works 1.12 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 KUS-1 Dam Safety remedial works 5.48 NCB 7/13/2007 6/15/2009 6/30/2009 PAR 8/30/2009 8/30/2010 A3 Dam Safety works of Kursarla M.I. Project Tq. Nagbhir Distt. KUS-1 4.23 NCB 30-Apr-09. 20-Jun-09. 20-Jun-09. PAR 18-Dec-09. Chandrapur for F20Pani Wapar Sansta Kusarla 121 Rudrapur RUD-1 Dam Safety remedial works 0.68 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R RUD-1 Dam Safety remedial works 0.68 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 RUD-1 Dam Safety remedial works 0.68 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 RUD-1 Dam Safety remedial works 12.73 NCB 6/3/2008 6/15/2009 6/30/2009 PAR 8/30/2009 8/30/2010 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 26 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document A3 Dam Safety works of Rudrapur M.I. RUD-1 Project Tq. Sawali Distt. Chandrapur 9.88 NCB 30-Jun-09. 17-Aug-09. 17-Aug-09. PAR 4-Feb-10. for Pani Wapar Sansta Rudrapur 122 Dhanora DHA-1 Dam Safety remedial works 0.60 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R DHA-1 Dam Safety remedial works 0.60 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 DHA-1 Dam Safety remedial works 0.60 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 DHA-1 Dam Safety remedial works 0.60 Shopping 12/9/2008 6/15/2009 6/30/2009 PAR 8/30/2009 8/30/2010 R4 Dam Safety works of Dhanora M.I. DHA-1 6.10 NCB 31-Oct-09. 31-Jul-10. 15-Aug-10. PAR 31-Dec-10. 31-Dec-11. Project Tq. Dhanora Distt.Gadchiroli 123 Yelgur YEL-1 Dam Safety remedial works 0.82 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R YEL-1 Dam Safety remedial works 0.82 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 YEL-1 Dam Safety remedial works 0.82 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 YEL-1 Dam Safety remedial works 0.82 Shopping 12/9/2008 6/15/2009 6/30/2009 PAR 8/30/2009 8/30/2010 A3 Dam Safety works of Yelgur M.M. YEL-1 6.41 NCB 30-Jun-09. 13-Aug-09. 14-Aug-09. PAR 27-Jan-10. Project Tq. Aheri Distt.Gadchiroli 124 Rajgatta RAJ-1 Dam Safety remedial works 0.95 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R RAJ-1 Dam Safety remedial works 0.95 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 RAJ-1 Dam Safety remedial works 0.95 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 RAJ-1 Dam Safety remedial works 0.95 Shopping 12/9/2008 6/15/2009 6/30/2009 PAR 8/30/2009 8/30/2010 A3 Dam Safety works of Rajgatta M.M. RAJ-1 Project Tq. Gadchiroli 6.22 NCB 30-Jun-09. 13-Aug-09. 14-Aug-09. PAR 27-Jan-10. Distt.Gadchiroli 125 Bodagha-Tukumba BOD-1 Dam Safety remedial works 0.99 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R BOD-1 Dam Safety remedial works 0.99 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 BOD-1 Dam Safety remedial works 0.99 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 BOD-1 Dam Safety remedial works 8.71 NCB 12/9/2008 6/15/2009 6/30/2009 PAR 8/30/2009 8/30/2010 R4 Dam Safety works of Bodadha M.I. BOD-1 8.321 NCB 31-Oct-09. 9-Dec-09. 4-Jan-10. PAR 15.06.10 31-Dec-11. Project Tq. Wadsa Distt. Gadchiroli 126 Lagam LAG-1 Dam Safety remedial works 0.70 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R LAG-1 Dam Safety remedial works 0.70 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 LAG-1 Dam Safety remedial works 0.70 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 LAG-1 Dam Safety remedial works 6.63 NCB 7/13/2007 6/15/2009 6/30/2009 PAR 8/30/2009 8/30/2010 A3 Dam Safety works of Lagam M.I. LAG-1 Project Tq. Mulchera 6.15 NCB 30-Jun-09. 10-Aug-09. 14-Aug-09. PAR 27-Jan-10. Distt.Gadchiroli 127 Ankhoda ANK-1 Dam Safety remedial works 0.41 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 27 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document R ANK-1 Dam Safety remedial works 0.41 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 ANK-1 Dam Safety remedial works 0.41 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 ANK-1 Dam Safety remedial works 0.41 Shopping 7/1/2008 6/15/2009 6/30/2009 PAR 8/30/2009 6/30/2010 A3 Dam Safety works of Ankhoda M.I. ANK-1 Project Tq. Chamorshi Distt. 1.087 Shopping 30-Jun-09. 11-Aug-09. 14-Aug-09. PAR 26-Nov-09. Gadchiroli 128 Rengepar(Kotha) REN-1 Dam Safety remedial works 2.65 NCB 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R REN-1 Dam Safety remedial works 2.65 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 2/28/2010 R2 REN-1 Dam Safety remedial works 2.65 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 9/2/2010 R3 REN-1 Dam Safety remedial works 17.74 NCB 9/30/2008 6/30/2009 7/15/2009 PAR 11/15/2009 6/31/2011 R4 Construction of Remedial work of REN-1 dam safety work for Rengepar 16.15 NCB 31-Jul-09 03-May-10 11-May-10 PAR 25-Jun-10 24-Jun-12 M.I.Project. under MWSIP 129 Aktatola AKT-1 Dam Safety remedial works 1.57 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R AKT-1 Dam Safety remedial works 1.57 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 AKT-1 Dam Safety remedial works 1.57 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 AKT-1 Dam Safety remedial works 2.64 NCB 10/14/2008 6/30/2009 7/15/2009 PAR 11/15/2009 5/31/2011 A3 Construction of Remedial work of AKT-1 dam safety work for Aktitola 2.35 NCB 10/14/2008 22-Sep-09 04-Nov-09 PAR 01-Feb-10 M.I.Project. 130 Hari HAR-1 Dam Safety remedial works 1.29 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R HAR-1 Dam Safety remedial works 1.29 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 HAR-1 Dam Safety remedial works 1.29 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 HAR-1 Dam Safety remedial works 1.16 Shopping 7/13/2007 12/26/2008 7/15/2009 PAR 11/15/2009 11/15/2010 A3 Construction of Remedial work of HAR-1 1.172 Shopping 7/13/2007 26-Dec-08 27-May-09 PAR 18-Aug-09 dam safety work for Hari M.I.Project. 131 Pipriya PIP-1 Dam Safety remedial works 0.93 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R PIP-1 Dam Safety remedial works 0.93 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 PIP-1 Dam Safety remedial works 0.93 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 PIP-1 Dam Safety remedial works 2.04 NCB 7/13/2007 7/30/2009 7/15/2009 PAR 11/15/2009 5/31/2011 A3 Construction of Remedial work of PIP-1 dam safety work for Pipariya 1.67 Shopping 7/13/2007 10/5/2009 11/4/2009 PAR 2/1/2010 M.I.Project. R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 28 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document 132 Salegaon SGN-1 Dam Safety remedial works 3.45 NCB 6/30/2006 7/30/2006 8/30/2006 Not Reqd 12/31/2006 6/30/2008 R SGN-1 Dam Safety remedial works 3.45 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 2/28/2010 R2 SGN-1 Dam Safety remedial works 3.45 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 9/2/2010 R3 SGN-1 Dam Safety remedial works 1.44 Shopping 2/29/2008 12/26/2008 7/15/2009 PAR 11/15/2009 11/15/2010 A3 Construction of Remedial work of SGN-1 dam safety work for Salegaon 1.464 Shopping 2/29/2008 12/26/2008 5/27/2009 PAR 8/18/2009 M.I.Project. 133 Gumdoh GUM-1 Dam Safety remedial works 2.54 NCB 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R GUM-1 Dam Safety remedial works 2.54 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 2/28/2010 R2 GUM-1 Dam Safety remedial works 2.54 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 9/2/2010 R3 GUM-1 Dam Safety remedial works 6.74 NCB 2/29/2008 6/30/2009 7/15/2009 PAR 11/15/2009 5/31/2011 A3 Construction of Remedial work of GUM-1 dam safety work for Gumdoh 4.04 NCB 14-Sep-09 19-Nov-09 08-Dec-09 PAR 23-Apr-10 M.I.Project. under MWSIP 134 Purjal PUR-1 Dam Safety remedial works 1.13 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R GUM-1 Dam Safety remedial works 2.54 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 2/28/2010 R2 GUM-1 Dam Safety remedial works 2.54 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 9/2/2010 R3 GUM-1 Dam Safety remedial works 1.21 Shopping 1/28/2008 6/26/2008 5/13/2008 PAR 9/30/2009 9/30/2010 A3 Remedial works of Dam Safety for Purjal M.I.Tank Tq.Aundha (N) Dist. GUM-1 1.23 Shopping 31-Jan-08 2008-09 13-May-08 PAR 17-Feb-10 Hingoli for Jaiprabhu w.U.A. Ltd.,Purjal 135 Parola PRL-1 Dam Safety remedial works 1.10 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R PRL-1 Dam Safety remedial works 1.10 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 PRL-1 Dam Safety remedial works 1.10 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 29 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document R3 PRL-1 Dam Safety remedial works 1.13 Shopping 1/28/2008 6/26/2008 5/13/2008 PAR 9/30/2009 9/30/2010 A3 Remedial works of Dam Safety for Parola M.I.Tank, Tq.Aundha (N) PRL-1 1.24 Shopping 31-Jan-08 2008-09 13-May-08 PAR 1-Dec-09 Dist. Hingoli for Shivshakti W.U.A. Ltd., Parola 136 Bothi BOT-1 Dam Safety remedial works 1.23 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R BOT-1 Dam Safety remedial works 1.23 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 BOT-1 Dam Safety remedial works 1.23 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 BOT-1 Dam Safety remedial works 1.27 Shopping 1/28/2008 6/26/2008 5/13/2008 PAR 9/30/2009 9/30/2010 A3 Remedial works of Dam Safety for Bothi M.I.Tank Tq.Kalamnuri BOT-1 1.45 Shopping 31-Jan-08 2008-09 13-May-08 PAR 9-Dec-09 Dist.Hingoli for Shri Gajanan Maharaj W.U.A. Ltd., Kandli. 137 Savana SAN-1 Dam Safety remedial works 0.87 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R SAN-1 Dam Safety remedial works 0.87 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 SAN-1 Dam Safety remedial works 0.87 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 SAN-1 Dam Safety remedial works 0.90 Shopping 9/25/2008 6/25/2009 7/15/2009 PAR 8/31/2009 6/30/2010 A3 Remedial works of Dam Safety for Sawna M.I.Tank Tq.Sengaon SAN-1 0.50 Shopping 27-Sep-08 2009-10 15-Jul-09 PAR 30-Dec-09 Dist.Hingoli for Late Shivajirao Deshmukh WUA Sawana 138 Keli KEI-1 Dam Safety remedial works 1.25 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R KEI-1 Dam Safety remedial works 1.25 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 KEI-1 Dam Safety remedial works 1.25 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 KEI-1 Dam Safety remedial works 0.81 Shopping 9/25/2008 6/6/2009 6/6/2009 PAR 8/31/2009 6/30/2010 A3 Remedial works of Dam Safety for Keli M.I.Tank KEI-1 0.80 Shopping 27-Sep-08 2009-10 6-Jun-09 PAR 30-Dec-09 Tq.Aundha,Dist.Hingoli for Jai Bajrangabli WUA, Keli 139 Ghordari GHO-1 Dam Safety remedial works 1.01 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R GHO-1 Dam Safety remedial works 1.01 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 GHO-1 Dam Safety remedial works 1.01 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 GHO-1 Dam Safety remedial works 1.90 Shopping 12/17/2008 6/25/2009 7/15/2009 PAR 8/31/2009 8/31/2010 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 30 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document A3 Remedial works of Dam Safety for Ghordari M.I.Tank Tq.Sengaon GHO-1 1.84 Shopping 20-Dec-08 2009-10 15-Jul-09 PAR 25-Mar-10 Dist.Hingoli for Sadgir Baba WUA Ghordari. 140 Konad KON-1 Dam Safety remedial works 2.73 NCB 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R KON-1 Dam Safety remedial works 2.73 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 2/28/2010 R2 KON-1 Dam Safety remedial works 2.73 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 9/2/2010 R3 KON-1 Dam Safety remedial works 0.69 Shopping 9/11/2008 9/11/2008 5/11/2009 PAR 6/27/2009 6/26/2010 A3/1 KON-1 Dam Safety remedial works 0.69 Shopping 29-Feb-08 11-Sep-09 11-May-09 PAR Rejected Rejected A3/2 KON-1 Dam Safety remedial works 0.69 Shopping 29-Feb-08 11-Sep-09 11-May-09 PAR Rejected Rejected A3/3 KON-1 Dam Safety remedial works 0.69 Shopping 29-Feb-08 11-Sep-09 11-May-09 PAR 27-Jun-09 141 Paratwadi PRT-1 Dam Safety remedial works 0.46 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R PRT-1 Dam Safety remedial works 0.46 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 PRT-1 Dam Safety remedial works 0.46 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 PRT-1 Dam Safety remedial works 0.27 Shopping 7/3/2008 7/3/2008 5/11/2009 PAR 6/27/2009 6/26/2010 A3/1 PRT-1 Dam Safety remedial works 0.27 Shopping 30-Jun-07 11-May-09 11-May-09 PAR Rejected Rejected A3/2 PRT-1 Dam Safety remedial works 0.27 Shopping 30-Jun-07 11-May-09 11-May-09 PAR 27-Jun-09 142 Talegaon TLG-1 Dam Safety remedial works 1.10 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R TLG-1 Dam Safety remedial works 1.10 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 31 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document R2 TLG-1 Dam Safety remedial works 1.10 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 TLG-1 Dam Safety remedial works 0.99 Shopping 11/6/2008 11/6/2008 5/22/2009 PAR 7/10/2009 9/9/2010 A3/1 0.99 TLG-1 Dam Safety remedial works Shopping 28-Jun-08 22-May-09 22-May-09 PAR Rejected Rejected A3/2 TLG-1 Dam Safety remedial works 0.99 Shopping 28-Jun-08 22-May-09 22-May-09 PAR 10-Jul-09 143 Pimperkheda PMK-1 Dam Safety remedial works 1.18 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R PMK-1 Dam Safety remedial works 1.18 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 PMK-1 Dam Safety remedial works 1.18 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 PMK-1 Dam Safety remedial works 0.75 Shopping 9/7/2008 9/7/2008 5/11/2009 PAR 6/27/2009 9/26/2010 A3/1 PMK-1 Dam Safety remedial works 0.75 Shopping 28-Jun-08 11-May-09 11-May-09 PAR Rejected Rejected A3/2 PMK-1 Dam Safety remedial works 0.78 Shopping 28-Jun-08 11-May-09 11-May-09 PAR 27-Jun-09 144 Barjala BRJ-1 Dam Safety remedial works 0.71 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R BRJ-1 Dam Safety remedial works 0.71 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 BRJ-1 Dam Safety remedial works 0.71 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 BRJ-1 Dam Safety remedial works 0.43 Shopping 12/19/2008 3/16/2009 5/22/2009 PAR 7/10/2009 6/9/2010 A3/1 BRJ-1 Dam Safety remedial works 0.43 Shopping 19-Dec-08 22-May-09 22-May-09 PAR Rejected Rejected A3/2 BRJ-1 Dam Safety remedial works 0.43 Shopping 19-Dec-08 22-May-09 22-May-09 PAR 10-Jul-09 145 Jamwadi JMW-2 Dam Safety remedial works 1.41 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R JMW-2 Dam Safety remedial works 1.41 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 JMW-2 Dam Safety remedial works 1.41 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 32 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document R3 JMW-2 Dam Safety remedial works 0.42 Shopping 11/14/2008 11/14/2008 5/22/2009 PAR 7/10/2009 6/9/2010 A3/1 JMW-2 Dam Safety remedial works 0.42 Shopping 26-Sep-08 22-May-09 22-May-09 PAR Rejected Rejected A3/2 JMW-2 Dam Safety remedial works 0.42 Shopping 26-Sep-08 22-May-09 22-May-09 PAR 10-Jul-09 146 Bokani BKN-1 Dam Safety remedial works 1.94 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R BKN-1 Dam Safety remedial works 1.94 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 BKN-1 Dam Safety remedial works 1.94 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 1.11 BKN-1 Dam Safety remedial works Shopping 10/18/2008 11/3/2008 6/15/2009 PAR 7/31/2009 1/31/2011 A3 BKN-1 Dam Safety remedial works 0.9 Shopping 18-Oct-08 3-Nov-08 15-Jun-09 PAR 16-Nov-09 147 Nivale NVL-1 Dam Safety remedial works 0.92 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R NVL-1 Dam Safety remedial works 0.92 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 NVL-1 Dam Safety remedial works 0.92 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 NVL-1 Dam Safety remedial works 0.27 Shopping 3/29/2008 10/30/2008 6/15/2009 PAR 7/31/2009 5/31/2010 A3 NVL-1 Dam Safety remedial works 0.23 Shopping 29-Mar-08 30-Oct-08 15-Jun-09 PAR 16-Nov-09 148 Kasar walkunda KAS-1 Dam Safety remedial works 1.31 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R KAS-1 Dam Safety remedial works 1.31 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 KAS-1 Dam Safety remedial works 1.31 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 KAS-1 Dam Safety remedial works 0.23 Shopping 6/28/2008 11/1/2008 6/15/2009 PAR 7/31/2009 5/31/2010 A3 KAS-1 Dam Safety remedial works 0.53 Shopping 28-Jun-08 1-Nov-08 15-Jun-09 PAR 16-Nov-09 149 Gotala GOT-1 Dam Safety remedial works 1.82 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R GOT-1 Dam Safety remedial works 1.82 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 GOT-1 Dam Safety remedial works 1.82 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 GOT-1 Dam Safety remedial works 0.35 Shopping 6/28/2008 11/2/2008 6/15/2009 PAR 7/31/2009 5/31/2010 A3 GOT-1 Dam Safety remedial works 0.29 Shopping 28-Jun-08 2-Nov-08 15-Jun-09 PAR 16-Nov-09 150 Nagathana NGT-1 Dam Safety remedial works 3.20 NCB 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R NGT-1 Dam Safety remedial works 3.20 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 2/28/2010 R2 NGT-1 Dam Safety remedial works 3.20 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 9/2/2010 R3 NGT-1 Dam Safety remedial works 5.34 NCB 7/1/2008 6/30/2009 7/15/2009 PAR 11/15/2009 5/31/2011 A3 Rehabilitation & Modernization of NGT-1 canal system of Nagthana M.I.Tank 3.33 Shopping 11-May-2009 10-Nov-2009 1-Dec-2009 PAR 15-May-2010 Ta. Mohadi Dist.Bhandara 151 Rachnnawadi RAC-1 Dam Safety remedial works 2.11 NCB 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 33 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document R RAC-1 Dam Safety remedial works 2.11 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 8/30/2009 R2 RAC-1 Dam Safety remedial works 2.11 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 3/2/2010 R3 RAC-1 Dam Safety remedial works 0.54 Shopping 7/27/2008 11/3/2008 6/15/2009 PAR 7/31/2009 6/30/2010 A3 RAC-1 Dam Safety remedial works 0.34 Shopping 27-Jul-08 3-Nov-08 15-Jun-09 PAR 16-Nov-09 152 Botezari BOZ-1 Dam Safety remedial works 1.24 Shopping 6/30/2006 7/30/2006 8/30/2006 Not Reqd 12/31/2006 6/30/2008 R BOZ-1 Dam Safety remedial works 1.24 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 BOZ-1 Dam Safety remedial works 1.24 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 BOZ-1 Dam Safety Works 1.26 Shopping 7/13/2007 6/30/2009 7/15/2009 PAR 11/15/2009 11/31/2010 A3 Rehabiliation & Dam Safety work of BOZ-1 Botezari M.I. Proj. Tq. Bhiwapur 1.330 SHOPPING 20-Mar-09 21-Apr-09 27-May-09 PAR 27-Oct-09 Distt. Nagpur 153 Salaimeta SMT-1 Dam Safety remedial works 2.41 NCB 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R SMT-1 Dam Safety remedial works 2.41 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 8/30/2009 R2 SMT-1 Dam Safety remedial works 2.41 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 3/2/2010 R3 SMT-1 Dam Safety Works 2.47 NCB 7/13/2007 5/25/2008 7/15/2009 PAR 11/15/2009 5/31/2011 A3 Rehabiliation & Dam Safety work of SMT-1 Salaimendha M.I. Proj. Tq. Hingna 2.47 NCB 15-Apr-08 21-May-08 4-May-09 PAR Rejected Rejected Distt. Nagpur A3/1 Rehabiliation & Dam Safety work of SMT-1 Salaimendha M.I. Proj. Tq. Hingna 2.39 NCB 15-Apr-08 21-May-08 4-May-09 PAR 1-Dec-09 Distt. Nagpur 154 Urakundapar URA-1 Dam Safety remedial works 2.63 NCB 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R URA-1 Dam Safety remedial works 2.63 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 2/28/2010 R2 URA-1 Dam Safety remedial works 2.63 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 9/2/2010 R3 URA-1 Dam Safety Works 2.69 NCB 7/13/2007 4/23/2009 7/15/2009 PAR 11/15/2009 5/31/2011 A3 Rehabiliation & Dam Safety work of URA-1 Urkudapar M.I. Proj. Tq. Bhiwapur 2.728 NCB 22-Feb-09 23-Apr-09 17-Jun-09 PAR 10-Dec-09 Distt. Nagpur 155 Sattighat SAG-1 Dam Safety remedial works 1.01 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R SAG-1 Dam Safety remedial works 1.01 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 SAG-1 Dam Safety remedial works 1.01 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 SAG-1 Dam Safety Works 0.96 Shopping 7/12/2007 6/30/2009 7/15/2009 PAR 11/15/2009 11/15/2010 A3 Rehabiliation & Dam Safety work of SAG-1 Satighat M.I. Proj. Tq. Kuhi Distt. 1.008 SHOPPING 20-Mar-09 21-Apr-09 27-May-09 PAR 27-Oct-09 Nagpur 156 Suwardhara SUW-1 Dam Safety remedial works 1.77 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R SUW-1 Dam Safety remedial works 1.77 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 SUW-1 Dam Safety remedial works 1.77 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 34 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document R3 SUW-1 Dam Safety Works 1.80 Shopping 7/13/2007 6/30/2009 7/15/2009 PAR 11/15/2009 11/15/2010 A3 Rehabiliation & Dam Safety work of SUW-1 Suwardhara M.I. Proj. Tq. Parshioni 1.80 Shopping 5-Apr-09 6-May-09 6-May-09 PAR Rejected Rejected Distt. Nagpur A3/1 Rehabiliation & Dam Safety work of SUW-1 Suwardhara M.I. Proj. Tq. Parshioni 1.786 Shopping 5-Apr-09 6-May-09 6-May-09 PAR 5-Nov-09 Distt. Nagpur 157 Kumari KUM-1 Dam Safety remedial works 1.18 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R KUM-1 Dam Safety remedial works 1.18 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 KUM-1 Dam Safety remedial works 1.18 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 KUM-1 Dam Safety remedial works 0.81 Shopping 7/13/2007 1/6/2009 7/15/2009 PAR 11/15/2009 11/15/2010 A3 Rehabiliation & Dam Safety work of KUM-1 Khumari M.I. Proj. Tq. Ramtek 0.81 Shopping 10-Dec-08 6-Jan-09 27-May-09 PAR Rejected Rejected Distt. Nagpur A3/1 Rehabiliation & Dam Safety work of KUM-1 Khumari M.I. Proj. Tq. Ramtek 1.805 Shopping 10-Dec-08 6-Jan-09 27-May-09 PAR 8-Jan-10 Distt. Nagpur 158 Karala KAR-1 Dam Safety remedial works 1.03 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R KAR-1 Dam Safety remedial works 1.03 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 KAR-1 Dam Safety remedial works 1.03 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 KAR-1 Dam Safety remedial works 1.06 Shopping 1/29/2008 3/26/2009 6/15/2009 PAR 8/1/2009 2/28/2011 A3 KAR-1 Dam safty work Karla M.I.Project 1.03 Shopping 1-Mar-09 26-Mar-09 30-Apr-09 PAR 15-Jan-10 159 Mulzara MUL-1 Dam Safety remedial works 1.35 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R MUL-1 Dam Safety remedial works 1.35 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 MUL-1 Dam Safety remedial works 1.35 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 MUL-1 Dam Safety remedial works 7.60 NCB 12/20/2008 8/1/2009 9/15/2009 PAR 10/31/2009 4/30/2011 A3 MUL-1 Dam safty work Mulzra M.I.Project 7.92 NCB 1-Mar-09 20-Jun-09 30-Nov-09 PAR 7-Dec-09 160 Sugaon SUG-1 Dam Safety remedial works 1.72 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R SUG-1 Dam Safety remedial works 1.72 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 SUG-1 Dam Safety remedial works 1.72 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 SUG-1 Dam Safety remedial works 1.37 NCB 7/31/2007 10/10/2007 1/31/2008 PAR 3/18/2008 12/17/2008 A3 SUG-1 Dam safty work Sugaon M.I.Project 1.40 Shopping 30-Apr-07 10-Oct-07 12-Oct-07 PAR 18-Mar-08 161 Ghagardara GHA-1 Dam Safety remedial works 0.85 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R GHA-1 Dam Safety remedial works 0.85 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 35 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document R2 GHA-1 Dam Safety remedial works 0.85 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 deleted deleted deleted 162 Kedarnath KED-1 Dam Safety remedial works 3.67 NCB 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R KED-1 Dam Safety remedial works 3.67 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 2/28/2010 R2 KED-1 Dam Safety remedial works 3.67 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 9/2/2010 R3 KED-1 Dam Safety remedial works 4.03 NCB 7/31/2007 9/21/2007 1/29/2008 PAR 3/7/2008 9/6/2009 A3 Dam safty work Kedarnath KED-1 3.75 NCB 1-Apr-07 21-Sep-07 12-Oct-07 PAR 7-Mar-08 M.I.Project 163 Akharga AKH-1 Dam Safety remedial works 0.77 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R AKH-1 Dam Safety remedial works 0.77 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 AKH-1 Dam Safety remedial works 0.77 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 AKH-1 Dam Safety remedial works 3.94 NCB 11/20/2008 8/1/2009 8/1/2009 PAR 10/15/2009 4/15/2011 A3 AKH-1 Dam safty work Akharga M.I.Project 4.18 NCB 1-Apr-09 14-Aug-09 12-Oct-07 PAR 7-Dec-09 164 Thangaon THA-1 Dam Safety remedial works 0.87 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R THA-1 Dam Safety remedial works 0.87 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 THA-1 Dam Safety remedial works 0.87 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 THA-1 Dam Safety remedial works 0.94 Shopping 11/22/2008 3/31/2009 5/25/2009 PAR 10/1/2009 9/30/2010 A3 Remidial Work of Dam Sefety of THA-1 THANGAON Dam Tq. Sinner 0.95 Shopping 31/12/2006 3-Jul-09 1-Aug-09 PAR 12-Nov-09 Dist.Nashik 165 Ramshej RAM-1 Dam Safety remedial works 1.06 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R RAM-1 Dam Safety remedial works 1.06 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 RAM-1 Dam Safety remedial works 1.06 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 RAM-1 Dam Safety remedial works 1.10 Shopping 5/29/2007 2/20/2009 5/25/2009 PAR 10/1/2009 9/30/2010 A3 Remidial Work of Dam Sefety of RAM-1 RAMSHEJ Dam Tq. Dindori 1.23 Shopping 31-Dec-06 2-Mar-09 30-May-09 PAR 21-Jul-09 17-Sep-09 Dist.Nashik 166 Eklahare EKL-1 Dam Safety remedial works 0.71 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R EKL-1 Dam Safety remedial works 0.71 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 EKL-1 Dam Safety remedial works 0.71 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 EKL-1 Dam Safety remedial works 0.73 Shopping 5/29/2007 2/20/2009 5/25/2009 PAR 10/1/2009 9/30/2010 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 36 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document A3 Remidial Work of Dam Sefety of EKL-1 EKLAHARE Dam Tq. Dindori 0.82 Shopping 31-Dec-06 2-Mar-09 30-May-09 PAR 21-Jul-09 6-Oct-09 Dist.Nashik 167 Jambutke JAM-1 Dam Safety remedial works 1.19 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R JAM-1 Dam Safety remedial works 1.19 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 JAM-1 Dam Safety remedial works 1.19 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 JAM-1 Dam Safety remedial works 1.33 Shopping 5/20/2008 3/31/2009 5/25/2009 PAR 10/1/2009 9/30/2010 A3 Dam Sfety work of Jambutake Minor JAM-1 Irrigation Tank Tal.Chandwad 1.411 Shopping 5/20/2008 3/31/2009 10/9/2009 PAR 7 Dec.09 Dist.Nashik 168 Pethsangvi PET-1 Dam Safety remedial works 0.58 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R PET-1 Dam Safety remedial works 0.58 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 PET-1 Dam Safety remedial works 0.58 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 PET-1 Dam Safety remedial works 0.58 Shopping 10/18/2008 11/15/2008 6/15/2009 PAR 7/31/2009 5/31/2010 A3 PET-1 Dam Safety remedial works 0.61 Shopping 18-Oct-08 15-Nov-08 15-Jun-09 PAR 27-Jan-10 169 Borgaon (Dha) BOR-1 Dam Safety remedial works 1.48 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R BOR-1 Dam Safety remedial works 1.48 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 BOR-1 Dam Safety remedial works 1.48 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 BOR-1 Dam Safety remedial works 0.15 Shopping 10/18/2008 11/15/2008 6/15/2009 PAR 7/31/2009 5/31/2010 A3 BOR-1 Dam Safety remedial works 0.16 Shopping 18-Oct-08 15-Nov-08 15-Jun-09 PAR 27-Jan-10 170 Kolhegaon KOL-1 Dam Safety remedial works 1.19 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R KOL-1 Dam Safety remedial works 1.19 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 KOL-1 Dam Safety remedial works 1.19 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 KOL-1 Dam Safety remedial works 0.48 Shopping 10/18/2008 11/15/2008 6/15/2009 PAR 7/31/2009 5/31/2010 A3 KOL-1 Dam Safety remedial works 0.50 Shopping 18-Oct-08 15-Nov-08 15-Jun-09 PAR 27-Jan-10 171 Devdhanora DEV-1 Dam Safety remedial works 0.74 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R DEV-1 Dam Safety remedial works 0.74 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 DEV-1 Dam Safety remedial works 0.74 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 DEV-1 Dam Safety remedial works 0.43 Shopping 10/18/2008 11/15/2008 6/15/2009 PAR 7/31/2009 5/31/2010 A3 DEV-1 Dam Safety remedial works 0.45 Shopping 18-Oct-08 15-Nov-08 15-Jun-09 PAR 27-Jan-10 172 Pedgaon PED-1 Dam Safety remedial works 0.82 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R PED-1 Dam Safety remedial works 0.82 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 PED-1 Dam Safety remedial works 0.82 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 PED-1 Dam Safety remedial works 0.43 Shopping 6/28/2008 12/4/2008 5/7/2009 PAR 7/31/2009 5/31/2010 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 37 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document A3 PED-1 Dam Safety remedial works 0.43 Shopping 28-Jun-2008 4-Dec-2008 8-May-2009 PAR 31-Aug-2009 173 Ambegaon BEG-1 Dam Safety remedial works 0.95 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R BEG-1 Dam Safety remedial works 0.95 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 BEG-1 Dam Safety remedial works 0.95 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 BEG-1 Dam Safety remedial works 0.65 Shopping 6/28/2008 12/4/2008 5/7/2009 PAR 7/26/2009 6/25/2010 A3 BEG-1 Dam Safety remedial works 0.65 Shopping 28-Jun-2008 4-Dec-2008 8-May-2009 PAR 31-Aug-2009 174 Nakhatwadi NAK-1 Dam Safety remedial works 0.54 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R NAK-1 Dam Safety remedial works 0.54 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 NAK-1 Dam Safety remedial works 0.54 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 NAK-1 Dam Safety remedial works 0.43 Shopping 12/20/2008 5/7/2009 5/7/2009 PAR 7/26/2009 6/25/2010 A3 NAK-1 Dam Safety remedial works 0.43 Shopping 20-Dec-2008 7-May-2009 8-May-2009 PAR 31-Aug-2009 175 Devgaon DVG-1 Dam Safety remedial works 1.07 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R DVG-1 Dam Safety remedial works 1.07 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 DVG-1 Dam Safety remedial works 1.07 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 DVG-1 Dam Safety remedial works 5.08 NCB 10/18/2008 6/1/2009 6/8/2009 PAR 7/31/2009 9/30/2010 A3/1 DVG-1 Dam Safety remedial works 5.08 NCB 18-Oct-2008 20-Jul-2009 11-Nov-2009 PAR Rejected Rejected A3/2 DVG-1 Dam Safety remedial works 5.18 NCB 18-Oct-2008 20-Jul-2009 11-Nov-2009 PAR 16-Feb-2010 176 Wadali WAD-1 Dam Safety remedial works 1.10 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R WAD-1 Dam Safety remedial works 1.10 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 WAD-1 Dam Safety remedial works 1.10 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 WAD-1 Dam Safety remedial works 0.65 Shopping 2/29/2008 5/15/2008 5/7/2008 PAR 7/26/2009 6/25/2010 A3 WAD-1 Dam Safety remedial works 0.65 Shopping 29-Feb-2008 15-May-2008 8-May-2008 PAR 24-Aug-2009 177 Marsul MRL-1 Dam Safety remedial works 0.70 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R MRL-1 Dam Safety remedial works 0.70 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 MRL-1 Dam Safety remedial works 0.70 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 MRL-1 Dam Safety remedial works 0.31 Shopping 9/25/2008 6/6/2009 6/6/2009 PAR 7/31/2009 5/31/2010 A3 Remedial works of Dam Safety for Marsul M.I.Tank Tq. Purna Dist. MRL-1 0.32 SHOPPING 27-Sep-08 1-Jun-09 6-Jun-09 PAR 31-Mar-10 Parbhani for Hiwreshwar W.U.A. Ltd., Hiwra (Bk) 178 Ambazari AMZ-1 Dam Safety remedial works 1.26 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R AMZ-1 Dam Safety remedial works 1.26 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 AMZ-1 Dam Safety remedial works 1.26 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 AMZ-1 Dam Safety remedial works 1.25 Shopping 2/25/2007 11/12/2008 4/30/2009 PAR 8/30/2009 8/30/2010 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 38 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document A3 AMZ-1 Dam Safety works of Ambazari M.I. 1.275 Shopping 30-Sept-08. 12-Dec-08. 30-Apr-09. PAR 24-Jul-09. Project Tq. Arvi Distt. Wardha 179 Kawadi KAW-1 Dam Safety remedial works 0.62 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R KAW-1 Dam Safety remedial works 0.62 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 KAW-1 Dam Safety remedial works 0.62 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 KAW-1 Dam Safety remedial works 4.68 NCB 7/13/2007 6/15/2009 6/30/2009 PAR 8/30/2009 8/30/2010 A3 Dam Safety works of Kawadi M.I. KAW-1 3.369 NCB 31-Jul-09. 10-Aug-09. 14-Aug-09. PAR 15-Dec-09. Tq. Arvi, Dist. Wardha 180 Umari UMA-1 Dam Safety remedial works 1.32 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R UMA-1 Dam Safety remedial works 1.32 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 UMA-1 Dam Safety remedial works 1.32 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 UMA-1 Dam Safety remedial works 0.71 Shopping 7/13/2007 11/12/2008 4/30/2009 PAR 8/30/2009 8/30/2010 A3 Dam Safety works of Umri M.I. Tq. UMA-1 0.722 Shopping 30-Sept-08. 12-Dec-08. 30-Apr-09. PAR 24-Jul-09. Arvi Distt. Wardha 181 Anjiborkhedi ANJ-1 Dam Safety remedial works 1.31 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R ANJ-1 Dam Safety remedial works 1.31 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 ANJ-1 Dam Safety remedial works 1.31 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 ANJ-1 Dam Safety remedial works 1.31 Shopping 6/3/2008 11/12/2008 4/30/2009 PAR 8/30/2009 8/30/2010 A3 Dam Safety works of Anji-Borkhedi ANJ-1 1.456 Shopping 30-Sept-08. 12-Dec-08. 30-Apr-09. PAR 24-Jul-09. M.I. Project 182 Kannamwargram KAN-1 Dam Safety remedial works 0.72 Shopping 6/30/2006 7/30/2006 8/30/2006 PAR 12/31/2006 6/30/2008 R KAN-1 Dam Safety remedial works 0.72 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 KAN-1 Dam Safety remedial works 0.72 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 KAN-1 Dam Safety remedial works 2.19 NCB 5/2/2008 6/15/2009 6/30/2009 PAR 8/30/2009 8/30/2010 A3 Dam Safety works of KAN-1 Kannamwargram M.I. Project Tq. 2.292 NCB 30-Apr-09. 8-Jun-09. 20-Jun-09. PAR 23-Oct-09. Karanji Distt. Wardha 183 Dongargaon DON-1 Dam Safety remedial works 1.97 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2006 1/31/2008 R DON-1 Dam Safety remedial works 1.97 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 DON-1 Dam Safety remedial works 1.97 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 DON-1 Dam Safety remedial works 3.05 NCB 6/3/2008 6/15/2009 6/30/2009 PAR 8/30/2009 8/30/2010 A3 Dam Safety works of Dongargaon M.I. Project Tq. Chimur Distt. DON-1 3.173 NCB 30-Apr-09. 20-Jun-09. 20-Jun-09. PAR 16-Dec-09. Chandrapur for Jai Kisan Pani Wapar Sanstha Dongargaon. 184 Asola-Ingole ASO-1 Dam Safety remedial works 1.18 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R ASO-1 Dam Safety remedial works 1.18 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 ASO-1 Dam Safety remedial works 1.18 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 39 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document R3 ASO-1 Dam Safety remedial works 1.18 Shopping 8/9/2007 3/20/2009 4/30/2009 PAR 7/30/2009 8/30/2010 A3 Asola Ingole M. I. Project Dam ASO-1 1.24 Shopping 20-Jan-08 20-Mar-09 25-May-09 PAR 5-Aug-09 Safty Work 185 Koyali KOY-1 Dam Safety remedial works 0.49 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R KOY-1 Dam Safety remedial works 0.49 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 KOY-1 Dam Safety remedial works 0.49 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 KOY-1 Dam Safety remedial works 2.19 NCB 10/13/2008 6/30/2009 6/15/2009 PAR 7/31/2009 8/31/2010 A3 Koyali M. I. Project Dam Safty 11-Aug-09 KOY-1 3.9 NCB 29-Dec-08 11-Aug-09 PAR 31-Aug.-09 Work 186 Motasawanga MOT-1 Dam Safety remedial works 2.64 NCB 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R MOT-1 Dam Safety remedial works 2.64 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 2/28/2010 R2 MOT-1 Dam Safety remedial works 2.64 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 9/2/2010 R3 MOT-1 Dam Safety remedial works 2.64 NCB 10/13/2008 2/17/2009 4/25/2009 PAR 7/15/2009 8/31/2010 A3 Motswanga M. I. Project Dam MOT-1 2.76 NCB 20-Dec-08 17-Feb-09 25-May-09 PAR 28-Jully-09 Safty Work 187 Sonkhas SON-1 Dam Safety remedial works 0.82 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R SON-1 Dam Safety remedial works 0.82 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 SON-1 Dam Safety remedial works 0.82 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 SON-1 Dam Safety remedial works 2.87 NCB 10/13/2008 6/30/2009 6/15/2009 PAR 7/15/2009 8/31/2010 A3 SON-1 Dam Safety remedial works 4.1 NCB 10/13/2008 27-Aug.09 27-Aug-09 PAR 5-Nov-09 188 Shirputi SRP-1 Dam Safety remedial works 1.21 Shopping 12/31/2006 1/31/2007 28-Feb-07 PAR 31-Jul-07 1/31/2009 R SRP-1 Dam Safety remedial works 1.21 Shopping 2/28/2007 3/30/2007 30-Apr-07 PAR 30-Aug-07 5/30/2009 R2 SRP-1 Dam Safety remedial works 1.21 Shopping 8/31/2007 10/2/2007 2-Nov-07 PAR 2-Mar-08 12/2/2009 R3 SRP-1 Dam Safety remedial works 17.90 NCB 12/8/2008 6/30/2009 15-Jun-09 PAR 31-Jul-09 12/31/2010 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 40 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document A3 Shirputi M. I. Project Dam SRP-1 15.58 NCB 31-Dec-08 25-Jun-09 30-Jun-09 PAR 11-Jan-10 Safty Work 189 Hiwara HWR-1 Dam Safety remedial works 0.61 Shopping 12/31/2006 1/31/2007 28-Feb-07 PAR 31-Jul-07 1/31/2009 R HWR-1 Dam Safety remedial works 0.61 Shopping 4/30/2007 5/30/2007 30-Jun-07 PAR 30-Oct-07 4/30/2009 R2 HWR-1 Dam Safety remedial works 0.61 Shopping 10/31/2007 11/30/2007 30-Dec-07 PAR 30-Apr-08 10/30/2009 R3 HWR-1 Dam Safety remedial works 4.37 NCB 12/7/2008 1/1/2009 15-Jun-09 PAR 31-Jul-09 12/31/2010 A3 HWR-1 Hiwara Lahe M. I. Project 5.24 NCB 8-Aug-08 7-Jully-09 17-Jully-09 PAR 27-Aug.09 Dam Safty Work 190 Ghoti GHT-1 Dam Safety remedial works 1.00 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2008 R GHT-1 Dam Safety remedial works 1.00 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 GHT-1 Dam Safety remedial works 1.00 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 GHT-1 Dam Safety remedial works 0.62 Shopping 6/3/2008 10/15/2008 4/1/2009 PAR 6/28/2009 5/27/2010 A3 GHT-1 Dam Safety remedial works 0.60 Shopping 3-Jun-08 15-Oct-08 1-Apr-09 PAR 28-Apr-09 15-Apr-10 191 Ningnoor NNG-1 Dam Safety remedial works 1.50 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2006 1/31/2008 R NNG-1 Dam Safety remedial works 1.50 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 NNG-1 Dam Safety remedial works 1.50 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 NNG-1 Dam Safety remedial works 1.26 Shopping 12/7/2008 2/27/2009 4/1/2009 PAR 7/28/2009 8/27/2010 A3 NNG-1 Dam Safety remedial works 1.26 Shopping 7-Dec-08 27-Feb-09 1-Apr-09 PAR 28-Apr-09 30-Mar-10 192 Dudhana DUD-1 Dam Safety remedial works 0.49 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R DUD-1 Dam Safety remedial works 0.49 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 DUD-1 Dam Safety remedial works 0.49 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 DUD-1 Dam Safety remedial works 0.44 Shopping 6/3/2008 3/4/2009 4/1/2009 PAR 7/28/2009 5/27/2010 A3 DUD-1 Dam Safety remedial works 0.44 Shopping 3-Jun-08 4-Mar-09 1-Apr-09 PAR 28-Apr-09 29-Mar-10 193 Eklara ELA-1 Dam Safety remedial works 0.75 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R ELA-1 Dam Safety remedial works 0.75 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 ELA-1 Dam Safety remedial works 0.75 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 ELA-1 Dam Safety remedial works 0.46 Shopping 6/3/2008 2/5/2008 4/1/2009 PAR 7/28/2009 5/27/2010 A3 ELA-1 Dam Safety remedial works 0.75 Shopping 3-Jun-08 5-Feb-08 1-Apr-09 PAR 28-Apr-09 24-Apr-10 194 Khadakdoh KHD-1 Dam Safety remedial works 1.34 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R KHD-1 Dam Safety remedial works 1.34 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 KHD-1 Dam Safety remedial works 1.34 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 KHD-1 Dam Safety remedial works 0.86 Shopping 6/3/2008 10/15/2008 4/1/2009 PAR 7/28/2009 5/27/2010 A3 KHD-1 Dam Safety remedial works 0.83 Shopping 3-Jun-08 15-Oct-08 1-Apr-09 PAR 28-Apr-09 20-Apr-10 195 Karanji KRJ-1 Dam Safety remedial works 0.99 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 41 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document R KRJ-1 Dam Safety remedial works 0.99 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 KRJ-1 Dam Safety remedial works 0.99 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 KRJ-1 Dam Safety remedial works 1.14 Shopping 6/3/2008 10/15/2008 4/1/2009 PAR 7/28/2009 8/27/2010 A3 KRJ-1 Dam Safety remedial works 1.14 Shopping 3-Jun-08 15-Oct-08 1-Apr-09 PAR 28-Apr-09 27-Mar-10 196 Uthala UTH-1 Dam Safety remedial works 3.00 NCB 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R UTH-1 Dam Safety remedial works 3.00 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 2/28/2010 R2 UTH-1 Dam Safety remedial works 3.00 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 9/2/2010 R3 UTH-1 Dam Safety remedial works 0.53 Shopping 10/18/2008 11/7/2008 6/15/2009 PAR 7/31/2009 5/31/2010 A3/1 UTH-1 Dam Safety remedial works 0.53 Shopping 18-Oct-08 7-Nov-08 17-Jun-09 PAR Rejected Rejected A3/2 UTH-1 Dam Safety remedial works 0.42 Shopping 18-Oct-08 7-Nov-08 17-Jun-09 PAR 23-Mar-10 197 Icharana ICH-1 Dam Safety remedial works 1.13 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R ICH-1 Dam Safety remedial works 1.13 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 ICH-1 Dam Safety remedial works 1.13 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 A3/1 ICH-1 Dam Safety remedial works 1.84 NCB 10/18/2008 6/30/2009 6/15/2009 PAR 7/31/2009 2/28/2011 A3/2 ICH-1 Dam Safety remedial works 3.10 NCB 18-Oct-08 5-Nov-09 23-Nov-09 PAR 8-Feb-10 198 Karanjivane KJV-1 Dam Safety remedial works 0.51 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R KJV-1 Dam Safety remedial works 0.51 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 KJV-1 Dam Safety remedial works 0.51 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 KJV-1 Dam Safety remedial works 0.52 Shopping 5/21/2008 5/20/2009 5/31/2009 PAR 7/31/2009 5/31/2010 A3 Dam Safety Remedial works of KJV-1 Karanjiwane M. I. Project Tal : Kagal, 0.36 Shopping 5-Aug-07 20-May-09 22-Jun-09 PAR 17-Aug-09 Dist : Kolhapur 199 Benikre BNK-1 Dam Safety remedial works 0.69 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R BNK-1 Dam Safety remedial works 0.69 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 BNK-1 Dam Safety remedial works 0.69 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 BNK-1 Dam Safety remedial works 0.19 Shopping 6/28/2008 5/20/2009 5/31/2009 PAR 7/31/2009 5/31/2010 A3 Dam Safety Remedial works of BNK-1 Benikre M. I. Project Tal : Kagal, Dist 0.04 Shopping 5-Aug-07 20-May-09 22-Jun-09 PAR 17-Aug-09 : Kolhapur 200 Man Padale MPD-1 Dam Safety remedial works 0.99 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R MPD-1 Dam Safety remedial works 0.99 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 MPD-1 Dam Safety remedial works 0.99 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 MPD-1 Dam Safety remedial works 0.44 Shopping 5/21/2008 5/20/2009 5/31/2009 PAR 7/31/2009 5/31/2010 A3 Dam Safety Remedial works of MPD-1 Manpadale M. I. Project Tal : 0.28 Shopping 5-Aug-07 20-May-09 22-Jun-09 PAR 17-Aug-09 Hatkanagle, Dist : Kolhapur 201 Pombre PMB-1 Dam Safety remedial works 1.38 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2006 1/31/2008 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 42 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document R PMB-1 Dam Safety remedial works 1.38 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 PMB-1 Dam Safety remedial works 1.38 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 PMB-1 Dam Safety remedial works 0.17 Shopping 11/15/2008 5/20/2009 5/31/2009 PAR 7/31/2009 5/31/2010 A3 Dam Safety Remedial works of Works are PMB-1 Pombre M. I. Project Tal : Panhala, 0.01 carried out 11/15/2008 25-Jul-09 28-Jul-09 PAR 21-Aug-09 Dist : Kolhapur through M&R 202 Narewadi NAR-1 Dam Safety remedial works 0.97 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R NAR-1 Dam Safety remedial works 0.97 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 NAR-1 Dam Safety remedial works 0.97 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 NAR-1 Dam Safety remedial works 0.97 Shopping 6/30/2008 7/15/2009 7/31/2009 PAR 9/30/2009 9/30/2010 R4 Remidial work dam safety work for NAR-1 3.53 NCB 4-Jan-10 2-Mar-10 10-Mar-10 PAR 15-Jul-10 14-Aug-11 M.I.Tank Narewadi Dist:Kolhapur 203 Andur ADR-1 Dam Safety remedial works 0.82 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R ADR-1 Dam Safety remedial works 0.82 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 ADR-1 Dam Safety remedial works 0.82 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 ADR-1 Dam Safety remedial works 0.16 Shopping 11/15/2008 5/20/2009 5/31/2009 PAR 7/31/2009 5/31/2010 A3 Dam Safety Remedial works of Works are ADR-1 Andur M. I. Project Tal : 0.01 carried out 11/15/2008 25-Jul-09 28-Jul-09 PAR 21-Aug-09 Gaganbawada, Dist : Kolhapur through M&R 204 Tintraj TIN-1 Dam Safety remedial works 0.56 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R TIN-1 Dam Safety remedial works 0.56 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 TIN-1 Dam Safety remedial works 0.56 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 TIN-1 Dam Safety remedial works 6.50 NCB 8/15/2009 8/31/2009 9/30/2009 PAR 12/31/2009 2/28/2011 R4 TIN-1 Dam Safety remedial works 6.50 NCB 18-Oct-08 1-Aug-10 15-Aug-10 PAR 15-Nov-10 15-May-12 205 Harni HRN-1 Dam Safety remedial works 3.37 NCB 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R HRN-2 Dam Safety remedial works 3.37 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 2/28/2010 R2 HRN-1 Dam Safety remedial works 3.37 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 9/2/2010 R3 HRN-1 Dam Safety remedial works 0.36 Shopping 7/27/2008 11/15/2008 6/15/2009 PAR 7/31/2009 5/31/2010 A3 HRN-2 Dam Safety remedial works 0.38 Shopping 20-Jun-07 15-Nov-08 15-Jun-09 PAR 27-Jan-10 206 Pilanwadi PIL-1 Dam Safety remedial works 0.85 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R PIL-1 Dam Safety remedial works 0.85 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 PIL-1 Dam Safety remedial works 0.85 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 PIL-1 Dam Safety remedial works 5.24 NCB 1/5/2008 5/31/2009 7/7/2009 PAR 7/31/2009 9/30/2011 A3 Remedial work of Dam Safety Work PIL-1 of Pilanwadi M. I. Tank, Tal. 1.53 Shopping 1/Sep/09 10/Sep/09 20/Sep/09 PAR 13/Nov/09 Purandar 207 Walen WAL-1 Dam Safety remedial works 0.98 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R WAL-1 Dam Safety remedial works 0.98 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 43 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document R2 WAL-1 Dam Safety remedial works 0.98 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 9/30/2010 WAL-1 Dam Safety remedial works 2.02 NCB 12/8/2008 5/31/2009 7/7/2009 PAR 7/31/2009 A3 Remedial work of Dam Safety Work WAL-1 0.88 Shopping 15/Oct/09 3/Nov/09 3/Nov/09 PAR 10/Nov/09 of Walen M. I. Tank, Tal. Mulshi 208 Alegaon ALE-1 Dam Safety remedial works 0.61 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R ALE-1 Dam Safety remedial works 0.61 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 ALE-1 Dam Safety remedial works 0.61 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 ALE-1 Dam Safety remedial works 3.71 NCB 2/15/2008 5/31/2009 7/7/2009 PAR 7/31/2009 9/30/2010 A3 Remedial work of Dam Safety Work ALE-1 0.95 Shopping 15/Oct/09 3/Nov/09 3/Nov/09 PAR 13/Nov/09 of Alegaon paga M. I. Tank, Tal. 209 Mahur MAH-1 Dam Safety remedial works 0.88 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R MAH-1 Dam Safety remedial works 0.88 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 MAH-1 Dam Safety remedial works 0.88 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 MAH-1 Dam Safety remedial works 5.44 NCB 1/5/2008 5/31/2009 7/7/2009 PAR 7/31/2009 1/30/2011 A3 Remedial work of Dam Safety Work MAH-1 1.79 Shopping 1/Sep/09 10/Sep/09 20/Sep/09 PAR 13/Nov/09 of Mahur M. I. Tank, Tal. Purandar 210 Pimpoli PIM-1 Dam Safety remedial works 0.82 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R PIM-1 Dam Safety remedial works 0.82 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 PIM-1 Dam Safety remedial works 0.82 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 PIM-1 Dam Safety remedial works 2.70 NCB 2/15/2008 5/31/2009 7/7/2009 PAR 7/31/2009 9/30/2010 R4 Remedial works of Dam Safety work PIM-1 of Pimpoli M.I. Tank Tal. Mulshi, 3.43 NCB 1/Jan/10 30/Apr/10 15/May/10 PAR 15/Jul/10 14/Aug/11 Di t P 211 Diwale DIW-1 Dam Safety remedial works 0.90 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R DIW-1 Dam Safety remedial works 0.90 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 DIW-1 Dam Safety remedial works 0.90 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 DIW-1 Dam Safety remedial works 3.21 NCB 12/8/2007 5/31/2009 7/7/2009 PAR 7/31/2009 9/30/2010 A3 Remedial work of Dam Safety Work DIW-1 2.02 NCB 10/Sep/09 20/Sep/09 7/7/2009 PAR 1/Dec/09 of Diwale M. I. Tank, Tal.Bhor 212 Sidhunath Remedial Work of Dam safety work SID-1 1.71 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2006 1/31/2008 for M.I.Tank Sidhanath Dist. Sangli R SID-1 Dam Safety remedial works 1.71 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 SID-1 Dam Safety remedial works 1.71 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 SID-1 Dam Safety remedial works 21.59 NCB 12/15/2008 6/7/2009 5/31/2009 PAR 7/31/2009 7/31/2011 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 44 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document A3 SID-1 Dam Safety remedial works 14.78 NCB 14-Dec-08 16-Sep-09 8-Dec-09 PAR 20-Feb-10 213 Dighanchi DIG-1 Dam Safety remedial works 1.35 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R DIG-1 Dam Safety remedial works 1.35 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 DIG-1 Dam Safety remedial works 1.35 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 DIG-1 Dam Safety remedial works 2.49 NCB 10/20/2008 5/25/2009 5/31/2009 PAR 7/31/2009 7/31/2010 A3 Remedial Work of Dam safety work DIG-1 2.29 NCB 24-Oct-08 26-May-09 22-Jun-09 PAR 29-Aug-09 for M.I.Tank Dighanchi Dist. Sangli 214 Kadegaon KAE-1 Dam Safety remedial works 0.86 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R KAE-1 Dam Safety remedial works 0.86 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 KAE-1 Dam Safety remedial works 0.86 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 KAE-1 Dam Safety remedial works 1.53 Shopping 9/25/2008 5/25/2009 5/31/2009 PAR 7/31/2009 7/31/2010 A3 Remedial Work of Dam safety work KAE-1 1.27 Shopping 27-Sep-08 26-May-09 23-Jun-09 PAR 21-Aug-09 for M.I.Tank Kadegaon Dist. Sangli 215 Anjani AJN-1 Dam Safety remedial works 1.01 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R AJN-1 Dam Safety remedial works 1.01 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 AJN-1 Dam Safety remedial works 1.01 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 AJN-1 Dam Safety remedial works 0.73 Shopping 12/15/2008 5/22/2009 5/31/2009 PAR 7/31/2009 6/30/2010 A3 Remedial Work of Dam safety work AJN-1 0.58 Shopping 14-Dec-08 26-May-09 23-Jun-09 PAR 21-Aug-09 for M.I.Tank Anjani Dist. Sangli 216 Kuchi KUC-1 Dam Safety remedial works 0.70 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R KUC-1 Dam Safety remedial works 0.70 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 KUC-1 Dam Safety remedial works 0.70 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 KUC-1 Dam Safety remedial works 0.80 Shopping 6/24/2008 5/25/2009 5/31/2009 PAR 7/31/2009 6/30/2010 A3 Remedial Work of Dam safety work KUC-1 0.64 Shopping 28-Jul-08 26-May-09 23-Jun-09 PAR 21-Aug-09 for M.I.Tank Kuchi Dist. Sangli 217 Linganur LIN-1 Dam Safety remedial works 0.62 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R LIN-1 Dam Safety remedial works 0.62 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 LIN-1 Dam Safety remedial works 0.62 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 LIN-1 Dam Safety remedial works 0.56 Shopping 5/16/2008 5/25/2009 5/31/2009 PAR 7/31/2009 6/30/2010 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 45 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document A3 Remedial Work of Dam safety work LIN-2 0.41 Shopping 21-May-08 26-May-09 23-Jun-09 PAR 21-Aug-09 for M.I.Tank Lingnoor Dist. Sangli 218 Hivre HIV-1 Dam Safety remedial works 1.03 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R HIV-1 Dam Safety remedial works 1.03 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 HIV-1 Dam Safety remedial works 1.03 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 HIV-1 Dam Safety remedial works 3.37 NCB 3/13/2008 6/6/2009 7/15/2009 PAR 8/31/2009 6/30/2011 A3 Remedial work of Dam Safety Work HIV-1 of Hivare M. I. Tank, Tal. Koregaon 3.63 NCB 6/Oct/09 6/Nov/09 7/Dec/09 PAR 11/Feb/10 219 Tambave 12/31/2006 1/31/2007 2/28/2007 7/31/2006 1/31/2008 TAM-1 Dam Safety remedial works 1.84 Shopping PAR R 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 TAM-1 Dam Safety remedial works 1.84 Shopping R2 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 TAM-1 Dam Safety remedial works 1.84 Shopping R3 8/30/2008 6/6/2009 6/30/2009 PAR 8/16/2009 6/15/2011 TAM-1 Dam Safety remedial works 3.96 NCB A3 Remedial work of Dam Safety Work TAM-1 3.63 NCB 6/Oct/09 6/Nov/09 7/Dec/09 PAR 11/Feb/10 of Tambave M. I. Tank, Tal. Phaltan 220 Pingali 12/31/2006 1/31/2007 2/28/2007 Not Reqd 7/31/2006 1/31/2008 PIN-1 Dam Safety remedial works 1.71 Shopping R 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 PIN-1 Dam Safety remedial works 1.71 Shopping R2 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 PIN-1 Dam Safety remedial works 1.71 Shopping R3 6/25/2009 6/30/2009 PAR 9/5/2009 12/4/2010 PIN-1 Dam Safety remedial works 1.94 NCB A3 Remedial work of Dam Safety Work PAR PIN-1 1.70 Shopping 5/Jun/09 8/Jul/09 9/Aug/09 23/Oct/09 for M. I. Tank Pingali, Tal. Man 221 Mayani 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 MYN-1 Dam Safety remedial works 3.39 NCB R 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 2/28/2010 MYN-1 Dam Safety remedial works 3.39 NCB R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 46 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document R2 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 9/2/2010 MYN-1 Dam Safety remedial works 3.39 NCB R3 --- 8/7/2009 8/30/2009 PAR 10/6/2009 4/5/2010 MYN-1 Dam Safety remedial works 3.99 NCB R4 Remedial works of Dam Safety work PAR MYN-1 of Mayahni M.I. Tank Tal. Khatau, 8.00 NCB 30/Apr/10 30/Jul/10 20/Aug/10 30/Oct/10 29/Oct/11 Di t S t 222 Nandval NDV-1 Dam Safety remedial works 0.67 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 NDV-1 Dam Safety remedial works 0.67 Shopping R2 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 NDV-1 Dam Safety remedial works 0.67 Shopping R3 5.55 8/30/2008 6/6/2009 7/15/2009 PAR 8/31/2009 7/30/2011 NDV-1 Dam Safety remedial works NCB A3 Remedial work of Dam Safety Work PAR NDV-1 of Nandwal M. I. Tank, Tal. 3.35 NCB 5/Oct/09 6/Nov/09 7/Dec/09 11/Feb/10 Koregaon 223 Banganga 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 BGG-1 Dam Safety remedial works 2.05 NCB R 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 8/30/2009 BGG-1 Dam Safety remedial works 2.05 NCB R2 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 3/2/2010 BGG-1 Dam Safety remedial works 2.05 NCB R3 2/13/2008 5/31/2009 6/20/2009 PAR 7/15/2009 12/14/2010 BGG-1 Dam Safety remedial works 2.12 NCB A3 Remedial work of Dam Safety Work PAR BGG-1 2.02 NCB 5/Jun/09 8/Jul/09 10/Aug/09 30/Nov/09 of Banganga M. I. Tank, Tal. Phaltan 224 Rampur RPR-1 Dam Safety remedial works 0.90 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R RPR-1 Dam Safety remedial works 0.90 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 RPR-1 Dam Safety remedial works 0.90 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 6/28/2008 10/16/2008 5/20/2009 PAR 7/31/2009 1/31/2010 RPR-1 Dam Safety remedial works 0.89 Shopping A3 0.65 PAR RPR-1 Dam Safety remedial works Shopping 26-Jun-08 16-Oct-08 15-May-09 6-Aug-09 1-Mar-10 225 Padwalkarwadi PWK-1 Dam Safety remedial works 0.86 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R PWK-1 Dam Safety remedial works 0.86 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 PWK-1 Dam Safety remedial works 0.86 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 PWK-1 Dam Safety remedial works 0.84 Shopping 12/20/2008 3/28/2008 5/20/2009 PAR 7/31/2009 1/31/2010 A3 PWK-1 Dam Safety remedial works 0.52 Shopping 15-Dec-08 28-Mar-08 10-May-09 PAR 4-Aug-09 1-Mar-10 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 47 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document 226 Sirwalwadi SWW-1 Dam Safety remedial works 1.23 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R SWW-1 Dam Safety remedial works 1.23 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 SWW-1 Dam Safety remedial works 1.23 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 SWW-1 Dam Safety remedial works 2.71 NCB 10/24/2008 6/30/2009 7/30/2009 PAR 10/30/2009 12/30/2010 R4 SWW-1 Dam Safety remedial works 3.43 NCB 23-Oct-08 31-Dec-09 20-Jan-10 PAR 30-Apr-10 29-Apr-11 227 Hanjagi HAN-1 Dam Safety remedial works 0.80 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R HAN-1 Dam Safety remedial works 0.80 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 HAN-1 Dam Safety remedial works 0.80 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 HAN-1 Dam Safety remedial works 1.60 Shopping 10/24/2008 6/30/2009 7/30/2009 PAR 10/30/2009 8/31/2010 R4 HAN-1 Dam Safety remedial works 2.85 Shopping 23-Oct-08 23-Dec-09 20-Jan-10 PAR 30-Apr-10 29-Apr-11 228 Chincholi 12/31/2006 1/31/2007 2/28/2007 7/31/2006 1/31/2008 CHI-1 Dam Safety remedial works 1.80 Shopping PAR R 2/28/2007 3/30/2007 4/30/2007 8/30/2007 5/30/2009 CHI-1 Dam Safety remedial works 1.80 Shopping PAR R2 8/31/2007 10/2/2007 11/2/2007 3/2/2008 12/2/2009 CHI-1 Dam Safety remedial works 1.80 Shopping PAR R3 12/20/2008 4/30/2008 5/20/2009 7/31/2009 8/30/2010 CHI-1 Dam Safety remedial works 1.82 Shopping PAR A3 CHI-1 Dam Safety remedial works 1.56 Shopping 15-Dec-08 30-Apr-08 15-May-09 PAR 21-Aug-09 229 Sapatne SPT-1 Dam Safety remedial works 0.35 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R 2/28/2007 3/30/2007 4/30/2007 8/30/2007 5/30/2009 SPT-1 Dam Safety remedial works 0.35 Shopping PAR R2 8/31/2007 10/2/2007 11/2/2007 3/2/2008 12/2/2009 SPT-1 Dam Safety remedial works 0.35 Shopping PAR R3 SPT-1 Dam Safety remedial works 0.35 Shopping 12/20/2008 4/30/2008 5/20/2009 PAR 7/31/2009 8/30/2010 R4 SPT-1 Dam Safety remedial works 2.00 Shopping 22-Jun-09 30-May-10 30-Jun-10 PAR 15-Aug-10 14-Jul-11 230 Kanadi KND-1 Dam Safety remedial works 0.51 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R KND-1 Dam Safety remedial works 0.51 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 KND-1 Dam Safety remedial works 0.51 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 KND-1 Dam Safety remedial works 0.50 Shopping 12/7/2008 2/17/2009 4/1/2009 PAR 5/14/2009 5/13/2010 A3 KND-1 Dam Safety remedial works 0.52 Shopping 7-Dec-08 17-Feb-09 1-Apr-09 PAR 14-May-09 7-Aug-09 231 Tuljapur TJP-1 Dam Safety remedial works 0.30 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R TJP-1 Dam Safety remedial works 0.30 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 TJP-1 Dam Safety remedial works 0.30 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 48 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document R3 TJP-1 Dam Safety remedial works 0.29 Shopping 12/7/2008 2/17/2009 4/1/2009 PAR 5/14/2009 5/13/2010 A3 TJP-1 Dam Safety remedial works 0.31 Shopping 7-Dec-08 17-Feb-09 1-Apr-09 PAR 14-May-09 15-Mar-10 232 Pimpalgaonshend PGS-1 Dam Safety remedial works 1.20 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R PGS-1 Dam Safety remedial works 1.20 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 PGS-1 Dam Safety remedial works 1.20 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 PGS-1 Dam Safety remedial works 1.19 Shopping 12/7/2008 2/17/2009 4/1/2009 PAR 6/15/2009 8/14/2010 A3 PGS-1 Dam Safety remedial works 1.24 Shopping 7-Dec-08 17-Feb-09 15-May-09 PAR 25-Jun-09 23-Aug-09 233 Dharur DHR-1 Dam Safety remedial works 0.43 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R DHR-1 Dam Safety remedial works 0.43 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 DHR-1 Dam Safety remedial works 0.43 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 DHR-1 Dam Safety remedial works 0.39 Shopping 12/7/2008 2/6/2009 4/1/2009 PAR 5/14/2009 5/13/2010 A3 DHR-1 Dam Safety remedial works 0.40 Shopping 7-Dec-08 6-Feb-09 1-Apr-09 PAR 14-May-09 15-Mar-10 234 Isapur ISP-1 Dam Safety remedial works 0.49 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R ISP-1 Dam Safety remedial works 0.49 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 ISP-1 Dam Safety remedial works 0.49 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 ISP-1 Dam Safety remedial works 0.45 Shopping 12/7/2008 2/17/2009 4/1/2009 PAR 5/14/2009 5/13/2010 A3 ISP-1 Dam Safety remedial works 0.47 Shopping 7-Dec-08 17-Feb-09 1-Apr-09 PAR 14-May-09 7-Aug-09 235 Pimpalgaonhande PPG-1 Dam Safety remedial works 0.52 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R PPG-1 Dam Safety remedial works 0.52 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 PPG-1 Dam Safety remedial works 0.52 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 PPG-1 Dam Safety remedial works 0.50 Shopping 12/7/2008 2/17/2009 4/1/2009 PAR 5/14/2009 5/13/2010 A3 PPG-1 Dam Safety remedial works 0.52 Shopping 7-Dec-08 17-Feb-09 1-Apr-09 PAR 14-May-09 7-Aug-09 236 Salai SLI-1 Dam Safety remedial works 0.70 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R SLI-1 Dam Safety remedial works 0.70 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 SLI-1 Dam Safety remedial works 0.70 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 SLI-1 Dam Safety remedial works 0.52 Shopping 12/7/2008 1/27/2009 4/4/2009 PAR 7/5/2009 6/4/2010 A3 SLI-1 Dam Safety remedial works 0.54 Shopping 7-Dec-08 27-Jan-09 4-Apr-09 PAR 9-Jun-09 237 Khatijapur KTJ-1 Dam Safety remedial works 1.05 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R KTJ-1 Dam Safety remedial works 1.05 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 KTJ-1 Dam Safety remedial works 1.05 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 KTJ-1 Dam Safety remedial works 1.86 NCB 7/13/2007 10/19/2007 4/4/2009 PAR 7/5/2009 9/4/2010 A3 KTJ-1 Dam Safety remedial works 2.52 NCB 13-Jul-07 19-Oct-07 4-Apr-09 PAR 9-Jun-09 238 Pimpalgaonnath PGN-1 Dam Safety remedial works 0.79 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R PGN-1 Dam Safety remedial works 0.79 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 PGN-1 Dam Safety remedial works 0.79 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 PGN-1 Dam Safety remedial works 0.72 Shopping 9/30/2008 12/10/2008 4/30/2009 PAR 7/20/2009 6/19/2010 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 49 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document A3 PGN-1 Dam Safety remedial works 0.74 Shopping 30-Sep-08 10-Dec-08 30-Apr-09 PAR 17-Jul-09 31-Mar-10 239 Chougaon CHG-1 Dam Safety remedial works 1.68 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2006 1/31/2008 R CHG-1 Dam Safety remedial works 1.68 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 CHG-1 Dam Safety remedial works 1.68 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 CHG-1 Dam Safety remedial works 1.99 NCB 8/31/2008 5/26/2009 6/15/2009 PAR 8/10/2009 2/10/2011 A3/1 CHG-1 Dam Safety remedial works 1.99 NCB 5-May-08 11-May-09 21-Jul-09 PAR Rejected Rejected A3/2 CHG-1 Dam Safety remedial works 2.10 NCB 5-May-08 11-May-09 21-Jul-09 PAR 17-Nov-09 240 Mitgaon MIT-1 Dam Safety remedial works 0.33 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R MIT-1 Dam Safety remedial works 0.33 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 MIT-1 Dam Safety remedial works 0.33 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 MIT-1 Dam Safety remedial works 0.58 Shopping 8/31/2008 5/26/2009 6/15/2009 PAR 8/10/2009 6/10/2010 A3/1 MIT-1 Dam Safety remedial works 0.67 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected R4 MIT-1 Dam Safety remedial works 0.67 Shopping 5-May-08 25-May-09 28-May-09 PAR 30-Apr-10 31-Jan-11 241 Virkhel VIR-1 Dam Safety remedial works 0.57 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R VIR-1 Dam Safety remedial works 0.57 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 VIR-1 Dam Safety remedial works 0.57 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 VIR-1 Dam Safety remedial works 0.47 Shopping 8/31/2008 5/26/2009 6/15/2009 PAR 8/10/2009 6/10/2010 A3/1 VIR-1 Dam Safety remedial works 0.41 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected A3/2 VIR-1 Dam Safety remedial works 0.41 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected A3/3 VIR-1 Dam Safety remedial works 0.43 Shopping 5-May-08 25-May-09 28-May-09 PAR 1-Feb-10 242 Budaki BDK-1 Dam Safety remedial works 1.11 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R BDK-1 Dam Safety remedial works 1.11 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 BDK-1 Dam Safety remedial works 1.11 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 BDK-1 Dam Safety remedial works 0.65 Shopping 8/31/2008 5/26/2009 6/15/2009 PAR 8/10/2009 6/10/2010 A3/1 BDK-2 Dam Safety remedial works 0.62 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected A3/2 BDK-2 Dam Safety remedial works 0.62 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected A3/3 BDK-2 Dam Safety remedial works 0.62 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected A3/4 BDK-2 Dam Safety remedial works 0.62 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected R4 BDK-2 Dam Safety remedial works 0.62 Shopping 5-May-08 25-May-09 28-May-09 PAR 31-May-10 28-Feb-11 243 Kothare KTH-1 Dam Safety remedial works 1.49 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2006 1/31/2008 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 50 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document R KTH-1 Dam Safety remedial works 1.49 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 KTH-1 Dam Safety remedial works 1.49 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 KTH-1 Dam Safety remedial works 0.54 Shopping 8/31/2008 5/26/2009 6/15/2009 PAR 8/10/2009 6/10/2010 A3/1 KTH-1 Dam Safety remedial works 0.54 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected A3/2 KTH-1 Dam Safety remedial works 0.54 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected A3/3 KTH-1 Dam Safety remedial works 0.56 Shopping 5-May-08 25-May-09 28-May-09 PAR 2-Feb-10 244 Shewade SHW-1 Dam Safety remedial works 0.40 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R SHW-1 Dam Safety remedial works 0.40 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 SHW-1 Dam Safety remedial works 0.40 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 SHW-1 Dam Safety remedial works 0.46 Shopping 11/24/2009 5/26/2009 6/15/2009 PAR 8/10/2009 7/10/2010 A3/1 SHW-1 Dam Safety remedial works 0.46 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected A3/2 SHW-1 Dam Safety remedial works 0.46 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected A3/3 SHW-1 Dam Safety remedial works 0.48 Shopping 5-May-08 25-May-09 28-May-09 PAR 11-Mar-10 245 Velhale VEL-1 Dam Safety remedial works 0.74 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R VEL-1 Dam Safety remedial works 0.74 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 VEL-1 Dam Safety remedial works 0.74 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 VEL-1 Dam Safety remedial works 1.15 Shopping 8/24/2008 5/25/2009 5/27/2009 PAR 7/30/2009 9/30/2010 246 R4 VEL-1 Dam Safety remedial works 1.146 Shopping 8/24/2008 5/25/2009 5/27/2009 PAR 7/31/2010 Vaghala -1 VAG-1 Dam Safety remedial works 0.45 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R VAG-1 Dam Safety remedial works 0.45 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 VAG-1 Dam Safety remedial works 0.45 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 VAG-1 Dam Safety remedial works 0.47 Shopping 11/24/2008 6/5/2009 6/15/2009 PAR 8/10/2009 6/10/2010 247 A3 VAG-1 Dam Safety remedial works 0.493 Shopping 11/24/2008 6/5/2009 20-Jun-2009 PAR 20-Nov-2009 Badrakha BDR-1 Dam Safety remedial works 0.68 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R BDR-1 Dam Safety remedial works 0.68 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 BDR-1 Dam Safety remedial works 0.68 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 BDR-1 Dam Safety remedial works 0.49 Shopping 8/24/2008 5/25/2009 5/27/2009 PAR 7/30/2009 6/30/2010 248 A3 BDR-1 Dam Safety remedial works 0.43 Shopping 8/24/2008 5/25/2009 8-Jun-09 PAR 27-Nov-09 Shewaga SWG-1 Dam Safety remedial works 1.13 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R SWG-1 Dam Safety remedial works 1.13 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 SWG-1 Dam Safety remedial works 1.13 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 SWG-1 Dam Safety remedial works 1.11 Shopping 4/30/2008 5/25/2009 5/27/2009 PAR 7/30/2009 8/29/2010 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 51 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document 249 A3 SWG-1 Dam Safety remedial works 1.08 Shopping 4/30/2008 5/25/2009 8-Jun-09 PAR 27-Nov-09 Kanakraj KNK-1 Dam Safety remedial works 0.67 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R KNK-1 Dam Safety remedial works 0.67 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 KNK-1 Dam Safety remedial works 0.67 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 KNK-1 Dam Safety remedial works 0.99 Shopping 8/30/2008 6/5/2009 6/15/2009 PAR 8/10/2009 6/10/2010 250 A3 KNK-1 Dam Safety remedial works 1.009 Shopping 8/30/2008 6/5/2009 20-Jun-2009 PAR 20-Nov-2009 Padmalaya PDM-1 Dam Safety remedial works 0.35 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R PDM-1 Dam Safety remedial works 0.35 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 PDM-1 Dam Safety remedial works 0.35 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 PDM-1 Dam Safety remedial works 0.762 Shopping 8/30/2008 6/5/2009 6/15/2009 PAR 8/10/2009 6/10/2010 251 A3 PDM-1 Dam Safety remedial works 0.799 Shopping 8/30/2008 6/5/2009 20-Jun-2009 PAR 20-Nov-2009 Shanimandal SHM-1 Dam Safety remedial works 0.66 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R SHM-1 Dam Safety remedial works 0.66 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 SHM-1 Dam Safety remedial works 0.66 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 SHM-1 Dam Safety remedial works 0.53 Shopping 8/31/2008 5/26/2009 6/15/2009 PAR 8/10/2009 6/10/2010 A3/1 SHM-1 Dam Safety remedial works 0.52 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected A3/2 SHM-1 Dam Safety remedial works 0.52 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected A3/3 SHM-1 Dam Safety remedial works 0.52 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected A3/4 SHM-1 Dam Safety remedial works 0.52 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected R4 SHM-1 Dam Safety remedial works 0.52 Shopping 5-May-08 25-May-09 28-May-09 PAR 31-May-10 28-Feb-11 252 Ambebara ABB-1 Dam Safety remedial works 2.02 NCB 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R ABB-1 Dam Safety remedial works 2.02 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 8/30/2009 R2 ABB-1 Dam Safety remedial works 2.02 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 3/2/2010 R3 ABB-1 Dam Safety remedial works 1.48 Shopping 11/24/2009 5/26/2009 6/15/2009 PAR 8/10/2009 10/10/2010 A3/1 ABB-1 Dam Safety remedial works 1.45 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected A3/2 ABB-1 Dam Safety remedial works 1.45 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected A3/3 ABB-1 Dam Safety remedial works 1.45 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected A3/4 ABB-1 Dam Safety remedial works 1.45 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected R4 ABB-1 Dam Safety remedial works 1.454 Shopping 5-May-08 25-May-09 28-May-09 PAR 31-May-10 28-Feb-11 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 52 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document 253 Dudhakheda DHK-1 Dam Safety remedial works 0.97 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R DHK-1 Dam Safety remedial works 0.97 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 DHK-1 Dam Safety remedial works 0.97 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 DHK-1 Dam Safety remedial works 0.43 Shopping 8/31/2008 5/26/2009 6/15/2009 PAR 8/10/2009 6/10/2010 A3/1 DHK-1 Dam Safety remedial works 0.43 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected A3/2 DHK-1 Dam Safety remedial works 0.43 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected A3/3 DHK-1 Dam Safety remedial works 0.43 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected A3/4 DHK-1 Dam Safety remedial works 0.43 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected R4 DHK-1 Dam Safety remedial works 0.43 Shopping 5-May-08 25-May-09 28-May-09 PAR 31-May-10 28-Feb-11 254 Khadkuna KDK-1 Dam Safety remedial works 2.12 NCB 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R KDK-1 Dam Safety remedial works 2.12 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 8/30/2009 R2 KDK-1 Dam Safety remedial works 2.12 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 3/2/2010 R3 KDK-1 Dam Safety remedial works 0.95 Shopping 11/24/2009 5/26/2009 6/15/2009 PAR 8/10/2009 6/10/2010 A3/1 KDK-1 Dam Safety remedial works 0.94 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected A3/2 KDK-1 Dam Safety remedial works 0.94 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected A3/3 KDK-1 Dam Safety remedial works 0.98 Shopping 5-May-08 25-May-09 28-May-09 PAR 1-Feb-10 255 Gadhawali GDW-1 Dam Safety remedial works 0.31 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R GDW-1 Dam Safety remedial works 0.31 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 GDW-1 Dam Safety remedial works 0.31 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 GDW-1 Dam Safety remedial works 0.34 Shopping 11/24/2009 5/26/2009 6/15/2009 PAR 8/10/2009 6/10/2010 A3/1 0.34 GDW-1 Dam Safety remedial works Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected A3/2 0.34 GDW-1 Dam Safety remedial works Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected A3/3 GDW-1 Dam Safety remedial works 0.351 Shopping 5-May-08 25-May-09 28-May-09 PAR 15-Feb-10 256 Khekada KKD-1 Dam Safety remedial works 0.98 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R KKD-1 Dam Safety remedial works 0.98 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 KKD-1 Dam Safety remedial works 0.98 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 KKD-1 Dam Safety remedial works 0.44 Shopping 11/24/2009 5/26/2009 6/15/2009 PAR 8/10/2009 6/10/2010 A3/1 0.35 KKD-1 Dam Safety remedial works Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 53 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document A3/2 0.35 KKD-1 Dam Safety remedial works Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected A3/3 KKD-1 Dam Safety remedial works 0.35 Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected A3/4 0.35 KKD-1 Dam Safety remedial works Shopping 5-May-08 25-May-09 28-May-09 PAR Rejected Rejected R4 KKD-1 Dam Safety remedial works 0.35 Shopping 5-May-08 25-May-09 28-May-09 PAR 31-May-10 28-Feb-11 257 Dasana DSN-1 Dam Safety remedial works 1.06 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R DSN-1 Dam Safety remedial works 1.06 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 DSN-1 Dam Safety remedial works 1.06 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 Deleted # deleted deleted deleted PAR 258 Khadakozar KKZ-1 Dam Safety remedial works 3.98 NCB 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R KKZ-1 Dam Safety remedial works 3.98 NCB 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 2/28/2010 R2 KKZ-1 Dam Safety remedial works 3.98 NCB 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 9/2/2010 R3 KKZ-1 Dam Safety remedial works 3.07 NCB 5/29/2007 7/20/2008 7/31/2008 PAR 8/20/2008 9/1/2009 A3 Remidial Work of Dam Sefety of KKZ-1 KHADAKOZAR Dam , Tq. 3.11 NCB 31-Dec-06 8-Oct-07 30-Dec-07 PAR 13-May-08 6-Nov-09 Chandawad., Dist.Nashik 259 Raniwali RNW-1 Dam Safety remedial works 0.42 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 5/30/2009 R RNW-1 Dam Safety remedial works 0.42 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 12/2/2009 R2 RNW-1 Dam Safety remedial works 0.42 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 9/2/2010 R3 RNW-1 Dam Safety remedial works 1.35 Shopping 8/31/2008 10/2/2008 2/2/2009 PAR 7/2/2009 1/31/2009 R4 Dam Safety remedial work of RNW-1 Ranivali M.I.Scheme, Tal:- 1.301 Shopping 8/31/2008 4-Feb-10 4-Mar-10 PAR 20-May-10 19-Nov-11 Shriwaedhan Dist:- Raigad 260 Warandh WAR-1 Dam Safety remedial works 0.44 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 4/30/2009 R WAR-1 Dam Safety remedial works 0.44 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 10/30/2009 R2 WAR-1 Dam Safety remedial works 0.44 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 1/31/2011 R3 WAR-1 Dam Safety remedial works 2.52 NCB 12/15/2008 5/30/2009 6/10/2009 PAR 8/1/2009 1/31/2009 A3 WAR-1 Dam Safety remedial works 2.048 NCB 18-Dec-08 5-Nov-09 1 Dec.09 PAR 13-Apr-10 261 Bhilawale BHI-1 Dam Safety remedial works 0.33 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 10/30/2009 R BHI-1 Dam Safety remedial works 0.33 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 BHI-1 Dam Safety remedial works 0.33 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 BHI-1 Dam Safety remedial works 0.033 Shopping 12/15/2008 5/30/2009 6/10/2009 PAR 8/1/2009 6/30/2010 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 54 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document Deleted # PAR 262 Unhere UNH-1 Dam Safety remedial works 0.34 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R UNH-1 Dam Safety remedial works 0.34 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 10/31/2007 11/30/2007 12/30/2007 4/30/2008 10/30/2009 UNH-1 Dam Safety remedial works 0.34 Shopping PAR R3 4/23/2008 4/15/2009 5/28/2009 8/1/2009 10/31/2010 UNH-1 Dam Safety remedial works 1.72 Shopping PAR A3/1 Dam Safety remedial work of Unhere UNH-1 M.I.Scheme, Tal:- SudhagadDist:- 1.28 Shopping 1-Apr-09 15-Apr-09 5-Jun-09 PAR Rejected Rejected -- Raigad. A3/2 Dam Safety remedial work of Unhere UNH-1 M.I.Scheme, Tal:- SudhagadDist:- 1.28 Shopping 1-Apr-09 15-Apr-09 5-Jun-09 PAR Rejected Rejected -- Dam d R i Safety remedial work of Unhere R4 UNH-1 M.I.Scheme, Tal:- SudhagadDist:- 1.28 Shopping 1-Apr-09 15-Apr-09 20-Jun-10 PAR 30-Aug-10 3-Mar-12 Raigad. 263 Awasare AWA-1 Dam Safety remedial works 0.37 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R AWA-1 Dam Safety remedial works 0.37 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 AWA-1 Dam Safety remedial works 0.37 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 AWA-1 Dam Safety remedial works 4.25 NCB 10/31/2008 11/30/2008 3/30/2009 PAR 7/30/2009 1/30/2011 R4 Dam Safety remedial work of Ausare AWA-1 M.I.Scheme, Tal:- Karjat, Dist:- 19.69 NCB 10/31/2008 20-Jun-10 15-Jul-10 PAR 1-Nov-10 31-Oct-12 Raigad. 264 Usran USR-1 Dam Safety remedial works 0.37 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R USR-1 Dam Safety remedial works 0.37 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 USR-1 Dam Safety remedial works 0.37 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 USR-1 Dam Safety remedial works 6.96 NCB 10/31/2008 11/30/2008 2/28/2009 PAR 7/28/2009 1/28/2011 R4 Dam Safety remedial work of Usran USR-1 M.I.Scheme, Tal:- Panvel, Dist:- 14.436 NCB 10/31/2008 20-Jun-10 15-Jul-10 PAR 1-Nov-10 31-Oct-12 265 Shirawali SRW-1 Dam Safety remedial works 0.21 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R SRW-1 Dam Safety remedial works 0.21 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 SRW-1 Dam Safety remedial works 0.21 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 55 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document R3 SRW-1 Dam Safety remedial works 16.13 NCB 11/10/2008 6/30/2009 7/15/2009 PAR 10/31/2009 3/31/2011 R4 SRW-1 Dam Safety remedial works 18.59 NCB 10-May-2010 15-May-2010 31-May-2010 PAR 31-Aug-2010 30-Aug-2012 266 Kadwai KWA-1 Dam Safety remedial works 0.27 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R KWA-1 Dam Safety remedial works 0.27 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 KWA-1 Dam Safety remedial works 0.27 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 KWA-1 Dam Safety remedial works 30.00 NCB 8/31/2008 10/2/2008 3/2/2009 PAR 7/2/2009 1/2/2011 R4 KWA-1 Dam Safety remedial works NCB 10-May-2010 15-May-2010 31-May-2010 PAR 31-Aug-2010 30-Aug-2012 43.15 267 Vhel VHL-1 Dam Safety remedial works 0.26 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R VHL-1 Dam Safety remedial works 0.26 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 VHL-1 Dam Safety remedial works 0.26 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 VHL-1 Dam Safety remedial works 30.78 NCB 10/31/2008 11/30/2008 3/30/2009 PAR 7/30/2009 1/30/2011 R4 VHL-1 Dam Safety remedial works 42.27 NCB 11-Feb-2010 28-Jan-2010 26-Mar-2010 PAR 30-Jun-2010 29-Jun-2012 268 Kalawande KDE-1 Dam Safety remedial works 0.32 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R KDE-1 Dam Safety remedial works 0.32 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 KDE-1 Dam Safety remedial works 0.32 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 KDE-1 Dam Safety remedial works 24.76 NCB 12/15/2008 6/30/2009 7/15/2009 PAR 10/31/2009 3/31/2011 R4 KDE-1 Dam Safety remedial works 24.84 NCB 18-Sep-2009 25-Feb-2010 30-Apr-2010 PAR 29-Jul-2010 28-Jul-2012 269 Guhagar GHG-1 Dam Safety remedial works 0.29 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R GHG-1 Dam Safety remedial works 0.29 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 GHG-1 Dam Safety remedial works 0.29 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 56 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document R3 GHG-1 Dam Safety remedial works 8.50 NCB 8/31/2008 10/3/2008 2/3/2009 PAR 6/3/2009 12/3/2010 R4 GHG-1 Dam Safety remedial works 8.03 NCB 22-Apr-2010 25-Apr-2010 30-Apr-2010 PAR 29-Jul-2010 28-Jul-2012 270 Malghar MLG-1 Dam Safety remedial works 0.32 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R MLG-1 Dam Safety remedial works 0.32 Shopping 2/28/2007 3/30/2007 4/30/2007 PAR 8/30/2007 5/30/2009 R2 MLG-1 Dam Safety remedial works 0.32 Shopping 8/31/2007 10/2/2007 11/2/2007 PAR 3/2/2008 12/2/2009 R3 MLG-1 Dam Safety remedial works 15.54 NCB 12/15/2008 6/30/2009 7/15/2009 PAR 10/31/2009 3/31/2011 R4 MLG-1 Dam Safety remedial works 16.17 NCB 18-Sep-2009 25-Feb-2010 30-Apr-2010 PAR 29-Jul-2010 28-Jul-2012 271 Oras ORS-1 Dam Safety remedial works 0.41 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R ORS-1 Dam Safety remedial works 0.41 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 ORS-1 Dam Safety remedial works 0.41 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 ORS-1 Dam Safety remedial works 6.23 NCB 12/15/2008 6/30/2009 7/15/2009 PAR 10/31/2009 3/31/2011 A3 ORS-1 Dam Safety remedial works 3.53 NCB 20-Dec-2008 30-May-2009 11-Jun-2009 PAR 24-Nov-2009 272 Harkul HKL-1 Dam Safety remedial works 0.34 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R HKL-1 Dam Safety remedial works 0.34 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 HKL-1 Dam Safety remedial works 0.34 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 HKL-1 Dam Safety remedial works 13.41 NCB 12/15/2008 6/30/2009 7/15/2009 PAR 10/31/2009 3/31/2011 A3 HKL-1 Dam Safety remedial works 5.36 NCB 10-Sep-2009 17-Sep-2009 17-Nov-2009 PAR 6-Feb-2010 273 Madkhol MDK-1 Dam Safety remedial works 0.41 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R MDK-1 Dam Safety remedial works 0.41 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 MDK-1 Dam Safety remedial works 0.41 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 MDK-1 Dam Safety remedial works 25.00 NCB 10/31/2008 11/30/2008 2/28/2009 PAR 6/28/2009 12/28/2010 R4 MDK-1 Dam Safety remedial works 29.70 NCB 11-Feb-2010 15-May-2010 31-May-2010 PAR 31-Aug-2010 30-Aug-2012 274 Shirgaon SIR-1 Dam Safety remedial works 0.32 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R SIR-1 Dam Safety remedial works 0.32 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 SIR-1 Dam Safety remedial works 0.32 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 SIR-1 Dam Safety remedial works 19.89 NCB 12/15/2008 6/30/2009 7/15/2009 PAR 10/31/2009 3/31/2011 R4 SIR-1 Dam Safety remedial works 14.12 NCB 18-Sep-2009 15-May-2010 31-May-2010 PAR 31-Aug-2010 30-Aug-2012 275 Nileli NIL-1 Dam Safety remedial works 0.32 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 57 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document R NIL-1 Dam Safety remedial works 0.32 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 NIL-1 Dam Safety remedial works 0.32 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 NIL-1 Dam Safety remedial works 28.49 NCB 10/31/2008 11/30/2008 2/28/2009 PAR 6/28/2009 12/28/2010 R4 NIL-1 Dam Safety remedial works 49.68 NCB 11-Feb-2010 15-May-2010 31-May-2010 PAR 31-Aug-2010 30-Aug-2012 276 Amboli ALI-1 Dam Safety remedial works 0.39 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R ALI-1 Dam Safety remedial works 0.39 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 ALI-1 Dam Safety remedial works 0.39 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 ALI-1 Dam Safety remedial works 0.67 Shopping 5/24/2008 2/20/2009 5/25/2009 PAR 10/1/2009 6/30/2010 A3 ALI-1 Dam Safety remedial works 0.65 Shopping 31-Dec-06 2-Mar-09 30-May-09 PAR 27-Jul-09 20-Oct-09 277 Velholi Remidial Work of Dam Sefety of VLI-1 AMBOLI Dam Tq. Dindori 0.51 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 Dist.Nashik R VLI-1 Dam Safety remedial works 0.51 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 VLI-1 Dam Safety remedial works 0.51 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 VLI-1 Dam Safety remedial works 1.45 Shopping 4/23/2008 5/25/2009 6/15/2009 PAR 9/15/2009 12/31/2010 A3/1 VLI-1 Dam Safety remedial works 0.31 Shopping 31-Mar-09 12-May-09 22 Jue 09 PAR Rejected Rejected A3/2 Remedial work of Dam Safety work VLI-1 of Velholi M.I. Scheme, Tal. 0.31 Shopping 31-Mar-09 12-May-09 22 Jue 09 PAR Rejected Rejected A3/3 Remedial work of Dam Safety work VLI-1 of Velholi M.I. Scheme, Tal. 0.31 Shopping 31-Mar-09 12-May-09 22 Jue 09 PAR 11-Mar-10 Shahapur, Dist. Thane 278 Jamburde Remedial work of Dam Safety work JBD-1 of Velholi M.I. Scheme, Tal. 0.52 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 Shahapur, Dist. Thane R JBD-1 Dam Safety remedial works 0.52 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 JBD-1 Dam Safety remedial works 0.52 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 JBD-1 Dam Safety remedial works 3.83 NCB 8/26/2008 7/31/2009 8/31/2009 PAR 1/31/2010 6/30/2011 A3 JBD-1 Dam Safety remedial works 3.20 NCB 31-Mar-09 5 Nov. 09 2 Dec. 09 PAR 25 Feb. 2010 279 Devkope DVK-1 Remedial work of Dam Safety work 0.49 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 of Jambhurde M I Scheme Tal R DVK-1 Dam Safety remedial works 0.49 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 DVK-1 Dam Safety remedial works 0.49 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 58 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document R3 DVK-1 Dam Safety remedial works 9.65 NCB 10/31/2008 11/30/2008 2/28/2009 PAR 6/28/2009 12/28/2010 R4 Remadial work of Dam Safety work DVK-1 of Deocope M.I. Scheme, Tal. 23.39 NCB 11 Dec. 09 30-Sep-10 31-Oct-10 PAR 31-Dec-10 30-Jun-12 Palghar, Dist. Thane 280 Usgaon USG-1 Dam Safety remedial works 0.57 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R USG-1 Dam Safety remedial works 0.57 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 USG-1 Dam Safety remedial works 0.57 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 USG-1 Dam Safety remedial works 8.47 NCB 12/15/2008 7/31/2009 8/31/2009 PAR 1/31/2010 6/30/2011 R4 Remadial work of Dam Safety work USG-1 of Usgaon M.I. Scheme, Tal. 9.95 NCB 23 Feb. 10 31-Jul-10 31-Aug-10 PAR 31-Oct-10 30-Apr-12 Bhiwandi, Dist. Thane 281 Kharade KAD-1 0.45 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 R KAD-1 Dam Safety remedial works 0.45 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 KAD-1 Dam Safety remedial works 0.45 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 KAD-1 Dam Safety remedial works 0.75 Shopping 8/26/2008 5/25/2009 6/15/2009 PAR 9/15/2009 5/31/2010 A3/1 KAD-1 Dam Safety remedial works 0.74 Shopping 31-Mar-09 12-May-09 22 Jue 09 PAR Rejected Rejected A3/2 Remedial work of Dam Safety work KAD-1 of Kharade M.I. Scheme, Tal. 0.74 Shopping 31-Mar-09 12-May-09 22 Jue 09 PAR Rejected Rejected Shahapur, Dist. Thane A3/3 Remedial work of Dam Safety work KAD-1 of Kharade M.I. Scheme, Tal. 0.744 Shopping 31-Mar-09 12-May-09 22 Jue 09 PAR 11-Mar-10 Shahapur, Dist. Thane 282 Dongaste Remedial work of Dam Safety work DGT-1 of Kharade M.I. Scheme, Tal. 0.37 Shopping 12/31/2006 1/31/2007 2/28/2007 PAR 7/31/2007 1/31/2009 Shahapur, Dist. Thane R DGT-1 Dam Safety remedial works 0.37 Shopping 4/30/2007 5/30/2007 6/30/2007 PAR 10/30/2007 4/30/2009 R2 DGT-1 Dam Safety remedial works 0.37 Shopping 10/31/2007 11/30/2007 12/30/2007 PAR 4/30/2008 10/30/2009 R3 DGT-1 Dam Safety remedial works 7.130 NCB 10/31/2008 11/30/2008 3/30/2009 PAR 7/30/2009 12/30/2010 R4 Remadial work of Dam Safety work DGT-1 of Dogaste M.I. Scheme, Tal. Wada, 7.90 NCB 11 Dec. 09 30-Sep-10 31-Oct-10 PAR 31-Dec-10 30-Jun-12 Dist Thane Pangdi - Dam Safety remedial works Dam Safety Works 0.000 0 12/9/2008 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 59 Maharashtra Water Sector Improvement Project Sr. Name of Project Package Description of Works/goods Estimated Method of Survey/ Estimate Preparation Banks Date of Date of No Nos. cost Procureme Design/ prepared & of Bid No Award of Completion (Rs. in nt DSRP sanctioned document objection Contract of Contract Million) ICB/NCB Approval (Date) (Date) to completed bidding (Date) document Deleted? Rengepar Construction of Remedial work of REN-1 dam safety work for Rengepar M.I.Project. under MWSIP Total for Minor Projects 308.90 R Total for Minor Projects 308.90 0.01 R2 Total for Minor Projects 308.90 1 R3 Total for Minor Projects 792.86 29/08/2009 R4 Total for Minor Projects 973.072 Investigation work Hat-4/1 31/08/2007 30/09/2007 30/10/2007 PAR 29/02/2008 29/08/2009 proposed by DSRP( 1.75 Shopping Now included) Hatnur Hat-4/2 Cleaning drainage hole & porous pipe 31/08/2007 30/09/2007 30/10/2007 PAR 29/02/2008 29/08/2009 gallery 4.43 NCB Hat-4/3 Demarcation of peak flood level of 31/08/2007 30/09/2007 30/10/2007 PAR 29/02/2008 D/S of Dam 0.895 Shopping Total for Dewatering of lower bucket of Hatnur Investigatio Dam D/S of radial gate No 26 to 29 7.08 n works Grand Total for Dam Safety Works 828.01 Grand Total for Dam Safety Works 824.27 R Grand Total for Dam Safety Works 831.35 831.345 R2 Grand Total for Dam Safety Works 831.345 1,925 R-Revised in Aug 2006 A-Achived R2 - Revision2 r4ver1.xlsxDSPKGR3 60 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) Procurement Packaging Plan and Implementation Schedule for Civil Works of Participatory Reh Financial Implementation Schedule for WUA level works Revision R4 WUA LEVEL WORKS (Rs in Millions) Sr. Name of Package Description of Works/goods Estimated Method of PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total No Project Nos. cost Procuremen (Rs. in t ICB/NCB Million) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 A Major Projects 1 Kal Kal-3** Rehabilation of minors WUAs work WUA -19 34.51 WUA 6.90 10.35 10.35 6.90 34.51 R Kal-3** Rehabilation of minors WUAs work WUA -19 34.51 WUA 5.18 12.08 15.53 1.73 34.51 R2 Kal-3**/1 Rehabilation of minors WUAs work WUA -19 1.107 Shopping 0.277 0.720 0.111 1.107 Rehabilitation work of Kal Major Project Tal.Roha, Dist.Raigad for Water Users A2 Kal-3**/1 1.107 Shopping Association, Khamb, Taluka Roha, District Raigad (WUA NO.1) Rehabilitation work of Kal Major Project Tal.Roha, Dist.Raigad for Water Users A2/1 Kal-3**/1 1.107 Shopping Association, Khamb, Taluka Roha, District Raigad (WUA NO.1) Rehabilitation work of Kal Major Project Tal.Roha, Dist.Raigad for Water Users A2/2 Kal-3**/1 1.107 Shopping Association, Khamb, Taluka Roha, District Raigad (WUA NO.1) Rehabilitation work of Kal Major Project Tal.Roha, Dist.Raigad for Water Users A2/3 Kal-3**/1 1.107 Shopping Association, Khamb, Taluka Roha, District Raigad (WUA NO.1) Rehabilitation work of Kal Major Project Tal.Roha, Dist.Raigad for Water Users R3 Kal-3**/1 1.107 Shopping 0.554 0.554 1.11 Association, Khamb, Taluka Roha, District Raigad (WUA NO.1) Rehabilitation work of Kal Major Project Tal.Roha, Dist.Raigad for Water Users A3 Kal-3**/1 1.107 Shopping Association, Khamb, Taluka Roha, District Raigad (WUA NO.1) 2/24/2011 wua_prmpkg_r4 1 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Kal Major Project Tal.Roha, Dist.Raigad for Water Users R4 Kal-3**/1 1.107 Shopping 1.107 1.11 Association, Khamb, Taluka Roha, District Raigad (WUA NO.1) Water user association No.2 Deokane, Tal. Roha, 292 R2 Kal-3**/2 1.331 Shopping 0.333 0.865 0.133 1.331 Dist. Raigad Water user association No.2 Deokane, Tal. Roha, A2 Kal-3**/2 1.331 Shopping Dist. Raigad Water user association No.2 Deokane, Tal. Roha, A2/1 Kal-3**/2 1.331 Shopping Dist. Raigad Water user association No.2 Deokane, Tal. Roha, A2/2 Kal-3**/2 1.331 Shopping Dist. Raigad Water user association No.2 Deokane, Tal. Roha, A2/3 Kal-3**/2 1.331 Shopping Dist. Raigad Water user association No.2 Deokane, Tal. Roha, R3 Kal-3**/2 1.331 Shopping 0.666 0.666 1.33 Dist. Raigad Water user association No.2 Deokane, Tal. Roha, A3 Kal-3**/2 1.331 Shopping Dist. Raigad Water user association No.2 Deokane, Tal. Roha, R4 Kal-3**/2 1.331 Shopping 1.33 1.33 Dist. Raigad Water user association No 3 Pingalsai, Tal. 293 R2 Kal-3**/3 1.009 Shopping 0.252 0.656 0.101 1.009 Roha, Dist. Raigad Water user association No 3 Pingalsai, Tal. A2 Kal-3**/3 1.009 Shopping Roha, Dist. Raigad Water user association No 3 Pingalsai, Tal. A2/1 Kal-3**/3 1.009 Shopping Roha, Dist. Raigad Water user association No 3 Pingalsai, Tal. A2/2 Kal-3**/3 1.009 Shopping Roha, Dist. Raigad Water user association No 3 Pingalsai, Tal. A2/3 Kal-3**/3 1.009 Shopping Roha, Dist. Raigad Water user association No 3 Pingalsai, Tal. R3 Kal-3**/3 1.009 Shopping 0.505 0.505 1.01 Roha, Dist. Raigad Water user association No 3 Pingalsai, Tal. A3 Kal-3**/3 1.009 Shopping Roha, Dist. Raigad Water user association No 3 Pingalsai, Tal. R4 Kal-3**/3 1.009 Shopping 1.009 1.01 Roha, Dist. Raigad Water user association No 6 Killa, Tal. Roha, 294 R2 Kal-3**/4 1.864 NCB 0.466 0.932 0.466 1.864 Dist. Raigad 2/24/2011 wua_prmpkg_r4 2 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Water user association No 6 Killa, Tal. Roha, A2 Kal-3**/4 1.864 Shopping Dist. Raigad Water user association No 6 Killa, Tal. Roha, A2/1 Kal-3**/4 1.864 Shopping Dist. Raigad Water user association No 6 Killa, Tal. Roha, A2/2 Kal-3**/4 1.864 Shopping Dist. Raigad Water user association No 6 Killa, Tal. Roha, A2/3 Kal-3**/4 1.864 Shopping Dist. Raigad Water user association No 6 Killa, Tal. Roha, R3 Kal-3**/4 1.864 Shopping 0.932 0.932 1.86 Dist. Raigad Water user association No 6 Killa, Tal. Roha, A3 Kal-3**/4 1.864 Shopping Dist. Raigad Water user association No 6 Killa, Tal. Roha, R4 Kal-3**/4 2.34 NCB 2.34 2.34 Dist. Raigad Water user association No 7 Talaghar, Tal. Roha, 295 R2 Kal-3**/5 2.34 NCB 0.585 1.170 0.585 2.340 Dist. Raigad Rehabilitation work of Minors & outlet of Talaghar Water User's Association No. 07 @ A2 Kal-3**/5 2.451 NCB -- 2.45 2.45 Talaghar Tal. Roha Dist. Raigad Maharashtra- India. Water user association No 8 Wadhavan, Tal. 296 R2 Kal-3**/6 2.316 NCB 0.579 1.158 0.579 2.316 Mangaon, Dist. Raigad Water user association No 8 Wadhavan, Tal. A2 Kal-3**/6 2.216 NCB Mangaon, Dist. Raigad Water user association No 8 Wadhavan, Tal. A2/1 Kal-3**/6 2.216 NCB Mangaon, Dist. Raigad Water user association No 8 Wadhavan, Tal. R3 Kal-3**/6 2.216 NCB 1.108 1.108 2.22 Mangaon, Dist. Raigad Water user association No 8 Wadhavan, Tal. A3 Kal-3**/6 2.216 NCB Mangaon, Dist. Raigad Water user association No 8 Wadhavan, Tal. R4 Kal-3**/6 2.216 NCB 1.25 0.966 2.22 Mangaon, Dist. Raigad Water user association No 9 Dakhane, Tal. 297 R2 Kal-3**/7 2.331 NCB 0.583 1.166 0.583 2.331 Mangaon, Dist. Raigad Rehabilitation of Minors & Outlet of WUA No. A2 Kal-3**/7 9 @ Dakhane, Tal. Mangaon, Dist. Raigad 2.442 NCB 1.50 0.94 2.44 Maharashtra-India. Water user association No 10 Uttekhol, Tal. 298 R2 Kal-3**/8 2.315 NCB 0.579 1.158 0.579 2.315 Mangaon, Dist. Raigad 2/24/2011 wua_prmpkg_r4 3 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation of Minors & Outlet of WUA No. A2 Kal-3**/8 10 Uttekhol Tal. Mangaon, Dist. Raigad 2.426 NCB 1.94 0.49 2.43 Maharashtra-India. Water user association No 11 Dhalghar, Tal. 299 R2 Kal-3**/9 2.052 NCB 0.513 1.026 0.513 2.052 Mangaon, Dist. Raigad Water user association No 11 Dhalghar, Tal. A2 Kal-3**/9 2.052 NCB Mangaon, Dist. Raigad Water user association No 11 Dhalghar, Tal. A2/1 Kal-3**/9 2.052 NCB Mangaon, Dist. Raigad Water user association No 11 Dhalghar, Tal. R3 Kal-3**/9 2.052 NCB 1.026 1.026 2.05 Mangaon, Dist. Raigad Water user association No 11 Dhalghar, Tal. A3 Kal-3**/9 2.052 NCB Mangaon, Dist. Raigad Water user association No 11 Dhalghar, Tal. R4 Kal-3**/9 2.052 NCB 1.00 1.05 2.05 Mangaon, Dist. Raigad Kal- Water user association No 12 Wave, Tal. 300 R2 2.326 NCB 0.582 1.163 0.582 2.326 3**/10 Mangaon , Dist. Raigad Kal- Water user association No 12 Wave, Tal. A2 2.326 NCB 3**/10 Mangaon , Dist. Raigad Kal- Water user association No 12 Wave, Tal. A2/1 2.326 NCB 3**/10 Mangaon , Dist. Raigad Kal- Water user association No 12 Wave, Tal. R3 2.326 NCB 1.163 1.163 2.33 3**/10 Mangaon , Dist. Raigad Kal- Water user association No 12 Wave, Tal. A3 2.326 NCB 3**/10 Mangaon , Dist. Raigad Kal- Water user association No 12 Wave, Tal. R4 2.326 NCB 1.20 1.13 2.33 3**/10 Mangaon , Dist. Raigad Kal- Water user association No 13 , Tal. Mangaon, 301 R2 2.226 NCB 0.557 1.113 0.557 2.226 3**/11 Dist. Raigad Rehabilitation of Minors & Outlet of WUA No. Kal- A2 13 @ Unegaon, Tal. Mangaon, Dist. Raigad 2.332 NCB 2.19 0.15 2.33 3**/11 Maharashtra-India. Kal- Water user association No 14 Repoli, Tal. 302 R2 2.203 NCB 0.551 1.102 0.551 2.203 3**/12 Mangaon, Dist. Raigad 2/24/2011 wua_prmpkg_r4 4 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Kal Minors, Canals & Kal- Br. Canal System of Goregaon Br. Canal, Repoli A2 2.299 NCB 1.84 0.46 2.30 3**/12 & Wadgaon Minor WUA No. 14 Repoli Tal. Mangaon Dist. Raigad Maharashtra-India. Kal- Water user association No 15 Goregaon, Tal. 303 R2 2.179 NCB 0.545 1.090 0.545 2.179 3**/13 Mangaon, Dist. Raigad Kal- Water user association No 15 Goregaon, Tal. A2 2.178 NCB 3**/13 Mangaon, Dist. Raigad Kal- Water user association No 15 Goregaon, Tal. A2/1 2.178 NCB 0.327 1.198 0.653 1.525 3**/13 Mangaon, Dist. Raigad Kal- Water user association No 15 Goregaon, Tal. R3 2.178 NCB 1.089 1.089 2.18 3**/13 Mangaon, Dist. Raigad Kal- Water user association No 15 Goregaon, Tal. A3 2.178 NCB 3**/13 Mangaon, Dist. Raigad Kal- Water user association No 15 Goregaon, Tal. R4 2.178 NCB 2.18 2.18 3**/13 Mangaon, Dist. Raigad Kal- Water user association No 17 Pahel, Tal. 304 R2 2.222 NCB 0.556 1.111 0.556 2.222 3**/14 Mangaon, Dist. Raigad Rehabilitation work of Kal Major Project, Kal- Tal.Mangaon, Dist.Raigad for Pahel Water Users A2 2.323 NCB 1.85 0.47 2.32 3**/14 Association, Tal.Mangaon, Dist.Ragiad. (W.U.A. NO.17) (Pakage Kal-3) Kal- Water user association No19 Koshimbale, Tal. 305 R2 1.968 NCB 0.492 0.984 0.492 1.968 3**/15 Roha, Dist. Raigad Rehabilitation work of Minors of Water User's Kal- Association No. 19 (Minor No. 1,2,3 of Morba A2 2.060 NCB 1.65 0.41 2.06 3**/15 Br.) Koshimbale Tal. Mangaon Dist. Raigad Maharashtra-India. Kal- Water user association No. 20 Sale, Tal. 306 R2 1.832 NCB 0.458 0.916 0.458 1.832 3**/16 Mangao, Dist. Raigad . Rehabilitation work of Sale Water User's Asso. Kal- A2 No. 20 (Minor No. 4 of Morba Branch) Sale Tal. 1.919 NCB 1.53 0.39 1.92 3**/16 Mangaon Dist. Raigad Maharashtra-India. Kal- Water user association No. 21 Umroli, Tal. 307 R2 2.08 NCB 0.520 1.040 0.520 2.080 3**/17 Mangao, Dist. Raigad 2/24/2011 wua_prmpkg_r4 5 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Minor of Umroli Water Kal- A2 User's Assoiation No. 21 Tal. Mangaon Dist. 2.180 NCB 0.57 1.61 2.18 3**/17 Raigad Maharashtra-India. Kal- Water user association No. 22 Surav, Tal. 308 R2 2.275 NCB 0.569 1.138 0.569 2.275 3**/18 Mangao, Dist. Raigad Rehabilitation work of Minors of Water User's Kal- A2 Association No. 22 Surav, Tal. Mangaon Dist. 2.382 NCB 2.38 2.38 3**/18 Raigad Maharashtra-India. Kal- Water user association No. 23 Morba, Tal. 309 R2 0.922 Shopping 0.231 0.599 0.092 0.922 3**/19 Mangao, Dist. Raigad Rehabilitation work of Morba Water User's Asso. Kal- A2 No.23 Tal. Mangaon ,Dist. Raigad Maharashtra- 0.963 Shopping 0.75 0.75 3**/19 India. 2 Pench Pch-6** Rehabilation of minors (WUA level works -50 327.87 WUA 65.57 65.57 98.36 65.57 32.79 327.87 R Pch-6** Rehabilation of minors (WUA level works -50 327.87 WUA 49.18 114.75 147.54 16.39 327.87 Pch- Nageshwar Water User Association Ltd. 310 R2 8.272 NCB 2.068 4.136 2.068 8.272 6**/1 Ta.Parseaoni Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq.Parshioni A2 8.248 NCB 6**/1 Distt. Nagpur for Nageshwar WUA Babhulwada Pch- Rehabiliation work of Pench Proj. Tq.Parshioni R3 8.248 NCB 1.237 4.536 2.474 8.25 6**/1 Distt. Nagpur for Nageshwar WUA Babhulwada Pch- Rehabiliation work of Pench Proj. Tq.Parshioni A3 9.623 NCB 2.31 7.31 9.62 6**/1 Distt. Nagpur for Nageshwar WUA Babhulwada Pch- Patimata Water User Association Ltd. Bansingi 311 R2 3.151 NCB 0.788 1.576 0.788 3.151 6**/2 Ta. Parseaoni Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Parshioni A2 3.729 NCB 3.73 3.73 6**/2 Distt. Nagpur for Patimata WUA Parshioni Pch- Kisan vikas Water User Association Ltd. 312 R2 9.039 NCB 2.260 4.520 2.260 9.039 6**/3 Parsodi Ta. Parseaoni Dist. Nagpur Rehabiliation work of Pench Proj. Tq. Parshioni Pch- A2 Distt. Nagpur for Parsodi Gundari Kisan Vikas 8.757 NCB 6**/3 WUA Gundari 2/24/2011 wua_prmpkg_r4 6 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabiliation work of Pench Proj. Tq. Parshioni Pch- A2/1 Distt. Nagpur for Parsodi Gundari Kisan Vikas 8.757 NCB 6**/3 WUA Gundari Rehabiliation work of Pench Proj. Tq. Parshioni Pch- A2/2 Distt. Nagpur for Parsodi Gundari Kisan Vikas 10.090 NCB 2.01 3.41 4.67 10.09 6**/3 WUA Gundari Pch- Manhantbaba Water User Association Ltd. 313 R2 3.874 NCB 0.969 1.937 0.969 3.874 6**/4 Palora Ta. Parseaoni Dist. Nagpur Pch- Mahantbaba WUA Palora Tah. Parshioni Distt A2 3.850 NCB 1.13 2.73 3.86 6**/4 Nagpur Pch- Vitthal Rukhmini Water User Association Ltd. 314 R2 6.693 NCB 1.673 3.347 1.673 6.693 6**/5 Pipala Ta. Parseaoni Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Parshioni R3 0.16 shopping 0.080 0.080 0.16 6**/5 Distt. Nagpur for Vittal Rukhmini WUA Pipla Pch- Rehabiliation work of Pench Proj. Tq. Parshioni A3 0.179 SHOPPING 0.18 0.18 6**/5 Distt. Nagpur for Vittal Rukhmini WUA Pipla Pch- Shivshakti Water User Association Ltd. Palora; 315 R2 4.776 NCB 1.194 2.388 1.194 4.776 6**/6 PipalaTa. Parseaoni Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Parshioni A2 5.805 NCB 6**/6 Distt. Nagpur for Shioshakti WUA Pipla Pch- Rehabiliation work of Pench Proj. Tq. Parshioni A2/1 5.805 NCB 6**/6 Distt. Nagpur for Shioshakti WUA Pipla Pch- Rehabiliation work of Pench Proj. Tq. Parshioni A2/2 6.624 NCB 1.02 2.69 2.91 6.62 6**/6 Distt. Nagpur for Shioshakti WUA Pipla Pch- SantTukaram Maharaj Water User Association 316 R2 5.996 NCB 1.499 2.998 1.499 5.996 6**/7 Ltd. SonegaonTa. Parseaoni Dist. Nagpur Rehabiliation work of Pench Proj. Tq. Parshioni Pch- A2 Distt. Nagpur for Sant Tukaram Maharaj WUA 5.723 NCB 6**/7 Sonegaon Rehabiliation work of Pench Proj. Tq. Parshioni Pch- A2/1 Distt. Nagpur for Sant Tukaram Maharaj WUA 5.723 NCB 6**/7 Sonegaon 2/24/2011 wua_prmpkg_r4 7 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabiliation work of Pench Proj. Tq. Parshioni Pch- A2/2 Distt. Nagpur for Sant Tukaram Maharaj WUA 6.586 NCB 0.54 2.69 3.36 6.59 6**/7 Sonegaon Sant Dyaneshwar Mawali Water User Pch- 317 R2 Association Ltd.Gawana Garanda Ta. Parseaoni 3.189 NCB 0.797 1.595 0.797 3.189 6**/8 Dist. Nagpur Rehabiliation work of Pench Proj. Tq. Parshioni Pch- A2 Distt. Nagpur for Sant Dhyaneshwar Mauli 2.930 NCB 6**/8 WUA Gawana Garanda Rehabiliation work of Pench Proj. Tq. Parshioni Pch- A2/1 Distt. Nagpur for Sant Dhyaneshwar Mauli 2.930 NCB 6**/8 WUA Gawana Garanda Rehabiliation work of Pench Proj. Tq. Parshioni Pch- A2/2 Distt. Nagpur for Sant Dhyaneshwar Mauli 2.930 NCB 6**/8 WUA Gawana Garanda Rehabiliation work of Pench Proj. Tq. Parshioni Pch- R3 Distt. Nagpur for Sant Dhyaneshwar Mauli 2.93 NCB 0.440 1.612 0.879 2.93 6**/8 WUA Gawana Garanda Rehabiliation work of Pench Proj. Tq. Parshioni Pch- A3 Distt. Nagpur for Sant Dhyaneshwar Mauli 3.396 NCB 1.50 1.90 3.40 6**/8 WUA Gawana Garanda Pch- Shriram Water User Association Ltd. Parseaoni 318 R2 4.836 NCB 1.209 2.418 1.209 4.836 6**/9 Ta. Parseaoni Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq.Parshioni A2 5.790 NCB 6**/9 Distt. Nagpur for Shriram WUA Parshioni Pch- Rehabiliation work of Pench Proj. Tq.Parshioni A2/1 5.790 NCB 6**/9 Distt. Nagpur for Shriram WUA Parshioni Pch- Rehabiliation work of Pench Proj. Tq.Parshioni R3 5.79 NCB 0.869 3.185 1.737 5.79 6**/9 Distt. Nagpur for Shriram WUA Parshioni Pch- Rehabiliation work of Pench Proj. Tq.Parshioni A3 6.749 NCB 3.27 3.48 6.75 6**/9 Distt. Nagpur for Shriram WUA Parshioni Pch- Shri Wasantbaba Water User Association Ltd. 319 R2 6.211 NCB 1.553 3.106 1.553 6.211 6**/10 Parseaoni Ta. Parseaoni Dist. Nagpur 2/24/2011 wua_prmpkg_r4 8 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabiliation work of Pench Proj. Tq. Parshioni Pch- A2 Distt. Nagpur for Sant Vasantbaba 4.73 NCB 6**/10 WUAParshioni Rehabiliation work of Pench Proj. Tq. Parshioni Pch- A2/1 Distt. Nagpur for Sant Vasantbaba 5.489 NCB 3.13 2.36 5.49 6**/10 WUAParshioni Pch- Om jai bhole Water User Association 320 R2 4.565 NCB 1.141 2.283 1.141 4.565 6**/11 Ltd.Karmbhad Ta. Parseaoni Dist. Nagpur Rehabiliation work of Pench Proj. Tq. Parshioni Pch- A2 Distt. Nagpur for Om Jaibhole WUA 3.630 NCB 6**/11 Karambhad Rehabiliation work of Pench Proj. Tq. Parshioni Pch- A2/1 Distt. Nagpur for Om Jaibhole WUA 3.630 NCB 6**/11 Karambhad Rehabiliation work of Pench Proj. Tq. Parshioni Pch- R3 Distt. Nagpur for Om Jaibhole WUA 3.630 NCB 0.545 1.997 1.089 3.63 6**/11 Karambhad Rehabiliation work of Pench Proj. Tq. Parshioni Pch- A3 Distt. Nagpur for Om Jaibhole WUA 4.232 NCB 1.00 3.23 4.23 6**/11 Karambhad Pch- ShriKrushna Water User Association Ltd. 321 R2 7.937 NCB 1.984 3.969 1.984 7.937 6**/12 Karmbhad Ta. Parseaoni Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Parshioni A2 6.788 NCB 0.25 1.73 4.81 6.79 6**/12 Distt. Nagpur for Shrikrushna WUA Karambhad Pch- Kamal Water User Association Ltd. Karmbhad 322 R2 11.439 NCB 2.860 5.720 2.860 11.439 6**/13 Ta. Parseaoni Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Parshioni R3 10.550 NCB 3.165 4.220 3.165 10.55 6**/13 Distt. Nagpur for Kamal WUA Karambhad Pch- Rehabiliation work of Pench Proj. Tq. Parshioni A3 12.494 NCB 2.68 8.00 1.81 12.49 6**/13 Distt. Nagpur for Kamal WUA Karambhad Pch- Jai Santoshi Maa Water User Association Ltd. 323 R2 6.856 NCB 1.714 3.428 1.714 6.856 6**/14 Dahegaon Ta. Parseaoni Dist. Nagpur Rehabiliation work of Pench Proj. Tq. Parshioni Pch- A2 Distt. Nagpur for Jai Santoshi Maa WUA 6.72 NCB 6**/14 Dahegaon 2/24/2011 wua_prmpkg_r4 9 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabiliation work of Pench Proj. Tq. Parshioni Pch- A2/1 Distt. Nagpur for Jai Santoshi Maa WUA 6.72 NCB 6**/14 Dahegaon Rehabiliation work of Pench Proj. Tq. Parshioni Pch- A2/2 Distt. Nagpur for Jai Santoshi Maa WUA 7.361 NCB 1.07 3.16 3.13 7.36 6**/14 Dahegaon Pch- ShivKrupa Water User Association Ltd. 324 R2 11.379 NCB 2.845 5.690 2.845 11.379 6**/15 Dahegaon Ta. Parseaoni Dist. Nagpur Rehabiliation work of Pench Proj. Pch- A2 Tq.Patansawangi Distt. Nagpur for Shiokrupa 11.588 NCB 6**/15 WUA Dahegaon Rehabiliation work of Pench Proj. Pch- A2/1 Tq.Patansawangi Distt. Nagpur for Shiokrupa 12.159 NCB 2.46 5.13 4.57 12.16 6**/15 WUA Dahegaon Pch- Nandaji Water User Association Ltd. Khandala 325 R2 4.386 NCB 1.097 2.193 1.097 4.386 6**/16 Ta. Parseaoni Dist. Nagpur Pch- Nandaji,WUA Khandala Tah. Parshioni Distt A2 4.460 NCB 4.46 4.46 6**/16 Nagpur Pch- Gadgebaba Water User Association Ltd. Itgaon 326 R2 6.04 NCB 1.510 3.020 1.510 6.040 6**/17 Ta. Parseaoni Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Parshioni A2 8.03 NCB 6**/17 Distt. Nagpur for Sant Gadgebaba WUA Itgaon Pch- Rehabiliation work of Pench Proj. Tq. Parshioni A2/1 8.03 NCB 6**/17 Distt. Nagpur for Sant Gadgebaba WUA Itgaon Pch- Rehabiliation work of Pench Proj. Tq. Parshioni A2/2 8.877 NCB 5.19 3.69 8.88 6**/17 Distt. Nagpur for Sant Gadgebaba WUA Itgaon Pch- Shetkari Bahuuddeshiya Water User Association 327 R2 4.364 NCB 1.091 2.182 1.091 4.364 6**/18 Ltd. Itgaon Ta. Parseaoni Dist. Nagpur Rehabiliation work of Pench Proj. Tq. Parshioni Pch- A2 Distt. Nagpur for Shetkari Bahu Uddheshiya 4.466 NCB 0.51 3.96 4.47 6**/18 WUA Itgaon Pch- Haritkranti Water User Association Ltd. 328 R2 2.653 NCB 0.663 1.327 0.663 2.653 6**/19 Tamswadi Ta. Paeseaoni Dist. Nagpur 2/24/2011 wua_prmpkg_r4 10 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Rehabiliation work of Pench Proj. Tq. Saoner A2 2.653 NCB 6**/19 Distt. Nagpur for Haritkranti WUA Tamswadi Pch- Rehabiliation work of Pench Proj. Tq. Saoner A2/1 2.662 NCB 2.66 2.66 6**/19 Distt. Nagpur for Haritkranti WUA Tamswadi Pch- Shri Tajuddinbaba Water User Association Ltd. 329 R2 2.696 NCB 0.674 1.348 0.674 2.696 6**/20 Mahadula Ta. Paeseaoni Dist. Nagpur Pch- Tajuddinbaba WUA Mahadula Tah. Parshioni A2 2.650 NCB 0.76 1.89 2.65 6**/20 Distt Nagpur Pch- Santkabir Water User Association Ltd. Umari 330 R2 5.338 NCB 0.534 2.936 1.868 5.338 6**/21 Ta. Parseaoni Dist. Nagpur Pch- Santkabir WUA Ltd. Umari Ta. Parseaoni Dist. R3 3.532 NCB 1.413 2.119 3.53 6**/21 Nagpur Pch- Santkabir WUA Ltd. Umari Ta. Parseaoni Dist. A3/1 3.532 NCB 6**/21 Nagpur Pch- Santkabir WUA Ltd. Umari Ta. Parseaoni Dist. A3/2 3.532 NCB 6**/21 Nagpur Pch- Santkabir WUA Ltd. Umari Ta. Parseaoni Dist. A3/3 3.532 NCB 6**/21 Nagpur Pch- Santkabir WUA Ltd. Umari Ta. Parseaoni Dist. A3/4 4.156 NCB 0.00 0.00 0.00 0.00 1.70 2.46 0.00 4.16 6**/21 Nagpur Pch- Haritganga Water User Association Ltd. 331 R2 5.800 NCB 0.580 3.190 2.030 5.800 6**/22 Kalapata Ta. Parseaoni Dist. Nagpur Pch- Hariganga WUA Ltd. Kalapata Ta. Parseaoni R3 0.889 shopping 0.356 0.534 0.89 6**/22 Dist. Nagpur Pch- Hariganga WUA Ltd. Kalapata Ta. Parseaoni A3/1 0.916 Shopping 6**/22 Dist. Nagpur Pch- Hariganga WUA Ltd. Kalapata Ta. Parseaoni A3/2 0.916 Shopping 6**/22 Dist. Nagpur Pch- Hariganga WUA Ltd. Kalapata Ta. Parseaoni R4 1.452 Shopping 0.550 0.902 1.45 6**/22 Dist. Nagpur Pch- Krushiganga Water User Association Ltd. 332 R2 5.057 NCB 0.506 2.781 1.770 5.057 6**/23 Mahuli Ta. Parseaoni Dist. Nagpur Pch- Krushiganga WUA Ltd. Mahuli Ta. Parseaoni R3 3.751 NCB 1.501 2.251 3.75 6**/23 Dist. Nagpur Pch- Krushiganga WUA Ltd. Mahuli Ta. Parseaoni A3/1 3.751 NCB 6**/23 Dist. Nagpur 2/24/2011 wua_prmpkg_r4 11 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Krushiganga WUA Ltd. Mahuli Ta. Parseaoni A3/2 4.405 NCB 0.00 0.00 0.00 0.00 1.74 2.66 0.00 4.41 6**/23 Dist. Nagpur Pch- Jivanvikas Water User Association Ltd. Mahuli 333 R2 5.880 NCB 0.588 3.234 2.058 5.880 6**/24 Ta. Parseaoni Dist. Nagpur Pch- Jiwanvikash WUA, Gundhari Ta-Parseoni, Dist- A2 5.176 NCB 6**/24 Nagpur Pch- Jiwanvikash WUA, Gundhari Ta-Parseoni, Dist- A2/1 5.176 NCB 6**/24 Nagpur Pch- Jiwanvikash WUA, Gundhari Ta-Parseoni, Dist- A2/2 5.176 NCB 6**/24 Nagpur Pch- Jiwanvikash WUA, Gundhari Ta-Parseoni, Dist- A2/3 5.564 NCB 0.00 0.00 0.00 0.00 3.05 2.51 0.00 5.56 6**/24 Nagpur Pch- Sujlam Sufalam Water User Association Ltd. 334 R2 4.385 NCB 0.439 2.412 1.535 4.385 6**/25 Nayakund Ta. Parseaoni Dist. Nagpur Pch- Sujlamsufalam WUA Ltd. Nayakund Ta. A2 4.762 NCB 6**/25 Parseaoni Dist. Nagpur Pch- Sujlamsufalam WUA Ltd. Nayakund Ta. A2/1 4.762 NCB 6**/25 Parseaoni Dist. Nagpur Pch- Sujlamsufalam WUA Ltd. Nayakund Ta. A2/2 4.762 NCB 6**/25 Parseaoni Dist. Nagpur Pch- Sujlamsufalam WUA Ltd. Nayakund Ta. A2/3 4.762 NCB 6**/25 Parseaoni Dist. Nagpur Pch- Sujlamsufalam WUA Ltd. Nayakund Ta. R3 4.762 NCB 1.905 2.857 4.76 6**/25 Parseaoni Dist. Nagpur Pch- Sujlamsufalam WUA Ltd. Nayakund Ta. A3 5.350 NCB 0.00 0.00 0.00 0.00 2.79 2.56 0.00 5.35 6**/25 Parseaoni Dist. Nagpur Pch- Krushivikas Water User Association Ltd. 335 R2 5.489 NCB 1.372 2.745 1.372 5.489 6**/26 Gosewadi Ta.Saoner Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Saoner A2 5.441 NCB 5.44 5.44 6**/26 Distt. Nagpur for Krushivikas WUA Gosewadi Pch- Tajbaba Water User Association Ltd. Waki 336 R2 2.789 NCB 0.697 1.395 0.697 2.789 6**/27 Ta.Saoner Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Saoner A2 2.860 NCB 0.66 2.01 2.67 6**/27 Distt. Nagpur for Tajbaba WUA Waki Pch- Dattraya Water User Association Ltd. 337 R2 3.703 NCB 0.926 1.852 0.926 3.703 6**/28 Patnsawangi Ta. Saoner Dist. Nagpur 2/24/2011 wua_prmpkg_r4 12 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Rehabiliation work of Pench Proj. Tq. Saoner A2 4.002 NCB 0.82 3.18 4.00 6**/28 Distt. Nagpur for Dattatraya WUA Patansawangi Pch- Jaidurga Water User Association Ltd. Walni Ta. 338 R2 7.004 NCB 1.751 3.502 1.751 7.004 6**/29 Saoner Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Saoner A2 5.592 NCB 0.55 5.04 5.59 6**/29 Distt. Nagpur for Jai Durga WUA Patansawangi Pch- Maatoshri Water User Association Ltd. Pipala 339 R2 5.579 NCB 1.395 2.790 1.395 5.579 6**/30 Ta. Saoner Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Saoner A2 6.935 NCB 3.02 3.92 6.94 6**/30 Distt. Nagpur for Matoshri WUA Pipla Pch- Jaishankar Water User Association Ltd. Pota Ta. 340 R2 8.83 NCB 2.208 4.415 2.208 8.830 6**/31 Saoner Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Saoner A2 8.975 NCB 6**/31 Distt. Nagpur for Jaishankar WUA Pota Pch- Rehabiliation work of Pench Proj. Tq. Saoner R3 8.975 NCB 1.346 4.936 2.693 8.98 6**/31 Distt. Nagpur for Jaishankar WUA Pota Pch- Rehabiliation work of Pench Proj. Tq. Saoner A3 10.665 NCB 3.46 7.21 10.67 6**/31 Distt. Nagpur for Jaishankar WUA Pota Pch- Prerna Water User Association Ltd. Ranala Ta. 341 R2 5.84 NCB 1.460 2.920 1.460 5.840 6**/32 Saoner Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Kamptee A2 3.838 NCB 0.48 3.36 3.84 6**/32 Distt. Nagpur for Prerana WUA Ranala Pch- ShriRam Water User Association Ltd. 342 R2 2.84 NCB 0.710 1.420 0.710 2.840 6**/33 Patansawangi Ta. Saoner Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Saoner A2 3.389 NCB 1.22 2.17 3.39 6**/33 Distt. Nagpur for Shriram WUA Patansawangi Pch- Ambika Water User Association Ltd. Itangoti 343 R2 3.963 NCB 0.991 1.982 0.991 3.963 6**/34 Ta. Saoner Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Saoner A2 4.364 NCB 4.36 4.36 6**/34 Distt. Nagpur for Ambika WUA Itangoti Pch- Mahuli Water User Association Ltd. Khapa 344 R2 4.545 NCB 1.136 2.273 1.136 4.545 6**/35 Ta.Kamptee Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Saoner A2 6.966 NCB 6**/35 Distt. Nagpur for Mauli WUA Khapa 2/24/2011 wua_prmpkg_r4 13 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Rehabiliation work of Pench Proj. Tq. Saoner R3 6.966 NCB 4.180 2.786 6.97 6**/35 Distt. Nagpur for Mauli WUA Khapa Pch- Rehabiliation work of Pench Proj. Tq. Saoner A3 8.103 NCB 5.65 2.45 8.10 6**/35 Distt. Nagpur for Mauli WUA Khapa Pch- Jaihanuman Water User Association Ltd. 345 R2 6.542 NCB 1.636 3.271 1.636 6.542 6**/36 Lonkhairy Ta.Kamptee Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Kamptee R3 8.565 NCB 2.141 4.283 2.141 8.57 6**/36 Distt. Nagpur for Jaihanuman WUA Lonkhairy Pch- Rehabiliation work of Pench Proj. Tq. Kamptee A3 10.045 NCB 5.44 4.61 10.05 6**/36 Distt. Nagpur for Jaihanuman WUA Lonkhairy Pch- Sarvoday Water User Association Ltd. Ghoghali 346 R2 4.054 NCB 6**/37 Ta. Nagpur Dist. Nagpur Pch- Shradha Water User Association Ltd. Kawatha 347 R2 6.701 NCB 1.675 3.351 1.675 6.701 6**/38 Ta. Kamptee Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Kamptee A2 6.36 NCB 6**/38 Distt. Nagpur for Shraddha WUA Kawatha Pch- Rehabiliation work of Pench Proj. Tq. Kamptee A2/1 6.471 NCB 0.92 2.00 3.55 6.47 6**/38 Distt. Nagpur for Shraddha WUA Kawatha Pch- Pragati Water User Association Ltd. Khairy 348 R2 5.19 NCB 1.298 2.595 1.298 5.190 6**/39 Ta.Kamptee Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Kamptee A2 5.08 NCB 6**/39 Distt. Nagpur for Pragati WUA Khairy Pch- Rehabiliation work of Pench Proj. Tq. Kamptee A2/1 5.332 NCB 0.56 2.01 2.76 5.33 6**/39 Distt. Nagpur for Pragati WUA Khairy Pch- Gajanan maharaj Water User Association Ltd. 349 R2 4.094 NCB 1.024 2.047 1.024 4.094 6**/40 Ranala Ta. Kamptee Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Kamptee A2 4.377 NCB 0.240 4.137 4.38 6**/40 Distt. Nagpur for Gajanan Maharaj WUA Ranala Pch- Sambrudhi Water User Association Ltd. 350 R2 4.85 NCB 1.213 2.425 1.213 4.850 6**/41 Kalmana Ta.Kamptee Dist. Nagpur 2/24/2011 wua_prmpkg_r4 14 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Rehabiliation work of Pench Proj. Tq. Kamptee A2 4.705 NCB 6**/41 Distt. Nagpur for Samruddhi WUA Kalamna Pch- Rehabiliation work of Pench Proj. Tq. Kamptee A2/1 5.140 NCB 1.40 3.74 5.14 6**/41 Distt. Nagpur for Samruddhi WUA Kalamna Pch- Shetakari Water User Association Ltd. 351 R2 4.404 NCB 1.101 2.202 1.101 4.404 6**/42 Pawangaon Ta.Kamptee Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Kamptee A2 4.431 NCB 0.94 3.49 4.43 6**/42 Distt. Nagpur for Shetkari WUA Pawangaon Pch- Rukhamini Water User Association Ltd. Ajni 352 R2 11.068 NCB 2.767 5.534 2.767 11.068 6**/43 Ta. Kamptee Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Kamptee R3 11.093 NCB 1.664 6.101 3.328 11.09 6**/43 Distt. Nagpur for Rukhmini WUA Gada Pch- Rehabiliation work of Pench Proj. Tq. Kamptee A3 12.999 NCB 5.69 7.31 13.00 6**/43 Distt. Nagpur for Rukhmini WUA Gada Pch- Ohm Water User Association Ltd. Ghorpad 353 R2 5.579 NCB 1.395 2.790 1.395 5.579 6**/44 Ta.Kamptee Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Kamptee A2 6.344 NCB 0.43 2.90 3.01 6.34 6**/44 Distt. Nagpur for Om WUA Ghorpad Pch- Trimurti Water User Association Ltd. 354 R2 9.894 NCB 2.474 4.947 2.474 9.894 6**/45 Mahalgaon Ta.Kamptee Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Kamptee A2 6.647 NCB 6**/45 Distt. Nagpur for Trimurti WUA Mahalgaon Pch- Rehabiliation work of Pench Proj. Tq. Kamptee A2/1 6.647 NCB 6**/45 Distt. Nagpur for Trimurti WUA Mahalgaon Pch- Rehabiliation work of Pench Proj. Tq. Kamptee R3 6.647 NCB 0.997 3.656 1.994 6.65 6**/45 Distt. Nagpur for Trimurti WUA Mahalgaon Pch- Rehabiliation work of Pench Proj. Tq. Kamptee A3 7.65 NCB 2.71 4.94 7.65 6**/45 Distt. Nagpur for Trimurti WUA Mahalgaon 2/24/2011 wua_prmpkg_r4 15 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Bajrang Water User Association Ltd. Lihigaon 355 R2 10.877 NCB 2.719 5.439 2.719 10.877 6**/46 Ta.Kamptee Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Kamptee R3 7.298 NCB 1.095 4.014 2.189 7.30 6**/46 Distt. Nagpur for Bajrang WUA Lihigaon Pch- Rehabiliation work of Pench Proj. Tq. Kamptee A3 9.203 NCB 2.37 3.83 3.00 9.20 6**/46 Distt. Nagpur for Bajrang WUA Lihigaon Pch- Yshawant Water User Association Ltd. Shirpur 356 R2 1.044 Shopping 0.261 0.679 0.104 1.044 6**/47 Ta.Kamptee Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Kamptee R3 1.040 shopping 0.520 0.520 1.04 6**/47 Distt. Nagpur for Yeshwant WUA Shirpur Pch- Rehabiliation work of Pench Proj. Tq. Kamptee R4 1.04 Shopping 1.04 1.04 6**/47 Distt. Nagpur for Yeshwant WUA Shirpur Pch- Nilkantha Water User Association Ltd. Gada 357 R2 5.95 NCB 1.488 2.975 1.488 5.950 6**/48 Ta.Kamptee Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Kamptee A2 5.855 NCB 6**/48 Distt. Nagpur for Nilkanth WUA Gada Pch- Rehabiliation work of Pench Proj. Tq. Kamptee A2/1 5.855 NCB 6**/48 Distt. Nagpur for Nilkanth WUA Gada Pch- Rehabiliation work of Pench Proj. Tq. Kamptee R3 5.855 NCB 0.878 3.220 1.757 5.86 6**/48 Distt. Nagpur for Nilkanth WUA Gada Pch- Rehabiliation work of Pench Proj. Tq. Kamptee A3 6.856 NCB 1.53 3.50 1.82 6.86 6**/48 Distt. Nagpur for Nilkanth WUA Gada Pch- Jiwandhara Water User Association Ltd. 358 R2 4.897 NCB 1.224 2.449 1.224 4.897 6**/49 Awandhi Ta.Kamptee Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq.Kamptee R3 3.510 NCB 0.527 1.931 1.053 3.51 6**/49 Distt. Nagpur for Jiwandhara WUA Awandhi Pch- Rehabiliation work of Pench Proj. Tq.Kamptee A3 4.022 NCB 1.00 3.02 4.02 6**/49 Distt. Nagpur for Jiwandhara WUA Awandhi 2/24/2011 wua_prmpkg_r4 16 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Amrjyoti Water User Association Ltd. Awandhi 359 R2 4.555 NCB 1.139 2.278 1.139 4.555 6**/50 Ta.Kamptee Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq.Kamptee R3 3.840 NCB 0.576 2.304 0.960 3.84 6**/50 Distt. Nagpur for Amarjoti WUA Awandhi Pch- Rehabiliation work of Pench Proj. Tq.Kamptee A3 4.421 NCB 1.00 3.42 4.42 6**/50 Distt. Nagpur for Amarjoti WUA Bhowari Pench Pch-7** Rehabilitation of minors (WUA level works -50 327.87 WUA 65.57 65.57 98.36 65.57 32.79 327.87 R Pch-7** Rehabilitation of minors (WUA level works -50 327.87 WUA 49.18 114.75 147.54 16.39 327.87 Pch- Jaihanuman Water User Association Ltd. 360 R2 2.98 NCB 0.745 1.490 0.745 2.980 7**/1 Bhowari Ta.Kamptee Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Kamptee R3 6.930 NCB 1.040 3.812 2.079 6.93 7**/1 Distt. Nagpur for Jai Human WUA Bhowari Pch- Rehabiliation work of Pench Proj. Tq. Kamptee A3 6.315 NCB 1.00 4.00 1.32 6.32 7**/1 Distt. Nagpur for Jai Hanuman WUA Bhowari Pch- Sant DyaneshwarWater User Association Ltd. 361 R2 2.619 NCB 0.655 1.310 0.655 2.619 7**/2 GAda Ta.Kamptee Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Kamptee R3 0.500 shopping 0.250 0.250 0.50 7**/2 Distt. Nagpur for Sant Dhyaneshwar WUA Gada Pch- Rehabiliation work of Pench Proj. Tq. Kamptee A3 0.627 SHOPPING 0.68 0.68 7**/2 Distt. Nagpur for Sant Dhyaneshwar WUA Gada Pch- Saibaba Water User Association Ltd. Gada 362 R2 2.837 NCB 0.709 1.419 0.709 2.837 7**/3 Ta.Kamptee Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Kamptee A2 2.816 NCB 0.26 2.56 2.82 7**/3 Distt. Nagpur for Saibaba WUA Gada Pch- Sant Gadgebaba Water User Association Ltd. 363 R2 8.449 NCB 2.112 4.225 2.112 8.449 7**/4 Neri Ta.Kamptee Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Kamptee R3 0.450 shopping 0.400 0.050 0.45 7**/4 Distt. Nagpur for Sant Gadgebaba WUA Neri 2/24/2011 wua_prmpkg_r4 17 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Rehabiliation work of Pench Proj. Tq. Kamptee A3 0.730 SHOPPING 0.37 0.37 0.73 7**/4 Distt. Nagpur for Sant Gadgebaba WUA Neri Pch- Sarvodaya Water User Association Ltd. Neri Ta. 364 R2 5.86 NCB 1.465 2.930 1.465 5.860 7**/5 Kamptee Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Kamptee R3 3.423 NCB 0.513 1.883 1.027 3.42 7**/5 Distt. Nagpur for Sarvodaya WUA Neri Pch- Rehabiliation work of Pench Proj. Tq. Kamptee A3 4.022 NCB 2.06 1.96 4.02 7**/5 Distt. Nagpur for Sarvodaya WUA Neri Pch- Jiwanvikas Water User Association Ltd. Ungaon 365 R2 8.027 NCB 2.007 4.014 2.007 8.027 7**/6 Ta.Kamptee Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Kamptee A2 6.127 NCB 1.41 5.19 6.60 7**/6 Distt. Nagpur for Jiwanvakas WUA Ungaon Pch- Sant Brahmeshwar Water User Association Ltd. 366 R2 8.288 NCB 2.072 4.144 2.072 8.288 7**/7 Sonegaon Ta. Kamptee Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Kamptee R3 0.400 shopping 0.200 0.200 0.40 7**/7 Distt. Nagpur for Bramheshwar WUA Sonegaon Pch- Rehabiliation work of Pench Proj. Tq. Kamptee A3 0.568 SHOPPING 0.28 0.28 0.57 7**/7 Distt. Nagpur for Bramheshwar WUA Sonegaon Pch- Sant Dyashwar Water User Association Ltd. 367 R2 9.435 NCB 2.359 4.718 2.359 9.435 7**/8 Wadoda Ta. Kamptee Dist. Nagpur Rehabiliation work of Pench Proj. Tq. Kamptee Pch- A2 Distt. Nagpur for Sant Dhyaneshwar WUA 9.401 NCB 0.92 8.48 9.40 7**/8 Wadoda Pch- Dattaguru Water User Association Ltd.Zullar 368 R2 2.956 NCB 0.739 1.478 0.739 2.956 7**/9 Ta. Kamptee Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Kamptee A2 2.927 NCB 0.34 2.59 2.93 7**/9 Distt. Nagpur for Dattaguru WUA Zullar Pch- Janseva Water User Association Ltd. Chehadi 369 R2 5.32 NCB 1.330 2.660 1.330 5.320 7**/10 Ta. Kamptee Dist. Nagpur Pch- Rehabiliation work of Pench Proj. Tq. Kamptee A2 5.004 NCB 7**/10 Distt. Nagpur for Jansewa WUA Chehadi 2/24/2011 wua_prmpkg_r4 18 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Rehabiliation work of Pench Proj. Tq. Kamptee A2/1 5.884 NCB 1.72 4.16 5.88 7**/10 Distt. Nagpur for Jansewa WUA Chehadi Pch- Nawadurga Water User Association Ltd. 370 R2 8.132 NCB 2.033 4.066 2.033 8.132 7**/11 Mehandi Ta. Parseaoni Dist. Nagpur Pch- Nawadurga WUA Ltd. Mehandi Ta. Parseaoni R3 7.567 NCB 3.027 4.540 7.57 7**/11 Dist. Nagpur Pch- Nawadurga WUA Ltd. Mehandi Ta. Parseaoni A3 8.627 NCB 0.00 0.00 0.00 0.00 4.06 4.57 0.00 8.63 7**/11 Dist. Nagpur Pch- Shrikrushna Water User Association Ltd. 371 R2 5.338 NCB 0.534 2.936 1.868 5.338 7**/12 Bakhari Ta.Parseaoni Dist. Nagpur Pch- Shrikrushna WUA Ltd. Bakhari Ta.Parseaoni A2 4.724 NCB 7**/12 Dist. Nagpur Pch- Shrikrushna WUA Ltd. Bakhari Ta.Parseaoni R3 4.724 NCB 1.890 2.835 4.72 7**/12 Dist. Nagpur Pch- Shrikrushna WUA Ltd. Bakhari Ta.Parseaoni A3/1 4.724 NCB 7**/12 Dist. Nagpur Pch- Shrikrushna WUA Ltd. Bakhari Ta.Parseaoni A3/2 5.435 NCB 0.00 0.00 0.00 0.00 2.64 2.79 0.00 5.44 7**/12 Dist. Nagpur Pch- Sarswati Water User Association Ltd. Nandgaon 372 R2 9.352 NCB 2.338 4.676 2.338 9.352 7**/13 Ta.Parseaoni Dist. Nagpur Pch- Sarswati WUA Ltd. Nandgaon Ta.Parseaoni R3 8.846 NCB 3.538 5.307 8.85 7**/13 Dist. Nagpur Pch- Sarswati WUA Ltd. Nandgaon Ta.Parseaoni A3 10.087 NCB 0.00 0.00 0.00 0.00 2.02 5.38 2.69 10.09 7**/13 Dist. Nagpur Pch- Waishnvi Water User Association Ltd. 373 R2 10.977 NCB 1.098 6.037 3.842 10.977 7**/14 Yeshamba Ta.Parseaoni Dist. Nagpur Pch- Waishnvi WUA Ltd. Yeshamba Ta.Parseaoni R3 8.937 NCB 3.575 5.362 8.94 7**/14 Dist. Nagpur Pch- Waishnvi WUA Ltd. Yeshamba Ta.Parseaoni A3 10.916 NCB 3.69 4.82 2.41 10.92 7**/14 Dist. Nagpur Pch- Sharda Water User Association Ltd. Ghatrohana 374 R2 10.365 NCB 1.037 5.701 3.628 10.365 7**/15 Ta. Parseaoni Dist. Nagpur Pch- Sharda WUA Ltd. Ghatrohana Ta. Parseaoni R3 9.961 NCB 3.984 5.977 9.96 7**/15 Dist. Nagpur Pch- Sharda WUA Ltd. Ghatrohana Ta. Parseaoni A3 11.741 NCB 0.00 0.00 0.00 0.00 4.30 4.96 2.48 11.74 7**/15 Dist. Nagpur Pch- Krushnakaweri Water User Association Ltd. 375 R2 3.670 NCB 0.918 1.835 0.918 3.670 7**/16 Warada Ta. Parseaoni Dist. Nagpur 2/24/2011 wua_prmpkg_r4 19 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Krushnakaweri WUA Ltd. Warada Ta. A2 3.563 NCB 7**/16 Parseaoni Dist. Nagpur Pch- Krushnakaweri WUA Ltd. Warada Ta. R3 3.563 NCB 1.425 2.138 3.56 7**/16 Parseaoni Dist. Nagpur Pch- Krushnakaweri WUA Ltd. Warada Ta. A3/1 3.563 NCB 7**/16 Parseaoni Dist. Nagpur Pch- Krushnakaweri WUA Ltd. Warada Ta. A3/2 4.022 NCB 0.00 0.00 0.00 0.00 1.45 2.57 0.00 4.02 7**/16 Parseaoni Dist. Nagpur Pch- Gangakaweri Water User Association Ltd. 376 R2 5.533 NCB 1.383 2.767 1.383 5.533 7**/17 Tekadi Ta. Parseaoni Dist. Nagpur Pch- Ganga Kaweri WUA, Tekadi Ta-Parshioni , A2 5.533 NCB 7**/17 Dist-Nagpur Pch- Ganga Kaweri WUA, Tekadi Ta-Parshioni , A2/1 5.447 NCB 0.00 0.00 0.00 0.00 3.77 1.68 0.00 5.45 7**/17 Dist-Nagpur Pch- Jai Bajrang Water User Association Ltd. 377 R2 3.371 NCB 0.843 1.686 0.843 3.371 7**/18 Wagholi Ta. Parseaoni Dist. Nagpur Pch- Jai Bajrang WUA, Wagholi, Ta-Parsheoni, Dist- A2 3.387 NCB 0.00 0.00 0.00 0.00 3.39 0.00 0.00 3.39 7**/18 Nagpur Pch- Bhagirath Water User Association Ltd. Kerdi 378 R2 12.742 NCB 3.186 6.371 3.186 12.742 7**/19 Ta. Parseaoni Dist. Nagpur Pch- Bhagirath WUA Ltd. Kerdi Ta. Parseaoni Dist. A2 9.366 NCB 7**/19 Nagpur Pch- Bhagirath WUA Ltd. Kerdi Ta. Parseaoni Dist. R3 9.366 NCB 3.746 5.620 9.37 7**/19 Nagpur Pch- Bhagirath WUA Ltd. Kerdi Ta. Parseaoni Dist. A3/1 9.366 NCB 7**/19 Nagpur Pch- Bhagirath WUA Ltd. Kerdi Ta. Parseaoni Dist. A3/2 10.614 NCB 0.00 0.00 0.00 0.00 5.34 5.28 0.00 10.61 7**/19 Nagpur Pch- Shetkari Vikas Water User Association Ltd. 379 R2 5.770 NCB 0.577 3.174 2.020 5.770 7**/20 Borada (Ganeshi) Ta. Parseaoni Dist. Nagpur Pch- Shetkari Vikas Water User Association Ltd. A2 4.778 NCB 7**/20 Borada (Ganeshi) Ta. Parseaoni Dist. Nagpur Pch- Shetkari Vikas Water User Association Ltd. R3 4.778 NCB 1.911 2.867 4.78 7**/20 Borada (Ganeshi) Ta. Parseaoni Dist. Nagpur Pch- Shetkari Vikas Water User Association Ltd. A3 5.392 NCB 0.00 0.00 0.00 0.00 2.35 3.05 0.00 5.39 7**/20 Borada (Ganeshi) Ta. Parseaoni Dist. Nagpur Pch- Jaikisan Water User Association Ltd. 380 R2 5.929 NCB 1.482 2.965 1.482 5.929 7**/21 Borada(Ganeshi) Ta. Parseaoni Dist. Nagpur 2/24/2011 wua_prmpkg_r4 20 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Jai Kisan WUA, Borda Tah.Parseoni Dist- A2 5.893 NCB 0.00 0.00 0.00 0.53 1.79 3.58 0.00 5.89 7**/21 Nagpur Pch- Saibaba Water User Association Ltd. Tekadi Ta. 381 R2 6.311 NCB 0.631 3.471 2.209 6.311 7**/22 Parseaoni Dist. Nagpur Pch- Saibaba WUA Ltd. Tekadi Ta. Parseaoni Dist. R3 0.319 shopping 0.128 0.192 0.32 7**/22 Nagpur Pch- Saibaba WUA Ltd. Tekadi Ta. Parseaoni Dist. A3/1 0.329 Shopping 7**/22 Nagpur Pch- Saibaba WUA Ltd. Tekadi Ta. Parseaoni Dist. A3/2 1.559 Shopping 7**/22 Nagpur Pch- Saibaba WUA Ltd. Tekadi Ta. Parseaoni Dist. R4 1.559 Shopping 0.132 1.427 1.56 7**/22 Nagpur Pch- Kandri Kisan Water User Association Ltd. 382 R2 9.352 NCB 0.935 5.144 3.273 9.352 7**/23 Kandri Ta. Parseaoni Dist. Nagpur Pch- Kandri Kisan WUA Ltd. Kandri Ta. Parseaoni A2 5.565 NCB 7**/23 Dist. Nagpur Pch- Kandri Kisan WUA Ltd. Kandri Ta. Parseaoni R3 5.565 NCB 2.226 3.339 5.57 7**/23 Dist. Nagpur Pch- Kandri Kisan WUA Ltd. Kandri Ta. Parseaoni A3/1 5.565 NCB 7**/23 Dist. Nagpur Pch- Kandri Kisan WUA Ltd. Kandri Ta. Parseaoni A3/2 6.288 NCB 0.00 0.00 0.00 0.00 3.54 2.75 0.00 6.29 7**/23 Dist. Nagpur Pch- Jagruti Water User Association Ltd. Khandala 383 R2 4.762 NCB 1.191 2.381 1.191 4.762 7**/24 (Ghatate) Ta. Parseaoni Dist. Nagpur Pch- Jagruti WUA, Khadala Ta-Parshioni , Dist- A2 5.551 NCB 7**/24 Nagpur Pch- Jagruti WUA, Khadala Ta-Parshioni , Dist- A2/1 5.551 NCB 7**/24 Nagpur Pch- Jagruti WUA, Khadala Ta-Parshioni , Dist- A2/2 4.764 NCB 0.00 0.00 0.00 0.92 2.23 1.62 0.00 4.76 7**/24 Nagpur Pch- Amrutdhara Water User Association Ltd. Nilaj 384 R2 9.061 NCB 0.906 4.984 3.171 9.061 7**/25 Ta. Parseaoni Dist. Nagpur Pch- Amrutdhara WUA Ltd. Nilaj Ta. Parseaoni Dist. A2 7.804 NCB 7**/25 Nagpur Pch- Amrutdhara WUA Ltd. Nilaj Ta. Parseaoni Dist. R3 7.804 NCB 3.122 4.682 7.80 7**/25 Nagpur Pch- Amrutdhara WUA Ltd. Nilaj Ta. Parseaoni Dist. A3/1 7.804 NCB 7**/25 Nagpur 2/24/2011 wua_prmpkg_r4 21 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Amrutdhara WUA Ltd. Nilaj Ta. Parseaoni Dist. A3/2 8.478 NCB 0.00 0.00 0.00 0.00 4.64 3.83 0.00 8.48 7**/25 Nagpur Pch- Gangotri Water User Association Ltd. Borda 385 R2 4.204 NCB 0.420 2.312 1.471 4.204 7**/26 (Ganeshi) Ta. Parseaoni Dist. Nagpur Pch- Gangotri WUA Ltd. Borda (Ganeshi) Ta. A2 4.471 NCB 7**/26 Parseaoni Dist. Nagpur Pch- Gangotri WUA Ltd. Borda (Ganeshi) Ta. R3 4.471 NCB 1.788 2.683 4.47 7**/26 Parseaoni Dist. Nagpur Pch- Gangotri WUA Ltd. Borda (Ganeshi) Ta. A3/1 4.471 NCB 7**/26 Parseaoni Dist. Nagpur Pch- Gangotri WUA Ltd. Borda (Ganeshi) Ta. A3/2 5.158 NCB 0.00 0.00 0.00 0.00 3.29 1.87 0.00 5.16 7**/26 Parseaoni Dist. Nagpur Pch- Dattatraya Water User Association Ltd. Khedi 386 R2 6.181 NCB 0.618 3.400 2.163 6.181 7**/27 Ta. Parseaoni Dist. Nagpur Pch- Dattatraya WUA Ltd. Khedi Ta. Parseaoni Dist. A2 5.967 NCB 7**/27 Nagpur Pch- Dattatraya WUA Ltd. Khedi Ta. Parseaoni Dist. R3 5.967 NCB 2.387 3.580 5.97 7**/27 Nagpur Pch- Dattatraya WUA Ltd. Khedi Ta. Parseaoni Dist. A3 6.573 NCB 0.00 0.00 0.00 0.00 3.49 3.08 0.00 6.57 7**/27 Nagpur Pch- Jaidurga Water User Association Ltd. 387 R2 4.726 NCB 0.473 2.599 1.654 4.726 7**/28 Gahuhiwara Ta. Parseaoni Dist. Nagpur Pch- Jaidurga WUA Ltd. Gahuhiwara Ta. Parseaoni A2 5.184 NCB 7**/28 Dist. Nagpur Pch- Jaidurga WUA Ltd. Gahuhiwara Ta. Parseaoni R3 5.184 NCB 2.074 3.111 5.18 7**/28 Dist. Nagpur Pch- Jaidurga WUA Ltd. Gahuhiwara Ta. Parseaoni A3/1 5.184 NCB 7**/28 Dist. Nagpur Pch- Jaidurga WUA Ltd. Gahuhiwara Ta. Parseaoni A3/2 5.820 NCB 0.00 0.00 0.00 0.00 3.30 2.52 0.00 5.82 7**/28 Dist. Nagpur Pch- Gurudeo Water User Association Ltd. Khopadi 388 R2 4.736 NCB 0.474 2.605 1.658 4.736 7**/29 Ta. Mouda Dist. Nagpur Pch- Gurudeo WUA Ltd. Khopadi Ta. Mouda Dist. A2 4.854 NCB 7**/29 Nagpur Pch- Gurudeo WUA Ltd. Khopadi Ta. Mouda Dist. R3 4.854 NCB 1.942 2.913 4.85 7**/29 Nagpur Pch- Gurudeo WUA Ltd. Khopadi Ta. Mouda Dist. A3 5.444 NCB 0.00 0.00 0.00 0.00 3.04 2.41 0.00 5.44 7**/29 Nagpur 2/24/2011 wua_prmpkg_r4 22 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Adrasha Shetkari vikas Water User Association Pch- 389 R2 Ltd. Yesamba (Nipani) Ta. Parseaoni Dist. 4.927 NCB 0.493 2.710 1.724 4.927 7**/30 Nagpur Pch- Adrasha Shetkari vikas WUA Ltd. Yesamba A2 4.338 NCB 7**/30 (Nipani) Ta. Parseaoni Dist. Nagpur Pch- Adrasha Shetkari vikas WUA Ltd. Yesamba R3 4.338 NCB 1.735 2.603 4.34 7**/30 (Nipani) Ta. Parseaoni Dist. Nagpur Pch- Adrasha Shetkari vikas WUA Ltd. Yesamba A3 4.919 NCB 0.00 0.00 0.00 0.00 3.17 1.75 0.00 4.92 7**/30 (Nipani) Ta. Parseaoni Dist. Nagpur Pch- Ganga kaweri Water User Association Ltd. 390 R2 5.940 NCB 1.485 2.970 1.485 5.940 7**/31 Salwa Ta. Mouda Dist. Nagpur Pch- Gangakaveri WUA, Salwa Ta-Parshioni , Dist- A2 5.693 NCB 7**/31 Nagpur Pch- Gangakaveri WUA, Salwa Ta-Parshioni , Dist- A2/1 5.693 NCB 7**/31 Nagpur Pch- Gangakaveri WUA, Salwa Ta-Parshioni , Dist- A2/2 5.975 NCB 0.00 0.00 0.00 0.00 2.18 3.79 0.00 5.98 7**/31 Nagpur Pch- Jankalyan Water User Association Ltd. Nilaj 391 R2 3.733 NCB 0.933 1.867 0.933 3.733 7**/32 Ta.Parseaoni Dist. Nagpur Pch- Jankalyan WUA Nilaj Ta-Parshioni, Dist- A2 3.552 NCB 7**/32 Nagpur Pch- Jankalyan WUA Nilaj Ta-Parshioni, Dist- A2/1 3.681 NCB 0.00 0.00 0.00 0.00 1.23 2.45 0.00 3.68 7**/32 Nagpur Pch- Samarth Water User Association Ltd. Gangner 392 R2 6.522 NCB 0.652 3.587 2.283 6.522 7**/33 Ta.Mouda Dist. Nagpur Pch- Samarth WUA Ltd. Gangner Ta.Mouda Dist. A2 5.893 NCB 7**/33 Nagpur Pch- Samarth WUA Ltd. Gangner Ta.Mouda Dist. R3 5.893 NCB 2.357 3.536 5.89 7**/33 Nagpur Pch- Samarth WUA Ltd. Gangner Ta.Mouda Dist. A3/1 5.893 NCB 7**/33 Nagpur Pch- Samarth WUA Ltd. Gangner Ta.Mouda Dist. A3/2 6.576 NCB 0.00 0.00 0.00 0.00 2.68 3.89 0.00 6.58 7**/33 Nagpur Krushi vikas Jal wyawashtapan Water User Pch- 393 R2 Association Ltd. Bori (si) Ta. Parseaoni Dist. 8.549 NCB 0.855 4.702 2.992 8.549 7**/34 Nagpur Pch- Krushivikash & Jalvyawasthapan WUA, Bori A2 9.088 NCB 0.00 0.00 0.00 0.41 7.65 1.03 0.00 9.09 7**/34 (Singori) Ta-Parshioni , Dist-Nagpur 2/24/2011 wua_prmpkg_r4 23 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Pragatishil Shetkari Water User Association Ltd. 394 R2 6.502 NCB 1.626 3.251 1.626 6.502 7**/35 Narsala Ta.Mouda Dist. Nagpur Pch- Pragatishil Shetkari WUA. Narsala, Ta-Mauda, A2 6.002 NCB 0.00 0.00 0.00 1.63 2.54 1.83 0.00 6.00 7**/35 Dist-Nagpur Pch- Krushidhara Water User Association Ltd. 395 R2 6.181 NCB 0.618 3.400 2.163 6.181 7**/36 Singori Ta.Mouda Dist. Nagpur Pch- Jaldhara WUA Ltd. Singori Ta.Mouda Dist. A2 6.829 NCB 7**/36 Nagpur Pch- Jaldhara WUA Ltd. Singori Ta.Mouda Dist. R3 6.829 NCB 2.732 4.097 6.83 7**/36 Nagpur Pch- Jaldhara WUA Ltd. Singori Ta.Mouda Dist. A3/1 6.829 NCB 7**/36 Nagpur Pch- Jaldhara WUA Ltd. Singori Ta.Mouda Dist. A3/2 7.632 NCB 0.00 0.00 0.00 0.00 3.79 3.85 0.00 7.63 7**/36 Nagpur Pch- Jai Bajrang Water User Association Ltd. 396 R2 11.108 NCB 1.111 6.109 3.888 11.108 7**/37 Kumbhapur Ta.Mouda Dist. Nagpur Pch- Jai Bajrang WUA Ltd. Kumbhapur Ta.Mouda A2 9.231 NCB 7**/37 Dist. Nagpur Pch- Jai Bajrang WUA Ltd. Kumbhapur Ta.Mouda R3 9.231 NCB 3.692 5.539 9.23 7**/37 Dist. Nagpur Pch- Jai Bajrang WUA Ltd. Kumbhapur Ta.Mouda A3/1 9.231 NCB 7**/37 Dist. Nagpur Pch- Jai Bajrang WUA Ltd. Kumbhapur Ta.Mouda A3/2 10.451 NCB 0.00 0.00 0.00 0.00 5.50 4.95 0.00 10.45 7**/37 Dist. Nagpur Pch- Wainganga Water User Association Ltd. 397 R2 9.231 NCB 0.923 5.077 3.231 9.231 7**/38 Mangali Ta.Mouda Dist. Nagpur Pch- Wainganga Water User Association Ltd. A2 6.474 NCB 7**/38 Mangali Ta.Mouda Dist. Nagpur Pch- Wainganga WUA Ltd. Mangali Ta.Mouda Dist. R3 6.474 NCB 2.590 3.884 6.47 7**/38 Nagpur Pch- Wainganga WUA Ltd. Mangali Ta.Mouda Dist. A3 7.085 NCB 0.00 0.00 0.00 0.00 3.11 3.97 0.00 7.09 7**/38 Nagpur Pch- Wainganga Water User Association Ltd.Kerdi 398 R2 8.754 NCB 0.875 4.814 3.064 8.754 7**/39 Ta.Parseaoni Dist. Nagpur Pch- Wainganga WUA Ltd.Kerdi Ta.Parseaoni Dist. R3 8.738 NCB 3.495 5.243 8.74 7**/39 Nagpur Pch- Wainganga WUA Ltd.Kerdi Ta.Parseaoni Dist. A3 9.922 NCB 0.00 0.00 0.00 0.00 2.83 4.73 2.36 9.92 7**/39 Nagpur 2/24/2011 wua_prmpkg_r4 24 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Janseva Water User Association Ltd. Satak 399 R2 4.866 NCB 0.487 2.676 1.703 4.866 7**/40 Ta.Parseaoni Dist. Nagpur Pch- Janseva WUA Ltd. Satak Ta.Parseaoni Dist. A2 5.699 NCB 7**/40 Nagpur Pch- Janseva WUA Ltd. Satak Ta.Parseaoni Dist. R3 5.699 NCB 2.280 3.419 5.70 7**/40 Nagpur Pch- Janseva WUA Ltd. Satak Ta.Parseaoni Dist. A3 6.453 NCB 0.00 0.00 0.00 0.00 3.01 3.44 0.00 6.45 7**/40 Nagpur Pch- Mahadurga Water User Association Ltd. Satak 400 R2 6.813 NCB 0.681 3.747 2.385 6.813 7**/41 Ta.Parseaoni Dist. Nagpur Pch- Mahadurga WUA Ltd. Satak Ta.Parseaoni Dist. R3 7.194 NCB 2.878 4.317 7.19 7**/41 Nagpur Pch- Mahadurga WUA Ltd. Satak Ta.Parseaoni Dist. A3 8.528 NCB 0.00 0.00 0.00 0.00 4.97 2.38 1.19 8.53 7**/41 Nagpur Pch- Wasundhara Water User Association Ltd. 401 R2 8.679 NCB 0.868 4.773 3.038 8.679 7**/42 Hiwara Ta.Ramtek Dist. Nagpur Pch- Wasundhara WUA Ltd. Hiwara Ta.Ramtek Dist. R3 10.922 NCB 4.369 6.553 10.92 7**/42 Nagpur Pch- Wasundhara WUA Ltd. Hiwara Ta.Ramtek Dist. A3 10.948 NCB 0.00 0.00 0.00 0.00 5.22 3.82 1.91 10.95 7**/42 Nagpur Pch- Dhanalaxmi Water User Association Ltd. 402 R2 7.897 NCB 0.790 4.343 2.764 7.897 7**/43 Telangkhedi Ta.Parseaoni Dist. Nagpur Pch- Dhanalaxmi WUA Ltd. Telangkhedi R3 7.063 NCB 2.825 4.238 7.06 7**/43 Ta.Parseaoni Dist. Nagpur Pch- Dhanalaxmi WUA Ltd. Telangkhedi A3 7.762 NCB 0.00 0.00 0.00 0.00 1.55 4.14 2.07 7.76 7**/43 Ta.Parseaoni Dist. Nagpur Pch- Pragatishil Water User Association Ltd. 403 R2 3.813 NCB 0.381 2.097 1.335 3.813 7**/44 Telangkhedi Ta.Parseaoni Dist. Nagpur Pch- Pragatishil WUA Ltd. Telangkhedi Ta.Parseaoni A2 2.595 NCB 7**/44 Dist. Nagpur Pch- Pragatishil WUA Ltd. Telangkhedi Ta.Parseaoni A2/1 2.595 NCB 7**/44 Dist. Nagpur Pch- Pragatishil WUA Ltd. Telangkhedi Ta.Parseaoni A2/2 2.595 NCB 7**/44 Dist. Nagpur Pch- Pragatishil WUA Ltd. Telangkhedi Ta.Parseaoni A2/3 2.595 NCB 7**/44 Dist. Nagpur Pch- Pragatishil WUA Ltd. Telangkhedi Ta.Parseaoni R3 2.595 NCB 1.038 1.557 2.60 7**/44 Dist. Nagpur 2/24/2011 wua_prmpkg_r4 25 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Pragatishil WUA Ltd. Telangkhedi Ta.Parseaoni A3/1 2.531 NCB 7**/44 Dist. Nagpur Pch- Pragatishil WUA Ltd. Telangkhedi Ta.Parseaoni A3/2 2.531 NCB 7**/44 Dist. Nagpur Pch- Pragatishil WUA Ltd. Telangkhedi Ta.Parseaoni A3/3 2.531 NCB 7**/44 Dist. Nagpur Pch- Pragatishil WUA Ltd. Telangkhedi Ta.Parseaoni A3/4 2.931 NCB 0.00 0.00 0.00 0.00 1.80 1.13 0.00 2.93 7**/44 Dist. Nagpur Pch- Jai Ambye Water User Association Ltd. 404 R2 4.435 NCB 0.444 2.439 1.552 4.435 7**/45 Nimkheda Ta.Parseaoni Dist. Nagpur Pch- Jai Ambye WUA Ltd. Nimkheda Ta.Parseaoni R3 1.089 shopping 0.436 0.654 1.09 7**/45 Dist. Nagpur Pch- Jai Ambye WUA Ltd. Nimkheda Ta.Parseaoni A3 1.818 shopping 0.00 0.00 0.00 0.00 0.61 1.21 0.00 1.82 7**/45 Dist. Nagpur Pch- Jankalyan Water User Association Ltd. Banpuri 405 R2 8.629 NCB 0.863 4.746 3.020 8.629 7**/46 Ta.Parseaoni Dist. Nagpur Pch- Jankalyan WUA Ltd. Banpuri Ta.Parseaoni R3 9.155 NCB 3.662 5.493 9.16 7**/46 Dist. Nagpur Pch- Jankalyan WUA Ltd. Banpuri Ta.Parseaoni A3 9.679 NCB 0.00 0.00 0.00 0.00 2.71 4.65 2.32 9.68 7**/46 Dist. Nagpur Pch- Ambika Water User Association Ltd. Nimkheda 406 R2 8.258 NCB 0.826 4.542 2.890 8.258 7**/47 Ta.Parseaoni Dist. Nagpur Pch- Ambika WUA Ltd. Nimkheda Ta.Parseaoni R3 11.350 NCB 4.540 6.810 11.35 7**/47 Dist. Nagpur Pch- Ambika WUA Ltd. Nimkheda Ta.Parseaoni R4 9.814 NCB 5.888 3.926 9.81 7**/47 Dist. Nagpur Pch- Khedi Water User Association Ltd. Khedi 407 R2 7.897 NCB 0.790 4.343 2.764 7.897 7**/48 Ta.Parseaoni Dist. Nagpur Pch- Khedi WUA Ltd. Khedi Ta.Parseaoni Dist. R3 1.858 shopping 0.743 1.115 1.86 7**/48 Nagpur Pch- Khedi WUA Ltd. Khedi Ta.Parseaoni Dist. A3 1.995 shopping 0.00 0.00 0.00 0.00 0.66 1.33 0.00 1.99 7**/48 Nagpur Pch- Rani Awantibai Water User Association Ltd. 408 R2 8.780 NCB 0.878 4.829 3.073 8.780 7**/49 Ajni Ta.Ramtek Dist. Nagpur Pch- Rani Awantibai WUA Ltd. Ajni Ta.Ramtek A2 5.777 NCB 7**/49 Dist. Nagpur Pch- Rani Awantibai WUA Ltd. Ajni Ta.Ramtek R3 5.777 NCB 2.311 3.466 5.78 7**/49 Dist. Nagpur 2/24/2011 wua_prmpkg_r4 26 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Rani Awantibai WUA Ltd. Ajni Ta.Ramtek A3 6.469 NCB 0.00 0.00 0.00 0.00 2.97 3.50 0.00 6.47 7**/49 Dist. Nagpur Pch- Swayamseva Water User Association Ltd. 409 R2 6.311 NCB 0.631 3.471 2.209 6.311 7**/50 Nisatkheda Ta.Parseaoni Dist. Nagpur Pch- Swayamseva WUA Ltd. Nisatkheda A2 5.954 NCB 7**/50 Ta.Parseaoni Dist. Nagpur Pch- Swayamseva WUA Ltd. Nisatkheda A2/1 5.954 NCB 7**/50 Ta.Parseaoni Dist. Nagpur Pch- Swayamseva WUA Ltd. Nisatkheda R3 5.954 NCB 2.382 3.573 5.95 7**/50 Ta.Parseaoni Dist. Nagpur Pch- Swayamseva WUA Ltd. Nisatkheda A3 6.932 NCB 0.00 0.00 0.00 0.00 2.67 4.26 0.00 6.93 7**/50 Ta.Parseaoni Dist. Nagpur Pench Pch-8** Rehabilitation of minors (WUA level works -50 327.87 WUA 16.39 81.97 98.36 98.36 32.79 327.87 R Pch-8** Rehabilitation of minors (WUA level works -50 327.87 WUA 49.18 114.75 147.54 16.39 327.87 Pch- Laxminarayan Water User Association Ltd. 410 R2 8.730 NCB 0.873 4.802 3.056 8.730 8**/1 Chacher Ta.Mouda Dist. Nagpur Pch- Laxminarayan WUA Ltd. Chacher Ta.Mouda R3 7.880 NCB 3.152 4.728 7.88 8**/1 Dist. Nagpur Pch- Laxminarayan WUA Ltd. Chacher Ta.Mouda A3 9.123 NCB 0.00 0.00 0.00 0.00 6.20 2.92 0.00 9.12 8**/1 Dist. Nagpur Pch- Gangapurti Water User Association Ltd. 411 R2 11.910 NCB 1.191 6.551 4.169 11.910 8**/2 Nisatkheda Ta.Mouda Dist. Nagpur Pch- Gangapurti WUA Ltd. Nisatkheda Ta.Mouda R3 9.570 NCB 3.828 5.742 9.57 8**/2 Dist. Nagpur Pch- Gangapurti WUA Ltd. Nisatkheda Ta.Mouda A3 10.954 NCB 0.00 0.00 0.00 0.00 2.74 8.22 0.00 10.95 8**/2 Dist. Nagpur Pch- Jaibhole Water User Association Ltd. Chacher 412 R2 10.877 NCB 1.088 5.982 3.807 10.877 8**/3 Ta.Mouda Dist. Nagpur Pch- Jaibhole WUA Ltd. Chacher Ta.Mouda Dist. R3 10.592 NCB 4.237 6.355 10.59 8**/3 Nagpur Pch- Jaibhole WUA Ltd. Chacher Ta.Mouda Dist. A3 12.178 NCB 0.00 0.00 0.00 0.00 6.88 5.30 0.00 12.18 8**/3 Nagpur Pch- Shri Bapujibuwa Water User Association Ltd. 413 R2 8.238 NCB 0.824 4.531 2.883 8.238 8**/4 Ashti Ta.Mouda Dist. Nagpur Pch- Shri Bapujibuwa WUA Ltd. Ashti Ta.Mouda R3 10.067 NCB 4.027 6.040 10.07 8**/4 Dist. Nagpur 2/24/2011 wua_prmpkg_r4 27 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Shri Bapujibuwa WUA Ltd. Ashti Ta.Mouda A3 11.028 NCB 0.00 0.00 0.00 0.00 5.25 5.78 0.00 11.03 8**/4 Dist. Nagpur Pch- Maa Durga Bhawani Water User Association 414 R2 4.596 NCB 0.460 2.528 1.609 4.596 8**/5 Ltd. Hingana (Ashti) Ta.Mouda Dist. Nagpur Pch- Maa Durga Bhawani WUA Ltd. Hingana R3 3.339 NCB 1.336 2.003 3.34 8**/5 (Ashti) Ta.Mouda Dist. Nagpur Pch- Maa Durga Bhawani WUA Ltd. Hingana A3 3.788 NCB 0.00 0.00 0.00 0.00 1.88 1.90 0.00 3.79 8**/5 (Ashti) Ta.Mouda Dist. Nagpur Pch- Amrjyoti Water User Association Ltd. Khandala 415 R2 6.622 NCB 0.662 3.642 2.318 6.622 8**/6 Ta.Mouda Dist. Nagpur Pch- Amrjyoti WUA Ltd. Khandala Ta.Mouda Dist. R3 6.405 NCB 2.562 3.843 6.41 8**/6 Nagpur Pch- Amrjyoti WUA Ltd. Khandala Ta.Mouda Dist. A3 7.309 NCB 0.00 0.00 0.00 0.00 2.18 3.42 1.71 7.31 8**/6 Nagpur Pch- Jai durgamata Water User Association Ltd. 416 R2 13.546 NCB 1.355 7.450 4.741 13.546 8**/7 Nawegaon Ta.Mouda Dist. Nagpur Pch- Jai durgamata WUA Ltd. Nawegaon Ta.Mouda R3 13.151 NCB 5.261 7.891 13.15 8**/7 Dist. Nagpur Pch- Jai durgamata WUA Ltd. Nawegaon Ta.Mouda R4 13.15 NCB 6.58 6.58 13.15 8**/7 Dist. Nagpur Pch- Nagdwar swami Water User Association Ltd. 417 R2 8.047 NCB 0.805 4.426 2.816 8.047 8**/8 Hiwara Ta.Mouda Dist. Nagpur Pch- Nagdwar swami WUA Ltd. Hiwara Ta.Mouda R3 5.433 NCB 2.173 3.260 5.43 8**/8 Dist. Nagpur Pch- Nagdwar swami WUA Ltd. Hiwara Ta.Mouda A3 6.259 NCB 0.00 0.00 0.00 0.00 3.56 2.69 0.00 6.26 8**/8 Dist. Nagpur Pch- Jailaxmi Water User Association Ltd. Tarasa 418 R2 3.863 NCB 0.386 2.125 1.352 3.863 8**/9 Ta.Mouda Dist. Nagpur Pch- Jal Laxmi WUA, Tarsa Ta-Mouda , Dist- A2 3.573 NCB 0.357 1.965 1.251 3.573 8**/9 Nagpur Pch- Jal Laxmi WUA, Tarsa Ta-Mouda , Dist- A2/1 3.743 NCB 0.00 0.00 0.00 0.91 1.32 1.50 0.00 3.74 8**/9 Nagpur Pch- Shri Chkradhar Swami Water User Association 419 R2 5.438 NCB 0.544 2.991 1.903 5.438 8**/10 Ltd. Sawargaon Ta.Mouda Dist. Nagpur Pch- Shri Chkradhar Swami WUA Ltd. Sawargaon R3 5.291 NCB 2.117 3.175 5.29 8**/10 Ta.Mouda Dist. Nagpur Pch- Shri Chkradhar Swami WUA Ltd. Sawargaon A3 5.719 NCB 0.00 0.00 0.00 0.00 2.54 3.18 0.00 5.72 8**/10 Ta.Mouda Dist. Nagpur 2/24/2011 wua_prmpkg_r4 28 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Jaiganga Maa Water User Association Ltd. 420 R2 5.198 NCB 0.520 2.859 1.819 5.198 8**/11 Babdeo Ta.Mouda Dist. Nagpur Pch- Jai Ganga Maa WUA, Babdeo Ta-Mouda , Dist- A2 3.728 NCB 0.373 2.050 1.305 3.728 8**/11 Nagpur Pch- Jai Ganga Maa WUA, Babdeo Ta-Mouda , Dist- A2/1 3.903 NCB 0.00 0.00 0.00 0.00 1.30 2.60 0.00 3.90 8**/11 Nagpur Pch- Jai Swarswati Maa Water User Association 421 R2 6.703 NCB 0.670 3.687 2.346 6.703 8**/12 Ltd.Babdeo Ta.Mouda Dist. Nagpur Pch- Jai Swarswati Maa WUA Ltd.Babdeo R3 3.837 NCB 1.535 2.302 3.84 8**/12 Ta.Mouda Dist. Nagpur Pch- Jai Swarswati Maa WUA Ltd.Babdeo R4 3.952 NCB 2.371 1.581 3.95 8**/12 Ta.Mouda Dist. Nagpur Pch- Mayamawali Water User Association Ltd. 422 R2 5.626 NCB 1.407 2.813 1.407 5.626 8**/13 Kumbhari Ta.Mouda Dist. Nagpur Pch- Mayamawali WUA Ltd. Kumbhari Ta.Mouda R3 5.462 NCB 2.185 3.277 5.46 8**/13 Dist. Nagpur Pch- Mayamawali WUA Ltd. Kumbhari Ta.Mouda R4 5.626 NCB 3.38 2.25 5.63 8**/13 Dist. Nagpur Pch- Jaimatrubhumi Water User Association Ltd. 423 R2 3.881 NCB 0.970 1.941 0.970 3.881 8**/14 Mouda Ta.Mouda Dist. Nagpur Pch- Jaimatrubhumi WUA Ltd. Mouda Ta.Mouda A2 3.768 NCB 8**/14 Dist. Nagpur Pch- Jaimatrubhumi WUA Ltd. Mouda Ta.Mouda A2/1 3.768 NCB 8**/14 Dist. Nagpur Pch- Jaimatrubhumi WUA Ltd. Mouda Ta.Mouda A2/2 3.768 NCB 8**/14 Dist. Nagpur Pch- Jaimatrubhumi WUA Ltd. Mouda Ta.Mouda A2/3 3.768 NCB 8**/14 Dist. Nagpur Pch- Jaimatrubhumi WUA Ltd. Mouda Ta.Mouda R3 3.768 NCB 1.507 2.261 3.77 8**/14 Dist. Nagpur Pch- Jaimatrubhumi WUA Ltd. Mouda Ta.Mouda A3 4.222 NCB 0.00 0.00 0.00 0.00 1.85 2.37 0.00 4.22 8**/14 Dist. Nagpur Pch- Jai Ganga Water User Association Ltd. 424 R2 4.634 NCB 1.159 2.317 1.159 4.634 8**/15 Dhamangaon Ta.Mouda Dist. Nagpur Pch- Jai Ganga WUA Ltd. Dhamangaon Ta.Mouda R3 4.499 NCB 1.800 2.699 4.50 8**/15 Dist. Nagpur Pch- Jai Ganga WUA Ltd. Dhamangaon Ta.Mouda R4 4.634 NCB 2.78 1.85 4.63 8**/15 Dist. Nagpur 2/24/2011 wua_prmpkg_r4 29 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Swamisamrth Water User Association Ltd. 425 R2 6.880 NCB 1.720 3.440 1.720 6.880 8**/16 Mouda Ta.Mouda Dist. Nagpur Pch- Swami Samartha WUA, Mouda Ta-Mouda , A2 5.533 NCB 1.383 2.767 1.383 5.533 8**/16 Dist-Nagpur Pch- Swami Samartha WUA, Mouda Ta-Mouda , A2/1 5.533 NCB 8**/16 Dist-Nagpur Pch- Swami Samartha WUA, Mouda Ta-Mouda , A2/2 6.218 NCB 0.00 0.00 0.00 0.00 2.38 3.84 0.00 6.22 8**/16 Dist-Nagpur Pch- Jaikisan; Jalsambrudhi Water User Association 426 R2 7.325 NCB 1.831 3.663 1.831 7.325 8**/17 Ltd. Marodi Ta.Mouda Dist. Nagpur Pch- Jai Kisan Jalsamrudhi WUA, Marodi, Ta- A2 6.052 NCB 0.00 0.00 0.00 0.73 2.48 2.84 0.00 6.05 8**/17 Mauda, Dist-Nagpur Pch- Annapurna Water User Association Ltd. 427 R2 10.977 NCB 1.098 6.037 3.842 10.977 8**/18 Nagardhan Ta.Ramtek Dist. Nagpur Pch- Annapurna WUA Ltd. Nagardhan Ta.Ramtek R3 9.830 NCB 3.932 5.898 9.83 8**/18 Dist. Nagpur Pch- Annapurna WUA Ltd. Nagardhan Ta.Ramtek A3 12.302 NCB 0.00 0.00 0.00 0.00 2.46 6.56 3.28 12.30 8**/18 Dist. Nagpur Pch- Koteswar Water User Association Ltd. 428 R2 8.940 NCB 0.894 4.917 3.129 8.940 8**/19 Nagardhan TaRamtek Dist. Nagpur Pch- Koteswar WUA Ltd. Nagardhan TaRamtek R3 7.635 NCB 3.054 4.581 7.63 8**/19 Dist. Nagpur Pch- Koteswar WUA Ltd. Nagardhan TaRamtek A3 9.015 NCB 0.00 0.00 0.00 0.00 3.37 3.77 1.88 9.02 8**/19 Dist. Nagpur Pch- Nandaji Water User Association Ltd. Nandapuri 429 R2 8.278 NCB 0.828 4.553 2.897 8.278 8**/20 Ta.Ramtek Mouda Dist. Nagpur Pch- Nandaji WUA Ltd. Nandapuri Ta.Ramtek R3 9.019 NCB 3.608 5.412 9.02 8**/20 Mouda Dist. Nagpur Pch- Nandaji WUA Ltd. Nandapuri Ta.Ramtek A3 10.846 NCB 0.00 0.00 0.00 0.00 3.01 5.22 2.61 10.85 8**/20 Mouda Dist. Nagpur Pch- Ekata Water User Association Ltd. Nerla 430 R2 6.622 NCB 0.662 3.642 2.318 6.622 8**/21 Ta.Ramtek Dist. Nagpur Pch- Akata WUA Ltd. Nerla Ta.Ramtek Dist. R3 6.140 NCB 2.456 3.684 6.14 8**/21 Nagpur Pch- Akata WUA Ltd. Nerla Ta.Ramtek Dist. A3 6.185 NCB 0.00 0.00 0.00 0.00 1.24 3.30 1.65 6.19 8**/21 Nagpur Pch- Panchashil Water User Association Ltd. 431 R2 2.940 NCB 0.294 1.617 1.029 2.940 8**/22 Chichala Ta.Ramtek Dist. Nagpur 2/24/2011 wua_prmpkg_r4 30 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Panchasheel WUA, chichala Ta-Ramtek , Dist- A2 3.400 NCB 0.00 0.00 0.00 0.00 2.32 1.08 0.00 3.40 8**/22 Nagpur Pch- Nawargaon Water User Association Ltd. 432 R2 1.154 Shopping 0.115 0.750 0.289 1.154 8**/23 Nawargaon Ta.Ramtek Dist. Nagpur Pch- Nawargaon WUA Ltd. Nawargaon Ta.Ramtek R3 1.310 shopping 0.524 0.786 1.31 8**/23 Dist. Nagpur Pch- Nawargaon WUA Ltd. Nawargaon Ta.Ramtek A3 1.516 shopping 0.00 0.00 0.00 0.00 0.51 1.01 0.00 1.52 8**/23 Dist. Nagpur Pch- Sangrampur Water User Association 433 R2 2.880 NCB 0.288 1.584 1.008 2.880 8**/24 Ltd.Sangrampur Ta.Ramtek Dist. Nagpur Pch- Sangrampur WUA, Sangrampur Ta-Ramtek , A2 2.860 NCB 0.00 0.00 0.00 0.00 2.35 0.51 0.00 2.86 8**/24 Dist-Nagpur Pch- Shetkari Water User Association Ltd. Chichala 434 R2 6.602 NCB 0.660 3.631 2.311 6.602 8**/25 Ta.Ramtek Dist. Nagpur Pch- Shetkari WUA, Chichala Ta-Ramtek , Dist- A2 4.929 NCB 0.00 0.00 0.00 0.00 2.87 2.06 0.00 4.93 8**/25 Nagpur Pch- Shri Narayanswami Water User Association Ltd. 435 R2 3.482 NCB 0.348 1.915 1.219 3.482 8**/26 Chichala Ta.Ramtek Dist. Nagpur Pch- Shri Narayanswami WUA Ltd. Chichala R3 7.054 NCB 2.822 4.233 7.05 8**/26 Ta.Ramtek Dist. Nagpur Pch- Shri Narayanswami WUA Ltd. Chichala A3 7.217 NCB 0.00 0.00 0.00 0.00 1.44 3.85 1.92 7.22 8**/26 Ta.Ramtek Dist. Nagpur Pch- Jaibhole Water User Association Ltd. Hatodi 436 R2 7.566 NCB 0.757 4.161 2.648 7.566 8**/27 Ta.Ramtek Dist. Nagpur Pch- Jai Bhole WUA, Hatodi Ta-Ramtek , Dist- A2 4.973 NCB 0.00 0.00 0.00 0.00 4.07 0.91 0.00 4.97 8**/27 Nagpur Pch- Bhagirath Water User Association Ltd. 437 R2 2.739 NCB 0.274 1.506 0.959 2.739 8**/28 Lohadongari .Mouda Dist. Nagpur Pch- Bhagirath WUA Ltd. Lohadongari .Mouda Dist. R3 1.842 shopping 0.737 1.105 1.84 8**/28 Nagpur Pch- Bhagirath WUA Ltd. Lohadongari .Mouda Dist. A3 2.073 shopping 0.00 0.00 0.00 0.00 0.90 1.17 0.00 2.07 8**/28 Nagpur Pch- Ganesh Water User Association Ltd. 438 R2 5.870 NCB 0.587 3.229 2.055 5.870 8**/29 Lohadongari Ta.Mouda Dist. Nagpur Pch- Ganesh WUA, Lohdongari Ta-Ramtek , Dist- A2 5.430 NCB 0.00 0.00 0.00 0.00 4.99 0.44 0.00 5.43 8**/29 Nagpur Pch- Adarsh Water User Association Ltd. Nerala 439 R2 8.740 NCB 0.874 4.807 3.059 8.740 8**/30 Ta.Mouda Dist. Nagpur 2/24/2011 wua_prmpkg_r4 31 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Adarsh WUA Ltd. Nerala Ta.Mouda Dist. R3 7.320 NCB 2.928 4.392 7.32 8**/30 Nagpur Pch- Adarsh WUA Ltd. Nerala Ta.Mouda Dist. A3 8.609 NCB 0.00 0.00 0.00 0.00 1.72 4.59 2.30 8.61 8**/30 Nagpur Pch- Shri Vignaharta Water User Association Ltd. 440 R2 6.171 NCB 0.617 3.394 2.160 6.171 8**/31 Chacher Ta.Mouda Dist. Nagpur Pch- Vighnaharta WUA, Chacher Ta-Mouda , Dist- A2 5.644 NCB 0.00 0.00 0.00 2.21 2.63 0.80 0.00 5.64 8**/31 Nagpur Pch- Jaishiv Water User Association Ltd. Dudhala 441 R2 8.692 NCB 0.869 4.781 3.042 8.692 8**/32 Ta.Mouda Dist. Nagpur Pch- Jaishiv WUA Ltd. Dudhala Ta.Mouda Dist. R3 9.350 NCB 3.740 5.610 9.35 8**/32 Nagpur Pch- Jaishiv WUA Ltd. Dudhala Ta.Mouda Dist. A3 11.314 NCB 0.00 0.00 0.00 0.00 4.03 4.86 2.43 11.31 8**/32 Nagpur Pch- Shrihari Water User Association Ltd. Barshi 442 R2 6.161 NCB 0.616 3.389 2.156 6.161 8**/33 Ta.Mouda Dist. Nagpur Pch- Shrihari WUA Ltd. Barshi Ta.Mouda Dist. R3 7.842 NCB 3.137 4.705 7.84 8**/33 Nagpur Pch- Shrihari WUA Ltd. Barshi Ta.Mouda Dist. A3 9.219 NCB 0.00 0.00 0.00 0.00 2.59 4.42 2.21 9.22 8**/33 Nagpur Pch- Jaikisan Water User Association Ltd. 443 R2 9.332 NCB 0.933 5.133 3.266 9.332 8**/34 Kachurwahi Ta.Ramtek Dist. Nagpur Pch- Jaikisan WUA Ltd. Kachurwahi Ta.Ramtek R3 5.990 NCB 2.396 3.594 5.99 8**/34 Dist. Nagpur Pch- Jaikisan WUA Ltd. Kachurwahi Ta.Ramtek A3 6.783 NCB 0.00 0.00 0.00 0.00 1.73 3.37 1.68 6.78 8**/34 Dist. Nagpur Pch- Jiwanjyoti Water User Association Ltd. Tarodi 444 R2 11.680 NCB 1.168 6.424 4.088 11.680 8**/35 Ta.Mouda Dist. Nagpur Pch- Jiwanjyoti WUA Ltd. Tarodi Ta.Mouda Dist. R3 15.049 NCB 6.019 9.029 15.05 8**/35 Nagpur Pch- Jiwanjyoti WUA Ltd. Tarodi Ta.Mouda Dist. A3 12.357 NCB 0.00 0.00 0.00 0.00 3.31 6.03 3.02 12.36 8**/35 Nagpur Pch- Shrikrushna Water User Association Ltd. 445 R2 6.512 NCB 0.651 3.582 2.279 6.512 8**/36 Khodgaon Ta.Ramtek Dist. Nagpur Pch- Jai Shrikrishna WUA, Khodagaon Ta-Ramtek , A2 4.462 NCB 0.00 0.00 0.00 0.00 1.49 2.97 0.00 4.46 8**/36 Dist-Nagpur Pch- Jiwanvikas Water User Association Ltd. 446 R2 11.981 NCB 1.198 6.590 4.193 11.981 8**/37 Kirnapur Ta.Ramtek Dist. Nagpur 2/24/2011 wua_prmpkg_r4 32 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Jivan Vikash WUA, Kirnapur Ta-Ramtek , Dist- A2 5.686 NCB 0.569 3.127 1.990 5.686 8**/37 Nagpur Pch- Jivan Vikash WUA, Kirnapur Ta-Ramtek , Dist- A2/1 5.686 NCB 8**/37 Nagpur Pch- Jivan Vikash WUA, Kirnapur Ta-Ramtek , Dist- A2/2 4.734 NCB 0.00 0.00 0.00 1.13 1.20 2.41 0.00 4.73 8**/37 Nagpur Pch- Janseva Water User Association Ltd. Chokhala 447 R2 1.756 Shopping 0.176 0.966 0.615 1.756 8**/38 Ta Ramtek Dist. Nagpur Pch- Jan Seva WUA, Chokhala Tah.Mouda Dist- A2 2.409 NCB 0.00 0.00 0.00 0.89 1.52 0.00 0.00 2.41 8**/38 Nagpur Pch- Jaltarang Water User Association Ltd. Aroli 448 R2 3.241 NCB 0.324 1.783 1.134 3.241 8**/39 Ta.Mouda Dist. Nagpur Pch- A2 Jaltarang WUA, Aroli Tah.Mouda Dist-Nagpur 2.433 NCB 0.00 0.00 0.00 0.60 1.84 0.00 0.00 2.43 8**/39 Pch- Adarsh Water User Association Ltd. 449 R2 6.984 NCB 0.698 3.841 2.444 6.984 8**/40 Khaperkhada Ta.Mouda Dist. Nagpur Pch- Adarsh WUA, Khaparkheda Ta-Mouda , Dist- A2 5.686 NCB 0.00 0.00 0.00 0.00 3.08 2.61 0.00 5.69 8**/40 Nagpur Pch- Jalvikas Water User Association Ltd. 450 R2 15.526 NCB 3.882 7.763 3.882 15.526 8**/41 Kodamendhi Ta.Mouda Dist. Nagpur Pch- Jalvikas WUA Ltd. Kodamendhi Ta.Mouda R3 15.074 NCB 6.030 9.044 15.07 8**/41 Dist. Nagpur Pch- Jalvikas WUA Ltd. Kodamendhi Ta.Mouda R4 13.501 NCB 8.10 5.40 13.50 8**/41 Dist. Nagpur Pch- Ganesh Water User Association Ltd. Rajoli 451 R2 8.067 NCB 0.807 4.437 2.823 8.067 8**/42 Ta.Mouda Dist. Nagpur Pch- Jai Ganesh WUA. Rajoli Ta-Mouda A2 4.904 NCB 0.00 0.00 0.00 1.05 3.85 0.00 0.00 4.90 8**/42 Dist-Nagpur Pch- Jiwansathi Water User Association Ltd. 452 R2 8.188 NCB 0.819 4.503 2.866 8.188 8**/43 Nandgaon Ta.Mouda Dist. Nagpur Pch- Jiwansathi WUA Ltd. Nandgaon Ta.Mouda R3 7.870 NCB 3.148 4.722 7.87 8**/43 Dist. Nagpur Pch- Jiwansathi WUA Ltd. Nandgaon Ta.Mouda R4 5.872 NCB 3.52 2.35 5.87 8**/43 Dist. Nagpur Pch- Janakalyan Water User Association Ltd. Kherda 453 R2 10.576 NCB 1.058 5.817 3.702 10.576 8**/44 Ta.Mouda Dist. Nagpur Pch- Jankalyan WUA, Kharda Ta-Mouda , Dist- A2 6.035 NCB 0.00 0.00 0.00 1.53 1.50 3.00 0.00 6.04 8**/44 Nagpur 2/24/2011 wua_prmpkg_r4 33 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Jaldhara Water User Association Ltd. Ejani Ta. 454 R2 4.540 NCB 1.135 2.270 1.135 4.540 8**/45 .Mouda Dist. Nagpur Pch- A2 Jaldhara WUA. Ejani Ta- Ramtek, Dist-Nagpur 4.352 NCB 8**/45 Pch- A2/1 Jaldhara WUA. Ejani Ta- Ramtek, Dist-Nagpur 4.562 NCB 0.00 0.00 0.00 0.50 2.94 1.13 0.00 4.56 8**/45 Pch- Shri Sai Water User Association Ltd. Tuman 455 R2 5.872 NCB 1.468 2.936 1.468 5.872 8**/46 Ta.Mouda Dist. Nagpur Pch- Shri Sai WUA, Tuman/Barshi Tah.Mouda Dist- A2 5.890 NCB 0.00 0.00 0.00 0.77 5.12 0.00 0.00 5.89 8**/46 Nagpur Pch- Shetkari Water User Association Ltd. Barshi 456 R2 5.629 NCB 1.407 2.815 1.407 5.629 8**/47 Ta.Mouda Dist. Nagpur Pch- Shetkari WUA, Barshi Tah.Mouda Dist- A2 5.664 NCB 0.00 0.00 0.00 0.85 1.61 3.21 0.00 5.66 8**/47 Nagpur Pch- Shri Balaji Water User Association Ltd. Tuman 457 R2 8.278 NCB 0.828 4.553 2.897 8.278 8**/48 Ta.Mouda Dist. Nagpur Pch- Shri Balaji WUA Ltd. Tuman Ta.Mouda Dist. R3 10.790 NCB 4.316 6.474 10.79 8**/48 Nagpur Pch- Shri Balaji WUA Ltd. Tuman Ta.Mouda Dist. A3 8.909 NCB 0.00 0.00 0.00 0.00 2.78 4.09 2.04 8.91 8**/48 Nagpur Pch- Parmatma Gramin Water User Association Ltd. 458 R2 5.694 NCB 1.424 2.847 1.424 5.694 8**/49 Pardi Ta.Mouda Dist. Nagpur Pch- A2 Parmatma WUA, Pardi, Ta-Mauda, Dist-Nagpur 5.622 NCB 0.00 0.00 0.00 0.19 3.64 1.79 0.00 5.62 8**/49 Pch- Pawansut Water User Association Ltd. 459 R2 5.694 NCB 1.424 2.847 1.424 5.694 8**/50 Khaperkheda Ta.Mouda Dist. Nagpur Pch- Pawansut WUA, Khaperkheda Ta-Mouda , Dist- A2 5.45 NCB 8**/50 Nagpur Pch- Pawansut WUA, Khaperkheda Ta-Mouda , Dist- A2/1 5.861 NCB 0.00 0.00 0.00 1.39 1.49 2.98 0.00 5.86 8**/50 Nagpur Pench Pch-9** Rehabilitation of minors (WUA level works -50 327.87 WUA 16.39 81.97 98.36 81.97 49.18 327.87 R Pch-9** Rehabilitation of minors (WUA level works -50 327.87 WUA 49.18 114.75 147.54 16.39 327.87 Pch- Shrikrushna Water User Association Ltd. 460 R2 4.740 NCB 1.185 2.370 1.185 4.740 9**/1 Nimkhada Ta.Mouda Dist. Nagpur Pch- Shrikrishna WUA, Nimkheda, Ta-Mauda, Dist- A2 4.754 NCB 0.00 0.00 0.00 2.68 2.07 0.00 0.00 4.75 9**/1 Nagpur 2/24/2011 wua_prmpkg_r4 34 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Shriram Water User Association Ltd.Nimkhada 461 R2 10.546 NCB 1.055 5.800 3.691 10.546 9**/2 Ta.Mouda Dist. Nagpur Pch- Shriram WUA Ltd.Nimkhada Ta.Mouda Dist. R3 13.233 NCB 5.293 7.940 13.23 9**/2 Nagpur Pch- Shriram WUA Ltd.Nimkhada Ta.Mouda Dist. A3 10.208 NCB 0.00 0.00 0.00 0.00 2.37 5.23 2.61 10.21 9**/2 Nagpur Pch- Shri Sant Gajanan Water User Association Ltd. 462 R2 3.777 NCB 0.944 1.889 0.944 3.777 9**/3 Tarsa Ta.Mouda Dist. Nagpur Pch- Shri Sant Gajanan WUA Ltd. Tarsa Ta.Mouda R3 3.667 NCB 1.467 2.200 3.67 9**/3 Dist. Nagpur Pch- Shri Sant Gajanan WUA Ltd. Tarsa Ta.Mouda A3/1 3.667 NCB 9**/3 Dist. Nagpur Pch- Shri Sant Gajanan WUA Ltd. Tarsa Ta.Mouda A3/2 3.667 NCB 9**/3 Dist. Nagpur Pch- Shri Sant Gajanan WUA Ltd. Tarsa Ta.Mouda A3/3 4.049 NCB 0.00 0.00 0.00 0.00 0.81 2.16 1.08 4.05 9**/3 Dist. Nagpur Pch- Pragati Water User Association Ltd. Tarasa 463 R2 5.629 NCB 0.563 3.096 1.970 5.629 9**/4 Ta.Mouda Dist. Nagpur Pch- Pragati WUA Ltd. Tarasa Ta.Mouda Dist. R3 5.282 NCB 2.113 3.169 5.28 9**/4 Nagpur Pch- Pragati WUA Ltd. Tarasa Ta.Mouda Dist. A3 6.023 NCB 0.00 0.00 0.00 0.00 1.20 3.21 1.61 6.02 9**/4 Nagpur Pch- Shri Sant Eknath Water User Association Ltd. 464 R2 12.262 NCB 1.226 6.744 4.292 12.262 9**/5 Esapur Ta.Mouda Dist. Nagpur Pch- Shri Sant Eknath WUA Ltd. Esapur Ta.Mouda R3 3.825 NCB 1.530 2.295 3.83 9**/5 Dist. Nagpur Pch- Shri Sant Eknath WUA Ltd. Esapur Ta.Mouda A3 6.398 NCB 0.00 0.00 0.00 0.00 2.07 2.88 1.44 6.40 9**/5 Dist. Nagpur Pch- Gurudeo Water User Association Ltd. Dhani 465 R2 3.880 NCB 0.970 1.940 0.970 3.880 9**/6 Ta.Mouda Dist. Nagpur Pch- Gurudeo WUA, Dhani Ta-Ramtek, Dist- A2 3.015 NCB 0.00 0.00 0.00 0.00 1.01 2.01 0.00 3.02 9**/6 Nagpur Pch- Ajangaon Water User Association Ltd. 466 R2 2.929 NCB 0.732 1.465 0.732 2.929 9**/7 Ajangaon Ta.Mouda Dist. Nagpur Pch- Ajangaon WUA, Ajangaon Ta-Mouda , Dist- A2 2.848 NCB 0.00 0.00 0.00 0.00 0.95 1.90 0.00 2.85 9**/7 Nagpur Pch- Virsi Bhendala Water User Association Ltd. 467 R2 17.309 NCB 1.731 9.520 6.058 17.309 9**/8 Virsi Ta.Mouda Dist. Nagpur 2/24/2011 wua_prmpkg_r4 35 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Virsi Bhendala WUA Ltd. Virsi Ta.Mouda Dist. R3 8.031 NCB 3.212 4.819 8.03 9**/8 Nagpur Pch- Virsi Bhendala WUA Ltd. Virsi Ta.Mouda Dist. R4 13.117 NCB 2.62 5.25 5.25 13.12 9**/8 Nagpur Pch- Nawegaon Dhanla Water User Association Ltd. 468 R2 9.171 NCB 0.917 5.044 3.210 9.171 9**/9 Dhanala Ta.Mouda Dist. Nagpur Pch- Nawegaon Dhanla WUA Ltd. Dhanala R3 8.120 NCB 3.248 4.872 8.12 9**/9 Ta.Mouda Dist. Nagpur Pch- Nawegaon Dhanla WUA Ltd. Dhanala R4 9.204 NCB 1.84 3.68 3.68 9.20 9**/9 Ta.Mouda Dist. Nagpur Pch- Mangali Teli Water User Association Ltd. 469 R2 20.550 NCB 2.055 11.303 7.193 20.550 9**/10 Mangli (Teli) Ta.Mouda Dist. Nagpur Pch- Mangali Teli WUA Ltd. Mangli (Teli) R3 8.970 NCB 3.588 5.382 8.97 9**/10 Ta.Mouda Dist. Nagpur Pch- Mangali Teli WUA Ltd. Mangli (Teli) R4 18.13 NCB 3.63 7.25 7.25 18.13 9**/10 Ta.Mouda Dist. Nagpur Rajoli Rewaral Wagholi Dhanala Water User Pch- 470 R2 Association Ltd. Rewaral Ta.Mouda Dist. 15.974 NCB 1.597 8.786 5.591 15.974 9**/11 Nagpur Pch- Rajuri Rewaral Wagholi Dhanala WUA Ltd. R3 11.824 NCB 4.730 7.095 11.82 9**/11 Rewaral Ta.Mouda Dist. Nagpur Pch- Rajuri Rewaral Wagholi Dhanala WUA Ltd. R4 13.555 NCB 2.71 5.42 5.42 13.56 9**/11 Rewaral Ta.Mouda Dist. Nagpur Pch- Mahatma Water User Association Ltd. Rajoli 471 R2 3.344 NCB 0.836 1.672 0.836 3.344 9**/12 Ta.Mouda Dist. Nagpur Pch- Mahatma WUA, Rajoli Ta-Mouda , Dist- A2 2.948 NCB 0.00 0.00 0.00 0.00 1.22 1.73 0.00 2.95 9**/12 Nagpur Pch- Sambrudhi Water User Association Ltd. 472 R2 14.760 NCB 1.476 8.118 5.166 14.760 9**/13 Dharmapuri Ta.Mouda Dist. Nagpur Pch- Sambrudhi WUA Ltd. Dharmapuri Ta.Mouda R3 19.150 NCB 7.660 11.490 19.15 9**/13 Dist. Nagpur Pch- Sambrudhi WUA Ltd. Dharmapuri Ta.Mouda R4 14.939 NCB 2.99 5.98 5.98 14.94 9**/13 Dist. Nagpur Pch- Bhagyodya Water User Association Ltd. 473 R2 3.834 NCB 0.959 1.917 0.959 3.834 9**/14 Rewaral Ta.Mouda Dist. Nagpur Pch- Bhagyodaya WUA, Reoral Ta-Ramtek , Dist- A2 3.720 NCB 0.00 0.00 0.00 0.00 2.45 1.27 0.00 3.72 9**/14 Nagpur Pch- Mahalaxmi Water User Association Ltd. 474 R2 3.333 NCB 0.83 1.67 0.83 3.33 9**/15 Rewaral (Khandala) Ta.Mouda Dist. Nagpur 2/24/2011 wua_prmpkg_r4 36 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Mahalaxmi WUA, Khandala(Reoral) A2 3.302 NCB 0.00 0.00 0.00 1.15 2.15 0.00 0.00 3.30 9**/15 Tah.Mohadi Dist-Bhandara Pch- Charbha Water User Association Ltd.Charbha 475 R2 2.609 NCB 0.261 1.435 0.913 2.609 9**/16 Ta.Mouda Dist. Nagpur Pch- Charbha WUA Ltd.Charbha Ta.Mouda Dist. R3 2.417 NCB 0.967 1.450 2.42 9**/16 Nagpur Pch- Charbha WUA Ltd.Charbha Ta.Mouda Dist. A3 2.793 NCB 0.00 0.00 0.00 0.00 2.02 0.77 0.00 2.79 9**/16 Nagpur Pch- Pipari Water User Association Ltd. Pipari 476 R2 8.067 NCB 0.807 4.437 2.823 8.067 9**/17 Ta.Mouda Dist. Nagpur Pch- R3 Pipari WUA Ltd. Pipari Ta.Mouda Dist. Nagpur 8.388 NCB 3.355 5.033 8.39 9**/17 Pch- A3 Pipari WUA Ltd. Pipari Ta.Mouda Dist. Nagpur 8.99 NCB 0.00 0.00 0.00 0.00 5.96 3.03 0.00 8.99 9**/17 Pch- Wangepar Water User Association Ltd. Pipari 477 R2 4.224 NCB 0.422 2.323 1.478 4.224 9**/18 Ta.Mouda Dist. Nagpur Pch- Wangepar WUA Ltd. Pipari Ta.Mouda Dist. R3 4.101 NCB 1.64 2.46 4.10 9**/18 Nagpur Pch- Wangepar WUA Ltd. Pipari Ta.Mouda Dist. A3 4.25 NCB 0.00 0.00 0.00 0.00 2.13 2.13 0.00 4.25 9**/18 Nagpur Pch- Dhanla Water User Association 478 R2 3.610 NCB 0.361 1.986 1.264 3.610 9**/19 Ltd.DhanlaTa.Mouda Dist. Nagpur Pch- A2 Dhanla WUA, Dhanla Ta-Mouda , Dist-Nagpur 3.248 NCB 0.00 0.00 0.00 0.00 3.28 0.00 0.00 3.28 9**/19 Pch- Pragati Water User Association Ltd. Dahegaon 479 R2 4.425 NCB 0.443 2.434 1.549 4.425 9**/20 Ta.Mouda Dist. Nagpur Pch- Rehabilitation & Modernisation Minor under A2 4.349 NCB 0.00 0.00 0.00 0.00 4.34 0.00 0.00 4.34 9**/20 Pragati WUA, Dahegaon Pch- Gayatri Water User Association Ltd. Dhanla 480 R2 8.398 NCB 0.840 4.619 2.939 8.398 9**/21 Ta.Mouda Dist. Nagpur Pch- Gayatri WUA Ltd. Dhanla Ta.Mouda Dist. R3 7.129 NCB 2.852 4.277 7.13 9**/21 Nagpur Pch- Gayatri WUA Ltd. Dhanla Ta.Mouda Dist. A3 8.878 NCB 0.00 0.00 0.00 0.00 4.44 4.44 0.00 8.88 9**/21 Nagpur Pch- Nagdeo Water User Association Ltd. Dhanla 481 R2 3.642 NCB 0.364 2.003 1.275 3.642 9**/22 Ta.Mouda Dist. Nagpur Pch- Nagdeo WUA, Dhanla Ta-Mouda , Dist- A2 2.897 NCB 0.00 0.00 0.00 0.00 2.89 0.00 0.00 2.89 9**/22 Nagpur 2/24/2011 wua_prmpkg_r4 37 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Indira Water User Association Ltd. Dahegaon 482 R2 4.177 NCB 1.044 2.089 1.044 4.177 9**/23 Ta.Mouda Dist. Nagpur Pch- A2 Indira WUA. Dahegaon, Ta-Mouda, Dist-Nagpur 4.003 NCB 9**/23 Pch- A2/1 Indira WUA. Dahegaon, Ta-Mouda, Dist-Nagpur 4.173 NCB 0.00 0.00 0.00 0.00 4.17 0.00 0.00 4.17 9**/23 Pch- Adarsh Water User Association Ltd.Chikhali 483 R2 2.569 NCB 0.257 1.413 0.899 2.569 9**/24 Ta.Mouda Dist. Nagpur Pch- Adarsh WUA Ltd.Chikhali Ta.Mouda Dist. R3 2.417 NCB 0.967 1.450 2.42 9**/24 Nagpur Pch- Adarsh WUA Ltd.Chikhali Ta.Mouda Dist. A3 2.776 NCB 0.00 0.00 0.00 0.00 1.39 1.39 0.00 2.78 9**/24 Nagpur Pch- Chincholi Water User Association Ltd. 484 R2 3.983 NCB 0.398 2.191 1.394 3.983 9**/25 Chincholi Ta.Mouda Dist. Nagpur Pch- Chincholi WUA Ltd. Chincholi Ta.Mouda Dist. R3 4.090 NCB 1.636 2.454 4.09 9**/25 Nagpur Pch- Chincholi WUA Ltd. Chincholi Ta.Mouda Dist. A3 4.547 NCB 0.00 0.00 0.00 0.00 2.50 2.04 0.00 4.55 9**/25 Nagpur Pch- Jalpurti Water User Association Ltd. Chikhali 485 R2 5.676 NCB 0.568 3.122 1.987 5.676 9**/26 Ta.MoudaDist. Nagpur Pch- Jalpurti WUA, Chikhali Ta-Bhandara , Dist- A2 5.401 NCB 0.00 0.00 0.00 2.29 3.11 0.00 0.00 5.40 9**/26 Bhandara Pch- Kisan Vikas Water User Association Ltd. 486 R2 3.867 NCB 0.387 2.127 1.353 3.867 9**/27 pandharabodi Ta.Dist. Bhandara Pch- Niharwani Water User Association Ltd. 487 R2 7.786 NCB 0.779 4.282 2.725 7.786 9**/28 Niharwani Ta.Bhandara Dist.Bhandara Pch- Niharvani WUA, Niharvani Ta-Mouda , Dist- A2 6.258 NCB 0.00 0.00 0.00 2.20 3.05 1.01 0.00 6.26 9**/28 Nagpur Pch- Kharbi Water User Association Ltd. Kharbi 488 R2 6.200 NCB 0.620 3.410 2.170 6.200 9**/29 Ta.Bhandara Dist.Bhandara Pch- Kharbi WUA, Kharbi Ta-Bhandara , Dist- A2 5.773 NCB 0.00 0.00 0.00 0.00 5.77 0.00 0.00 5.77 9**/29 Bhandara Pch- Jailaxmi Water User Association Ltd. 489 R2 8.990 NCB 0.899 4.945 3.147 8.990 9**/30 Nawargaon Ta.Mouda Dist. Nagpur Pch- Jailaxmi WUA Ltd. Nawargaon Ta.Mouda R3 8.728 NCB 3.491 5.237 8.73 9**/30 Dist. Nagpur Pch- Jailaxmi WUA Ltd. Nawargaon Ta.Mouda A3 10.222 NCB 0.00 0.00 0.00 0.00 5.11 5.11 0.00 10.22 9**/30 Dist. Nagpur 2/24/2011 wua_prmpkg_r4 38 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Khandala Water User Association Ltd. Khandala 490 R2 11.131 NCB 2.783 5.566 2.783 11.131 9**/31 Ta.Mouda Dist. Nagpur Pch- Khandala WUA, Khandala Ta-Mouda , Dist- A2 11.069 NCB 0.00 0.00 0.00 5.33 3.43 2.30 0.00 11.07 9**/31 Nagpur Pch- Ashti (Dahegaon ) Water User Association Ltd. 491 R2 24.965 NCB 2.497 13.731 8.738 24.965 9**/32 Dahegaon Ta.Mouda Dist. Nagpur Pch- A2 Asti WUA, Dahegaon Ta-Mouda , Dist-Nagpur 12.879 NCB 0.00 0.00 0.00 0.00 7.81 5.07 0.00 12.88 9**/32 Pch- Shiwani Water User Association Ltd. 492 R2 17.931 NCB 1.793 9.862 6.276 17.931 9**/33 Ghotmundhari Ta.Mouda Dist. Nagpur Pch- Shioni WUA, Ghotmundhari Ta-Mouda , Dist- A2 13.470 NCB 0.00 0.00 0.00 0.00 6.74 6.74 0.00 13.47 9**/33 Nagpur Pch- Nisarga Water User Association Ltd. 493 R2 6.793 NCB 0.679 3.736 2.378 6.793 9**/34 Deomundhari Ta.Mouda Dist. Nagpur Pch- Nisarg WUA, Deomundhari Ta-Mouda Dist- A2 5.851 NCB 0.00 0.00 0.00 0.00 5.85 0.00 0.00 5.85 9**/34 Nagpur Pch- Jaibhawani Water User Association 494 R2 8.138 NCB 0.814 4.476 2.848 8.138 9**/35 Ltd.Deomundhari Ta.Mouda Dist. Nagpur Pch- Jai Bhawani WUA, Deomundhari Ta-Mouda , A2 6.160 NCB 0.00 0.00 0.00 0.00 6.16 0.00 0.00 6.16 9**/35 Dist-Nagpur Pch- Mahalgaon Water User Association Ltd. 495 R2 4.140 NCB 1.035 2.070 1.035 4.140 9**/36 Mahalgaon Ta.Mouda Dist. Nagpur Pch- Mahalgaon WUA, Mahalgaon Tah.Mouda Dist- A2 4.151 NCB 0.00 0.00 0.00 0.85 3.31 0.00 0.00 4.15 9**/36 Nagpur Pch- Pragati Water User Association Ltd. Takli 496 R2 10.335 NCB 1.034 5.684 3.617 10.335 9**/37 (Bhosa) Ta.Mohadi Dist. Bhandara Pch- Pragati WUA Ltd. Bhosa Ta.Mohadi Dist. R3 10.034 NCB 4.014 6.020 10.03 9**/37 Bhandara Pch- Pragati WUA Ltd. Bhosa Ta.Mohadi Dist. A3 11.897 NCB 0.00 0.00 0.00 0.00 7.05 4.84 0.00 11.90 9**/37 Bhandara Pch- Panjara Water User Association Ltd. Panjara 497 R2 6.903 NCB 1.726 3.452 1.726 6.903 9**/38 Ta.Mouda Dist. Nagpur Pch- Panjara WUA Ltd. Panjara Ta.Mouda Dist. R3 15.102 NCB 6.041 9.061 15.10 9**/38 Nagpur Pch- Panjara WUA Ltd. Panjara Ta.Mouda Dist. A3 9.807 NCB 0.00 0.00 0.00 0.00 4.90 4.90 0.00 9.81 9**/38 Nagpur Pch- Gurukrupa Water User Association Ltd.Pahuni 498 R2 5.560 NCB 1.390 2.780 1.390 5.560 9**/39 Ta.Mohadi Dist. Bhandara 2/24/2011 wua_prmpkg_r4 39 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Gurukrupa WUA, Pahuni Tah.Mohadi, Dist- A2 5.584 NCB 0.00 0.00 0.00 1.90 3.96 0.00 0.00 5.85 9**/39 Bhandara Pch- Jaidurga Water User Association Ltd. Pahuni 499 R2 3.320 NCB 0.830 1.660 0.830 3.320 9**/40 Ta.Mouda Dist. Nagpur Pch- Jai Durga WUA, Pahuni Tah.Mohadi Dist- A2 3.136 NCB 0.00 0.00 0.00 0.71 2.42 0.00 0.00 3.14 9**/40 Bhandara Pch- Shriram Water User Association Ltd. Neri 500 R2 5.898 NCB 0.590 3.244 2.064 5.898 9**/41 Ta.Mohadi Dist. Bhandara Pch- A2 Shriram WUA, Neri Ta-Mohadi, Dist-Bhandara 5.765 NCB 0.00 0.00 0.00 0.00 5.76 0.00 0.00 5.76 9**/41 Pch- Shetkari Water User Association Ltd. Satona 501 R2 7.847 NCB 0.785 4.316 2.746 7.847 9**/42 Ta.Mohadi Dist. Bhandara Pch- Shetkari WUA, Satona, Ta-Mohadi, Dist- A2 6.026 NCB 0.00 0.00 0.00 0.00 6.03 0.00 0.00 6.03 9**/42 Bhandara Pch- Datta Water User Association Ltd. Bid 502 R2 7.586 NCB 0.759 4.172 2.655 7.586 9**/43 Ta.Mohadi Dist. Bhandara Pch- A2 Datta WUA, Bid, Ta-Mohadi, Dist-Bhandara 5.061 NCB 0.00 0.00 0.00 1.37 3.69 0.00 0.00 5.06 9**/43 Pch- Krushisampann Water User Association Ltd. 503 R2 6.320 NCB 1.580 3.160 1.580 6.320 9**/44 Khurshipar Ta.Dist. Bhandarn Pch- Krishisampanna WUA, khurshipar Ta-Bhandara A2 5.678 NCB 0.00 0.00 0.00 0.30 5.38 0.00 0.00 5.68 9**/44 , Dist-Bhandara Pch- Shivshankar Water User Association Ltd. 504 R2 9.512 NCB 0.951 5.232 3.329 9.512 9**/45 Hattidoi Ta.Mouda Dist. Nagpur Pch- Shivshankar WUA, Hattidoi Ta-Mouda , Dist- A2 9.224 NCB 0.00 0.00 0.00 0.00 9.22 0.00 0.00 9.22 9**/45 Nagpur Pch- Gurukrupa Water User Association Ltd.Adasa 505 R2 7.686 NCB 0.769 4.227 2.690 7.686 9**/46 TaMouda Dist. Nagpur Pch- Gurukrupa WUA, Adasa Ta-Mouda , Dist- A2 7.573 NCB 0.00 0.00 0.00 0.00 5.21 2.36 0.00 7.57 9**/46 Nagpur Pch- Gramvikas Water User Association Ltd. 506 R2 10.576 NCB 1.058 5.817 3.702 10.576 9**/47 Chikhalabodi Ta.Mouda Dist. Nagpur Pch- Gramvikash WUA, Chikhalabodi Ta-Mouda , A2 10.158 NCB 0.00 0.00 0.00 0.00 6.16 4.00 0.00 10.16 9**/47 Dist-Nagpur Pch- Shetkari Water User Association Ltd. Mohadura 507 R2 8.218 NCB 0.822 4.520 2.876 8.218 9**/48 Ta.Bhandara Dist. Bhandara Pch- Shetakari WUA, Mohadura Ta-Bhandara, Dist- A2 7.940 NCB 0.00 0.00 0.00 0.00 4.21 3.38 0.00 7.58 9**/48 Bhandara 2/24/2011 wua_prmpkg_r4 40 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Ekata Water User Association Ltd. Gopiwada 508 R2 15.071 NCB 1.507 8.289 5.275 15.071 9**/49 Ta.Mouda Dist. Nagpur Pch- Ekata WUA Ltd. Gopiwada Ta.Mouda Dist. R3 13.877 NCB 5.551 8.326 13.88 9**/49 Nagpur Pch- Ekata WUA Ltd. Gopiwada Ta.Mouda Dist. A3 14.81 NCB 0.00 0.00 0.00 3.93 5.93 4.95 0.00 14.81 9**/49 Nagpur Pch- Bahuuddyeshiya Water User Association 509 R2 5.308 NCB 0.531 2.919 1.858 5.308 9**/50 Ltd.Sirsi Ta.Bhandara Dist. Bhandara Pch- A2 Bahuuddeshiya WUA. Sirsi, Ta-Dist-Bhandara 4.867 NCB 0.00 0.00 0.00 0.00 4.87 0.00 0.00 4.87 9**/50 Pch- Khokarla Water User Association Ltd.Khokarla 510 R2 12.655 NCB 1.266 6.960 4.429 12.655 9**/51 Ta.Bhandara Dist. Bhandara Pch- Khokarla WUA, Khokarla Ta-Bhandara , Dist- A2 12.387 NCB 0.00 0.00 0.00 0.00 7.19 5.19 0.00 12.39 9**/51 Bhandara Pch- Water User Association Ltd.Bhandara 511 R2 9.342 NCB 0.934 5.138 3.270 9.342 9**/52 Ta.BhandaraDist. Bhandara Pch- Bhandara WUA Ltd.Bhandara R3 9.550 NCB 3.820 5.730 9.55 9**/52 Ta.BhandaraDist. Bhandara Pch- Bhandara WUA Ltd.Bhandara A3 10.034 NCB 0.00 0.00 0.00 0.00 6.03 4.01 0.00 10.03 9**/52 Ta.BhandaraDist. Bhandara Pch- Adarsh Water User Association Ltd. Neri 512 R2 12.462 NCB 1.246 6.854 4.362 12.462 9**/53 (Pachgaon) Ta.Mohadi Dist. Bhandara Pch- Adarsha WUA, Neri Ta-Bhandara , Dist- A2 10.808 NCB 0.00 0.00 0.00 1.25 6.74 2.84 0.00 10.83 9**/53 Bhandara Pch- Pachagaon Water User Association Ltd. 513 R2 3.743 NCB 0.936 1.872 0.936 3.743 9**/54 Pachagaon Ta.Mohadi Dist. Bhandara Pch- Pachgaon WUA, Pachgain Tah.Mohadi Dist- A2 3.648 NCB 1.459 2.189 3.648 9**/54 Bhandara Pch- Water User Association Ltd.Bothali Ta.Mohadi 514 R2 11.730 NCB 1.173 6.452 4.106 11.730 9**/55 Dist. Bhandara Pch- Bothali WUA Ltd.Bothali Ta.Mohadi Dist. R3 11.676 NCB 4.670 7.006 11.68 9**/55 Bhandara Pch- Bothali WUA Ltd.Bothali Ta.Mohadi Dist. A3 13.492 NCB 0.00 0.00 0.00 0.00 8.10 5.39 0.00 13.49 9**/55 Bhandara MohagaonWater User Association Pch- 515 R2 Ltd.Mohagaon (Devi) Ta.Mohadi Dist. 3.505 NCB 0.876 1.753 0.876 3.505 9**/56 Bhandara Pch- Mohagaon Devi WUA, Mohagaon, Ta-Mauda, A2 3.274 NCB 1.310 1.964 3.274 9**/56 Dist-Napgur 2/24/2011 wua_prmpkg_r4 41 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Water User Association Ltd.Dhabha 516 R2 13.054 NCB 1.305 7.180 4.569 13.054 9**/57 Ta.Bhandara Dist. Bhandara Pch- Dhabha WUA Ltd.Dhabha Ta.Bhandara Dist. R3 8.738 NCB 3.495 5.243 8.74 9**/57 Bhandara Pch- Dhabha WUA Ltd.Dhabha Ta.Bhandara Dist. A3 12.493 NCB 0.00 0.00 0.00 0.00 6.25 6.25 0.00 12.49 9**/57 Bhandara Pch- Pragati Water User Association Ltd. Khandala, 517 R2 5.839 NCB 0.584 3.211 2.044 5.839 9**/58 Sirpur Ta.Ramtek Dist. Nagpur Pch- Pragati WUA Ltd. Khandala, Sirpur Ta.Ramtek A2 5.535 NCB 9**/58 Dist. Nagpur Pch- Pragati WUA Ltd. Khandala, Sirpur Ta.Ramtek R3 5.535 NCB 2.214 3.321 5.53 9**/58 Dist. Nagpur Pch- Pragati WUA Ltd. Khandala, Sirpur Ta.Ramtek A3 6.336 NCB 0.00 0.00 0.00 0.00 3.91 2.42 0.00 6.34 9**/58 Dist. Nagpur Pch- Mahasangha Water User Association Ltd. Bori 518 R2 8.459 NCB 0.846 4.652 2.961 8.459 9**/59 Masala Ta.Ramtek Dist. Nagpur Pch- Mahasangha WUA Ltd. Bori Masala Ta.Ramtek A2 5.746 NCB 9**/59 Dist. Nagpur Pch- Mahasangha WUA Ltd. Bori Masala Ta.Ramtek R3 5.746 NCB 2.298 3.447 5.75 9**/59 Dist. Nagpur Pch- Mahasangha WUA Ltd. Bori Masala Ta.Ramtek A3 6.581 NCB 0.00 0.00 0.00 0.00 1.32 3.51 1.75 6.58 9**/59 Dist. Nagpur Pch- Samrtha Water User Association Ltd. Aroli 519 R2 16.606 NCB 1.661 9.133 5.812 16.606 9**/60 Ta.Mouda Dist. Nagpur Pch- Samrtha WUA Ltd. Aroli Ta.Mouda Dist. A2 5.973 NCB 9**/60 Nagpur Pch- Samrtha WUA Ltd. Aroli Ta.Mouda Dist. R3 5.973 NCB 2.389 3.584 5.97 9**/60 Nagpur Pch- Samrtha WUA Ltd. Aroli Ta.Mouda Dist. A3/1 5.973 NCB 9**/60 Nagpur Pch- Samrtha WUA Ltd. Bhandewadi Ta.Mouda A3/2 6.364 NCB 1.34 3.22 1.80 6.37 9**/60 Dist. Nagpur Pch- Gitanjali Water User Association Ltd. Aroli 520 R2 6.994 NCB 0.699 3.847 2.448 6.994 9**/61 Ta.Mouda Dist. Nagpur Pch- Geetanjali WUA, Aroli Ta-Mouda , Dist- A2 6.946 NCB 0.00 0.00 0.00 1.02 2.23 3.69 0.00 6.95 9**/61 Nagpur Pch- Wainganga Water User Association Ltd. 521 R2 8.248 NCB 0.825 4.536 2.887 8.248 9**/62 Mahadula Ta.Ramtek Dist. Nagpur 2/24/2011 wua_prmpkg_r4 42 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Wainganga WUA Ltd. Ghoti-Bori Ta.Ramtek R3 5.882 NCB 2.353 3.529 5.88 9**/62 Dist. Nagpur Pch- Wainganga WUA Ltd. Ghoti-Bori Ta.Ramtek A3/1 5.378 NCB 9**/62 Dist. Nagpur Pch- Wainganga WUA Ltd. Ghoti-Bori Ta.Ramtek R4 5.378 NCB 2.69 2.69 5.38 9**/62 Dist. Nagpur Pch- Jalganga Water User Association Ltd. Panchala 522 R2 4.712 NCB 0.471 2.592 1.649 4.712 9**/63 Lohara Ta.Ramtek Dist. Nagpur Pch- Jalaganga WUA Panchala /Lohara Ta-Ramtek, A2 4.650 NCB 0.00 0.00 0.00 0.54 1.91 2.20 0.00 4.65 9**/63 Dist-Nagpur Pch- Prerna Water User Association Ltd.Berdepar Ta 523 R2 7.776 NCB 0.778 4.277 2.722 7.776 9**/64 Mouda Dist. Nagpur Pch- Prerana WUA. Beradepar Ta-Mouda Dist- A2 4.298 NCB 0.00 0.00 0.00 2.16 2.13 0.00 0.00 4.30 9**/64 Nagpur Pch- Jagruti Water User Association Ltd. Salemeta 524 R2 5.298 NCB 0.530 2.914 1.854 5.298 9**/65 Ta.Ramtek Dist. Nagpur Pch- Jagruti WUA, Salaimeta/Hansapur Ta-Ramtek , A2 3.715 NCB 0.00 0.00 0.00 1.22 2.23 0.27 0.00 3.72 9**/65 Dist-Nagpur Pch- Jaikisan Bahuuddeshiya Water User Association 525 R2 13.817 NCB 1.382 7.599 4.836 13.817 9**/66 Ltd. Sawangi Ta.Ramtek Dist. Nagpur Pch- Jai Kisan Bahuuddeya WUA, Sawangi Ta- A2 5.212 NCB 0.00 0.00 0.00 1.36 2.97 0.89 0.00 5.21 9**/66 Ramek, Dist-Nagpur Pch- Kirnapur Water User Association Ltd.Kirnapur 526 R2 1.646 Shopping 0.165 1.070 0.412 1.646 9**/67 Ta.Ramtek Dist. Nagpur Pch- Kirnapur WUA Ltd.Kirnapur Ta.Ramtek Dist. R3 1.430 shopping 0.572 0.858 1.43 9**/67 Nagpur Pch- Kirnapur WUA Ltd.Kirnapur Ta.Ramtek Dist. A3/1 1.402 Shopping 9**/67 Nagpur Pch- Kirnapur WUA Ltd.Kirnapur Ta.Ramtek Dist. R4 1.402 Shopping 0 0.70 0.70 1.40 9**/67 Nagpur Pch- Maa Bambleswari Water User Association Ltd. 527 R2 3.733 NCB 0.933 1.867 0.933 3.733 9**/68 Adegaon Ta.Mouda Dist. Nagpur Pch- Maa Bamleshwari WUA Adegaon, Ta-Mauda, A2 3.549 NCB 9**/68 Dist-Nagpur Pch- Maa Bamleshwari WUA Adegaon, Ta-Mauda, A2/1 3.685 NCB 0.00 0.00 0.00 0.45 1.37 1.86 0.00 3.69 9**/68 Dist-Nagpur Pch- Maa sharda Water User Association 528 R2 17.509 NCB 1.751 9.630 6.128 17.509 9**/69 Ltd.Borihiwari Ta.Mouda Dist. Nagpur 2/24/2011 wua_prmpkg_r4 43 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Maa sharda WUA Ltd.Borihiwari Ta.Mouda R3 12.236 NCB 4.894 7.342 12.24 9**/69 Dist. Nagpur Pch- Maa sharda WUA Ltd.Borihiwari Ta.Mouda A3 14.144 NCB 0.00 0.00 0.00 0.00 3.82 6.88 3.44 14.14 9**/69 Dist. Nagpur Pch- Wakeshwar Water User Association Ltd. 529 R2 8.873 NCB 2.218 4.437 2.218 8.873 9**/70 Wakeshwar Ta.Mouda Dist. Nagpur Pch- Wakeshwar WUA, Wakeshwar Ta-Mouda , A2 9.364 NCB 0.00 0.00 0.00 2.61 3.44 3.32 0.00 9.36 9**/70 Dist-Nagpur Pch- Sirsoli Water User Association Ltd.Sirsoli 530 R2 11.308 NCB 2.827 5.654 2.827 11.308 9**/71 Ta.Mouda Dist. Nagpur Pch- A2 Sirsoli WUA, Sirsoli Ta-Mouda , Dist-Nagpur 10.921 NCB 9**/71 Pch- A2/1 Sirsoli WUA, Sirsoli Ta-Mouda , Dist-Nagpur 11.445 NCB 0.00 0.00 0.00 0.66 6.10 4.68 0.00 11.45 9**/71 Pch- Ekatmik Water User Association Ltd. 531 R2 5.418 NCB 0.542 2.980 1.896 5.418 9**/72 Baghabodi Ta.Mouda Dist. Nagpur Pch- Ekatmik WUA ,Kathalabodi Dhanla Ta-Mouda , A2 3.904 NCB 0.00 0.00 0.00 0.57 1.45 1.89 0.00 3.90 9**/72 Dist-Nagpur Pch- Nawayuwak Water User Association Ltd. 532 R2 7.425 NCB 0.743 4.084 2.599 7.425 9**/73 Dhanoli Ta.Mouda Dist. Nagpur Pch- Nawa yuwak WUA Ltd. Dhanoli Ta.Mouda A2 5.911 NCB 9**/73 Dist. Nagpur Pch- Nawa yuwak WUA Ltd. Dhanoli Ta.Mouda R3 5.911 NCB 2.364 3.546 5.91 9**/73 Dist. Nagpur Pch- Nawa yuwak WUA Ltd. Dhanoli Ta.Mouda A3 6.841 NCB 0.00 0.00 0.00 0.00 3.18 3.66 0.00 6.84 9**/73 Dist. Nagpur Pch- Krushivikas Water User Association Ltd. 533 R2 6.261 NCB 0.626 3.444 2.191 6.261 9**/74 Dhanoli Ta.Mouda Dist. Nagpur Pch- Krushivikas WUA Ltd. Dhanoli Ta.Mouda Dist. A2 5.094 NCB 9**/74 Nagpur Pch- Krushivikas WUA Ltd. Dhanoli Ta.Mouda Dist. R3 5.094 NCB 2.038 3.057 5.09 9**/74 Nagpur Pch- Krushivikas WUA Ltd. Dhanoli Ta.Mouda Dist. A3/1 5.094 NCB 9**/74 Nagpur Pch- Krushivikas WUA Ltd. Dhanoli Ta.Mouda Dist. A3/2 5.788 NCB 0.00 0.00 0.00 0.00 2.45 3.33 0.00 5.79 9**/74 Nagpur Pch- Shivshakti vikas Water User Association Ltd. 534 R2 5.867 NCB 1.467 2.934 1.467 5.867 9**/75 wayagaon Ta.Mouda Dist. Nagpur 2/24/2011 wua_prmpkg_r4 44 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Shivshakti WUA, Waigaon Tah.Mouda Dist- A2 5.787 NCB 0.00 0.00 0.00 1.79 2.43 1.56 0.00 5.79 9**/75 Nagpur Pch- Bhagyodya vikas Water User Association Ltd. 535 R2 6.762 NCB 1.691 3.381 1.691 6.762 9**/76 Wayagaon Ta.Mouda Dist. Nagpur Pch- Bhagyodaya WUA, Waigaon Ta-Mouda , Dist- A2 5.871 NCB 9**/76 Nagpur Pch- Bhagyodaya WUA, Waigaon Ta-Mouda , Dist- A2/1 6.144 NCB 0.00 0.00 0.00 1.02 2.67 2.46 0.00 6.14 9**/76 Nagpur Pch- Saibaba Water User Association Ltd. 536 R2 6.010 NCB 0.601 3.306 2.104 6.010 9**/77 Pimpalgaon Ta.Mouda Dist. Nagpur Pch- Saibaba WUA. Pimpalgaon Ta-Mauda, Dist- A2 5.046 NCB 0.00 0.00 0.00 0.00 3.76 1.29 0.00 5.05 9**/77 Nagpur Pch- Acharya Vinoba Bhave Water User Association 537 R2 3.687 NCB 0.922 1.844 0.922 3.687 9**/78 Ltd.Panjara Ta. Mohadi Dist. Bhandara Pch- Acharya Vinoba Bhave WUA. Panjara Ta- A2 3.515 NCB 9**/78 Mohadi, Dist-Bhandara Pch- Acharya Vinoba Bhave WUA. Panjara Ta- A2/1 3.595 NCB 0.00 0.00 0.00 0.52 1.78 1.29 0.00 3.60 9**/78 Mohadi, Dist-Bhandara Pch- Adarsh Water User Association Ltd. Bondri Ta. 538 R2 7.248 NCB 0.725 3.986 2.537 7.248 9**/79 Mohadi Dist. Bhandara Pch- Adarsh Water User Association Ltd. Bondri Ta. A2 5.685 NCB 0.00 0.00 0.00 0.00 1.90 3.79 0.00 5.69 9**/79 Mohadi Dist. Bhandara Pch- Jamb Water User Association Ltd. Jamb Ta. 539 R2 6.636 NCB 0.664 3.650 2.323 6.636 9**/80 Mohadi Dist. Bhandara Pch- Jamb WUA, Jamb Ta-Ta-Mohadi, Dist- A2 5.930 NCB 0.00 0.00 0.00 0.00 3.65 2.28 0.00 5.93 9**/80 Bhandara Pch- Chincholi Water User Association Ltd. 540 R2 7.420 NCB 0.742 4.081 2.597 7.420 9**/81 Chincholi Ta. Mohadi Dist. Bhandara Pch- Chincholi WUA Ltd. Chincholi Ta. Mohadi R3 5.957 NCB 2.383 3.574 5.96 9**/81 Dist. Bhandara Pch- Chincholi WUA Ltd. Chincholi Ta. Mohadi A3/1 5.957 NCB 9**/81 Dist. Bhandara Pch- Chincholi WUA Ltd. Chincholi Ta. Mohadi A3/2 6.862 NCB 0.00 0.00 0.00 0.00 1.37 3.66 1.83 6.86 9**/81 Dist. Bhandara Pch- Kandri Water User Association Ltd. Kandri Ta. 541 R2 1.967 NCB 0.197 1.082 0.688 1.967 9**/82 Mohadi Dist. Bhandara Pch- Kandri WUA, Kandri Ta-Mohadi, Dist- A2 2..208 NCB 9**/82 Bhandara 2/24/2011 wua_prmpkg_r4 45 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Kandri WUA, Kandri Ta-Mohadi, Dist- A2/1 2.306 NCB 0.00 0.00 0.00 0.80 0.73 0.78 0.00 2.31 9**/82 Bhandara Pch- Dhusala Water User Association Ltd. Dhusala 542 R2 7.526 NCB 0.753 4.139 2.634 7.526 9**/83 Ta. Mohadi Dist. Bhandara Pch- Dhusala WUA, Dhusala Ta-Mohadi, Dist- A2 5.861 NCB 0.00 0.00 0.00 0.00 2.40 3.46 0.00 5.86 9**/83 Bhandara Pch- Shivani Water User Association Ltd. Shivani 543 R2 5.851 NCB 1.463 2.926 1.463 5.851 9**/84 Ta. Mohadi Dist. Bhandara Pch- Shivani WUA, Shivani, Ta-Mohadi, Dist- A2 5.759 NCB 0.00 0.00 0.00 2.00 3.76 0.00 0.00 5.76 9**/84 Bhandara Pch- Jai Bajarang Water User Association Ltd. 544 R2 5.198 NCB 0.520 2.859 1.819 5.198 9**/85 Khairlanji Ta. Mohadi Dist. Bhandara Pch- Jai Bajaranga WUA. Khairalanji Ta-Mohadi, A2 5.184 NCB 0.00 0.00 0.00 0.00 2.88 2.31 0.00 5.18 9**/85 Dist-Bhandara Pch- Pragati Water User Association Ltd. Nawegaon 545 R2 3.281 NCB 0.328 1.805 1.148 3.281 9**/86 Ta. Mohadi Dist. Bhandara Pch- Pragati WUA, Navegaon Ta-Mohadi, Dist- A2 2.958 NCB 0.00 0.00 0.00 0.00 1.25 1.71 0.00 2.96 9**/86 Bhandara Pch- Shivganga Water User Association Ltd.Shiwani 546 R2 12.248 NCB 1.225 6.736 4.287 12.248 9**/87 Ta. Mohadi Dist. Bhandara Pch- Shivganga WUA Ltd.Shiwani Ta. Mohadi Dist. R3 11.891 NCB 4.757 7.135 11.89 9**/87 Bhandara Pch- Shivganga WUA Ltd.Shiwani Ta. Mohadi Dist. R4 10.296 NCB 2.06 4.12 4.12 10.30 9**/87 Bhandara Pch- Jai Ganesh Water User Association Ltd. 547 R2 5.551 NCB 1.388 2.776 1.388 5.551 9**/88 Wadegaon Ta. Mohadi Dist. Bhandara Pch- Jai Ganesh WUA, Wadegaon, Ta-Mohadi,Dist- A2 5.561 NCB 0.00 0.00 0.00 0.00 4.15 1.42 0.00 5.56 9**/88 Bhandara Pch- Shriram Water User Association Ltd.Sirsoli Ta. 548 R2 7.847 NCB 0.785 4.316 2.746 7.847 9**/89 Mohadi Dist. Bhandara Pch- Shriram WUA Ltd.Sirsoli Ta. Mohadi Dist. R3 8.738 NCB 3.50 5.24 8.74 9**/89 Bhandara Pch- Shriram WUA Ltd.Sirsoli Ta. Mohadi Dist. A3 9.432 NCB 0.00 0.00 0.00 0.00 3.13 6.30 0.00 9.43 9**/89 Bhandara Pch- Jaibajrang Water User Association Ltd. 549 R2 6.213 NCB 1.553 3.107 1.553 6.213 9**/90 Kanhalgaon Ta. Mohadi Dist. Bhandara Pch- Jai Bajarang WUA. Kanhalgaon Ta-Mohadi A2 6.143 NCB 0.00 0.00 0.00 0.00 4.01 2.14 0.00 6.14 9**/90 Dist-Bhandara 2/24/2011 wua_prmpkg_r4 46 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Adarsh Water User Association Ltd. Chichkheda 550 R2 3.996 NCB 0.999 1.998 0.999 3.996 9**/91 Ta. Mohadi Dist. Bhandara Pch- Adarsha WUA, Chichkheda Ta-Mouda , Dist- A2 3.808 NCB 9**/91 Nagpur Pch- Adarsha WUA, Chichkheda Ta-Mouda , Dist- A2/1 3.866 NCB 0.00 0.00 0.00 0.00 3.48 0.39 0.00 3.87 9**/91 Nagpur Pch- Akashganga Water User Association Ltd. 551 R2 4.127 NCB 1.032 2.064 1.032 4.127 9**/92 Morgaon Ta. Mohadi Dist. Bhandara Pch- Akashaganga WUA.Morgaon Ta-Mohadi Dist- A2 4.040 NCB 0.00 0.00 0.00 0.00 3.16 0.88 0.00 4.04 9**/92 Bhandara Pch- Surganga Water User Association Ltd. Pardi Ta. 552 R2 9.261 NCB 0.926 5.094 3.241 9.261 9**/93 Mohadi Dist. Bhandara Pch- Surganga WUA Ltd. Pardi Ta. Mohadi Dist. R3 8.920 NCB 3.568 5.352 8.92 9**/93 Bhandara Pch- Surganga WUA Ltd. Pardi Ta. Mohadi Dist. A3 9.674 NCB 0.00 0.00 0.00 0.00 5.61 4.06 0.00 9.67 9**/93 Bhandara Pch- Jaiganga Water User Association Ltd. Dahegaon 553 R2 6.205 NCB 1.551 3.103 1.551 6.205 9**/94 Ta. Mohadi Dist. Bhandara Pch- Jai Ganga WUA, Dahegaon Tah.Mohadi Dist- A2 6.060 NCB 0.00 0.00 0.00 0.99 3.90 1.17 0.00 6.06 9**/94 Bhandara Pch- Saibaba Water User Association Ltd. 554 R2 3.817 NCB 0.954 1.909 0.954 3.817 9**/95 Chorkhamari Ta. Mohadi Dist. Bhandara Pch- Saibaba WUA.Chorkhamari Ta-Mohadi, Dist- A2 3.697 NCB 0.00 0.00 0.00 0.00 1.92 1.78 0.00 3.70 9**/95 Bhandara Pch- Haritkranti Water User Association Ltd. 555 R2 6.080 NCB 1.520 3.040 1.520 6.080 9**/96 Mandesar Ta. Mohadi Dist. Bhandara Pch- Harit Kranti WUA, Mandesar Tah.Mohadi Dist- A2 6.062 NCB 0.00 0.00 0.00 0.00 3.17 2.90 0.00 6.06 9**/96 Bhandara Pch- Jaihanuman Water User Association Ltd. 556 R2 4.545 NCB 0.455 2.500 1.591 4.545 9**/97 Salebardi Ta. Mohadi Dist. Bhandara Pch- Jai Hanuman WUA.Salebardi Ta-Mohadi, Dist- A2 5.262 NCB 0.00 0.00 0.00 0.00 2.32 2.94 0.00 5.26 9**/97 Bhandara Pch- Jaikalyani Water User Association Ltd. Hardoli 557 R2 4.783 NCB 1.196 2.392 1.196 4.783 9**/98 Ta. Mohadi Dist. Bhandara Pch- Jan Kalyani WUA, Hardoli, Tah.Mohadi Dist- A2 4.788 NCB 0.00 0.00 0.00 0.44 1.92 2.42 0.00 4.79 9**/98 Bhandara Pch- Jiwandaini Water User Association Ltd. 558 R2 9.041 NCB 0.904 4.973 3.164 9.041 9**/99 Khutwari Ta. Mohadi Dist. Bhandara 2/24/2011 wua_prmpkg_r4 47 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pch- Jeevadayeeni WUA. Khutsaori Ta-Mohadi, Dist- A2 6.187 NCB 0.00 0.00 0.00 1.14 5.05 0.00 0.00 6.19 9**/99 Bhandara Pch- Shatrapati Shiwaji Water User Association Ltd. 559 R2 9.312 NCB 0.931 5.122 3.259 9.312 9**/100 Pandharabodi Ta. Mohadi Dist. Bhandara Pch- Shatrapati Shiwaji WUA Ltd. Pandharabodi Ta. R3 11.414 NCB 4.565 6.848 11.41 9**/100 Mohadi Dist. Bhandara Pch- Shatrapati Shiwaji WUA Ltd. Pandharabodi Ta. A3 11.671 NCB 2.33 6.22 3.12 11.67 9**/100 Mohadi Dist. Bhandara Pch- Jaishriram Water User Association Ltd. 560 R2 5.348 NCB 0.535 2.941 1.872 5.348 9**/101 Pandharabodi Ta. Mohadi Dist. Bhandara Pch- Jaishriram WUA Ltd. Pandharabodi Ta. Mohadi R3 6.203 NCB 2.481 3.722 6.20 9**/101 Dist. Bhandara Pch- Jaishriram WUA Ltd. Pandharabodi Ta. Mohadi A3 5.983 NCB 0.00 0.00 0.00 0.00 2.10 2.59 1.29 5.98 9**/101 Dist. Bhandara Pch- Water User Association Ltd. Khamari (buj) Ta. 561 R2 8.419 NCB 0.842 4.630 2.947 8.419 9**/102 Mohadi Dist. Bhandara Pch- Jaldhara WUA Ltd. Khamari (buj) Ta. Mohadi R3 9.986 NCB 3.994 5.992 9.99 9**/102 Dist. Bhandara Pch- Jaldhara WUA Ltd. Khamari (buj) Ta. Mohadi A3 11.535 NCB 0.00 0.00 0.00 0.00 7.91 3.63 0.00 11.54 9**/102 Dist. Bhandara Pch- Pimpalgaon Water User Association Ltd. 562 R2 6.562 NCB 0.656 3.609 2.297 6.562 9**/103 Pimpalgaon (Za) Ta. Mohadi Dist. Bhandara Pch- Pimpalgaon WUA Ltd. Pimpalgaon (Za) Ta. R3 8.642 NCB 3.457 5.185 8.64 9**/103 Mohadi Dist. Bhandara Pch- Pimpalgaon WUA Ltd. Pimpalgaon (Za) Ta. A3 9.975 NCB 0.00 0.00 0.00 0.00 6.98 3.00 0.00 9.98 9**/103 Mohadi Dist. Bhandara Pch- Boteshwar Water User Association Ltd. Rampur 563 R2 4.066 NCB 0.407 2.236 1.423 4.066 9**/104 Ta. Mohadi Dist. Bhandara Pch- Boteshewar WUA. Rampur Ta-Mohadi, Dist- A2 4.061 NCB 0.00 0.00 0.00 0.00 2.20 1.86 0.00 4.06 9**/104 Bhandara Pch- MAHADULA WUA MAHADULA Tah-Mouda R4 9**/105 Dist- Nagpur Pch- MAHADULA WUA MAHADULA Tah-Mouda A4 8.475 NCB 1.02 7.46 8.48 9**/105 Dist- Nagpur 3 Mula Mul-5** Rehabilation of minors (WUA level works -50 74.75 WUA 14.95 14.95 22.43 14.95 7.48 74.75 R Mul-5** Rehabilation of minors (WUA level works -50 74.75 WUA 11.21 26.16 33.64 3.74 74.75 2/24/2011 wua_prmpkg_r4 48 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Mul- Mahadeo Water User's Association, Sade, Tal. 564 R2 2.032 NCB 0.508 1.321 0.203 2.032 5**/1 Rahuri Mul- Rehabilitaion work of Minor 2 of MRBC A2 1.730 Shopping 0 0 0.00 0.61 0.00 1.12 0 1.73 5**/1 Mahadev WUA Sade Mul- Shri Ganesh Water User's Association, Umbare, 565 R2 1.900 NCB 0.475 0.950 0.475 1.900 5**/2 Tal. Rahuri Mul- Rehabilitaion work of Direct Minor 3 / of A2 1.540 Shopping 0 0 0.00 0.51 0.00 1.00 0 1.51 5**/2 MRBC Ganesh WUA Umbre Mul- Baliraja Water User's Association, Kondhavad, 566 R2 2.474 NCB 0.619 1.237 0.619 2.474 5**/3 Tal. Rahuri Mul- Rehabilitaion work of Sub 5, 6 And Tail Minor A2 2.120 NCB 0.00 0.00 0.00 0.99 0.00 1.13 0.00 2.12 5**/3 2 / Dy 1 / of MRBC Baliraja WUA Kondwad Mul- Krishidhan Water User's Association, Shilegaon, 567 R2 2.450 NCB 0.613 1.225 0.613 2.450 5**/4 Tal. Rahuri Mul- Rehabilitaion work of Minor 3 / Dy 1 / MRBC A2 2.190 NCB 0.00 0.00 0.00 0.84 0.00 1.35 0.00 2.19 5**/4 Krishidhan WUA Shilegaon Mul- Munjeshwar Water User's Association, Pimpri 568 R2 1.787 Shopping 0.447 1.162 0.179 1.787 5**/5 Avaghad, Tal. Rahuri Mul- Rehabilitaion work of OR1 to 4 & OL 1 to 2 A2 1.650 Shopping 0 0 0.00 0.49 0.00 1.16 0 1.65 5**/5 of MRBC Murjareshwar WUA Pimpari Mul- Bholenath Water User's Association, 569 R2 1.798 Shopping 0.450 1.169 0.180 1.798 5**/6 Kukkadvedhe, Tal. Rahuri Mul- Rehabilitaion work of D.O. 4, 5, 5A, and 6 of A2 1.570 Shopping 0.00 0.00 0.00 0.44 0.00 1.13 0.00 1.57 5**/6 MRBC Bholenath WUA Kukadvedhe Mul- Shivam Water User's Association, Kendal Bk., 570 R2 0.605 Shopping 0.151 0.393 0.061 0.605 5**/7 Tal. Rahuri Mul- Rehabilitaion work of Minor 3 / Dy 2 of A2 0.550 Shopping 0 0 0.00 0.41 0.00 0.14 0 0.55 5**/7 MRBC Shivam WUA Kendal Mul- Vaibhav Water User's Association, Kendal Kd., 571 R2 0.689 Shopping 0.172 0.448 0.069 0.689 5**/8 Tal. Rahuri Mul- Rehabilitaion work of Minor 2 / Dy 2 of A2 0.620 Shopping 0 0 0.00 0.41 0.00 0.21 0 0.62 5**/8 MRBC Vaibhav WUA Kendal Mul- Malganga Water User's Association, Umbare, 572 R2 1.055 Shopping 0.264 0.686 0.106 1.055 5**/9 Tal. Rahuri Mul- Rehabilitaion work of Do 7. 8, 9, / of MRBC A2 0.840 Shopping 0 0 0.00 0.37 0.34 0.13 0 0.84 5**/9 Malganga WUA Umbre Mul- Mauli Water User's Association, Bramhani, Tal. 573 R2 0.757 Shopping 0.189 0.492 0.076 0.757 5**/10 Rahuri 2/24/2011 wua_prmpkg_r4 49 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Mul- Rehabilitaion work of Do 10, 11 of MRBC A2 0.690 Shopping 0 0 0.00 0.00 0.65 0.05 0 0.70 5**/10 Mauli WUA Brahmni Mul- Shri Swami Samarth Water User's Association, 574 R2 0.924 Shopping 0.231 0.601 0.092 0.924 5**/11 Vanjarwadi, Tal. Newasa Mul- Rehabilitaion work of Do 3 to 14 of MRBC A2 0.830 Shopping 0 0 0.00 0.00 0.30 0.53 0 0.83 5**/11 Swami Samarth WUA Brahmni Mul- Renuka Water User's Association, Brahmani, 575 R2 1.778 Shopping 0.445 1.156 0.178 1.778 5**/12 Tal. Rahuri Mul- Rehabilitaion work of Direct Minor 4 of MRBC A2 1.610 Shopping 0 0 0.00 0.50 0.00 1.11 0 1.61 5**/12 Renuka Mata WUA Brahamni Mul- Shri Paramanand Water User's Association, 576 R2 0.816 Shopping 0.204 0.530 0.082 0.816 5**/13 Khedle Paramanand, Tal. Newasa Mul- Rehabilitaion work of Direct Minor 4 to Tail A2 0.720 Shopping 0 0 0.00 0.34 0.28 0.10 0 0.72 5**/13 MRBC Paramanand WUA Khedle pramanand Mul- Yashavant Water User's Association, 577 R2 2.461 NCB 0.615 1.231 0.615 2.461 5**/14 Vanjarwadi, Tal. Newasa Mul- Rehabilitaion work of Direct Monor 5/ MRBC A2 2.300 NCB 0.00 0.00 0.00 0.00 0.85 1.45 0.00 2.30 5**/14 Yashwant WUA Wanjarwadi Mul- Veerbhadra Water User's Association, Kendal 578 R2 0.615 Shopping 0.215 0.400 0.615 5**/15 Bk., Tal. Rahuri Mul- Rehabilitaion work of Minor 1 Dy 2 of MRBC A2 0.520 Shopping 0 0 0.00 0.25 0.00 0.20 0 0.45 5**/15 Virbhadra WUA Kendal Mul- Shriram Water User's Association, Umbare, Tal. 579 R2 2.191 NCB 0.548 1.096 0.548 2.191 5**/16 Rahuri Mul- Rehabilitaion work of OL 1 to 6 / Dy 2 / MRBC A2 1.880 NCB 0.00 0.00 0.00 0.99 0.00 0.89 0.00 1.88 5**/16 Shriram WUA Brahmni Mul- Shri Dnyaneshwar Water User's Association, 580 R2 1.612 Shopping 0.403 1.048 0.161 1.612 5**/17 Kendal Bk. , Tal.Rahuri Rehabilitaion work of Do 6 AL, 7L, To 9L & Mul- A2 3AL Dy 2 of MRBC Dnyaneshwar WUA 1.490 Shopping 0 0 0.00 0.00 1.40 0.09 0 1.49 5**/17 Kendal Mul- Hanuman Water User's Association, Kendal Kd., 581 R2 1.619 Shopping 0.405 1.052 0.162 1.619 5**/18 Tal. Rahuri Mul- Rehabilitaion work of OL AR1 , OL10, OL Tail A2 1.500 Shopping 0 0 0.00 0.95 0.00 0.55 0 1.50 5**/18 10 R Dy 2 of MRBC Hanuman WUA Kendal Mul- Ramkrishna Water User's Association, 582 R2 1.326 Shopping 0.332 0.862 0.133 1.326 5**/19 Gonegaon, Tal. Newasa 2/24/2011 wua_prmpkg_r4 50 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Mul- Rehabilitaion work of Minor 4 of Dy 3 / MRBC A2 1.190 Shopping 0 0 0.00 0.98 0.00 0.20 0 1.18 5**/19 Ramkrishna WUA Gonegaon Mul- Ganesh Water User's Association, Brahmani, 583 R2 0.95 Shopping 0.238 0.618 0.095 0.950 5**/20 Tal. Rahuri Mul- Rehabilitaion work of SM 3L, 4LA, 5L Dy 3 of A2 0.840 Shopping 0 0 0.00 0.46 0.00 0.38 0 0.84 5**/20 MRBC Ganesh WUA Brahamni Mul- Yogeshwar Water User's Association, Brahmani, 584 R2 1.204 Shopping 0.301 0.783 0.120 1.204 5**/21 Tal. Rahuri Mul- Rehabilitaion work of Minor 2 Dy 3 of MRBC A2 1.060 Shopping 0 0 0.00 0.70 0.00 0.36 0 1.06 5**/21 Yogeshwar WUA Brhamni Mul- Gurudatta Water User's Association, Brahmani, 585 R2 1.158 Shopping 0.290 0.753 0.116 1.158 5**/22 Tal. Rahuri Mul- Rehabilitaion work of SM 3 R, 5LA 6L / Dy 3 A2 1.040 Shopping 0 0 0.00 0.70 0.00 0.34 0 1.04 5**/22 of MRBC Gurudatta WUA Brahamni Mul- Shriram Water User's Association, Brahmani, 586 R2 1.568 Shopping 0.392 1.019 0.157 1.568 5**/23 Tal. Rahuri Mul- Rehabilitaion work of SubMnor 4R, AR, 5R Dy A2 1.250 Shopping 0 0 0.00 0.00 0.00 1.25 0 1.25 5**/23 3I of MRBC Shriram WUA Branmni Mul- Narayangiri Water User's Association, Pimpri 587 R2 1.154 Shopping 0.289 0.750 0.115 1.154 5**/24 Valan, Tal. Rahuri Mul- Rehabilitaion work of D.O. 8 to 10 / Dy 3 of A2 1.060 Shopping 0 0 0.00 0.34 0.24 0.48 0 1.06 5**/24 MRBC Narayangiri WUA Pimpari Mul- Chandragiri Water User's Association, Panegaon, 588 R2 0.74 Shopping 0.185 0.481 0.074 0.740 5**/25 Tal. Newasa Mul- Rehabilitaion work of SM 13L / Dy 3 of MRBC A2 0.510 Shopping 0 0 0.00 0.00 0.48 0.05 0 0.53 5**/25 Chandragiri WUA Panegaon Mul- Jagdamba Water User's Association, Bramhani, 589 R2 1.483 Shopping 0.371 0.964 0.148 1.483 5**/26 Tal. Rahuri Rehabilitaion work of Minor 1 / SM 1L, 2L, Mul- A2 1R, 2R Dy 3 of MRBC Jagdamba WUA 1.360 Shopping 0 0 0.00 0.74 0.11 0.51 0 1.36 5**/26 Brahmani Mul- Panegaon Water User's Association, Panegaon, 590 R2 0.888 Shopping 0.222 0.577 0.089 0.888 5**/27 Tal. Newasa Mul- Rehabilitaion work of Sub Minor 14L to 15L / A2 0.740 Shopping 0 0 0.00 0.35 0.00 0.40 0 0.75 5**/27 Dy 3 / of MRBC Panegaon WUA Panegaon Mul- Rajbaksha Water User's Association, Khedle 591 R2 2.497 NCB 0.624 1.249 0.624 2.497 5**/28 Paramanand, Tal. Newasa 2/24/2011 wua_prmpkg_r4 51 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitaion work of Sub Minor 14L, 15L / Dy Mul- A2 3 of MRBC Rajbaksha WUA Khedle 2.050 NCB 0.00 0.00 0.00 0.91 0.16 0.98 0.00 2.05 5**/28 Paramanand Mul- Jay Bhavani Water User's Association, Khedle 592 R2 1.502 Shopping 0.526 0.976 1.502 5**/29 Paramanand , Tal. Newasa Mul- Rehabilitaion work of Minor 3R / Dy 3 of A2 1.310 Shopping 0 0 0.00 0.90 0.29 0.12 0 1.31 5**/29 MRBC Jaibhavani WUA Kendal Mul- Kanifnath Water User's Association, Pimpri 593 R2 0.749 Shopping 0.187 0.487 0.075 0.749 5**/30 Valan, Tal. Rahuri Mul- Rehabilitaion work of Minor 1 L & SM 7/ Dy 3 A2 0.670 Shopping 0 0 0.00 0.00 0.21 0.46 0 0.67 5**/30 of MRBC Kanifnath WUA Pimpari Mul- Sadichha Water User's Association, Karajgaon, 594 R2 1.373 Shopping 0.343 0.892 0.137 1.373 5**/31 Tal. Newasa Mul- Rehabilitaion work of S.M. 10 R to 12 R / Dy 3 A2 1.070 Shopping 0 0 0.00 0.00 0.53 0.54 0 1.07 5**/31 of MRBC Sadiccha WUA Karajgaon Mul- Bheiravnath Water User's Association, Amalner, 595 R2 1.01 Shopping 0.253 0.657 0.101 1.010 5**/32 Tal. Newasa Mul- Rehabilitaion work of SM 13L to 14L / Dy 3 of A2 1.130 Shopping 0 0 0.00 0.00 0.60 0.53 0 1.13 5**/32 MRBC Bhairavanath WUA Amalner Mul- Nimbhari Water User's Association, Nimbhari, 596 R2 2.27 NCB 0.568 1.135 0.568 2.270 5**/33 Tal. Newasa Mul- Rehabilitaion work of Sub Minor 21, 22, 23 L & A2 1.890 NCB 0 0 0.00 0.96 0.00 1.03 0 1.99 5**/33 16 r Dy 3 of MRBC Nibhari WUA Nimbhari Mul- Gajanan Water User's Association, Karajgaon, 597 R2 0.79 Shopping 0.198 0.514 0.079 0.790 5**/34 Tal. Newasa Mul- Rehabilitaion work of Sub Minor 1L to 18L / Dy A2 0.640 Shopping 0 0 0.00 0.18 0.00 0.46 0 0.64 5**/34 3 of MRBC Gajanan WUA Karajgaon Mul- Pandurang Water User's Association, Amalner, 598 R2 0.935 Shopping 0.234 0.608 0.094 0.935 5**/35 Tal. Newasa Mul- Rehabilitaion work of SM 19L, 20L / Dy 3 of A2 0.750 Shopping 0 0 0.00 0.00 0.44 0.35 0 0.79 5**/35 MRBC Pandurang WUA Amalner Mul- Sant Dnyneshwar Water User's Association, 599 R2 2.12 NCB 0.530 1.060 0.530 2.120 5**/36 Gonegaon, Tal. Newasa Mul- Rehabilitaion work of SM 14 L to 25 L / Dy 3 of A2 1.660 Shopping 0 0 0.00 1.04 0.00 0.62 0 1.66 5**/36 MRBC Sant Dnyaneshwar WUA Gonegaon Mul- Navnath Water User's Association, Bhaygaon, 600 R2 1.004 Shopping 0.251 0.653 0.100 1.004 5**/37 Tal. Shevgaon 2/24/2011 wua_prmpkg_r4 52 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Mul- Rehabilitaion work of Tail Minor / Dy 1 / of A2 0.910 Shopping 0 0 0.00 0.43 0.00 0.45 0 0.88 5**/37 Br.II of MRBC Navnath WUA Bhaigaon Mul- Dnyaneshwar Water User's Association, 601 R2 1.394 Shopping 0.349 0.906 0.139 1.394 5**/38 Bhaygaon, Tal.Shevgaon Mul- Rehabilitaion work of Tail Minor / Dy I / Br. II A2 1.290 Shopping 0.00 0.00 0.00 0.62 0.52 0.15 0.00 1.29 5**/38 of MRBC Dnyaneshwar WUA Bhaigaon Mul- Pragat Bagayatdar Water User's Association, 602 R2 2.266 NCB 0.567 1.133 0.567 2.266 5**/39 Kukana, Tal. Newasa Rehabilitaion work of Minor 1,2, and D.O. 2 L / Mul- A2 Dy 1 / Br. II of MRBC Pragat Bagayatdar WUA 2.120 NCB 0.00 0.00 0.00 1.17 1.04 0.00 0.00 2.21 5**/39 Kukana Mul- Datta Digambar Water User's Association, 603 R2 2.731 NCB 0.683 1.366 0.683 2.731 5**/40 Chilekhanwadi, Tal. Shevgaon Mul- Rehabilitaion work of Minor 5 / Dy 1 / Br. II / A2 2.220 NCB 0.00 0.00 0.00 1.80 0.29 0.13 0.00 2.22 5**/40 MRBC Datta Digambar WUA Chilekhanwadi Mul- Nageshwar Water User's Association, Bhenda 604 R2 1.702 Shopping 0.426 1.106 0.170 1.702 5**/41 Bk., Tal. Newasa Mul- Rehabilitaion work of Do. 8 Branch II MRBC R3 1.60 Shopping 0.800 0.800 1.60 5**/41 Nageshwar WUA Bhenda Rehabilitation And Modernization works to Mul- A3 Direct Out 8 Branch II M. R. B. C. 1.40 Shopping 0 0 0.00 0.00 0.00 1.40 0 1.40 5**/41 (Nageshwar WUA Bhenda Tal. Newasa) Mul- Nath Water User's Association, Kukana, Tal. 605 R2 1.498 Shopping 0.375 0.974 0.150 1.498 5**/42 Newasa Mul- Rehabilitaion work of DO.5 L to 7 L/ Dy 1 / A2 1.020 Shopping 0 0 0.00 0.41 0.00 0.61 0 1.02 5**/42 Br.II of MRBC Nath WUA Kukana Mul- Kulaswamini Water User's Association, Jeur 606 R2 1.067 Shopping 0.267 0.694 0.107 1.067 5**/43 (Haibati), Tal. Newasa Mul- Rehabilitaion work of Minor 3 Dy 1 fo Br. II of A2 0.810 Shopping 0.00 0.00 0.00 0.45 0.30 0.00 0.00 0.75 5**/43 MRBC Kulswamini WUA Jeur Mul- Niyamat Baba Water User's Association, 607 R2 0.695 Shopping 0.174 0.452 0.070 0.695 5**/44 Kukana, Tal.Newasa Mul- Rehabilitaion work of D.O. 2L to 4L / Dy 1 of A2 0.700 Shopping 0 0 0.00 0.53 0.00 0.17 0 0.70 5**/44 Br.II of MRBC Nyamat baba WUA Kukana Mul- Pawan Hanuman Water User's Association, Jeur 608 R2 1.491 Shopping 0.373 0.969 0.149 1.491 5**/45 (Haibati), Tal. Newasa 2/24/2011 wua_prmpkg_r4 53 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitaion work of Minor 4 DO R 7 to 9 Dy Mul- A2 1 Br. II of MRBC Pawan Hanuman 1.150 Shopping 0.00 0.00 0.00 0.00 1.11 0.00 0.00 1.11 5**/45 WUA Jeur Mul- Shiv Shankar Water User's Association, Jeur 609 R2 1.59 Shopping 0.398 1.034 0.159 1.590 5**/46 (Haibati), Tal. Newasa Mul- Rehabilitaion work of Minor I Br. II of MRBC A2 1.330 Shopping 0.00 0.00 0.00 0.43 0.88 0.00 0.00 1.31 5**/46 Shivshankar WUA Jeur Mul- Har Har Mahadeo Water User's Association, 610 R2 1.641 Shopping 0.410 1.067 0.164 1.641 5**/47 Taravadi, Tal. Newasa Mul- Rehabilitaion work of Minor 2 / of Br. II of A2 1.470 Shopping 0 0 0.00 0.47 0.00 1.00 0 1.47 5**/47 MRBC Harhar Mahadeo WUA Tarwadi Mul- Pandurang Water User's Association, Bhenda 611 R2 1.005 Shopping 0.251 0.653 0.101 1.005 5**/48 Kd., Tal. Newasa Mul- Rehabilitaion work of D.O. 4 to 17 of Br. II of A2 0.960 Shopping 0 0 0.00 0.45 0.00 0.55 0 1.00 5**/48 MRBC Pandurang WUA Bhenda Mul- Ganaraya Water User's Association, Tarawadi , 612 R2 1.372 Shopping 0.343 0.892 0.137 1.372 5**/49 Tal.Newasa Mul- Rehabilitaion work of DO 18 to 20 of Br. II of A2 1.290 Shopping 0 0 0.00 0.63 0.68 0.00 0 1.31 5**/49 MRBC Ganarya WUA Tarwadi Mul- Marutrao Ghule Patil Water User's Association, 613 R2 1.835 NCB 0.459 0.918 0.459 1.835 5**/50 Deogaon, Tal.Newasa Rehabilitaion work of Do 1R to 5R Dy 1 / of Br. Mul- A2 II of MRBC Maurtrao Ghule Patil WUA 1.400 Shopping 0 0 0.00 0.46 0.61 0.33 0 1.40 5**/50 Deogaon Mul- Balaji Water User's Association, Dedgaon, Tal. 614 R2 2.216 NCB 0.554 1.108 0.554 2.216 5**/51 Newasa Mul- Rehabilitaion work of D.O. 1 to 5 / Br. II of A2 2.100 NCB 0.00 0.00 0.00 1.04 0.83 0.00 0.00 1.87 5**/51 MRBC Balaji WUA Dedgaon Mul- Vishvanath Water User's Association, Jeur 615 R2 1.028 Shopping 0.257 0.668 0.103 1.028 5**/52 (Haibati), Tal. Newasa Mul- Rehabilitaion work of Sub Minor I Br. II of A2 0.810 Shopping 0.00 0.00 0.00 0.00 0.85 0.00 0.00 0.85 5**/52 MRBC Vishwanath WUA Jeur Mul- Shri Ram Water User's Association, Deogaon, 616 R2 1.268 Shopping 0.317 0.824 0.127 1.268 5**/53 Tal. Newasa Mul- Rehabilitaion work of Do 6 to 7 of Br. II of A2 1.200 Shopping 0 0 0.00 0.92 0.18 0.00 0 1.10 5**/53 MRBC Shriram WUA Degaon Mul- Dakshinmukhi Maruti Water User's Association, 617 R2 1.649 Shopping 0.412 1.072 0.165 1.649 5**/54 Bhenda Bk, Tal. Newasa 2/24/2011 wua_prmpkg_r4 54 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Mul- Rehabilitaion work of D.O. 9 to 13 of Bt. II og A2 1.580 Shopping 0.00 0.00 0.00 0.00 1.13 0.45 0.00 1.58 5**/54 MRBC Dakshinmukhi Maruti WUA Bhenda Mul- Rameshwar Water User's Association, Bhaygaon, 618 R2 1.355 Shopping 0.339 0.881 0.136 1.355 5**/55 Tal. Shevgaon Mul- Rehabilitaion work of Minor 4, D.O. 8, 9, 10 A2 1.350 Shopping 0.00 0.00 0.00 0.68 0.68 0.00 0.00 1.36 5**/55 of Br. II of MRBC Rameshwar WUA Bhaigaon Mul- Jay Malhar Water User's Association, Deo Takali 619 R2 1.84 NCB 0.460 0.920 0.460 1.840 5**/56 , Tal. Shevgaon Mul- Rehabilitaion work of Dy 4 Branch II MRBC R3 1.74 Shopping 0.261 0.957 0.522 1.74 5**/56 Jai Malhar WUA Deo Takali Rehabilitation And Modernization works Dy 4 Mul- A3 Branch II M. R. B. C. 1.48 Shopping 0 0 0.00 0.00 0.54 0.94 0 1.48 5**/56 ( Jai Malhar WUA Deotakali) Mul- Bheiravanath Water User's Association, 620 R2 2.14 NCB 0.535 1.070 0.535 2.140 5**/57 Bakhatarpur, Tal. Shevgaon Mul- Rehabilitaion work of Minor 6 / Dy 4 Br. II of A2 2.030 NCB 0 0 0.00 1.13 0.90 0.00 0 2.03 5**/57 MRBC Bhairavnath WUA Bakhatarpur Mul- Jijamata Water User's Association, Vadule, Tal. 621 R2 1.057 Shopping 0.264 0.687 0.106 1.057 5**/58 Newasa Mul- Rehabilitaion work of Minor 3 / D.O.R. 7,4, 5, / A2 1.060 Shopping 0.00 0.00 0.00 0.41 0.35 0.30 0.00 1.06 5**/58 Dy 4 of Br. II of MRBC Jijamata WUA Vadule Mul- Sanjeevani Water User's Association, Shahar 622 R2 2.178 NCB 0.545 1.089 0.545 2.178 5**/59 Takali, Tal. Shevgaon Mul- Rehabilitaion work of Sub Minor 2 / Dy 2 / Br. A2 2.120 NCB 0.00 0.00 0.00 1.17 0.56 0.38 0.00 2.11 5**/59 II of MRBC Sanjivani WUA Shahar Takali Mul- Gayatri Water User's Association, Vadule, Tal. 623 R2 1.18 Shopping 0.295 0.767 0.118 1.180 5**/60 Newasa Mul- Rehabilitaion work of Minor 2, D.O.R 6 / Dy 4 A2 1.120 Shopping 0 0 0.00 0.46 0.00 0.80 0 1.26 5**/60 of Br. II of MRBC Gayatree WUA Vadule Mul- Shiv Krupa Water User's Association, Deo 624 R2 1.427 Shopping 0.357 0.928 0.143 1.427 5**/61 Takali, Tal. Shevgaon Mul- Rehabilitaion work of Minor 5 Dy 4 Branch II R3 1.34 Shopping 0.670 0.485 1.16 5**/61 MRBC Shivkrupa WUA Deo Takali 2/24/2011 wua_prmpkg_r4 55 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation And Modernization worksMinor Mul- A3 5/1 / Minor 5 Dy 4 / Branch II M. R. B. C. 1.10 Shopping 0 0 0.00 0.00 0.46 0.64 0 1.10 5**/61 ( Shivkripa WUADeotakali ) Mul- Savitribai Phule Water User's Association, 625 R2 0.878 Shopping 0.220 0.571 0.088 0.878 5**/62 Taravadi, Tal. Newasa Mul- Rehabilitaion work of Minor 4 of Br. II of A2 1.060 Shopping 0.00 0.00 0.00 0.54 0.30 0.00 0.00 0.84 5**/62 MRBC Savitribai Phule WUA Tarwadi Mul- Kal Bheirav Water User's Association, Sultanpur, 626 R2 0.721 Shopping 0.180 0.469 0.072 0.721 5**/63 Tal. Newasa Mul- Rehabilitaion work of D.O. 21 to 22 of Br. II A2 0.670 Shopping 0.00 0.00 0.00 0.00 0.66 0.00 0.00 0.66 5**/63 of MRBC Kalbhairav WUA Sultanpur Mul- Savanta Maharaj Water User's Association, 627 R2 0.643 Shopping 0.161 0.418 0.064 0.643 5**/64 Taravadi, Tal. Newasa Mul- Rehabilitaion work of Minor 3 / Dy 4 / Br. II of A2 0.610 Shopping 0 0 0.00 0.46 0.16 0.00 0 0.62 5**/64 MRBC Sawata Maharaj WUA Tarwadi Mul- Siddhi Vinayak Water User's Association, 628 R2 1.247 Shopping 0.312 0.811 0.125 1.247 5**/65 Patharwala, Tal. Newasa Rehabilitaion work of Minor 5/ Minor II of Mul- A2 MRBC Sidhivinayak 1.080 Shopping 0.00 0.00 0.00 0.48 0.56 0.00 0.00 1.04 5**/65 WUA Pahtarwala Mul- Hari Om Water User's Association, Majale 629 R2 1.302 Shopping 0.326 0.846 0.130 1.302 5**/66 Shahar, Tal. Shevgaon Mul- Rehabilitaion work of Minor 5 / Dy 4 of Br. II A2 1.240 Shopping 0 0 0.00 0.00 0.58 0.66 0 1.24 5**/66 of MRBC Hari Om WUA Majale Shahar Mul- Maha Rudra Water User's Association, Shahar 630 R2 2.205 NCB 0.551 1.103 0.551 2.205 5**/67 Takali, Tal. Shevgaon Mul- Rehabilitaion work of Minor 5 / Dy 4 / Br. II of A2 2.090 NCB 0.00 0.00 0.00 1.00 1.16 0.00 0.00 2.16 5**/67 MRBC Maharudra WUA Shahar Takali Mul- Durga Mata Water User's Association, Sukali, 631 R2 1.026 Shopping 0.257 0.667 0.103 1.026 5**/68 Tal. Newasa Mul- Rehabilitaion work of Minor 1/1 Dy 4 of Br. II A2 0.980 Shopping 0.00 0.00 0.00 0.37 0.63 0.00 0.00 1.00 5**/68 of MRBC Durgamata WUA Sukali Mul- Muktai Water User's Association, Sultanpur, Tal. 632 R2 0.814 Shopping 0.204 0.529 0.081 0.814 5**/69 Shevgaon Mul- Rehabilitaion work of Minor 1 Dy 4 Branch II R3 0.74 Shopping 0.370 0.370 0.74 5**/69 MRBC Muktaii WUA Sultanpur 2/24/2011 wua_prmpkg_r4 56 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation And Modernization works / Minor Mul- A3 1 / Dy 4 Branch II M. R. B. C. 0.63 Shopping 0 0 0.00 0.00 0.00 0.63 0 0.63 5**/69 ( Muktai WUA Sultanpur ) Mul- Bhayanath Baba Water User's Association, 633 R2 1.341 Shopping 0.335 0.872 0.134 1.341 5**/70 Nandur Shikari, Tal.Newasa Mul- Rehabilitaion work of Minor 1 / Dy 4 / of Br. II A2 1.270 Shopping 0.00 0.00 0.00 0.60 0.52 0.15 0.00 1.27 5**/70 of MRBC BhainathBaba WUA Nandur Shikari Mul- Shamindar Baba Water User's Association, 634 R2 2.121 NCB 0.530 1.061 0.530 2.121 5**/71 Antarvali, Tal. Newasa Mul- Rehabilitaion work of Minor 4, Minor 4/1 / Br. A2 1.980 NCB 0.00 0.00 0.00 0.00 0.81 1.16 0.00 1.97 5**/71 II of MRBC Shaminder Baba WUA Autarwadi Mul- Someshwar Water User's Association, Nandur 635 R2 1.332 Shopping 0.333 0.866 0.133 1.332 5**/72 Shikari, Tal. Newasa Rehabilitaion work of D.O. OL1, OL3, OR 1 to Mul- A2 OR 5 / Dy 4 of Br. II of MRBC Someshwar 1.160 Shopping 0.00 0.00 0.00 0.52 0.00 0.64 0.00 1.16 5**/72 WUA Nandur Shikari Mul- Jay Bajarang Water User's Association, 636 R2 0.472 Shopping 0.118 0.307 0.047 0.472 5**/73 Goyegavhan, Tal. Newasa Rehabilitaion work of D.O. L 8 to 9, Tail and Mul- A2 Minor 1/1 of Minor 1 / Dy 2 of Br. II of MRBC 1.480 Shopping 0 0 0.00 0.67 0.00 0.61 0 1.28 5**/73 Jay Bajrang WUA Gonegaon Mul- Jay Khanderay Water User's Association, 637 R2 0.426 Shopping 0.107 0.277 0.043 0.426 5**/74 Wakadi, Tal. Newasa Rehabilitaion work of D.O. L 7 to Tail / Minor 1 Mul- A2 / Dy 2 of Br.II of MRBC Jay Khanderay 0.800 Shopping 0.00 0.00 0.00 0.49 0.00 0.50 0.00 0.99 5**/74 WUA Wakdi Mul- Jagdamba Water User's Association, Wakadi , 638 R2 1.921 NCB 0.480 0.961 0.480 1.921 5**/75 Tal. Newasa Mul- Rehabilitaion work of Sub Minor 2 / Dy 2 / Br. A2 2.540 NCB 0.00 0.00 0.00 1.25 0.90 0.39 0.00 2.54 5**/75 II of MRBC Jagdamba WUA Wakadi Mul- Gurukripa Water User's Association, Gidegaon, 639 R2 1.529 Shopping 0.382 0.994 0.153 1.529 5**/76 Tal. Newasa Rehabilitaion work of Sub Minor / D.O. / Minor Mul- A2 2 / Dy 2 of Br. II of MRBC Gurukripa WUA 1.410 Shopping 0.00 0.00 0.00 0.62 0.54 0.25 0.00 1.41 5**/76 Gidegaon Mul- Krishi Bhushan Water User's Association, 640 R2 0.844 Shopping 0.211 0.549 0.084 0.844 5**/77 Sultanpur, Tal. Newasa 2/24/2011 wua_prmpkg_r4 57 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitaion work of D.O. R 1 to R 4 / Minor 1 Mul- A2 Dy 2 of Br.II of MRBC Krishibhushan WUA 1.100 Shopping 0.00 0.00 0.00 0.42 0.54 0.14 0.00 1.10 5**/77 Sultanpur Mul- Shri Swami Samarth Water User's Association, 641 R2 0.923 Shopping 0.231 0.600 0.092 0.923 5**/78 Patharwala, Tal. Newasa Rehabilitaion work of DO R5 to R7 Minor 1 Dy Mul- A2 2 of Br. II of MRBC Swami Samarth WUA 1.180 Shopping 0 0 0.00 0.60 0.00 0.58 0 1.18 5**/78 Patharwala Mul- Veerbhadra Water User's Association, Georai, 642 R2 1.355 Shopping 0.339 0.881 0.136 1.355 5**/79 Tal. Newasa Mul- Rehabilitaion work of Minor 1 Dy 2 Branch II R3 1.22 Shopping 0.610 0.610 1.22 5**/79 MRBC VirBhadra WUA Gevarai Rehabilitation And Modernization works / Do l Mul- A3 to Do L6 / Minor 1/ Branch II M. R. B. C. 1.02 Shopping 0 0 0.00 0.00 0.00 1.02 0 1.02 5**/79 ( Virbhadra WUA Gavarai ) Mul- Ambika Water User's Association, Shirasgaon, 643 R2 1.823 Shopping 0.456 1.185 0.182 1.823 5**/80 Tal. Newasa Rehabilitaion work of Minor 2 Dy 2 Br. II of Mul- A2 MRBC Ambika WUA 1.500 Shopping 0.00 0.00 0.00 0.67 0.50 0.33 0.00 1.50 5**/80 Shirasgaon Mul- Jay Jagdamba Water User's Association, 644 R2 1.696 Shopping 0.424 1.102 0.170 1.696 5**/81 Shirasgaon, Tal. Newasa Rehabilitaion work of S. M. 4 / O R - 10 Minor Mul- A2 2 dy 2 Br. II of MRBC Jay Jagdamba WUA 1.490 Shopping 0.00 0.00 0.00 0.60 0.63 0.26 0.00 1.49 5**/81 Shirasgaon Mul- Jay Hanuman Water User's Association, 645 R2 1.564 Shopping 0.391 1.017 0.156 1.564 5**/82 Gopalpur, Tal. Newasa Mul- Rehabilitaion work of Minor 1 / Dy 2 of Br. II A2 1.420 Shopping 0 0 0.00 0.72 0.00 0.70 0 1.42 5**/82 of MRBC Jay Hanuman WUA Gopalpur Mul- Rameshwar Water User's Association, Ramdoho, 646 R2 1.394 Shopping 0.349 0.906 0.139 1.394 5**/83 Tal. Newasa Mul- Rehabilitaion work of Minor 2 / SM 6 / Dy 2 of A2 1.170 Shopping 0 0 0.00 0.00 1.15 0.02 0 1.17 5**/83 Br. II of MRBC Rameshwar WUA Ramdoh Mul- Mahalaxmi Water User's Association, Varkhed, 647 R2 2.444 NCB 0.611 1.222 0.611 2.444 5**/84 Tal. Newasa Mul- Rehabilitaion work of Minor 2 / OL 8 to 14 / Dy A2 2.280 NCB 0.00 0.00 0.00 0.00 1.02 1.25 0.00 2.27 5**/84 2 / Br. II MRBC Mahalaxmi WUA Warkhed 2/24/2011 wua_prmpkg_r4 58 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Mul- Shri Krishna Water User's Association, Georai, 648 R2 1.654 Shopping 0.414 1.075 0.165 1.654 5**/85 Tal. Newasa Rehabilitaion work of OL 1, 2, OR 1 to 4 / Minor Mul- A2 2 / Dy 2 of Br. II of MRBC Shrikrishna WUA 1.550 Shopping 0.00 0.00 0.00 0.57 0.60 0.38 0.00 1.55 5**/85 Georai Mul- Savanta Krupa Water User's Association, Najik 649 R2 1.887 NCB 0.472 0.944 0.472 1.887 5**/86 Chincholi, Tal. Newasa Mul- Rehabilitaion work of 9 - M 1 Dy 2 of Br. II A2 1.750 Shopping 0 0 0.00 0.95 0.52 0.28 0 1.75 5**/86 of MRBC Sawata Kripa WUA Najik Chincholi Mul- Kanifnath Water User's Association, Georai, Tal. 650 R2 1.054 Shopping 0.264 0.685 0.105 1.054 5**/87 Newasa Mul- Rehabilitaion work of OR1, OR7 / DY2 / of A2 0.960 Shopping 0 0 0.00 0.40 0.45 0.10 0 0.95 5**/87 Br.II of MRBC Kanifnath WUA Georai Mul- Jay Durga Mata Water User's Association, Dighi, 651 R2 1.216 Shopping 0.304 0.790 0.122 1.216 5**/88 Tal. Newasa Mul- Rehabilitaion work of SM OL2 to OL5 / Dy 2 A2 1.130 Shopping 0 0 0.00 0.42 0.00 0.70 0 1.12 5**/88 of Br. II of MRBC Jay Durga WUA Dighi Mul- Somnath Water User's Association, Georai, Tal. 652 R2 1.264 Shopping 0.316 0.822 0.126 1.264 5**/89 Newasa Mul- Rehabilitaion work of Outlet 8 & 10 Dy 2 R3 1.15 Shopping 0.575 0.575 1.15 5**/89 Branch II MRBC Somnath WUA Gevrai Rehabilitation And Modernization works OR 8 Mul- A3 to OR10 / Dy 2 / Branch II M. R. B. C. ( 0.93 Shopping 0 0 0.00 0.00 0.00 0.93 0 0.93 5**/89 Somnath WUA Gevrai ) Mul- Yashvant Water User's Association, Salabatpur, 653 R2 2.988 NCB 0.747 1.494 0.747 2.988 5**/90 Tal. Newasa Mul- Rehabilitaion work Minor 3 / Dy 2/ Br. II of A2 2.290 NCB 0.00 0.00 0.00 0.00 0.00 2.29 0.00 2.29 5**/90 MRBC Yashwant WUA Sultanpur Mul- Gangagiri Water User's Association, Gogalgaon, 654 R2 2.497 NCB 0.624 1.249 0.624 2.497 5**/91 Tal. Newasa Mul- Rehabilitaion work of Minor 4 Dy 2 Branch II R3 1.69 Shopping 0.845 0.845 1.69 5**/91 MRBC Gangagiri WUA Gogalgaon Rehabilitation And Modernization works Minor Mul- A3 4 / Dy 2 Branch II M. R. B. C. 1.36 Shopping 0 0 0.00 0.00 0.78 0.58 0 1.36 5**/91 ( Gangagiri WUA Gogalgaon) Mul- Mangaleshwar Water User's Association, 655 R2 3.645 NCB 0.911 1.823 0.911 3.645 5**/92 Gogalgaon, Tal. Newasa 2/24/2011 wua_prmpkg_r4 59 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Mul- Rehabilitaion work Minor 4/ Dy 2/Br. II of A2 2.550 NCB 0.00 0.00 0.00 0.00 0.00 2.25 0.00 2.25 5**/92 MRBC Mangaleshwar WUA Gogalgaon Mul- Sudamrao Mate Water User's Association, 656 R2 3.321 NCB 0.830 1.661 0.830 3.321 5**/93 Gogalgaon, Tal. Newasa Rehabilitaion work of Minor 5 / Dy 2 / Br. II Mul- A2 of MRBC Sudamrao Mate Patil WUA 2.610 NCB 0.00 0.00 0.00 0.00 2.60 0.00 0.00 2.60 5**/93 Gogalgaon Mul- Mauli Water User's Association, Galnimb, Tal. 657 R2 2.475 NCB 0.619 1.238 0.619 2.475 5**/94 Newasa Mul- Rehabilitaion work of Minor 5 / Dy 2 of Br. II A2 1.880 Shopping 0.00 0.00 0.00 1.18 0.80 0.00 0.00 1.98 5**/94 of MRBC Mauli WUA Galnimb Mul- Godavari Water User's Association, Galnimb, 658 R2 2.395 NCB 0.599 1.198 0.599 2.395 5**/95 Tal. Newasa Mul- Rehabilitaion work of Minor 4 / Dy 2 of Br. II A2 1.880 Shopping 0.00 0.00 0.00 1.20 0.77 0.00 0.00 1.97 5**/95 of MRBC Godavari WUA Galnimb Mul- Kanifnath Water User's Association, Ranjani, 659 R2 1.947 NCB 0.487 0.974 0.487 1.947 5**/96 Tal. Shevgaon Mul- Rehabilitaion work of Minor 6 / Dy 3 / of Br. II A2 1.830 Shopping 0 0 0.00 1.59 0.00 0.24 0 1.83 5**/96 of MRBC Kanifnath WUA Ranjgaon Mul- Eknath Water User's Association, Dahigaon Ne, 660 R2 1.256 Shopping 0.314 0.628 0.314 1.256 5**/97 Tal. Shevgaon Mul- Rehabilitaion work of Minor 6, Tail Dy 3 of A2 1.210 Shopping 0 0 0.00 1.10 0.11 0.00 0 1.21 5**/97 Br. II of MRBC Eknath WUA Dahigaon Mul- Ranukamata Water User's Association, Bhavi 661 R2 0.978 Shopping 0.245 0.636 0.098 0.978 5**/98 Nimgaon, Tal. Shevgaon Mul- Rehabilitaion work of Minor 5 / Dy 3 of Br. II A2 0.790 Shopping 0 0 0.00 0.55 0.19 0.00 0 0.74 5**/98 of MRBC Renukamata WUA Bhavinimgaon Mul- Chanakya Water User's Association, Dahigaon 662 R2 2.355 NCB 0.589 1.178 0.589 2.355 5**/99 Ne , Tal. Shevgaon Mul- Rehabilitaion work of Minor 8 / Dy 3 / of A2 2.360 NCB 0.00 0.00 0.00 1.32 1.10 0.00 0.00 2.42 5**/99 MRBC Chanakya WUA Dahigaon Mul- Jay Bhavani Water User's Association, Bhavi 663 R2 1.388 Shopping 0.347 0.902 0.139 1.388 5**/100 Nimgaon , Tal. Shevgaon Mul- Rehabilitaion work of Dy 3 Branch II MRBC R3 1.26 Shopping 0.63 0.63 1.26 5**/100 Jai Bhawani WUA Bhavinimgaon Rehabilitation And Modernization works Dy 3 Mul- A3 Tail / Branch II M. R. B. C. 1.04 Shopping 0 0 0.00 0.00 0.00 1.04 0 1.04 5**/100 ( JaiBhavani WUA Bhavi Nigaon) 2/24/2011 wua_prmpkg_r4 60 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Mul- Shakambhari Devi Water User's Association, 664 R2 0.71 Shopping 0.178 0.462 0.071 0.710 5**/101 Sukali Bk., Tal. Newasa Mul- Rehabilitaion work of Minor I - O 1R Dy 3 of A2 0.800 Shopping 0.00 0.00 0.00 0.00 0.43 0.37 0.00 0.80 5**/101 Br.ii of MRBC Shkambhari Devi WUA Sukali Mul- Sant Tukaram Water User's Association, Pimpri 665 R2 1.125 Shopping 0.281 0.731 0.113 1.125 5**/102 Shahali, Tal. Newasa Rehabilitaion work of Minor 5 / Dy 3 / Branch Mul- A2 II of MRBC Sant Tukaram WUA Pimpari 0.940 Shopping 0 0 0.00 0.00 0.34 0.60 0 0.94 5**/102 Shahali Mul- Mauli Water User's Association, Pimpri Shahali , 666 R2 0.681 Shopping 0.170 0.443 0.068 0.681 5**/103 Tal. Newasa Mul- Rehabilitaion work of Minor 3 Dy 3 Branch II R3 0.84 Shopping 0.420 0.420 0.84 5**/103 MRBC Mauli WUA PimpariShahali Rehabilitation And Modernization works / Minor Mul- A3 3 / Dy 3 Branch II M. R. B. C. 0.68 Shopping 0 0 0.00 0.00 0.29 0.39 0 0.68 5**/103 ( Mauli WUA Pimpari Shali ) Mul- Ganesh Water User's Association, Sukali Bk., 667 R2 0.883 Shopping 0.221 0.574 0.088 0.883 5**/104 Tal. Newasa Mul- Rehabilitaion work of Minor 2 Dy 3 Branch II R3 0.97 Shopping 0.485 0.485 0.97 5**/104 MRBC Ganesh WUA Sukali Rehabilitation And Modernization works Minor Mul- A3 2 / O2R, O3R, O5R Dy 3 / Branch II M. R. B. C. 0.80 Shopping 0 0 0.00 0.00 0.00 0.80 0 0.80 5**/104 ( Ganesh WUA Sukali ) Mul- Rishikesh Water User's Association, Dahigaon 668 R2 0.998 Shopping 0.250 0.649 0.100 0.998 5**/105 Ne , Tal. Shevgaon Rehabilitaion work of Minor 7 O9 to 11L Dy 3 Mul- A2 / of Br. II of MRBC Rhishikesh WUA 0.990 Shopping 0 0 0.00 0.56 0.32 0.11 0 0.99 5**/105 Dhaigaon Mul- Mhasoba Water User's Association, Khamagaon, 669 R2 1.342 Shopping 0.336 0.872 0.134 1.342 5**/106 Tal. Newasa Rehabilitaion work of Minor 6/6/6 Dy 3 Br. II Mul- A2 of MRBC Mhasoba 1.150 Shopping 0.00 0.00 0.00 0.51 0.66 0.00 0.00 1.17 5**/106 WUA Khamgaon Mul- Laxmi Mata Water User's Association, Bhavi 670 R2 0.805 Shopping 0.201 0.523 0.081 0.805 5**/107 Nimgaon, Tal. Shevgaon Mul- Rehabilitaion work of Dy 3 Branch II MRBC R3 0.76 Shopping 0.760 0.76 5**/107 Laxmimata i WUA Bahvinimgaon 2/24/2011 wua_prmpkg_r4 61 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation And Modernization works / Minor Mul- 9 / O4R, O5R, O6R.O7R Dy 3 / Branch II M. R. A3 0.63 Shopping 0 0 0.00 0.00 0.00 0.63 0 0.63 5**/107 B.C. ( Laxmimata WUA Bhavinimgaon ) Mul- Shri Swami Samarth Water User's Association, 671 R2 1.707 Shopping 0.427 1.110 0.171 1.707 5**/108 Sultanpur, Tal. Shevgaon Mul- Rehabilitaion work of Minor 5 Dy 3 of Br. II A2 1.320 Shopping 0.00 0.00 0.00 1.00 0.30 0.02 0.00 1.32 5**/108 of MRBC Shri Swami Samarth WUA Sultanpur Mula Mul-6** Rehabilation of minors (WUA level works -50 74.75 WUA 14.95 22.43 22.43 14.95 74.75 R Mul-6** Rehabilation of minors (WUA level works -50 74.75 WUA 11.21 26.16 33.64 3.74 74.75 Mul- Hanuman Water User's Association, Karajgaon, 672 R2 1.273 Shopping 0.318 0.827 0.127 1.273 6**/1 Tal. Newasa Mul- Rehabilitaion work of Minor 4L / Sonai Dy of A2 1.060 Shopping 0 0 0.00 0.00 0.80 0.26 0 1.06 6**/1 MRBC Hanuman WUA Karajgaon Mul- Pandurang Water User's Association, Karajgaon, 673 R2 0.665 Shopping 0.166 0.432 0.067 0.665 6**/2 Tal. Newasa Mul- Rehabilitaion work of Minor 14 R Sonai DyI A2 0.600 Shopping 0 0 0.00 0.34 0.14 0.12 0 0.60 6**/2 of MRBC Pandurang WUA Karajgaon Mul- Shaneshwar Water User's Association, 674 R2 0.714 Shopping 0.179 0.464 0.071 0.714 6**/3 Ganeshwadi, Tal. Newasa Mul- Rehabilitaion work of Minor 2R Sonai Dy II A2 0.680 Shopping 0 0 0.00 0.30 0.00 0.38 0 0.68 6**/3 of MRBC Shaineshwar WUA Ganesh wadi Mul- Sant Madhavbaba Water User's Association, 675 R2 2.32 NCB 0.580 1.160 0.580 2.320 6**/4 Landewadi No. 1, Tal. Newasa Mul- Rehabilitaion work of Minor 2 L, Sonai Dy A2 1.760 Shopping 0 0 0.00 0.68 0.32 0.36 0 1.36 6**/4 MRBC Sant Madhav Babaj WUA Landewadi Mul- Chandragiri Water User's Association, 676 R2 1.106 Shopping 0.277 0.719 0.111 1.106 6**/5 Karajgaon, Tal. Newasa Mul- Rehabilitaion work of Minor 2L / Sonai Dy / A2 0.920 Shopping 0 0 0.00 0.47 0.00 0.45 0 0.92 6**/5 MRBCChandragiri WUA Karajgaon Mul- Anand Water User's Association, Kharvandi, Tal. 677 R2 1.275 Shopping 0.319 0.829 0.128 1.275 6**/6 Newasa Mul- Rehabilitaion work of D.O.3 / Minor 3 R / Sonai A2 1.270 Shopping 0 0 0.00 0.52 0.25 0.50 0 1.27 6**/6 Dy of MRBC Anand WUA Gomalwadi Mul- Sant Dnyaneshwar Water User's Association, 678 R2 0.917 Shopping 0.229 0.596 0.092 0.917 6**/7 Amalner, Tal. Newasa 2/24/2011 wua_prmpkg_r4 62 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Mul- Rehabilitaion work of D.O. 15 R and Tail / Sonai A2 0.860 Shopping 0 0 0.00 0.50 0.00 0.40 0 0.90 6**/7 Dy of MRBC Sant Dnyaneshwar WUA Amalner Mul- Jay Bajrang Water User's Association, 679 R2 0.552 Shopping 0.138 0.359 0.055 0.552 6**/8 Karajgaon, Tal. Newasa Mul- Rehabilitaion work of 11 to 12L / Sonai Dy / A2 0.520 Shopping 0 0 0.00 0.00 0.29 0.23 0 0.52 6**/8 MRBC Jai Bajrang WUA Karajgaon Mul- Ganesh Water User's Association, Karajgaon, 680 R2 1.371 Shopping 0.343 0.891 0.137 1.371 6**/9 Tal. Newasa Mul- Rehabilitaion work of Do 11, 12, 13R / Sonai Dy A2 1.250 Shopping 0 0 0.00 0.00 0.56 0.69 0 1.25 6**/9 / MRBC Ganesh WUA Karajgaon Mul- Shri Nath Water User's Association, Watapur, 681 R2 1.047 Shopping 0.262 0.681 0.105 1.047 6**/10 Tal. Newasa Mul- Rehabilitaion work of OL R 6 / Minor 3 / Sonai A2 1.010 Shopping 0 0 0.00 0.00 0.80 0.22 0 1.02 6**/10 Dy of MRBC Sant Shrinath WUA Watapur Mul- Ambika Water User's Association, Gomalwadi, 682 R2 1.698 Shopping 0.425 1.104 0.170 1.698 6**/11 Tal. Newasa Mul- Rehabilitaion work of Minor 3 / Sonai Dy of A2 1.650 Shopping 0 0 0.00 1.08 0.37 0.05 0 1.50 6**/11 MRBC Ambika WUA Gomalwadi Mul- Sant Madhav Baba Water User's Association, 683 R2 0.595 Shopping 0.149 0.387 0.060 0.595 6**/12 Landewadi No.2 , Tal. Newasa Mul- Rehabilitaion work of Minor 3L Sonai Dy / A2 0.470 Shopping 0 0 0.00 0.00 0.48 0.05 0 0.53 6**/12 of MRBC Santa Madhavbaba WUA Landewadi Mul- Shivaji Raje Water User's Association, 684 R2 1.304 Shopping 0.326 0.848 0.130 1.304 6**/13 Ganeshwadi, Tal. Newasa Rehabilitaion work of D.O. 9R, 10R, 7L, to 11L Mul- A2 / Minor 1 R / Sonai Dy of MRBC Shivaji Raje 1.040 Shopping 0 0 0.00 0.25 0.00 0.85 0 1.10 6**/13 WUA Ganeshwadi Mul- Jalseva Water User's Association, Landewadi, 685 R2 1.054 Shopping 0.264 0.685 0.105 1.054 6**/14 Tal. Newasa Mul- Rehabilitaion work of Do 7 R, 6 L, 6 L B / A2 0.950 Shopping 0 0 0.00 0.49 0.17 0.29 0 0.95 6**/14 Sonai Dy / MRBC Janaseva WUA Landewadi Mul- Biroba Water User's Association, Belhekarwadi, 686 R2 0 Shopping 6**/15 Tal.Newasa Mul- Datta Digambar Water User's Association, 687 R2 1.443 Shopping 0.361 0.938 0.144 1.443 6**/16 Belhekarwadi, Tal. Newasa 2/24/2011 wua_prmpkg_r4 63 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Mul- Rehabilitaion work of Minor 1L Sonai Dy of A2 1.270 Shopping 0 0 0.00 0.47 0.00 0.80 0 1.27 6**/16 MRBC Dattadigambar WUA Belekar wadi Mul- Renuka Mata Water User's Association, 688 R2 0 Shopping 6**/17 Belhekarwadi, Tal. Newasa Mul- Jagdamba Water User's Association, 689 R2 0 Shopping 6**/18 Belhekarwadi, Tal. Newasa Mul- Shri Swami Samarth Water User's Association, 690 R2 0.691 Shopping 0.173 0.449 0.069 0.691 6**/19 sonai, Tal. Newasa Rehabilitaion work of D.O. 1 to 3 R and D.O. 1 Mul- A2 TO 2 L of Sonai Dy of MRBC Swami Samarth 0.660 Shopping 0 0 0.00 0.42 0.12 0.12 0 0.66 6**/19 WUA Sonai Mul- Yashavant Water User's Association, Sonai, Tal. 691 R2 1.209 Shopping 0.302 0.786 0.121 1.209 6**/20 Newasa Mul- Rehabilitaion work of D.O. 4, 5, 6(A) R, 5L, / A2 1.100 Shopping 1.100 1.10 6**/20 Sonai Dy of MRBC Yashvant WUA Sonai Mul- Ramu Anna Phatake Water User's Association, 692 R2 1.458 Shopping 0.365 0.948 0.146 1.458 6**/21 Kharvandi, Tal. Newasa Rehabilitaion work of OL 7R, 8R, Tail / Dy 4 Mul- A2 of MRBC Late Ramuanna Phatake WUA 1.270 Shopping 0 0 0.00 0.95 0.08 0.00 0 1.03 6**/21 Kharvandi Mul- Vishvasrao Patil Water User's Association, 693 R2 1.528 Shopping 0.382 0.993 0.153 1.528 6**/22 Sonai, Tal.Newasa Mul- Rehabilitaion work of D.O. 14 A to 16 A of A2 1.270 Shopping 0 0 0.00 0.56 0.53 0.00 0 1.09 6**/22 MRBC Vishwas WUA Sonai Mul- Shri Sant Udasi Maharaj Water User's 694 R2 2.477 NCB 0.619 1.239 0.619 2.477 6**/23 Association, Shinganapur, Tal. Newasa Mul- Rehabilitaion work Direct outlet 17 to 19 B of A2 2.240 NCB 0.00 0.00 0.00 1.76 0.23 0.00 0.00 1.99 6**/23 MRBC SnntUdasi WUA Ghodegaon Shingapur Mul- Rameshwar Water User's Association, Sonai, 695 R2 2.035 NCB 0.509 1.018 0.509 2.035 6**/24 Tal. Newasa Mul- Rehabilitaion work of Minor I Dy 4 of MRBC A2 1.760 Shopping 0.88 0.88 1.76 6**/24 Rameshwar WUA Sonai Mul- Jay Bhavani Water User's Association, Sonai, 696 R2 2.418 NCB 0.00 0.00 0.00 1.27 0.23 0.00 0.00 1.50 6**/25 Tal. Newasa Mul- Rehabilitaion work of Minor 2 / Dy 4 / MRBC A2 2.280 NCB 0.00 0.00 0.00 1.36 0.52 0.00 0.00 1.88 6**/25 Jay Bhavani WUA Sonai 2/24/2011 wua_prmpkg_r4 64 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Mul- Pandurang Water User's Association, Hingoni, 697 R2 1.933 NCB 0.483 0.967 0.483 1.933 6**/26 Tal. Newasa Mul- Rehabilitaion work of OL4 R, 5R, 6R, OL3, /dY A2 1.750 Shopping 0 0 0.00 1.36 0.00 0.40 0 1.76 6**/26 4 of MRBC Pandurang WUA Hingoli Mul- Datta Water User's Association, Chanda, Tal. 698 R2 0 _ 6**/27 Newasa Mul- Ghodeshwar Water User's Association, 699 R2 1.478 Shopping 0.370 0.961 0.148 1.478 6**/28 Ghodegaon, Tal. Newasa Rehabilitaion work of D.O. 1, 2, to OR 1 A, OR Mul- A2 1B, OR2, OR2A, OR2B, OL3, / Dy 5 of MRBC 1.170 Shopping 0 0 0.00 0.57 0.09 0.51 0 1.17 6**/28 Ghodeshwari WUA Ghodegaon Mul- Kangoni Water User's Association, Kangoni, Tal. 700 R2 2.343 NCB 0.586 1.172 0.586 2.343 6**/29 Newasa Mul- Rehabilitaion work of OL3 to OL7, OR3 to OR7 A2 1.730 Shopping 0 0 0.00 0.98 0.00 0.75 0 1.73 6**/29 / Dy 5 of MRBC Kangoni WUA Kangoni Mul- Jay Bajarang Water User's Association, 701 R2 1.312 Shopping 0.328 0.853 0.131 1.312 6**/30 Kharvandi, Tal. Newasa Mul- Rehabilitaion work of OL 8, 9, RO 10, Tail / Dy A2 1.030 Shopping 0 0 0.00 0.00 0.55 0.48 0 1.03 6**/30 5 of MRBC Jay BajrangBali WUA Kharwandi Mul- Someshwar Water User's Association, Chanda, 702 R2 0.884 Shopping 0.221 0.575 0.088 0.884 6**/31 Tal. Newasa Mul- Rehabilitaion work of Direct Minor 6 / MRBC A2 0.740 Shopping 0 0 0.00 0.00 0.43 0.40 0 0.83 6**/31 Someshwar WUA Chanda Mul- Ganesh Water User's Association, Chanda, Tal. 703 R2 1.629 Shopping 0.407 1.059 0.163 1.629 6**/32 Newasa Mul- Rehabilitaion work of Direct Minor 6 of A2 1.340 Shopping 0.00 0.00 0.00 0.79 0.00 0.55 0.00 1.34 6**/32 MRBC Ganesh WUA Chanda Mul- Barhanpur Water User's Association, Barhanpur, 704 R2 4.05 NCB 1.013 2.025 1.013 4.050 6**/33 Tal. Newasa Mul- Rehabilitaion work of Minor 1 / Dy 5 / PBC of A2 3.670 NCB 0.00 0.00 0.00 0.84 0.00 2.84 0.00 3.68 6**/33 MRBC Barhanpur WUA Barhanpur Mul- Sant Dnyaneshwar Water User's Association, 705 R2 1.097 Shopping 0.274 0.713 0.110 1.097 6**/34 Kharavandi, Tal. Newasa Mul- Rehabilitaion work of Minor 1 / Dy 5 of MRBC A2 1.040 Shopping 0 0 0.00 0.00 0.53 0.51 0 1.04 6**/34 Sant Dnyaneshwar WUA Kharwandi Mul- Bhairavnath Water User's Association, Chanda, 706 R2 1.038 Shopping 0.260 0.675 0.104 1.038 6**/35 Barhanpur, Morgavan, Tal.Newasa 2/24/2011 wua_prmpkg_r4 65 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Mul- Rehabilitaion work of D.O. 20 / MRBC A2 0.920 Shopping 0 0 0.00 0.00 0.54 0.38 0 0.92 6**/35 Bhairavanath WUA Chanda Mul- Mulamai Water User's Association, Chanda, 707 R2 0.507 Shopping 0.127 0.330 0.051 0.507 6**/36 Kautha, Rastapur, Tal. Newasa Mul- Rehabilitaion work of D.O. 21, 22, 22 (A) 23 of A2 0.450 Shopping 0 0 0.00 0.00 0.20 0.26 0 0.46 6**/36 MRBC Mulamai WUA Chanda Mul- Avdhoot Water User's Association, Patharwala, 708 R2 1.224 Shopping 0.306 0.796 0.122 1.224 6**/37 Tal. Newasa Mul- Janapur Water User's Association, Nandur, Tal. 709 R2 3.083 NCB 0.771 1.542 0.771 3.083 6**/38 Shevgaon Mul- Rehabilitaion work of Minor 1B / PBC of A2 2.770 NCB 0.00 0.00 0.00 1.33 1.40 0.00 0.00 2.73 6**/38 MRBC Janaur WUA Nimbhenandur Mul- Mankavati Water User's Association, Maka, Tal. 710 R2 1.207 Shopping 0.422 0.785 1.207 6**/39 Newasa Mul- Rehabilitaion work of Minor 2 / D.O. 4, 5 / PBC A2 1.060 Shopping 0.00 0.00 0.00 0.66 0.35 0.00 0.00 1.01 6**/39 of MRBC Mankawati WUA Maka Mul- Bhagavan Baba Water User's Association, 711 R2 1.069 Shopping 0.267 0.695 0.107 1.069 6**/40 Hivare, Tal. Newasa Mul- Rehabilitaion work of D.O.6to 9 / PBC / MRBC A2 0.950 Shopping 0 0 0.00 0.67 0.18 0.05 0 0.90 6**/40 Bhagwanbaba WUA Hiware Mul- Waman Bhau Water User's Association, Maka, 712 R2 1.623 Shopping 0.568 1.055 1.623 6**/41 Tal. Newasa Mul- Rehabilitaion work of Minor 3 / PBC of MRBC A2 1.310 Shopping 0.00 0.00 0.00 0.79 0.00 0.52 0.00 1.31 6**/41 Wamanbhau WUA Maka Mul- Shiv Shankar Water User's Association, Adgaon, 713 R2 1.173 Shopping 0.411 0.762 1.173 6**/42 Tal. Pathardi Mul- Rehabilitaion work of Minor 4 of PBC of A2 1.010 Shopping 0.00 0.00 0.00 0.92 0.00 0.09 0.00 1.01 6**/42 MRBC Shivshankar WUA Adgaon Mul- Vrudheshwar Water User's Association, 714 R2 1.363 Shopping 0.341 0.886 0.136 1.363 6**/43 Adgaon, Tal. Pathardi Mul- Rehabilitaion work of Minor 5 / D.O. 10 to 12 / A2 1.270 Shopping 0 0 0.00 0.92 0.34 0.00 0 1.26 6**/43 P.B.C. of MRBC Vridheshwar WUA Adgaon Mul- Adinath Water User's Association,Shingava 715 R2 2.814 NCB 0.704 1.407 0.704 2.814 6**/44 Kamat, Tal. Pathardi Mul- Rehabilitaion work of Minor 6 / PBC / MRBC A2 2.460 NCB 0.00 0.00 0.00 1.03 0.00 1.43 0.00 2.46 6**/44 Adinath WUA Shingve Mul- Kanifnath Water User's Association, Javkhede, 716 R2 0.56 Shopping 0.140 0.364 0.056 0.560 6**/45 Tal. Pathardi 2/24/2011 wua_prmpkg_r4 66 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Mul- Rehabilitaion work of D.O. 13 to 16 of PBC OF A2 0.510 Shopping 0 0 0.00 0.00 0.52 0.00 0 0.52 6**/45 MRBC Kanifnath WUA Javkhede Mul- Mahatma Phule Water User's Association, 717 R2 1.128 Shopping 0.395 0.733 1.128 6**/46 Wagholi, Tal. Shevgaon Mul- Rehabilitaion work of Minor 7 /PBC of MRBC A2 1.010 Shopping 0.00 0.00 0.00 0.97 0.06 0.00 0.00 1.03 6**/46 Mahatma Phule WUA Wagholi Mul- Ahilya Bai Water User's Association, Wagholi , 718 R2 1.169 Shopping 0.409 0.760 1.169 6**/47 Tal. Shevgaon Mul- Rehabilitaion work of Minor 8 / PBC of MRBC A2 0.980 Shopping 0 0 0.00 0.77 0.20 0.00 0 0.97 6**/47 Ahilyadevi WUA Wagholi Mul- Shetkari Water User's Association, Javkhede, 719 R2 1.382 Shopping 0.346 0.898 0.138 1.382 6**/48 Tal. Shevgaon Mul- Rehabilitaion work of Minor 9 an D.O. 17 / A2 1.230 Shopping 0.00 0.00 0.00 0.79 0.00 0.44 0.00 1.23 6**/48 PBC of MRBC Shetkari WUA Javkhede Mul- Jeevandhara Water User's Association, Wagholi, 720 R2 5.205 NCB 1.301 2.603 1.301 5.205 6**/49 Tal. Shevgaon Mul- Rehabilitaion work of Minor 1R / Dy 1 PBC of A2 4.630 NCB 0.00 0.00 0.00 0.00 3.33 1.33 0.00 4.66 6**/49 MRBC Jivan Dhara WUA Wagholi Mul- Nageshwar Water User's Association, Nimbhe, 721 R2 2.5 NCB 0.625 1.250 0.625 2.500 6**/50 Tal. Shevgaon Mul- Rehabilitaion work of Nimbhe Minor / Dy 1 / A2 2.290 NCB 0.00 0.00 0.00 2.07 0.30 0.00 0.00 2.37 6**/50 PBC of MRBC Nageshwar WUA Nibhe Mul- Hanuman Water User's Association, Pachunda, 722 R2 3.05 NCB 0.763 1.525 0.763 3.050 6**/51 Tal. Newasa Mul- Rehabilitaion work of Minor A / DO L 1 to 3 / A2 2.670 NCB 0.00 0.00 0.00 1.37 1.30 0.00 0.00 2.67 6**/51 PBC of MRBC Hanuman WUA Pachunda Mul- Vrudheshwar Water User's Association, Kasar 723 R2 0.698 Shopping 0.244 0.454 0.698 6**/52 Pimpalgaon, Tal. Pathardi Mul- Rehabilitaion work of Do 17 A & B PBC of A2 0.600 Shopping 0 0 0.00 0.44 0.00 0.20 0 0.64 6**/52 MRBC Wrudheshwar WUA Kasarpimplaon Mul- Mhasoba Water User's Association, Chitali, Tal. 724 R2 1.208 Shopping 0.302 0.785 0.121 1.208 6**/53 Pathardi Mul- Rehabilitaion work of Minor 10 / PBC / MRBC A2 1.040 Shopping 0.00 0.00 0.00 0.73 0.16 0.15 0.00 1.04 6**/53 Mhasoba WUA Chitali Mul- Yedoba Water User's Association, Padali, Tal. 725 R2 0.943 Shopping 0.236 0.613 0.094 0.943 6**/54 Pathardi Mul- Rehabilitaion work of D.O. 18 to 20 / PBC / A2 0.830 Shopping 0 0 0.00 0.00 0.28 0.55 0 0.83 6**/54 MRBC Yedoba WUA Padali 2/24/2011 wua_prmpkg_r4 67 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Mul- Macchindrnath Water User's Association, 726 R2 1.502 Shopping 0.376 0.976 0.150 1.502 6**/55 Chitali, Tal. Pathardi Mul- Rehabilitaion work of Minor I/ PBC of MRBC A2 1.220 Shopping 0.00 0.00 0.00 0.72 0.24 0.00 0.00 0.96 6**/55 Macchindranath WUA Chitali Mul- Kanifnath Water User's Association, Sakegaon, 727 R2 1.043 Shopping 0.261 0.678 0.104 1.043 6**/56 Tal. Pathardi Mul- Rehabilitaion work of D.O. 21 to 23 / PBC / of A2 0.920 Shopping 0 0 0.00 0.51 0.00 0.40 0 0.91 6**/56 MRBC Kanifnath WUA Sakegaon Mul- Bhagavan Baba Water User's Association, 728 R2 0.885 Shopping 0.221 0.575 0.089 0.885 6**/57 Vadule Kd. , Tal. Shevgaon Mul- Rehabilitaion work of OL to 7 / Dy 2 PBC of A2 1.490 Shopping 0 0 0.00 0.46 0.00 1.03 0 1.49 6**/57 MRBC Bhagwanbaba WUA Wadule Mul- Hanuman Water User's Association, Garadwadi, 729 R2 0.859 Shopping 0.301 0.558 0.859 6**/58 Tal. Shevgaon Mul- Rehabilitaion work of OL 8 9 Dy 2 PBC of A2 0.750 Shopping 0 0 0.00 0.54 0.00 0.20 0 0.74 6**/58 MRBC Hanuman WUA Garad Wadi Mul- Sant Tukaram Water User's Association, 730 R2 1.796 Shopping 0.449 1.167 0.180 1.796 6**/59 Barhanpur, Tal. Shevgaon Mul- Rehabilitaion work of Minor 2,3,4/ Dy 2 of PBC A2 1.500 Shopping 0.00 0.00 0.00 1.33 0.16 0.00 0.00 1.49 6**/59 of MRBC Sant Tukaram WUA Barhanpur Mul- Om Jagdamba Water User's Association, Avhane 731 R2 0.979 Shopping 0.245 0.636 0.098 0.979 6**/60 Bk, Tal. Shevgaon Rehabilitaion work of Do 1to 13 & OL 1 to 5 Mul- A2 Dy 2 PBC II of MRBC Omjagdamba WUA 0.850 Shopping 0 0 0.00 0.47 0.23 0.00 0 0.70 6**/60 Awhane Mul- Mayureshwar Water User's Association, Avhane 732 R2 2.49 NCB 0.249 1.370 0.872 2.490 6**/61 Bk, Tal. Shevgaon Mul- Rehabilitaion work of Minor 5] 6 Dy 2 / PBC / A2 2.340 NCB 0.00 0.00 0.00 0.56 0.72 1.06 0.00 2.34 6**/61 MRBC Mayureshwar WUA Avhane Mul- Malganga Water User's Association, Malegaon, 733 R2 2.167 NCB 0.217 1.192 0.758 2.167 6**/62 Tal. Shevgaon Rehabilitaion work of Minor 7A, 7, 8A & Do R Mul- A2 11to 12 / Dy 2 / PBC of MRBC Malganga 2.130 NCB 0.00 0.00 0.00 1.20 0.00 0.93 0.00 2.13 6**/62 WUA Malegaon Mul- Jagdamba Water User's Association, Samangaon, 734 R2 2.153 NCB 0.215 1.184 0.754 2.153 6**/63 Tal. Shevgaon 2/24/2011 wua_prmpkg_r4 68 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitaion work of Minor 8 & D.O. R 13 to Mul- A2 17 / Dy 2 / Pathardi Branc Canal of MRBC 1.680 Shopping 0 0 0.00 0.58 1.08 0.00 0 1.66 6**/63 Jagdamba WUA Samangaon Mul- Omkareshvar Water User's Association, Vadule 735 R2 1.532 Shopping 0.383 0.996 0.153 1.532 6**/64 Bk., Tal. Shevgaon Mul- Rehabilitaion work of Minor 9 / Dy 2 / of PBC A2 1.460 Shopping 0.00 0.00 0.00 1.55 0.00 0.00 0.00 1.55 6**/64 of MRBC Omkareshwar WUA Vadule Mul- Ashta Vinayak Water User's Association, 736 R2 1.093 Shopping 0.273 0.710 0.109 1.093 6**/65 Amarapur, Tal. Shevgaon Rehabilitaion work of SM 1R, D.O. OL 1 & 2, Mul- A2 OR 2, / PBC of MRBC Ashtvinayak WUA 0.940 Shopping 0 0 0.00 0.44 0.57 0.00 0 1.01 6**/65 Amarapur Mul- Vitthal Water User's Association, Avhane Kd., 737 R2 2.494 NCB 0.624 1.247 0.624 2.494 6**/66 Tal. Shevgaon Mul- Rehabilitaion work of Minor 1 to 4 / Dy 3 / PBC A2 2.230 NCB 0.00 0.00 0.00 0.00 0.84 1.38 0.00 2.22 6**/66 / MRBC Vithal WUA Avhane Mul- Sadguru Aai Water User's Association, Avhane, 738 R2 2.003 NCB 0.501 1.002 0.501 2.003 6**/67 Tal. Shevgaon Rehabilitaion work of 4 A, D.O. OL 5, 6, 7, OR Mul- A2 5, 6, 8 PBC / MRBC Sadguru Aai WUA 1.800 Shopping 0 0 0.00 0.94 0.41 0.45 0 1.80 6**/67 Avhane Mul- Shri Domeshwar Water User's Association, 739 R2 2.494 NCB 0.624 1.247 0.624 2.494 6**/68 Vadule Bd., Tal. Shevgaon Rehabilitaion work of Minor 5 & 6 / DO 8 to 10 Mul- A2 OR 9 to 12 / Dy 3 / of MRBC Domeshwar 2.250 NCB 0.00 0.00 0.00 1.54 0.13 0.61 0.00 2.28 6**/68 WUA Wadule Mul- Shri Khandoba Water User's Association, Vadule 740 R2 2.191 NCB 0.548 1.096 0.548 2.191 6**/69 Bk., Tal. Shevgaon Rehabilitaion work of Minor 7,8 / DO L 11 to Mul- A2 14/ OR 13 to 15 / Dy 3 / PBC of MRBC 1.910 NCB 0.00 0.00 0.00 0.00 1.91 0.02 0.00 1.93 6**/69 Khondaba WUA Wadule Mul- Kei. Marutraon Patil Satpute Water User's 741 R2 1.469 Shopping 0.367 0.955 0.147 1.469 6**/70 Association, Sakegaon, Tal. Pathardi Rehabilitaion work of D.O. OL1, OL5, OR 1/ Mul- A2 Tail Dy of MRBC Kai. Marutrao Satpute WUA 1.290 Shopping 0 0 0.00 0.88 0.28 0.14 0 1.30 6**/70 Sakegaon Mul- Shri Swami Samarth Water User's Association, 742 R2 1.312 Shopping 0.328 0.853 0.131 1.312 6**/71 Kalegaon, Tal. Pathardi 2/24/2011 wua_prmpkg_r4 69 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitaion work of D.O. 6L to 18 L of Tail Mul- A2 Dy of PBC of MRBC Swami Samarth WUA 1.150 Shopping 0.00 0.00 0.00 0.69 0.15 0.00 0.00 0.84 6**/71 Kolgaon Mul- Abhinete Sadashiv Amarpurkar Water User's 743 R2 2.309 NCB 0.577 1.155 0.577 2.309 6**/72 Association, Amarapur, Tal. Shevgaon Rehabilitaion work of Sub Minor 2 / Tail Dy / Mul- A2 Dy 2 /PBC of MRBC Sadashiv Amarapurkar 1.970 NCB 0.00 0.00 0.00 1.33 0.29 0.00 0.00 1.62 6**/72 WUA Amarapur Mul- Sant Eknath Water User's Association, Bhagur, 744 R2 2.105 NCB 0.526 1.053 0.526 2.105 6**/73 Tal. Shevgaon Mul- Sant Eknath Water User's Association, Bhagur, A2 1.89 NCB 6**/73 Tal. Shevgaon Mul- Sant Eknath Water User's Association, Bhagur, A2/1 1.980 NCB 0.00 0.00 0.00 1.23 0.43 0.32 0.00 1.98 6**/73 Tal. Shevgaon Mul- Jagdamba Water User's Association, Amarapur , 745 R2 1.368 Shopping 0.342 0.889 0.137 1.368 6**/74 Tal. Shevgaon Mul- Rehabilitaion work of SM 2 / Minor 3 / Tail Dy A2 1.250 Shopping 0 0 0.00 1.08 0.10 0.00 0 1.18 6**/74 / PBC of MRBC Jagdamba WUA Amarapur Mul- Mauli Water User's Association, Varoor Bk, Tal. 746 R2 2.461 NCB 0.615 1.231 0.615 2.461 6**/75 Shevgaon Mul- Rehabilitaion work of Sub Minor 3 / Tail Dy / A2 2.210 NCB 0.00 0.00 0.00 1.97 0.10 0.00 0.00 2.07 6**/75 PBP. II of MRBC Mauli WUA Warur Mul- Pandurang Water User's Association, Varoor 747 R2 1.728 Shopping 0.432 1.123 0.173 1.728 6**/76 Bk., Tal. Shevgaon Rehabilitaion work of SM R 2 L , SMR, SMR 3, Mul- A2 SM 3 L / Minor 4 / Tail Dy of PBC of MRBC 1.430 Shopping 0 0 0.00 1.25 0.19 0.00 0 1.44 6**/76 Pandurang WUA Varur Mul- Shri Raj Water User's Association, Susare, Tal. 748 R2 2.498 NCB 0.625 1.249 0.625 2.498 6**/77 Pathardi Mul- Rehabilitaion work of Sub 1R & 1L Minor 4 A2 2.200 NCB 0.00 0.00 0.00 1.72 0.57 0.00 0.00 2.29 6**/77 Tail Dy / PBC of MRBC Shriraj WUA Susare Mul- Jagdamba Water User's Association, Dhor 749 R2 1.255 Shopping 0.314 0.816 0.126 1.255 6**/78 Jalgaon, Tal. Shevgaon Rehabilitaion work of Sub Minor 3/1 & Do 1& Mul- A2 2R Minor 3 Tail Dy of MRBC Jagdamba 1.100 Shopping 0 0 0.00 0.52 0.00 0.58 0 1.10 6**/78 WUA Dhorjalgaon 2/24/2011 wua_prmpkg_r4 70 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Mul- Mauli Water User's Association, Dhor Jalgaon, 750 R2 1.057 Shopping 0.370 0.687 1.057 6**/79 Tal. Shevgaon Rehabilitaion work of Minor 3/2, D.O.3, 4 of Mul- A2 Minor 3 / Tail Dy of MRBC Mauli WUA 0.910 Shopping 0 0 0.00 0.48 0.00 0.50 0 0.98 6**/79 Dhorjalgaon Mul- Ram Krishna Water User's Association, 751 R2 0.969 Shopping 0.242 0.630 0.097 0.969 6**/80 Akhatwade, Tal. Shevgaon Mul- Rehabilitaion work of Minor 3/9 Tail Dy of A2 0.820 Shopping 0.00 0.00 0.00 0.77 0.00 0.05 0.00 0.82 6**/80 MRBC Ramkrishna WUA Akhatwade Mul- Ambika Water User's Association, Akhatwade, 752 R2 0.683 Shopping 0.239 0.444 0.683 6**/81 Tal. Shevgaon Mul- Rehabilitaion work of S M 3/4 of Minor 2 of A2 0.590 Shopping 0 0 0.00 0.50 0.00 0.00 0 0.50 6**/81 Tail Dy of MRBC Ambika WUA Akhatwade Mul- Shri Ganesh Water User's Association, 753 R2 1.182 Shopping 0.296 0.768 0.118 1.182 6**/82 Bhatkudgaon, Tal. Shevgaon Rehabilitaion work of Minor 3/5, D.O. 8 AL / Mul- A2 mINOR 3 / Tail Dy / of MRBC Ganesh WUA 1.030 Shopping 0 0 0.00 0.75 0.00 0.28 0 1.03 6**/82 Bhatkudgaon Mul- Pandurang Water User's Association, 754 R2 0.838 Shopping 0.210 0.545 0.084 0.838 6**/83 Akhatwade, Tal. Shevgaon Rehabilitaion work of Minor 3/6, D.O. 5 R / Mul- A2 Minor 3 / Tail Dy of MRBC Pandurang WUA 0.680 Shopping 0 0 0.00 0.38 0.00 0.32 0 0.70 6**/83 Akhatwade Mul- Hanuman Water User's Association, Akhatwade , 755 R2 0.967 Shopping 0.242 0.629 0.097 0.967 6**/84 Tal. Shevgaon Mul- Rehabilitaion work of Minor 3/8 / Tail Dy of A2 0.770 Shopping 0 0 0.00 0.60 0.00 0.17 0 0.77 6**/84 MRBC Hanuman WUA Akhatwade Mul- Shri Swami Samarth Water User's Association, 756 R2 2.9 NCB 0.725 1.450 0.725 2.900 6**/85 Lolegaon, Malegaon, Samangaon, Tal. Shevgaon Rehabilitaion work of Minor 3/9 & OL 6R Mul- A2 Minor 3 Tail Dy of MRBC Swami Samarth 2.580 NCB 0.00 0.00 0.00 2.47 0.00 0.11 0.00 2.58 6**/85 WUA Loladgaon Mul- Shri Dnyaneshwar Water User's Association, 757 R2 0.972 Shopping 0.243 0.632 0.097 0.972 6**/86 Bhatkudgaon, Tal.Shevgaon Rehabilitaion work of Minor 3/10. 10 B / Tail Mul- A2 Dy of MRBC Dnyaneshwar WUA 0.890 Shopping 0 0 0.00 0.48 0.00 0.50 0 0.98 6**/86 Bhatkudgaon 2/24/2011 wua_prmpkg_r4 71 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Mul- Jijamata Water User's Association, Joharapur, 758 R2 1.076 Shopping 0.269 0.699 0.108 1.076 6**/87 Tal. Shevgaon Mul- Rehabilitaion work of Minor 3/12 & Do 7R Tail A2 1.130 Shopping 0 0 0.00 0.79 0.00 0.34 0 1.13 6**/87 Dy of MRBC Jijamata WUA Joharpur Mul- Shri Trimurti Water User's Association, 759 R2 0.926 Shopping 0.232 0.602 0.093 0.926 6**/88 Bhatkudgaon, Tal. Shevgaon Mul- Rehabilitaion work of Minor 3/12, D.O. 8 R / A2 0.900 Shopping 0 0 0.00 0.60 0.38 0.00 0 0.98 6**/88 Tail Dy of MRBC Trimurti WUA Bhatkudgaon Mul- Hari Prasad Water User's Association, 760 R2 3.174 NCB 0.794 1.587 0.794 3.174 6**/89 Khamgaon, Hingaongaon, Tal. Shevgaon Mul- Rehabilitaion work of Minor 3/14 / Tail Dy / of A2 2.580 NCB 0.00 0.00 0.00 2.23 0.06 0.00 0.00 2.29 6**/89 MRBC Hariprasd WUA Khamgaon Mul- Harit Kranti Water User's Association, 761 R2 0.666 Shopping 0.167 0.433 0.067 0.666 6**/90 Joharapur, Tal. Shevgaon Rehabilitaion work of Minor 3/15 and D.O. 8 B Mul- A2 of Tail Dy of MRBC Haritkranti WUA 0.500 Shopping 0 0 0.00 0.33 0.20 0.00 0 0.53 6**/90 Joharapur Mul- Kisan Kranti Water User's Association, 762 R2 1.854 NCB 0.464 0.927 0.464 1.854 6**/91 Joharapur, Tal. Shevgaon Mul- Rehabilitaion work of Tail DO 9, 10R & 1L Tail A2 1.540 Shopping 0 0 0.00 0.00 1.13 0.40 0 1.53 6**/91 Dy of MRBC KisanKranti WUA Joharapur Mul- Shri Shankar Water User's Association, 763 R2 0.708 Shopping 0.177 0.460 0.071 0.708 6**/92 Bhatkudgaon, Tal. Shevgaon Rehabilitaion work of D.O. 8LB, 9L / Minor 9 / Mul- A2 Tail Dy of MRBC Shivshankar WUA 0.560 Shopping 0 0 0.00 0.31 0.22 0.10 0 0.63 6**/92 Bhatkudgaon Mul- Nagnath Water User's Association, Telkudgaon , 764 R2 0.735 Shopping 0.184 0.478 0.074 0.735 6**/93 Tal. Newasa Mul- Rehabilitaion work of Minor 2 / Tail Dy of A2 0.820 Shopping 0 0 0.00 0.45 0.00 0.40 0 0.85 6**/93 MRBC Nagnath WUA Telkudgaon Mul- Raje Shivaji Water User's Association, 765 R2 0.62 Shopping 0.155 0.403 0.062 0.620 6**/94 Telkudgaon , Tal. Newasa Rehabilitaion work of DO.5L to 7L / Minor 3 / Mul- A2 Tail Dy of MRBC Raje Shivaji WUA 0.560 Shopping 0 0 0.00 0.00 0.34 0.22 0 0.56 6**/94 Telkudgaon Mul- Savshid Baba Water User's Association, Dhor 766 R2 0.674 Shopping 0.169 0.438 0.067 0.674 6**/95 Jalgaon, Tal. Shevgaon 2/24/2011 wua_prmpkg_r4 72 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Mul- Rehabilitaion work of D.O. 19L / Minor 4 / Tail A2 1.190 Shopping 0 0 0.00 0.58 0.00 0.61 0 1.19 6**/95 Dy of MRBC Savshidbaba WUA Dhorjalgaon Mul- Shaneishwar Water User's Association, Nandur 767 R2 1.597 Shopping 0.399 1.038 0.160 1.597 6**/96 Vihire, Tal.Shevgaon Rehabilitaion work of Minor 5 , D.O. 20L, to Mul- A2 22L / Tail Dy of MRBC Shaneshwar WUA 1.490 Shopping 0 0 0.00 1.07 0.00 0.40 0 1.47 6**/96 Nandur Vihir Mul- Sant Kisan Giri Water User's Association, 768 R2 0.821 Shopping 0.205 0.534 0.082 0.821 6**/97 Bhatkudgaon, Tal. Shevgaon Rehabilitaion work of D.O. 6 R to 8 R Minor I / Mul- A2 Tail Dy of MRBC Kisangiri WUA 0.800 Shopping 0.00 0.00 0.00 0.60 0.16 0.10 0.00 0.86 6**/97 Bhatkudgaon Mul- Gangotri Water User's Association, 769 R2 0.62 Shopping 0.155 0.403 0.062 0.620 6**/98 Bhatkudgaon, Tal. Shevgaon Rehabilitaion work of D.O. 9 R to 11 r (A) / Mul- A2 Minor 1 / Tail Dy of MRBC Gangotri WUA 0.760 Shopping 0 0 0.00 0.72 0.07 0.05 0 0.84 6**/98 Bhatkudgaon Mul- Matoshri Water User's Association, 770 R2 1.566 Shopping 0.392 1.018 0.157 1.566 6**/99 Bhatkudgaon, Tal. Shevgaon Rehabilitaion work of D.O. 11L to 14L, 12 R Mul- A2 and Tail Minor / Tail Dy of MRBC Matoshri 1.300 Shopping 0 0 0.00 0.49 0.00 0.85 0 1.34 6**/99 WUA Bhatkudgaon Mul- Mohini Water User's Association, Telkudgaon, 771 R2 1.368 Shopping 0.342 0.889 0.137 1.368 6**/100 Tal. Shevgaon Mul- Rehabilitaion work of Minor 1/3, 4 R, 5, 6/1 of A2 1.450 Shopping 0 0 0.00 0.80 0.34 0.31 0 1.45 6**/100 Tail Dy of MRBC Mohini WUA Telkudgaon Mul- Jay Hanuman Water User's Association, Jeur, 772 R2 0.677 Shopping 0.237 0.440 0.677 6**/101 Tal.Newasa Mul- Rehabilitaion work of SM 1/1 and OL 4/ Minor A2 0.550 Shopping 0 0 0.00 0.15 0.34 0.06 0 0.55 6**/101 1/ Tail Dy of MRBC Jay Hanuman WUA Jeur Mul- Mahadeo Water User's Association, Deosade, 773 R2 1.345 Shopping 0.471 0.874 1.345 6**/102 Tal. Newasa Mul- Rehabilitaion work of Minor I Tail Dy of A2 1.100 Shopping 0.00 0.00 0.00 0.42 0.00 0.68 0.00 1.10 6**/102 MRBC Mahadeo WUA Deosade Mul- Nagnath Water User's Association, Telkudgaon, 774 R2 0.786 Shopping 0.197 0.511 0.079 0.786 6**/103 Tal. Newasa 2/24/2011 wua_prmpkg_r4 73 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitaion work of D.O. 12 to 14L / Minor Mul- A2 3 / Tail Dy of MRBC Nagnath WUA 0.650 Shopping 0 0 0.00 0.62 0.00 0.05 0 0.67 6**/103 Telkudgaon Mul- Balaji Water User's Association, Dedgaon, Tal. 775 R2 1.279 Shopping 0.320 0.831 0.128 1.279 6**/104 Newasa Mul- Rehabilitaion work of D.O. 16 L to 19 L / Tai Dy A2 1.160 Shopping 0 0 0.00 0.56 0.45 0.15 0 1.16 6**/104 of MRBC Balaji WUA Dedgaon Mul- Ramgir Baba Water User's Association, 776 R2 1.229 Shopping 0.307 0.799 0.123 1.229 6**/105 Telkudgaon, Tal. Newasa Mul- Rehabilitaion work of D.O. 10 L to 18 L / Taili A2 1.280 Shopping 0 0 0.00 0.00 0.45 0.83 0 1.28 6**/105 Dy of MRBC Ramgiribaba WUA Telkudgaon Mul- Vyankatesh Water User's Association, Dedgaon, 777 R2 0.958 Shopping 0.240 0.623 0.096 0.958 6**/106 Tal. Newasa Rehabilitaion work of D.O. 1L to 3L, 1 R to 3 R Mul- A2 / Minor 1 / Tail Dy of MRBC Vyankatesh WUA 0.990 Shopping 0 0 0.00 0.49 0.42 0.10 0 1.01 6**/106 Dedgaon Mul- Jagdamba Water User's Association, Deosade, 778 R2 1.295 Shopping 0.324 0.842 0.130 1.295 6**/107 Tal. Newasa Rehabilitaion work of OL1, OL5,6, 6a, 6b. 7, 8, Mul- A2 9, 10 / Tail Dy / MRBC Jagdamba WUA 1.230 Shopping 0 0 0.00 0.19 0.31 0.73 0 1.23 6**/107 Deosade Mula Mul-7** Rehabilation of minors (WUA level works -50 74.75 WUA 3.74 18.69 22.43 22.43 7.48 74.75 R Mul-7** Rehabilation of minors (WUA level works -50 74.75 WUA 11.21 26.16 33.64 3.74 74.75 Mul- Bhairavanath Water User's Association, Vadala, 779 R2 1.284 Shopping 0.321 0.835 0.128 1.284 7**/1 Tal.Newasa Mul- Rehabilitaion work of DO 2L, 3L Minor 2 Dy 1 A2 1.140 Shopping 0 0 0.00 0.92 0.21 0.00 0 1.13 7**/1 Br,4 of MRBC Bhairavnath WUA Wadala Mul- Adarsha Water User's Association, Vadala, Tal. 780 R2 0.961 Shopping 0.240 0.625 0.096 0.961 7**/2 Newasa Mul- Rehabilitaion work of D.O. 4L, 5L, / Dy 1 of Br. A2 0.920 Shopping 0 0 0.00 0.00 0.52 0.40 0 0.92 7**/2 I of MRBC Adarsha Shetkari WUA Vadala Mul- Shambhu Raje Water User's Association, 781 R2 0.786 Shopping 0.197 0.511 0.079 0.786 7**/3 Tamaswadi, Tal. Newasa 2/24/2011 wua_prmpkg_r4 74 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Mul- Rehabilitaion work of D.O. 8L, 9L, / Dy 1/ Br. I A2 0.680 Shopping 0 0 0.00 0.00 0.00 0.70 0 0.70 7**/3 of MRBC Shambhuraje WUA Tamaswadi Mul- Swami Vivekanand Water User's Association, 782 R2 1.14 Shopping 0.285 0.741 0.114 1.140 7**/4 Tamaswadi, Tal. Newasa Rehabilitaion work of D.O. 10 L / Dy 1 of Br.I Mul- A2 of MRBC Swami Vivekanand WUA 1.000 Shopping 0 0 0.00 0.00 0.00 1.00 0 1.00 7**/4 Tamaswadi Mul- Gahininath Water User's Association, Mali 783 R2 1.281 Shopping 0.320 0.833 0.128 1.281 7**/5 Chinchora, Tal. Newasa Rehabilitaion work of D.O. 2 R , 2 RA, /Minor 3 Mul- A2 / Dy 1 / Branch I / MRBC Gahininath WUA 1.160 Shopping 0 0 0.00 0.61 0.35 0.00 0 0.96 7**/5 Mali Chinchore Mul- Kanifnath Water User's Association, Newasa 784 R2 1.463 Shopping 0.366 0.951 0.146 1.463 7**/6 Kd., Tal. Newasa Mul- Rehabilitaion work of Minor 8 / Dy 1 of Br. I of A2 1.370 Shopping 0 0 0.00 0.00 0.00 1.37 0 1.37 7**/6 MRBC Kanifnath WUA Newasa Mul- Dnyaneshwar Mauli Water User's Association, 785 R2 1.308 Shopping 0.327 0.850 0.131 1.308 7**/7 Mali Chinchora, Tal. Newasa Mul- Rehabilitaion work of Minor 4 Dy 1 of Br. I of A2 1.100 Shopping 0.00 0.00 0.50 0.50 0.00 0.10 0.00 1.10 7**/7 MRBC Dnyaneshwar WUA Mali Chinchora Mul- Pandurang Water User's Association, Rastapur, 786 R2 1.706 Shopping 0.427 1.109 0.171 1.706 7**/8 Tal. Newasa Mul- Rehabilitaion work of DO 1 to 3 Br I of MRBC A2 1.600 Shopping 0 0 0.00 0.97 0.00 0.62 0 1.59 7**/8 Pandurang WUA Rastapur Mul- Hingala Devi Water User's Association, 787 R2 1.683 Shopping 0.421 1.094 0.168 1.683 7**/9 Rastapur, Tal. Newasa Mul- Rehabilitaion work of Do 2, 3 & 5 6L / Branch I R3 1.50 Shopping 0.750 0.750 1.50 7**/9 MRBC Hingaladevi WUA Rastapur Rehabilitation And Modernization works / Direct Mul- A3 Minor 2, 3 and Do 4L, 5L Branch I M. R. B. C. 1.30 Shopping 0 0 0.00 0.00 0.00 1.30 0 1.30 7**/9 ( Hingaladevi WUA Rastapur ) Mul- Rajmata Water User's Association, Mhalas 788 R2 1.012 Shopping 0.253 0.658 0.101 1.012 7**/10 Pimpalgaon, Tal. Newasa Mul- Rehabilitaion work of Minor I Dy 1 Br. I of A2 0.800 Shopping 0.00 0.00 0.00 0.44 0.00 0.36 0.00 0.80 7**/10 MRBC Rajmata WUMhalas Pimplagon 2/24/2011 wua_prmpkg_r4 75 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Mul- Jay Durga Mata Water User's Association, Usthal 789 R2 0.906 Shopping 0.227 0.589 0.091 0.906 7**/11 Dumala, Tal. Newasa Mul- Rehabilitaion work of Minor 4 / Dy 1 of Br. I A2 0.820 Shopping 0 0 0.00 0.00 0.00 0.82 0 0.82 7**/11 of MRBC Jay Durga WUA Usthal Mul- Samarth Water User's Association, Usthal 790 R2 1.41 Shopping 0.353 0.917 0.141 1.410 7**/12 Dumala, Tal. Newasa Mul- Rehabilitaion work of Minor 4 / Dy 1 of Br. I of A2 1.100 Shopping 0 0 0.00 0.00 0.00 1.10 0 1.10 7**/12 MRBC Samarth WUA Usthal Mul- Shri Ganesh Water User's Association, Nipani 791 R2 1.247 Shopping 0.312 0.811 0.125 1.247 7**/13 Nimgaon, Tal. Newasa Rehabilitaion work of D.O. 3 R, 4L, 6L, 7L, / Mul- A2 Dy 1/ Br. I of MRBC Shri Ganesh WUA Nipani 1.150 Shopping 0.00 0.00 0.00 0.58 0.40 0.17 0.00 1.15 7**/13 Nimgaon Mul- Triveneshwar Water User's Association, 792 R2 4.462 NCB 1.116 2.231 1.116 4.462 7**/14 Kharavandi, Tal. Newasa Mul- Rehabilitaion work of Nimbhe Minor 5 / Dy 1 / A2 3.530 NCB 0.00 0.00 0.00 0.00 2.85 0.04 0.00 2.89 7**/14 Br. I of MRBC Triveni shwar WUA Kharwandi Mul- Jagdamba Mata Water User's Association, 793 R2 2.499 NCB 0.625 1.250 0.625 2.499 7**/15 Tamaswadi, Tal. Newasa Mul- Rehabilitaion work Minor 5 / Dy 1 / Br. I of A2 2.500 NCB 0.00 0.00 0.00 0.00 0.00 2.50 0.00 2.50 7**/15 MRBC Jagdamba mata WUA Tamaswadi Mul- Pandurang Water User's Association, Tamaswadi 794 R2 0.919 Shopping 0.230 0.597 0.092 0.919 7**/16 , Tal. Newasa Mul- Rehabilitaion work of Direct Minor 6 / Dy 1 of A2 0.800 Shopping 0 0 0.00 0.00 0.00 0.80 0 0.80 7**/16 Br. I of MRBC Pandurang WUA Tamaswadi Mul- Samata Water User's Association, Nipani 795 R2 1.553 Shopping 0.388 1.009 0.155 1.553 7**/17 Nimgaon, Tal. Newasa Mul- Rehabilitaion work of Minor 7 Dy 1 of Br. I A2 1.310 Shopping 0.00 0.00 0.00 0.60 0.70 0.00 0.00 1.30 7**/17 of MRBC Samata WUA Nipani Nimgaon Mul- Sant Lukade Maharaj Water User's Association, 796 R2 2.122 NCB 0.531 1.061 0.531 2.122 7**/18 Narayanwadi, Tal. Newasa Mul- Rehabilitaion work Minor 7 / Dy 1 / Br. I of A2 1.980 NCB 0.00 0.00 0.00 0.00 0.00 1.98 0.00 1.98 7**/18 MRBC Sant Lukade maharaj WUA Naayanwadi Mul- Vishvakarma Water User's Association, 797 R2 0.933 Shopping 0.233 0.606 0.093 0.933 7**/19 Narayanwadi, Tal. Newasa 2/24/2011 wua_prmpkg_r4 76 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitaion work of D.O. 5 R to 8 R/ Dy 1 / Mul- A2 Branch I / MRBC Vishvakarma WUA 0.820 Shopping 0 0 0.00 0.00 0.46 0.36 0 0.82 7**/19 Narayanwadi Mul- Veerbhadra Water User's Association, 798 R2 0.986 Shopping 0.247 0.641 0.099 0.986 7**/20 Dhangarwadi, Tal. Newasa Rehabilitaion work of D.O. 13L, to 15L, / Dy 1 Mul- A2 of Br. 1 of MRBC Virbhadra WUA 0.910 Shopping 0 0 0.00 0.00 0.00 0.92 0 0.92 7**/20 Dhanagarwadi Mul- Ekata Water User's Association, Newasa, Tal. 799 R2 1.861 NCB 0.465 0.931 0.465 1.861 7**/21 Newasa Rehabilitaion work of D.O. 9 R (A), 10 R / Mul- A2 Minor 9 / Dy 1 of Br. I of MRBC Ekata WUA 1.210 Shopping 0 0 0.00 0.28 0.61 0.00 0 0.89 7**/21 Newasa Mul- Swami Sachhidanad Water User's Association, 800 R2 1.063 Shopping 0.266 0.691 0.106 1.063 7**/22 Khupti, Tal. Newasa Rehabilitaion work of Minor 8, D.O. 9R / Dy 1 Mul- A2 of Br 1 of MRBC Swami Sacchidanand WUA 0.980 Shopping 0 0 0.00 0.00 0.00 0.99 0 0.99 7**/22 Khupati Mul- Shri Saraswati Mata Water User's Association, 801 R2 1.042 Shopping 0.261 0.677 0.104 1.042 7**/23 Khupti, Tal. Newasa Mul- Rehabilitaion work of Do 15L to 17L Dy 1 / Br. A2 0.870 Shopping 0 0 0.00 0.24 0.00 0.63 0 0.87 7**/23 I of MRBC Shri Sarswatimata WUA Khupti Mul- Mahanandi Water User's Association, Khupti, 802 R2 2.494 NCB 0.624 1.247 0.624 2.494 7**/24 Tal. Newasa Mul- Rehabilitaion work of Dy 1 of Br. 1 of A2 0.910 Shopping 0 0 0.00 0.00 0.00 0.91 0 0.91 7**/24 MRBC Mahanandi WUA Khupati Mul- Mohinaraj Water User's Association, Newasa 803 R2 1.045 Shopping 0.261 0.679 0.105 1.045 7**/25 Kd., Tal. Newasa Rehabilitaion work of Sub Minor 10 L, 12 L, / Mul- A2 Dy 2 / Branch I / MRBC Mohaniraj WUA 0.970 Shopping 0 0 0.00 0.46 0.00 0.51 0 0.97 7**/25 Newasa Mul- Jay Kisan Water User's Association, Handi 804 R2 1.895 NCB 0.474 0.948 0.474 1.895 7**/26 Nimgaon, Tal. Newasa Mul- Rehabilitaion work of Minor 4 / Dy 2 / Branch I A2 1.800 Shopping 0 0 0.00 0.62 0.65 0.00 0 1.27 7**/26 / MRBC JayKisan WUA Handi Nimgaon Mul- Veerbhadra Water User's Association, Bhanas 805 R2 1.29 Shopping 0.323 0.839 0.129 1.290 7**/27 Hivare, Tal. Newasa 2/24/2011 wua_prmpkg_r4 77 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitaion work of Minor 2 / Sub Minor 4 / Mul- A2 Dy 2 / Branch I / MRBC Virbhadra WUA 1.190 Shopping 0 0 0.00 0.68 0.26 0.25 0 1.19 7**/27 Bhanashivara Mul- Pawan Ganesh Water User's Association, 806 R2 1.628 Shopping 0.407 1.058 0.163 1.628 7**/28 Newasa, Tal. Newasa Rehabilitaion work of Minor 5 / Sub Minor 14 R Mul- A2 / 14 L Dy 2 of Br. I of MRBC Pawan Ganesh 1.430 Shopping 0.00 0.00 0.00 0.00 0.00 1.43 0.00 1.43 7**/28 WUA Newasa Mul- Nagnath Water User's Association, Ranjangaon, 807 R2 1.236 Shopping 0.309 0.803 0.124 1.236 7**/29 Tal. Newasa Mul- Rehabilitaion work of D.O. 9 to 13 of Br. I of A2 1.130 Shopping 0 0 0.00 0.92 0.21 0.00 0 1.13 7**/29 MRBC Nagnath WUA Ranjangaon Mul- Sant Savanta Maharaj Water User's Association, 808 R2 1.551 Shopping 0.388 1.008 0.155 1.551 7**/30 Mali Chinchora, Tal. Newasa Mul- Rehabilitaion work of Direct Minor 4 / Br. I / A2 1.440 Shopping 1.440 1.44 7**/30 MRBC Savata WUA Mali Chinchora Mul- Trimurti Water User's Association, Mali 809 R2 1.518 Shopping 0.380 0.987 0.152 1.518 7**/31 Chinchora, Tal. Newasa Mul- Rehabilitaion work of Minor 5 Do 6, 7, 8 Br. I A2 1.290 Shopping 0.00 0.00 0.00 0.84 0.30 0.00 0.00 1.14 7**/31 of MRBC Trimurti Mali Chijchora Mul- Shri Ram Water User's Association, Bhanas 810 R2 1.459 Shopping 0.365 0.948 0.146 1.459 7**/32 Hivara, Tal. Newasa Mul- Rehabilitaion work of D.O. 14 / to 18 / Branch I A2 1.350 Shopping 0 0 0.00 0.56 0.00 0.79 0 1.35 7**/32 / MRBC Shriram WUA Bhanashivara Mul- Varkhed Mata Water User's Association, Usthal, 811 R2 1.768 Shopping 0.442 1.149 0.177 1.768 7**/33 Tal. Newasa Mul- Rehabilitaion work of DO 7R to 9R, 9L / Dy 2 A2 1.650 Shopping 0 0 0.00 0.00 0.00 1.65 0 1.65 7**/33 Br. I / MRBC Warkhedmauli WUA Ushtal Mul- Gurudeo Datta Water User's Association, 812 R2 2.496 NCB 0.624 1.248 0.624 2.496 7**/34 Bhanas Hivare, Tal. Newasa Rehabilitaion work of Minor 4 / Tail Portion of Mul- A2 Dy 2 / Branch I / MRBC Jay Gurudeodatta 2.080 NCB 0.00 0.00 0.00 0.00 1.00 1.08 0.00 2.08 7**/34 WUA Bhanashivare Mul- Hanuman Water User's Association, Bhanas 813 R2 1.687 Shopping 0.422 1.097 0.169 1.687 7**/35 Hivara, Tal. Newasa Mul- Rehabilitaion work of Minor 4 / Dy 2 / Branch I A2 1.400 Shopping 0 0 0.00 0.00 0.00 1.40 0 1.40 7**/35 of MRBC Hanuman WUA Bhanashivare 2/24/2011 wua_prmpkg_r4 78 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Mul- Priyadarshani Water User's Association, 814 R2 1.387 Shopping 0.347 0.902 0.139 1.387 7**/36 Salabatpur, Tal. Newasa Mul- Rehabilitaion work of Minor 1 Dy 5 of Br.I of A2 1.180 Shopping 0.00 0.00 0.00 1.05 0.13 0.00 0.00 1.18 7**/36 MRBC Priyadarshani WUA Sultanpur Mul- Mauli Water User's Association, Mukindpur, Tal. 815 R2 0.913 Shopping 0.228 0.593 0.091 0.913 7**/37 Newasa Mul- Rehabilitaion work of OL 4L to 6L / 4\ R to 6R A2 0.700 Shopping 0 0 0.00 0.00 0.25 0.45 0 0.70 7**/37 Dy 3 / Br. I / MRBC Mauli WUA Mukindpur Mul- Jay Shri Swami Samarth Water User's 816 R2 1.423 Shopping 0.356 0.925 0.142 1.423 7**/38 Association, Newasa Kd., Tal. Newasa Rehabilitaion work of OL7 R to 9 R / Dy 3 / Mul- A2 Branch I / M.R.B.C. Swami Samarth WUA 1.320 Shopping 0 0 0.00 0.00 0.47 0.85 0 1.32 7**/38 Newasa Mul- Triveneshwar Water User's Association, Handi 817 R2 1.171 Shopping 0.293 0.761 0.117 1.171 7**/39 Nimgaon, Tal. Newasa Mul- Rehabilitaion work of Minor 2 / Dy 3 / Branch I A2 1.080 Shopping 0 0 0.00 0.00 0.41 0.67 0 1.08 7**/39 of MRBC Trivenishwar WUA Handi Nimgaon Mul- Sant Savanti Water User's Association, 818 R2 0.823 Shopping 0.206 0.535 0.082 0.823 7**/40 Gondegaon, Tal. Newasa Mul- Rehabilitaion work of OL - 10 L to 13 L / Dy 5 A2 0.780 Shopping 0.00 0.00 0.00 0.33 0.31 0.14 0.00 0.78 7**/40 of Br.I of MRBC Sant Savanta WUA Gonegaon Mul- Shri Krishna Water User's Association, Bhanas 819 R2 1.176 Shopping 0.294 0.764 0.118 1.176 7**/41 Hivara, Tal. Newasa Mul- Rehabilitaion work of Direct Minor 6 /Br. I / A2 1.080 Shopping 0 0 0.00 0.00 1.05 0.00 0 1.05 7**/41 MRBC ShriKrishna WUA Bhanashivare Mul- Gurudatta Water User's Association, Handi 820 R2 1.583 Shopping 0.396 1.029 0.158 1.583 7**/42 Nimgaon, Tal. Newasa Mul- Rehabilitaion work of Minor 1 / Dy 3 / Br. I A2 1.470 Shopping 0 0 0.00 0.00 1.04 0.43 0 1.47 7**/42 MRBC GuruDatta WUA Handi Nimgaon Mul- Hanuman Water User's Association, Mukindpur, 821 R2 0.926 Shopping 0.232 0.602 0.093 0.926 7**/43 Tal. Newasa Mul- Rehabilitaion work of Dy 3 / Br. I / MRBC A2 0.800 Shopping 0 0 0.00 0.00 0.28 0.52 0 0.80 7**/43 Hanuman WUA Mukindpur Mul- Pawan Ganapati Water User's Association, 822 R2 1.774 Shopping 0.444 1.153 0.177 1.774 7**/44 Mukindpur, Tal. Newasa 2/24/2011 wua_prmpkg_r4 79 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Mul- Rehabilitaion work of Minor 2 Dy 3 Branch I R3 1.58 Shopping 0.790 0.790 1.58 7**/44 MRBC Pavan Ganpati WUA Newasa Rehabilitation And Modernization works Minor Mul- A3 2 / Dy 3 Branch I M. R. B. C. 1.29 Shopping 0 0 0.00 0.00 0.00 1.29 0 1.29 7**/44 ( Pawan Ganpati WUA Newasa ) Mul- Bhairavanath Water User's Association, 823 R2 1.292 Shopping 0.323 0.840 0.129 1.292 7**/45 Pichadgaon, Tal. Newasa Mul- Rehabilitaion work of OL 1 t0 8 Dy 5 Branch I A2 1.120 Shopping 0 0 0.00 0.80 0.21 0.13 0 1.14 7**/45 of MRBC Bhairvnath WUA Malewadi Mul- Sant Tukaram Water User's Association, 824 R2 1.03 Shopping 0.258 0.670 0.103 1.030 7**/46 Babhulkheda, Tal. Newasa Mul- Rehabilitaion work of Minor 1 / Dy 5 of Br. I of A2 0.830 Shopping 0 0 0.00 0.00 0.24 0.60 0 0.84 7**/46 MRBC Tukaran WUA Babhulkheda Mul- Sant Dnyaneshwar Water User's Association, 825 R2 1.775 Shopping 0.444 1.154 0.178 1.775 7**/47 Babhulkheda, Tal. Newasa Mul- Rehabilitaion work of Minor 1 of Dy 5 / Branch A2 1.640 Shopping 0 0 0.00 0.00 1.61 0.00 0 1.61 7**/47 I / MRBC Dnyaneshwar WUA Babhulkhede Mul- Shri Kisan Giri Water User's Association, Baku 826 R2 2.497 NCB 0.624 1.249 0.624 2.497 7**/48 Pimpalgaon, Tal. Newasa Mul- Rehabilitaion work of Minor 5 / Dy 4 / Br. I / A2 2.070 NCB 0.00 0.00 0.00 0.00 1.23 0.84 0.00 2.07 7**/48 MRBC Kisangiri WUA Baku pimpalgaon Mul- Jay Jijau Water User's Association, Malewadi, 827 R2 1.609 Shopping 0.402 1.046 0.161 1.609 7**/49 Tal. Newasa Rehabilitaion work of D.O.9L to 10 L / Minor 6 / Mul- A2 Dy 4 of Br. I of MRBC Jay Jijau WUA 1.490 Shopping 0 0 0.00 1.06 0.45 0.00 0 1.51 7**/49 Malwadi Mul- Shri Dnyaneshwar Water User's Association, 828 R2 1.105 Shopping 0.276 0.718 0.111 1.105 7**/50 Jalke, Tal. Newasa Mul- Rehabilitaion work of Minor 3. D.O. R 4 of Br. A2 0.980 Shopping 0 0 0.00 0.94 0.00 0.04 0 0.98 7**/50 I of MRBC Dnyaneshwar WUA Jalka Mul- Shri Muktapur Water User's Association, 829 R2 1.997 NCB 0.499 0.999 0.499 1.997 7**/51 Muktapur, Tal. Newasa Rehabilitaion work of Do 19 to 20 Sub Minor 1, Mul- R3 2 , 3, 4 Dy 4 Branch I MRBC Muktipur WUA 1.37 Shopping 0.685 0.685 1.37 7**/51 Muktipur 2/24/2011 wua_prmpkg_r4 80 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitaion work of DO 19 to 20 Subminor OL Mul- A3 2 OL 3 Dy 4 Branch I / MRBC Mukindpur 1.44 Shopping 0 0 0.00 0.00 1.17 0.00 0 1.17 7**/51 WUA Mukindpur Mul- Shri Shiv Shakti Water User's Association, 830 R2 2.49 NCB 0.623 1.245 0.623 2.490 7**/52 Khadka, Tal. Newasa Rehabilitaion work of Minor 2 / Minor 2/1 Mul- A2 SMR / Minor 2/ DO 4 / Dy 4 of Br. I of 1.870 Shopping 0 0 0.00 1.23 0.15 0.00 0 1.38 7**/52 MRBC Shivshakti WUA Khadaka Mul- Shri Mauli Water User's Association, Jalke Kd., 831 R2 1.723 Shopping 0.431 1.120 0.172 1.723 7**/53 Tal. Newasa Mul- Rehabilitaion work of Minor 2 Dy 4 of Br. I A2 1.380 Shopping 0 0 0.00 0.54 0.00 0.84 0 1.38 7**/53 of MRBC Mauli WUA Jalaka Mul- Shri Mahant Bhaskar Giri Water User's 832 R2 1.87 NCB 0.468 0.935 0.468 1.870 7**/54 Association, Jalke Kd., Tal. Newasa Rehabilitaion work of Direct Minor 2 / SM 2/3 / Mul- A2 Dy 4 / Branch I of MRBC Mahant Bhaskargiri 1.620 Shopping 0 0 0.00 1.23 0.35 0.00 0 1.58 7**/54 Maharaj WUA Jalka Mul- Shri Siddheshwar Water User's Association, 833 R2 3.26 NCB 0.815 1.630 0.815 3.260 7**/55 Pravara Sangam, Tal. Newasa Rehabilitaion work of Minor 7 and 8, D.O. L 4 / Mul- A2 Dy 4/ Branch I/ MRBC Sidhewshwar WUA 2.560 NCB 0.00 0.00 0.00 0.00 1.14 1.42 0.00 2.56 7**/55 Pravara Sangam Mul- Shri Sangameshwar Water User's Association, 834 R2 1.072 Shopping 0.268 0.697 0.107 1.072 7**/56 Pravara Sangam, Tal. Newasa Rehabilitaion work of SM OL 6, OR 7, OR 6 (A) Mul- A2 , Tail / Dy 4 of Br. I of MRBC Sangameshwar 0.950 Shopping 0 0 0.00 0.00 0.87 0.00 0 0.87 7**/56 WUA Pravara Sangam Mul- Shri Kal Bheirav Water User's Association, 835 R2 1.841 NCB 0.460 0.921 0.460 1.841 7**/57 Khalal Pimpri, Tal. Newasa Mul- Rehabilitaion work of Minor 4 / Dy4 of Br. 1 of A2 1.730 Shopping 0 0 0.00 0.70 0.00 1.00 0 1.70 7**/57 MRBC KalBhairav WUA Khalal Pimpri Mul- Shri Jagdamba Water User's Association, 836 R2 2.416 NCB 0.604 1.208 0.604 2.416 7**/58 Khadka, Tal. Newasa Mul- Rehabilitaion work Minor 4 / Dy 4 / Br. I of A2 2.230 NCB 0.00 0.00 0.00 0.00 0.78 1.45 0.00 2.23 7**/58 MRBC Jagdamba WUA Khadka Mul- Shri Ganesh Trupti Water User's Association, 837 R2 1.331 Shopping 0.333 0.865 0.133 1.331 7**/59 Babhulkheda, Tal. Newasa 2/24/2011 wua_prmpkg_r4 81 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Mul- Rehabilitaion work of Minor 2 Dy 4 / of Br. I A2 0.970 Shopping 0 0 0.00 0.70 0.00 0.37 0 1.07 7**/59 of MRBC Ganesh Trupti WUA Babul Khede Mul- Shripad Krishna Water User's Association, Jalke 838 R2 2.956 NCB 0.739 1.478 0.739 2.956 7**/60 Bk., Tal. Newasa Mul- Rehabilitaion work of Minor 2/2 / Dy 4 / Br. I A2 2.220 NCB 0.00 0.00 0.00 1.11 0.00 1.10 0.00 2.21 7**/60 of MRBC Shripad Krishna WUA Jalke Mul- Jay Yogeshwar Water User's Association, Jalke 839 R2 1.997 NCB 0.499 0.999 0.499 1.997 7**/61 Kd., Tal. Newasa Rehabilitaion work of Minor 2 / Minor 2/1 / Mul- A2 SMR / Minor 2 Dy 4 of Br. I of MRBC Jay 1.620 Shopping 0 0 0.00 1.27 0.02 0.30 0 1.59 7**/61 Yogeshwar WUA Pichadgaon Mul- Shri Shankar Water User's Association, Jalke 840 R2 1.387 Shopping 0.347 0.902 0.139 1.387 7**/62 Kd., Tal. Newasa Mul- Rehabilitaion work of Minor 2/2 Dy 4 of Br. I A2 1.490 Shopping 0 0 0.00 0.20 1.27 0.00 0 1.47 7**/62 of MRBC Shankar WUA Jalka Mul- Shri Shivaji Maharaj Water User's Association, 841 R2 1.606 Shopping 0.402 1.044 0.161 1.606 7**/63 Murume, Tal. Newasa Mul- Rehabilitaion work of Minor 4 Dy 4 of Br. I A2 1.370 Shopping 0 0 0.00 0.00 0.64 0.72 0 1.36 7**/63 of MRBC Jai Shivaji WUA Murame Mul- Tulja Bhavani Water User's Association, Jalke 842 R2 2.482 NCB 0.621 1.241 0.621 2.482 7**/64 Kd., Tal. Newasa Rehabilitaion work of D.O. 6L to 8 L, and DO.R. Mul- A2 1 to 3 / Dy 4 of Br.I of MRBC Tulja Bhavani 1.590 Shopping 0 0 0.00 0.00 0.85 0.74 0 1.59 7**/64 WUA Jalka Mula Mul-8** Rehabilation of minors (WUA level works -69 103.15 WUA 5.16 25.79 30.95 25.79 15.47 103.15 R Mul-8** Rehabilation of minors (WUA level works -30 44.87 WUA 6.73 15.70 20.19 2.24 44.87 Mul- 843 R2 Rokadeshwar WUA 1.704 Shopping 0.596 1.108 1.704 8**/1 Mul- Rokdeshwar Water User's Association,, Tal. A2 1.70 Shopping 8**/1 Rahuri Dist. Ahmednagar Mul- Rokdeshwar Water User's Association,, Tal. A2/1 1.670 Shopping 0 0 0.00 1.09 0.23 0.00 0 1.32 8**/1 Rahuri Dist. Ahmednagar Mul- 844 R2 K.L.Pawar WUA 2.913 NCB 0.728 1.457 0.728 2.913 8**/2 2/24/2011 wua_prmpkg_r4 82 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Mul- Late K.L. Pawar ,Water User's Association A2 2.481 NCB 0 0 0.00 0.66 0.33 0.00 0 0.99 8**/2 Baragaon Nandur Tal. Rahuri Dist. Ahmednagar Mul- 845 R2 Prasad WUA 4.142 NCB 1.036 2.071 1.036 4.142 8**/3 Mul- Prasad Water User's Association, Rahuri Tal. A2 3.959 NCB 0 0 0.00 0.00 1.03 0.00 0 1.03 8**/3 Rahuri Dist. Ahmednagar Mul- 846 R2 Baleshwar WUA 2.482 NCB 0.621 1.241 0.621 2.482 8**/4 Mul- Baleshwar Water User's Association, Rahuri A2 2.427 NCB 0 0 0.00 2.10 0.00 0.00 0 2.10 8**/4 Tal. Rahuri Dist. Ahmednagar Mul- 847 R2 Jai Malhar WUA 2.499 NCB 0.625 1.250 0.625 2.499 8**/5 Mul- Jai Malhar Water User's Association, Rahuri A2 2.422 NCB 0 0 0.00 2.32 0.00 0.00 0 2.32 8**/5 Tal. Rahuri Dist. Ahmednagar Mul- 848 R2 Ahilyadevi WUA 1.592 Shopping 0.557 1.035 1.592 8**/6 Mul- Ahilydevi , Water User's Association,Lakh Tal. A2 1.59 Shopping 8**/6 Rahuri Dist. Ahmednagar Mul- Ahilydevi , Water User's Association,Lakh Tal. A2/1 1.560 Shopping 0 0 0.00 0.00 1.01 0.00 0 1.01 8**/6 Rahuri Dist. Ahmednagar Mul- 849 R2 Jai Bajarang Bali WUA 2.328 NCB 0.582 1.164 0.582 2.328 8**/7 Mul- Jai Bajrang Bali Water User's Association, A2 2.273 NCB 0 0 0.00 1.18 0.00 0.00 0 1.18 8**/7 Rahuri Tal. Rahuri Dist. Ahmednagar Mul- 850 R2 Narsoba WUA 3.833 NCB 0.958 1.917 0.958 3.833 8**/8 Mul- Narsoba, Water User's Association,Taklimiya A2 3.740 NCB 0 0 0.00 1.76 0.00 0.00 0 1.76 8**/8 Tal. Rahuri Dist. Ahmednagar Mul- 851 R2 Shri Vitthal WUA 2.566 NCB 0.642 1.283 0.642 2.566 8**/9 Shri Vitthal, Aradgaon Water User's Mul- A2 Association, Aradgaon Tal. Rahuri Dist. 2.393 NCB 0 0 0.00 0.91 0.39 0.00 0 1.29 8**/9 Ahmednagar Mul- 852 R2 Renukamata WUA 2.057 NCB 0.514 1.029 0.514 2.057 8**/10 2/24/2011 wua_prmpkg_r4 83 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Renukamata Manori Water User's Mul- A2 Association, WUA, Manori Tal. Rahuri Dist. 2.002 NCB 0 0 0.00 0.57 0.72 0.00 0 1.29 8**/10 Ahmednagar Mul- 853 R2 Hanuman WUA 6.291 NCB 1.573 3.146 1.573 6.291 8**/11 Mul- Hanuman , Water User's Association,Walan A2 5.700 NCB 0 0 0.00 2.63 0.00 0.00 0 2.63 8**/11 Tal. Rahuri Dist. Ahmednagar Mul- 854 R2 Chandragiri WUA 3.708 NCB 0.927 1.854 0.927 3.708 8**/12 Mul- Chandragiri , Water User's Association, A2 3.765 NCB 0 0 0.00 1.44 1.76 0.00 0 3.20 8**/12 Manjri Tal. Rahuri Dist. Ahmednagar Mul- 855 R2 Sant Bansi Maharaj WUA 3.821 NCB 0.955 1.911 0.955 3.821 8**/13 Mul- Sant Bansi Maharaj Water User's Association, A2 3.809 NCB 0 0 0.00 1.00 0.00 0.00 0 1.00 8**/13 Kopre Tal. Rahuri Dist. Ahmednagar Mul- 856 R2 Sant Govindbaba WUA 3.057 NCB 0.764 1.529 0.764 3.057 8**/14 Mul- Sant Govind Baba Water User's Association, A2 2.999 NCB 0 0 0.00 2.05 0.83 0.00 0 2.88 8**/14 Pathare Tal. Rahuri Dist. Ahmednagar Mul- 857 R2 Sant Kadam Mauli WUA 4.405 NCB 1.101 2.203 1.101 4.405 8**/15 Mul- Sant Kadam Mauli Water User's Association, A2 4.321 NCB 0 0 0.00 3.10 1.51 0.00 0 4.61 8**/15 Pathare Tal. Rahuri Dist. Ahmednagar Mul- 858 R2 Brahamanand WUA 2.656 NCB 0.664 1.328 0.664 2.656 8**/16 Brahmanand , Water User's Association, Mul- A2 Mahegaon Khudsargaon i Tal. Rahuri Dist. 2.560 NCB 0 0 0.00 0.00 1.32 0.00 0 1.32 8**/16 Ahmednagar Mul- 859 R2 Mhasoba Maharaj WUA 2.971 NCB 0.743 1.486 0.743 2.971 8**/17 Mhasobamaharaj Water User's Mul- A2 Association,MusalwadiTal. Rahuri Dist. 2.893 NCB 0 0 0.00 0.00 2.82 0.00 0 2.82 8**/17 Ahmednagar Mul- 860 R2 Miyasaheb WUA 3.108 NCB 0.777 1.554 0.777 3.108 8**/18 2/24/2011 wua_prmpkg_r4 84 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Mul- Miya Saheb , Water User's Association,Takali A2 3.043 NCB 0 0 0.00 2.08 1.04 0.00 0 3.12 8**/18 Miya,Tal. Rahuri Dist. Ahmednagar Mul- 861 R2 Shri Amruteshwar WUA 1.809 NCB 0.452 0.905 0.452 1.809 8**/19 Mul- Amruteshwar , Water User's Association, Lakh A2 1.662 Shopping 0 0 0.00 0.99 0.67 0.00 0 1.66 8**/19 , Tal. Rahuri Dist. Ahmednagar Mul- 862 R2 Pandurang WUA 4.549 NCB 1.137 2.275 1.137 4.549 8**/20 Mul- Pandurang , Water User's Association, A2 4.411 NCB 0 0 0.00 1.52 0.00 0.00 0 1.52 8**/20 Malunja Tal. Rahuri Dist. Ahmednagar Mul- 863 R2 Shri Ch.Shivaji Maharaj WUA 5.084 NCB 1.271 2.542 1.271 5.084 8**/21 Shri Ch. Shivaji Maharaj , Water User's Mul- A2 Association, Deolali Pravara Tal. Rahuri Dist. 4.911 NCB 0 0 0.00 4.09 0.97 0.00 0 5.07 8**/21 Ahmednagar Mul- 864 R2 Trimbakraj WUA 2.357 NCB 0.589 1.179 0.589 2.357 8**/22 Mul- Trimbakraj Water User's Association, Deolali A2 2.284 NCB 0 0 0.00 0.82 0.84 0.00 0 1.66 8**/22 Pravara Tal. Rahuri Dist. Ahmednagar Mul- 865 R2 Annasaheb Patil WUA 1.798 Shopping 0.450 1.169 0.180 1.798 8**/23 Mul- Annasaheb Patil , Water User's Association, A2 1.721 Shopping 0 0 0.00 1.04 0.00 0.00 0 1.04 8**/23 Deolali Pravara , Tal. Rahuri Dist. Ahmednagar Mul- 866 R2 Chandreshwar WUA 2.772 NCB 0.693 1.386 0.693 2.772 8**/24 Mul- Chandreshwar Water User's Association, A2 2.672 NCB 0 0 0.00 2.01 0.54 0.00 0 2.55 8**/24 Deolali Pravara , Tal. Rahuri Dist. Ahmednagar Rehabilitation of Minors of Hatnur Project 4 Hatnur Hat-4** 116.40 WUA 23.28 23.28 34.92 23.28 11.64 116.40 WUA-37 Rehabilitation of Minors of Hatnur Project R Hat-4** 116.40 WUA 17.46 40.74 52.38 5.82 116.40 WUA-38 Rehabilition work in the jurisdiction of Manwel 867 R2 HAT-4_5/1 W U Asso. Manwel for Manwel Minor of 8.156 NCB 1.631 4.078 2.447 8.156 Piloda dy of HRBC Tal Yawal Dist Jalgaon 2/24/2011 wua_prmpkg_r4 85 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the jurisdiction of A2 HAT-4_5/1 Manwel WUA Manwel for Manwel Minor of 7.96 NCB Piloda Dy. of H.R.B.C. Tal. Yawal Dist. Jalgaon. Rehabilitation work in the jurisdiction of A2/1 HAT-4_5/1 Manwel WUA Manwel for Manwel Minor of 8.250 NCB 0.00 0.00 1.53 1.29 1.25 3.70 0.00 7.77 Piloda Dy. of H.R.B.C. Tal. Yawal Dist. Jalgaon. Rehabilition work in the jurdicition of Sant 868 R2 HAT-4_5/2 Tukdoji W U Asso.Sampule for Kurwel Dy 8.72 NCB 1.744 4.360 2.616 8.720 minor-3 of HRBC Tal Chopada dist Jalgaon Rehabilitation work in the jurisdiction of Sant Tukadoji Water User Association, Sampule for A2 HAT-4_5/2 8.50 NCB Kurwel Dy, Minor 3 of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Sant Tukadoji Water User Association, Sampule for A2/1 HAT-4_5/2 8.50 NCB Kurwel Dy, Minor 3 of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Sant Tukadoji Water User Association, Sampule for A2/2 HAT-4_5/2 8.50 NCB Kurwel Dy, Minor 3 of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Sant Tukadoji Water User Association, Sampule for R3 HAT-4_5/2 9.07 NCB 0.454 5.896 2.721 9.07 Kurwel Dy, Minor 3 of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Sant Tukadoji Water User Association, Sampule for A3 HAT-4_5/2 9.07 NCB 0.00 0.00 0.00 4.91 5.60 0.00 0.00 10.51 Kurwel Dy, Minor 3 of HRBC Tal. Chopda Dist. Jalgaon Rehabilition work in the jurdicition of Sainatha W U Asso. Manjrehole for Vele Dy2 and its 869 R2 HAT-4_5/3 9.484 NCB 1.897 4.742 2.845 9.484 minors of Vele dy no 2 of HRBC Tal Chopada dist Jalgaon 2/24/2011 wua_prmpkg_r4 86 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the jurisdiction of Sainath A2 HAT-4_5/3 WUA Manjarehole for vele Dy. 2 & It's minor of 9.24 NCB H.R.B.C. Tal. Chopda Dist. Jalgaon. Rehabilitation work in the jurisdiction of Sainath A2/1 HAT-4_5/3 WUA Manjarehole for vele Dy. 2 & It's minor of 9.700 NCB 0.00 0.00 0.00 0.00 1.85 7.86 0.00 9.71 H.R.B.C. Tal. Chopda Dist. Jalgaon. Rehabilition work in the jurdicition of SanjeevaniW U AssoPungaon for Sub Minor 1 870 R2 HAT-4_5/4 4.776 NCB 0.955 2.388 1.433 4.776 to2 of Pungaon minor no1 of HRBC Tal Yawal dist Jalgaon Rehabilition work in the jurdicition of SanjeevaniW U AssoPungaon for Sub Minor 1 A2 HAT-4_5/4 4.960 NCB 0.00 0.00 0.00 1.65 0.00 3.31 0.00 4.96 to2 of Pungaon minor no1 of HRBC Tal Yawal dist Jalgaon Rehabilition work in the jurdicition of Shirsad 871 R2 HAT-4_5/5 W U Asso.Shirsad for shirsath and dev Minor 4.029 NCB 0.806 2.015 1.209 4.029 of HRBC Tal Chopada dist Jalgaon Rehabilitation work in the jurisdiction of Shirsad A2 HAT-4_5/5 Water User Association, Shirsad for Shirsad and 3.81 NCB Dev Minor of HRBC Tal. Yawal Dist. Jalgaon Rehabilitation work in the jurisdiction of Shirsad A2/1 HAT-4_5/5 Water User Association, Shirsad for Shirsad and 3.81 NCB Dev Minor of HRBC Tal. Yawal Dist. Jalgaon Rehabilitation work in the jurisdiction of Shirsad A2/2 HAT-4_5/5 Water User Association, Shirsad for Shirsad and 3.81 NCB Dev Minor of HRBC Tal. Yawal Dist. Jalgaon Rehabilitation work in the jurisdiction of Shirsad R3 HAT-4_5/5 Water User Association, Shirsad for Shirsad and 3.92 NCB 0.588 2.156 1.176 3.92 Dev Minor of HRBC Tal. Yawal Dist. Jalgaon 2/24/2011 wua_prmpkg_r4 87 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the jurisdiction of Shirsad A3 HAT-4_5/5 Water User Association, Shirsad for Shirsad and 3.92 NCB 0.00 0.00 0.00 0.00 3.06 0.86 0.00 3.92 Dev Minor of HRBC Tal. Yawal Dist. Jalgaon Rehabilition work in the jurdicition of KalbhairavW U Asso.Mangrud for Mangurad dy 872 R2 HAT-4_5/6 3.321 NCB 0.664 1.661 0.996 3.321 ch 3500 to 4300 m and its Minor of HRBC Tal Chopada dist Jalgaon Rehabilitation work in the jurisdiction of Kalbhairav Water User Association, Mangrul for A2 HAT-4_5/6 3.14 NCB Mangrul Dy. Ch. 3500 m. to 4300 m. and its minor of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Kalbhairav Water User Association, Mangrul for A2/1 HAT-4_5/6 3.14 NCB Mangrul Dy. Ch. 3500 m. to 4300 m. and its minor of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Kalbhairav Water User Association, Mangrul for A2/2 HAT-4_5/6 3.14 NCB Mangrul Dy. Ch. 3500 m. to 4300 m. and its minor of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Kalbhairav Water User Association, Mangrul for A2/3 HAT-4_5/6 3.14 NCB Mangrul Dy. Ch. 3500 m. to 4300 m. and its minor of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Kalbhairav Water User Association, Mangrul for R3 HAT-4_5/6 3.57 NCB 0.179 2.321 1.071 3.57 Mangrul Dy. Ch. 3500 m. to 4300 m. and its minor of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Kalbhairav Water User Association, Mangrul for A3 HAT-4_5/6 3.57 NCB 0.00 0.00 0.00 0.00 1.69 1.89 0.00 3.58 Mangrul Dy. Ch. 3500 m. to 4300 m. and its minor of HRBC Tal. Chopda Dist. Jalgaon Rehabilition work in the jurdicition of Sati kamalja deviW U Asso.Chahardi for Sub Minor 873 R2 HAT-4_5/7 3.11 NCB 0.622 1.555 0.933 3.110 1 of Chahardi dy of HRBC Tal Chopada dist Jalgaon 2/24/2011 wua_prmpkg_r4 88 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the jurisdiction of Sati Kamalaja Devi Water User Association, A2 HAT-4_5/6 2.93 NCB Chahardi for Sub Minor 1 of Chahardi Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Sati Kamalaja Devi Water User Association, A2/1 HAT-4_5/6 2.93 NCB Chahardi for Sub Minor 1 of Chahardi Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Sati Kamalaja Devi Water User Association, A2/2 HAT-4_5/6 2.93 NCB Chahardi for Sub Minor 1 of Chahardi Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Sati Kamalaja Devi Water User Association, R3 HAT-4_5/6 3.46 NCB 0.173 2.249 1.038 3.46 Chahardi for Sub Minor 1 of Chahardi Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Sati Kamalaja Devi Water User Association, A3 HAT-4_5/6 3.46 NCB 0.00 0.00 0.00 0.00 2.30 1.16 0.00 3.46 Chahardi for Sub Minor 1 of Chahardi Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilition work in the jurdicition of Boraval Sangvi W U AssoBoraval of Sangavi and 874 R2 HAT-4_5/8 4.066 NCB 0.813 2.033 1.220 4.066 Boraval Minor of HRBC Tal Yawal dist Jalgaon Rehabilitation work in the jurisdiction of Borawal Sangavi Water User Association, A2 HAT-4_5/8 3.95 NCB Borawal for Sangavi & Borawal Minor of HRBC Tal. Yawal Dist. Jalgaon Rehabilitation work in the jurisdiction of Borawal Sangavi Water User Association, A2/1 HAT-4_5/8 3.95 NCB Borawal for Sangavi & Borawal Minor of HRBC Tal. Yawal Dist. Jalgaon Rehabilitation work in the jurisdiction of Borawal Sangavi Water User Association, A2/2 HAT-4_5/8 3.95 NCB Borawal for Sangavi & Borawal Minor of HRBC Tal. Yawal Dist. Jalgaon 2/24/2011 wua_prmpkg_r4 89 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the jurisdiction of Borawal Sangavi Water User Association, R3 HAT-4_5/8 4.43 NCB 0.665 2.437 1.329 4.43 Borawal for Sangavi & Borawal Minor of HRBC Tal. Yawal Dist. Jalgaon Rehabilitation work in the jurisdiction of Borawal Sangavi Water User Association, A3 HAT-4_5/8 4.43 NCB 0.00 0.00 0.00 0.00 1.00 3.43 0.00 4.43 Borawal for Sangavi & Borawal Minor of HRBC Tal. Yawal Dist. Jalgaon Rehabilition work in the jurdicition of Manudevi W U Assol of Adavad for Wathar dy ch 2100 876 R2 HAT-4_5/10to 3600 m and its sub Minor and Gavali dy and 4.941 NCB 0.988 2.471 1.482 4.941 its sub minor of HRBC Tal Chopada dist Jalgaon Rehabilitation work in the jurisdiction of Manudevi Water User Association, Adawad of Vathar Dy Ch. 2100 m. to 3600 m. & its Sub A2 HAT-4_5/10 4.67 NCB Minor and Gawali Dy and its Sub Minor of Hatnur Right Bank Canal Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Manudevi Water User Association, Adawad of Vathar Dy Ch. 2100 m. to 3600 m. & its Sub A2/1 HAT-4_5/10 4.67 NCB Minor and Gawali Dy and its Sub Minor of Hatnur Right Bank Canal Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Manudevi Water User Association, Adawad of Vathar Dy Ch. 2100 m. to 3600 m. & its Sub A2/2 HAT-4_5/10 4.67 NCB Minor and Gawali Dy and its Sub Minor of Hatnur Right Bank Canal Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Manudevi Water User Association, Adawad of Vathar Dy Ch. 2100 m. to 3600 m. & its Sub A2/3 HAT-4_5/10 4.67 NCB Minor and Gawali Dy and its Sub Minor of Hatnur Right Bank Canal Tal. Chopda Dist. Jalgaon 2/24/2011 wua_prmpkg_r4 90 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the jurisdiction of Manudevi Water User Association, Adawad of Vathar Dy Ch. 2100 m. to 3600 m. & its Sub R3 HAT-4_5/10 5.32 NCB 0.266 3.458 1.596 5.32 Minor and Gawali Dy and its Sub Minor of Hatnur Right Bank Canal Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Manudevi Water User Association, Adawad of Vathar Dy Ch. 2100 m. to 3600 m. & its Sub A3 HAT-4_5/10 5.32 NCB 0.00 0.00 0.00 0.00 2.70 2.62 0.00 5.32 Minor and Gawali Dy and its Sub Minor of Hatnur Right Bank Canal Tal. Chopda Dist. Jalgaon Rehabilition work in the jurdicition of Tapi W U AssoWadgaon for Adavad dy ch 2700 to 5700 875 R2 HAT-4_5/9 4.447 NCB 0.889 2.224 1.334 4.447 and its wadgaon sub l Minor of Adavad dy of HRBC Tal Chopada dist Jalgaon Rehabilitation work in the jurisdiction of Tapi Water User Association, Vadgaon of Adawad Dy A2 HAT-4_5/9 Ch. 2700 m. to 5700 m. and its Vadgaon Sub 4.21 NCB Minor of Adawad Dy. of Hatnur Right Bank Canal Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Tapi Water User Association, Vadgaon of Adawad Dy A2/1 HAT-4_5/9 Ch. 2700 m. to 5700 m. and its Vadgaon Sub 4.21 NCB Minor of Adawad Dy. of Hatnur Right Bank Canal Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Tapi Water User Association, Vadgaon of Adawad Dy A2/2 HAT-4_5/9 Ch. 2700 m. to 5700 m. and its Vadgaon Sub 4.21 NCB Minor of Adawad Dy. of Hatnur Right Bank Canal Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Tapi Water User Association, Vadgaon of Adawad Dy A2/3 HAT-4_5/9 Ch. 2700 m. to 5700 m. and its Vadgaon Sub 4.21 NCB Minor of Adawad Dy. of Hatnur Right Bank Canal Tal. Chopda Dist. Jalgaon 2/24/2011 wua_prmpkg_r4 91 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the jurisdiction of Tapi Water User Association, Vadgaon of Adawad Dy R3 HAT-4_5/9 Ch. 2700 m. to 5700 m. and its Vadgaon Sub 4.77 NCB 0.239 3.101 1.431 4.77 Minor of Adawad Dy. of Hatnur Right Bank Canal Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Tapi Water User Association, Vadgaon of Adawad Dy A3 HAT-4_5/9 Ch. 2700 m. to 5700 m. and its Vadgaon Sub 4.77 NCB 0.00 0.00 0.00 0.00 3.34 1.22 0.00 4.56 Minor of Adawad Dy. of Hatnur Right Bank Canal Tal. Chopda Dist. Jalgaon Rehabilition work in the jurdicition of Shri Datta 877 R2 HAT-4_5/11W U Asso Tavase for Minor no 6 of Kurvel 4.534 NCB 0.907 2.267 1.360 4.534 dy of HRBC Tal Chopada dist Jalgaon Rehabilitation work in the jurisdiction of A2 HAT-4_5/11ShriDatta WUA Tawase Br. For minor No.6 of 4.28 NCB Kurvel Dy.of HRBC Tal.- Chopda Dist. Jalgaon. Rehabilitation work in the jurisdiction of A2/1 HAT-4_5/11ShriDatta WUA Tawase Br. For minor No.6 of 4.28 NCB Kurvel Dy.of HRBC Tal.- Chopda Dist. Jalgaon. Rehabilitation work in the jurisdiction of A2/2 HAT-4_5/11ShriDatta WUA Tawase Br. For minor No.6 of 4.470 NCB 0.00 0.00 0.00 1.26 1.85 1.37 0.00 4.48 Kurvel Dy.of HRBC Tal.- Chopda Dist. Jalgaon. Rehabilition work in the jurdicition of Swami shitalnath W U Asso of Nimgavan for Minor 878 R2 HAT-4_5/12 3.628 NCB 0.726 1.814 1.088 3.628 no 7 of Kurwel dy of HRBC Tal Chopada dist Jalgaon Rehabilitation work in the jurisdiction of Swami Shitalnath Water User Association, Nimgavan A2 HAT-4_5/12 3.43 NCB for Minor No. 7 of Kurvel Dy. of Hatnur Right Bank Canal Tal. Chopda Dist. Jalgaon 2/24/2011 wua_prmpkg_r4 92 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the jurisdiction of Swami Shitalnath Water User Association, Nimgavan A2/1 HAT-4_5/12 3.43 NCB for Minor No. 7 of Kurvel Dy. of Hatnur Right Bank Canal Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Swami Shitalnath Water User Association, Nimgavan A2/2 HAT-4_5/12 3.43 NCB for Minor No. 7 of Kurvel Dy. of Hatnur Right Bank Canal Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Swami Shitalnath Water User Association, Nimgavan R3 HAT-4_5/12 3.91 NCB 0.196 2.542 1.173 3.91 for Minor No. 7 of Kurvel Dy. of Hatnur Right Bank Canal Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Swami Shitalnath Water User Association, Nimgavan A3 HAT-4_5/12 4.03 NCB 0.00 0.00 0.00 0.00 4.03 0.00 0.00 4.03 for Minor No. 7 of Kurvel Dy. of Hatnur Right Bank Canal Tal. Chopda Dist. Jalgaon Rehabilition work in the jurdicition of JaiBhavani i W U Asso Chahardi for sub Minor 879 R2 HAT-4_5/13 4.629 NCB 0.926 2.315 1.389 4.629 no 3, 4, 5 of chahardi dy of HRBC Tal Chopada dist Jalgaon Rehabilitation work in the jurisdiction of Jai Bhawani Water User Association Chahardi for A2 HAT-4_5/13 4.34 NCB Sub Minor 3,4 & 5 of Chahardi Dy of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jai Bhawani Water User Association Chahardi for A2/1 HAT-4_5/13 4.34 NCB Sub Minor 3,4 & 5 of Chahardi Dy of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jai Bhawani Water User Association Chahardi for A2/2 HAT-4_5/13 4.34 NCB Sub Minor 3,4 & 5 of Chahardi Dy of HRBC Tal. Chopda Dist. Jalgaon 2/24/2011 wua_prmpkg_r4 93 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the jurisdiction of Jai Bhawani Water User Association Chahardi for R3 HAT-4_5/13 4.86 NCB 0.243 3.159 1.458 4.86 Sub Minor 3,4 & 5 of Chahardi Dy of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jai Bhawani Water User Association Chahardi for A3 HAT-4_5/13 4.86 NCB 0.00 0.00 0.00 0.00 2.24 2.63 0.00 4.87 Sub Minor 3,4 & 5 of Chahardi Dy of HRBC Tal. Chopda Dist. Jalgaon Rehabilition work in the jurdicition of Jaihind W 880 R2 HAT-4_5/14U AssoChahardi for sub Minor no 6 of Chahardi 4.175 NCB 0.835 2.088 1.253 4.175 dy of HRBC Tal Chopada Rehabilitation work in the jurisdiction of Jai Hind Water User Association, Chahardi for Sub A2 HAT-4_5/14 3.84 NCB Minor No. 6 of Chahardi Dy. of Hatnur Right Bank Canal Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jai Hind Water User Association, Chahardi for Sub A2/1 HAT-4_5/14 3.84 NCB Minor No. 6 of Chahardi Dy. of Hatnur Right Bank Canal Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jai Hind Water User Association, Chahardi for Sub A2/2 HAT-4_5/14 3.84 NCB Minor No. 6 of Chahardi Dy. of Hatnur Right Bank Canal Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jai Hind Water User Association, Chahardi for Sub R3 HAT-4_5/14 4.39 NCB 0.220 2.854 1.317 4.39 Minor No. 6 of Chahardi Dy. of Hatnur Right Bank Canal Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jai Hind Water User Association, Chahardi for Sub A3 HAT-4_5/14 4.39 NCB 0.00 0.00 0.00 0.00 2.70 1.70 0.00 4.40 Minor No. 6 of Chahardi Dy. of Hatnur Right Bank Canal Tal. Chopda Dist. Jalgaon Rehabilition work in the jurdicition of Satpuda W U AssoBoraval of Dhabhurni for sub Minor 881 R2 HAT-4_5/15 2.688 NCB 0.538 1.344 0.806 2.688 no 1& 2 of Pungaon Minor No 2 of HRBC Tal Yawal dist Jalgaon Rehabilitation work in the jurisdiction of Satpuda Water User Association, Dambhurni for A2 HAT-4_5/15 2.54 NCB Sub Minor 1 & 2 of Pungaon Minor No.1 of HRBC Tal. Yawal Dist. Jalgaon 2/24/2011 wua_prmpkg_r4 94 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the jurisdiction of Satpuda Water User Association, Dambhurni for A2/1 HAT-4_5/15 2.54 NCB Sub Minor 1 & 2 of Pungaon Minor No.1 of HRBC Tal. Yawal Dist. Jalgaon Rehabilitation work in the jurisdiction of Satpuda Water User Association, Dambhurni for A2/2 HAT-4_5/15 2.54 NCB Sub Minor 1 & 2 of Pungaon Minor No.1 of HRBC Tal. Yawal Dist. Jalgaon Rehabilitation work in the jurisdiction of Satpuda Water User Association, Dambhurni for R3 HAT-4_5/15 3.04 NCB 0.152 1.976 0.912 3.04 Sub Minor 1 & 2 of Pungaon Minor No.1 of HRBC Tal. Yawal Dist. Jalgaon Rehabilitation work in the jurisdiction of Satpuda Water User Association, Dambhurni for A3 HAT-4_5/15 3.58 NCB 0.00 0.00 0.00 0.00 0.15 3.43 0.00 3.58 Sub Minor 1 & 2 of Pungaon Minor No.1 of HRBC Tal. Yawal Dist. Jalgaon Rehabilition work in the jurdicition of Jaidurga W U Asso of Adavad fo Adavad dy ch 2000 to 882 R2 HAT-4_5/162700 m and its Loni minor & sub Minor no 3.757 NCB 0.751 1.879 1.127 3.757 1,2,3, of Adavad dy of HRBC Tal Chopada dist Jalgaon Rehabilitation work in the jurisdiction of Jai Durga Mata Water User Association, Adawad A2 HAT-4_5/16for Adawad Dy Ch. 2000 m. to 2700 m. and its 3.55 NCB Loni MInor & Sub Minor 1,2,3 of Adawad Dy of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jai Durga Mata Water User Association, Adawad A2/1 HAT-4_5/16for Adawad Dy Ch. 2000 m. to 2700 m. and its 3.55 NCB Loni MInor & Sub Minor 1,2,3 of Adawad Dy of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jai Durga Mata Water User Association, Adawad A2/2 HAT-4_5/16for Adawad Dy Ch. 2000 m. to 2700 m. and its 3.55 NCB Loni MInor & Sub Minor 1,2,3 of Adawad Dy of HRBC Tal. Chopda Dist. Jalgaon 2/24/2011 wua_prmpkg_r4 95 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the jurisdiction of Jai Durga Mata Water User Association, Adawad A2/3 HAT-4_5/16for Adawad Dy Ch. 2000 m. to 2700 m. and its 3.55 NCB Loni MInor & Sub Minor 1,2,3 of Adawad Dy of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jai Durga Mata Water User Association, Adawad R3 HAT-4_5/16for Adawad Dy Ch. 2000 m. to 2700 m. and its 4.23 NCB 0.212 2.750 1.269 4.23 Loni MInor & Sub Minor 1,2,3 of Adawad Dy of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jai Durga Mata Water User Association, Adawad A3 HAT-4_5/16for Adawad Dy Ch. 2000 m. to 2700 m. and its 4.23 NCB 0.00 0.00 0.00 0.40 1.00 2.83 0.00 4.23 Loni MInor & Sub Minor 1,2,3 of Adawad Dy of HRBC Tal. Chopda Dist. Jalgaon Rehabilition work in the jurdicition of Jogeshwar W U AssoBoraval ofAdavad for 883 R2 HAT-4_5/17 3.648 NCB 0.730 1.824 1.094 3.648 sub Minor and sub minor 1 & 2 of Adavad dy of HRBC Tal Chopada dist Jalgaon Rehabilitation work in the jurisdiction of Jogeshwar Water User Association, Adawad for A2 HAT-4_5/17 3.45 NCB Sub Minor and its Sub Minor 1 & 2 of Adawad Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jogeshwar Water User Association, Adawad for A2/1 HAT-4_5/17 3.45 NCB Sub Minor and its Sub Minor 1 & 2 of Adawad Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jogeshwar Water User Association, Adawad for A2/2 HAT-4_5/17 3.45 NCB Sub Minor and its Sub Minor 1 & 2 of Adawad Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jogeshwar Water User Association, Adawad for A2/3 HAT-4_5/17 3.45 NCB Sub Minor and its Sub Minor 1 & 2 of Adawad Dy. of HRBC Tal. Chopda Dist. Jalgaon 2/24/2011 wua_prmpkg_r4 96 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the jurisdiction of Jogeshwar Water User Association, Adawad for R3 HAT-4_5/17 4.13 NCB 0.207 2.685 1.239 4.13 Sub Minor and its Sub Minor 1 & 2 of Adawad Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jogeshwar Water User Association, Adawad for A3 HAT-4_5/17 4.13 NCB 0.00 0.00 0.00 0.00 1.00 3.14 0.00 4.14 Sub Minor and its Sub Minor 1 & 2 of Adawad Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilition work in the jurdicition of Maharana pratap W U Asso Devgaon for Devgaon 884 R2 HAT-4_5/18 4.856 NCB 0.971 2.428 1.457 4.856 Minor with sub minor of HRBC Tal Chopada dist Jalgaon Rehabilitation work in the jurisdiction of Maharana Pratap Water User Association, A2 HAT-4_5/18 4.62 NCB Deogaon for Deogaon Minor with Sub Minor of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Maharana Pratap Water User Association, A2/1 HAT-4_5/18 4.62 NCB Deogaon for Deogaon Minor with Sub Minor of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Maharana Pratap Water User Association, A2/2 HAT-4_5/18 4.62 NCB Deogaon for Deogaon Minor with Sub Minor of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Maharana Pratap Water User Association, A2/3 HAT-4_5/18 4.62 NCB Deogaon for Deogaon Minor with Sub Minor of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Maharana Pratap Water User Association, R3 HAT-4_5/18 5.66 NCB 0.849 3.113 1.698 5.66 Deogaon for Deogaon Minor with Sub Minor of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Maharana Pratap Water User Association, A3 HAT-4_5/18 5.66 NCB 0.00 0.00 0.00 0.00 1.00 4.66 0.00 5.66 Deogaon for Deogaon Minor with Sub Minor of HRBC Tal. Chopda Dist. Jalgaon 2/24/2011 wua_prmpkg_r4 97 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilition work in the jurdicition of Eakvira W U Asso of Khadgaon Gorgavale for Minor 885 R2 HAT-4_5/19 3.873 NCB 0.775 1.937 1.162 3.873 no 1, 2 of Kurvel dy of HRBC Tal Chopada dist Jalgaon Rehabilitation work in the jurisdiction of Ekvira WUA Khadgaon-Gorgawale for minor no.1&2 A2 HAT-4_5/19 3.66 NCB of Kurvel Dy. Of HRBC Tal.- Chopda Dist. Jalgaon. Rehabilitation work in the jurisdiction of Ekvira WUA Khadgaon-Gorgawale for minor no.1&2 A2/1 HAT-4_5/19 3.66 NCB of Kurvel Dy. Of HRBC Tal.- Chopda Dist. Jalgaon. Rehabilitation work in the jurisdiction of Ekvira WUA Khadgaon-Gorgawale for minor no.1&2 A2/2 HAT-4_5/19 3.830 NCB 0.00 0.00 0.00 0.00 3.20 0.70 0.00 3.90 of Kurvel Dy. Of HRBC Tal.- Chopda Dist. Jalgaon. Rehabilition work in the jurdicition of Nagnath W U Asso Kurvel for Minor no 5 and direct 886 R2 HAT-4_5/20 3.329 NCB 0.666 1.665 0.999 3.329 out let 19 to 24 and OR 24 to 28 of Kurvel dy dy of HRBC Tal Chopada dist Jalgaon Rehabilitation work in the jurisdiction of Nagnath Water User Association, Kurvel for A2 HAT-4_5/20Minor 5 and direct Outlets OL 19 to 24 & OR 24 3.11 NCB to 28 of Kurvel Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Nagnath Water User Association, Kurvel for A2/1 HAT-4_5/20Minor 5 and direct Outlets OL 19 to 24 & OR 24 3.11 NCB to 28 of Kurvel Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Nagnath Water User Association, Kurvel for A2/2 HAT-4_5/20Minor 5 and direct Outlets OL 19 to 24 & OR 24 3.11 NCB to 28 of Kurvel Dy. of HRBC Tal. Chopda Dist. Jalgaon 2/24/2011 wua_prmpkg_r4 98 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the jurisdiction of Nagnath Water User Association, Kurvel for R3 HAT-4_5/20Minor 5 and direct Outlets OL 19 to 24 & OR 24 3.67 NCB 0.184 2.386 1.101 3.67 to 28 of Kurvel Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Nagnath Water User Association, Kurvel for A3 HAT-4_5/20Minor 5 and direct Outlets OL 19 to 24 & OR 24 3.61 NCB 0.00 0.00 0.00 0.00 2.66 1.00 0.00 3.66 to 28 of Kurvel Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilition work in the jurdicition of Manudevi W U Asso. Chahardi forsub Minor no 2 of 887 R2 HAT-4_5/21 3.814 NCB 0.763 1.907 1.144 3.814 Chahardi dy . of HRBC Tal Chopada dist Jalgaon Rehabilitation work in the jurisdiction of Manudevi Water User Association, Chahardi for A2 HAT-4_5/21 3.60 NCB Sub Minor No. 2 of Chahardi Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Manudevi Water User Association, Chahardi for A2/1 HAT-4_5/21 3.60 NCB Sub Minor No. 2 of Chahardi Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Manudevi Water User Association, Chahardi for A2/2 HAT-4_5/21 3.60 NCB Sub Minor No. 2 of Chahardi Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Manudevi Water User Association, Chahardi for R3 HAT-4_5/21 4.04 NCB 0.202 2.626 1.212 4.04 Sub Minor No. 2 of Chahardi Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Manudevi Water User Association, Chahardi for A3 HAT-4_5/21 4.04 NCB 0.00 0.00 0.00 0.00 2.83 1.25 0.00 4.08 Sub Minor No. 2 of Chahardi Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilition work in the jurdicition of Swami Vivekanda W U Asso Mangrud for sub Minor 888 R2 HAT-4_5/22 4.784 NCB 1.196 2.392 1.196 4.784 no 1 and sub minor A & B of Gorgavale A dy of HRBC Tal Chopada dist Jalgaon 2/24/2011 wua_prmpkg_r4 99 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the jurisdiction of Swami Vivekanand Water User Association Mangrul for A2 HAT-4_5/22 4.53 NCB Sub Minor 1 & Sub Minor A & B of Gorgavale A Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Swami Vivekanand Water User Association Mangrul for A2/1 HAT-4_5/22 4.53 NCB Sub Minor 1 & Sub Minor A & B of Gorgavale A Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Swami Vivekanand Water User Association Mangrul for A2/2 HAT-4_5/22 4.53 NCB Sub Minor 1 & Sub Minor A & B of Gorgavale A Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Swami Vivekanand Water User Association Mangrul for A2/3 HAT-4_5/22 4.53 NCB Sub Minor 1 & Sub Minor A & B of Gorgavale A Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Swami Vivekanand Water User Association Mangrul for R3 HAT-4_5/22 5.15 NCB 0.258 3.348 1.545 5.15 Sub Minor 1 & Sub Minor A & B of Gorgavale A Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Swami Vivekanand Water User Association Mangrul for A3 HAT-4_5/22 5.15 NCB 0.00 0.00 0.00 0.83 4.41 0.00 0.00 5.24 Sub Minor 1 & Sub Minor A & B of Gorgavale A Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilition work in the jurdicition of Jay Bhajrang W U AssoTandalwadi for diecte out 889 R2 HAT-4_5/23 3.708 NCB 0.927 1.854 0.927 3.708 let OL 38 to 55 and OR 45 to 57 of Kurvel dy of HRBC Tal Chopada dist Jalgaon 2/24/2011 wua_prmpkg_r4 100 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the jurisdiction of Jay Bajrang Water User Association Tandulwadi for A2 HAT-4_5/23 3.50 NCB direct outlet OL 38 to 55 & OR 45 to 57 of Kurvel Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jay Bajrang Water User Association Tandulwadi for A2/1 HAT-4_5/23 3.50 NCB direct outlet OL 38 to 55 & OR 45 to 57 of Kurvel Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jay Bajrang Water User Association Tandulwadi for A2/2 HAT-4_5/23 3.50 NCB direct outlet OL 38 to 55 & OR 45 to 57 of Kurvel Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jay Bajrang Water User Association Tandulwadi for A2/3 HAT-4_5/23 3.50 NCB direct outlet OL 38 to 55 & OR 45 to 57 of Kurvel Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jay Bajrang Water User Association Tandulwadi for R3 HAT-4_5/23 3.97 NCB 0.199 2.581 1.191 3.97 direct outlet OL 38 to 55 & OR 45 to 57 of Kurvel Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jay Bajrang Water User Association Tandulwadi for A3 HAT-4_5/23 3.91 NCB 0.00 0.00 0.00 0.00 1.00 2.91 0.00 3.91 direct outlet OL 38 to 55 & OR 45 to 57 of Kurvel Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilition work in the jurdicition of Tapi mai W U AssoChahardi for sub Minor no 7 and 8 890 R2 HAT-4_5/24 3.939 NCB 0.985 1.970 0.985 of chahardi dy of HRBC Tal Chopada dist Jalgaon Rehabilitation work in the jurisdiction of Tapi Mai Water User Association Chahardi for sub A2 HAT-4_5/24 3.67 NCB Minor No. 7 & 8 of Chahardi Dy. of HRBC Tal. Chopda Dist. Jalgaon 2/24/2011 wua_prmpkg_r4 101 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the jurisdiction of Tapi Mai Water User Association Chahardi for sub A2/1 HAT-4_5/24 3.67 NCB Minor No. 7 & 8 of Chahardi Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Tapi Mai Water User Association Chahardi for sub A2/2 HAT-4_5/24 3.67 NCB Minor No. 7 & 8 of Chahardi Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Tapi Mai Water User Association Chahardi for sub R3 HAT-4_5/24 3.67 NCB 0.184 2.386 1.101 3.67 Minor No. 7 & 8 of Chahardi Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Tapi Mai Water User Association Chahardi for sub A3 HAT-4_5/24 4.31 NCB 0.00 0.00 0.00 0.00 2.77 1.54 0.00 4.31 Minor No. 7 & 8 of Chahardi Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilition work in the jurdicition of Rajmata Ahilyadevi W U AssoChahardi for sub Minor 891 R2 HAT-4_5/25 4.11 NCB 1.028 2.055 1.028 4.110 no 1,2,3 of Dhupe dy no 1 of HRBC Tal Chopada dist Jalgaon Rehabilitation work in the jurisdiction of Raj Mata Ahilyadevi Water User Association A2 HAT-4_5/25 4.14 NCB Chahardi for Sub Minor 1,2,3 of Dhupe Dy No. 1 of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Raj Mata Ahilyadevi Water User Association A2/1 HAT-4_5/25 4.14 NCB Chahardi for Sub Minor 1,2,3 of Dhupe Dy No. 1 of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Raj Mata Ahilyadevi Water User Association A2/2 HAT-4_5/25 4.14 NCB Chahardi for Sub Minor 1,2,3 of Dhupe Dy No. 1 of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Raj Mata Ahilyadevi Water User Association R3 HAT-4_5/25 4.61 NCB 0.231 2.997 1.383 4.61 Chahardi for Sub Minor 1,2,3 of Dhupe Dy No. 1 of HRBC Tal. Chopda Dist. Jalgaon 2/24/2011 wua_prmpkg_r4 102 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the jurisdiction of Raj Mata Ahilyadevi Water User Association A3 HAT-4_5/25 4.61 NCB 0.00 0.00 0.00 0.00 2.24 2.37 0.00 4.61 Chahardi for Sub Minor 1,2,3 of Dhupe Dy No. 1 of HRBC Tal. Chopda Dist. Jalgaon Rehabilition work in the jurdicition of Shriram W U AssoTavase Bk for sub Minor no 1to 5 of 892 R2 HAT-4_5/26 9.578 NCB 2.395 4.789 2.395 9.578 vele dy no 1 of HRBC Tal Chopada dist Jalgaon Rehabilitation work in the jurisdiction of Shri Ram Water User Association Tavase Bk. for A2 HAT-4_5/26 9.29 NCB Sub Minor 1 to 5 of Vele Dy.-1 of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Shri Ram Water User Association Tavase Bk. for A2/1 HAT-4_5/26 9.29 NCB Sub Minor 1 to 5 of Vele Dy.-1 of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Shri Ram Water User Association Tavase Bk. for R3 HAT-4_5/26 10.53 NCB 0.527 6.845 3.159 10.53 Sub Minor 1 to 5 of Vele Dy.-1 of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Shri Ram Water User Association Tavase Bk. for A3 HAT-4_5/26 10.63 NCB 0.00 0.00 0.00 0.00 1.50 9.13 0.00 10.63 Sub Minor 1 to 5 of Vele Dy.-1 of HRBC Tal. Chopda Dist. Jalgaon Rehabilition work in the jurdicition of Rameshwar W U Asso Dhanwadi for sub 893 R2 HAT-4_5/27 5.64 NCB 1.410 2.820 1.410 5.640 Minor no 4 of Kurvel dy of HRBC Tal Chopada dist Jalgaon Rehabilitation work in the jurisdiction of Rameshwar WUA Dhanwadi for Sub minor A2 HAT-4_5/27 5.33 NCB No.4 of Kurvel Dy. Of HRBC Tal.- Chopda Dist. Jalgaon. Rehabilitation work in the jurisdiction of Rameshwar WUA Dhanwadi for Sub minor A2/1 HAT-4_5/27 5.33 NCB No.4 of Kurvel Dy. Of HRBC Tal.- Chopda Dist. Jalgaon. 2/24/2011 wua_prmpkg_r4 103 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the jurisdiction of Rameshwar WUA Dhanwadi for Sub minor A2/2 HAT-4_5/27 5.590 NCB 0.00 0.00 0.00 0.00 1.30 4.60 0.00 5.90 No.4 of Kurvel Dy. Of HRBC Tal.- Chopda Dist. Jalgaon. Rehabilition work in the jurdicition of Nimgaon Rajora W U Asso Rajora for Nimgaon Minor 894 R2 HAT-4_5/28 10.9 NCB 2.725 5.450 2.725 10.900 Rajora Minor of Anjale dy of HRBC Tal Yawal dist Jalgaon Rehabilitation work in the jurisdiction of Nimgaon-Rajora WUA Rajora for Nimgaon & A2 HAT-4_5/28 10.34 NCB Rajora Minor of Anjale Dy. of H.R.B.C. Tal. Yawal Dist. Jalgaon. Rehabilitation work in the jurisdiction of Nimgaon-Rajora WUA Rajora for Nimgaon & A2/1 HAT-4_5/28 10.740 NCB 0.00 0.00 0.00 7.14 3.25 0.00 0.00 10.39 Rajora Minor of Anjale Dy. of H.R.B.C. Tal. Yawal Dist. Jalgaon. Rehabilition work in the jurdicition of Panchak 895 R2 HAT-4_5/29W U Asso Panchak for Panchak with sub 3.1 NCB 0.775 1.550 0.775 3.100 Minor of HRBC Tal Chopada dist Jalgaon Rehabilitation work in the jurisdiction of Panchak Water User Association Panchak for A2 HAT-4_5/29 2.96 NCB Panchak Minor with Sub Minor of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Panchak Water User Association Panchak for A2/1 HAT-4_5/29 2.96 NCB Panchak Minor with Sub Minor of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Panchak Water User Association Panchak for A2/2 HAT-4_5/29 2.96 NCB Panchak Minor with Sub Minor of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Panchak Water User Association Panchak for A2/3 HAT-4_5/29 2.96 NCB Panchak Minor with Sub Minor of HRBC Tal. Chopda Dist. Jalgaon 2/24/2011 wua_prmpkg_r4 104 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the jurisdiction of Panchak Water User Association Panchak for R3 HAT-4_5/29 3.58 NCB 0.179 2.327 1.074 3.58 Panchak Minor with Sub Minor of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Panchak Water User Association Panchak for A3 HAT-4_5/29 3.58 NCB 0.00 0.00 0.00 0.00 1.00 2.58 0.00 3.58 Panchak Minor with Sub Minor of HRBC Tal. Chopda Dist. Jalgaon Rehabilition work in the jurdicition of Ramnath Baba W U Asso Khedi Bhokar for sub 896 R2 HAT-4_5/30 4.319 NCB 1.080 2.160 1.080 4.319 Minor No 2 of Gorgavale A dy of HRBC Tal Chopada dist Jalgaon Rehabilitation work in the jurisdiction of Ramnath Baba Water User Association Khedi A2 HAT-4_5/30 4.20 NCB Bhokari for Sub Minor No. 2 of Gorgavale A Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Ramnath Baba Water User Association Khedi A2/1 HAT-4_5/30 4.20 NCB Bhokari for Sub Minor No. 2 of Gorgavale A Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Ramnath Baba Water User Association Khedi A2/2 HAT-4_5/30 4.20 NCB Bhokari for Sub Minor No. 2 of Gorgavale A Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Ramnath Baba Water User Association Khedi R3 HAT-4_5/30 4.7 NCB 0.235 3.055 1.410 4.70 Bhokari for Sub Minor No. 2 of Gorgavale A Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Ramnath Baba Water User Association Khedi A3 HAT-4_5/30 4.7 NCB 0.00 0.00 0.00 0.00 4.70 0.00 0.00 4.70 Bhokari for Sub Minor No. 2 of Gorgavale A Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilition work in the jurdicition of Khanderao W U Asso Gorgavale Kh for 897 R2 HAT-4_5/31Gorgavale A Dy Ch 4500mTo5900m & sub 3.493 NCB 0.873 1.747 0.873 3.493 Minor no 3 of HRBC Tal Chopada dist Jalgaon 2/24/2011 wua_prmpkg_r4 105 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the jurisdiction of Khanderao Water User Association Gorgavale A2 HAT-4_5/31Kh. for Gorgavale A Dy. Ch. 4500 to 5900 Mtr. 3.31 NCB and Sub Minor No. 3 of Gorgavale A Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Khanderao Water User Association Gorgavale A2/1 HAT-4_5/31Kh. for Gorgavale A Dy. Ch. 4500 to 5900 Mtr. 3.31 NCB and Sub Minor No. 3 of Gorgavale A Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Khanderao Water User Association Gorgavale A2/2 HAT-4_5/31Kh. for Gorgavale A Dy. Ch. 4500 to 5900 Mtr. 3.31 NCB and Sub Minor No. 3 of Gorgavale A Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Khanderao Water User Association Gorgavale R3 HAT-4_5/31Kh. for Gorgavale A Dy. Ch. 4500 to 5900 Mtr. 3.76 NCB 0.188 2.444 1.128 3.76 and Sub Minor No. 3 of Gorgavale A Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Khanderao Water User Association Gorgavale A3 HAT-4_5/31Kh. for Gorgavale A Dy. Ch. 4500 to 5900 Mtr. 3.76 NCB 0.00 0.00 0.00 0.00 3.76 0.00 0.00 3.76 and Sub Minor No. 3 of Gorgavale A Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilition work in the jurdicition of Shri Datta W U Asso Chahardi for sub Minor No 4&5 of 898 R2 HAT-4_5/32 3.799 NCB 0.950 1.900 0.950 3.799 Dhupe dy No 1 of HRBC Tal Chopada dist Jalgaon Rehabilitation work in the jurisdiction of Shri Datta Water User Association Chahardi for Sub A2 HAT-4_5/32 3.49 NCB Minor No. 4, 5 of Dhupe Dy. No. 1 of HRBC Tal. Chopda Dist. Jalgaon 2/24/2011 wua_prmpkg_r4 106 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the jurisdiction of Shri Datta Water User Association Chahardi for Sub A2/1 HAT-4_5/32 3.49 NCB Minor No. 4, 5 of Dhupe Dy. No. 1 of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Shri Datta Water User Association Chahardi for Sub A2/2 HAT-4_5/32 3.49 NCB Minor No. 4, 5 of Dhupe Dy. No. 1 of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Shri Datta Water User Association Chahardi for Sub R3 HAT-4_5/32 3.90 NCB 0.195 2.535 1.170 3.90 Minor No. 4, 5 of Dhupe Dy. No. 1 of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Shri Datta Water User Association Chahardi for Sub A3 HAT-4_5/32 3.90 NCB 0.00 0.00 0.00 0.00 1.94 1.96 0.00 3.90 Minor No. 4, 5 of Dhupe Dy. No. 1 of HRBC Tal. Chopda Dist. Jalgaon Rehabilition work in the jurdicition of Jagruti W U Asso Hated Kh for sub Minor No.1 & 1 Aof 899 R2 HAT-4_5/33 2.917 NCB 0.729 1.459 0.729 2.917 Dhupe Dy No.2 .of HRBC Tal Chopada dist Jalgaon Rehabilitation work in the jurisdiction of Jagruti Water User Association Hated Kh. for Sub A2 HAT-4_5/33 2.75 NCB Minor 1 and 1 A of Dhupe Dy No. 2 of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jagruti Water User Association Hated Kh. for Sub A2/1 HAT-4_5/33 2.75 NCB Minor 1 and 1 A of Dhupe Dy No. 2 of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jagruti Water User Association Hated Kh. for Sub A2/2 HAT-4_5/33 2.75 NCB Minor 1 and 1 A of Dhupe Dy No. 2 of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jagruti Water User Association Hated Kh. for Sub R3 HAT-4_5/33 2.96 NCB 0.148 1.924 0.888 2.96 Minor 1 and 1 A of Dhupe Dy No. 2 of HRBC Tal. Chopda Dist. Jalgaon 2/24/2011 wua_prmpkg_r4 107 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the jurisdiction of Jagruti Water User Association Hated Kh. for Sub A3 HAT-4_5/33 2.96 NCB 0.00 0.00 0.00 0.00 1.90 1.06 0.00 2.96 Minor 1 and 1 A of Dhupe Dy No. 2 of HRBC Tal. Chopda Dist. Jalgaon Rehabilition work in the jurdicition of Chattrapati W U Asso of Mangrul for 900 R2 HAT-4_5/34Mangrul Dy No.2 Ch.1200 to 2400 m & sub 3.093 NCB 0.773 1.547 0.773 3.093 Minor of Mangrul Dy No.2 of HRBC Tal Chopada dist Jalgaon Rehabilitation work in the jurisdiction of Chatrapati Water User Association Mangrul for A2 HAT-4_5/34Mangrul Dy No. 2, Ch. 1200 to 2400 and Sub 2.95 NCB Minor of Mangrul Dy No. 2 of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Chatrapati Water User Association Mangrul for A2/1 HAT-4_5/34Mangrul Dy No. 2, Ch. 1200 to 2400 and Sub 2.95 NCB Minor of Mangrul Dy No. 2 of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Chatrapati Water User Association Mangrul for A2/2 HAT-4_5/34Mangrul Dy No. 2, Ch. 1200 to 2400 and Sub 2.95 NCB Minor of Mangrul Dy No. 2 of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Chatrapati Water User Association Mangrul for R3 HAT-4_5/34Mangrul Dy No. 2, Ch. 1200 to 2400 and Sub 3.37 NCB 0.169 2.191 1.011 3.37 Minor of Mangrul Dy No. 2 of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Chatrapati Water User Association Mangrul for A3 HAT-4_5/34Mangrul Dy No. 2, Ch. 1200 to 2400 and Sub 3.37 NCB 0.00 0.00 0.00 0.00 1.78 1.56 0.00 3.34 Minor of Mangrul Dy No. 2 of HRBC Tal. Chopda Dist. Jalgaon Rehabilition work in the jurdicition of Vittal Rukhmai W U Asso Dhanwadi for sub Minor 901 R2 HAT-4_5/35 13.558 NCB 3.390 6.779 3.390 13.558 1& 7 of Dhandawi Dy of HRBC Tal Chopada dist Jalgaon 2/24/2011 wua_prmpkg_r4 108 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the jurisdiction of Vitthal Rukhamai WUA Dhanwadi for Sub-minor no.1 A2 HAT-4_5/35 13.18 NCB to 7 of Dhanwadi Dy. Of HRBC Tal.- Chopda Dist. Jalgaon. Rehabilitation work in the jurisdiction of Vitthal Rukhamai WUA Dhanwadi for Sub-minor no.1 A2/1 HAT-4_5/35 13.18 NCB to 7 of Dhanwadi Dy. Of HRBC Tal.- Chopda Dist. Jalgaon. Rehabilitation work in the jurisdiction of Vitthal Rukhamai WUA Dhanwadi for Sub-minor no.1 A2/2 HAT-4_5/35 14.260 NCB 0.00 0.00 0.00 0.00 9.22 5.00 0.00 14.22 to 7 of Dhanwadi Dy. Of HRBC Tal.- Chopda Dist. Jalgaon. Rehabilition work in the jurdicition of Kalbhairav W U Asso Kolamba for direct Outlet 902 R2 HAT-4_5/36 1.974 NCB 0.494 0.987 0.494 1.974 OL 10 to 18 & OR 14 to 23 of Kurwel Dy of HRBC Tal Chopada dist Jalgaon Rehabilitation work in the jurisdiction of Kal Bhairav Water User Association Kolamba for A2 HAT-4_5/36 1.80 NCB Direct outlet OL 10 to 18 and OR 14 to 23 of Kurvel Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Kal Bhairav Water User Association Kolamba for A2/1 HAT-4_5/36 1.80 NCB Direct outlet OL 10 to 18 and OR 14 to 23 of Kurvel Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Kal Bhairav Water User Association Kolamba for A2/2 HAT-4_5/36 1.80 NCB Direct outlet OL 10 to 18 and OR 14 to 23 of Kurvel Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Kal Bhairav Water User Association Kolamba for R3 HAT-4_5/36 1.96 NCB 0.098 1.274 0.588 1.96 Direct outlet OL 10 to 18 and OR 14 to 23 of Kurvel Dy. of HRBC Tal. Chopda Dist. Jalgaon 2/24/2011 wua_prmpkg_r4 109 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the jurisdiction of Kal Bhairav Water User Association Kolamba for A3 HAT-4_5/36 1.96 NCB 0.00 0.00 0.00 0.00 1.00 0.96 0.00 1.96 Direct outlet OL 10 to 18 and OR 14 to 23 of Kurvel Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilition work in the jurdicition of Tuljabhawani W U Asso Gorgawale for direct 903 R2 HAT-4_5/37 2.01 NCB 0.503 1.005 0.503 2.010 Outlet OL 1 to 9 & OR 1 to 13 of HRBC Tal Chopada dist Jalgaon Rehabilitation work in the jurisdiction of Tulaja Bhawani Water User Association Gorgavale for A2 HAT-4_5/37 1.84 NCB Direct outlet OL 1 to 9 & OR 1 to 13 of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Tulaja Bhawani Water User Association Gorgavale for A2/1 HAT-4_5/37 1.84 NCB Direct outlet OL 1 to 9 & OR 1 to 13 of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Tulaja Bhawani Water User Association Gorgavale for A2/2 HAT-4_5/37 1.84 NCB Direct outlet OL 1 to 9 & OR 1 to 13 of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Tulaja Bhawani Water User Association Gorgavale for R3 HAT-4_5/37 2.07 NCB 0.104 1.346 0.621 2.07 Direct outlet OL 1 to 9 & OR 1 to 13 of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Tulaja Bhawani Water User Association Gorgavale for A3 HAT-4_5/37 2.091 NCB 0.00 0.00 0.00 0.00 0.50 1.60 0.00 2.10 Direct outlet OL 1 to 9 & OR 1 to 13 of HRBC Tal. Chopda Dist. Jalgaon Rehabilition work in the jurdicition of Shivrai W U Asso Chahardi for sub Minor 1&2 of 904 R2 HAT-4_5/38 2.03 NCB 0.508 1.015 0.508 2.030 Akulkheda Dy& Akulkheda Dy of HRBC Tal Chopada dist Jalgaon Rehabilitation work in the jurisdiction of Jai Shivrai Water User Association Chahardi for A2 HAT-4_5/38Sub Minor No. 1, 2 of Akulkheda Dy and 1.92 NCB Akulkheda Dy of HRBC Tal. Chopda Dist. Jalgaon 2/24/2011 wua_prmpkg_r4 110 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the jurisdiction of Jai Shivrai Water User Association Chahardi for A2/1 HAT-4_5/38Sub Minor No. 1, 2 of Akulkheda Dy and 1.92 NCB Akulkheda Dy of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jai Shivrai Water User Association Chahardi for A2/2 HAT-4_5/38Sub Minor No. 1, 2 of Akulkheda Dy and 1.92 NCB Akulkheda Dy of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jai Shivrai Water User Association Chahardi for R3 HAT-4_5/38Sub Minor No. 1, 2 of Akulkheda Dy and 2.15 NCB 0.108 1.398 0.645 2.15 Akulkheda Dy of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jai Shivrai Water User Association Chahardi for A3 HAT-4_5/38Sub Minor No. 1, 2 of Akulkheda Dy and 2.15 NCB 0.00 0.00 0.00 0.00 0.50 1.65 0.00 2.15 Akulkheda Dy of HRBC Tal. Chopda Dist. Jalgaon Rehabilition work in the jurdicition of Sant Dyneshwar W U Asso Chahardi for Akulkheda 905 R2 HAT-4_5/39 2.048 NCB 0.512 1.024 0.512 2.048 Dy No.2 with its sub Minor of HRBC Tal Chopada dist Jalgaon Rehabilitation work in the jurisdiction of Sant Dnyaneshwar Water User Association Chahardi A2 HAT-4_5/39 1.93 NCB for Akulkheda Dy No. 2 with its Sub Minors of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Sant Dnyaneshwar Water User Association Chahardi A2/1 HAT-4_5/39 1.93 NCB for Akulkheda Dy No. 2 with its Sub Minors of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Sant Dnyaneshwar Water User Association Chahardi A2/2 HAT-4_5/39 1.93 NCB for Akulkheda Dy No. 2 with its Sub Minors of HRBC Tal. Chopda Dist. Jalgaon 2/24/2011 wua_prmpkg_r4 111 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the jurisdiction of Sant Dnyaneshwar Water User Association Chahardi R3 HAT-4_5/39 2.16 NCB 0.108 1.404 0.648 2.16 for Akulkheda Dy No. 2 with its Sub Minors of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Sant Dnyaneshwar Water User Association Chahardi A3 HAT-4_5/39 2.16 NCB 0.00 0.00 0.00 0.00 0.90 1.26 0.00 2.16 for Akulkheda Dy No. 2 with its Sub Minors of HRBC Tal. Chopda Dist. Jalgaon Rehabilition work in the jurdicition of Swami Samarth W U Asso Khachane for direct Outlet 906 R2 HAT-4_5/40 2.262 NCB 0.566 1.131 0.566 2.262 OL 25 to 37 & OR 29 to 44 of Kurwel Dy of HRBC Tal Chopada dist Jalgaon Rehabilitation work in the jurisdiction of Swami Samarth Water User Association Khachane for A2 HAT-4_5/40 2.06 NCB Direct Outlet OL 25 to 37 and OR 29 to 44 of Kurvel Dy of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Swami Samarth Water User Association Khachane for A2/1 HAT-4_5/40 2.06 NCB Direct Outlet OL 25 to 37 and OR 29 to 44 of Kurvel Dy of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Swami Samarth Water User Association Khachane for A2/2 HAT-4_5/40 2.06 NCB Direct Outlet OL 25 to 37 and OR 29 to 44 of Kurvel Dy of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Swami Samarth Water User Association Khachane for R3 HAT-4_5/40 2.19 NCB 0.110 1.424 0.657 2.19 Direct Outlet OL 25 to 37 and OR 29 to 44 of Kurvel Dy of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Swami Samarth Water User Association Khachane for A3 HAT-4_5/40 2.19 NCB 0.00 0.00 0.00 0.00 0.80 2.11 0.00 2.91 Direct Outlet OL 25 to 37 and OR 29 to 44 of Kurvel Dy of HRBC Tal. Chopda Dist. Jalgaon 2/24/2011 wua_prmpkg_r4 112 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilition work in the jurdicition of Jaishree Dadaji W U Asso Nimgavan for Mino No.8 & 907 R2 HAT-4_5/41 2.125 NCB 0.531 1.063 0.531 2.125 9 of Kurwel Dy of HRBC Tal Chopada dist Jalgaon Rehabilitation work in the jurisdiction of Jaishree Dadaji Water User Association A2 HAT-4_5/41 2.02 NCB Nimgavhan for Minor No. 8 & 9 of Kurvel Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jaishree Dadaji Water User Association A2/1 HAT-4_5/41 2.02 NCB Nimgavhan for Minor No. 8 & 9 of Kurvel Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jaishree Dadaji Water User Association A2/2 HAT-4_5/41 2.02 NCB Nimgavhan for Minor No. 8 & 9 of Kurvel Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jaishree Dadaji Water User Association A2/3 HAT-4_5/41 2.02 NCB Nimgavhan for Minor No. 8 & 9 of Kurvel Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jaishree Dadaji Water User Association R3 HAT-4_5/41 2.37 NCB 0.119 1.541 0.711 2.37 Nimgavhan for Minor No. 8 & 9 of Kurvel Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jaishree Dadaji Water User Association A3 HAT-4_5/41 2.37 NCB 0.00 0.00 0.00 0.00 0.60 1.78 0.00 2.38 Nimgavhan for Minor No. 8 & 9 of Kurvel Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilition work in the jurdicition of Pargaon 908 R2 HAT-4_5/42W U Asso Pargaon for Pargaon Minor with sub 2.344 NCB 0.586 1.172 0.586 2.344 Minor of HRBC Tal Chopada dist Jalgaon Rehabilitation work in the jurisdiction of Pargaon Water User Association Pargaon for A2 HAT-4_5/42 2.24 NCB Pargaon Minor with Sub Minor of HRBC Tal. Chopda Dist. Jalgaon 2/24/2011 wua_prmpkg_r4 113 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the jurisdiction of Pargaon Water User Association Pargaon for A2/1 HAT-4_5/42 2.24 NCB Pargaon Minor with Sub Minor of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Pargaon Water User Association Pargaon for A2/2 HAT-4_5/42 2.24 NCB Pargaon Minor with Sub Minor of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Pargaon Water User Association Pargaon for R3 HAT-4_5/42 2.70 NCB 0.135 1.755 0.810 2.70 Pargaon Minor with Sub Minor of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Pargaon Water User Association Pargaon for A3 HAT-4_5/42 2.70 NCB 0.00 0.00 0.00 0.00 0.80 1.90 0.00 2.70 Pargaon Minor with Sub Minor of HRBC Tal. Chopda Dist. Jalgaon Rehabilition work in the jurdicition of Yawal W U Asso Yawal for sub Minor No 1 & 2 & 909 R2 HAT-4_5/43 1.945 NCB 0.486 0.973 0.486 1.945 Tembhi Minor of HRBC Tal Yawal dist Jalgaon Rehabilitation work in the jurisdiction of Yawal A2 HAT-4_5/43WUA Yawal for sur-minor 1, 2 & Tembhi Minor 1.90 NCB of H.R.B.C. Tal. Yawal Dist. Jalgaon. Rehabilitation work in the jurisdiction of Yawal A2/1 HAT-4_5/43WUA Yawal for sur-minor 1, 2 & Tembhi Minor 1.980 NCB 0.00 0.00 0.00 0.92 1.06 0.00 0.00 1.98 of H.R.B.C. Tal. Yawal Dist. Jalgaon. Rehabilition work in the jurdicition of Dagadi 910 R2 HAT-4_5/44W U Asso Dagadi for Dagadi Minor of HRBC 2.155 NCB 0.539 1.078 0.539 2.155 Tal Yawal dist Jalgaon Rehabilitation work in the jurisdiction of Dagadi A2 HAT-4_5/44Water User Association Dagadi for Dagadi 2.11 NCB Minor of HRBC Tal. Yawal Dist. Jalgaon Rehabilitation work in the jurisdiction of Dagadi A2/1 HAT-4_5/44Water User Association Dagadi for Dagadi 2.11 NCB Minor of HRBC Tal. Yawal Dist. Jalgaon 2/24/2011 wua_prmpkg_r4 114 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the jurisdiction of Dagadi A2/2 HAT-4_5/44Water User Association Dagadi for Dagadi 2.11 NCB Minor of HRBC Tal. Yawal Dist. Jalgaon Rehabilitation work in the jurisdiction of Dagadi A2/3 HAT-4_5/44Water User Association Dagadi for Dagadi 2.11 NCB Minor of HRBC Tal. Yawal Dist. Jalgaon Rehabilitation work in the jurisdiction of Dagadi R3 HAT-4_5/44Water User Association Dagadi for Dagadi 2.16 NCB 0.108 1.404 0.648 2.16 Minor of HRBC Tal. Yawal Dist. Jalgaon Rehabilitation work in the jurisdiction of Dagadi A3 HAT-4_5/44Water User Association Dagadi for Dagadi 2.16 NCB 0.00 0.00 0.00 0.00 0.50 1.66 0.00 2.16 Minor of HRBC Tal. Yawal Dist. Jalgaon Rehabilition work in the jurdicition of Dambhurni W U Asso Dambhurni for 911 R2 HAT-4_5/45 1.95 NCB 0.488 0.975 0.488 1.950 Dambhurni Minor 1,2 & 3 of HRBC Tal Yawal dist Jalgaon Rehabilitation work in the jurisdiction of Dambhurni Water User Association Dambhurni A2 HAT-4_5/45 1.85 NCB for Dambhurni Minor 1, 2 & 3 of HRBC Tal. Yawal Dist. Jalgaon Rehabilitation work in the jurisdiction of Dambhurni Water User Association Dambhurni A2/1 HAT-4_5/45 1.85 NCB for Dambhurni Minor 1, 2 & 3 of HRBC Tal. Yawal Dist. Jalgaon Rehabilitation work in the jurisdiction of Dambhurni Water User Association Dambhurni A2/2 HAT-4_5/45 1.85 NCB for Dambhurni Minor 1, 2 & 3 of HRBC Tal. Yawal Dist. Jalgaon Rehabilitation work in the jurisdiction of Dambhurni Water User Association Dambhurni A2/3 HAT-4_5/45 1.85 NCB for Dambhurni Minor 1, 2 & 3 of HRBC Tal. Yawal Dist. Jalgaon 2/24/2011 wua_prmpkg_r4 115 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the jurisdiction of Dambhurni Water User Association Dambhurni R3 HAT-4_5/45 2.19 NCB 0.110 1.424 0.657 2.19 for Dambhurni Minor 1, 2 & 3 of HRBC Tal. Yawal Dist. Jalgaon Rehabilitation work in the jurisdiction of Dambhurni Water User Association Dambhurni A3 HAT-4_5/45 2.19 NCB 0.00 0.00 0.00 0.00 0.50 1.69 0.00 2.19 for Dambhurni Minor 1, 2 & 3 of HRBC Tal. Yawal Dist. Jalgaon Rehabilition work in the jurdicition of Jai Maharashtra W U Asso Mangrul for 912 R2 HAT-4_5/46 2.472 NCB 0.618 1.236 0.618 2.472 Gorgawale" B " & Sub Minor of Gorgawale "B" DY of HRBC Tal Chopada dist Jalgaon Rehabilitation work in the jurisdiction of Jai Maharashtra Water User Association Mangrul A2 HAT-4_5/46for Gorgavale B Dy. and Sub Minor of 2.37 NCB Gorgavale B Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jai Maharashtra Water User Association Mangrul A2/1 HAT-4_5/46for Gorgavale B Dy. and Sub Minor of 2.37 NCB Gorgavale B Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jai Maharashtra Water User Association Mangrul A2/2 HAT-4_5/46for Gorgavale B Dy. and Sub Minor of 2.37 NCB Gorgavale B Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jai Maharashtra Water User Association Mangrul A2/3 HAT-4_5/46for Gorgavale B Dy. and Sub Minor of 2.37 NCB Gorgavale B Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Jai Maharashtra Water User Association Mangrul R3 HAT-4_5/46for Gorgavale B Dy. and Sub Minor of 2.7 NCB 0.135 1.755 0.810 2.70 Gorgavale B Dy. of HRBC Tal. Chopda Dist. Jalgaon 2/24/2011 wua_prmpkg_r4 116 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the jurisdiction of Jai Maharashtra Water User Association Mangrul A3 HAT-4_5/46for Gorgavale B Dy. and Sub Minor of 2.7 NCB 0.00 0.00 0.00 0.00 2.70 0.00 0.00 2.70 Gorgavale B Dy. of HRBC Tal. Chopda Dist. Jalgaon Rehabilition work in the jurdicition of Srusti W U Asso Hated for Sub Minor no 2 & 3 of 913 R2 HAT-4_5/47 2.393 NCB 0.598 1.197 0.598 2.393 Dhupe Dy No.2 of HRBC Tal Chopada dist Jalgaon Rehabilitation work in the jurisdiction of Shrushti Water User Association Hated for Sub A2 HAT-4_5/47 2.21 NCB Minor 2 & 3 of Dhupe Dy. No. 2 of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Shrushti Water User Association Hated for Sub A2/1 HAT-4_5/47 2.21 NCB Minor 2 & 3 of Dhupe Dy. No. 2 of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Shrushti Water User Association Hated for Sub A2/2 HAT-4_5/47 2.21 NCB Minor 2 & 3 of Dhupe Dy. No. 2 of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Shrushti Water User Association Hated for Sub A2/3 HAT-4_5/47 2.21 NCB Minor 2 & 3 of Dhupe Dy. No. 2 of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Shrushti Water User Association Hated for Sub R3 HAT-4_5/47 2.48 NCB 0.124 1.612 0.744 2.48 Minor 2 & 3 of Dhupe Dy. No. 2 of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation work in the jurisdiction of Shrushti Water User Association Hated for Sub A3 HAT-4_5/47 2.48 NCB 0.00 0.00 0.00 0.00 1.68 0.81 0.00 2.49 Minor 2 & 3 of Dhupe Dy. No. 2 of HRBC Tal. Chopda Dist. Jalgaon Rehabilitation of Minors of Hatnur Project Hatnur Hat-5** 113.29 WUA 5.66 28.32 33.99 33.99 11.33 113.29 WUA-36 Rehabilitation of Minors of Hatnur Project R Hat-5** 113.29 WUA 16.99 39.65 50.98 5.66 113.29 WUA-36 Amalgated @ Hatnur 4 2/24/2011 wua_prmpkg_r4 117 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 5 Ghod Gd-4** Rehabilitation of the Minors WUA-66 84.15 WUA 16.83 16.83 25.25 16.83 8.42 84.15 R Gd-4** Rehabilitation of the Minors WUA-66 84.15 WUA 12.62 29.45 37.87 4.21 84.15 Shri. Nangeshwar water user Association, 914 R2 Gd-4**/1 Hangewadi/ Bore Tal- Shrigonda, 2.80 NCB 0.560 1.400 0.840 2.800 Dist- Ahmednagar. Rehabilitation work in Jurisdiction of WUA No. 1 on Dy 22, 23, of GLBC. Shri A2 Gd-4**/1 Nageshwar Water User 2.80 NCB Association,Hangewadi Tal : Shrigonda,Dist : Ahmednagar Rehabilitation work in Jurisdiction of WUA No. 1 on Dy 22, 23, of GLBC. Shri R3 Gd-4**/1 Nageshwar Water User 2.80 NCB 0.420 1.680 0.700 2.80 Association,Hangewadi Tal : Shrigonda,Dist : Ahmednagar Rehabilitation work in Jurisdiction of wua No. 1 on Dy. 3 & ol in Km 0/00 to 4/500 of GLBC. For A3 Gd-4**/1 3.02 NCB 0.76 2.27 3.02 Shri. Nangeshwar wua, Hangewadi Tal- Shrigonda. Shri. Hangeshwar water user Association, 915 R2 Gd-4**/2 Hangewadi, Tal- Shrigonda, Dist- 3.23 NCB 0.808 1.615 0.808 3.230 Ahmednagar. Rehabilitation work in Jurisdiction of WUA No .2 on Dy. No.1 OL 5 to 19 of GLBCShri A2 Gd-4**/2 Hangeshwar Water User 3.057 NCB 2.18 1.03 3.20 Association,Hangewadi, Tal-Shrigonda, Dist :Ahmednagar . Shri. Ajinkyatara water user Association, 916 R2 Gd-4**/3 Chimbala, Tal- Shrigonda, Dist- 2.45 NCB 0.613 1.225 0.613 2.450 Ahmednagar. Rehabilitation work in Jurisdiction of WUA No .3 on Dy. No.11 & 12 of GLBC A2 Gd-4**/3 ShriAjinkaytara Water User 2.343 NCB 0.33 0.61 1.53 2.46 Association,Chinbhala, Tal-Shrigonda, Dist :Ahmednagar . 2/24/2011 wua_prmpkg_r4 118 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Shri. Ambika water user Association, 917 R2 Gd-4**/4 Wangdari, Tal- Shrigonda, Dist- 3.66 NCB 0.732 1.830 1.098 3.660 Ahmednagar. Rehabilitation work in Jurisdiction of WUA No.4 on Minor 1 to 6 of Dy. No.14 of GLBC A2 Gd-4**/4 Shri Abinka Water User 3.458 NCB 1.83 1.80 3.62 Association,Wangdari, Tal-Shrigonda, Dist :Ahmednagar . Shri. Vaishnavdevi water user Association, 918 R2 Gd-4**/5 Wangdari,, Tal- Shrigonda, Dist- 3.59 NCB 0.898 1.795 0.898 3.590 Ahmednagar. Rehabilitation work in Jurisdiction of WUA No .5, Minor No. 7 to 12 & Tail minor of Dy. No.14 of GLBC Shri A2 Gd-4**/5 3.396 NCB 0.83 0.98 1.75 3.56 Waishnvidevi Water User Association,Wangdari, Tal-Shrigonda, Dist :Ahmednagar . Shri. Varsharani water user Association, 919 R2 Gd-4**/6 Madhewadgaon, Tal- Shrigonda, 2.43 NCB 0.608 1.215 0.608 2.430 Dist- Ahmednagar. Rehabilitation work in Jurisdiction of WUA No.6 on Dy. No.15 & 16 of GLBC A2 Gd-4**/6 Shri Warsharani Water User 2.313 NCB 0.30 1.00 1.13 2.43 Association,Madhevagaon, Tal-Shrigonda, Dist :Ahmednagar . Shri. Siddeshwar water user Association, 920 R2 Gd-4**/7 Madhewadgaon,, Tal- Shrigonda, 3.58 NCB 0.895 1.790 0.895 3.580 Dist- Ahmednagar. Rehabilitation work in Jurisdiction of WUA No.7 on Dy. No.17 in Km. o to 3 of GLBC A2 Gd-4**/7 Shri Lingaleshwar Water User 3.389 NCB 1.16 2.40 3.56 Association,Madhevagaon, Tal-Shrigonda, Dist :Ahmednagar . Shri. Jay Bhavani water user Association, 921 R2 Gd-4**/8 Madhewadgaon, Tal- Shrigonda, 3.01 NCB 0.753 1.505 0.753 3.010 Dist- Ahmednagar. 2/24/2011 wua_prmpkg_r4 119 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in Jurisdiction of WUA No. 8 on Dy 22, 23, of GLBC. Shri A2 Gd-4**/8 Jai Bhawani Water User 3.01 NCB Association,Madhewadgaon Tal : Shrigonda,Dist : Ahmednagar Rehabilitation work in Jurisdiction of WUA No. 8 on Dy 22, 23, of GLBC. Shri R3 Gd-4**/8 Jai Bhawani Water User 3.01 NCB 0.452 1.806 0.753 3.01 Association,Madhewadgaon Tal : Shrigonda,Dist : Ahmednagar Rehabilitation work in Jurisdiction of wua No.8 on km 3 to 9, RM5,7,10,12,LMS, minor 11 of A3 Gd-4**/8 3.205 NCB 0.80 2.40 3.21 Dy. 17of of GLBC. Ghod Project. For Shri. Jay Bhavani wua, Madhevadgaon Tal-Shrigonda. Shri. Trimurti water user Association, Kasti, 922 R2 Gd-4**/9 2.63 NCB 0.526 1.315 0.789 2.630 Tal- Shrigonda, Dist- Ahmednagar. Rehabilitation work in Jurisdiction of WUA No .9 on Dy. No.18 of GLBC Shri A2 Gd-4**/9 2.486 NCB 0.52 0.80 1.28 2.60 Trimurti Water User Association,Kashti, Tal- Shrigonda, Dist :Ahmednagar . Shri. Gajanan water user Association, Gd- 923 R2 Kasti,, Tal- Shrigonda, Dist- 4.21 NCB 0.842 2.105 1.263 4.210 4**/10 Ahmednagar. Rehabilitation work in Jurisdiction of WUA No.10 on Minor 2 DOR No.1 to 4 of Dy. Gd- A2 No.20 of GLBC Shri Ghajanan 3.985 NCB 0.52 1.75 1.91 4.18 4**/10 Water User Association,Kashti, Tal- Shrigonda, Dist :Ahmednagar . Shri. Bhairavnath water user Association, Gd- 924 R2 Kasti,, Tal- Shrigonda, Dist- 4.82 NCB 0.964 2.410 1.446 4.820 4**/11 Ahmednagar. 2/24/2011 wua_prmpkg_r4 120 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in Jurisdiction of WUA No. 11 on Dy.No.20 miner No.4 to 6 of Gd- A2 GLBC Shri 4.528 NCB 0.55 1.06 3.17 4.78 4**/11 Bhairavanath Water User Association,Kasti, Tal-Shrigonda, Dist : Ahmednagar Shri. Khuleshwar water user Association, Gd- 925 R2 Nimgaon khalu Tal- Shrigonda, 4.87 NCB 0.974 2.435 1.461 4.870 4**/12 Dist- Ahmednagar. Rehabilitation work in Jurisdiction of WUA No .12 on Dy. No.20 Minor 7 & 8 of GLBC Gd- A2 Shri Khuleshwar Water User 4.615 NCB 0.471 0.07 1.64 2.66 4.84 4**/12 Association,Nimgaon Khalu, Tal-Shrigonda, Dist :Ahmednagar . Shri. Jotir water user Association, 926 R2 Gd-4**/13 3.15 NCB 0.630 1.575 0.945 3.150 Anandwadi,tal Shrigonda,Dist ahmednagar. Rehabilitation work in Jurisdiction of WUA No .13 on Dy. No.21 & outlet in Km.No.1 to A2 Gd-4**/13 5 of GLBC Shri Jotriling 2.981 NCB 0.80 0.50 0.99 0.79 3.08 Water User Association,Anadwadi, Tal- Shrigonda, Dist :Ahmednagar . Shri. Ganeshkrupa water user Association, 927 R2 Gd-4**/14 Anandwadi,Tal Shrigonda Dist 3.75 NCB 0.750 1.875 1.125 3.750 Ahmednagar. Rehabilitation work in Jurisdiction of WUA No. 14 on Dy.No.21 minor No.4 to 6 of GLBC Shri A2 Gd-4**/14 3.559 NCB 0.49 2.01 1.23 3.73 Ganeshkrupa Water User Association,Anadwadi, Tal-Shrigonda, Dist : Ahmednagar Shri. Buvasaheb water user Association, 928 R2 Gd-4**/15 Nimgaon Khalu Tal Shrigonda,dist 3.47 NCB 0.868 1.735 0.868 3.470 Ahmednagar 2/24/2011 wua_prmpkg_r4 121 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in Jurisdiction of WUA No .15 on Nimgaon minor on Dy. No.21 of GLBC Shri A2 Gd-4**/15 3.280 NCB 0.95 0.00 0.89 1.60 3.44 Buvasaheb Water User Association,Nimgaon Khalu, Tal-Shrigonda, Dist :Ahmednagar . Shri. Nageshwar water user 929 R2 Gd-4**/16 Association,Shipalkarwadi,Tal 3.69 NCB 0.923 1.845 0.923 3.690 Shrigonda,Dist Ahmednagar. Rehabilitation work in Jurisdiction of WUA No .16 on OL 9 to 12 of Dy.21 of GLBC A2 Gd-4**/16 Shri Nageshwar Water User 2.489 NCB 1.15 2.49 3.63 Association,Shipalkarwadi, Tal-Shrigonda, Dist :Ahmednagar . Shri.Ambika water user Association, 930 R2 Gd-4**/17 2.84 NCB 0.710 1.420 0.710 2.840 Angare. Rehabilitation work in Jurisdiction of WUA No. 17 on OL 13 to 16 of Dy.No.21 of GLBC A2 Gd-4**/17 Shri Abinka Water User 2.69 NCB 0.24 0.39 1.24 0.94 0.00 2.82 Association,Anagare Tal : Shrigonda,Dist : Ahmednagar Shri. Jay Hanuman water user 931 R2 Gd-4**/18 Association,Kawatha,Tal shrigonda,Dist 2.88 NCB 0.720 1.440 0.720 2.880 ahmednagar. Rehabilitation work in Jurisdiction of WUA No.18 of minor of Dy. 21 of GRBC Shri A2 Gd-4**/18 JaHanuman Water User 2.720 NCB 0.42 0.98 1.46 2.86 Association,Kautha, Tal-Shrigonda, Dist :Ahmednagar . Shri. Siddeshwar water user Association, 932 R2 Gd-4**/19 0.87 NCB 0.217 0.564 0.087 0.868 Mundhekarwadi. Rehabilitation work in Jurisdiction of WUA No. 19 on Dy 22, 23, of GLBC. Shri A2 Gd-4**/19 Shidheshwar Water User 0.822 Shopping 0.18 0.17 0.51 0.86 Association,Mundhekarwadi Tal : Shrigonda,Dist : Ahmednagar 2/24/2011 wua_prmpkg_r4 122 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Shri. ShivParvati water user Association, 933 R2 Gd-4**/20 Mundhekarwadi,Tal shrigonda,Dist 2.89 NCB 0.723 1.445 0.723 2.890 Ahmednagar. Rehabilitation work in Jurisdiction of WUA No. 20 on Dy. No.24, 25 of GLBC A2 Gd-4**/20 Shri SivParvti Water User 2.733 NCB 0.59 0.57 1.70 2.86 Association,Mundhekarwadi, Tal-Shrigonda, Dist :Ahmednagar . Shri.Waleneshwar water user 934 R2 Gd-4**/21 Association,Ajanuj,Tal shrigonda,Dist 3.93 NCB 0.786 1.965 1.179 3.930 Ahmednagar. Rehabilitation work in Jurisdiction of WUA No.21 on Ajanuj Minor of Dy. No.21 of GLBC Shri A2 Gd-4**/21 3.724 NCB 0.91 0.32 0.67 2.01 3.91 Walaneshwar Water User Association,Ajanuj, Tal-Shrigonda, Dist :Ahmednagar . Shri. Bhairavnath water user Association, 935 R2 Gd-4**/22 Shankarnagar,Tal shrigonda,Dist 5.38 NCB 1.076 2.690 1.614 5.380 Ahmednagar. Rehabilitation work in Jurisdiction of WUA No .22 on Dy.28 & 29 of GLBC Shri A2 Gd-4**/22 Bhairavanath Water User 5.096 NCB 1.80 3.53 5.33 Association,Shankarnagar, Tal-Shrigonda, Dist :Ahmednagar . Shri. Gahininath water user Association, 936 R2 Gd-4**/23 3.28 NCB 0.820 1.640 0.820 3.280 Pedgaon Tal Shrigaon,Dist Ahmednagar. Rehabilitation work in Jurisdiction of WUA No .23 on Dy. No.29A,30A, 30B & 31 of A2 Gd-4**/23 GLBC Shri Gahininath 3.102 NCB 0.29 0.00 0.74 2.21 3.24 Water User Association,Pedgaon, Tal- Shrigonda, Dist :Ahmednagar . Shri. Bhairavnath water user 937 R2 Gd-4**/24 Association,Adhojewadi,Tal Shrigonda,Dist 3.48 NCB 0.696 1.740 1.044 3.480 Ahmednagar. 2/24/2011 wua_prmpkg_r4 123 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in Jurisdiction of WUA No.24 on Dy. No.33A ,33B of GLBC A2 Gd-4**/24 Shri Bhiravnath Water User 3.315 NCB 0.80 1.24 1.37 3.41 Association,Adhorewadi, Tal-Shrigonda, Dist :Ahmednagar . Shri.Shiv Kupra WUA Takali Kdde,Tal 938 R2 Gd-4**/25 4.17 NCB 1.043 2.085 1.043 4.170 Shrigonda,Dist Ahmednagar. Rehabilitation work in Jurisdiction of WUA No .25 on Dy. No.35, 36 of GLBC A2 Gd-4**/25 Shri Shivkurpa Water User 3.999 NCB 0.429 0.942 2.827 4.20 Association,Takali, Tal-Shrigonda, Dist :Ahmednagar . Shri. Jay Bhavani water user Association, 939 R2 Gd-4**/26 4.89 NCB 1.223 2.445 1.223 4.890 Shedgaon,Tal Shrigonda,Dist pune Rehabilitation work in Jurisdiction of WUA No.26 on Dy. No.37,38 of GLBC A2 Gd-4**/26 Shri JayBhavani Water User 4.663 NCB 0.59 1.64 2.66 4.89 Association,Shedagaon, Tal-Shrigonda, Dist :Ahmednagar . Shri. Datta water user Association, 940 R2 Gd-4**/27 Shedagaon Tal Shrigonda Dist 4.05 NCB 1.013 2.025 1.013 4.050 Ahmednagar. Rehabilitation work in Jurisdiction of WUA No .27 on Dy. No.39 minor 1,2 OL 1 to 2 of A2 Gd-4**/27 GLBC Shri Datta Water 3.865 NCB 1.01 3.04 4.06 User Association,Shedagaon, Tal- Shrigonda, Dist :Ahmednagar . Shri. Bhairavnath water user 941 R2 Gd-4**/28 Association,Jalalpur,Tal karjet,Dist 5.79 NCB 1.158 2.895 1.737 5.790 Ahmednagar. Rehabilitation work in Jurisdiction of WUA No .28 on Dy. No.39 Minor No. 3&4 & outlet No. 3 to 7 of GLBC Shri A2 Gd-4**/28 5.554 NCB 1.04 0.00 2.08 2.69 5.80 Bhairavnath Water User AssociationJalalpur, Tal-Karjat, Dist :Ahmednagar . Shri. Siddhivinyak water user Association, 942 R2 Gd-4**/29 5.94 NCB 1.485 2.970 1.485 5.940 Siddhtek Tal Karjet,Dist Ahmednagar. 2/24/2011 wua_prmpkg_r4 124 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in Jurisdiction of WUA No. 29 on Dy.No.37,38 of GLBC Shri A2 Gd-4**/29 Sidhivinayak Water User 5.639 NCB 0.367 3.129 2.41 5.90 Association,Siddhatek Tal-Karjat, Dist : Ahmednagar Shri. Sidheshwar water user Association, 943 R2 Gd-4**/30 6.01 NCB 1.202 3.005 1.803 6.010 Bhombora tal karjat,Dist Ahmednagar. Rehabilitation work in Jurisdiction of WUA No .30 on Minor No. 10 of GLBC Shri A2 Gd-4**/30 Sidyeshwar Water User 5.724 NCB 0.60 0.00 1.56 3.85 6.01 Association,Bhanbora, Tal-Karjat, Dist :Ahmednagar . 944 R2 Gd-4**/31 Shri. Hanuman water user Association,Taju. 0.76 Shopping 0.190 0.494 0.076 0.760 Rehabilitation work in Jurisdiction of WUA No. 31on Dy 41 of GLBC Shri A2 Gd-4**/31 0.731 Shopping 0.731 0 0.731 Hanuman Water User Association,Taju Tal- Karjat, Dist : Ahmednagar Shri. Bhairavnath water user Association, 945 R2 Gd-4**/32 2.10 NCB 0.525 1.050 0.525 2.100 taju,tal karjat,Dist Ahmednagar. Rehabilitation work in Jurisdiction of WUA No.32 on Dy. No. 42,43B & 45 of GLBC A2 Gd-4**/32 Shri Bhairavnath Water User 1.932 NCB 0.19 0.37 0.95 0.51 2.03 Association,Taju, Tal-Karjat, Dist :Ahmednagar . Shri. Shivratna water user Association, 946 R2 Gd-4**/33 4.31 NCB 1.078 2.155 1.078 4.310 Baradgaon Tal karjet,Dist Ahmednagar Rehabilitation work in Jurisdiction of WUA No. 33 on Dy.No.46 A ,46B, 47 & 48 minor No.4 to 6 of GLBC Shri A2 Gd-4**/33 4.180 NCB 1.15 0.09 1.71 1.31 4.26 Shivratna Water User Association,Baradgaon Tal-Karjat, Dist : Ahmednagar Shri. Bardeshwar water user Association, 947 R2 Gd-4**/34 3.21 NCB 0.803 1.605 0.803 3.210 Baradgaon,tal Karjet,Dist Ahmednagar. 2/24/2011 wua_prmpkg_r4 125 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in Jurisdiction of WUA No.34 on Dy. No. 49A,49B,50A, 51 of GLBC A2 Gd-4**/34 Shri Baradheshwar Water User 3.052 NCB 1.29 1.91 3.20 Association,Baradhgon, Tal-Karjat, Dist :Ahmednagar . Shri. Ganesh water user Association, 948 R2 Gd-4**/35 4.53 NCB 1.133 2.265 1.133 4.530 Ganeshwadi Tal Karjet Dist Ahmednagar. Rehabilitation work in Jurisdiction of WUA No .35 on Dy. No.52A ,49B ,53 of GRBC A2 Gd-4**/35 Shri Ganesh Water User 4.383 NCB 0.63 2.133 1.838 4.60 Association,Ganeshwadi,Post Khed, Tal- Karjat, Dist :Ahmednagar . Shri. Sadguru water user Association, Khed 949 R2 Gd-4**/36 5.98 NCB 1.196 2.990 1.794 5.980 tal karjet Dist Ahmednagar. Rehabilitation work in Jurisdiction of WUA No. 36 on Outlet No.1 to 12 & minor No.1 to 2 in Km.78 to 84 of GLBC Shri Sadguru A2 Gd-4**/36 5.676 NCB 1.07 0.41 2.32 2.12 5.91 Guptnath Maharaj Water User Association,Khed,Tal-Karjat, Dist : Ahmednagar 950 R2 Gd-4**/37 Shri. Nagnath water user Association, 0.80 Shopping 0.200 0.520 0.080 0.800 Rehabilitation work in Jurisdiction of WUA No. 37 on Chinchani Dy.OL 1,OL 1B of A2 Gd-4**/37 GRBC Shri Naganath Water User 0.754 Shopping 0.20 0.59 0.79 Association,Chinchani Tal-Shirur, Dist : Pune. Shri. Ajinkaya water user Association, 951 R2 Gd-4**/38 0.75 Shopping 0.188 0.488 0.075 0.751 Pimpalsuti Tal Shirur Dist Pune Rehabilitation work in Jurisdiction of WUA No. 38 on Dy.No.1 Minor No. 1 of GRBC A2 Gd-4**/38 Shri Ajinkya Water User 0.703 Shopping 0.43 0.31 0.74 Association,Pinpalsuti, Tal-Shirur, Dist : Pune. Shri. Siddeshwer water user 952 R2 Gd-4**/39 4.27 NCB 0.854 2.135 1.281 4.270 Association,Inamgaon, Tal Shir Dist Pune. 2/24/2011 wua_prmpkg_r4 126 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in Jurisdiction of WUA No. 39 on Dy. No.1 outlet No.1 to 2 of A2 Gd-4**/39 GLBC Shri Sidheshwar 4.036 NCB 0.76 2.31 1.30 4.37 Water User Association,Inamgaon, Tal- Shirur, Dist :Pune. Shri. Bhairavnath water user Association, 953 R2 Gd-4**/40 2.18 NCB 0.545 1.090 0.545 2.180 Inamgaon,Tal Shirur,Dist Pune. Rehabilitation work in Jurisdiction of WUA No .40 on Dy. No.1 OL 5 to 19 of GRBC A2 Gd-4**/40 Shri Bhiranath Water User 1.910 NCB 1.20 0.44 0.37 2.01 Association,Inamgaon, Tal-Shirur, Dist :Pune . Shri. Sharadchandrji Pawar water user 954 R2 Gd-4**/41 3.46 NCB 0.865 1.730 0.865 3.460 Association, Tandali,Tal Shirur,Dist Pune Rehabilitation work in Jurisdiction of WUA No .41 on Minor No. 5 & 6 Dy. No.1 of GRBC Shri A2 Gd-4**/41 3.280 NCB 0.81 0.00 0.66 1.98 3.44 Sharadchndraji Pawar Water User Association,Tandali , Tal- Shirur, Dist :Pune . Shri. Ajitdada Pawar water user 955 R2 Gd-4**/42 Association, Ganegaon Dumala,Tal 2.76 NCB 0.690 1.380 0.690 2.760 Shirur,Dist Pune. Rehabilitation work in Jurisdiction of WUA No. 42 on Dy 22, 23, of GLBC. Shri A2 Gd-4**/42 Ajit Dada pawar Water User 2.76 NCB Association,Ganegaon dumala Tal : Shirur ,Dist :Pune Rehabilitation work in Jurisdiction of WUA No. 42 on Dy 22, 23, of GLBC. Shri R3 Gd-4**/42 Ajit Dada pawar Water User 2.760 NCB 0.41 1.66 0.69 2.76 Association,Ganegaon dumala Tal : Shirur ,Dist :Pune Rehabilitation work in Jurisdiction of wua No. A3 Gd-4**/42 42 on ol 20 to 27of Dy.1 of GRBC. For Shri. 2.919 NCB 0.7 2.2 2.92 Ajitdada Pawar wua, Ganegaon Tal- Shirur. 2/24/2011 wua_prmpkg_r4 127 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Shri. Hanumant water user Association, 956 R2 Gd-4**/43 2.12 NCB 0.530 1.060 0.530 2.120 Mandagaon Farata, Tal Shirur,Dist Pune. Rehabilitation work in Jurisdiction of WUA No. 43 on OL. 3,4,of Dy. No.1 of GRBC A2 Gd-4**/43 Shri Hanuman Water User 1.983 NCB 0.66 0.69 0.74 2.08 Association,Mandavagaon, Tal-Shirur, Dist :Pune. Shri. Vagheshwar water user Association, 957 R2 Gd-4**/44 2.38 NCB 0.595 1.190 0.595 2.380 Mandgaon Farata Tal Shirur,Dist Pune. Rehabilitation work in Jurisdiction of WUA No. 44 on SM-1 ,OL.2 & 3 of M-2 of Dy. No.1 of GRBC Shri A2 Gd-4**/44 2.020 NCB 0.57 0.71 1.06 2.33 Wagheshwar Water User Association,Mandavagaon, Tal-Shirur, Dist :Pune. Shri. Kanifnath water user 958 R2 Gd-4**/45 Association,Ganegaon Dumala,Tal 2.71 NCB 0.542 1.355 0.813 2.710 Shirur,Dist Pune. Rehabilitation work in Jurisdiction of WUA No.45 on Dy.No1,Minor 2 Outlet 4 to 7 Sub A2 Gd-4**/45 Minor 3 of GRBC Shri Kaniphanath 2.571 NCB 0.994 0.00 0.98 0.80 2.78 Water User Association,Ganegaon dumala, Tal-Shirur, Dist :Pune . Shri. Om sai water user Association, 959 R2 Gd-4**/46 3.34 NCB 0.835 1.670 0.835 3.340 Ganegaon Dumala,Tal Shirur. Dist Pune. Rehabilitation work in Jurisdiction of WUA No. 46 on OL-8 to 15 ,Sub Minor-4 of Minor- A2 Gd-4**/46 2 of Dy. No.1 of GRBC Shri OmSai Water 3.881 NCB 2.96 0.37 3.34 User Association,,Ganegaon Dumala Tal- Shirur, Dist :Pune. Shri. Chandrabhaga water user Association, 960 R2 Gd-4**/47 3.02 NCB 0.755 1.510 0.755 3.020 Babhulsar,tal Shirur,Dist pune. 2/24/2011 wua_prmpkg_r4 128 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in Jurisdiction of WUA No. 47 on OL.16 to 23 & tail of Minor-2 of Dy. No.1 of GRBC Shri A2 Gd-4**/47 2.825 NCB 2.05 0.91 2.96 Chandrabhaga Water User Association,Babhulsar, Tal-Shirur, Dist :Pune. Shri. Gokulnagar water user 961 R2 Gd-4**/48 Association,Mandavgaon Farata Tal shirur 1.97 NCB 0.493 0.985 0.493 1.970 Dist Pune. Rehabilitation work in Jurisdiction of WUA No .48 on Dy. No.2 WC.No. 4 & 5 of A2 Gd-4**/48 GRBC Shri Gokulnagar 1.831 NCB 1.42 0.49 1.92 Water User Association,Mandavgaon Pharata, Tal-Shirur, Dist :Pune . Shri. Someshwar water user 962 R2 Gd-4**/49 Association,Mandavgaon Farata,tal 2.91 NCB 0.582 1.455 0.873 2.910 shirur,Dist Pune. Rehabilitation work in Jurisdiction of WUA No.49 on Dy. No.3 Outlet 1 to 8 of GRBC A2 Gd-4**/49 Shri Someshwar Water User 2.752 NCB 0.25 0.94 1.75 2.94 Association,Mandavgaon Prhrata, Tal- Shirur, Dist :Pune . Shri. Ganes water user Association, 963 R2 Gd-4**/50 4.41 NCB 1.103 2.205 1.103 4.410 Sadalgaon Tal Shirur Dist pune. Rehabilitation work in Jurisdiction of WUA No.50 on outlet No.9 to tail outlet Minor 2 to A2 Gd-4**/50 4 of Dy. No.3 of GRBC Shri Ganesh 4.182 NCB 1.47 2.92 4.39 Water User Association,Sadalgaon, Tal- Shirur, Dist :Pune. Shri. Rasaidevi water user 964 R2 Gd-4**/51 Association,Vadgaon rasai,Tal shirur,Dist 4.94 NCB 0.988 2.470 1.482 4.940 Pune. 2/24/2011 wua_prmpkg_r4 129 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in Jurisdiction of WUA No .51 on Dy. No.4 minor 1 & outlet 6 to 8 A2 Gd-4**/51 of GRBC Shri Rasaidevi 4.703 NCB 1.50 3.43 4.93 Water User Association,Vadhagaon Rasai , Tal- Shirur, Dist :Pune . Gd- Shri. Shrinath water user Association, 965 R2 2.77 NCB 0.693 1.385 0.693 2.770 4**/52 Kuarule, Tal- Shirur, Dist- Pune. Rehabilitation work in Jurisdiction of WUA Gd- No .52 on Dy. No.5, OL 9 & 11 of GRBC A2 2.612 NCB 0.23 0.63 1.88 2.74 4**/52 Shri Nath Water User Association,Kuruli , Tal- Shirur, Dist :Pune . Shri. Sudgur Shetaram water user Gd- 966 R2 Association, Nagargaon, Tal- Shirur, Dist- 3.55 NCB 0.888 1.775 0.888 3.550 4**/53 Pune. Rehabilitation work in Jurisdiction of WUA No .53 on Minor 1 of Dy.6 of GRBC Shri Gd- A2 Satguru Sitaram Water User 3.371 NCB 0.88 2.65 3.54 4**/53 Association,Nagargaon , Tal- Shirur, Dist :Pune . Shri.Chitine Kanifanath water user 967 R2 Gd-4**/54 Association, Nagargaon,Tal shirur,Dist 3.26 NCB 0.815 1.630 0.815 3.260 Pune. Rehabilitation work in Jurisdiction of WUA No .54 on Outlet No. 1 to 5 of Dy. No.7 of A2 Gd-4**/54 GRBCShri Chaitanya Kaniphanath Water 3.089 NCB 1.47 1.77 3.24 User Association,Nagargaon, Tal-Shirur, Dist :Pune . Shri. Santraj water user 968 R2 Gd-4**/55 Association,Ranjangaon Tal Shirur, Dist 4.16 NCB 0.832 2.080 1.248 4.160 Pune. 2/24/2011 wua_prmpkg_r4 130 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in Jurisdiction of WUA No.55 on Outlet No. 6 to tail Minor 3 to 4 of A2 Gd-4**/55 Dy. No.7 of GRBC Shri Santaraj 3.952 NCB 1.45 2.69 4.15 Water User Association,Ranjhangaon Sandas, Tal-Shirur, Dist :Pune. 6 Kukadi Kuk-7** Rehabilitation of the Minors WUA -60 95.62 WUA 19.12 19.12 28.69 19.12 9.56 95.62 R Kuk-7** Rehabilitation of the Minors WUA -60 95.62 WUA 14.34 33.47 43.03 4.78 95.62 969 R2 KUK-7/1 Datta Digambar WUA Basti WUA No.1 0.499 Shopping 0.200 0.299 0.499 Rehabilitation work in the juridiction of Minor A2 KUK-7/1 No.1 of MFC of the Datta Digambar WUA Basti 0.460 Shopping 0.00 0.00 0.00 0.31 0.69 0.00 0.00 1.00 WUA No.1 970 R2 KUK-7/2 Yayukumar WUA Wadgaon sahani WUA No.2 0.464 Shopping 0.186 0.278 0.46 Rehabilitation work in the juridiction of Minor A2 KUK-7/2 No.2 of MFC of the Yayukumar WUA 0.426 Shopping 0.00 0.00 0.00 0.13 0.36 0.00 0.00 0.49 Wadgaon sahani WUA No.2 971 R2 KUK-7/3 Shriram WUA Pimpalgaon WUA No 3 1.218 Shopping 0.487 0.731 1.22 Rehabilitation work in the juridiction of Minor A2 KUK-7/3 No.3 of MFC of the Shriram WUA Pimpalgaon 1.117 Shopping 0.00 0.00 0.00 0.33 0.67 0.00 0.00 1.00 WUA No 3 972 R2 KUK-7/4 Shiv Uttkarsh WUA Hivare WUA No.6 1.500 Shopping 0.600 0.900 1.50 Rehabilitation work in the juridiction of Minor A2 KUK-7/4 No.2,3,4 of MBC of the Shiv Uttkarsh WUA 1.366 Shopping 0.00 0.00 0.00 1.02 0.32 0.00 0.00 1.34 Hivare WUA No.6 973 R2 KUK-7/5 Hashtamata WUA Khodad WUA No.7 0.658 Shopping 0.263 0.395 0.66 Rehabilitation work in the juridiction of Minor A2 KUK-7/5 No.5,6 of MBC of the Hashtamata WUA 0.601 Shopping 0.00 0.00 0.00 0.21 0.37 0.00 0.00 0.58 Khodad WUA No.7 974 R2 KUK-7/6 Shri Vighnahar WUA Shrioli Bk WUA No.8 0.811 Shopping 0.324 0.487 0.81 Rehabilitation work in the juridiction of Minor A2 KUK-7/6 No.4,5 of Dy 1 of MFC of theShri Vighnahar 0.736 Shopping 0.00 0.00 0.00 0.31 0.00 0.43 0.00 0.74 WUA Shrioli Bk WUA No.8 975 R2 KUK-7/7 Bhairavnath WUA Shrioli Bk WUA No.9 0.713 Shopping 0.285 0.428 0.71 Rehabilitation work in the juridiction of Minor A2 KUK-7/7 No.3 of Dy 1 of MFC of the Bhairavnath WUA 0.650 Shopping 0.00 0.00 0.00 0.21 0.00 0.45 0.00 0.66 Shrioli Bk WUA No.9 2/24/2011 wua_prmpkg_r4 131 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 976 R2 KUK-7/8 Krushi vikas WUA Kuran WUA No.10 0.566 Shopping 0.226 0.340 0.57 Rehabilitation work in the juridiction of Minor A2 KUK-7/8 No.1,2 of Dy 1 MFC of theKrushi vikas WUA 0.517 Shopping 0.00 0.00 0.00 0.00 0.46 0.00 0.00 0.46 Kuran WUA No.10 977 R2 KUK-7/9 Shri Bajrangappa WUA Dhalewadi WUA No.12 1.335 Shopping 0.534 0.801 1.34 Rehabilitation work in the juridiction of Minor A2 KUK-7/9 No.3,4 of Dy 2 of MFC of the Shri Bajrangappa 1.225 Shopping 0.00 0.00 0.00 0.87 0.33 0.00 0.00 1.20 WUA Dhalewadi WUA No.12 978 R2 KUK-7/10 Charangbaba WUA Yedgaon WUA No .13 1.660 Shopping 0.664 0.996 1.66 Rehabilitation work in the juridiction of Minor A2 KUK-7/10 No.5,6,7,8,9 of Dy-2 of MFC of the 1.512 Shopping 0.00 0.00 0.46 0.93 0.08 0.00 0.00 1.47 Charangbaba WUA Yedgaon WUA No .13 979 R2 KUK-7/11 Bhairavnath WUA Yedgaon WUA No.14 1.108 Shopping 0.443 0.665 1.11 Rehabilitation work in the juridiction of Minor A2 KUK-7/11 No.10,11,12 Dy-2 of MFC of the Bhairavnath 1.116 Shopping 0.00 0.00 0.17 0.00 0.37 0.70 0.00 1.24 WUA Yedgaon WUA No.14 980 R2 KUK-7/12 Kalikamata WUA Kandali WUA No .15 2.686 NCB 1.074 1.612 2.69 Rehabilitation work in the juridiction of Minor A2 KUK-7/12 No.3,4,5 of Dy-1 of MBC of theKalikamata 2.444 NCB 0.00 0.00 0.00 1.21 1.31 0.00 0.00 2.52 WUA Kandali WUA No .15 981 R2 KUK-7/13 Viroba WUA Wadgaon Kandali WUA No.16 2.843 NCB 1.137 1.706 2.84 Rehabilitation work in the juridiction of Minor A2 KUK-7/13 No.1,2 of Dy-1 MBC of theViroba WUA 2.568 NCB 0.00 0.00 0.00 2.13 0.58 0.00 0.00 2.71 Wadgaon Kandali WUA No.16 982 R2 KUK-7/14 Mukatai WUA Khodad WUA No.17 2.302 NCB 0.921 1.381 2.30 Rehabilitation work in the juridiction of Minor A2 KUK-7/14 No.7,8,11,13,14 of MBC of theMukatai WUA 2.097 NCB 0.00 0.00 0.00 0.79 1.43 0.00 0.00 2.22 Khodad WUA No.17 983 R2 KUK-7/15 Bhagadeshwar WUA Valati WUA No.18 2.466 NCB 0.863 1.603 2.47 Rehabilitation work in the juridiction of Dy A2 KUK-7/15 No.2 of MBC of the Bhagadeshwar WUA Valati 2.227 NCB 0.00 0.00 0.00 0.00 1.58 0.00 0.00 1.58 WUA No.18 2/24/2011 wua_prmpkg_r4 132 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 984 R2 KUK-7/16 Gopalkrishna WUA Bori Kd WUA No.19 2.080 NCB 0.832 1.248 2.08 Rehabilitation work in the juridiction of Minor A2 KUK-7/16 No.9,10 of MBC of the Gopalkrishna WUA 1.846 Shopping 0.00 0.00 0.00 0.39 1.32 0.00 0.00 1.71 Bori Kd WUA No.19 985 R2 KUK-7/17 Charangseva WUA Shiroli Tr Ale WUA No.20 2.168 NCB 0.759 1.409 2.17 Rehabilitation work in the juridiction of Minor A2 KUK-7/17 No.12,15,16 of MBC of the Charangseva WUA 1.976 NCB 0.00 0.00 0.00 1.43 0.66 0.00 0.00 2.09 Shiroli Tr Ale WUA No.20 986 R2 KUK-7/18 Pandurang WUA Nimgaon sava WUA No.22 2.379 NCB 0.833 1.546 2.38 Rehabilitation work in the juridiction of Minor A2 KUK-7/18 No.17,18,19,20 of MBC of the Pandurang WUA 2.175 NCB 0.00 0.00 0.00 0.51 1.57 0.00 0.00 2.08 Nimgaon sava WUA No.22 987 R2 KUK-7/19 Chhatrapati WUA Bhagadi WUA No.23 2.052 NCB 0.821 1.231 2.05 Rehabilitation work in the juridiction of Minor A2 KUK-7/19 No. 26 of MBC of the Chhatrapati WUA 1.866 Shopping 0.00 0.00 0.77 0.00 1.09 0.00 0.00 1.86 Bhagadi WUA No.23 988 R2 KUK-7/20 JaiMalhar WUA Pimparkhed WUA No.24 1.869 NCB 0.748 1.121 1.87 Rehabilitation work in the juridiction of Minor A2 KUK-7/20 No.28,32 ,3R of MBC of the JaiMalhar WUA 1.703 Shopping 0.00 0.00 0.00 1.43 0.26 0.00 0.00 1.69 Pimparkhed WUA No.24 989 R2 KUK-7/21 Bhairavnath WUA Chandoh WUA No.25 1.474 Shopping 0.590 0.884 1.47 Rehabilitation work in the juridiction of Minor A2 KUK-7/21 No.34,35 of MBC of the Bhairavnath WUA 1.343 Shopping 0.00 0.00 0.00 0.99 0.36 0.00 0.00 1.34 Chandoh WUA No.25 990 R2 KUK-7/22 Shri Krishna WUA Aurangpur WUA No.26 1.212 Shopping 0.485 0.727 1.21 Rehabilitation work in the juridiction of Minor A2 KUK-7/22 No.21 of MBC of the Shri Krishna WUA 1.103 Shopping 0.00 0.00 0.00 0.00 1.14 0.00 0.00 1.14 Aurangpur WUA No.26 991 R2 KUK-7/23 Shri Malganga WUA Takali Haji WUA No.34 2.449 NCB 0.857 1.592 2.45 2/24/2011 wua_prmpkg_r4 133 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the juridiction of Minor A2 KUK-7/23 No.1,2,5,7,10,12 of Tail Dy of MBC of the Shri 2.229 NCB 0.00 0.00 0.00 1.25 1.05 0.00 0.00 2.30 Malganga WUA Takali Haji WUA No.34 992 R2 KUK-7/24 Shrikund Maouli Takali Haji WUA No.38 1.572 Shopping 0.629 0.943 1.57 Rehabilitation work in the juridiction of Minor A2 KUK-7/24 No.1a,2,a,3,4,6 of Tail Dy of MBC of the 1.432 Shopping 0.00 0.00 0.00 0.63 0.76 0.00 0.00 1.40 Shrikund Maouli Takali Haji WUA No.38 993 R2 KUK-7/25 Bhairvnath WUA Takali Haji WUA No.39 2.005 NCB 0.802 1.203 2.01 Rehabilitation work in the juridiction of Minor A2 KUK-7/25 No.8,8a,10,11,13,14,17 of MBC of the 1.796 Shopping 0.00 0.00 0.00 0.64 1.00 0.00 0.00 1.64 Bhairvnath WUA Takali Haji WUA No.39 994 R2 KUK-7/26 Kamaljadevi WUA Kalamb WUA No.40 1.968 NCB 0.787 1.181 1.97 Rehabilitation work in the juridiction of Minor A2 KUK-7/26 No.1 to 5 of GBC of the Kamaljadevi WUA 1.784 Shopping 0.00 0.00 0.70 0.00 0.77 0.31 0.00 1.78 Kalamb WUA No.40 995 R2 KUK-7/27 Kanhoba WUA Chandoli WUA No.41 1.060 Shopping 0.424 0.636 1.06 Rehabilitation work in the juridiction of Minor A2 KUK-7/27 No.6 of Dy-1 of GBC of the Kanhoba WUA 0.966 Shopping 0.00 0.00 0.51 0.00 0.47 0.00 0.00 0.98 Chandoli WUA No.41 996 R2 KUK-7/28 Mukatadev WUA Khadaki WUA No.42 0.986 Shopping 0.394 0.592 0.99 Rehabilitation work in the juridiction of Minor A2 KUK-7/28 No. 2 to 5 Dy 1 of GBC of the Mukatadev WUA 0.896 Shopping 0.00 0.00 0.00 0.45 0.00 0.54 0.00 0.99 Khadaki WUA No.42 997 R2 KUK-7/29 Jagdamba WUA Manjarwadi WUA No.43 1.756 Shopping 0.702 1.054 1.76 Rehabilitation work in the juridiction of Dy-2 of A2 KUK-7/29 GBC of the Jagdamba WUA Manjarwadi WUA 1.603 Shopping 0.00 0.00 0.00 0.84 0.00 0.76 0.00 1.60 No.43 998 R2 KUK-7/30 Narshingh WUA Ranjai WUA No.44 2.972 NCB 0.594 1.486 0.892 2.97 Rehabilitation work in the juridiction of Tail A2 KUK-7/30 Minor No 7 to 10 of GBC of the Narshingh 2.683 NCB 0.00 0.00 0.94 0.00 1.40 0.45 0.00 2.79 WUA Ranjai WUA No.44 2/24/2011 wua_prmpkg_r4 134 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 999 R2 KUK-7/31 Manakadevi WUA Khadaki WUA No.45 1.018 Shopping 0.407 0.611 1.02 Rehabilitation work in the juridiction of Tail A2 KUK-7/31 Minor No 1,2 of Dy-3 of GBC Manakadevi 0.925 Shopping 0.00 0.00 0.00 0.64 0.00 0.29 0.00 0.93 WUA Khadaki WUA No.45 1000 R2 KUK-7/32 Nageshwar WUA Nagapur WUA No.46 1.814 NCB 0.726 1.088 1.81 Rehabilitation work in the juridiction of Tail A2 KUK-7/32 Minor No of Dy-3 of GBC Nageshwar WUA 1.655 Shopping 0.00 0.00 0.00 0.00 1.33 0.35 0.00 1.68 Nagapur WUA No.46 1001 R2 KUK-7/33 Bhimashankar WUA Jawale WUA No.47 2.034 NCB 0.814 1.220 2.03 Rehabilitation work in the juridiction of Tail A2 KUK-7/33 Minor No 4,5 of Dy-3 of GBC Bhimashankar 1.853 Shopping 0.00 0.00 0.00 0.00 0.86 1.00 0.00 1.86 WUA Jawale WUA No.47 1002 R2 KUK-7/34 Shri Vitthalkrupa WUA Mangrul WUA No.51 2.498 NCB 0.87 1.62 2.50 Rehabilitation work in the juridiction of Minor A2 KUK-7/34 No.8,9,10 of KLBC Shri Vitthalkrupa WUA 2.431 NCB 0.00 0.00 0.00 0.00 0.46 2.02 0.00 2.48 Mangrul WUA No.51 1003 R2 KUK-7/35 Sahakar WUA Jawala WUA No.65 0.619 Shopping 0.248 0.371 0.62 Rehabilitation work in the juridiction of Minor A2 KUK-7/35 No.2 of Dy-3 of KLBC Sahakar WUA Jawala 0.565 Shopping 0.00 0.00 0.00 0.55 0.06 0.00 0.00 0.61 WUA No.65 1004 R2 KUK-7/36 Krushiganga WUA Jawala WUA No.77 4.054 NCB 0.811 2.027 1.216 4.05 Rehabilitation work in the juridiction of Minor A2 KUK-7/36 No.23 & Dy-4 of KLBC Krushiganga WUA 3.692 NCB 0.00 0.00 2.86 0.35 0.33 0.00 0.00 3.54 Jawala WUA No.77 1005 R2 KUK-7/37 Ratneshwar WUA Kohakadi WUA No.79 3.155 NCB 0.631 1.578 0.947 3.16 Rehabilitation work in the juridiction of Minor A2 KUK-7/37 No. 2,3,4 of Dy 5 of KLBC Ratneshwar WUA 2.907 NCB 0.00 0.00 2.11 0.50 0.27 0.00 0.00 2.89 Kohakadi WUA No.79 1006 R2 KUK-7/38 Malhari Marthand WUA Yelpane WUA No.106 1.785 Shopping 0.714 1.071 1.79 2/24/2011 wua_prmpkg_r4 135 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the juridiction of Minor A2 KUK-7/38 No. 38 of KLBC Malhari Marthand WUA 1.727 Shopping 0.00 0.00 0.51 1.21 0.00 0.00 0.00 1.72 Yelpane WUA No.106 Kukadi Kuk-8** Rehabilitation of the Minors WUA -60 95.62 WUA 4.78 23.91 28.69 28.69 9.56 95.62 R Kuk-8** Rehabilitation of the Minors WUA -60 95.62 WUA 14.34 33.47 43.03 4.78 95.62 1007 R2 KUK-8/1 Swami Mohananandgiri WUA Arvi WUA No.4 0.610 Shopping 0.244 0.366 0.61 Rehabilitation work in the juridiction of Minor A2 KUK-8/1 No.4,5 of MFC Swami Mohananandgiri WUA 0.556 Shopping 0.00 0.00 0.00 0.45 0.06 0.00 0.00 0.50 Arvi WUA No.4 1008 R2 KUK-8/2 Mukatai WUA Narayangaon WUA No.5 0.693 Shopping 0.277 0.416 0.69 Rehabilitation work in the juridiction of Minor A2 KUK-8/2 No.1 of MBC Mukatai WUA Narayangaon 0.633 Shopping 0.00 0.00 0.00 0.62 0.00 0.00 0.00 0.62 WUA No.5 1009 R2 KUK-8/3 Shri Ganesh WUA Dhalewadi WUA No.11 1.092 Shopping 0.437 0.655 1.09 Rehabilitation work in the juridiction of Minor A2 KUK-8/3 No.1,2 Dy-2 of MBC Shri Ganesh WUA 0.992 Shopping 0.00 0.00 0.00 0.00 1.20 0.00 0.00 1.20 Dhalewadi WUA No.11 1010 R2 KUK-8/4 Hanuman WUA Sultanpur WUA No.21 0.988 Shopping 0.395 0.593 0.99 Rehabilitation work in the juridiction of Minor A2 KUK-8/4 No.16 of MBC Hanuman WUA Sultanpur 0.917 Shopping 0.00 0.00 0.00 0.00 0.67 0.00 0.00 0.67 WUA No.21 1011 R2 KUK-8/5 Pareshwar WUA Pargaon WUA No.28 1.254 Shopping 0.502 0.752 1.25 Rehabilitation work in the juridiction of Minor A2 KUK-8/5 No.25,27 of MBCPareshwar WUA Pargaon 1.150 Shopping 0.00 0.00 0.00 0.69 0.47 0.00 0.00 1.15 WUA No.28 1012 R2 KUK-8/6 Bhairavnath WUA Jambut WUA No.30 1.383 Shopping 0.553 0.830 1.38 Rehabilitation work in the juridiction of Minor A2 KUK-8/6 No.30 of MBC Bhairavnath WUA Jambut 1.262 Shopping 0.00 0.00 0.00 1.12 0.15 0.00 0.00 1.27 WUA No.30 Sant Dnyaneshwar WUA Saradwadi WUA 1013 R2 KUK-8/7 2.022 NCB 0.809 1.213 2.02 No.31 Rehabilitation work in the juridiction of Minor A2 KUK-8/7 No.31 of MBC Sant Dnyaneshwar WUA 1.869 Shopping 0.00 0.00 0.00 1.41 0.49 0.00 0.00 1.90 Saradwadi WUA No.31 1014 R2 KUK-8/8 Shriram WUA Fakate WUA No.32 2.059 NCB 0.824 1.235 2.06 2/24/2011 wua_prmpkg_r4 136 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the juridiction of Minor A2 KUK-8/8 No.6,7,8R of MBC Shriram WUA Fakate WUA 1.866 Shopping 0.00 0.00 0.00 1.14 0.72 0.00 0.00 1.87 No.32 1015 R2 KUK-8/9 Shrikrishna WUA Takali Haji WUA No.33 1.781 Shopping 0.712 1.069 1.78 Rehabilitation work in the juridiction of Minor A2 KUK-8/9 No.9R of MBC Shrikrishna WUA Takali Haji 1.643 Shopping 0.00 0.00 0.00 0.53 1.10 0.00 0.00 1.63 WUA No.33 1016 R2 KUK-8/10 Choufula WUA Dongargan WUA No.35 1.973 NCB 0.789 1.184 1.97 Rehabilitation work in the juridiction of Minor A2 KUK-8/10 No.15,16,18 of Tail Dy of MBC Choufula 1.796 Shopping 0.00 0.00 0.00 0.75 0.97 0.00 0.00 1.72 WUA Dongargan WUA No.35 1017 R2 KUK-8/11 Sangmeshwar WUA Mahashe Bk WUA No.36 2.077 NCB 0.831 1.246 2.08 Rehabilitation work in the juridiction of Minor A2 KUK-8/11 No.19,20,21 of Tail Dy of MBC Sangmeshwar 1.886 Shopping 0.00 0.00 1.13 0.00 0.72 0.00 0.00 1.85 WUA Mahashe Bk WUA No.36 1018 R2 KUK-8/12 Gurunath WUA Wadner Kd WUA No.37 1.542 Shopping 0.617 0.925 1.54 Rehabilitation work in the juridiction of Minor A2 KUK-8/12 No.7,8,9L of MBC Gurunath WUA Wadner Kd 1.403 Shopping 0.00 0.00 0.00 0.80 0.70 0.00 0.00 1.50 WUA No.37 1019 R2 KUK-8/13 Ganesh WUA Bori Bk WUA No.48 1.910 NCB 0.764 1.146 1.91 Rehabilitation work in the juridiction of Minor A2 KUK-8/13 No. 1,2,3 of KLBC Ganesh WUA Bori Bk 1.756 Shopping 0.00 0.00 0.00 0.00 1.78 0.00 0.00 1.78 WUA No.48 1020 R2 KUK-8/14 Shaneshwar WUA Jadhavwadi WUA No.49 1.285 Shopping 0.514 0.771 1.29 Rehabilitation work in the juridiction of Minor A2 KUK-8/14 No. 4 of KLBC Shaneshwar WUA Jadhavwadi 1.205 Shopping 0.00 0.00 0.00 0.00 1.21 0.00 0.00 1.21 WUA No.49 1021 R2 KUK-8/15 Dharmnath WUA Sakori WUA No.50 1.528 Shopping 0.611 0.917 1.53 Rehabilitation work in the juridiction of Minor A2 KUK-8/15 No. 6,7 of KLBC Dharmnath WUA Sakori 1.340 Shopping 0.00 0.00 0.00 0.66 0.70 0.00 0.00 1.35 WUA No.50 2/24/2011 wua_prmpkg_r4 137 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1022 R2 KUK-8/16 Jai Bajarang WUA Padali WUA No.52 1.296 Shopping 0.518 0.778 1.30 Rehabilitation work in the juridiction of Minor A2 KUK-8/16 No. 11 of KLBC Jai Bajarang WUA Padali 1.199 Shopping 0.00 0.00 0.00 0.55 0.63 0.00 0.00 1.18 WUA No.52 1023 R2 KUK-8/17 Chombheshwar WUA Choumbut WUA No.53 1.069 Shopping 0.428 0.641 1.07 Rehabilitation work in the juridiction of Minor A2 KUK-8/17 No. 12 of KLBC Chombheshwar WUA 0.971 Shopping 0.00 0.00 0.00 0.79 0.20 0.00 0.00 0.99 Choumbut WUA No.53 1024 R2 KUK-8/18 Ganesh WUA Choumbut WUA No.54 1.314 Shopping 0.526 0.788 1.31 Rehabilitation work in the juridiction of Minor A2 KUK-8/18 No. 13 of KLBC Ganesh WUA Choumbut WUA 1.208 Shopping 0.00 0.00 0.00 0.47 0.75 0.00 0.00 1.22 No.54 1025 R2 KUK-8/19 Kanifnath WUA Choumbut WUA No.55 1.208 Shopping 0.483 0.725 1.21 Rehabilitation work in the juridiction of Minor A2 KUK-8/19 No. 14 of KLBC Kanifnath WUA Choumbut 1.135 Shopping 0.00 0.00 0.00 0.39 0.82 0.00 0.00 1.21 WUA No.55 1026 R2 KUK-8/20 Siddheshwar WUA Shirapur WUA No.56 1.030 Shopping 0.412 0.618 1.03 Rehabilitation work in the juridiction of Minor A2 KUK-8/20 No. 15,16 of KLBC Siddheshwar WUA Shirapur 0.908 Shopping 0.00 0.00 0.00 0.23 0.70 0.00 0.00 0.93 WUA No.56 1027 R2 KUK-8/21 Charangbaba WUA Alkuti WUA No.57 1.995 NCB 0.798 1.197 2.00 Rehabilitation work in the juridiction of Minor A2 KUK-8/21 No. 17 of KLBC Charangbaba WUA Alkuti 1.109 Shopping 0.00 0.00 0.00 0.00 0.60 0.52 0.00 1.12 WUA No.57 1028 R2 KUK-8/22 Jai Hanuman WUA Shirapur WUA No.58 1.634 Shopping 0.654 0.980 1.63 Rehabilitation work in the juridiction of Minor A2 KUK-8/22 No. 18,19 of KLBC Jai Hanuman WUA 1.506 Shopping 0.00 0.00 0.00 0.42 0.60 0.51 0.00 1.53 Shirapur WUA No.58 1029 R2 KUK-8/23 Hiramata WUA Wadner Bk WUA No.59 2.467 NCB 0.86 1.60 2.47 2/24/2011 wua_prmpkg_r4 138 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the juridiction of Dy-1 of A2 KUK-8/23 2.151 NCB 0.00 0.00 0.00 0.73 1.51 0.00 0.00 2.24 KLBC Hiramata WUA Wadner Bk WUA No.59 1030 R2 KUK-8/24 Mulika WUA Nighoj WUA No.62 3.314 NCB 0.663 1.657 0.994 3.31 Rehabilitation work in the juridiction of Dy-2 A2 KUK-8/24 3.025 NCB 0.00 0.00 0.00 2.10 1.16 0.00 0.00 3.25 of KLBC Mulika WUA Nighoj WUA No.62 1031 R2 KUK-8/25 Waghjai WUA Nighoj WUA No.63 1.926 NCB 0.770 1.156 1.93 Rehabilitation work in the juridiction of Minor A2 KUK-8/25 No. 22 of KLBC Waghjai WUA Nighoj WUA 1.758 Shopping 0.00 0.00 0.00 1.67 0.16 0.00 0.00 1.84 No.63 1032 R2 KUK-8/26 Bhairvnath WUA Patharwadi WUA No.64 1.041 Shopping 0.416 0.625 1.04 Rehabilitation work in the juridiction of Minor A2 KUK-8/26 No. 22B of KLBC Bhairvnath WUA Patharwadi 0.949 Shopping 0.00 0.00 0.00 0.82 0.16 0.00 0.00 0.98 WUA No.64 1033 R2 KUK-8/27 Dharmnath WUA Jawala WUA No.66 1.221 Shopping 0.488 0.733 1.22 Rehabilitation work in the juridiction of Dy-3 A2 KUK-8/27 1.115 Shopping 0.00 0.00 0.00 0.85 0.30 0.00 0.00 1.15 of KLBC Dharmnath WUA Jawala WUA No.66 1034 R2 KUK-8/28 Jai Bhavani WUA Jawala WUA No.67 0.336 Shopping 0.134 0.202 0.34 Rehabilitation work in the juridiction of DO 8,9 A2 KUK-8/28 0.309 Shopping 0.00 0.00 0.00 0.23 0.09 0.00 0.00 0.32 of KLBC Jai Bhavani WUA Jawala WUA No.67 1035 R2 KUK-8/29 Ghodoba WUA Gadilgaon WUA No.68A 1.785 Shopping 0.714 1.071 1.79 Rehabilitation work in the juridiction of Minor A2 KUK-8/29 No. 1 Dy-2 of KLBC Ghodoba WUA Gadilgaon 1.630 Shopping 0.00 0.00 0.00 1.52 0.14 0.00 0.00 1.67 WUA No.68A 1036 R2 KUK-8/30 Girija WUA Golegaon WUA No.69 0.619 Shopping 0.248 0.371 0.62 Rehabilitation work in the juridiction of Minor A2 KUK-8/30 No. 4,5,6 of MLBC Girija WUA Golegaon 0.562 Shopping 0.00 0.00 0.00 0.13 0.44 0.00 0.00 0.57 WUA No.69 2/24/2011 wua_prmpkg_r4 139 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1037 R2 KUK-8/31 Vallabha WUA Kumshet WUA No.70 0.793 Shopping 0.317 0.476 0.79 Rehabilitation work in the juridiction of Minor A2 KUK-8/31 No. 7 of MLBC Vallabha WUA Kumshet WUA 0.757 Shopping 0.00 0.00 0.00 0.35 0.42 0.00 0.00 0.77 No.70 1038 R2 KUK-8/32 Sahayadri WUA Shiroli Kd WUA No.71 0.627 Shopping 0.251 0.376 0.63 Rehabilitation work in the juridiction of Minor A2 KUK-8/32 No. 8,9,12 of MLBC Sahayadri WUA Shiroli 0.581 Shopping 0.00 0.00 0.00 0.31 0.28 0.00 0.00 0.58 Kd WUA No.71 1039 R2 KUK-8/33 Jai Malhar WUA Tejewadi WUA No.72 0.589 Shopping 0.236 0.353 0.59 Rehabilitation work in the juridiction of Minor A2 KUK-8/33 No. 13,14,15 of MLBC Jai Malhar WUA 0.553 Shopping 0.00 0.00 0.00 0.24 0.30 0.00 0.00 0.54 Tejewadi WUA No.72 1040 R2 KUK-8/34 Vighnahar WUA Ozar WUA No.73 0.852 Shopping 0.341 0.511 0.85 Rehabilitation work in the juridiction of Minor A2 KUK-8/34 No. 16 of KLBC Vighnahar WUA Ozar WUA 0.777 Shopping 0.00 0.00 0.00 0.35 0.45 0.00 0.00 0.80 No.73 1041 R2 KUK-8/35 Bhairvnath WUA Hivare Kd WUA No.74 1.027 Shopping 0.411 0.616 1.03 Rehabilitation work in the juridiction of Minor A2 KUK-8/35 No. 17,18 of MLBC Bhairvnath WUA Hivare 0.913 Shopping 0.00 0.00 0.00 0.28 0.62 0.00 0.00 0.90 Kd WUA No.74 1042 R2 KUK-8/36 Jai Malhar WUA Netwad WUA No.75 0.581 Shopping 0.232 0.349 0.58 Rehabilitation work in the juridiction of Minor A2 KUK-8/36 No. 20 of KLBC Jai Malhar WUA Netwad 0.515 Shopping 0.00 0.00 0.00 0.20 0.33 0.00 0.00 0.53 WUA No.75 1043 R2 KUK-8/37 Wakoba WUA Udapur WUA No.76 0.223 Shopping 0.089 0.134 0.22 Rehabilitation work in the juridiction of DO A2 KUK-8/37 15,16,17,18 of MLBC Wakoba WUA Udapur 0.174 Shopping 0.00 0.00 0.00 0.07 0.11 0.00 0.00 0.18 WUA No.76 1044 R2 KUK-8/38 Shri Gajraj WUA Yavati WUA No.89 1.488 Shopping 0.595 0.893 1.49 2/24/2011 wua_prmpkg_r4 140 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the juridiction of Minor A2 KUK-8/38 No. 33 of KLBC Shri Gajraj WUA Yavati WUA 1.387 Shopping 0.00 0.00 0.93 0.37 0.12 0.00 0.00 1.43 No.89 1045 R2 KUK-8/39 Shri Bhairvnath WUA Mengalwadi WUA No.95 1.988 NCB 0.795 1.193 1.99 Rehabilitation work in the juridiction of Math A2 KUK-8/39 Minor No. Dy-7 of KLBC Shri Bhairvnath WUA 1.826 Shopping 0.00 0.00 0.77 0.83 0.15 0.00 0.00 1.75 Mengalwadi WUA No.95 1046 R2 KUK-8/40 Sadashivbaba WUA Rajapur WUA No.96 2.069 NCB 0.828 1.241 2.07 Rehabilitation work in the juridiction of Math A2 KUK-8/40 Minor of Dy-7 of KLBC Sadashivbaba WUA 1.888 Shopping 0.00 0.00 0.00 1.51 0.27 0.00 0.00 1.79 Rajapur WUA No.96 1047 R2 KUK-8/41 Shri Pandurang WUA Hingani WUA No.97 1.974 NCB 0.790 1.184 1.97 Rehabilitation work in the juridiction of Sub A2 KUK-8/41 Minor Math Minor of Dy 7 of KLBC Shri 1.830 Shopping 0.00 0.00 0.00 1.11 0.28 0.00 0.00 1.39 Pandurang WUA Hingani WUA No.97 1048 R2 KUK-8/42 Shri Sai WUA Devdhaithan WUA No.98 1.916 NCB 0.766 1.150 1.92 Rehabilitation work in the juridiction of Rajapur A2 KUK-8/42 East Sub-Minor of Dy-7 of KLBC Shri Sai 1.747 Shopping 0.00 0.00 1.16 0.00 0.40 0.00 0.00 1.56 WUA Devdhaithan WUA No.98 1049 R2 KUK-8/43 Mukatabai WUA Pargaon WUA No.27 1.090 Shopping 0.436 0.654 1.09 Rehabilitation work in the juridiction of Minor A2 KUK-8/43 No. 22,23,24 of MBC Mukatabai WUA Pargaon 0.990 Shopping 0.00 0.00 0.00 0.90 0.99 0.00 0.00 1.89 WUA No.27 1050 R2 KUK-8/44 Takdeshwar WUA Pimpari Kaval WUA No.29 1.606 Shopping 0.642 0.964 1.61 Rehabilitation work in the juridiction of Minor A2 KUK-8/44 No. 29,30,31 of MBC Takdeshwar WUA 1.410 Shopping 0.00 0.00 0.00 1.00 0.49 0.00 0.00 1.49 Pimpari Kaval WUA No.29 1051 R2 KUK-8/45 Shivshakati WUA Nighoj WUA No.60 1.133 Shopping 0.453 0.680 1.13 Rehabilitation work in the juridiction of Minor A2 KUK-8/45 No. 20 of KLBC Shivshakati WUA Nighoj 1.034 Shopping 0.00 0.00 0.60 0.38 0.06 0.00 0.00 1.04 WUA No.60 2/24/2011 wua_prmpkg_r4 141 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1052 R2 KUK-8/46 Manganga WUA Nighoj WUA No.61 1.366 Shopping 0.546 0.820 1.37 Rehabilitation work in the juridiction of Minor A2 KUK-8/46 No. 21 of KLBC Manganga WUA Nighoj WUA 1.246 Shopping 0.00 0.00 0.41 0.75 0.04 0.00 0.00 1.19 No.61 Nirbhay WUA Pimpalgaon Siddhanath WUA 1053 R2 KUK-8/47 0.738 Shopping 0.295 0.443 0.74 No.68B Rehabilitation work in the juridiction of Minor A2 KUK-8/47 No. 1,2,3 of MLBC Nirbhay WUA Pimpalgaon 0.672 Shopping 0.00 0.00 0.00 0.19 0.48 0.00 0.00 0.67 Siddhanath WUA No.68B Khandeshwar WUA RalegaonTherpal WUA 1054 R2 KUK-8/48 2.069 NCB 0.828 1.241 2.07 No.78 Rehabilitation work in the juridiction of Dy-5 A2 KUK-8/48 of KLBC Khandeshwar WUA RalegaonTherpal 1.837 Shopping 0.00 0.00 0.00 0.60 0.20 0.00 0.00 0.80 WUA No.78 1055 R2 KUK-8/49 Viroba WUA Ralegaon Therpal WUA No.80 1.989 NCB 0.796 1.193 1.99 Rehabilitation work in the juridiction of Minor A2 KUK-8/49 No. 24 of KLBC Viroba WUA Ralegaon 1.880 Shopping 0.00 0.00 0.00 1.41 0.00 0.00 0.00 1.41 Therpal WUA No.80 1056 R2 KUK-8/50 Rokadeshwar WUA Kurund WUA No.81 2.049 NCB 0.820 1.229 2.05 Rehabilitation work in the juridiction of Dy-6 A2 KUK-8/50 of KLBC Rokadeshwar WUA Kurund WUA 1.831 Shopping 0.00 0.00 0.00 0.00 1.65 0.00 0.00 1.65 No.81 1057 R2 KUK-8/51 Bhairvnath WUA Mavalewadi WUA No.82 0.259 Shopping 0.104 0.155 0.26 Rehabilitation work in the juridiction of Do.17. A2 KUK-8/51 18,19 of KLBC Bhairvnath WUA Mavalewadi 0.240 Shopping 0.00 0.00 0.00 0.18 0.00 0.00 0.00 0.18 WUA No.82 1058 R2 KUK-8/52 Khandeshwar WUA Wadegavan WUA No.83 2.015 NCB 0.806 1.209 2.02 Rehabilitation work in the juridiction of Minor A2 KUK-8/52 No. 25 of KLBC Khandeshwar WUA 1.824 Shopping 0.00 0.00 0.00 0.00 1.88 0.00 0.00 1.88 Wadegavan WUA No.83 1059 R2 KUK-8/53 Tukai WUA Wadegavan WUA No.84 0.740 Shopping 0.296 0.444 0.74 2/24/2011 wua_prmpkg_r4 142 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the juridiction of Minor A2 KUK-8/53 No. 26,27 of KLBC Tukai WUA Wadegavan 0.674 Shopping 0.00 0.00 0.00 0.19 0.44 0.00 0.00 0.63 WUA No.84 1060 R2 KUK-8/54 Jagdambha WUA Wadegavan WUA No.85 1.136 Shopping 0.454 0.682 1.14 Rehabilitation work in the juridiction of Minor A2 KUK-8/54 No. 28,28a,28b of KLBC Jagdambha WUA 1.023 Shopping 0.00 0.00 0.00 0.22 0.74 0.00 0.00 0.96 Wadegavan WUA No.85 1061 R2 KUK-8/55 Jai Hanuman WUA Yadavwadi WUA No.86 1.074 Shopping 0.430 0.644 1.07 Rehabilitation work in the juridiction of Minor A2 KUK-8/55 No. 29 of KLBC Jai Hanuman WUA 0.978 Shopping 0.00 0.00 0.00 0.94 0.00 0.00 0.00 0.94 Yadavwadi WUA No.86 1062 R2 KUK-8/56 Shri Adarsha WUA Devdaithan WUA No.87 0.501 Shopping 0.200 0.301 0.50 Rehabilitation work in the juridiction of Minor A2 KUK-8/56 No. 30 of KLBC Shri Adarsha WUA Devdaithan 0.492 Shopping 0.00 0.00 0.00 0.33 0.17 0.00 0.00 0.49 WUA No.87 1063 R2 KUK-8/57 ShriramKrushnahari WUA Padali WUA No.88 0.693 Shopping 0.277 0.416 0.69 Rehabilitation work in the juridiction of Minor A2 KUK-8/57 No. 31,31a,32 of KLBC ShriramKrushnahari 0.626 Shopping 0.00 0.00 0.00 0.49 0.00 0.00 0.00 0.49 WUA Padali WUA No.88 1064 R2 KUK-8/58 Govindbaba WUA Rajapur WUA No.90 1.627 Shopping 0.651 0.976 1.63 Rehabilitation work in the juridiction of Hingani A2 KUK-8/58 Minor of Dy-7 of KLBC Govindbaba WUA 1.493 Shopping 0.00 0.00 0.00 1.45 0.00 0.00 0.00 1.45 Rajapur WUA No.90 1065 R2 KUK-8/59 Nilkanteshwar WUA Davalgaon WUA No.91 0.778 Shopping 0.311 0.467 0.78 Rehabilitation work in the juridiction of A2 KUK-8/59 Devdaithan Minor of Dy-7 of KLBC 0.712 Shopping 0.00 0.00 0.43 0.00 0.18 0.00 0.00 0.61 Nilkanteshwar WUA Davalgaon WUA No.91 1066 R2 KUK-8/60 Mauli WUA Hingani WUA No.92 1.799 Shopping 0.720 1.079 1.80 Rehabilitation work in the juridiction of Hingani A2 KUK-8/60 Sub Minor Dy-7 of KLBC Mauli WUA Hingani 1.692 Shopping 0.00 0.00 0.69 0.74 0.19 0.00 0.00 1.61 WUA No.92 2/24/2011 wua_prmpkg_r4 143 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1067 R2 KUK-8/61 Shri Bhairvnath WUA Math WUA No.93 1.685 Shopping 0.674 1.011 1.69 Rehabilitation work in the juridiction of Rajapur A2 KUK-8/61 West Sub-Minor of Dy-7 of KLBC Shri 1.535 Shopping 0.00 0.00 0.84 0.26 0.39 0.00 0.00 1.49 Bhairvnath WUA Math WUA No.93 1068 R2 KUK-8/62 Shri Jagdambha WUA Raigavan WUA No.94 1.042 Shopping 0.417 0.625 1.04 Rehabilitation work in the juridiction of A2 KUK-8/62 Kolhewadi Sub- Minor of Dy-7 of KLBC Shri 0.952 Shopping 0.00 0.00 0.32 0.00 0.43 0.00 0.00 0.75 Jagdambha WUA Raigavan WUA No.94 1069 R2 KUK-8/63 Miravalibaba WUA Arangaon WUA No.99 2.121 NCB 0.848 1.273 2.12 Rehabilitation work in the juridiction of Minor A2 KUK-8/63 No. 34 of KLBC Miravalibaba WUA Arangaon 1.887 Shopping 0.00 0.00 1.57 0.19 0.00 0.00 0.00 1.76 WUA No.99 Shivshakati WUA Pimpari Kolandhar WUA 1070 R2 KUK-8/64 2.056 NCB 0.822 1.234 2.06 No.100 Rehabilitation work in the juridiction of Head of A2 KUK-8/64 Minor No. 35 of KLBC Shivshakati WUA 1.868 Shopping 0.00 0.00 1.33 0.52 0.00 0.00 0.00 1.85 Pimpari Kolandhar WUA No.100 1071 R2 KUK-8/65 Shrikrusha WUA Raigavan WUA No.101 2.037 NCB 0.815 1.222 2.04 Rehabilitation work in the juridiction of Tail A2 KUK-8/65 Minor No. 35 of KLBC Shrikrusha WUA 1.887 Shopping 0.00 0.00 1.76 0.12 0.00 0.00 0.00 1.88 Raigavan WUA No.101 Koleshwar WUA Pimpari Kolandhar WUA 1072 R2 KUK-8/66 2.016 NCB 0.806 1.210 2.02 No.102 Rehabilitation work in the juridiction of Sub A2 KUK-8/66 Minor No. 1,2 of M-37 of KLBC Koleshwar 1.884 Shopping 0.00 0.00 1.45 0.42 0.00 0.00 0.00 1.87 WUA Pimpari Kolandhar WUA No.102 1073 R2 KUK-8/67 Kanifnath WUA Mahashe WUA No.103 2.075 NCB 0.830 1.245 2.08 Rehabilitation work in the juridiction of Sub- A2 KUK-8/67 Minor No. 3 ,4 of KLBC Kanifnath WUA 1.886 Shopping 0.00 0.00 1.70 0.18 0.00 0.00 0.00 1.87 Mahashe WUA No.103 1074 R2 KUK-8/68 Munjoba WUA Mahashe WUA No.104 2.043 NCB 0.817 1.226 2.04 2/24/2011 wua_prmpkg_r4 144 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the juridiction of Minor A2 KUK-8/68 No. 37 of KLBC Munjoba WUA Mahashe WUA 1.887 Shopping 0.00 0.00 1.70 0.18 0.00 0.00 0.00 1.88 No.104 1075 R2 KUK-8/69 Gajanan WUA Ukkadgaon WUA No.105 0.908 Shopping 0.363 0.545 0.91 Rehabilitation work in the juridiction of Minor A2 KUK-8/69 No. 38 of KLBC Gajanan WUA Ukkadgaon 0.830 Shopping 0.00 0.00 0.28 0.56 0.00 0.00 0.00 0.83 WUA No.105 1076 R2 KUK-8/70 Khandobarai WUA Yelpane WUA No.107 1.786 Shopping 0.714 1.072 1.79 Rehabilitation work in the juridiction of Minor A2 KUK-8/70 No. 38 of KLBC Khandobarai WUA Yelpane 1.645 Shopping 0.00 0.00 0.55 1.09 0.00 0.00 0.00 1.64 WUA No.107 1077 R2 KUK-8/71 Rameshwar WUA Yelpane WUA No.108 3.136 NCB 0.627 1.568 0.941 3.14 Rehabilitation work in the juridiction of Minor A2 KUK-8/71 No. 38 of KLBC Rameshwar WUA Yelpane 2.880 NCB 0.00 0.00 0.00 1.92 1.20 0.00 0.00 3.12 WUA No.108 1078 R2 KUK-8/72 Jai Hanuman WUA Yelpane WUA No.109 2.321 NCB 0.812 1.509 2.32 Rehabilitation work in the juridiction of Minor A2 KUK-8/72 No. 38 of KLBC Jai Hanuman WUA Yelpane 2.128 NCB 0.00 0.00 0.94 1.17 0.09 0.00 0.00 2.20 WUA No.109 1079 R2 KUK-8/73 Vighanaghar WUA Yelpane WUA No.110 0.650 Shopping 0.260 0.390 0.65 Rehabilitation work in the juridiction of Minor A2 KUK-8/73 No. 39 of KLBC Vighanaghar WUA Yelpane 0.596 Shopping 0.00 0.00 0.00 0.59 0.00 0.00 0.00 0.59 WUA No.110 1080 R2 KUK-8/74 Gangothri WUA Belwandi WUA No.111 1.258 Shopping 0.503 0.755 1.26 Rehabilitation work in the juridiction of Minor A2 KUK-8/74 No. 40 of KLBC Gangothri WUA Belwandi 1.153 Shopping 0.00 0.00 0.68 0.48 0.00 0.00 0.00 1.15 WUA No.111 Dharmveer Sambhaji WUA Yerondoli WUA 1081 R2 KUK-8/75 0.771 Shopping 0.308 0.463 0.77 No.112 Rehabilitation work in the juridiction of Minor A2 KUK-8/75 No. 41,42 of KLBC Dharmveer Sambhaji WUA 0.719 Shopping 0.00 0.00 0.00 0.72 0.00 0.00 0.00 0.72 Yerondoli WUA No.112 2/24/2011 wua_prmpkg_r4 145 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1082 R2 KUK-8/76 Siddheshwar WUA Pimpalgaon WUA No.113 1.465 Shopping 0.586 0.879 1.47 Rehabilitation work in the juridiction of Head of A2 KUK-8/76 Dy-8 of KLBC Siddheshwar WUA Pimpalgaon 1.343 Shopping 0.00 0.00 0.74 0.60 0.00 0.00 0.00 1.34 WUA No.113 1083 R2 KUK-8/77 Bhairvnath WUA Belwandi WUA No.114 0.911 Shopping 0.364 0.547 0.91 Rehabilitation work in the juridiction of Tail of A2 KUK-8/77 Dy 8 of KLBC Bhairvnath WUA Belwandi 0.784 Shopping 0.00 0.00 0.26 0.51 0.00 0.00 0.00 0.77 WUA No.114 1084 R2 KUK-8/78 Renukamata WUA Pimpalgaon WUA No.115 0.632 Shopping 0.253 0.379 0.63 Rehabilitation work in the juridiction of Minor A2 KUK-8/78 No. 43 of KLBC Renukamata WUA Pimpalgaon 0.579 Shopping 0.00 0.00 0.35 0.23 0.00 0.00 0.00 0.58 WUA No.115 1085 R2 KUK-8/79 Kukadi WUA Pimpalgaon WUA No.116 0.844 Shopping 0.338 0.506 0.84 Rehabilitation work in the juridiction of Minor A2 KUK-8/79 No. 44 of KLBC Kukadi WUA Pimpalgaon 0.775 Shopping 0.00 0.00 0.46 0.31 0.00 0.00 0.00 0.78 WUA No.116 7 Manar Man-4** Rehabilitation of the Minors WUA-41 79.73 WUA 15.95 15.95 23.92 15.95 7.97 79.73 R Man-4** Rehabilitation of the Minors WUA-41 79.73 WUA 11.96 27.91 35.88 3.99 79.73 Man- 1086 R2 Jai Shivshanker W.U.A. Kautha. 6.195 NCB 2.168 4.027 6.195 4**/1 Man- Rehabilitation work of Manar Project for Jai A2 7.072 NCB 0 0.00 2.09 5.26 0.33 0.00 0.00 7.68 4**/1 Shivshanker W.U.A. Kautha. Man- 1087 R2 Venkateshwara W.U.A. Tembhurni 0.00 NCB 4**/2 Man- R3 Venkatesh Co.op.W.U.A.Tembhurni 0.00 NCB 0.00 4**/2 Man- A3 Venkatesh Co.op.W.U.A.Tembhurni 5.660 NCB 0 0.00 0 2.43 0.92 2.30 0.00 5.65 4**/2 Man- 1088 R2 Jai Kishan W.U.A. Tembhurni 2.307 NCB 0.461 1.154 0.692 2.307 4**/3 Man- Rehabilitation work of Manar Project for Jai A2 2.444 NCB 0 0.00 1.17 1.10 0.93 0.08 0.00 3.28 4**/3 Kishan W.U.A. Tembhurni Man- 1089 R2 Shri.Gajanan W.U.A. Takli 11.95 NCB 2.390 5.975 3.585 11.950 4**/4 2/24/2011 wua_prmpkg_r4 146 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Man- Rehabilitation work of Manar Project for A2 11.760 NCB 0 0.00 6.34 7.07 1.18 0.00 0.00 14.59 4**/4 Shri.Gajanan W.U.A. Takli Man- 1090 R2 Baliraja W.U.A. Khairgaon 5.91 NCB 2.069 3.842 5.910 4**/5 Man- Rehabilitation work of Manar Project for A2 6.870 NCB 0 0.00 0 4.67 0.94 1.26 0.00 6.87 4**/5 Baliraja W.U.A. Khairgaon Man- 1091 R2 Jai Hanuman W.U.A. Sujlegaon 3.7 NCB 1.295 2.405 3.700 4**/6 Man- Rehabilitation work of Manar Project for Jai A2 4.256 NCB 0 0.00 1.21 2.48 1.17 1.59 0.00 6.45 4**/6 Hanuman W.U.A. Sujlegaon Man- 1092 R2 Jai Ambika W.U.A. Kuntoor 5.93 NCB 2.076 3.855 5.930 4**/7 Man- Rehabilitation work of Manar Project for Jai A2 6.500 NCB 0 0.00 0 4.65 0.00 1.85 0.00 6.50 4**/7 Ambika W.U.A. Kuntoor Man- 1093 R2 Shri.Datta W.U.A. at Hotala 9.03 NCB 1.806 4.515 2.709 9.030 4**/8 Man- Rehabilitation work of Manar Project for A2 9.660 NCB 0 0.00 0 7.97 1.80 0.69 0.00 10.46 4**/8 Shri.Datta W.U.A. at Hotala Man- 1094 R2 Shri.Sai W.U.A. Degaon 4.583 NCB 1.604 2.979 4.583 4**/9 Man- Rehabilitation work of Manar Project for A2 5.283 NCB 0 0.00 1.67 2.60 0.00 1.01 0.00 5.28 4**/9 Shri.Sai W.U.A. Degaon Man- 1095 R2 Shri Shivsamb W.U.A. Palasgaon 5.77 NCB 1.154 2.885 1.731 5.770 4**/10 Man- Rehabilitation work of Manar Project for Shri A2 6.144 NCB 0 0.00 2.98 0.67 0.64 1.85 6.14 4**/10 Shivsamb W.U.A. Palasgaon Man- 1096 R2 Sant Shiromani Maharaj W.U.A Jakapur. 3.59 NCB 0.898 2.334 0.359 3.590 4**/11 Man- R3 Shri Sant Shiromani Maroti Maharaj W.U.A. 3.59 NCB 1.795 1.795 3.59 4**/11 Man- A3 Sant Shiromani WUA Jakapur 18.64 NCB 0 0.00 0 0.00 0.00 18.64 0.00 18.64 4**/11 Man- -- Court R3 Jai Hanuman Co.op.W.U.A.Shirur 0.00 4**/12 Stay -- Man- R4 Jai Hnumn Co.op. Shirur NCB 4**/12 Man- -- Court R3 Rokdeshwar Co.op.W.U.A.Ratoli 0.00 4**/13 Stay -- 2/24/2011 wua_prmpkg_r4 147 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Man- R4 Rokdeshwr Co.op.Ratoli NCB 4**/13 Man- -- Court R3 Nathoba Co.op.W.U.A.Ratoli 0.00 4**/14 Stay -- Man- R4 Nathoba Co.op.Ratoli NCB 4**/14 Man- -- Court R3 Jai Shivaji Co.op.W.U.A.Mugaon 0.00 4**/15 Stay -- Man- R4 Jai Shivaji Co.o.Mugaon NCB 4**/15 Man- -- Court R3 Parbateshwar Co.op.W.U.A.Marvali 0.00 4**/16 Stay -- Man- R4 Parbateshwar Co.op.Marwali NCB 4**/16 Man- -- Court R3 Sai baba Co.op.W.U.A.Dhanora 0.00 4**/17 Stay -- Man- R4 Sai baba Co.op.Dhanora NCB 4**/17 Man- -- Court R3 Shiva Co.op.W.U.A.Dhanora 0.00 4**/18 Stay -- Man- R4 Shiva Coop.Dhnora NCB 4**/18 Man- -- Court R3 Jai Shivrai Co.op.W.U.A.Narsi 0.00 4**/19 Stay -- Man- R4 Jai Shivray Co.op.Nrsi NCB 4**/19 Man- R3 Sant Tulsiram Co.op.W.U.A.Kuncheli NCB 0.00 4**/20 Man- R4 Sant Tulsirm Kundheli NCB 4**/20 Man- R3 Jai Malikanath Co.op.W.U.A.Bhopala NCB 0.00 4**/21 Man- A3 Jay Malinath WUA Bhopala 11.32 NCB 0 0.00 0 0.00 2.81 8.51 0.00 11.32 4**/21 Man- R3 Sant Nayneshwar Co.op.W.U.A.Chitmogra NCB 0.00 4**/22 Man- A3 Gnaneshwar WUA Chitmogra 6.81 NCB 0 0.00 0 0.00 2.81 4.00 0.00 6.81 4**/22 2/24/2011 wua_prmpkg_r4 148 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Man- R3 Yogeshwar Co.op.W.U.A.Aalandi NCB 0.00 4**/23 Man- A3 Yogeshwar WUA Alandi 14.34 NCB 0 0.00 0 0.00 3.72 5.60 5.02 14.34 4**/23 Man- R3 Kisan Vikas Co.op.W.U.A.Atakali NCB 0.00 4**/24 Man- R4 Kisn viks QUA tkli 13.84 NCB 8.84 5 13.84 4**/24 Man- R3 Walmiki Co.op.W.U.A.Tadisavali NCB 0.00 4**/25 Man- A3 Walmiki WUA Thadisawli 19.76 NCB 0 0.00 0 0.00 4.48 10.00 5.28 19.76 4**/25 Man- R3 Jai Kedar Co.op.W.U.A.Aadampur NCB 0.00 4**/26 Man- A3 Jay Kedrnath WUA dampur 15.33 NCB 0 0.00 0 0.00 1.88 13.45 0.00 15.33 4**/26 Man- R3 Sangameshwar Co.op.W.U.A.Katgaon NCB 0.00 4**/27 Man- A3 Sangameshwar WUA Khatgaon 14.77 NCB 0 0.00 0 0.00 3.16 5.07 6.54 14.77 4**/27 Man- R3 Shetakari vikas Co.op.W.U.A.Naigaon NCB 0.00 4**/28 Man- R4 Shetkari Viks Nigaon 14.47 NCB 10 4.47 14.47 4**/28 Man- R3 Gangagir Maharaj Co.op.W.U.A.Koklegaon NCB 0.00 4**/29 Man- Rehabilitation works of WUA Gangagir WUA R4 17.64 NCB 12.64 5 17.64 4**/29 Koklegaon Man- R3 Mhalsakant Co.op.W.U.A.Kuntoor NCB 0.00 4**/30 Man- A3 Mahlsakant WUA Kuntur 16.89 NCB 0 0.00 0 0.00 0.00 16.89 0.00 16.89 4**/30 Man- R3 Parbateshwar Co.op.W.U.A.Iklimal NCB 0.00 4**/31 Man- A3 Parbateshwar WUA Ekliml 11.95 NCB 0 0.00 0 0.00 0.00 11.95 0.00 11.95 4**/31 Man- R3 Rameshwar Co.op.W.U.A.Sategaon NCB 0.00 4**/32 2/24/2011 wua_prmpkg_r4 149 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Man- R4 Remehwar Satgaon NCB 4**/32 Man- R3 Shri Ganesh Co.op.W.U.A.Paradwadi NCB 0.00 4**/33 Man- R4 Ganesh Pardwadi NCB 4**/33 Man- R3 Gurudev Co.op.W.U.A.Hussa NCB 0.00 4**/34 Man- R4 Gurudev WU Hussa NCB 4**/34 Man- R3 Jai baliraja Co.op.W.U.A.Kothala NCB 0.00 4**/35 Man- A3 Jay Baliraj WUA Kothala 8.7 NCB 0 0.00 0 0.00 1.29 4.00 3.41 8.70 4**/35 Man- R3 Vithaleshwar Co.op.W.U.A.Dugaon NCB 0.00 4**/36 Man- A3 Vithaleshwar WUA Degaon 14.8 NCB 0 0.00 0 0.00 2.12 12.68 0.00 14.80 4**/36 Man- R3 Anusayamaa Co.op.W.U.A.Kumbhargaon NCB 0.00 4**/37 Man- R4 Anusayamata Kumbhargaon WUA NCB 4**/37 Man- R3 Shidheshwar Co.op.W.U.A.Raher NCB 0.00 4**/38 Man- R4 Sidheshwar WUA Raher NCB 4**/38 Man- R3 Jai Mahakali Co.op.W.U.A.Kangthi NCB 0.00 4**/39 Man- R4 Jai Mahkali WUA Kngthi NCB 4**/39 8 Upper Pus Pus-4** Rehabilitation of the Minors WUA -32 44.57 NCB 8.91 13.37 13.37 8.91 44.57 R Pus-4** Rehabilitation of the Minors WUA -32 44.57 NCB 6.69 15.60 20.06 2.23 44.57 1097 R2 PUS-4/1 Shrisant Lobhiwant W.U.A. Mungshi. 2.73 NCB 0.683 1.365 0.683 2.730 Rehabilitation work of Pus Major Project A2 PUS-4/1 Tq.Pusad Dist.Yavatmal For Shrisant Lobhiwant 2.65 NCB W.U.A. Mungshi. (Package PUS-4) 2/24/2011 wua_prmpkg_r4 150 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Pus Major Project A2/1 PUS-4/1 Tq.Pusad Dist.Yavatmal For Shrisant Lobhiwant 2.780 NCB 0.00 0.00 0.00 1.06 1.71 0.00 0.00 2.77 W.U.A. Mungshi. (Package PUS-4) 1098 R2 PUS-4/2 Khode Maharaj W.U.A.Banshi. 4.30 NCB 1.075 2.150 1.075 4.300 Rehabilitation work of Pus Major Project A2 PUS-4/2 Tq.Pusad Dist.Yavatmal For Khode Maharaj 3.870 NCB 0.00 0.00 0.00 2.80 1.06 0.00 0.00 3.86 W.U.A.Banshi. (Package PUS-4) 1099 R2 PUS-4/3 Shri Shivshakti W.U.A. Pimpalkhuta 3.11 NCB 0.778 1.555 0.778 3.110 Rehabilitation work of Pus Major Project A2 PUS-4/3 Tq.Pusad Dist.Yavatmal For Shri Shivshakti 2.40 NCB W.U.A. Pimpalkhuta (Package PUS-4) Rehabilitation work of Pus Major Project A2/1 PUS-4/3 Tq.Pusad Dist.Yavatmal For Shri Shivshakti 2.490 NCB 0.00 0.00 0.00 0.36 2.14 0.00 0.00 2.50 W.U.A. Pimpalkhuta (Package PUS-4) 1100 R2 PUS-4/4 Shri Ambikadevi W.U.A Eranda 3.51 NCB 0.878 1.755 0.878 3.510 Rehabilitation work of Pus Major Project A2 PUS-4/4 Tq.Pusad Dist.Yavatmal For Shri Ambikadevi 3.600 NCB 0.00 0.00 0.00 1.11 2.48 0.00 0.00 3.590 W.U.A Eranda (Package PUS-4) 1101 R2 PUS-4/5 Shri Swami Samarth W.U.A Warud 5.22 NCB 1.305 2.610 1.305 5.220 Rehabilitation work of Pus Major Project A2 PUS-4/5 Tq.Pusad Dist.Yavatmal For Shri Swami 5.320 NCB 0.00 0.00 0.00 1.67 3.65 0.00 0.00 5.320 Samarth W.U.A Warud (Package PUS-4) 1102 R2 PUS-4/6 Shri.Annapurna W.U.A.Itawa 5.91 NCB 1.478 2.955 1.478 5.910 Rehabilitation work of Pus Major Project A2 PUS-4/6 Tq.Pusad Dist.Yavatmal For Shri.Annapurna 6.02 NCB W.U.A.Itawa (Package PUS-4) Rehabilitation work of Pus Major Project A2/1 PUS-4/6 Tq.Pusad Dist.Yavatmal For Shri.Annapurna 6.930 NCB 1.09 5.84 0.00 0.00 6.930 W.U.A.Itawa (Package PUS-4) 1103 R2 PUS-4/7 Maulikrupa W.U.A. Loni 2.30 NCB 0.575 1.150 0.575 2.300 Rehabilitation work of Pus Major Project A2 PUS-4/7 Tq.Pusad Dist.Yavatmal For Maulikrupa W.U.A. 2.20 NCB Loni (Package PUS-4) Rehabilitation work of Pus Major Project A2/1 PUS-4/7 Tq.Pusad Dist.Yavatmal For Maulikrupa W.U.A. 2.20 NCB Loni (Package PUS-4) 2/24/2011 wua_prmpkg_r4 151 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Pus Major Project A2/2 PUS-4/7 Tq.Pusad Dist.Yavatmal For Maulikrupa W.U.A. 2.310 NCB 1.54 0.77 0.00 0.00 2.310 Loni (Package PUS-4) 1104 R2 PUS-4/8 Jaikisan W.U.AAregaon 5.74 NCB 1.435 2.870 1.435 5.740 Rehabilitation work of Pus Major Project A2 PUS-4/8 Tq.Pusad Dist.Yavatmal For Jaikisan 5.11 NCB W.U.Aaregaon (Package PUS-4) Rehabilitation work of Pus Major Project A2/1 PUS-4/8 Tq.Pusad Dist.Yavatmal For Jaikisan 5.760 NCB 0.00 4.69 1.07 5.760 W.U.Aaregaon (Package PUS-4) 1105 R2 PUS-4/9 Sau.Renuka Jadhao W.U.A. Bhtanmba 8.11 NCB 0.41 4.055 3.650 8.110 Rehabilitation work of Pus Major Project A2 PUS-4/9 Tq.Pusad Dist.Yavatmal For Sau.Renuka Jadhao 7.900 NCB 1.15 3.70 3.05 7.900 W.U.A. Bhtanmba (Package PUS-4) 1106 R2 PUS-4/10 Ramji Maharaj W.U.A. Hegdi/Bhatamba 10.99 NCB 0.55 5.495 4.946 10.990 Rehabilitation work of Pus Major Project A2 PUS-4/10 Tq.Pusad Dist.Yavatmal For Ramji Maharaj 14.830 NCB 2.97 5.86 6.00 14.830 W.U.A. Hegdi/Bhatamba (Package PUS-4) 1107 R2 PUS-4/11 Sri.Sadbhawna W.U.A. Katkheda 2.08 NCB 0.208 1.144 0.728 2.080 Rehabilitation work of Pus Major Project A2 PUS-4/11 Tq.Pusad Dist.Yavatmal For Sri.Sadbhawna 2.35 NCB 0 0 W.U.A. Katkheda (Package PUS-4) Rehabilitation work of Pus Major Project A2/1 PUS-4/11 Tq.Pusad Dist.Yavatmal For Sri.Sadbhawna 2.460 NCB 0.00 0.43 2.03 2.460 W.U.A. Katkheda (Package PUS-4) 1108 R2 PUS-4/12 Shri,Rushibaba W.U.A. Katkheda 2.03 NCB 0.203 1.117 0.711 2.030 Rehabilitation work of Pus Major Project A2 PUS-4/12 Tq.Pusad Dist.Yavatmal For Shri,Rushibaba 2.17 NCB W.U.A. Katkheda (Package PUS-4) Rehabilitation work of Pus Major Project A2/1 PUS-4/12 Tq.Pusad Dist.Yavatmal For Shri,Rushibaba 2.260 NCB 0.00 0.49 1.79 2.280 W.U.A. Katkheda (Package PUS-4) 1109 R2 PUS-4/13 Shri.Ayodhya W.U.A. Hudi 6.97 NCB 0.35 3.485 3.137 6.970 Rehabilitation work of Pus Major Project A2 PUS-4/13 Tq.Pusad Dist.Yavatmal For Shri.Ayodhya 6.210 NCB 2.64 3.67 6.310 W.U.A. Hudi (Package PUS-4) 1110 R2 PUS-4/14 Shri.Ramchandra Maharaj W.U.A. Tarodi 3.66 NCB 0.915 1.830 0.915 3.660 2/24/2011 wua_prmpkg_r4 152 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Pus Major Project A2 PUS-4/14 Tq.Pusad Dist.Yavatmal For Shri.Ramchandra 4.770 NCB 3.17 1.58 4.750 Maharaj W.U.A. Tarodi (Package PUS-4) 1111 R2 PUS-4/15 Hajisaheb W.U.A. Pimpalgaon. 3.39 NCB 0.17 1.695 1.526 3.390 Rehabilitation work of Pus Major Project A2 PUS-4/15 Tq.Pusad Dist.Yavatmal For Hajisaheb W.U.A. 5.570 NCB 2.94 2.63 5.570 Pimpalgaon. (Package PUS-4) 1112 R2 PUS-4/16 Shri.Kaneshwar W.U.A. Kanha. 4.37 NCB 0.22 2.185 1.967 4.370 Rehabilitation work of Pus Major Project A2 PUS-4/16 Tq.Pusad Dist.Yavatmal For Shri.Kaneshwar 5.03 NCB W.U.A. Kanha. (Package PUS-4) Rehabilitation work of Pus Major Project A2/1 PUS-4/16 Tq.Pusad Dist.Yavatmal For Shri.Kaneshwar 5.620 NCB 0.63 3.61 1.39 5.630 W.U.A. Kanha. (Package PUS-4) 1113 R2 PUS-4/17 Chtrapati Shahu Maharaj W.U.A. Gunj. 5.43 NCB 0.27 2.715 2.444 5.430 Rehabilitation work of Pus Major Project A2 PUS-4/17 Tq.Pusad Dist.Yavatmal For Chtrapati Shahu 4.88 NCB Maharaj W.U.A. Gunj. (Package PUS-4) Rehabilitation work of Pus Major Project A2/1 PUS-4/17 Tq.Pusad Dist.Yavatmal For Chtrapati Shahu 5.760 NCB 1.280 1.950 2.540 5.770 Maharaj W.U.A. Gunj. (Package PUS-4) 1114 R2 PUS-4/18 JaiHanuman W.U.A. Gunj 4.66 NCB 0.23 2.330 2.097 4.660 Rehabilitation work of Pus Major Project A2 PUS-4/18 Tq.Pusad Dist.Yavatmal For JaiHanuman 3.85 NCB W.U.A. Gunj (Package PUS-4) Rehabilitation work of Pus Major Project A2/1 PUS-4/18 Tq.Pusad Dist.Yavatmal For JaiHanuman 4.580 NCB 0.460 4.120 4.580 W.U.A. Gunj (Package PUS-4) 1115 R2 PUS-4/19 Govind Maharaj W.U.A. Weni. 4.00 NCB 0.20 2.000 1.800 4.000 Rehabilitation work of Pus Major Project A2 PUS-4/19 Tq.Pusad Dist.Yavatmal For Govind Maharaj 4.150 NCB 1.710 2.460 4.170 W.U.A. Weni. (Package PUS-4) 1116 R2 PUS-4/20 Jijamata W.U.A. Sawana 2.05 NCB 0.10 1.025 0.923 2.050 Rehabilitation work of Pus Major Project A2 PUS-4/20 Tq.Pusad Dist.Yavatmal For Jijamata W.U.A. 2.350 NCB 0.95 0.00 1.40 0.00 2.350 Sawana (Package PUS-4) 1117 R2 PUS-4/21 ShivParvati W.U.A. Pimpalgaon. 7.13 NCB 0.36 3.565 3.209 7.130 2/24/2011 wua_prmpkg_r4 153 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Pus Major Project A2 PUS-4/21 Tq.Pusad Dist.Yavatmal For ShivParvati W.U.A. 3.850 NCB 1.90 1.95 0.00 3.850 Pimpalgaon. (Package PUS-4) 1118 R2 PUS-4/22 Jai Bhole W.U.A. Bhojla 4.93 NCB 0.25 2.465 2.219 4.930 Rehabilitation work of Pus Major Project A2 PUS-4/22 Tq.Pusad Dist.Yavatmal For Jai Bhole W.U.A. 4.970 NCB 1.84 3.14 0.00 4.980 Bhojla (Package PUS-4) 1119 R2 PUS-4/23 Sri.SiddiVinayak W.U.A. Bhojla 4.33 NCB 0.22 2.165 1.949 4.330 Rehabilitation work of Pus Major Project A2 PUS-4/23 Tq.Pusad Dist.Yavatmal For Sri.SiddiVinayak 4.540 NCB 0.00 0.78 3.76 4.540 W.U.A. Bhojla (Package PUS-4) 1120 R2 PUS-4/24 Vasant Jaldhara W.U.A. Pardi. 3.76 NCB 0.19 1.880 1.692 3.760 Rehabilitation work of Pus Major Project A2 PUS-4/24 Tq.Pusad Dist.Yavatmal For Vasant Jaldhara 3.76 NCB W.U.A. Pardi. (Package PUS-4) Rehabilitation work of Pus Major Project A2/1 PUS-4/24 Tq.Pusad Dist.Yavatmal For Vasant Jaldhara 3.940 NCB 0.00 0.72 3.22 3.940 W.U.A. Pardi. (Package PUS-4) 1121 R2 PUS-4/25 Swami Vivekanand W.U.A. Waltur. 6.97 NCB 0.35 3.485 3.137 6.970 Rehabilitation work of Pus Major Project A2 PUS-4/25 Tq.Pusad Dist.Yavatmal For Swami Vivekanand 7.790 NCB 0.62 5.08 2.09 7.790 W.U.A. Waltur. (Package PUS-4) 1122 R2 PUS-4/26 Dhankeshwar W.U.A. Nimbhi. 3.45 NCB 0.17 1.725 1.553 3.450 Rehabilitation work of Pus Major Project A2 PUS-4/26 Tq.Pusad Dist.Yavatmal For Dhankeshwar 3.100 NCB 0.67 2.73 0.00 3.400 W.U.A. Nimbhi. (Package PUS-4) 1123 R2 PUS-4/27 Sri.Sant Dudhadhari W.U.A. Borgadi. 10.76 NCB 0.54 5.380 4.842 10.760 Rehabilitation work of Pus Major Project A2 PUS-4/27 Tq.Pusad Dist.Yavatmal For Sri.Sant 11.850 NCB 1.53 6.41 3.91 11.850 Dudhadhari W.U.A. Borgadi. (Package PUS-4) 1124 R2 PUS-4/28 Nawnath W.U.A. Bori. 5.35 NCB 0.27 2.675 2.408 5.350 Rehabilitation work of Pus Major Project A2 PUS-4/28 Tq.Pusad Dist.Yavatmal For Nawnath W.U.A. 5.720 NCB 0.00 2.93 2.79 5.720 Bori. (Package PUS-4) 1125 R2 PUS-4/29 SriKrushna W.U.A. Shelu. 5.44 NCB 0.27 2.720 2.448 5.440 2/24/2011 wua_prmpkg_r4 154 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Pus Major Project A2 PUS-4/29 Tq.Pusad Dist.Yavatmal For SriKrushna W.U.A. 5.34 NCB Shelu. (Package PUS-4) Rehabilitation work of Pus Major Project A2/1 PUS-4/29 Tq.Pusad Dist.Yavatmal For SriKrushna W.U.A. 5.600 NCB 0.00 0.57 5.03 5.600 Shelu. (Package PUS-4) 1126 R2 PUS-4/30 Bhyanbaba W.U.A. Pokhari. 6.09 NCB 0.30 3.045 2.741 6.090 Rehabilitation work of Pus Major Project A2 PUS-4/30 Tq.Pusad Dist.Yavatmal For Bhyanbaba W.U.A. 6.210 NCB 1.03 5.50 0.00 6.530 Pokhari. (Package PUS-4) 9 Itiadoh Iti-4** Rehabilitation of the Minors WUA-52 74.56 WUA 14.91 14.91 22.37 14.91 7.46 74.56 R Iti-4** Rehabilitation of the Minors WUA-52 74.56 WUA 11.18 26.10 33.55 3.73 74.56 Rehabilitation Work in Juridiction of W.U.A. No.1 Gajanan WUA, Bondgaon (Sur.) Tah. 1127 R2 Iti-4**/1 2.145 NCB 0.429 1.073 0.644 2.145 Arjuni (Mor.) Dist. Gondia on Kadholi Minor and Karandli Minor. of I.M.C. Rehabilitation Work in Juridiction of W.U.A. No.1 Gajanan WUA, Bondgaon (Sur.) Tah. Arjuni (Mor.) A2 Iti-4**/1 2.197 NCB 0.00 0.00 0.24 1.61 0.16 0.00 0.00 2.02 Dist. Gondia on Kadholi Minor and Karandli Minor. of I.M.C. of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.2 . Itiadoh Shetkari WUA, Pratapgarh Tah. 1128 R2 Iti-4**/2 0.984 Shopping 0.344 0.640 0.984 Arjuni (Mor.) Dist. Gondia on Minor No. 2 A, 2 and Sub Minor 2 of I.M.C. Rehabilitation Work in Juridiction of W.U.A. No.2 . Itiadoh Shetkari WUA, Pratapgarh Tah. Arjuni A2 Iti-4**/2 1.009 Shopping 0.00 0.00 0.16 0.57 0.30 0.00 0.00 1.03 (Mor.) Dist. Gondia on Minor No. 2 A, 2 and Sub Minor 2 of I.M.C. of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.3 . Bhagirathi WUA, Dinkarnagar Tah. 1129 R2 Iti-4**/3 0.901 Shopping 0.315 0.586 0.901 Arjuni (Mor.) Dist. Gondia on Minor No. 4 and Sub Minor 4 of I.M.C. Rehabilitation Work in Juridiction of W.U.A. No.3 . Bhagirathi WUA, Dinkarnagar Tah. Arjuni (Mor.) A2 Iti-4**/3 0.928 Shopping 0.00 0.00 0.16 0.43 0.44 0.00 0.00 1.03 Dist. Gondia on Minor No. 4 and Sub Minor 4 of I.M.C. of Itiadoh Project. 2/24/2011 wua_prmpkg_r4 155 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation Work in Juridiction of W.U.A. No.4 . Jaibajarang WUA, Chicholi Tah. Arjuni 1130 R2 Iti-4**/4 0.885 Shopping 0.310 0.575 0.885 (Mor.) Dist. Gondia on Minor No. 5 and Sub Minor 5 of I.M.C. Rehabilitation Work in Juridiction of W.U.A. No.4 . Jaibajarang WUA, Chicholi Tah. Arjuni (Mor.) Dist. A2 Iti-4**/4 0.921 Shopping 0.00 0.00 0.20 0.56 0.10 0.00 0.00 0.86 Gondia on Minor No. 5 and Sub Minor 5 of I.M.C. of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.5 . Tibetian WUA, Tibet Camp 239 Tah. 1131 R2 Iti-4**/5 0.404 Shopping 0.141 0.263 0.404 Arjuni (Mor.) Dist. Gondia on Minor No. 6 of I.M.C. Rehabilitation Work in Juridiction of W.U.A. No.5 . Tibetian WUA, Tibet Camp 239 Tah. Arjuni (Mor.) A2 Iti-4**/5 0.626 Shopping 0.00 0.00 0.34 0.26 0.00 0.00 0.00 0.60 Dist. Gondia on Minor No. 6 of I.M.C. of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.6 . Mahatma Jyotiba Fule WUA, Navanitpur 1132 R2 Iti-4**/6 1.247 Shopping 0.436 0.811 1.247 Tah. Arjuni (Mor.) Dist. Gondia on Minor No. 7 and 8 of I.M.C. Rehabilitation Work in Juridiction of W.U.A. No.6 . Mahatma Jyotiba Fule WUA, Navanitpur Tah. A2 Iti-4**/6 1.305 Shopping 0.00 0.00 0.27 0.71 0.38 0.00 0.00 1.36 Arjuni (Mor.) Dist. Gondia on Minor No. 7 and 8 of I.M.C. of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.7 . Chhatrapati Shivaji Maharaj WUA, 1133 R2 Iti-4**/7 0.618 Shopping 0.216 0.402 0.618 Shiroli Tah. Arjuni (Mor.) Dist. Gondia on Mahagaon Branch Canal of I.M.C. Rehabilitation Work in Juridiction of W.U.A. No.7 . Chhatrapati Shivaji Maharaj WUA, Shiroli Tah. A2 Iti-4**/7 0.883 Shopping 0.00 0.00 0.00 0.47 0.43 0.00 0.00 0.90 Arjuni (Mor.) Dist. Gondia on Mahagaon Branch Canal of I.M.C. of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.8 . Bahuuddeshiya WUA, Mahurkuda Tah. 1134 R2 Iti-4**/8 1.648 Shopping 0.577 1.071 1.648 Arjuni (Mor.) Dist. Gondia on Mahurkuda Minor No. 9 and 10 of I.M.C. Rehabilitation Work in Juridiction of W.U.A. No.8 . Bahuuddeshiya WUA, Mahurkuda Tah. Arjuni A2 Iti-4**/8 1.693 Shopping 0.00 0.00 0.00 0.61 1.13 0.00 0.00 1.74 (Mor.) Dist. Gondia on Mahurkuda Minor No. 9 and 10 of I.M.C. of Itiadoh Project. 2/24/2011 wua_prmpkg_r4 156 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation Work in Juridiction of W.U.A. No.9 . Jaidurga WUA, Nilaj Tah. Arjuni (Mor.) 1135 R2 Iti-4**/9 0.472 Shopping 0.165 0.307 0.472 Dist. Gondia on Nilaj Minor & Nilaj D.O. of I.M.C. Rehabilitation Work in Juridiction of W.U.A. No.9 . Jaidurga WUA, Nilaj Tah. Arjuni (Mor.) Dist. A2 Iti-4**/9 0.444 Shopping 0.00 0.00 0.00 0.26 0.19 0.00 0.00 0.46 Gondia on Nilaj Minor & Nilaj D.O. of I.M.C. of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.10 . Sainath WUA, Arjuni Mor. Tah. Arjuni 1136 R2 Iti-4**/10 0.948 Shopping 0.332 0.616 0.948 (Mor.) Dist. Gondia on Morgaon D.O. & Arjuni Minor of I.M.C. Rehabilitation Work in Juridiction of W.U.A. No.10 . Sainath WUA, Arjuni Mor. Tah. Arjuni (Mor.) Dist. A2 Iti-4**/10 0.934 Shopping 0.00 0.00 0.00 0.30 0.65 0.00 0.00 0.96 Gondia on Morgaon D.O. & Arjuni Minor of I.M.C. of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.11 . Swami Vivekanand WUA, Mahagaon 1137 R2 Iti-4**/11 Tah. Arjuni (Mor.) Dist. Gondia on Tadgaon 1.239 Shopping 0.434 0.805 1.239 D.O., Zarpada D.O., Mahalgaon Minor & Dongargaon Minor of I.M.C. Rehabilitation Work in Juridiction of W.U.A. No.11 . Swami Vivekanand WUA, Mahagaon Tah. Arjuni A2 Iti-4**/11 (Mor.) Dist. Gondia on Tadgaon D.O., Zarpada D.O., 1.254 Shopping 0.00 0.00 0.00 0.42 0.85 0.00 0.00 1.27 Mahalgaon Minor & Dongargaon Minor of I.M.C. of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.12 . Jaikisan WUA, Mahagaon Tah. Arjuni 1138 R2 Iti-4**/12 1.510 Shopping 0.529 0.982 1.510 (Mor.) Dist. Gondia on Mahagaon Minor No. 1 & 2, & Yegaon Minor of I.M.C. Rehabilitation Work in Juridiction of W.U.A. No.12 . Jaikisan WUA, Mahagaon Tah. Arjuni (Mor.) Dist. A2 Iti-4**/12 1.537 Shopping 0.00 0.00 0.00 0.46 1.12 0.00 0.00 1.58 Gondia on Mahagaon Minor No. 1 & 2, & Yegaon Minor of I.M.C. of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.13 . Naoday WUA, Mahagaon Tah. Arjuni 1139 R2 Iti-4**/13 1.251 Shopping 0.438 0.813 1.251 (Mor.) Dist. Gondia on Mahagaon Disty. Km. 0 to 4.70 & Mahagaon Minor No. 3 of I.M.C. 2/24/2011 wua_prmpkg_r4 157 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation Work in Juridiction of W.U.A. No.13 . Naoday WUA, Mahagaon Tah. Arjuni (Mor.) Dist. A2 Iti-4**/13 1.197 Shopping 0.00 0.00 0.00 0.20 1.01 0.00 0.00 1.21 Gondia on Mahagaon Disty. Km. 0 to 4.70 & Mahagaon Minor No. 3 of I.M.C. of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.14 . Sahu Maharaj WUA, Bori Tah. Arjuni 1140 R2 Iti-4**/14 0.189 Shopping 0.066 0.123 0.189 (Mor.) Dist. Gondia on D.O. of Mahagaon Distributory Km. 4.70 to 9.00 of I.M.C. Rehabilitation Work in Juridiction of W.U.A. No.14 . Sahu Maharaj WUA, Bori Tah. Arjuni (Mor.) Dist. A2 Iti-4**/14 0.968 Shopping 0.00 0.00 0.00 0.00 0.57 0.00 0.00 0.57 Gondia on D.O. of Mahagaon Distributory Km. 4.70 to 9.00 of I.M.C. of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.15 . Samruddhi WUA, Itkheda Tah. Arjuni 1141 R2 Iti-4**/15 1.390 Shopping 0.487 0.904 1.390 (Mor.) Dist. Gondia on Itkheda Minor, Isapur Sub Minor of I.M.C. Rehabilitation Work in Juridiction of W.U.A. No.15 . Samruddhi WUA, Itkheda Tah. Arjuni (Mor.) Dist. A2 Iti-4**/15 1.146 Shopping 0.00 0.00 0.00 1.05 0.09 0.00 0.00 1.15 Gondia on Itkheda Minor, Isapur Sub Minor of I.M.C. of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. 1142 R2 Iti-4**/16 No.16 . Kaveri WUA, Puyar Tah. Lakhandur 0.690 Shopping 0.242 0.449 0.690 Dist. Bhandara on Puyar Minor of Rehabilitation Work in Juridiction of W.U.A. No.16 . A2 Iti-4**/16 Kaveri WUA, Puyar Tah. Lakhandur Dist. Bhandara 0.906 Shopping 0.00 0.00 0.00 0.89 0.02 0.00 0.00 0.91 on Puyar Minor of of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.17 . Wainganga WUA, Soni Tah. Lakhandur 1143 R2 Iti-4**/17 3.550 NCB 0.710 1.775 1.065 3.550 Dist. Bhandara on Puyar Branch, Soni Distributory, Keshori Minor of Rehabilitation Work in Juridiction of W.U.A. No.17 . Wainganga WUA, Soni Tah. Lakhandur Dist. A2 Iti-4**/17 3.217 NCB 0.00 0.00 0.00 2.12 1.10 0.00 0.00 3.22 Bhandara on Puyar Branch, Soni Distributory, Keshori Minor of of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.18 . Yamuna WUA, Sawangi Tah. 1144 R2 Iti-4**/18 0.380 Shopping 0.133 0.247 0.380 Lakhandur Dist. Bhandara on Soni Distributory & Minors, Sawangi Distributory & Minors 2/24/2011 wua_prmpkg_r4 158 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation Work in Juridiction of W.U.A. No.18 . Yamuna WUA, Sawangi Tah. Lakhandur Dist. A2 Iti-4**/18 0.598 Shopping 0.00 0.00 0.00 0.37 0.24 0.00 0.00 0.61 Bhandara on Soni Distributory & Minors, Sawangi Distributory & Minors of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.19 . Rashtrasant Tukdoji Maharaj WUA, 1145 R2 Iti-4**/19 3.140 NCB 0.628 1.570 0.942 3.140 Chaprad Tah. Lakhandur Dist. Bhandara on 5 L, 6 L & 3 R, 4 R Minors on Madeghat Distributory Rehabilitation Work in Juridiction of W.U.A. No.19 . Rashtrasant Tukdoji Maharaj WUA, Chaprad Tah. A2 Iti-4**/19 2.892 NCB 0.00 0.00 0.23 1.74 0.92 0.00 0.00 2.89 Lakhandur Dist. Bhandara on 5 L, 6 L & 3 R, 4 R Minors on Madeghat Distributory of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.20 . Gajanan Baba WUA, Kanhalgaon Tah. 1146 R2 Iti-4**/20 1.238 Shopping 0.433 0.805 1.238 Lakhandur Dist. Bhandara on L3 Minor, L4 Minor of Madeghat Distributory Rehabilitation Work in Juridiction of W.U.A. No.20 . Gajanan Baba WUA, Kanhalgaon Tah. Lakhandur A2 Iti-4**/20 1.175 Shopping 0.00 0.00 0.31 0.80 0.11 0.00 0.00 1.22 Dist. Bhandara on L3 Minor, L4 Minor of Madeghat Distributory of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.21 . Gadhavi Nadi WUA, Madeghat Tah. 1147 R2 Iti-4**/21 1.821 NCB 0.364 0.911 0.546 1.821 Lakhandur Dist. Bhandara on 1 R & 2 R Minors on Madeghat Distributory Rehabilitation Work in Juridiction of W.U.A. No.21 . Gadhavi Nadi WUA, Madeghat Tah. Lakhandur A2 Iti-4**/21 1.847 Shopping 0.00 0.00 0.25 1.45 0.22 0.00 0.00 1.92 Dist. Bhandara on 1 R & 2 R Minors on Madeghat Distributory of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.22 . Saibaba WUA, Lakhandur Tah. 1148 R2 Iti-4**/22 1.321 Shopping 0.462 0.859 1.321 Lakhandur Dist. Bhandara on 2L , 2R , & 3R Minors on Lakhandur Distributory Rehabilitation Work in Juridiction of W.U.A. No.22 . Saibaba WUA, Lakhandur Tah. Lakhandur Dist. A2 Iti-4**/22 1.428 Shopping 0.00 0.00 0.00 1.37 0.10 0.00 0.00 1.47 Bhandara on 2L , 2R , & 3R Minors on Lakhandur Distributory of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.23 . Shri Ganesh WUA, Pimpalgaon (Kohali) 1149 R2 Iti-4**/23 2.109 NCB 0.422 1.055 0.633 2.109 Tah. Lakhandur Dist. Bhandara on Pimpalgaon & Kohali Minors 2/24/2011 wua_prmpkg_r4 159 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation Work in Juridiction of W.U.A. No.23 . Shri Ganesh WUA, Pimpalgaon (Kohali) Tah. A2 Iti-4**/23 2.132 Shopping 0.00 0.00 0.28 1.71 0.22 0.00 0.00 2.21 Lakhandur Dist. Bhandara on Pimpalgaon & Kohali Minors of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.24 . Shri Shri Gurudeo WUA, Pimpalgaon 1150 R2 Iti-4**/24 0.455 Shopping 0.091 0.228 0.137 0.455 Tah. Lakhandur Dist. Bhandara on Minors & D.O.s on Lakhandur Distributory Rehabilitation Work in Juridiction of W.U.A. No.24 . Shri Shri Gurudeo WUA, Pimpalgaon Tah. A2 Iti-4**/24 0.449 Shopping 0.00 0.00 0.00 0.29 0.04 0.00 0.00 0.33 Lakhandur Dist. Bhandara on Minors & D.O.s on Lakhandur Distributory of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.25 . Adarsh WUA, Lakhandur Tah. 1151 R2 Iti-4**/25 Lakhandur Dist. Bhandara on Pimpalgaon 2.114 NCB 0.423 1.057 0.634 2.114 Colony Minor on Lakhandur Distributory and 5L, 1R Minor on Antargaon Distributory Rehabilitation Work in Juridiction of W.U.A. No.25 . Adarsh WUA, Lakhandur Tah. Lakhandur Dist. A2 Iti-4**/25 Bhandara on Pimpalgaon Colony Minor on 2.217 NCB 0.00 0.00 0.00 2.03 0.25 0.00 0.00 2.29 Lakhandur Distributory and 5L, 1R Minor on Antargaon Distributory of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.26 . Samarth Ramdas WUA, Chicholi Tah. 1152 R2 Iti-4**/26 Lakhandur Dist. Bhandara on 1 L & 1 R Minors 2.217 NCB 0.443 1.109 0.665 2.217 on Lakhandur Distributory, Silli Minor, Antargaon Distributory Rehabilitation Work in Juridiction of W.U.A. No.26 . Samarth Ramdas WUA, Chicholi Tah. Lakhandur A2 Iti-4**/26 Dist. Bhandara on 1 L & 1 R Minors on Lakhandur 2.268 NCB 0.00 0.00 0.29 1.57 0.50 0.00 0.00 2.36 Distributory, Silli Minor, Antargaon Distributory of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.27 . Kisan WUA, Dandegaon Tah. 1153 R2 Iti-4**/27 0.620 Shopping 0.217 0.403 0.620 Lakhandur Dist. Bhandara on Dandegaon Minor & Sub Minor Rehabilitation Work in Juridiction of W.U.A. No.27 . Kisan WUA, Dandegaon Tah. Lakhandur Dist. A2 Iti-4**/27 0.609 Shopping 0.00 0.00 0.00 0.47 0.14 0.00 0.00 0.61 Bhandara on Dandegaon Minor & Sub Minor of Itiadoh Project. 2/24/2011 wua_prmpkg_r4 160 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation Work in Juridiction of W.U.A. No.28 . Chaitanya WUA, Dharmapuri (Bothali) 1154 R2 Iti-4**/28 2.247 NCB 0.449 1.124 0.674 2.247 Tah. Lakhandur Dist. Bhandara on Borgaon, Dharmapuri & Kochhi Minors Rehabilitation Work in Juridiction of W.U.A. No.28 . Chaitanya WUA, Dharmapuri (Bothali) Tah. A2 Iti-4**/28 2.241 NCB 0.00 0.00 0.43 1.17 0.64 0.00 0.00 2.24 Lakhandur Dist. Bhandara on Borgaon, Dharmapuri & Kochhi Minors of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.29 . Jai Vidarbha WUA, Manegaon Tah. Work 1155 R2 Iti-4**/29 Lakhandur Dist. Bhandara on Direct Outlets 0 included in R.D. 2242, 2305, 2312, 2325, 2349, 2358, 2366, ICB - 1 & 2376 on Main Canal Rehabilitation Work in Juridiction of W.U.A. No.30 . Haritkranti WUA, Jaitpur (Barva) Tah. 1156 R2 Iti-4**/30 1.756 Shopping 0.615 1.141 1.756 Lakhandur Dist. Bhandara on Barva Distributory, Jaitpur Minor & Kholmara Minor Rehabilitation Work in Juridiction of W.U.A. No.30 . Haritkranti WUA, Jaitpur (Barva) Tah. Lakhandur A2 Iti-4**/30 1.762 Shopping 0.00 0.00 0.00 1.32 0.44 0.00 0.00 1.76 Dist. Bhandara on Barva Distributory, Jaitpur Minor & Kholmara Minor of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.31 . Sant Tukaram WUA, Khamkhura Tah. 1157 R2 Iti-4**/31 1.440 Shopping 0.504 0.936 1.440 Arjuni (Mor.) Dist. Gondia on Khamkhura Minor No. 1,2,3, of W.B.C. Rehabilitation Work in Juridiction of W.U.A. No.31 . Sant Tukaram WUA, Khamkhura Tah. Arjuni (Mor.) A2 Iti-4**/31 1.461 Shopping 0.00 0.00 0.00 1.47 0.00 0.00 0.00 1.47 Dist. Gondia on Khamkhura Minor No. 1,2,3, of W.B.C. of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. Work No.32 . Jijaoo WUA, Khamkhura Tah. Arjuni 1158 R2 Iti-4**/32 0 included in (Mor.) Dist. Gondia Direct Outlets on ICB - 1 Khamkhura Minor & W.B.C. Rehabilitation Work in Juridiction of W.U.A. No.33 . Jai Hanuman WUA, Korambi Tah. 1159 R2 Iti-4**/33 Arjuni (Mor.) Dist. Gondia on Arttondi 0.620 Shopping 0.217 0.403 0.620 (Mandokhal ) Minor No. 1 and Korambi D.O. of W.B.C. 2/24/2011 wua_prmpkg_r4 161 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation Work in Juridiction of W.U.A. No.33 . Jai Hanuman WUA, Korambi Tah. Arjuni (Mor.) A2 Iti-4**/33 0.638 Shopping 0.00 0.00 0.00 0.60 0.00 0.00 0.00 0.60 Dist. Gondia on Arttondi (Mandokhal ) Minor No. 1 and Korambi D.O. of W.B.C. of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.34 . Shri Ganesh WUA, Korambitola Tah. 1160 R2 Iti-4**/34 Arjuni (Mor.) Dist. Gondia on Arttondi 1.000 Shopping 0.350 0.650 1.000 (Mandokhal ) Minor No. 2, 3 on Mandokhal Minor of W.B.C. Rehabilitation Work in Juridiction of W.U.A. No.34 . Shri Ganesh WUA, Korambitola Tah. Arjuni (Mor.) A2 Iti-4**/34 1.076 Shopping 0.00 0.00 0.00 1.02 0.00 0.00 0.00 1.02 Dist. Gondia on Arttondi (Mandokhal ) Minor No. 2, 3 on Mandokhal Minor of W.B.C. of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.35 . Maa Ganga WUA, Arjunnagar Tah. 1161 R2 Iti-4**/35 1.030 Shopping 0.361 0.670 1.030 Arjuni (Mor.) Dist. Gondia on Bangali Minor & D.O. of W.B.C. Rehabilitation Work in Juridiction of W.U.A. No.35 . Maa Ganga WUA, Arjunnagar Tah. Arjuni (Mor.) A2 Iti-4**/35 1.030 Shopping 0.00 0.00 0.00 0.98 0.00 0.00 0.00 0.98 Dist. Gondia on Bangali Minor & D.O. of W.B.C. of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.36 . Maa Durga WUA, Gaurnagar/ Asoli 1162 R2 Iti-4**/36 1.020 Shopping 0.357 0.663 1.020 Tah. Arjuni (Mor.) Dist. Gondia on Asoli Minor & Asoli Sub Minor of W.B.C. Rehabilitation Work in Juridiction of W.U.A. No.36 . Maa Durga WUA, Gaurnagar/ Asoli Tah. Arjuni A2 Iti-4**/36 1.122 Shopping 0.00 0.00 0.00 0.80 0.25 0.00 0.00 1.05 (Mor.) Dist. Gondia on Asoli Minor & Asoli Sub Minor of W.B.C. of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.37 . Jai Kisan WUA, Ekalpur Tah. Wadsa 1163 R2 Iti-4**/37 1.140 Shopping 0.399 0.741 1.140 Dist. Gadchiroli on Ekalpur Minor & Sub Minor of W.B.C. Rehabilitation Work in Juridiction of W.U.A. No.37 . Jai Kisan WUA, Ekalpur Tah. Wadsa Dist. A2 Iti-4**/37 1.160 Shopping 0.00 0.00 0.31 0.86 0.00 0.00 0.00 1.17 Gadchiroli on Ekalpur Minor & Sub Minor of W.B.C. of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.38 . Bhagirath WUA, Visora Tah. Wadsa 1164 R2 Iti-4**/38 2.600 NCB 0.520 1.300 0.780 2.600 Dist. Gadchiroli on Visora Minor No. 1 & 2 of W.B.C. 2/24/2011 wua_prmpkg_r4 162 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation Work in Juridiction of W.U.A. No.38 . Bhagirath WUA, Visora Tah. Wadsa Dist. A2 Iti-4**/38 2.575 NCB 0.00 0.00 0.00 2.67 0.00 0.00 0.00 2.67 Gadchiroli on Visora Minor No. 1 & 2 of W.B.C. of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. 1165 R2 Iti-4**/39 No.39 . Tulsai WUA, Tulsi Tah. Wadsa Dist. 2.240 NCB 0.448 1.120 0.672 2.240 Gadchiroli on Tulsi Minor 1 & 2 of W.B.C. Rehabilitation Work in Juridiction of W.U.A. No.39 . A2 Iti-4**/39 Tulsai WUA, Tulsi Tah. Wadsa Dist. Gadchiroli on 2.370 NCB 0.00 0.00 0.00 1.49 0.76 0.00 0.00 2.25 Tulsi Minor 1 & 2 of W.B.C. of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.40 . Amgaon WUA, Amgaon Tah. Wadsa 1166 R2 Iti-4**/40 Dist. Gadchiroli on Amgaon Minior No. 1, Sub 3.830 NCB 1.341 2.490 3.830 Minor No. 1 & 2 , Amgaon Minor No. 3 & 4 & D.O. of W.B.C. Rehabilitation Work in Juridiction of W.U.A. No.40 . Amgaon WUA, Amgaon Tah. Wadsa Dist. A2 Iti-4**/40 Gadchiroli on Amgaon Minior No. 1, Sub Minor No. 3.897 NCB 0.00 0.00 0.00 2.91 1.34 0.00 0.00 4.25 1 & 2 , Amgaon Minor No. 3 & 4 & D.O. of W.B.C. of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.41 . Sainath WUA, Virsi Tukum Tah. Wadsa 1167 R2 Iti-4**/41 1.930 NCB 0.386 0.965 0.579 1.930 Dist. Gadchiroli on Virsi Tukum Minor No. 1 & Sub Minor of W.B.C. Rehabilitation Work in Juridiction of W.U.A. No.41 . Sainath WUA, Virsi Tukum Tah. Wadsa Dist. A2 Iti-4**/41 1.949 Shopping 0.00 0.00 0.00 1.99 0.00 0.00 0.00 1.99 Gadchiroli on Virsi Tukum Minor No. 1 & Sub Minor of W.B.C. of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.42 . Nainpur WUA, Nainpur Tah. Wadsa 1168 R2 Iti-4**/42 2.140 NCB 0.749 1.391 2.140 Dist. Gadchiroli on Wadegaon Minor, Wadsa Minor & Sub Minor of W.B.C. Rehabilitation Work in Juridiction of W.U.A. No.42 . Nainpur WUA, Nainpur Tah. Wadsa Dist. Gadchiroli A2 Iti-4**/42 2.113 NCB 0.00 0.00 0.00 1.25 0.90 0.00 0.00 2.15 on Wadegaon Minor, Wadsa Minor & Sub Minor of W.B.C. of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.43 . Gurudeo WUA, Kokadi Tah. Wadsa 1169 R2 Iti-4**/43 1.960 NCB 0.392 0.980 0.588 1.960 Dist. Gadchiroli on Kokaki Minor, Tulsi Sub Minor, Zari Fari Minor R.D. 1860 m of W.B.C. 2/24/2011 wua_prmpkg_r4 163 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation Work in Juridiction of W.U.A. No.43 . Gurudeo WUA, Kokadi Tah. Wadsa Dist. Gadchiroli A2 Iti-4**/43 1.989 NCB 0.00 0.00 0.00 1.25 0.79 0.00 0.00 2.04 on Kokaki Minor, Tulsi Sub Minor, Zari Fari Minor R.D. 1860 m of W.B.C. of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. 1170 R2 Iti-4**/44 No.44 . Zari Zari WUA, Zari Fari Tah. Wadsa 0.520 Shopping 0.182 0.338 0.520 Dist. Gadchiroli on Zari Fari Minor of W.B.C. Rehabilitation Work in Juridiction of W.U.A. No.44 . Zari Zari WUA, Zari Fari Tah. Wadsa Dist. A2 Iti-4**/44 0.534 Shopping 0.00 0.00 0.00 0.53 0.00 0.00 0.00 0.53 Gadchiroli on Zari Fari Minor of W.B.C. of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.45 . Dhanlaxmi WUA, Usegaon Tah. Wadsa 1171 R2 Iti-4**/45 1.330 Shopping 0.466 0.865 1.330 Dist. Gadchiroli on Usegaon Minor No. 1 & 2 of W.B.C. Rehabilitation Work in Juridiction of W.U.A. No.45 . Dhanlaxmi WUA, Usegaon Tah. Wadsa Dist. A2 Iti-4**/45 1.339 Shopping 0.00 0.00 0.00 1.32 0.00 0.00 0.00 1.32 Gadchiroli on Usegaon Minor No. 1 & 2 of W.B.C. of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.46 . Gajanan WUA, Kurud Tah. Wadsa Dist. Gadchiroli on Kurud Minor No. 1 & 2, Kondhala 1172 R2 Iti-4**/46 3.830 NCB 0.766 1.915 1.149 3.830 Minor No. 1, 2 & 3 offtaking from Kurud Distributory and Sub minor of Konkhala Minor No. 2 of W.B.C. of Itiadoh Projec Rehabilitation Work in Juridiction of W.U.A. No.46 . Gajanan WUA, Kurud Tah. Wadsa Dist. Gadchiroli A2 Iti-4**/46 on Kurud Minor No. 1 & 2, Kondhala Minor No. 1, 2 3.591 NCB 0.00 0.00 0.00 3.64 0.44 0.00 0.00 4.08 & 3 offtaking from Kurud Distributory and Sub minor of Konkhala Minor No. 2 of W.B.C. of Itiadoh Projec Rehabilitation Work in Juridiction of W.U.A. No.47 . Sharda WUA, Shivarajpur Tah. Wadsa 1173 R2 Iti-4**/47 1.620 Shopping 0.567 1.053 1.620 Dist. Gadchiroli on Shivrajpur No. 1& 2, D.O. 1 , 2 & 3 of W.B.C. Rehabilitation Work in Juridiction of W.U.A. No.47 . Sharda WUA, Shivarajpur Tah. Wadsa Dist. A2 Iti-4**/47 1.553 Shopping 0.00 0.00 0.00 1.50 0.00 0.00 0.00 1.50 Gadchiroli on Shivrajpur No. 1& 2, D.O. 1 , 2 & 3 of W.B.C. of Itiadoh Project. 2/24/2011 wua_prmpkg_r4 164 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation Work in Juridiction of W.U.A. No.48 . Shraddheya WUA, Kondhala Tah. 1174 R2 Iti-4**/48 1.080 Shopping 0.378 0.702 1.080 Wadsa Dist. Gadchiroli on Konndhala Minor No. 1 & 2 of W.B.C. Rehabilitation Work in Juridiction of W.U.A. No.48 . Shraddheya WUA, Kondhala Tah. Wadsa Dist. A2 Iti-4**/48 1.132 Shopping 0.00 0.00 0.00 1.12 0.00 0.00 0.00 1.12 Gadchiroli on Konndhala Minor No. 1 & 2 of W.B.C. of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.49 . Shri Ganesh WUA, Kasavi Tah. Armori 1175 R2 Iti-4**/49 1.390 Shopping 0.278 0.695 0.417 1.390 Dist. Gadchiroli on Asta Minor & Kasavi Sub Minor of W.B.C. Rehabilitation Work in Juridiction of W.U.A. No.49 . Shri Ganesh WUA, Kasavi Tah. Armori Dist. A2 Iti-4**/49 1.450 Shopping 0.00 0.00 0.00 1.45 0.00 0.00 0.00 1.45 Gadchiroli on Asta Minor & Kasavi Sub Minor of W.B.C. of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.50 . Shri Saibaba WUA, Antaraji Tah. 1176 R2 Iti-4**/50 Armori Dist. Gadchiroli on Asta Bund Minor, 2.890 NCB 0.578 1.445 0.867 2.890 Antaraji Minor, Kosa Left Minor & D.O. Left & Right of W.B.C. Rehabilitation Work in Juridiction of W.U.A. No.50 . Shri Saibaba WUA, Antaraji Tah. Armori Dist. A2 Iti-4**/50 Gadchiroli on Asta Bund Minor, Antaraji Minor, 2.793 NCB 0.00 0.00 0.00 1.73 1.19 0.00 0.00 2.91 Kosa Left Minor & D.O. Left & Right of W.B.C. of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.51 . Jai Durga WUA, Palora Tah. Armori 1177 R2 Iti-4**/51 2.630 NCB 0.526 1.315 0.789 2.630 Dist. Gadchiroli on Palora Minior, Armori Sub Minor, Shegaon Sub minor of W.B.C. Rehabilitation Work in Juridiction of W.U.A. No.51 . Jai Durga WUA, Palora Tah. Armori Dist. Gadchiroli A2 Iti-4**/51 2.808 NCB 0.00 0.00 0.00 1.61 1.11 0.00 0.00 2.72 on Palora Minior, Armori Sub Minor, Shegaon Sub minor of W.B.C. of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.52 . HariOm WUA, Armori Tah. Armori 1178 R2 Iti-4**/52 1.630 Shopping 0.571 1.060 1.630 Dist. Gadchiroli on Armori Minor No.1 of W.B.C. Rehabilitation Work in Juridiction of W.U.A. No.52 . A2 Iti-4**/52 HariOm WUA, Armori Tah. Armori Dist. Gadchiroli 1.651 Shopping 0.00 0.00 0.17 1.44 0.00 0.00 0.00 1.61 on Armori Minor No.1 of W.B.C. of Itiadoh Project. 2/24/2011 wua_prmpkg_r4 165 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation Work in Juridiction of W.U.A. No.53 . Vitthal Rakhumai WUA, Armori Tah. 1179 R2 Iti-4**/53 1.510 Shopping 0.529 0.982 1.510 Armori Dist. Gadchiroli on Armori Minor No. 2 of W.B.C. Rehabilitation Work in Juridiction of W.U.A. No.53 . Vitthal Rakhumai WUA, Armori Tah. Armori Dist. A2 Iti-4**/53 1.537 Shopping 0.00 0.00 0.00 1.51 0.00 0.00 0.00 1.51 Gadchiroli on Armori Minor No. 2 of W.B.C. of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.54 . Jai Shriram WUA, Saygaon Tah. Armori 1180 R2 Iti-4**/54 Dist. Gadchiroli on Sivani Tail Minor, Shivani 5.210 NCB 1.042 2.605 1.563 5.210 Minor, Sub minor, & D.O. of Waghada Distributory of W.B.C. Rehabilitation Work in Juridiction of W.U.A. No.54 . Jai Shriram WUA, Saygaon Tah. Armori Dist. A2 Iti-4**/54 Gadchiroli on Sivani Tail Minor, Shivani Minor, Sub 4.969 NCB 0.00 0.00 1.38 2.52 1.49 0.00 0.00 5.39 minor, & D.O. of Waghada Distributory of W.B.C. of Itiadoh Project. Rehabilitation Work in Juridiction of W.U.A. No.55 Wainganga WUA, Arsoda Tah. Armori 1181 R2 Iti-4**/55 Dist. Gadchiroli on Ravi Minor, Mulur Minor, 2.400 NCB 0.480 1.200 0.720 2.400 Kosa Right Minor, Arsoda Minor No. 1 & 2 Arsoda Sub minor of W.B.C. Rehabilitation Work in Juridiction of W.U.A. No.55 . Wainganga WUA, Arsoda Tah. Armori Dist. A2 Iti-4**/55 Gadchiroli on Ravi Minor, Mulur Minor, Kosa Right 2.558 NCB 0.00 0.00 0.89 1.52 0.31 0.00 0.00 2.71 Minor, Arsoda Minor No. 1 & 2, Arsoda Sub Minor of W.B.C. of Itiadoh Project. Krishna 287 KRI-1 NIL NIL NIL canal R KRI-2*** Rehabilitation of the Minors WUA-29 106.49 WUA 15.97 37.27 47.92 5.32 106.49 Information A awaited Shri Dhanai Jakhai WUA Karve Tal. Karad R3 KRI 2/1 6.19 NCB 0.9285 3.714 1.55 6.19 Dist.Satara. Shri Dhanai Jakhai WUA Karve Tal. Karad A3 KRI 2/1 6.836 NCB 3.454 3.38 6.836 Dist.Satara. 2/24/2011 wua_prmpkg_r4 166 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Godandgiri Maharaj WUA.Kodoli Tal.Karad R3 KRI 2/2 10.06 NCB 1.509 6.036 2.52 10.06 Dist. Satara Godandgiri Maharaj WUA.Kodoli Tal.Karad A3 KRI 2/2 11.016 NCB 5.123 5.89 11.016 Dist. Satara Hanuman WUA Wadgaon Haweli Tal. Karad R3 KRI 2/3 3.27 NCB 0.4905 1.962 0.82 3.27 Dist. Satara Hanuman WUA Wadgaon Haweli Tal. Karad A3 KRI 2/3 3.499 NCB 0.525 2.98 3.500 Dist. Satara Krishnamai WUA Rethare Budruk Tal. Karad R3 KRI 2/4 15.78 NCB 2.367 9.468 3.95 15.78 Dist. Satara. Krishnamai WUA Rethare Budruk Tal. Karad A3 KRI 2/4 16.656 NCB 1.874 14.78 16.658 Dist. Satara. Bichudnath WUA Bichud Tal.Walva Dist. R3 KRI 2/5 6.2 NCB 0.93 3.72 1.55 6.20 Sangli. Bichudnath WUA Bichud Tal.Walva Dist. A3 KRI 2/5 6.834 NCB 0.768 6.07 6.834 Sangli. Sadguru WUA Rethareharanaksh. Tal. Walva R3 KRI 2/6 6.44 NCB 0.966 3.864 1.61 6.44 Dist. Sangli Sadguru WUA Rethareharanaksh. Tal. Walva A3 KRI 2/6 7.132 NCB 1.346 5.79 7.132 Dist. Sangli Krishnkanth WUA Dudhondi Tal. Palus Dist. R3 KRI 2/7 11.74 NCB 1.761 7.044 2.94 11.74 Sangli. Krishnkanth WUA Dudhondi Tal. Palus Dist. A3 KRI 2/7 12.616 NCB 8.159 4.46 12.620 Sangli. R3 KRI 2/8 Shramik WUA Nagarale Tal. Palus Dist. Sangli. 6.77 NCB 1.0155 4.062 1.69 6.77 A3 KRI 2/8 Shramik WUA Nagarale Tal. Palus Dist. Sangli. NCB A3/1 KRI 2/8 Shramik WUA Nagarale Tal. Palus Dist. Sangli. 7.17 NCB 0.807 6.36 7.170 R3 KRI 2/9 Krishnamai WUA Burli Tal.Palus Dist. Sangli.. 12.74 NCB 1.911 7.644 3.19 12.74 A3 KRI 2/9 Krishnamai WUA Burli Tal.Palus Dist. Sangli.. 13.73 NCB 1.937 11.79 13.730 Krishnamai No.1 WUA Amanapur Tal.Palus R3 KRI 2/10 5.16 NCB 0.774 3.096 1.29 5.16 Dist. Sangli.. Krishnamai No.1 WUA Amanapur Tal.Palus A3 KRI 2/10 NCB Dist. Sangli.. 2/24/2011 wua_prmpkg_r4 167 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Krishnamai No.1 WUA Amanapur Tal.Palus A3/1 KRI 2/10 5.26 NCB 0.936 3.30 1.03 5.260 Dist. Sangli.. Krishnamai No.2 WUA Amanapur Tal.Palus R3 KRI 2/11 8.02 NCB 1.203 4.812 2.01 8.02 Dist. Sangli.. Krishnamai No.2 WUA Amanapur Tal.Palus A3 KRI 2/11 NCB Dist. Sangli.. Krishnamai No.2 WUA Amanapur Tal.Palus A3/1 KRI 2/11 8.443 NCB 2.879 3.96 1.61 8.443 Dist. Sangli.. Krishivikas WUA Savantpur ,Gondilwadi Tal. R3 KRI 2/12 8.19 NCB 1.23 4.91 2.05 8.19 Palus Dist. Sangli. Krishivikas WUA Savantpur ,Gondilwadi Tal. A3 KRI 2/12 NCB 0.00 0.00 0.00 0.00 Palus Dist. Sangli. Krishivikas WUA Savantpur ,Gondilwadi Tal. A3/1 KRI 2/12 8.72 NCB 1.30 4.94 2.48 8.72 Palus Dist. Sangli. Sidthanath WUA Yelavi Tal. Tasgaon Dist. R3 KRI 2/13 6.14 NCB 0.92 3.68 1.54 6.14 Sangli. Sidthanath WUA Yelavi Tal. Tasgaon Dist. A3 KRI 2/13 6.73 NCB 2.26 4.47 6.73 Sangli. Sidthanath WUA Yelavi Tal. Tasgaon Dist. A3 KRI 2/13 6.730 NCB 2.26 4.47 6.73 Sangli. Brhamanand WUA Yelavi Tal. Tasgaon Dist. R3 KRI 2/14 12.33 NCB 1.85 7.40 3.08 12.33 Sangli. Brhamanand WUA Yelavi Tal. Tasgaon Dist. A3 KRI 2/14 13.185 NCB 3.77 9.41 13.19 Sangli. 288 Nira L.B.C. Nil Nil Nil R NLB-2*** Rehabilitation of the Minors WUA 189.90 WUA 28.49 66.47 85.46 9.50 189.90 R3 NLB-2*** Rehabilitation of the Minors WUA_70 254 WUA 101.6 152.4 254.00 1)Bhairawanath Water Users Association, R4 NLB-2/1 5.25 NCB 0 3 2.25 5.25 Nimbut Tal.Baramati 2)Maruti Water Users Association Nimbut R4 NLB-2/2 4.59 NCB 0 2 2.59 4.59 Tal.Baramati 3)Datta Water Users Association, Murum R4 NLB-2/3 4.59 NCB 0 2 2.59 4.59 Tal.Baramati 4)Soneshwar Water Users Association Mekhali R4 NLB-2/4 8.05 NCB 0 4 4.05 8.05 Tal.Baramati 5)Hanuman Water Users Association Mekhali R4 NLB-2/5 4 NCB 0 2 2 4 Ghadgewadi Tal.Baramati 2/24/2011 wua_prmpkg_r4 168 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 6)Bhairawanath Water Users Association R4 NLB-2/6 1.29 Shopping 0 1 0.29 1.29 Nirawagaj Tal.Baramati 7)Wagheshwar Water Users Association R4 NLB-2/7 2.49 NCB 0 2 0.49 2.49 Nirawagaj Tal.Baramati 8)Shivganga Water Users Association R4 NLB-2/8 1.58 Shopping 0 1 0.58 1.58 Ghadgewadi Tal.Baramati 9)Khandesh-wari Water Users Association R4 NLB-2/9 4.14 NCB 0 2 2.14 4.14 Khandaj Tal.Baramati 10)Laxmi Water Users Association Malad R4 NLB-2/10 2.22 NCB 0 1 1.22 2.22 Tal.Baramati 11)Baneshwar Water Users Association R4 NLB-2/11 6.27 NCB 0 4 2.27 6.27 Yelewasti Tal.Baramati 12)Nath Mhaskoba Water Users Association R4 NLB-2/12 4.22 NCB 0 3 1.22 4.22 Yelewasti Tal.Baramati 13)Mhaskoba Water Users Association R4 NLB-2/13 2.93 NCB 0 2 0.93 2.93 Manappawasti Tal.Baramati 14)Kalbhairav Water Users Association R4 NLB-2/14 6.51 NCB 0 4 2.51 6.51 Dhumalwadi Tal.Baramati 15)Krishna Water Users Association Sangavi R4 NLB-2/15 5.35 NCB 0 3 2.35 5.35 Tal.Baramati 16)Shriram Water Users Association Hol R4 NLB-2/16 9.77 NCB 0 5 4.77 9.77 Soratewadi Tal.Baramati 17)Hanuman Water Users Association R4 NLB-2/17 5.77 NCB 0 3 2.77 5.77 Sadobachiwadi Hol Tal.Baramati 18)Pandurang Water Users Association Korhale R4 NLB-2/18 6.64 NCB 0 4 2.64 6.64 Kd. Tal.Baramati 19)Sharad Water Users Association Malegaon R4 NLB-2/19 5.73 NCB 0 3 2.73 5.73 Tal.Baramati 20)Khande- shwari Water Users Association R4 NLB-2/20 8.2 NCB 0 5 3.2 8.2 Khandaj Tal.Baramati 21)Bhairava nath Water Users Association R4 NLB-2/21 4.22 NCB 0 3 1.22 4.22 Yelewasti Tal.Baramati 22)Janubai Water Users Association Shiravali R4 NLB-2/22 3.53 NCB 0 2 1.53 3.53 Tal.Baramati 23)Jyotirling Water Users Association R4 NLB-2/23 3.82 NCB 0 2 1.82 3.82 Kambaleshear Tal.Baramati 24)Sainath Water Users Association Sangavi R4 NLB-2/24 3.52 NCB 0 2 1.52 3.52 Tal.Baramati 2/24/2011 wua_prmpkg_r4 169 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 25)Ajinkya Water Users Association Korhale BK R4 NLB-2/25 7.47 NCB 0 4 3.47 7.47 Tal.Baramati 26)Adarsh Water Users Association Malwadi R4 NLB-2/26 5.91 NCB 0 3 2.91 5.91 Tal.Baramati 27)Ajit Water Users Association Pingalewasti R4 NLB-2/27 1.82 Shopping 0 1 0.82 1.82 Tal.Baramati 28)Shri Nageshwar Water Users Association R4 NLB-2/28 2.65 NCB 0 2 0.65 2.65 Malegaon Tal.Baramati 29)Chandkan Water Users Association Baramati R4 NLB-2/29 5.19 NCB 0 3 2.19 5.19 Tal.Baramati 30)Shridatta Water Users Association Malad R4 NLB-2/30 7.82 NCB 0 4 3.82 7.82 Tal.Baramati 31)Jagdamba Water Users Association Nira R4 NLB-2/31 2.44 NCB 0 2 0.44 2.44 Wagaj Tal.Baramati 32)MhalsakantWater Users Association R4 NLB-2/32 1.97 Shopping 0 1 0.97 1.97 Tal.Baramati 33)Bhavani mataWater Users Association R4 NLB-2/33 3.37 NCB 0 2 1.37 3.37 Katewadi Tal.Baramati 34)Sidheshwar Water Users Association R4 NLB-2/34 3.92 NCB 0 2 1.92 3.92 Baramati Tal.Baramati 35)Pandharewhwar Water Users Association R4 NLB-2/35 2.52 NCB 0 2 0.52 2.52 Tal.Baramati 36)Sharadchandraji Pawar Water Users R4 NLB-2/36 5.8 NCB 0 3 2.8 5.8 Association Gunawadi Tal.Baramati 37)Krishi Devata Kalva Water Users Association R4 NLB-2/37 4.84 NCB 0 3 1.84 4.84 Gunawadi Tal.Baramati 38)ShriSant Tukaram Water Users Association R4 NLB-2/38 5.1 NCB 0 3 2.1 5.1 Dorlewadi Tal.Baramati 39)Soneshwar Water Users Association R4 NLB-2/39 7.14 NCB 0 4 3.14 7.14 Zargadwadi Tal.Baramati 40)Laxman Water Users Association Pimpali R4 NLB-2/40 5.26 NCB 0 3 2.26 5.26 Tal.Baramati 41)Sunetra Water Users Association Katewadi R4 NLB-2/41 6.82 NCB 0 4 2.82 6.82 Tal.Baramati 42)Yeshwant Water Users Association Belwadi/ R4 NLB-2/42 6.07 NCB 0 4 2.07 6.07 Thoratwadi Tal.Baramati 43)Shivprasad Water Users Association R4 NLB-2/43 1.2 Shopping 0 1 0.2 1.2 Jankshan Tal.Indapur 2/24/2011 wua_prmpkg_r4 170 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 44)Jankshan Water Users Association Jankshan R4 NLB-2/44 4.46 NCB 0 3 1.46 4.46 Tal.Indapur 45)Gurudatta Water Users Association Lasurne R4 NLB-2/45 5.78 NCB 0 3 2.78 5.78 (Rangaon) Tal.Baramati 46)Khandakari Shetkari Water Users Association R4 NLB-2/46 6.89 NCB 0 4 2.89 6.89 Kalamb Tal.Indapur 47)Ratnapuri Water Users Association Rangaon R4 NLB-2/47 4.07 NCB 0 2 2.07 4.07 Tal.Indapur 48)Adipuri Water Users Association Walchand R4 NLB-2/48 4.66 NCB 0 3 1.66 4.66 nagar (Kalamb) Tal.Indapur 49)BharnewadiWater Users Association R4 NLB-2/49 7.15 NCB 0 4 3.15 7.15 Walchand nagar (Kalamb) Tal.Indapur 50)Muktadevi Water Users Association Shelgaon R4 NLB-2/50 3.53 NCB 0 2 1.53 3.53 Tal.Indapur 51)Shelgaon Water Users Association Shelgaon R4 NLB-2/51 5.29 NCB 0 3 2.29 5.29 Tal.Baramati 52)Dilip Water Users Association Dhekalwadi R4 NLB-2/52 7.44 NCB 0 4 3.44 7.44 Tal.Indapur 53)Goraksh- nath Water Users Association R4 NLB-2/53 9.69 NCB 0 5 4.69 9.69 Pawarwadi Tal.Indapur 54)Shri Chatrapati Kalva Water Users R4 NLB-2/54 4.02 NCB 0 2 2.02 4.02 Association Pawarwadi Tal.Indapur 55)Shivshankar Kalva Water Users Association R4 NLB-2/55 6.1 NCB 0 3 3.1 6.1 Jamb Tal.Indapur 56)Vishveshwarayya Water Users Association R4 NLB-2/56 6.47 NCB 0 4 2.47 6.47 Sansar Tal.Indapur 57)Nilkantheshwar Water Users Association R4 NLB-2/57 5.8 NCB 0 3 2.8 5.8 Belwadi Tal.Indapur 58)Bhairavnath Water Users Association R4 NLB-2/58 6.91 NCB 0 4 2.91 6.91 Lasurne Tal.Indapur 289 Nira R.B.C. Nil Nil Nil NRB- R Rehabilitation of the Minors WUA 207.404 WUA 31.11 72.59 93.33 10.37 207.40 2*** NRB- R3 Rehabilitation of the Minors WUA_70 254 WUA 101.6 152.4 254.00 2*** Rehabilitation of Dy. No. B 1, 1, 2, 3 of NRBC R4 NRB-2/1 of Janai WUA Pimpode Bk, Tal. Khandala, Dist. 1.05 Shopping 0.25 0.25 0.55 1.05 Satara 2/24/2011 wua_prmpkg_r4 171 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation of Dy. No. 4A of NRBC of R4 NRB-2/2 Sugercane Re WUA Padegaon, Tal. Phaltan, 0.805 Shopping 0.20 0.30 0.31 0.81 Dist. Satara Rehabilitation of Dy. No. 4 of NRBC of R4 NRB-2/3 Padegaon WUA Padegaon, Tal. Phaltan, Dist. 2.7 NCB 0.50 0.50 1.70 2.70 Satara Rehabilitation of Dy. No. 5 of NRBC of Shri R4 NRB-2/4 0.61 Shopping 0.10 0.20 0.31 0.61 Datta WUA Mirewadi, Tal. Phaltan, Dist. Satara Rehabilitation of Dy. No. 6 of NRBC of Shri R4 NRB-2/5 1.578 Shopping 0.50 0.65 0.43 1.58 Viththal WUA Kusur, Tal. Phaltan, Dist. Satara Rehabilitation of Dy. No. 7 of NRBC of Ravadi R4 NRB-2/6 3.239 NCB 0.50 1.00 1.74 3.24 Kh. WUA Ravadi Bk. Tal. Phaltan, Dist. Satara Rehabilitation of Dy. No. 8 & 9 of NRBC of R4 NRB-2/7 Ravadi Bk. WUA Ravadi Bk. Tal. Phaltan, Dist. 1.783 Shopping 0.50 0.80 0.48 1.78 Satara Rehabilitation of Dy. No. 10 & 11 of NRBC of R4 NRB-2/8 Shrinath WUA Tadwali Tal. Phaltan, Dist. 3.02 NCB 0.50 1.00 1.52 3.02 Satara Rehabilitation of Dy. No. 12 of NRBC of R4 NRB-2/9 1.6 Shopping 0.30 0.50 0.80 1.60 Murum WUA Tadwali Tal. Phaltan, Dist. Satara Rehabilitation of Dy. No. 13 OL No. 1 to 9 of R4 NRB-2/10 NRBC of Vithal WUA Sakharwadi Tal. Phaltan, 7.595 NCB 1.00 2.50 4.10 7.60 Dist. Satara Rehabilitation of Dy. No. 13 OL No.10 to Tail of R4 NRB-2/11 NRBC of Dhandevi WUA Sakharwadi Tal. 7.192 NCB 1.00 2.00 4.19 7.19 Phaltan, Dist. Satara Rehabilitation of Dy. No. 14 & 15 of NRBC of R4 NRB-2/12 Vithal WUA No.2 Pimpalwaidi Tal. Phaltan, 1.909 Shopping 0.30 0.50 1.11 1.91 Dist. Satara Rehabilitation of Dy. No. 16 of NRBC of Shri R4 NRB-2/13 5.357 NCB 0.50 1.50 3.36 5.36 Jitoba WUA No. 1 Jinti Tal. Phaltan, Dist. Satara Rehabilitation of Dy. No. 17 of NRBC of R4 NRB-2/14 Nimbhore WUA Phadtardwadi Tal. Phaltan, 2.624 NCB 0.50 0.80 1.32 2.62 Dist. Satara 2/24/2011 wua_prmpkg_r4 172 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation of Dy. No.18 Jinti Minor 2 of R4 NRB-2/15 NRBC of Shri Jitoba WUA No.2 Jinti Tal. 5.637 NCB 0.50 1.50 3.64 5.64 Phaltan, Dist. Satara Rehabilitation of Dy. No. 18 Khunte Minor of R4 NRB-2/16 NRBC of Shindewadi WUA Shindewadi Tal. 4.552 NCB 0.30 1.50 2.75 4.55 Phaltan, Dist. Satara Rehabilitation of Dy. No. 18 Main of NRBC of R4 NRB-2/17 5.95 NCB 0.50 1.75 3.70 5.95 Khunte WUA Khunte Tal. Phaltan, Dist. Satara Rehabilitation of Dy. No. 19 of NRBC of R4 NRB-2/18 Gurudatta WUA Chaudharwadi Tal. Phaltan, 2.06 NCB 0.30 0.80 0.96 2.06 Dist. Satara Rehabilitation of Dy. No. 20 Main (1 to 4) of R4 NRB-2/19 NRBC of Chaudharwadi WUA Chaudharwadi, 1.105 Shopping 0.30 0.50 0.31 1.11 Tal. Phaltan, Dist. Satara Rehabilitation of Dy. No. 20 Main (4 to Tail) of R4 NRB-2/20 NRBC of Bhiwai WUA Sastewadi, Tal. Phaltan, 5.145 NCB 0.50 1.50 3.15 5.15 Dist. Satara Rehabilitation of Dy. No. 20 Kambleshwar R4 NRB-2/21 Minor of NRBC of Kambleshwar WUA 4.44 NCB 0.50 1.50 2.44 4.44 Kambleshwar Tal. Phaltan, Dist. Satara Rehabilitation of Dy. No. 21 of NRBC of R4 NRB-2/22 Nageshwar WUA Sastewadi, Tal. Phaltan, Dist. 5.034 NCB 0.50 1.50 3.03 5.03 Satara Rehabilitation of Dy. No. 22 of NRBC of R4 NRB-2/23 2.356 NCB 0.50 0.80 1.06 2.36 Ganesh WUA Dhuldev, Tal. Phaltan, Dist. Satara Rehabilitation of Dy. No.23 of NRBC of R4 NRB-2/24 Dhuldev WUA Dhuldev, Tal. Phaltan, Dist. 5.349 NCB 0.50 1.50 3.35 5.35 Satara Rehabilitation of Dy. No. 24 of NRBC of R4 NRB-2/25 Bhairavwnath WUA Vidani, Tal. Phaltan, Dist. 2.804 NCB 0.30 0.80 1.70 2.80 Satara Rehabilitation of Dy. No. 24 (Tail) of NRBC of R4 NRB-2/26 Hanuman WUA Somanthali, Tal. Phaltan, Dist. 2.443 NCB 0.30 0.80 1.34 2.44 Satara Rehabilitation of Dy. No. 25 of NRBC of R4 NRB-2/27 1.915 Shopping 0.25 0.40 1.27 1.92 Shankar WUA Vidani, Tal. Phaltan, Dist. Satara 2/24/2011 wua_prmpkg_r4 173 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation of Dy. No. 26 Sangavi Minor of R4 NRB-2/28 NRBC of Sangavi WUA No. 1, Malwadi, Tal. 6.792 NCB 0.50 1.50 4.79 6.79 Phaltan, Dist. Satara Rehabilitation of Dy. No. 26 Sangavi Minor of R4 NRB-2/29 NRBC of Sangavi WUA No. 2, Waghachiwadi, 4.823 NCB 0.50 1.50 2.82 4.82 Tal. Phaltan, Dist. Satara Rehabilitation of Dy. No. 26 (4 to 7) of NRBC of R4 NRB-2/30 Janaidevi WUA No. 1, Rajale, Tal. Phaltan, Dist. 5.473 NCB 0.50 1.50 3.47 5.47 Satara Rehabilitation of Dy. No. 27 of NRBC of R4 NRB-2/31 Janaidevi WUA No. 2, Rajale, Tal. Phaltan, Dist. 4.814 NCB 0.50 1.50 2.81 4.81 Satara Rehabilitation of Dy. No. 28 of NRBC of R4 NRB-2/32 Takalwade WUA Takalwade, Tal. Phaltan, Dist. 0.6 Shopping 0.25 0.25 0.10 0.60 Satara Rehabilitation of Dy. No.29 (OL 1 to 10) of R4 NRB-2/33 NRBC of Nimblak WUA Sherewasti, Tal. 4.405 NCB 0.30 0.80 3.31 4.41 Phaltan, Dist. Satara Rehabilitation of Dy. No. 29 Sarde Minor of R4 NRB-2/34 NRBC of Sherewasti WUA Sherewasti, Tal. 2.266 NCB 0.30 0.80 1.17 2.27 Phaltan, Dist. Satara Rehabilitation of Dy. No. 29 (11 to tail, Sathe R4 NRB-2/35 Minor) of NRBC of Sathe WUA Sathe, Tal. 4.306 NCB 0.30 0.80 3.21 4.31 Phaltan, Dist. Satara Rehabilitation of Dy. No. 30 of NRBC of R4 NRB-2/36 Nimblak WUA Yadavwasti, Tal. Phaltan, Dist. 0.547 Shopping 0.10 0.25 0.20 0.55 Satara Rehabilitation of Dy. No. 31 of NRBC of R4 NRB-2/37 Kashivishweshwar WUA Shindewasti, Tal. 3.725 NCB 0.25 1.00 2.48 3.73 Phaltan, Dist.Satara Rehabilitation of Dy. No. 32 (1 to 7) of NRBC of R4 NRB-2/38 Bhairavnath WUA Gunware, Tal. Phaltan, Dist. 4.878 NCB 0.30 1.50 3.08 4.88 Satara Rehabilitation of Dy. No. 32 (8 to 10) of NRBC R4 NRB-2/39 of Gokhali WUA Gokhali, Tal. Phaltan, Dist. 4.576 NCB 0.25 1.50 2.83 4.58 Satara Rehabilitation of Dy. No. 32 Ghokhali Minor of R4 NRB-2/40 NRBC of Hanuman WUA Panchbiga, Tal. 4.863 NCB 0.25 1.50 3.11 4.86 Phaltan, Dist. Satara 2/24/2011 wua_prmpkg_r4 174 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation of Dy. No. 33 of NRBC of Janai R4 NRB-2/41 1.559 Shopping 0.25 0.75 0.56 1.56 WUA Gawadewasti, Tal. Phaltan, Dist. Satara Rehabilitation of Dy. No. 34 (1 to 4) of NRBC of R4 NRB-2/42 Munjwadi WUA Munjwadi, Tal. Phaltan, Dist. 2.346 NCB 0.25 0.75 1.35 2.35 Satara Rehabilitation of Dy. No. 34 (5 to 8) of NRBC of R4 NRB-2/43 Jadhavwadi WUA Jadhavwadi, Tal. Phaltan, 2.589 NCB 0.25 0.75 1.59 2.59 Dist. Satara Rehabilitation of Dy.No. 34 (9 to 11 R4 NRB-2/44 Dhawalewadi Minor) of NRBC of Jotirling 7.008 NCB 0.50 1.50 5.01 7.01 WUA Pawarwadi, Tal. Phaltan, Dist. Satara Rehabilitation of Dy. 34 (12 to 15) of NRBC of R4 NRB-2/45 5.676 NCB 0.50 1.50 3.68 5.68 Hanuman WUA Asu, Tal. Phaltan, Dist. Satara Rehabilitation of Dy. No. 34 (16 to 19) of NRBC R4 NRB-2/46 of Kaleshwar WUA Asu, Tal. Phaltan, Dist. 5.913 NCB 0.50 1.50 3.91 5.91 Satara Rehabilitation of Dy. 34 (Asu Minor 1 to 7) of R4 NRB-2/47 NRBC of Shriram WUA Munjwadi, Tal. 2.261 NCB 0.50 1.50 0.26 2.26 Phaltan, Dist. Satara Rehabilitation of Dy. No.34 (Asu Minor 8 to 10) R4 NRB-2/48 of NRBC of Ganesh WUA Hanumanwadi, Tal. 2.749 NCB 0.25 0.75 1.75 2.75 Phaltan, Dist. Satara Rehabilitation of Dy. No.34 (Asu Minor 11 to R4 NRB-2/49 Tail) of NRBC of Shri Datta WUA Shindenagar, 3.835 NCB 0.25 1.00 2.59 3.84 Tal. Phaltan, Dist. Satara Rehabilitation of Dy. No. 35 of NRBC of Sant R4 NRB-2/50 Sadhubuva WUA Rajuri, Tal. Phaltan, Dist. 4.254 NCB 0.50 1.00 2.75 4.25 Satara Rehabilitation of Dy. No. 36 (2 to 10) of NRBC R4 NRB-2/51 of Shri Ganesh WUA Shindewadi, Tal. 4.737 NCB 0.25 1.50 2.99 4.74 Malshiras, Dist. Solapur Rehabilitation of Dy. No. 36 (11 to 15) of NRBC R4 NRB-2/52 of Shri Hanuman WUA Shindewadi, Tal. 3.813 NCB 0.25 1.00 2.56 3.81 Malshiras, Dist. Solapur Rehabilitation of Dy. No. 36 (OL 15 to Tail) of R4 NRB-2/53 NRBC of Deshmukhwadi WUA Deshmukhwadi, 2.445 NCB 0.25 0.75 1.45 2.45 Tal. Malshiras, Dist. Solapur 2/24/2011 wua_prmpkg_r4 175 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation of Dy. No. 37 & 38 of NRBC of R4 NRB-2/54 Umaji Naik WUA Dharmpuri, Tal. Malshiras, 5.261 NCB 0.50 1.50 3.26 5.26 Dist. Solapur Rehabilitation of Dy. No. 39 (3, 5, 8, 9) & R4 NRB-2/55 Gursale Minor of NRBC of Chatrapati Shivaji 8.139 NCB 0.50 2.00 5.64 8.14 WUA Gursale, Tal. Malshiras, Dist. Solapur Rehabilitation of 39 (1, 2, 4, 6, 7, 7A, 10) of R4 NRB-2/56 NRBC of Shivshankar WUA Dahigaon, Tal. 6.657 NCB 0.50 1.50 4.66 6.66 Malshiras, Dist. Solapur Rehabilitation of Dy. No. 39 (O.L. 11) Dombalwadi Minor of NRBC of R4 NRB-2/57 7.407 NCB 0.50 1.75 5.16 7.41 DombalwadiWUA Dombalwadi,, Tal. Malshiras, Dist. Solapur Rehabilitation of Dy. No. 39 Tambewadi Minor R4 NRB-2/58 of NRBC of Ahilyadevi WUA Kurbhavi, Tal. 9.592 NCB 0.50 2.00 7.09 9.59 Malshiras, Dist. Solapur Rehabilitation of Dy. No. 39 (12 to 19) of NRBC R4 NRB-2/59 of Mahatma Jotiba Phule WUA Dahigaon, Tal. 6.083 NCB 0.50 1.75 3.83 6.08 Malshiras, Dist. Solapur Rehabilitation of Dy. No. 39 (20 to 23 Tail) of R4 NRB-2/60 NRBC of Kalamboli WUA Kalamboli, Tal. 6.727 NCB 0.50 1.75 4.48 6.73 Malshiras, Dist. Solapur Rehabilitation of Dy. 39 Eakshiv Minor of R4 NRB-2/61 NRBC of Eakshiv WUA Eakshiv, Tal. 6.542 NCB 0.50 1.75 4.29 6.54 Malshiras, Dist. Solapur Rehabilitation of Dy. No. 40, 41, 42 of NRBC of R4 NRB-2/62 5.661 NCB 0.50 1.50 3.66 5.66 Morochi WUA , Tal. Malshiras, Dist. Solapur Rehabilitation of Dy. No. 43 of NRBC of R4 NRB-2/63 3.944 NCB 0.30 0.75 2.89 3.94 Dahigaon WUA , Tal. Malshiras, Dist. Solapur Rehabilitation of Dy. No. 44 (O.L. 1 to 10) of R4 NRB-2/64 NRBC of Natepute Dahigaon WUA , Tal. 12.113 NCB 0.50 3.00 8.61 12.11 Malshiras, Dist. Solapur Rehabilitation of Dy.44 Pirale Minor of NRBC R4 NRB-2/65 7.404 NCB 0.50 2.00 4.90 7.40 of Pirale WUA , Tal. Malshiras, Dist. Solapur 2/24/2011 wua_prmpkg_r4 176 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation of Dy. 44 O.L. 11 to 13 & R4 NRB-2/66 Motewadi Minor of NRBC of Motewadi WUA , 4.981 NCB 0.50 1.50 2.98 4.98 Tal. Malshiras, Dist. Solapur Rehabilitation of Dy. No.44 (O.L. 14 to 22 B) of R4 NRB-2/67 NRBC of Bangarde WUA , Tal. Malshiras, Dist. 9.843 NCB 1.00 2.00 6.84 9.84 Solapur Rehabilitation of Dy. No. 44 (23 to Tail) of R4 NRB-2/68 NRBC of Palasmandal WUA , Tal. Malshiras, 6.69 NCB 0.50 1.50 4.69 6.69 Dist. Solapur 290 Khadakwasla Nil Nil Nil KDK- R Rehabilitation of the Minors WUA 128.56 WUA 19.28 45.00 57.85 6.43 128.56 2*** KDK- R3 Rehabilitation of the Minors WUA_29 109 WUA 43.6 65.4 109.00 2*** R4 KDK-2/1 Sortapeshwar W.U.A. Sortapwadi Tal Haveli 3.22 NCB 0 0.5 2.72 3.22 R4 KDK-2/2 Shivsambho W.U.A. Sortapwadi Tal Haveli 4.55 NCB 0 0.7 3.85 4.55 R4 KDK-2/3 Hanuman W.U.A. Koregaon Mul Tal Haveli 5.22 NCB 0 0.8 4.42 5.22 R4 KDK-2/4 Bhaivanath W.U.A. Uruli kanchan Tal Haveli 9.77 NCB 0 0.75 9.02 9.77 Kalbhraivanath W.U.A. Uruli kanchan Tal R4 KDK-2/5 3.88 NCB 0 0.6 3.28 3.88 Haveli R4 KDK-2/6 Shri Krushna W.U.A. Tilekarwadi Tal Haveli 5.72 NCB 0 0.5 5.22 5.72 R4 KDK-2/7 Savtamali W.U.A. Sahajpur tal Daund 4.6 NCB 0 0.6 4 4.6 R4 KDK-2/8 Dy.17 W.U.A. Sahajpur tal Daund 4.06 NCB 0 0.5 3.56 4.06 R4 KDK-2/9 Bhaivanath W.U.A. Kasurdi Dal Daund 1.51 Shopping 0 0.5 1.01 1.51 R4 KDK-2/10 Dy.18 W.U.A. Kamthewadi Tal Daund 8.18 NCB 0 0.9 7.28 8.18 R4 KDK-2/11 Dy.19 W.U.A. Tambewadi Tal Daund 7.55 NCB 0 0.8 6.75 7.55 R4 KDK-2/12 Jaldevi W.U.A. Yewat TAl Daund 1.92 Shopping 0 0.5 1.42 1.92 R4 KDK-2/13 Dy.20 W.U.A. Yewat Tal Daund 9.02 NCB 0 0.75 8.27 9.02 R4 KDK-2/14 Kalbhraivanath W.U.A. Khutbav Tal Daund 3.88 NCB 0 0.7 3.18 3.88 R4 KDK-2/15 Matoba W.U.A. No.1 Nathachi wadi Tal Daund 9.58 NCB 0 0.9 8.68 9.58 R4 KDK-2/16 Matoba W.U.A. No.2 Galandwadi Tal Daund 6.36 NCB 0 0.7 5.66 6.36 2/24/2011 wua_prmpkg_r4 177 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 R4 KDK-2/17 Padamawati W.U.A. Kedgaon Tal Kedgaon 1.95 Shopping 0 0.7 1.25 1.95 R4 KDK-2/18 Bormalnath W.U.A. Boriparadhi Tal Daund 3.72 NCB 0 0.7 3.02 3.72 R4 KDK-2/19 Nageshwar WUA Kangaon Tal Daund 6.07 NCB 0 0.6 5.47 6.07 R4 KDK-2/20 Amrpali WUA Kangaon Tal Daund 6.39 NCB 0 0.6 5.79 6.39 R4 KDK-2/21 Pandurang WUA Kangaon Tal Daund 8.26 NCB 0 0.5 7.76 8.26 R4 KDK-2/22 Audumber WUA kangaon Tal Daund 0.92 Shopping 0 0.5 0.42 0.92 R4 KDK-2/23 Sahajeevan WUA Patas Tal Daund 1.96 Shopping 0 0.7 1.26 1.96 R4 KDK-2/24 Biroba WUA Patas Tal Daund 2.57 NCB 0 0.7 1.87 2.57 R4 KDK-2/25 Nageshwar WUA Gar Tal Daund 7.12 NCB 0 0.8 6.32 7.12 R4 KDK-2/26 Pandurang WUA Betwadi Tal Daund 1.26 Shopping 0 0.6 0.66 1.26 R3_Total for Major Projects 3619 77.84 1,415.66 1,567.54 558.09 3,619 R4_Total for Major Projects 4025.86 0.00 0.00 61.82 513.80 1331.46 1,500.23 609.23 4016.54 Medium Projects 10 Katepurna Kat-3** Rehabilitation of the Minors WUA-24 144.63 WUA 28.93 28.93 43.39 28.93 14.46 144.63 R Kat-3** Rehabilitation of the Minors WUA-24 144.63 WUA 21.69 50.62 65.08 7.23 144.63 1182 R2 kat-3/1 Mohadi Maharaj W.U.A. Khadka 11.75 NCB 0.59 5.875 5.288 11.750 Rehabilitation work of Katepurna Medium R3 kat-3/1 Project Tq.Barshi Takli Dist.Akola For Mohadi 10.50 NCB 2.62 6.00 1.88 10.50 Maharaj W.U.A. Khadka (Package KAT-3 ) Rehabilitation work of Katepurna Medium A3 kat-3/1 Project Tq.Barshi Takli Dist.Akola For Mohadi 11.89 NCB 6.33 6.75 13.080 Maharaj W.U.A. Khadka (Package KAT-3 ) 1183 R2 kat-3/2 Shri Chandika Devi W.U.A. Pailpada 12.20 NCB 0.61 6.100 5.490 12.200 2/24/2011 wua_prmpkg_r4 178 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Katepurna Medium Project Tq.Barshi Takli Dist.Akola For Shri R3 kat-3/2 10.98 NCB 2.75 7.00 1.23 10.98 Chandika Devi W.U.A. Pailpada (Package KAT- 3) Rehabilitation work of Katepurna Medium Project Tq.Barshi Takli Dist.Akola For Shri R4 kat-3/2 12.16 NCB 7.30 4.86 12.16 Chandika Devi W.U.A. Pailpada (Package KAT- 3) 1184 R2 kat-3/3 Shri Sopinath Maharaj W.U.A. Mirzapur 25.00 NCB 1.25 12.500 11.250 25.000 Rehabilitation work of Katepurna Medium R3 kat-3/3 Project Tq.Barshi Takli Dist.Akola For 26.11 NCB 3.92 14.36 7.83 26.11 Borgaon W.U.A., Borgaon (Package KAT-3 ) Rehabilitation work of Katepurna Medium R4 kat-3/3 Project Tq.Barshi Takli Dist.Akola For 28.98 NCB 17.39 11.59 28.98 Borgaon W.U.A., Borgaon (Package KAT-3 ) 1185 R2 kat-3/4 Shri Hanuman W.U.A.Mirzapur - deleted deleted 1186 R2 kat-3/5 Malkoji Maharaj W.U.A.Dhaga 6.22 NCB 1.555 3.110 1.555 6.220 Rehabilitation work of Katepurna Medium A2 kat-3/5 Project Tq.Barshi Takli Dist.Akola For Malkoji 6.22 NCB Maharaj W.U.A.Dhaga (Package KAT-3) Rehabilitation work of Katepurna Medium A2/1 kat-3/5 Project Tq.Barshi Takli Dist.Akola For Malkoji 6.22 NCB Maharaj W.U.A.Dhaga (Package KAT-3) Rehabilitation work of Katepurna Medium A2/2 kat-3/5 Project Tq.Barshi Takli Dist.Akola For Malkoji 6.50 NCB 5 2.17 7.460 Maharaj W.U.A.Dhaga (Package KAT-3) 1187 R2 kat-3/6 Wasundara W.U.A.Khothari 6.21 NCB 1.553 3.105 1.553 6.210 Rehabilitation work of Katepurna Medium A2 kat-3/6 Project Tq.Barshi Takli Dist.Akola For 6.21 NCB Wasundara W.U.A.Khothari (Package KAT-3) Rehabilitation work of Katepurna Medium A2/1 kat-3/6 Project Tq.Barshi Takli Dist.Akola For 6.21 NCB Wasundara W.U.A.Khothari (Package KAT-3) 2/24/2011 wua_prmpkg_r4 179 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Katepurna Medium A2/2 kat-3/6 Project Tq.Barshi Takli Dist.Akola For 6.51 NCB 4.98 2.48 7.460 Wasundara W.U.A.Khothari (Package KAT-3) 1188 R2 kat-3/7 Sultan pur W.U.A.Dhothardi 11.30 NCB 0.57 5.650 5.085 11.300 Rehabilitation work of Katepurna Medium R3 kat-3/7 Project Tq.Barshi Takli Dist.Akola For Sultan 10.41 NCB 2.60 6.00 1.81 10.41 pur W.U.A. Dhothardi (Package KAT-3 ) Rehabilitation work of Katepurna Medium A3 kat-3/7 Project Tq.Barshi Takli Dist.Akola For Sultan 11.47 NCB 4.88 7.74 12.620 pur W.U.A. Dhothardi (Package KAT-3 ) 1189 R2 kat-3/8 Keshao raj W.U.A.Anvi Mirzapur 3.09 NCB 0.15 1.545 1.391 3.090 Rehabilitation work of Katepurna Medium A2 kat-3/8 Project Tq.Barshi Takli Dist.Akola For Keshav 3.09 NCB Raj W.U.A.Anvi Mirzapur (Package KAT-3 ) Rehabilitation work of Katepurna Medium A2/1 kat-3/8 Project Tq.Barshi Takli Dist.Akola For Keshav 3.09 NCB Raj W.U.A.Anvi Mirzapur (Package KAT-3 ) Rehabilitation work of Katepurna Medium A2/2 kat-3/8 Project Tq.Barshi Takli Dist.Akola For Keshav 3.09 NCB Raj W.U.A.Anvi Mirzapur (Package KAT-3 ) Rehabilitation work of Katepurna Medium A2/3 kat-3/8 Project Tq.Barshi Takli Dist.Akola For Keshav 3.09 NCB Raj W.U.A.Anvi Mirzapur (Package KAT-3 ) Rehabilitation work of Katepurna Medium R3 kat-3/8 Project Tq.Barshi Takli Dist.Akola For Keshav 3.09 NCB 0.77 1.32 1.000 3.09 Raj W.U.A.Anvi Mirzapur (Package KAT-3 ) Rehabilitation work of Katepurna Medium A3 kat-3/8 Project Tq.Barshi Takli Dist.Akola For Keshav 3.49 NCB 0.64 2.56 0.64 3.84 Raj W.U.A.Anvi Mirzapur (Package KAT-3 ) 1190 R2 kat-3/9 Kisan W.U.A.Borgaon Manju 4.67 NCB 0.23 2.335 2.102 4.670 2/24/2011 wua_prmpkg_r4 180 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Katepurna Medium A2 kat-3/9 Project Tq.Barshi Takli Dist.Akola For Kisan 4.67 NCB W.U.A., Borgaon Manju (Package KAT-3 ) Rehabilitation work of Katepurna Medium A2/1 kat-3/9 Project Tq.Barshi Takli Dist.Akola For Kisan 4.67 NCB W.U.A., Borgaon Manju (Package KAT-3 ) Rehabilitation work of Katepurna Medium A2/2 kat-3/9 Project Tq.Barshi Takli Dist.Akola For Kisan 4.67 NCB W.U.A., Borgaon Manju (Package KAT-3 ) Rehabilitation work of Katepurna Medium A2/3 kat-3/9 Project Tq.Barshi Takli Dist.Akola For Kisan 4.67 NCB W.U.A., Borgaon Manju (Package KAT-3 ) Rehabilitation work of Katepurna Medium R3 kat-3/9 Project Tq.Barshi Takli Dist.Akola For Kisan 4.67 NCB 1.17 2.45 1.05 4.67 W.U.A., Borgaon Manju (Package KAT-3 ) Rehabilitation work of Katepurna Medium A3 kat-3/9 Project Tq.Barshi Takli Dist.Akola For Kisan 5.27 NCB 0.96 3.86 0.98 5.80 W.U.A., Borgaon Manju (Package KAT-3 ) 1191 R2 kat-3/10 Jalpurna W.U.A.Borgaon Manju 7.60 NCB 0.38 3.800 3.420 7.600 Rehabilitation work of Katepurna Medium Project Tq.Barshi Takli Dist.Akola For A2 kat-3/10 6.19 NCB Jalpurna W.U.A.Borgaon Manju (Package KAT- 3) Rehabilitation work of Katepurna Medium Project Tq.Barshi Takli Dist.Akola For A2/1 kat-3/10 6.19 NCB Jalpurna W.U.A.Borgaon Manju (Package KAT- 3) Rehabilitation work of Katepurna Medium Project Tq.Barshi Takli Dist.Akola For A2/2 kat-3/10 6.19 NCB Jalpurna W.U.A.Borgaon Manju (Package KAT- 3) 2/24/2011 wua_prmpkg_r4 181 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Katepurna Medium Project Tq.Barshi Takli Dist.Akola For A2/3 kat-3/10 6.80 NCB 7.80 7.800 Jalpurna W.U.A.Borgaon Manju (Package KAT- 3) 1192 R2 kat-3/11 Shri Gurudeo W.U.A.Waki 23.50 NCB 1.18 11.750 10.575 23.500 Rehabilitation work of Katepurna Medium R3 kat-3/11 Project Tq.Barshi Takli Dist.Akola For Shri 23.96 NCB 5.990 15.000 2.970 23.96 Gurudev W.U.A.Waki (Package KAT-3 ) Rehabilitation work of Katepurna Medium A3 kat-3/11 Project Tq.Barshi Takli Dist.Akola For Shri 26.90 NCB 15.63 13.97 29.60 Gurudev W.U.A.Waki (Package KAT-3 ) 1193 R2 kat-3/12 Bhagirath W.U.A.Telkhed 12.70 NCB 0.64 6.350 5.715 12.700 Rehabilitation work of Katepurna Medium R3 kat-3/12 Project Tq.Barshi Takli Dist.Akola For 11.26 NCB 2.815 6.000 2.440 11.26 Bhagirath W.U.A.Telkhed. (Package KAT-3 ) Rehabilitation work of Katepurna Medium A3 kat-3/12 Project Tq.Barshi Takli Dist.Akola For 13.16 NCB 6.09 8.39 14.48 Bhagirath W.U.A.Telkhed. (Package KAT-3 ) 1194 R2 kat-3/13 Annapurna W.U.A.Palso 20.90 NCB 1.05 10.450 9.405 20.900 Rehabilitation work of Katepurna Medium R3 kat-3/13 Project Tq.Barshi Takli Dist.Akola For 18.49 NCB 4.62 10.00 3.87 18.49 Annapurna W.U.A.Palso (Package KAT-3 ) Rehabilitation work of Katepurna Medium A3 kat-3/13 Project Tq.Barshi Takli Dist.Akola For 20.69 NCB 4.55 18.22 22.77 Annapurna W.U.A.Palso (Package KAT-3 ) 1195 R2 kat-3/14 Shri. Gajanan Maharaj W.U.A. Ramgaon 5.82 NCB 1.455 2.910 1.455 5.820 Rehabilitation work of Katepurna Medium Project Tq.Barshi Takli Dist.Akola For A2 kat-3/14 5.82 NCB Gajanan Maharaj W.U.A.Ramgaon. (Package KAT-3 ) Rehabilitation work of Katepurna Medium Project Tq.Barshi Takli Dist.Akola For A2/1 kat-3/14 5.82 NCB Gajanan Maharaj W.U.A.Ramgaon. (Package KAT-3 ) 2/24/2011 wua_prmpkg_r4 182 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Katepurna Medium Project Tq.Barshi Takli Dist.Akola For A2/2 kat-3/14 5.82 NCB Gajanan Maharaj W.U.A.Ramgaon. (Package KAT-3 ) Rehabilitation work of Katepurna Medium Project Tq.Barshi Takli Dist.Akola For A2/3 kat-3/14 5.82 NCB Gajanan Maharaj W.U.A.Ramgaon. (Package KAT-3 ) Rehabilitation work of Katepurna Medium Project Tq.Barshi Takli Dist.Akola For R3 kat-3/14 5.82 NCB 1.46 3.05 1.31 5.82 Gajanan Maharaj W.U.A.Ramgaon. (Package KAT-3 ) Rehabilitation work of Katepurna Medium Project Tq.Barshi Takli Dist.Akola For A3 kat-3/14 6.59 NCB 1.20 4.82 1.23 7.25 Gajanan Maharaj W.U.A.Ramgaon. (Package KAT-3 ) 1196 R2 kat-3/15 Shri. Krupa W.U.A. Dhapura 12.10 NCB 0.61 6.050 5.445 12.100 Rehabilitation work of Katepurna Medium R3 kat-3/15 Project Tq.Barshi Takli Dist.Akola For Shri 10.60 NCB 2.65 6.00 1.95 10.60 Krupa W.U.A.Dapura (Package KAT-3 ) Rehabilitation work of Katepurna Medium A3 kat-3/15 Project Tq.Barshi Takli Dist.Akola For Shri 12.35 NCB 5.63 7.96 13.59 Krupa W.U.A.Dapura (Package KAT-3 ) 1197 R2 kat-3/16 Jai Bhawani W.U.A.Dhahigaon - deleted deleted 1198 R2 kat-3/17 Shri. Awadhut Maharaj W.U.A.Bhairkhed 11.11 NCB 0.56 5.555 5.000 11.110 Rehabilitation work of Katepurna Medium R3 kat-3/17 Project Tq.Barshi Takli Dist.Akola For Avdhut 9.80 NCB 2.45 6.00 1.35 9.80 Maharaj W.U.A.,Bahirkhed (Package KAT-3 ) Rehabilitation work of Katepurna Medium A3 kat-3/17 Project Tq.Barshi Takli Dist.Akola For Avdhut 11.19 NCB 6.42 5.89 12.310 Maharaj W.U.A.,Bahirkhed (Package KAT-3 ) Shri. Swami Samrath Maharaj 1199 R2 kat-3/18 8.30 NCB 0.42 4.150 3.735 8.300 W.U.A.Gondhapur 2/24/2011 wua_prmpkg_r4 183 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Katepurna Medium Project Tq.Barshi Takli Dist.Akola For Shri R3 kat-3/18 7.29 NCB 1.83 4.00 1.47 7.30 Swami Samartha W.U.A.Gondapur. (Package KAT-3 ) Rehabilitation work of Katepurna Medium Project Tq.Barshi Takli Dist.Akola For Shri R4 kat-3/18 8.1 NCB 4.86 3.24 8.10 Swami Samartha W.U.A.Gondapur. (Package KAT-3 ) 1200 R2 kat-3/19 Shri.Ram Gopal Maharaj W.U.A.Palso 9.00 NCB 0.45 4.500 4.050 9.000 Rehabilitation work of Katepurna Medium R3 kat-3/19 Project Tq.Barshi Takli Dist.Akola For 7.10 NCB 0.100 3.500 3.500 7.10 Ramgopal W.U.A.Palso (Package KAT-3 ) 1201 R2 kat-3/20 Shri.Kala Maroti W.U.A.Palso - deleted deleted 1202 R2 kat-3/21 Shri.Jai Ram Baba W.U.A.Sangwha Mel 4.79 NCB 1.198 2.395 1.198 4.790 Rehabilitation work of Katepurna Medium A2 kat-3/21 Project Tq.Barshi Takli Dist.Akola For Jairam 4.79 NCB Baba W.U.A. Sangva Mel (Package KAT-3 ) Rehabilitation work of Katepurna Medium A2/1 kat-3/21 Project Tq.Barshi Takli Dist.Akola For Jairam 4.79 NCB Baba W.U.A. Sangva Mel (Package KAT-3 ) Rehabilitation work of Katepurna Medium A2/2 kat-3/21 Project Tq.Barshi Takli Dist.Akola For Jairam 4.79 NCB Baba W.U.A. Sangva Mel (Package KAT-3 ) Rehabilitation work of Katepurna Medium A2/3 kat-3/21 Project Tq.Barshi Takli Dist.Akola For Jairam 4.79 NCB Baba W.U.A. Sangva Mel (Package KAT-3 ) Rehabilitation work of Katepurna Medium R3 kat-3/21 Project Tq.Barshi Takli Dist.Akola For Jairam 4.79 NCB 0.79 3.00 1.00 4.79 Baba W.U.A. Sangva Mel (Package KAT-3 ) 2/24/2011 wua_prmpkg_r4 184 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Katepurna Medium A3 kat-3/21 Project Tq.Barshi Takli Dist.Akola For Jairam 5.39 NCB 0.98 3.94 1.01 5.93 Baba W.U.A. Sangva Mel (Package KAT-3 ) 1203 R2 kat-3/22 Krushi Mitra W.U.A.Sangwha Mel 11.80 NCB 1.180 6.490 4.130 11.800 Rehabilitation work of Katepurna Medium R3 kat-3/22 Project Tq.Barshi Takli Dist.Akola For Krushi 10.13 NCB 2.53 6.00 1.60 10.13 Mitra W.U.A.Sangvamel. (Package KAT-3 ) Rehabilitation work of Katepurna Medium A3 kat-3/22 Project Tq.Barshi Takli Dist.Akola For Krushi 11.71 NCB 5.63 7.26 12.890 Mitra W.U.A.Sangvamel. (Package KAT-3 ) 1204 R2 kat-3/23 Shri.Chihdnaji Maharaj W.U.A.Dathala 9.10 NCB 0.910 5.005 3.185 9.100 Rehabilitation work of Katepurna Medium Project Tq.Barshi Takli Dist.Akola For R3 kat-3/23 8.00 NCB 2.00 4.00 2.00 8.00 Chindaji Maharaj W.U.A. Datala.(Package KAT- 3) Rehabilitation work of Katepurna Medium Project Tq.Barshi Takli Dist.Akola For R4 kat-3/23 8.88 NCB 5.33 3.55 8.88 Chindaji Maharaj W.U.A. Datala.(Package KAT- 3) 1205 R2 kat-3/24 Shrikrishna W.U.A.koulkhed (JA) 1.63 Shopping 0.408 1.060 0.163 1.630 Rehabilitation work of Katepurna Medium Project Tq.Barshi Takli Dist.Akola For A2 kat-3/24 1.63 Shopping Shrikrishna W.U.A. Kaulkhed. (Package KAT- 3) Rehabilitation work of Katepurna Medium Project Tq.Barshi Takli Dist.Akola For A2/1 kat-3/24 1.63 Shopping Shrikrishna W.U.A. Kaulkhed. (Package KAT- 3) Rehabilitation work of Katepurna Medium Project Tq.Barshi Takli Dist.Akola For A2/2 kat-3/24 1.63 Shopping Shrikrishna W.U.A. Kaulkhed. (Package KAT- 3) Rehabilitation work of Katepurna Medium Project Tq.Barshi Takli Dist.Akola For A2/3 kat-3/24 1.63 Shopping Shrikrishna W.U.A. Kaulkhed. (Package KAT- 3) 2/24/2011 wua_prmpkg_r4 185 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Katepurna Medium Project Tq.Barshi Takli Dist.Akola For R3 kat-3/24 1.63 Shopping 0.41 1.00 0.22 1.63 Shrikrishna W.U.A. Kaulkhed. (Package KAT- 3) Rehabilitation work of Katepurna Medium Project Tq.Barshi Takli Dist.Akola For R4 kat-3/24 1.64 NCB 0.98 0.66 1.64 Shrikrishna W.U.A. Kaulkhed. (Package KAT- 3) 1206 R2 kat-3/25 Bahirkhed Disty. W.U.A. Bahirkhed Disty 20.00 NCB 1.00 10.00 9.00 20.00 deleted deleted 1207 R2 kat-3/26 Lakhamaji Maharaj W.U.A. Bahirkhed Disty 15.00 NCB 0.75 7.500 6.750 15.000 Rehabilitation work of Katepurna Medium Project Tq.Barshi Takli Dist.Akola For R3 kat-3/26 30.65 NCB 7.66 13.79 9.20 30.65 Lakhmaji Maharaj W.U.A.Bhairkhed (Package KAT-3 ) 1208 R2 kat-3/27 Bhardhurpur W.U.A. Bhardhurpur - deleted deleted 1209 R2 kat-3/28 Majlapur W.U.A. Majlapur 3.55 NCB 0.888 1.775 0.888 3.550 Rehabilitation work of Katepurna Medium A2 kat-3/28 Project Tq.Barshi Takli Dist.Akola For 3.55 NCB Majlapur W.U.A. Majlapur (Package KAT-3 ) Rehabilitation work of Katepurna Medium A2/1 kat-3/28 Project Tq.Barshi Takli Dist.Akola For 3.55 NCB Majlapur W.U.A. Majlapur (Package KAT-3 ) Rehabilitation work of Katepurna Medium A2/2 kat-3/28 Project Tq.Barshi Takli Dist.Akola For 3.55 NCB Majlapur W.U.A. Majlapur (Package KAT-3 ) Rehabilitation work of Katepurna Medium A2/3 kat-3/28 Project Tq.Barshi Takli Dist.Akola For 3.55 NCB Majlapur W.U.A. Majlapur (Package KAT-3 ) Rehabilitation work of Katepurna Medium R3 kat-3/28 Project Tq.Barshi Takli Dist.Akola For 3.55 NCB 0.89 2.00 0.66 3.55 Majlapur W.U.A. Majlapur (Package KAT-3 ) 2/24/2011 wua_prmpkg_r4 186 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Katepurna Medium A3 kat-3/28 Project Tq.Barshi Takli Dist.Akola For 4.03 NCB 0.74 2.95 0.74 4.430 Majlapur W.U.A. Majlapur (Package KAT-3 ) 1210 R2 kat-3/29 Mohamadpur W.U.A1) Mohamadpur 15.00 NCB 0.75 7.500 6.750 15.000 Rehabilitation work of Katepurna Medium Project Tq.Barshi Takli Dist.Akola For R3 kat-3/29 19.64 NCB 4.91 10.00 4.73 19.64 Mohmadpur W.U.A.Mohmadpur (Package KAT-3 ) Rehabilitation work of Katepurna Medium Project Tq.Barshi Takli Dist.Akola For R4 kat-3/29 21.8 NCB 13.08 8.72 21.80 Mohmadpur W.U.A.Mohmadpur (Package KAT-3 ) 1211 R2 kat-3/30 Jalpurna W.U.A.2) Mohamadpur 10.00 NCB 0.50 5.000 4.500 10.000 1212 R2 kat-3/31 Ramgopal W.U.A. Bhatori Dysty (1) 20.00 NCB 1.00 10.000 9.000 20.000 Rehabilitation work of Katepurna Medium R3 kat-3/31 Project Tq.Barshi Takli Dist.Akola For 37.28 NCB 9.32 16.78 11.18 37.28 Ramgopal W.U.A.Bhatori (Package KAT-3 ) deleted 1213 R2 kat-3/32 Jai TuljaBhawani W.U.A. Bhatori Dysty (2) 15.00 NCB 0.75 7.500 6.750 15.000 deleted deleted Rehabilitation work of Katepurna Medium kat-3/33 Project Tq.Barshi Takli Dist.Akola For Ramgopal W.U.A. Shahapur (Package KAT-3 ) Rehabilitation work of Katepurna Medium A4 kat-3/33 Project Tq.Barshi Takli Dist.Akola For 8.05 NCB 3.60 5.27 8.87 Ramgopal W.U.A. Shahapur (Package KAT-3 ) Rehabilitation work of Katepurna Medium R4 kat-3/34 Project Tq.Barshitakali Dist.Akola for Bahirkhed 34.02 NCB 20.41 13.61 34.02 Dy. Water Users Association Dahigaon. Rehabilitation work of Katepurna Medium R4 kat-3/35 Project Tq.Barshitakali Dist.Akola for Bhatori 41.38 NCB 24.83 16.55 41.38 Dy. Water Users Association Bhatori. 11 Koradi Nala Kor-3** Rehabilitation of the Minors WUA-16 27.43 WUA 5.49 5.49 8.23 5.49 2.74 27.43 2/24/2011 wua_prmpkg_r4 187 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 R Kor-3** Rehabilitation of the Minors WUA-16 27.43 WUA 1214 R2 kor-3/1 Mahatma Phule W.U.A.Deulgaon Mali. 2.46 NCB 1.23 1.23 2.46 deleted 1215 R2 kor-3/2 Kalyana Erandoli Faijalpur W.U.A.Kalyana 5.57 NCB 2.79 2.79 5.57 Rehabilitation work of Koradi Medium Project Tq. Mehkar Dist. Buldana For Kalyana A2 kor-3/2 2.05 NCB 0 1.80 0.64 2.44 Erandoli Faijalpur W.U.A.Kalyana (Package KOR-3) 1216 R2 kor-3/3 Krushi Kanya W.U.A.Mehkar 5.50 NCB 2.75 2.75 5.50 Rehabilitation work of Koradi Medium Project A2 kor-3/3 Tq. Mehkar Dist. Buldana For Krushi Kanya 2.12 NCB 0 2.46 2.460 W.U.A.Mehkar (Package KOR-3) 1217 R2 kor-3/4 Bartala Mehkar W.U.A.Mehkar 4.50 NCB 2.25 2.25 4.50 Rehabilitation work of Koradi Medium Project A2 kor-3/4 Tq. Mehkar Dist. Buldana For Bartala Mehkar 2.48 NCB 0 1.04 1.82 2.86 W.U.A.Mehkar (Package KOR-3) 1218 R2 kor-3/5 Sarangpur Jaitala W.U.A.Sarangpur 7.50 NCB 3.75 3.75 7.50 Rehabilitation work of Koradi Medium Project A2 kor-3/5 Tq. Mehkar Dist. Buldana For Sarangpur Jaitala 2.66 NCB W.U.A.Sarangpur (Package KOR-3) Rehabilitation work of Koradi Medium Project A2/1 kor-3/5 Tq. Mehkar Dist. Buldana For Sarangpur Jaitala 2.78 NCB 0.64 2.64 3.28 W.U.A.Sarangpur (Package KOR-3) 1219 R2 kor-3/6 Haldhar W.U.A. Dadulgavan 3.70 NCB 1.85 1.85 3.70 Rehabilitation work of Koradi Medium Project A2 kor-3/6 Tq. Mehkar Dist. Buldana For Haldhar W.U.A. 3.71 NCB 0 3.44 0.84 4.28 Dadulgavan (Package KOR-3) 1220 R2 kor-3/7 Sultanpur Dadulgavan Ganpur W.U.A.Sultanpur 6.50 NCB 3.25 3.25 6.50 Rehabilitation work of Koradi Medium Project Tq. Mehkar Dist. Buldana For Sultanpur A2 kor-3/7 2.00 NCB 0 0.24 2.09 2.33 Dadulgavan Ganpur W.U.A.Sultanpur (Package KOR-3) 2/24/2011 wua_prmpkg_r4 188 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1221 R2 kor-3/8 Antri Deshmukh W.U.A.A'Deshmukh 5.90 NCB 2.95 2.95 5.90 Rehabilitation work of Koradi Medium Project A2 kor-3/8 Tq. Mehkar Dist. Buldana For Antri Deshmukh 2.29 NCB 0 0.00 2.63 2.63 W.U.A.A'Deshmukh (Package KOR-3) 1222 R2 kor-3/9 Borkhedi W.U.A.Borkhedi 7.50 NCB 3.75 3.75 7.50 A2 deleted deleted deleted 1223 R2 kor-3/10 Bori W.U.A. Bori 5.45 NCB 2.73 2.73 5.45 Rehabilitation work of Koradi Medium Project A2 kor-3/10 Tq. Mehkar Dist. Buldana For Bori W.U.A. 2.12 NCB 0 0.00 2.36 2.36 Bori (Package KOR-3) 1224 R2 kor-3/11 Shri W.U.A.Bori 8.81 NCB 4.41 4.41 8.81 Rehabilitation work of Koradi Medium Project A2 kor-3/11 Tq. Mehkar Dist. Buldana For Shri W.U.A.Bori 2.50 NCB 0 2.57 0.20 2.77 (Package KOR-3) 1225 R2 kor-3/12 Gohgaon W.U.A.Gohgaon 7.05 NCB 3.53 3.53 7.05 Rehabilitation work of Koradi Medium Project A2 kor-3/12 Tq. Mehkar Dist. Buldana For Gohgaon 3.17 NCB 0 1.04 2.47 3.51 W.U.A.Gohgaon (Package KOR-3) 1226 R2 kor-3/13 Wakad W.U.A. Wakad 7.50 NCB 3.75 3.75 7.50 Rehabilitation work of Koradi Medium Project A2 kor-3/13 Tq. Mehkar Dist. Buldana For Wakad W.U.A. 6.05 NCB 0 1.74 5.07 6.81 Wakad (Package KOR-3) 12 Sukhana Suk-3** Rehabilitation of the Minors WUA-19 40.24 WUA 8.05 8.05 12.07 8.05 4.02 40.24 R Suk-3** Rehabilitation of the Minors WUA-19 40.24 WUA 6.04 14.08 18.11 2.01 40.24 Vishwanand Water User Association, Ltd. 1227 R2 Suk-3**/1 3.52 NCB 0.880 1.760 0.880 3.520 Pimpri Raja.Tq. Aurangabad. Rehablitation of DistributoryNo.1& 2 of Sukhna A2 Suk-3**/1 Medium ProjectTq.& Dist.Aurangabad. For 4.05 NCB 0 0 0.00 0.00 1.55 3.00 0.00 4.55 Shri Vishwanand WUA Ltd. Pimpari Raja Padamashri sakharampant W.U.A. Ltd. pimpri 1228 R2 Suk-3**/2 5.42 NCB 1.355 2.710 1.355 5.420 Raja.Tq. Aurangabad. 2/24/2011 wua_prmpkg_r4 189 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehablitation of Distributory No.3 & 4 of Sukhna Medium ProjectTq.& Dist.Aurangabad. A2 Suk-3**/2 5.55 NCB 0 0 0 2.77 2.07 1.26 0.00 6.10 For Padmashri Sakharampant Pawar WUA Ltd., Pimpari Raja Jai Malhar W.U.A. Ltd. pimpri Raja. Tq. 1229 R2 Suk-3**/3 3.8 NCB 0.950 1.900 0.950 3.800 Aurangabad. Rehablitation of Distributory No.5 of Sukhna A2 Suk-3**/3 Medium ProjectTq.& Dist.Aurangabad For 3.27 NCB 0 0 0 1.22 0.02 2.20 0.00 3.44 Jai Malhar WUA Ltd. Pimpari Raja 1230 R2 Suk-3**/4 Ambika W.U.A. Ltd.Daighavan.Tq. Aurangabad. 5.05 NCB 1.263 2.525 1.263 5.050 Rehablitation of Distributory No.6 of Sukhna A2 Suk-3**/4 Medium ProjectTq.& Dist.Aurangabad. For 4.95 NCB 0 0 0 0.14 2.32 3.18 0.00 5.64 Ambika WUA Ltd. Diagavan Sant Tukaram W.U.A. Ltd.Sanjkheda.Tq. 1231 R2 Suk-3**/5 3.35 NCB 0.838 1.675 0.838 3.350 Aurangabad. Rehablitation of Distributory No.6A& 7 of Sukhna Medium ProjectTq.& Dist.Aurangabad A2 Suk-3**/5 3.00 NCB 0 0 0 0.21 1.82 1.00 0.00 3.03 For Sant Tukaram WUA Ltd. Sanjkheda Shri krishana W.U.A. Ltd.Sanjkheda.Tq. 1232 R2 Suk-3**/6 3.5 NCB 0.875 1.750 0.875 3.500 Aurangabad. Rehablitation of Distributory No.8 of Sukhna Medium ProjectTq.& Dist.Aurangabad. For A2 Suk-3**/6 3.44 NCB Shri Krishna WUA Ltd. Sanjkheda. Rehablitation of Distributory No.8 of Sukhna Medium ProjectTq.& Dist.Aurangabad. For A2/1 Suk-3**/6 3.73 NCB 0 0 0 1.53 0.45 1.75 0.00 3.722 Shri Krishna WUA Ltd. Sanjkheda. 1233 R2 Suk-3**/7 Jai Bajrang W.U.A. Ltd.Adul.Tq. Paithan 3.15 NCB 0.788 1.575 0.788 3.150 2/24/2011 wua_prmpkg_r4 190 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehablitation of Distributory No.9 of Sukhna Medium ProjectTq.& Dist.Aurangabad. A2 Suk-3**/7 2.26 NCB 0 0 0 0.28 1.24 0.78 0.00 2.30 For Jai Bajrang WUA Ltd. Pimpalgaon. 1234 R2 Suk-3**/8 Sai W.U.A. Ltd.Adul.Tq. Paithan 2.9 NCB 0.725 1.450 0.725 2.900 Rehablitation of Distributory No.10 of A2 Suk-3**/8 Sukhna Medium ProjectTq.& Dist.Aurangabad. 2.55 NCB 0 0 0 0.24 1.54 1.03 0.00 2.81 For Sai WUA Ltd. Adul , 1235 R2 Suk-3**/9 Chintamani W.U.A. Ltd. Gharegaon.Tq. Paithan 4.5 NCB 1.125 2.250 1.125 4.500 Rehablitation of Distributory No.11 of A2 Suk-3**/9 Sukhna Medium ProjectTq.& Dist.Aurangabad. 3.16 NCB 0 0 0 0.05 0.43 2.99 0.00 3.47 For Chintamani WUA Ltd. Adul, Suk- 1236 R2 Sidheshwar W.U.A. Ltd. Adul.Tq. Paithan 5.37 NCB 1.343 2.685 1.343 5.370 3**/10 Rehablitation of Distributory No. 12 & Suk- 13 of Sukhna Medium ProjectTq.& A2 5.74 NCB 0 0 0 0.11 1.44 4.77 0.00 6.32 3**/10 Dist.Aurangabad. For Siddheshwar WUA Ltd. Adul Suk- Sandipan W.U.A. Ltd. Sanjkheda.Tq. 1237 R2 4.6 NCB 1.150 2.300 1.150 4.600 3**/11 Aurangabad. Rehablitation of DistributoryNo.14 of Sukhna Suk- A2 Medium ProjectTq.& Dist.Aurangabad. For 4.86 NCB 0 0 0 0.95 1.88 2.53 0.00 5.36 3**/11 Sandipan WUA Ltd. Gharegaon /Ektuni 13 Waghad Wag-3** Rehabilitation of the Minors WUA-25 20.72 WUA 4.14 4.14 6.22 4.14 2.07 20.72 R Wag-3** Rehabilitation of the Minors WUA-25 20.72 WUA 3.11 7.25 9.32 1.04 20.72 Wag- 1238 R2 Ganesh W.U.A. Dindori 3.059 NCB 0.612 1.530 0.918 3.059 3**/1 Rehabilitation work of Minor No.5 of Waghad Wag- A2 Right Bank Canal (Area under Ganesh Water 3.068 NCB 0 0 0.00 2.23 0.84 0.00 0 3.07 3**/1 User Asso.Dindori Tal.Dindori. Wag- 1239 R2 Dr.Babasaheb Ambedkar W.U.A. Dindori 6.841 NCB 1.368 3.421 2.052 6.841 3**/2 2/24/2011 wua_prmpkg_r4 191 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Minor No.8 of Waghad Wag- A2 Right Bank Canal (Area under Dr.Babasaheb 6.933 NCB 0 0 0.00 3.14 3.79 0.00 0 6.93 3**/2 Ambedkar Water User Aso.Dindori Dist.Nashik. Wag- 1240 R2 Samarth W.U.A. Mohadi 4.084 NCB 0.817 2.042 1.225 4.084 3**/3 Rehabilitation work of Minor No.9 of Waghad Wag- A2 Right Bank Canal (Area under Samarth Water 4.004 NCB 0 0 0.00 0.00 4.01 0.00 0 4.01 3**/3 User Asso.Mohadi Tal.Dindori. Wag- 1241 R2 Navanath W.U.A. Mohadi 7.160 NCB 1.432 3.580 2.148 7.160 3**/4 Rehabilitation work of Dy.No.1 of Waghad Wag- A2 Right Bank Canal (Area under Navnath Water 7.138 NCB 0 0 0.00 2.80 4.34 0.00 0 7.14 3**/4 User Asso.Mohadi Tal.Dindori Dist.Nashik. Wag- 1242 R2 Baneshwar W.U.A. Ambe 2.211 NCB 0.442 1.106 0.663 2.211 3**/5 Rehabilitation work of Minor No.13 D.O.No.17 Wag- & 18 of Waghad Right Bank Canal (Area under A2 2.222 NCB 0 0 0.00 0.50 1.72 0.00 0 2.22 3**/5 Baneshwar Water User Asso.,Ambe Tal.Dindori Dist. Nashik. Wag- 1243 R2 Mauli Adivasi W.U.A. Kadwa Mhalungi 2.720 NCB 0.544 1.360 0.816 2.720 3**/6 Rehabilitation work of Minor No.1 & 2 of Wag- Waghad Left Bank Canal (Area under Mauli A2 2.632 NCB 0 0 0.00 0.00 2.43 0.20 0 2.63 3**/6 Adiwashi Water User Asso.Kadwa, Mhalungi Tal.Dindori Dist. Nashik. Wag- 1244 R2 Jai Yogeshwar W.U.A. Ozar 2.523 NCB 0.505 1.262 0.757 2.523 3**/7 Rehabilitation work of Minor No.18 A & 19 of Wag- A2 Waghad Right Bank Canal (Area under Jai 2.466 NCB 0 0 0.00 1.38 1.09 0.00 0 2.47 3**/7 Yogeshwar Water User Asso. Ozer Tal.Niphad Wag- 1245 R2 Late.R.G.Patil W.U.A. Valkhed 2.495 NCB 0.499 1.248 0.749 2.495 3**/8 Rehabilitation work of Pada Walkhed Dy.No.1 Wag- D.O.;No.18 & 19 of Waghad Left Bank Canal A2 2.30 NCB 0 0 0.00 0.77 1.53 0.00 0 2.30 3**/8 (Area under Lt.R.G.Patil Water User Asso. Walkhed Tal. Dindori 2/24/2011 wua_prmpkg_r4 192 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Wag- 1246 R2 Kolwan W.U.A. Hatnore 1.066 shopping 0.267 0.693 0.107 1.066 3**/9 Rehabilitation work of Minor No.1, D.O.No.1 to Wag- 5 of Waghad Right Bank Canal (Area under A2 1.032 Shopping 0 0 0.00 0.00 0.98 0.05 0 1.03 3**/9 Kolwan Water User AssoHatnore Tal.Dindori Dist.Nashik. Wag- 1247 R2 Kanifnath W.U.A. Nilwandi 1.366 shopping 0.342 0.888 0.137 1.366 3**/10 Rehabilitation work of Minor No.2 & 3, Wag- D.O.No.6 & 7 of Waghad Right bank Canal A2 1.33 Shopping 0 0 0.00 0.00 1.26 0.07 0 1.33 3**/10 (Area under Kanifniath Water Usser Asso.Dindori Tal.Dindori Dist. Nashik. Wag- 1248 R2 Mohalban W.U.A. Dindori 0.963 shopping 0.241 0.626 0.096 0.963 3**/11 Rehabilitation of work of Minor No.4 of Waghad Wag- A2 Right Bank Canal (Area under Mohal Ban Water 0.963 Shopping 0 0 0.00 0.50 0.42 0.05 0 0.96 3**/11 User Asso.Dindori Tal.Dindori Dist. Nashik. Wag- 1249 R2 Late.Popatrao Jadhav W.U.A. Dindori 0.559 shopping 0.140 0.363 0.056 0.559 3**/12 Rehabilitation work of D.O.No.8 to 11 of Wag- Waghad Right Bank Canal (Area under Lt. A2 0.545 Shopping 0 0 0.00 0.00 0.52 0.03 0 0.55 3**/12 Popatrao Jadhav Water User Asso. Dindori Tal.Dindori) Wag- 1250 R2 Manki Parisar W.U.A. Dindori 0.625 shopping 0.156 0.406 0.063 0.625 3**/13 Rehabilitation work of Minor No.7 D.O.No.12 of Wag- Waghad Right Bank Canal (Area under Manki A2 0.625 Shopping 0 0 0.00 0.00 0.59 0.03 0 0.63 3**/13 Parisar Water User Asso.Dindori Tal.Dindori Dist. Nashik. Wag- 1251 R2 Jai Mahalaxmi W.U.A. Nigdol 1.527 shopping 0.382 0.993 0.153 1.527 3**/14 Rehabilitation work of D.O.No.1 to 12 of Wag- Waghad Left bank Canal (Area under Jai A2 1.482 Shopping 0 0 0.00 0.00 1.41 0.07 0 1.48 3**/14 Mahalaxmimata Water User Asso.Nigdol Tal.Dindori Dist.Nashik) Wag- 1252 R2 Jai Janardan W.U.A. Korhate 1.383 shopping 0.346 0.899 0.138 1.383 3**/15 2/24/2011 wua_prmpkg_r4 193 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Minor No.8 & 8 b of Wag- Waghad Right Bank Canal (Area under Jai A2 1.367 Shopping 0 0 0.00 0.00 1.30 0.07 0 1.37 3**/15 Jandradhan Water User Asso.Korate Tal.Dindori Dist. Nashik. Wag- 1253 R2 Saptashringi W.U.A. Mohadi 1.390 shopping 0.348 0.904 0.139 1.390 3**/16 Rehabilitation work of Minor No.10 & 10 A Wag- D.O.No.13 to 14 Waghad Right Bank Canal A2 1.363 Shopping 0 0 0.00 0.00 1.30 0.07 0 1.36 3**/16 (Area under Saptshrungi Water User Aso. Mohadi Tal.Dindori Dist. Nashik. Wag- 1254 R2 Late.Balasaheb Raje W.U.A. Dindori 1.704 shopping 0.426 1.108 0.170 1.704 3**/17 Rehabilitation work of Mkinor No.6 of Waghad Wag- Right Bank Canal (Area under Lt. Balasaheb A2 1.742 Shopping 0 0 0.00 0.51 1.15 0.09 0 1.74 3**/17 Raje Water User Asso.Dindori Tal; Dindori Dist.Nashik. Wag- 1255 R2 Banganga W.U.A. Ozar 1.408 shopping 0.352 0.915 0.141 1.408 3**/18 Rehabilitation work of Minor No.3 of Dy.No.1 Wag- of Wagjad Right Bank Canal (Area under A2 1.416 Shopping 0 0 0.00 0.36 0.98 0.07 0 1.42 3**/18 Banganga Water User Asso.Ozer Tal.Niphad Dist. Nashik. Wag- 1256 R2 Baliraja W.U.A. Janori 1.072 shopping 0.268 0.697 0.107 1.072 3**/19 Rehabilitation work of Minor No.11 of Water Wag- A2 Right Bank Canal (Area under Baliraja Water 1.05 Shopping 0 0 0.00 0.00 1.00 0.05 0 1.05 3**/19 User Asso.Janori Tal.Dindori Dist. Nashik. Wag- 1257 R2 Jai Laxmimata W.U.A. Ambe 0.941 shopping 0.235 0.612 0.094 0.941 3**/20 Rehabilitation work of Minor No.12 D.O.No.15 Wag- to 16 of Waghad Right Bank Canal (Area under A2 0.888 Shopping 0 0 0.00 0.00 0.84 0.04 0 0.89 3**/20 Jai Laxmi Mata Water User Asso.Ambe Tal.Dindori Dist.Nashik. Wag- 1258 R2 Jai Bajrang W.U.A. Janori 1.747 shopping 0.437 1.136 0.175 1.747 3**/21 2/24/2011 wua_prmpkg_r4 194 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Minor No.14, 15 & Wag- D.O.No.19 of Wathad Right Bank Canal (Area A2 1.712 Shopping 0 0 0.00 0.00 1.63 0.09 0 1.71 3**/21 under Jai Bajrang Water User Asso.Janori Tal.Dindori Dist. Nashik. Wag- 1259 R2 Jagdamba W.U.A. Janori 1.754 shopping 0.439 1.140 0.175 1.754 3**/22 Rehabilitation work of Minor No.16 & 17 Wag- D.O.No.20,21 of Waghad Right Bank Canal A2 1.728 Shopping 0 0 0.00 0.94 0.70 0.09 0 1.73 3**/22 (Area under Jag damba Water User Asso.Janori Tal.Dindori Dist. Nashik. Wag- 1260 R2 Mahatma Jyotirao Phule W.U.A. Ozar 1.161 shopping 0.290 0.755 0.116 1.161 3**/23 Rehabilitation work of Minor No.17 & 18 Wag- Waghad Right Bank Canal (Area under A2 1.113 Shopping 0 0 0.00 0.69 0.37 0.06 0 1.11 3**/23 Mah.Jyotirao Fule Water User Asso.Ozer Tal.Niphad Dist. Nashik. Wag- 1261 R2 Shrikrishna W.U.A. Pade 1.640 shopping 0.410 1.066 0.164 1.640 3**/24 Rehabilitation work of Pade Minor No.1 & 2 Wag- D.O.No. 13 to 17 of Waghad Left Bank Canal A2 1.608 Shopping 0 0 0.00 0.68 0.85 0.08 0 1.61 3**/24 (Area under Shrikrishana Water User Asso.Pade Tal.Dindori Dist.Nashik. Ghatshill 14 Gha-3** Rehabilitation of the Minors WUA-5 5.90 WUA 1.18 1.77 1.77 1.18 5.90 Pargaon R Gha-3** Rehabilitation of the Minors WUA-5 5.90 WUA 0.89 2.07 2.66 0.30 5.90 1262 R2 Gha-3**/1 Sant Wamanbhau WUA 0.781 Shopping 0.273 0.508 0.781 Sant Wamanbhau Water User's Association, A2 Gha-3**/1 0.72 Shopping 0 0 0.11 0.49 0.05 0.00 0 0.64 Ghatshil Pargaon , Tal. shirur Dist. Beed 1263 R2 Gha-3**/2 Shri Shivshankar WUA 1.475 Shopping 0.516 0.959 1.475 Shivshankar Water User's Association, A2 Gha-3**/2 1.30 Shopping 0 0 0.26 0.00 0.84 0.00 0 1.10 Dhakanwadi , Tal. Pathardi Dist. Ahmednagar 1264 R2 Gha-3**/3 Shri Bhagwanbaba WUA 1.595 Shopping 0.558 1.037 1.595 Bhagwanbaba Water User's Association, A2 Gha-3**/3 Malewadi , Kharwandi Tal. Pathardi Dist. 1.40 Shopping 0 0 0.28 0.89 0.16 0.00 0 1.33 Ahmednagar 2/24/2011 wua_prmpkg_r4 195 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1265 R2 Gha-3**/4 Shri Namdeo Shastri WUA Shopping 0.000 0.000 0.000 Namdev shasri Water User's A2 Gha-3**/4 Association,Kirtenewadi Tal. Pathardi Dist. 1.33 Shopping 0 0 0.25 0.00 0.83 0.00 0 1.08 Ahmednagar 1266 R2 Gha-3**/5 Bhardwaj WUA 1.463 Shopping 0.512 0.951 1.463 Bhardwaj Water User's AssociationBharajwadi A2 Gha-3**/5 1.29 Shopping 0 0 0.45 0.00 0.60 0.00 0 1.05 Po.Midsangwi Tal. Pathardi Dist. Ahmednagar 1267 R2 Gha-3**/6 Ghatshila Devi WUA 2.936 NCB 0.734 1.468 0.734 2.936 Ghatshiladevi Water User's Association, A2 Gha-3**/6 2.97 NCB 0 0 0.79 1.75 0.00 0.00 0 2.54 Ghatshil Pargaon , Tal. shirur Dist. Beed 15 Mangi Mng-3** Rehabilitation of the Minors WUA-8 25.29 WUA 5.06 5.06 7.59 5.06 22.76 R Mng-3** Rehabilitation of the Minors WUA-8 25.29 WUA (1)Rehabilation & Moderization of M.No.1 (Do- Mng- 1) Dy No 1 & 2 of MRBC (Kamladevi WUA @ 1268 R2 5.11 NCB 1.022 2.555 1.533 5.110 3**/1 Mangi pothare ) excluding main canal Tal- Karmala Dist- Solapur (1) Rehabilation & Moderization of M.No.1 (Do- 1) Dy No 1 & 2 of MRBC (NCB-15) Mng- A2 (Kamladevi WUA @ Mangi pothare ) excluding 5.15 NCB 0.13 3.03 1.78 0.21 5.150 3**/1 main canal Tal-Karmala Dist- Solapur (Package MNG-3) (2)Rehabilation & Moderization of M.No.2 (Do- Mng- 18) M3 (Do-20) M-4 (D0-21) & Dy. 3 of 1269 R2 4.76 NCB 0.952 2.380 1.428 4.760 3**/2 MRBC (Sangameshwar WUA @ Khambewadi ) Tal-Karmala Dist- Solapur (2) Rehabilation & Moderization of M.No.2 (Do- 18) M3 (Do-20) M-4 (D0-21) & Dy. 3 of Mng- A2 MRBC (NCB-13) (Sangameshwar WUA @ 4.38 NCB 0.08 0.88 1.01 3 4.970 3**/2 Khambewadi ) Tal-Karmala Dist- Solapur (Package MNG-3) (3)Rehabilation & Moderization of Dy.4 & 5 of Mng- 1270 R2 MRBC (Seenamai WUA @Karanje ) Tal- 5.17 NCB 1.034 2.585 1.551 5.170 3**/3 Karmala Dist- Solapur 2/24/2011 wua_prmpkg_r4 196 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 (3) Rehabilation & Moderization of Dy.4 & 5 of Mng- A2 MRBC (NCB-17) (Seenamai WUA @Karanje ) 5.37 NCB 0.44 3.68 0.95 0.3 5.370 3**/3 Tal-Karmala Dist- Solapur (Package MNG-3) (4)Rehabilation & Moderization of Dy.6 & 7 of Mng- 1271 R2 MRBC (Shivshankar WUA @ Mirgavan ) 4.69 NCB 0.938 2.345 1.407 4.690 3**/4 Tal-Karmala Dist- Solapur (4) Rehabilation & Moderization of Dy.6 & 7 of Mng- MRBC (NCB-8) (Shivshankar WUA @ A2 4.07 NCB 0.3 2.33 0.85 0.6 4.080 3**/4 Mirgavan ) Tal-Karmala Dist- Solapur (Package MNG-3) (5)Rehabilation & Moderization of D.O. 39 & 41 Mng- 1272 R2 & 42,43 & 46 of MRBC (Nagnath WUA @ 0.38 Shopping 0.133 0.247 0.380 3**/5 Arjunnagar ) Tal-Karmala Dist- Solapur Rehabilation & Moderization of D.O. 39 & 41 & Mng- 42,43 & 46 of MRBC (SHOPPY-1/2008-09) A2 0.28 Shopping 3**/5 (Nagnath WUA @ Arjunnagar ) Tal-Karmala Dist- Solapur (Package MNG-3) Rehabilation & Moderization of D.O. 39 & 41 & Mng- 42,43 & 46 of MRBC (SHOPPY-1/2008-09) A2/1 0.31 Shopping 0 0.31 0.310 3**/5 (Nagnath WUA @ Arjunnagar ) Tal-Karmala Dist- Solapur (Package MNG-3) Rehabilation & Moderization of Dy.1,D.O.14 Mng- 1273 R2 of MLBC (Shaneshwar WUA @ Mangi 1.53 Shopping 0.536 0.995 1.530 3**/6 pothare) Tal-Karmala Dist- Solapur Rehabilation & Moderization of Dy.1,D.O.14 Mng- of MLBC (SHOPPY-1/2007-08) (Shaneshwar A2 1.38 Shopping 0 0.84 0.55 0.2 1.590 3**/6 WUA @ Mangi pothare) Tal-Karmala Dist- Solapur (Package MNG-3) (7)Rehabilation & Moderization of Dy.3, & Mng- Extention Minor of MLBC (Pandurang WUA 1274 R2 3.30 NCB 0.660 1.650 0.990 3.300 3**/7 @ Pothare-Bitargaon) Tal-Karmala Dist- Solapur 2/24/2011 wua_prmpkg_r4 197 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 (7) Rehabilation & Moderization of Dy.3, & Mng- Extention Minor of MLBC (NCB-14) A2 3.29 NCB 0.08 1.03 2.18 3.290 3**/7 (Pandurang WUA @ Pothare-Bitargaon) Tal- Karmala Dist- Solapur (Package MNG-3) (8)Rehabilation & Moderization of Dy.2, of Mng- 1275 R2 MLBC (Adinath WUA @ Pothare-Nilaj) Tal- 4.89 NCB 0.978 2.445 1.467 4.890 3**/8 Karmala Dist- Solapur (8) Rehabilation & Moderization of Dy.2, of Mng- MLBC (NCB-16) (Adinath WUA @ Pothare- A2 4.25 NCB 0.18 0.85 2.23 1 4.260 3**/8 Nilaj) Tal-Karmala Dist- Solapur (Package MNG-3) 16 Gharni Ghr-3** Rehabilitation of the Minors WUA-2 13.37 WUA 2.67 4.01 4.01 2.67 13.37 R Ghr-3** Rehabilitation of the Minors WUA-2 13.37 WUA 2.00 4.68 6.01 0.67 13.37 Rehabilitation of Distributories/ minors under jurisdiction of Shivshakti WUA No.1 on 1276 R2 Ghr-3**/1 5.33 NCB 1.066 2.665 1.599 5.330 R.F.Canal of Gharni Medium Project Tq, Shirur Anantpal Dist. Latur Rehabilatation of distributories/ minors under A2 Ghr-3**/1 5.59 NCB 0.00 0.00 0.00 0.31 0.53 4.75 0.00 5.590 jurisdiction of Shivshakti WUA No.1 Rehabilitation of Distributories/ minors under jurisdiction of Shivshakti WUA No.2 on 1277 R2 Ghr-3**/2 2.08 NCB 0.416 1.040 0.624 2.080 R.F.Canal of Gharni Medium Project Tq, Shirur Anantpal Dist. Latur Rehabilatation of distributories/ minors under A2 Ghr-3**/2 2.18 NCB 0.00 0.00 0.00 0.30 0.73 1.15 0.00 2.180 jurisdiction of Shivshakti WUA No.2 Rehabilitation of Distributories/ minors under jurisdiction of Tithal WUA on L.F. Canal of 1278 R2 Ghr-3**/3 1.99 NCB 0.398 0.995 0.597 1.990 Gharni Medium Project Tq, Shirur Anantpal Dist. Latur Rehabilatation of distributories/ minors under A2 Ghr-3**/3 2.09 NCB 0.00 0.00 0.00 0.33 0.17 1.59 0.00 2.090 jurisdiction of Vitthal WUA Rehabilitation of Distributories/ minors under jurisdiction of Vithai WUA on L.F.Canal of 1279 R2 Ghr-3**/4 1.88 NCB 0.376 0.940 0.564 1.880 Gharni Medium Project Tq, Shirur Anantpal Dist. Latur Rehabilatation of distributories/ minors under A2 Ghr-3**/4 1.98 NCB 0.00 0.00 0.00 0.00 0.20 1.78 0.00 1.980 jurisdiction of Vithai WUA 2/24/2011 wua_prmpkg_r4 198 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation of Dy.& minors under jurisdiction of Narashina WUA R/F canal of R2 1.31 Shopping Gharni Medium Project Tq.Shirur Anantpal Dist.Latur Rehabilitation of Dy.& minors under jurisdiction of Narashina WUA R/F canal of A2 1.37 Shopping 0.00 0.00 0.00 0.00 0.13 1.24 0.00 1.370 Gharni Medium Project Tq.Shirur Anantpal Dist.Latur 18 Kambli Kam-3** Rehabilitation of the Minors WUA- 0.00 WUA 0.00 R Kam-3** Rehabilitation of the Minors WUA- 5.59 WUA 1.40 2.80 1.40 5.59 Rehabilitation of main Canal under jurisdiction 1280 R2 Kam-3** of Baludev Maraj WUASabankhed on Kambli 5.77 NCB 1.443 2.885 1.443 5.770 Medium Project Tq. Ashti Dist. Beed Rehabilitation work of Baludev Maharaj W.U.A. A2 Kam-3** 6.03 NCB 0.00 0.00 0.00 5.43 0.68 0.00 0.00 6.11 on L.F. Canal of kambali Medium Project 19 Terna Ter-3** Rehabilitation of the Minors WUA- 0.00 WUA 0.00 R Ter-3** Rehabilitation of the Minors WUA- 41.23 WUA 6.18 14.43 18.55 2.06 41.23 20 Panzara Pan-3** Rehabilitation of the Minors WUA-19 31.50 WUA 6.30 6.30 9.45 6.30 3.15 31.50 R Pan-3** Rehabilitation of the Minors WUA-19 31.50 WUA 4.72 11.02 14.17 1.57 31.50 R1 Pan-3** Rehabilitation of the Minors wUA - 15 28.127 WUA Rehabilitation of the Minors wUA DY 1,2& 1281 R2 Pan-3**/1 2.599 NCB 0.520 1.300 0.780 2.599 OUTLET 1 Rehabilitaion work of Dy No. 1 and 2 and Direct Outlet NO. 1 of RBC of Panzara Medium Project A2 Pan-3**/1 2.34 NCB Tal Sakri Dist Dhule For Ch Ekvira WUA Sakri Tal Sakri Rehabilitaion work of Dy No. 1 and 2 and Direct Outlet NO. 1 of RBC of Panzara Medium Project A2/1 Pan-3**/1 2.45 NCB 0.88 1.57 2.45 Tal Sakri Dist Dhule For Ch Ekvira WUA Sakri Tal Sakri Rehabilitation of the Minors wUADY 3 & 1282 R2 Pan-3**/2 1.307 Shopping 0.457 0.850 1.307 OUTLET 3, 4 Rehabilitaion work of Dy No. 3 and D.O. No. 2 of RBC of Panzara Medium Project Tal Sakri A2 Pan-3**/2 1.17 Shopping Dist Dhule For Ch Dhandaimata WUA Chikase Tal Sakri Dist Dhule 2/24/2011 wua_prmpkg_r4 199 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitaion work of Dy No. 3 and D.O. No. 2 of RBC of Panzara Medium Project Tal Sakri R3 Pan-3**/2 1.17 Shopping 1.17 1.17 Dist Dhule For Ch Dhandaimata WUA Chikase Tal Sakri Dist Dhule Rehabilitaion work of Dy No. 3 and D.O. No. 2 of RBC of Panzara Medium Project Tal Sakri A3/1 Pan-3**/2 1.17 Shopping 0.00 Dist Dhule For Ch Dhandaimata WUA Chikase Tal Sakri Dist Dhule Rehabilitaion work of Dy No. 3 and D.O. No. 2 of RBC of Panzara Medium Project Tal Sakri A3/2 Pan-3**/2 1.17 Shopping 0.00 Dist Dhule For Ch Dhandaimata WUA Chikase Tal Sakri Dist Dhule Rehabilitaion work of Dy No. 3 and D.O. No. 2 of RBC of Panzara Medium Project Tal Sakri A3/3 Pan-3**/2 1.17 Shopping 0.00 Dist Dhule For Ch Dhandaimata WUA Chikase Tal Sakri Dist Dhule Rehabilitaion work of Dy No. 3 and D.O. No. 2 of RBC of Panzara Medium Project Tal Sakri A3/4 Pan-3**/2 1.17 Shopping 0.00 Dist Dhule For Ch Dhandaimata WUA Chikase Tal Sakri Dist Dhule Rehabilitaion work of Dy No. 3 and D.O. No. 2 of RBC of Panzara Medium Project Tal Sakri A3/5 Pan-3**/2 1.17 Shopping 0.00 Dist Dhule For Ch Dhandaimata WUA Chikase Tal Sakri Dist Dhule Rehabilitaion work of Dy No. 3 and D.O. No. 2 of RBC of Panzara Medium Project Tal Sakri R4 Pan-3**/2 1.17 Shopping 1.17 1.170 Dist Dhule For Ch Dhandaimata WUA Chikase Tal Sakri Dist Dhule Rehabilitation of the Minors wUA DY 4 & 1283 R2 Pan-3**/3 3.187 NCB 0.637 1.594 0.956 3.187 OUTLET 3,4 Rehabilitaion work of Dy No. 4 and Direct Outlet NO. 3 and 4 of RBC of Panzara Medium A2 Pan-3**/3 2.87 NCB Project Tal Sakri Dist Dhule For Ch Gangeshwar Maharaj WUA Degaon Tal Sakri Rehabilitaion work of Dy No. 4 and Direct Outlet NO. 3 and 4 of RBC of Panzara Medium A2/1 Pan-3**/3 3.01 NCB 0.87 2.14 3.01 Project Tal Sakri Dist Dhule For Ch Gangeshwar Maharaj WUA Degaon Tal Sakri 2/24/2011 wua_prmpkg_r4 200 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1284 R2 Pan-3**/4 Rehabilitation of the Minors wUA DY 5 , 6 2.369 NCB 0.474 1.185 0.711 2.369 Rehabilitaion work of Dy No. 5 and 6 of RBC of Panzara Medium Project Tal Sakri Dist Dhule A2 Pan-3**/4 2.13 NCB For Ch Koldharmata WUA Degaon Tal Sakri Dist Dhule Rehabilitaion work of Dy No. 5 and 6 of RBC of Panzara Medium Project Tal Sakri Dist Dhule A2/1 Pan-3**/4 2.24 NCB 1.16 1.08 2.24 For Ch Koldharmata WUA Degaon Tal Sakri Dist Dhule Rehabilitation of the Minors wUA DY 7& 1285 R2 Pan-3**/5 1.083 Shopping 0.379 0.704 1.083 OUTLET 5 TO 10 Rehabilitaion work of Dy No. 7 and Direct Outlet NO. 5 and 10 of RBC of Panzara Medium A2 Pan-3**/5 Project Tal Sakri Dist Dhule For Ch Sant 0.97 Shopping Tukaram Maharaj Maharaj WUA Umbhare Tal Sakri Rehabilitaion work of Dy No. 7 and Direct Outlet NO. 5 and 10 of RBC of Panzara Medium A2/1 Pan-3**/5 Project Tal Sakri Dist Dhule For Ch Sant 0.97 Shopping Tukaram Maharaj Maharaj WUA Umbhare Tal Sakri Rehabilitaion work of Dy No. 7 and Direct Outlet NO. 5 and 10 of RBC of Panzara Medium R3 Pan-3**/5 Project Tal Sakri Dist Dhule For Ch Sant 0.97 Shopping 0.388 0.582 0.97 Tukaram Maharaj Maharaj WUA Umbhare Tal Sakri Rehabilitaion work of Dy No. 7 and Direct Outlet NO. 5 and 10 of RBC of Panzara Medium A3/1 Pan-3**/5 Project Tal Sakri Dist Dhule For Ch Sant 0.97 Shopping 0.00 Tukaram Maharaj Maharaj WUA Umbhare Tal Sakri Rehabilitaion work of Dy No. 7 and Direct Outlet NO. 5 and 10 of RBC of Panzara Medium A3/2 Pan-3**/5 Project Tal Sakri Dist Dhule For Ch Sant 0.97 Shopping 0.00 Tukaram Maharaj Maharaj WUA Umbhare Tal Sakri 2/24/2011 wua_prmpkg_r4 201 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitaion work of Dy No. 7 and Direct Outlet NO. 5 and 10 of RBC of Panzara Medium A3/3 Pan-3**/5 Project Tal Sakri Dist Dhule For Ch Sant 1.17 Shopping 0.00 Tukaram Maharaj Maharaj WUA Umbhare Tal Sakri Rehabilitaion work of Dy No. 7 and Direct Outlet NO. 5 and 10 of RBC of Panzara Medium A3/4 Pan-3**/5 Project Tal Sakri Dist Dhule For Ch Sant 1.17 Shopping 0.00 Tukaram Maharaj Maharaj WUA Umbhare Tal Sakri Rehabilitaion work of Dy No. 7 and Direct Outlet NO. 5 and 10 of RBC of Panzara Medium A3/5 Pan-3**/5 Project Tal Sakri Dist Dhule For Ch Sant 1.17 Shopping 0.00 Tukaram Maharaj Maharaj WUA Umbhare Tal Sakri Rehabilitaion work of Dy No. 7 and Direct Outlet NO. 5 and 10 of RBC of Panzara Medium R4 Pan-3**/5 Project Tal Sakri Dist Dhule For Ch Sant 1.17 Shopping 1.17 1.170 Tukaram Maharaj Maharaj WUA Umbhare Tal Sakri Rehabilitation of the Minors wUA DY 8 & 1286 R2 Pan-3**/6 3.043 NCB 0.609 1.522 0.913 3.043 IT' S MINOR Rehabilitaion work of Dy No. 8 and its minor of RBC of Panzara Medium Project Tal Sakri Dist A2 Pan-3**/6 2.74 NCB Dhule For Ch Kanubaimata WUA Malanjan Tal Sakri Dist Dhule Rehabilitaion work of Dy No. 8 and its minor of RBC of Panzara Medium Project Tal Sakri Dist A2/1 Pan-3**/6 2.87 NCB 0.87 2 2.87 Dhule For Ch Kanubaimata WUA Malanjan Tal Sakri Dist Dhule Rehabilitation of the Minors wUA DY 9 & 1287 R2 Pan-3**/7 3.319 NCB 0.664 1.660 0.996 3.319 IT' S MINOR Rehabilitation work of Dy No. 9 and its minor of RBC of Panzara Medium Project Tal Sakri A2 Pan-3**/7 3.00 NCB Dist Dhule For Ch Pragati WUA Dighave Tal Sakri Dist Dhule 2/24/2011 wua_prmpkg_r4 202 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Dy No. 9 and its minor of RBC of Panzara Medium Project Tal Sakri R3 Pan-3**/7 3.10 NCB 1.5 1.6 3.10 Dist Dhule For Ch Pragati WUA Dighave Tal Sakri Dist Dhule Rehabilitation work of Dy No. 9 and its minor of RBC of Panzara Medium Project Tal Sakri R3 Pan-3**/7 3.00 NCB 0.00 Dist Dhule For Ch Pragati WUA Dighave Tal Sakri Dist Dhule Rehabilitation work of Dy No. 9 and its minor of RBC of Panzara Medium Project Tal Sakri R3 Pan-3**/7 3.20 NCB 0.00 Dist Dhule For Ch Pragati WUA Dighave Tal Sakri Dist Dhule Rehabilitation work of Dy No. 9 and its minor of RBC of Panzara Medium Project Tal Sakri R4 Pan-3**/7 3.2 NCB 2.4 0.8 3.200 Dist Dhule For Ch Pragati WUA Dighave Tal Sakri Dist Dhule Rehabilitation of the Minors wUA DY 10, 1288 R2 Pan-3**/8 1.929 NCB 0.386 0.965 0.579 1.929 11& OUTLET 16 Rehabilitaion work of Dy No. 10 and 11 and Direct Outlet No. 12 to 15 of RBC of Panzara Pan- A2 Medium Project Tal Sakri Dist Dhule For Ch 1.73 Shopping 3**/15 Karmameer Tanaji Chiman Patil WUA Dighave Tal Sakri Dist Dhule Rehabilitaion work of Dy No. 10 and 11 and Direct Outlet No. 12 to 15 of RBC of Panzara Pan- A2/1 Medium Project Tal Sakri Dist Dhule For Ch 1.82 Shopping 1.180 0.640 1.82 3**/15 Karmameer Tanaji Chiman Patil WUA Dighave Tal Sakri Dist Dhule Rehabilitation of the Minors wUA DY 12 & 1289 R2 Pan-3**/9 3.617 NCB 0.723 1.809 1.085 3.617 IT' S MINOR Rehabilitation work of Dy No. 12 and its minor of RBC of Panzara Medium Project Tal Sakri A2 Pan-3**/9 3.21 NCB Dist Dhule For Ch Dhandai mata WUA Kasare Tal Sakri Dist Dhule Rehabilitation work of Dy No. 12 and its minor of RBC of Panzara Medium Project Tal Sakri A2/1 Pan-3**/9 3.35 NCB 1.95 1.40 3.35 Dist Dhule For Ch Dhandai mata WUA Kasare Tal Sakri Dist Dhule 2/24/2011 wua_prmpkg_r4 203 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pan- 1290 R2 Rehabilitation of the Minors wUA DY 13 2.969 NCB 0.594 1.485 0.891 2.969 3**/10 Rehabilitaion work of Dy No. 13 of RBC of Pan- Panzara Medium Project Tal Sakri Dist Dhule A2 2.67 NCB 3**/10 For Ch Shri Punai WUA Kasare Tal Sakri Dist Dhule Rehabilitaion work of Dy No. 13 of RBC of Pan- Panzara Medium Project Tal Sakri Dist Dhule A2/1 2.67 NCB 3**/10 For Ch Shri Punai WUA Kasare Tal Sakri Dist Dhule Rehabilitaion work of Dy No. 13 of RBC of Pan- Panzara Medium Project Tal Sakri Dist Dhule R3 2.67 NCB 1 1.67 2.67 3**/10 For Ch Shri Punai WUA Kasare Tal Sakri Dist Dhule Pan- R3 2.67 NCB 0.00 3**/10 Pan- A3 2.85 NCB 0.83 2.02 2.85 3**/10 Pan- Rehabilitation of the Minors wUA DY 14 & 1291 R2 1.058 Shopping 0.370 0.688 1.058 3**/11 OUTLET 17 TO 20 Rehabilitaion work of Dy No. 14 and Direct Pan- Outlet No. 17 to 20 of RBC of Panzara Medium A2 0.94 Shopping 3**/11 Project Tal Sakri Dist Dhule For Ch Dhanlaxmi WUA Chhail Tal Sakri Dist Dhule Rehabilitaion work of Dy No. 14 and Direct Pan- Outlet No. 17 to 20 of RBC of Panzara Medium A2/1 0.95 Shopping 0.480 0.470 0.95 3**/11 Project Tal Sakri Dist Dhule For Ch Dhanlaxmi WUA Chhail Tal Sakri Dist Dhule Pan- Rehabilitation of the Minors wUA DY 15 & 1292 R2 3.382 NCB 0.676 1.691 1.015 3.382 3**/12 OUTLET 15/1 Rehabilitation work of Dy No. 15 and D.O. 15/1 Pan- of RBC of Panzara Medium Project Tal Sakri A2 3.00 NCB 3**/12 Dist Dhule For Ch Kanhyalal Maharaj WUA Chhail Tal Sakri Dist Dhule Rehabilitation work of Dy No. 15 and D.O. 15/1 Pan- of RBC of Panzara Medium Project Tal Sakri A2/1 3.15 NCB 1.5 1.650 3.15 3**/12 Dist Dhule For Ch Kanhyalal Maharaj WUA Chhail Tal Sakri Dist Dhule 2/24/2011 wua_prmpkg_r4 204 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Pan- 1293 R2 Rehabilitation of the Minors wUA DY 16 1.445 Shopping 0.506 0.939 1.445 3**/13 Rehabilitaion work of Dy No. 16 of RBC of Pan- Panzara Medium Project Tal Sakri Dist Dhule A2 1.30 Shopping 3**/13 For Ch Rajeshri Chhatrapati Shahu Maharaj WUA Kasare Tal Sakri Dist Dhule Rehabilitaion work of Dy No. 16 of RBC of Pan- Panzara Medium Project Tal Sakri Dist Dhule A2/1 1.36 Shopping 0.680 0.680 1.36 3**/13 For Ch Rajeshri Chhatrapati Shahu Maharaj WUA Kasare Tal Sakri Dist Dhule Pan- Rehabilitation of the Minors wUA DY 1& 1294 R2 2.761 NCB 0.552 1.381 0.828 2.761 3**/14 OUTLET 1 TO 8 Rehabilitaion work of Dy No. 1 and Direct Pan- Outlet NO. 8 of RBC of Panzara Medium Project A2 0.27 Shopping 3**/14 Tal Sakri Dist Dhule For Ch Kadeshwar Maharaj WUA Pimpalner Tal Sakri Rehabilitaion work of Dy No. 1 and Direct Pan- Outlet NO. 8 of RBC of Panzara Medium Project A2/1 0.27 Shopping 3**/14 Tal Sakri Dist Dhule For Ch Kadeshwar Maharaj WUA Pimpalner Tal Sakri Rehabilitaion work of Dy No. 1 and Direct Pan- Outlet NO. 8 of RBC of Panzara Medium Project A2/2 0.27 Shopping 3**/14 Tal Sakri Dist Dhule For Ch Kadeshwar Maharaj WUA Pimpalner Tal Sakri Rehabilitaion work of Dy No. 1 and Direct Pan- Outlet NO. 8 of RBC of Panzara Medium Project A2/3 0.27 Shopping 3**/14 Tal Sakri Dist Dhule For Ch Kadeshwar Maharaj WUA Pimpalner Tal Sakri Rehabilitaion work of Dy No. 1 and Direct Pan- Outlet NO. 8 of RBC of Panzara Medium Project R3 0.27 Shopping 0.27 0.27 3**/14 Tal Sakri Dist Dhule For Ch Kadeshwar Maharaj WUA Pimpalner Tal Sakri 2/24/2011 wua_prmpkg_r4 205 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitaion work of Dy No. 1 and Direct Pan- Outlet NO. 8 of RBC of Panzara Medium Project A3/1 0.27 Shopping 0.00 3**/14 Tal Sakri Dist Dhule For Ch Kadeshwar Maharaj WUA Pimpalner Tal Sakri Rehabilitaion work of Dy No. 1 and Direct Pan- Outlet NO. 8 of RBC of Panzara Medium Project A3/2 0.27 Shopping 0.00 3**/14 Tal Sakri Dist Dhule For Ch Kadeshwar Maharaj WUA Pimpalner Tal Sakri Rehabilitaion work of Dy No. 1 and Direct Pan- Outlet NO. 8 of RBC of Panzara Medium Project A3/3 0.27 Shopping 0.00 3**/14 Tal Sakri Dist Dhule For Ch Kadeshwar Maharaj WUA Pimpalner Tal Sakri Rehabilitaion work of Dy No. 1 and Direct Pan- Outlet NO. 8 of RBC of Panzara Medium Project R4 0.27 Shopping 0.27 0.270 3**/14 Tal Sakri Dist Dhule For Ch Kadeshwar Maharaj WUA Pimpalner Tal Sakri Pan- Rehabilitation of the Minors wUA DY 10 & 1295 R2 1.318 Shopping 0.461 0.857 1.318 3**/15 OUTLET 13 TO 14 Rehabilitaion work of Dy No. 10 and Direct Pan- Outlet No. 13 to 14 of RBC of Panzara Medium A2 1.16 Shopping 3**/15 Project Tal Sakri Dist Dhule For Ch Shri Saibaba WUA Samode Tal Sakri Dist Dhule Rehabilitaion work of Dy No. 10 and Direct Pan- Outlet No. 13 to 14 of RBC of Panzara Medium A2/1 1.16 Shopping 3**/15 Project Tal Sakri Dist Dhule For Ch Shri Saibaba WUA Samode Tal Sakri Dist Dhule Rehabilitaion work of Dy No. 10 and Direct Pan- Outlet No. 13 to 14 of RBC of Panzara Medium R3 1.16 Shopping 0.16 1 1.16 3**/15 Project Tal Sakri Dist Dhule For Ch Shri Saibaba WUA Samode Tal Sakri Dist Dhule 2/24/2011 wua_prmpkg_r4 206 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitaion work of Dy No. 10 and Direct Pan- Outlet No. 13 to 14 of RBC of Panzara Medium A3/1 1.16 Shopping 0.00 3**/15 Project Tal Sakri Dist Dhule For Ch Shri Saibaba WUA Samode Tal Sakri Dist Dhule Rehabilitaion work of Dy No. 10 and Direct Pan- Outlet No. 13 to 14 of RBC of Panzara Medium A3/2 1.16 Shopping 0.00 3**/15 Project Tal Sakri Dist Dhule For Ch Shri Saibaba WUA Samode Tal Sakri Dist Dhule Rehabilitaion work of Dy No. 10 and Direct Pan- Outlet No. 13 to 14 of RBC of Panzara Medium A3/3 1.16 Shopping 0.00 3**/15 Project Tal Sakri Dist Dhule For Ch Shri Saibaba WUA Samode Tal Sakri Dist Dhule Rehabilitaion work of Dy No. 10 and Direct Pan- Outlet No. 13 to 14 of RBC of Panzara Medium A3/4 1.16 Shopping 0.00 3**/15 Project Tal Sakri Dist Dhule For Ch Shri Saibaba WUA Samode Tal Sakri Dist Dhule Rehabilitaion work of Dy No. 10 and Direct Pan- Outlet No. 13 to 14 of RBC of Panzara Medium A3/5 1.16 Shopping 0.00 3**/15 Project Tal Sakri Dist Dhule For Ch Shri Saibaba WUA Samode Tal Sakri Dist Dhule Rehabilitaion work of Dy No. 10 and Direct Pan- Outlet No. 13 to 14 of RBC of Panzara Medium R4 1.16 Shopping 1.16 1.160 3**/15 Project Tal Sakri Dist Dhule For Ch Shri Saibaba WUA Samode Tal Sakri Dist Dhule 21 Kanholi Kan-3** Rehabilitation of the Minors WUA-5 53.55 WUA 10.71 10.71 16.07 10.71 5.36 53.55 R Kan-3** Rehabilitation of the Minors WUA-5 53.55 WUA 8.03 18.74 24.10 2.68 53.55 Kanholi Nalla Medium Irrigation Project. Rehabilitation & Modernisation of Minors at 1296 R2 Kan-3**/1 WUA level for "JAI JAWAN JAI KISAN Water 8.414 NCB 2.524 5.048 0.841 8.414 Users Association", Kanholibara. Tah - Hingna Dist - Nagpur 2/24/2011 wua_prmpkg_r4 207 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabiliation work of Kanholi Medium Project A2 Kan-3**/1 Tq. Hnigna Distt. Nagpur for Jai Jawan Jai 8.93 NCB 1.53 2.01 2.00 3.39 8.932 Kisan WUA Kanholibara Kanholi Nalla Medium Irrigation Project. Rehabilitation & Modernisation of Minors at 1297 R2 Kan-3**/2 WUA level for "NAVJIWAN Water Users 8.756 NCB 2.627 5.254 0.876 8.756 Association", Kanholibara. Tah - Hingna Dist - Nagpur Rehabiliation work of Kanholi Medium Project A2 Kan-3**/2 Tq. Hnigna Distt. Nagpur for Navjivan WUA 9.29 NCB 1.13 2.87 3.11 2.18 9.294 Kanholibara Kanholi Nalla Medium Irrigation Project. Rehabilitation & Modernisation of Minors at 1298 R2 Kan-3**/3 WUA level for "JANATA Water Users 9.071 NCB 2.721 5.443 0.907 9.071 Association", Khapri (Moreshwar). Tah - Hingna Dist - Nagpur Rehabiliation work of Kanholi Medium Project A2 Kan-3**/3 Tq. Hnigna Distt. Nagpur for Janta WUA Khapri 9.56 NCB 1.43 4.80 3.33 9.559 (Moreshwar) Kanholi Nalla Medium Irrigation Project. Rehabilitation & Modernisation of Minors at 1299 R2 Kan-3**/4 WUA level for "VIKTUBABA Water Users 14.802 NCB 4.441 8.881 1.480 14.802 Association", Takalghat. Tah - Hingna Dist - Nagpur Rehabiliation work of Kanholi Medium Project A2 Kan-3**/4 Tq. Hnigna Distt. Nagpur for Viktubaba WUA 15.03 NCB 1.48 5.38 2.00 6.17 15.028 Takalghat Kanholi Nalla Medium Irrigation Project. Rehabilitation & Modernisation of Minors at 1300 R2 Kan-3**/5 WUA level for "SHETKARI Water Users 5.827 NCB 1.748 3.496 0.583 5.827 Association", Takalghat. Tah - Hingna Dist - Nagpur Rehabiliation work of Kanholi Medium Project A2 Kan-3**/5 Tq. Hnigna Distt. Nagpur for Shetkari WUA 6.21 NCB 1.08 3.88 1.25 6.208 Takalghat 2/24/2011 wua_prmpkg_r4 208 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Kanholi Nalla Medium Irrigation Project. Rehabilitation & Modernisation of Minors at 1301 R2 Kan-3**/6 WUA level for "JAI BHOLE Water Users 14.699 NCB 4.410 8.819 1.470 14.699 Association", Asola. Tah - Hingna Dist - Nagpur Rehabiliation work of Kanholi Medium Proj. R3 Kan-3**/6 Tq. Hingna Distt. Nagpur for Jaibhole WUA 14.51 NCB 7.26 7.26 14.51 Asola Rehabiliation work of Kanholi Medium Proj. A3 Kan-3**/6 Tq. Hingna Distt. Nagpur for Jaibhole WUA 15.88 NCB 15.88 15.88 Asola Total for Medium Projects 4.72 256.09 243.90 66.47 571 R3_Total for Medium Projects 571 R4_Total for Medium Projects 606.47 0.00 0.00 17.49 93.12 211.22 242.34 68.18 632.35 Minor Prtojects WUA/Comm 29 Tithavali TTH-2 Rehabilitation of dist.system 0.84 0.38 0.34 0.13 0.84 unity level WUA/Comm R TTH-2 Rehabilitation of dist.system 0.84 0.21 0.42 0.21 0.84 unity level Shri Dev Gangeshwer water Users Assosiation 1302 R2 TTH -2 2.07 NCB 0.311 1.035 0.725 2.070 Ltd. Tithavali IPI /01/06-07 Rehabilitation of Tithwali M.I.schemeShri. Dev A2 TTH -2 1.008 Shopping Gandheshwar WuaLtd.Tithwali Rehabilitation of Tithwali M.I.schemeShri. Dev A2 TTH -2 1.011 Shopping 0 1.009 1.009 Gandheshwar WuaLtd.Tithwali WUA/Comm 67 Shekdari SHK-2 Rehabilitation of dist.system 25.92 10.37 10.37 5.18 25.92 unity level WUA/Comm R SHK-2 Rehabilitation of dist.system 25.92 3.89 12.96 9.07 25.92 unity level 1)Kapileshwar W.U.A.Ltd.Temburkheda Tq. 1303 R2 SHK-2/1 3.15 NCB 0.16 1.575 1.418 3.150 Warud Rehabilitation work of Shekdari Minor Project Tq. Warud Dist. Amravati For 1)Kapileshwar A2 SHK-2/1 4.13 NCB 3.49 1.08 4.57 W.U.A.Ltd.Temburkheda Tq. Warud (Package SHK-2) 1304 R2 SHK-2/2 2 ) Satpuda W.U.A.Ltd.Temburkheda Tq. Warud 1.70 Shopping 0.09 0.850 0.765 1.700 2/24/2011 wua_prmpkg_r4 209 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Shekdari Minor Project Tq. Warud Dist. Amravati For 2 ) Satpuda A2 SHK-2/2 1.82 Shopping 0.84 0.99 1.83 W.U.A.Ltd.Temburkheda Tq. Warud (Package SHK-2) 1305 R2 SHK-2/3 3)Trivani W.U.A.Ltd.Temburkheda Tq. Warud 2.50 NCB 0.13 1.250 1.125 2.500 Rehabilitation work of Shekdari Minor Project Tq. Warud Dist. Amravati For 3)Trivani A2 SHK-2/3 1.60 Shopping 0.00 1.04 0.57 1.61 W.U.A.Ltd.Temburkheda Tq. Warud (Package SHK-2) 1306 R2 SHK-2/4 4)Baliraja W.U.A.Ltd. Temburkheda Tq. Warud 3.90 NCB 0.20 1.950 1.755 3.900 Rehabilitation work of Shekdari Minor Project Tq. Warud Dist. Amravati For 4)Baliraja A2 SHK-2/4 4.30 NCB 3.51 0.79 4.30 W.U.A.Ltd. Temburkheda Tq. Warud (Package SHK-2) 1307 R2 SHK-2/5 5)Gangotri W.U.A.Ltd. Isambari Tq. Warud 7.50 NCB 0.38 3.750 3.375 7.500 Rehabilitation work of Shekdari Minor Project Tq. Warud Dist. Amravati For 5)Gangotri A2 SHK-2/5 6.46 NCB 0.94 4.46 1.06 6.46 W.U.A.Ltd. Isambari Tq. Warud (Package SHK- 2) 1308 R2 SHK-2/6 6)Trimurti W.U.A.Ltd Jarud Tq.Warud. 3.50 NCB 0.18 1.750 1.575 3.500 Rehabilitation work of Shekdari Minor Project A2 SHK-2/6 Tq. Warud Dist. Amravati For 6)Trimurti 4.15 NCB 0.67 2.90 1.07 4.64 W.U.A.Ltd Jarud Tq.Warud. (Package SHK-2) 1309 R2 SHK-2/7 7)Amrutdhara W.U.A.Ltd. Jarud Tq. Warud 3.05 NCB 0.15 1.525 1.373 3.050 Rehabilitation work of Shekdari Minor Project A2 SHK-2/7 Tq. Warud Dist. Amravati For 7)Amrutdhara 2.34 NCB 0.20 2.00 0.33 2.53 W.U.A.Ltd. Jarud Tq. Warud (Package SHK-2) 1310 R2 SHK-2/8 8)Bhagirath W.U.A.Ltd. Bahada Tq. Warud 2.20 NCB 0.11 1.100 0.990 2.200 Rehabilitation work of Shekdari Minor Project Tq. Warud Dist. Amravati For 8)Bhagirath A2 SHK-2/8 3.79 NCB 0.40 2.04 1.35 3.79 W.U.A.Ltd. Bahada Tq. Warud (Package SHK- 2) 1311 R2 SHK-2/9 9)Trushnatrupti W.U.A.Ltd Benoda Tq. Warud. 2.60 NCB 0.13 1.300 1.170 2.600 2/24/2011 wua_prmpkg_r4 210 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Shekdari Minor Project Tq. Warud Dist. Amravati For 9)Trushnatrupti A2 SHK-2/9 2.54 NCB 1.00 1.20 0.54 2.74 W.U.A.Ltd Benoda Tq. Warud. (Package SHK- 2) WUA/Comm 73 Vyagra VYG-2 Rehabilitation of dist.system 35.61 14.25 14.25 7.12 35.61 unity level WUA/Comm R VYG-2 Rehabilitation of dist.system 35.61 5.34 17.81 12.46 35.61 unity level 1312 R2 VYG-2/1 Vikasganga W.U.A.Dahigaon 2.73 NCB 0.273 1.502 0.956 2.730 Rehabilitation work of Vyaghra Minor Project A2 VYG-2/1 Tq. Motala Dist. Buldana For Vikasganga 2.56 NCB 0 0.00 2.91 2.91 W.U.A.Dahigaon (Package VYG-2) 1313 R2 VYG-2/2 Jay Durge W.U.A.Chinchkhed kd. 3.34 NCB 0.334 1.837 1.169 3.340 Rehabilitation work of Vyaghra Minor Project A2 VYG-2/2 Tq. Motala Dist. Buldana For Jay Durge 4.98 NCB 0 0.00 5.51 5.51 W.U.A.Chinchkhed kd. (Package VYG-2) 1314 R2 VYG-2/3 Jai Jagdamba W.U.A. Wadaji 9.04 NCB 0.904 4.972 3.164 9.040 Rehabilitation work of Vyaghra Minor Project Tq. Motala Dist. Buldana For Jai Jagdamba A2 VYG-2/3 11.45 NCB 0 2.37 10.78 13.15 W.U.A. Wadaji & Main Canal 1 to 14 KM (Package VYG-2) 1315 R2 VYG-2/4 Jaldhara W.U.A.Malegaon 1.42 Shopping 0.142 0.923 0.355 1.420 Rehabilitation work of Vyaghra Minor Project A2 VYG-2/4 Tq. Motala Dist. Buldana For Jaldhara 0.76 Shopping W.U.A.Malegaon (Package VYG-2) Rehabilitation work of Vyaghra Minor Project A2/1 VYG-2/4 Tq. Motala Dist. Buldana For Jaldhara 0.96 Shopping 0.68 0.40 1.08 W.U.A.Malegaon (Package VYG-2) 1316 R2 VYG-2/5 Gokul W.U.A.Malegaon 1.98 NCB 0.198 1.089 0.693 1.980 Rehabilitation work of Vyaghra Minor Project A2 VYG-2/5 Tq. Motala Dist. Buldana For Gokul 1.08 Shopping W.U.A.Malegaon (Package VYG-2) Rehabilitation work of Vyaghra Minor Project A2/1 VYG-2/5 Tq. Motala Dist. Buldana For Gokul 1.13 Shopping 1.00 0.25 1.25 W.U.A.Malegaon (Package VYG-2) 1317 R2 VYG-2/6 Sant Gajanan Maharaj W.U.A.Wadaji 4.72 NCB 0.472 2.596 1.652 4.720 2/24/2011 wua_prmpkg_r4 211 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Vyaghra Minor Project A2 VYG-2/6 Tq. Motala Dist. Buldana For Sant Gajanan 2.39 NCB 0 0.91 0.50 1.41 Maharaj W.U.A.Wadaji (Package VYG-2) 1318 R2 VYG-2/7 Sant Muktabai W.U.A.Harankhed 13.13 NCB 1.313 7.222 4.596 13.130 Rehabilitation work of Vyaghra Minor Project A2 VYG-2/7 Tq. Motala Dist. Buldana For Sant Muktabai 9.10 NCB W.U.A.Harankhed (Package VYG-2) Rehabilitation work of Vyaghra Minor Project A2/1 VYG-2/7 Tq. Motala Dist. Buldana For Sant Muktabai 10.60 NCB 8.77 3.40 12.17 W.U.A.Harankhed (Package VYG-2) 1319 R2 VYG-2/8 Mahabali W.U.A. Aland 4.55 NCB 0.455 2.503 1.593 4.550 Rehabilitation work of Vyaghra Minor Project A2 VYG-2/8 Tq. Motala Dist. Buldana For Mahabali 1.58 Shopping 0 0.00 1.68 1.68 W.U.A. Aland (Package VYG-2) WUA/Comm 75 Manjra MJR-2 Rehabilitation of dist.system 24.19 9.68 9.68 4.84 24.19 unity level WUA/Comm R MJR-2 Rehabilitation of dist.system 24.19 3.63 12.10 8.47 24.19 unity level Rehabilitation of LBC from KM 1 to 6.16 & R4 MAJ-2/1 Minor no 1,2,3,4.Area under Vithal-Rukhmai 10.936 NCB WUA Pimparidurg Rehabilitation of LBC from KM 1 to 6.16 & A4 MAJ-2/1 Minor no 1,2,3,4.Area under Vithal-Rukhmai 11.38 NCB 3.71 7.68 11.38 WUA Pimparidurg Rehabilitation of LBC from KM 6.16 to 9.87 & R4 MAJ-2/2 Minor no 6,7,8. Area under Bhagyodaya WUA 10.945 NCB jalaka Rehabilitation of LBC from KM 6.16 to 9.87 & A4 MAJ-2/2 Minor no 6,7,8. Area under Bhagyodaya WUA 11.48 NCB 4.33 7.15 11.48 jalaka Rehabilitation of Minor no 5 Area under Jai- R4 MAJ-2/3 4.7 NCB Hanuman WUA Raveri Rehabilitation of Minor no 5 Area under Jai- A4 MAJ-2/3 4.92 NCB 1.50 3.42 4.92 Hanuman WUA Raveri Wai WAI-2 2/24/2011 wua_prmpkg_r4 212 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of L.B.C. from Km 1 to 5 & its minor No. 1,2,3 of Wai M.I. Project (Area R4 WAI-2/1 15.720 NCB under Jai Bajrang Water Users Association,Pimplapur) Rehabilitation work of L.B.C. from Km 1 to 5 & its minor No. 1,2,3 of Wai M.I. Project (Area A4 WAI-2/1 15.677 NCB 3.63 12.05 15.68 under Jai Bajrang Water Users Association,Pimplapur) Rehabilitation work of L.B.C. from Km 6 to 12 & its minor No. 4,5,6 & 7 of Wai M.I. Project R4 WAI-2/2 13.630 NCB (Area under Jai Durgamata Water Users Association, Niljai) Rehabilitation work of L.B.C. from Km 6 to 12 & its minor No. 4,5,6 & 7 of Wai M.I. Project A4 WAI-2/2 13.595 NCB 4.24 9.35 13.59 (Area under Jai Durgamata Water Users Association, Niljai) Rehabilitation work of R.B.C. & its minor No. 1, R4 WAI-2/3 2, 3 of Wai M.I. Project (Area under 6.016 NCB JChandikamata Water Users Association,Wai) Rehabilitation work of R.B.C. & its minor No. 1, A4 WAI-2/3 2, 3 of Wai M.I. Project (Area under 6.314 NCB 1.60 4.72 6.31 JChandikamata Water Users Association,Wai) WUA/Comm 78 Ukarwahi UKR-2 Rehabilitation of dist.system 19.48 7.79 7.79 3.90 19.48 unity level WUA/Comm R UKR-2 Rehabilitation of dist.system 19.48 2.92 9.74 6.82 19.48 unity level Ukerwahi Minor Irrigation Project. Rehabilitation & Modernisation of Main Canal & 1320 R2 UKR-2 Minors at WUA level for "Jai Durga Water 20.895 NCB 5.224 10.448 5.224 20.895 Users Association", Ukerwahi Tah - Umred Dist - Nagpur Rehabiliation work of Ukarwahi Minor Project A2 UKR-2 Tq. Umred Distt. Nagpur for Jaidurga WUA 18.46 NCB Ukarwahi Rehabiliation work of Ukarwahi Minor Project A2/1 UKR-2 Tq. Umred Distt. Nagpur for Jaidurga WUA 19.587 NCB 3.09 16.48 19.57 Ukarwahi 2/24/2011 wua_prmpkg_r4 213 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 WUA/Comm 84 Yerawaghu YRW-2 Rehabilitation of dist.system 6.09 2.74 2.44 0.91 6.09 unity level WUA/Comm R YRW-2 Rehabilitation of dist.system 6.09 1.52 3.66 0.91 6.09 unity level WUA/Comm 23 Thakurwadi THK-2 Rehabilitation of dist.system 3.51 1.58 1.40 0.53 3.51 unity level WUA/Comm R THK-2 Rehabilitation of dist.system 3.51 0.88 2.11 0.53 3.51 unity level Late. pandurang Smruti Water User Association, 1321 R2 THK-2 4.107 NCB 1.027 2.054 1.027 4.107 thakurwadi Tal. Murbad Late. pandurang Smruti Water User Association, R3 THK-2 4.11 NCB 2.054 2.054 4.11 thakurwadi Tal. Murbad Late. pandurang Smruti Water User Association, A3/1 THK-2 4.11 NCB thakurwadi Tal. Murbad Late. pandurang Smruti Water User Association, A3/2 THK-2 4.11 NCB thakurwadi Tal. Murbad Late. pandurang Smruti Water User Association, A3/3 THK-2 5.577 NCB 5.577 5.58 thakurwadi Tal. Murbad WUA/Comm 24 Raitale RAI-2 Rehabilitation of dist.system 1.42 0.64 0.57 0.21 1.42 unity level WUA/Comm R RAI-2 Rehabilitation of dist.system 1.42 0.35 0.85 0.21 1.42 unity level Raitale Water User Association, Raitale. Tal. 1322 R2 RAI-2 1.175 Shopping 0.294 0.588 0.294 1.175 Dahanu Rehabiliation of Main Canal & Distribution Net A2 RAI-2 Work of Raitale Minor Irrigation Scheme 1.175 Shopping 0.50 0.68 1.18 Tal.Palghar Dist.Thane Maharashtra-India. WUA/Comm 25 Shrigaon SHR-2 Rehabilitation of dist.system 1.07 0.48 0.43 0.16 1.07 unity level WUA/Comm R SHR-2 Rehabilitation of dist.system 1.07 0.27 0.64 0.16 1.07 unity level 1323 R2 SHR-2 Shrigaon W.U.A.No31Shrigaon. 1.13 Shopping 0.283 0.735 0.113 1.130 Rehabilitation work of P.V.C. pipeline of A2 SHR-2 Shrigaon M.I.Scheme Tal. Alibag, Dist. Raigad 1.186 Shopping 1.19 1.19 Maharashtra-India. 2/24/2011 wua_prmpkg_r4 214 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 WUA/Comm 26 Kondgaon KDG-2 Rehabilitation of dist.system 1.38 0.62 0.55 0.21 1.38 unity level WUA/Comm R KDG-2 Rehabilitation of dist.system 1.38 0.34 0.83 0.21 1.38 unity level 1324 R2 KDG-2 Kondagaon W.U.A.No30 Kondagaon. 1.523 Shopping 0.381 0.990 0.152 1.523 Rehabilitation work of P.V.C. & R.C.C. pipe line A2 KDG-2 of Kondgaon M.I.S. Tal. Sudhagad, Dist. Raigad 1.594 Shopping 1.59 1.59 Maharashtra-India. WUA/Comm 27 Gawane GAW-2 Rehabilitation of dist.system 2.24 1.01 0.90 0.34 2.24 unity level WUA/Comm R GAW-2 Rehabilitation of dist.system 2.24 0.56 1.35 0.34 2.24 unity level WUA/Comm 30 Shirval SHI-2 Rehabilitation of dist.system 2.43 1.09 0.97 0.36 2.43 unity level WUA/Comm R SHI-2 Rehabilitation of dist.system 2.43 0.61 1.46 0.36 2.43 unity level Shri Dev Sateri water Users Assosiation Ltd. 1325 R2 SHI - 2 2.32 NCB Dodamarg.IPI /08/06-07 Rehabilitation of Shirwal M.I.scheme Shri. Dev A2 SHI - 2 2.312 NCB 0 1.877 0.337 2.214 Sateri Wua Dodamarg WUA/Comm 31 Amboli AMB-2 Rehabilitation of dist.system 8.97 3.59 3.59 1.79 8.97 unity level WUA/Comm R AMB-2 Rehabilitation of dist.system 8.97 2.24 4.49 2.24 8.97 unity level Trimbakraj Water Users Co-operative Society, 1326 R2 AMB-2 9.53 NCB 2.383 4.765 2.383 9.530 Amboli, Tal.Trimbakeshwar, Dist.Nashik Rehabilitation Work of AMBOLI M.I. Project Tq. Trambakeshwar, Dist.Nashik (Package AMB- R3 AMB-2 9.254 NCB 4.627 4.627 9.25 2 ) for Trambakraj W.U.A.Ltd. Amboli Tq.Trambakeshwar,Dist_ Nashik Rehabilitation Work of AMBOLI M.I. Project Tq. Trambakeshwar, Dist.Nashik (Package AMB- A3 AMB-2 11.34 NCB 0 0 0.00 0.00 7.54 3.80 0.00 11.34 2 ) for Trambakraj W.U.A.Ltd. Amboli Tq.Trambakeshwar,Dist_ Nashik 2/24/2011 wua_prmpkg_r4 215 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 WUA/Comm 32 Mahirawani MHR-2 Rehabilitation of dist.system 9.90 3.96 3.96 1.98 9.90 unity level WUA/Comm R MHR-2 Rehabilitation of dist.system 9.90 2.48 4.95 2.48 9.90 unity level WUA/Comm 33 Ratnapur RAT-2 Rehabilitation of dist.system 6.55 2.62 2.62 1.31 6.55 unity level WUA/Comm R RAT-2 Rehabilitation of dist.system 6.55 1.64 3.93 0.98 6.55 unity level 1327 R2 RAT-2 Ratnadeep WUA, Ratnapur, Tal : Jamkhed 13.45 NCB 1.345 7.398 4.708 13.450 Rehabilitation work of Ratnapur M. I. Project A2 RAT-2 Tal : Jamkhed, Dist : Ahmednagar for Ratnadeep 7.41 NCB WUA Ratnapur Rehabilitation work of Ratnapur M. I. Project R3 RAT-2 Tal : Jamkhed, Dist : Ahmednagar for Ratnadeep 8.080 NCB 0.500 5.000 2.580 8.08 WUA Ratnapur Rehabilitation work of Ratnapur M. I. Project A3 RAT-2 Tal : Jamkhed, Dist : Ahmednagar for Ratnadeep 7.700 NCB 0.00 0.00 0.00 0.00 0.00 1.70 6.00 7.70 WUA Ratnapur Belapur WUA/Comm 34 BBD-2 Rehabilitation of dist.system 2.41 1.09 0.97 0.36 2.41 Badgi unity level WUA/Comm R BBD-2 Rehabilitation of dist.system 2.41 0.60 1.45 0.36 2.41 unity level WUA/Comm 35 Nimgul NIM-2 Rehabilitation of dist.system 2.66 1.20 1.06 0.40 2.66 unity level WUA/Comm R NIM-2 Rehabilitation of dist.system 2.66 0.66 1.59 0.40 2.66 unity level 1328 R2 NIM-2 Rehabilitation of dist. system 2.877 NCB 0.575 1.439 0.863 2.877 Rehabilitation work of Canal System of Nimgul A2 NIM-2 2.920 NCB 1.160 1.760 2.92 Minor Project Tal Dhule Dist Dhule Hatgaon WUA/Comm 37 HGN-2 Rehabilitation of dist.system 1.57 0.71 0.63 0.24 1.57 No.1 unity level WUA/Comm R HGN-2 Rehabilitation of dist.system 1.57 0.39 0.94 0.24 1.57 unity level Rehabilitation work in the Juridisction A2 HGN-2 of Vasundhara Vaibhav WUA 1.59 Shopping Tamgavhan Tal.Chalisgaon of Hatgaon- 1 M.I.Project 2/24/2011 wua_prmpkg_r4 216 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the Juridisction A2/1 HGN-2 of Vasundhara Vaibhav WUA 1.740 Shopping 1.020 0.720 1.740 Tamgavhan Tal.Chalisgaon of Hatgaon- 1 M.I.Project WUA/Comm 38 Galan GLN-2 Rehabilitation of dist.system 5.10 2.30 2.04 0.77 5.10 unity level WUA/Comm R GLN-2 Rehabilitation of dist.system 5.10 1.28 3.06 0.77 5.10 unity level Rehabilition work in the jurdicition of Harivithal 1329 R2 GLN-2 5.99 NCB 1.198 2.995 1.797 5.990 W U AssoGalan for Right bank Canal Galan Galan M I Tank Tal Pachora dist Jalgaon Rehabilitation work in the jurisdiction A2 GLN-2 of Harivitthal WUA Galan Of Right 5.947 NCB Bank Canal for Galan M.I.Tank. Rehabilitation work in the jurisdiction A2/1 GLN-2 of Harivitthal WUA Galan Of Right 5.947 NCB 0.00 0.00 0.00 0.00 1.44 5.00 0.00 6.440 Bank Canal for Galan M.I.Tank. Khaparkhed WUA/Comm 39 KPK-2 Rehabilitation of dist.system 1.35 0.61 0.54 0.20 1.35 a unity level WUA/Comm R KPK-2 Rehabilitation of dist.system 1.35 0.34 0.81 0.20 1.35 unity level 1330 R2 KPK-2 Rehabilitation of dist. system 1.529 Shopping 0.306 0.765 0.459 1.529 Rehabilation work of canal systme of Khaparkheda M.I. Tal Dist Nandurbar For Ch Jai A2 KPK-2 1.24 Shopping Shivkripa WUA Kondawal Tal Shahada Dist Nandurbar Rehabilation work of canal systme of Khaparkheda M.I. Tal Dist Nandurbar For Ch Jai A2/1 KPK-2 1.24 Shopping Shivkripa WUA Kondawal Tal Shahada Dist Nandurbar Rehabilation work of canal systme of Khaparkheda M.I. Tal Dist Nandurbar For Ch Jai A2/2 KPK-2 1.24 Shopping Shivkripa WUA Kondawal Tal Shahada Dist Nandurbar 2/24/2011 wua_prmpkg_r4 217 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilation work of canal systme of Khaparkheda M.I. Tal Dist Nandurbar For Ch Jai R3 KPK-2 1.240 Shopping 1.240 1.24 Shivkripa WUA Kondawal Tal Shahada Dist Nandurbar Rehabilation work of canal systme of Khaparkheda M.I. Tal Dist Nandurbar For Ch Jai R3 KPK-2 1.24 Shopping 0.00 Shivkripa WUA Kondawal Tal Shahada Dist Nandurbar Rehabilation work of canal systme of Khaparkheda M.I. Tal Dist Nandurbar For Ch Jai A3/1 KPK-2 1.41 Shopping 0.00 Shivkripa WUA Kondawal Tal Shahada Dist Nandurbar Rehabilation work of canal systme of Khaparkheda M.I. Tal Dist Nandurbar For Ch Jai A3/2 KPK-2 1.41 Shopping 0.00 Shivkripa WUA Kondawal Tal Shahada Dist Nandurbar Rehabilation work of canal systme of Khaparkheda M.I. Tal Dist Nandurbar For Ch Jai R4 KPK-2 1.41 Shopping 1.410 1.410 Shivkripa WUA Kondawal Tal Shahada Dist Nandurbar WUA/Comm 40 Kodhawal KOD-2 Rehabilitation of dist.system 2.48 1.12 0.99 0.37 2.48 unity level WUA/Comm R KOD-2 Rehabilitation of dist.system 2.48 0.62 1.49 0.37 2.48 unity level 1331 R2 KOD-2 Rehabilitation of dist. system 2.889 NCB 0.578 1.445 0.867 2.889 Rehabilation work of canal systme of Kondawal A2 KOD-2 M.I. Tal Shahada Dist Nandurbar For Ch 2.960 NCB 2.960 2.96 Krunmocheshwar WUA JayNagar Tal Shahada WUA/Comm 41 Wafgaon WAF-2 Rehabilitation of dist.system 2.42 1.09 0.97 0.36 2.42 unity level WUA/Comm R WAF-2 Rehabilitation of dist.system 2.42 0.60 1.45 0.36 2.42 unity level 1332 R2 WAF-2 Muktadevi WUA, Wafgaon, Tal : Khed 12.60 NCB 1.260 6.930 4.410 12.600 Rehabilitation work of Wafgaon M. I. Project A2 WAF-2 Tal : Khed, Dist : Pune for Muktaidevi WUA 9.420 NCB 0.00 0.00 0.00 1.48 2.000 5.94 0.00 9.420 Wafgaon WUA/Comm 42 Shirsuphal SUP-2 Rehabilitation of dist.system 1.43 0.64 0.57 0.21 1.43 unity level 2/24/2011 wua_prmpkg_r4 218 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 WUA/Comm R SUP-2 Rehabilitation of dist.system 1.43 0.36 0.86 0.21 1.43 unity level 1333 R2 SUP-2 Shirsai WUA, Rawangaon, Tal : Daund 5.88 NCB 0.588 3.234 2.058 5.880 Rehabilitation work of Shirsuphal M. I. Project R3 SUP-2 Tal : Baramati, Dist : Pune for Shirsai WUA 3.610 NCB 1.000 1.610 1.000 3.61 Rawangaon Rehabilitation work of Shirsuphal M. I. Project A3 SUP-2 Tal : Baramati, Dist : Pune for Shirsai WUA 3.390 NCB 0.00 0.00 0.00 0.00 1.00 2.39 0.00 3.39 Rawangaon WUA/Comm 43 Aatpadi AAT-2 Rehabilitation of dist.system 23.01 9.21 9.21 4.60 23.01 unity level WUA/Comm R Rehabilitation of dist.system 23.01 3.45 11.51 8.05 23.01 unity level 1334 R2 AAT-2/1 Atpadi WUA Atpadi 7.05 NCB 1.410 3.525 2.115 7.050 Rehabilitation work of ATPADI MI Project Tal. A2 AAT-2/1 Atpadi Dist. Sangli (Package No. AAT II)for 7.526 NCB 3.126 4.400 7.526 Atpadi Tank WUA No.1 Atpadi 1335 R2 AAT-2/2 Shrimant Babasaheb Deshmukh WUA Atpadi 18.57 NCB 3.714 9.285 5.571 18.570 Rehabilitation work of ATPADI MI Project Tal. A2 AAT-2/2 Atpadi Dist. Sangli (Package No. AAT II)for 18.525 NCB 0 0 2.778 15.747 18.525 Babasaheb Deshmukh WUA Atpadi . WUA/Comm 44 Shegaon SHE-2 Rehabilitation of dist.system 7.14 3.21 2.86 1.07 7.14 unity level WUA/Comm R SHE-2 Rehabilitation of dist.system 7.14 1.79 4.29 1.07 7.14 unity level 1336 R2 SHE - 2 Jaysahakar WUA Shegaon 14.54 NCB 3.635 7.270 3.635 14.540 Rehabilitation work of SHEGAON MI Project A2 SHE - 2 Tal. Jath Dist. Sangli (Package No. SHE II)for 15.488 NCB 0.950 5.053 9.482 15.485 Jaisahakar WUA Shegaon. WUA/Comm 45 Hingangaon HIN-2 Rehabilitation of dist.system 2.67 1.20 1.07 0.40 2.67 unity level WUA/Comm R HIN-2 Rehabilitation of dist.system 2.67 0.67 1.60 0.40 2.67 unity level 1337 R2 HIN-2 Bhiaranath WUA, Hingaongaon, Tal : Phaltan 2.99 NCB 0.748 1.495 0.748 2.990 Rehabilitation work of Hingangaon M. I. Project A2 HIN-2 Tal : Phaltan, Dist : Satara for Bhairvnath WUA 2.98 NCB Hingangaon 2/24/2011 wua_prmpkg_r4 219 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Hingangaon M. I. Project A2/1 HIN-2 Tal : Phaltan, Dist : Satara for Bhairvnath WUA 3.06 NCB Hingangaon Rehabilitation work of Hingangaon M. I. Project R3 HIN-2 Tal : Phaltan, Dist : Satara for Bhairvnath WUA 3.680 NCB 0.500 2.000 1.180 3.68 Hingangaon Rehabilitation work of Hingangaon M. I. Project A3 HIN-2 Tal : Phaltan, Dist : Satara for Bhairvnath WUA 2.978 NCB 0.00 0.00 0.00 0.00 0.00 2.98 0.00 2.98 Hingangaon WUA/Comm 47 Hotgi HOT-2 Rehabilitation of dist.system 20.09 8.04 8.04 4.02 20.09 unity level WUA/Comm R HOT-2 Rehabilitation of dist.system 20.09 3.01 10.05 7.03 20.09 unity level (1)REHABILITATION & MODERIZATION OF MAIN CANAL KM.0/000 TO 7/680 AND 1338 R2 HOT-2/1 MINORS NO 1 & 2 OF HOTAGI M.I.TANK 11.00 NCB 3.300 6.600 1.100 11.000 TAL:SOUTH SOLAPUR , DIST-SOLAPUR ( SHIVACHARYA WUA HOTGI) (1) Rehabilation & Moderization of Main Canal KM.0/000 to 7/680 and Minors No 1 & 2 of A2 HOT-2/1 Hotagi M.I.Tank Tal; South Solapur , Dist- 10.360 NCB 1.410 4.620 4.260 1.430 11.720 Solapur (NCB-3) (Shivacharya WUA Hotagi) (Package HOT-2) (2)REHABILITATION & MODERIZATION OF MAIN CANAL KM.7/680 TO 11/380 AND 1339 R2 HOT-2/2 MINOR NO 3,4 & 5 OF HOTAGI M.I.TANK 8.62 NCB 2.586 5.172 0.862 8.620 TAL:SOUTH SOLAPUR , DIST-SOLAPUR ( REVALSIDHA WUA MADRE) (2) Rehabilation & Moderization of Main Canal KM.7/680 to 11/380 and Minor No 3,4 & 5 of A2 HOT-2/2 Hotagi M.I.Tank Tal; South Solapur , Dist- 8.360 NCB 0.780 0.720 4.590 3.430 9.520 Solapur (NCB-6) ( Revalsidha WUA Madre) (Package HOT-2) WUA/Comm 48 Pathri PTH-2 Rehabilitation of dist.system 9.37 4.22 3.75 1.41 9.37 unity level WUA/Comm R PTH-2 Rehabilitation of dist.system 9.37 2.34 4.68 2.34 9.37 unity level 2/24/2011 wua_prmpkg_r4 220 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 (1)REHABILITATION & MODERIZATION OF MAIN CANAL KM. 8/000 TO 11/000 AND MAMDAPUR AND KHAMGAON Dy. OF 1340 R2 PTH-2/1 3.75 NCB 1.125 2.250 0.375 3.750 PATHARI M.I.TANK TAL:BARSHI DIST-SOLAPUR ( SANJIVANI WUA GHARI) (1) Rehabilation & Moderization of Main Canal KM. 8/000 to 11/000 & Mamdapur Dist And A2 PTH-2/1 Khamgaon Dist. of Pathari M.I.Tank Tal: Barshi 3.68 NCB 0.44 0.86 1.77 3.070 Dist -Solapur (NCB-5) ( Sanjivani WUA Ghari) (PackagePTH-2) (2)REHABILITATION & MODERIZATION OF MAIN CANAL KM. 0/000 TO 8/000 AND GHARI Dy of PATHARI M.I.TANK 1341 R2 PTH-2/2 TAL:BARSHI, DIST-SOLAPUR ( MAHADEO 6.91 NCB 2.073 4.146 0.691 6.910 WUA PATHRI) (2) Rehabilation & Moderization of Main Canal KM. 0/000 to 8/000 and Ghari Dist. Pathari A2 PTH-2/2 M.I.Tank Tal: Barshi Dist -Solapur 6.41 NCB 0 2.3 4.58 6.880 (NCB-19) ( Mahadeo WUA Pathari) (PackagePTH-2) WUA/Comm 49 Shendri SHN-2 Rehabilitation of dist.system 0.77 0.35 0.31 0.12 0.77 unity level WUA/Comm R SHN-2 Rehabilitation of dist.system 0.77 0.19 0.46 0.12 0.77 unity level 1342 R2 SHN 2 Shri. Kalbhairav WUA Shindre 0.87 Shopping 0.218 0.566 0.087 0.870 Rehabilitation work of SHENDRI MI Project A2 SHN 2 Tal. Gadhinglaj Dist.Kolhapur (Package No. 0.795 Shopping SHN II)for Kalbhairav WUA Shendri. Rehabilitation work of SHENDRI MI Project A2/1 SHN 2 Tal. Gadhinglaj Dist.Kolhapur (Package No. 0.85 Shopping 0 0.542 0 0.542 SHN II)for Kalbhairav WUA Shendri. WUA/Comm 50 Kandalgaon KDL-2 Rehabilitation of dist.system 2.55 1.15 1.02 0.38 2.55 unity level WUA/Comm R KDL-2 Rehabilitation of dist.system 2.55 0.64 1.53 0.38 2.55 unity level 1343 R2 KDL 2 Mahalaxmi WUA Kandalgaon 2.72 NCB 0.544 1.360 0.816 2.720 2/24/2011 wua_prmpkg_r4 221 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of KANDALGAON MI A2 KDL 2 Project Tal. Karveer Dist.Kolhapur (Package No. 2.86 NCB 0 0.496 0.466 1.898 2.860 KDL II)forMahalaxmi WUA Kandalgaon. WUA/Comm 51 Ranjangaon RJN-2 Rehabilitation of dist.system 4.64 2.09 1.86 0.70 4.64 unity level WUA/Comm R RJN-2 Rehabilitation of dist.system 4.64 1.16 2.79 0.70 4.64 unity level Devi Daxayani Water User Association, Ltd. 1344 R2 RJN-2 4.25 NCB 0.850 2.126 1.276 4.252 Rangangaon Tq. Gangapur Rehablitation of Canal & Distributory of Ranjangaon M. I. Tank Tq.Gangapur A2 RJN-2 3.99 NCB 0 0 0 1.60 2.36 0.04 0.00 4.00 Dist.Aurangabad. For Devi Daxayani WUA Ltd. Ranjangaon WUA/Comm 54 Bharaj BHA-2 Rehabilitation of dist.system 4.91 2.21 1.96 0.74 4.91 unity level WUA/Comm R BHA-2 Rehabilitation of dist.system 4.91 1.23 2.95 0.74 4.91 unity level Shamgir Baba Water User Association, Bharaj 1345 R2 BHA-2 5.525 NCB 1.105 2.763 1.658 5.525 Tq. Jafrabad. Rehablitation of Canal & Distributory of Bharaj M. I. Tank Tq.Jafrabad Dist. Jalna. For Shamgir A2 BHA-2 5.78 NCB 0 0 0 2.59 1.07 2.10 0.00 5.76 Baba WUA Ltd. Bharaj WUA/Comm 55 Pimparala PPL-2 Rehabilitation of dist.system 7.94 3.18 3.18 1.59 7.94 unity level WUA/Comm R PPL-2 Rehabilitation of dist.system 7.94 1.99 3.97 1.99 7.94 unity level 1346 R2 PPL 2 Pimprala M.I.Tank Tq.Hadgaon 20.01 NCB 4.002 10.005 6.003 20.010 Rehabilitation of Distribution system of canal of Pimprala M.I.Tank Tq. Hadghaon, Dist. Nanded R3 PPL 2 11.338 NCB 1.7007 6.8028 2.834 11.34 for for Mahatma Basweshwar W.U.A.Ltd, Pimprala Rehabilitation work for main canal of Pimparala R4 PPL 2 0 NCB M.I.Project WUA/Comm 56 Nichpur NCH-2 Rehabilitation of dist.system 2.20 0.99 0.88 0.33 2.20 unity level WUA/Comm R NCH-2 Rehabilitation of dist.system 2.20 0.55 1.32 0.33 2.20 unity level 1347 R2 NCH 2 Nichpur M.I.Tank Tq.Kinwat 2.878 NCB 1.007 1.871 2.878 2/24/2011 wua_prmpkg_r4 222 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Canal system for A2 NCH 2 Nichpur M.I.Tank Tq.Kinwat Dist. Nanded for 3.651 NCB 0 0.00 0 1.27 0.00 2.38 0.00 3.65 Dharbaji Darade W.U.A. Ltd., Nichpur. WUA/Comm 57 Tandulwadi TAN-2 Rehabilitation of dist.system 5.66 2.55 2.26 0.85 5.66 unity level WUA/Comm R TAN-2 Rehabilitation of dist.system 5.66 1.42 3.40 0.85 5.66 unity level Shri.Sant Mahipati Water User Association Ltd. 1348 R2 TAN-2 6.25 NCB 1.563 3.125 1.563 6.250 Tandulwadi Tq.Palam Rehablitation work of Tandulwadi M. I. Project Tq. Palam Dist. Parbhani, For Shri Sant A2 TAN-2 8.79 NCB 0 0 0 0.475 0.4 3.91 4.785 Mahipati Maharaj WUA Ltd. Tandulwadi Tq. Palam. WUA/Comm 58 Mandvi MDV-2 Rehabilitation of dist.system 5.31 2.39 2.12 0.80 5.31 unity level WUA/Comm R MDV-2 Rehabilitation of dist.system 5.31 1.33 3.18 0.80 5.31 unity level Late Wamanrao Bordikar Water User 1349 R2 MDV-2 2.65 NCB 0.663 1.325 0.663 2.650 Association Ltd. Kharadi Tq.Jintoor Rehablitation work of Mandvi M. I. Project A2 MDV-2 Tq.Jintur Dist. Parbhani, For Late Wamanrao 5.81 NCB 0 1.51 0.4 3.908 5.818 Bordikar WUA Ltd. Khardadi Tq.Jintur WUA/Comm 59 Walki WLK-2 Rehabilitation of dist.system 3.65 1.64 1.46 0.55 3.65 unity level WUA/Comm R WLK-2 Rehabilitation of dist.system 3.65 0.91 2.19 0.55 3.65 unity level 1350 R2 WAL 2 Walki M.I.Tank 3.63 NCB 1.271 2.360 3.630 Rehabilitation work of Canal system for Walki A2 WAL 2 M.I.Tank, Tq.Aundha (N) Dist. Hingoli for Shri 3.606 NCB 0 0.00 0 0.98 1.35 1.28 0.00 3.61 Krapa W.U.A. Ltd., Walki WUA/Comm 60 Kalamnuri KLM-2 Rehabilitation of dist.system 15.01 6.00 6.00 3.00 15.01 unity level WUA/Comm R KLM-2 Rehabilitation of dist.system 15.01 2.25 7.51 5.25 15.01 unity level 1352 R2 KLM-2 Kalamnuri M.I.Tank 16.6 NCB 3.320 8.300 4.980 16.600 2/24/2011 wua_prmpkg_r4 223 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Canal system for A2 KLM-2 Kalamnuri M.I.Tank Tq.Kalamnuri Dist.Hingoli 16.317 NCB 0 0.00 0 0.26 2.96 13.10 0.00 16.32 for Shri Sant Dudhari W.U.A.Ltd, Salegaon. WUA/Comm 61 Belgaon BEL-2 Rehabilitation of dist.system 1.76 0.79 0.70 0.26 1.76 unity level WUA/Comm R BEL-2 Rehabilitation of dist.system 1.76 0.44 1.06 0.26 1.76 unity level Rehabilitation of Main Canal/ Minors under 1353 R2 BEL-2 jurisdiction of Jagdamba W.U.A. on Belgaon 1.77 Shopping 0.443 1.151 0.177 1.770 minor Project Tq. Ashti Dist. Beed Rehabilitation work in jurisdiction of Jagdamba A2 BEL-2 1.95 Shopping 0.00 0.00 0.00 0.71 1.24 0.00 0.00 1.950 W.U.A. Belgaon M.I. Project WUA/Comm 62 Golangari GOL-2 Rehabilitation of dist.system 3.39 1.53 1.36 0.51 3.39 unity level WUA/Comm R GOL-2 Rehabilitation of dist.system 3.39 0.85 2.04 0.51 3.39 unity level Rehabilitation of main canal & Distributories under jurisdiction of Bhairavnath WUA on 1354 R2 GOL-2 3.73 NCB 0.933 1.865 0.933 3.730 Golangri minor Irrigation Project Tq. Beed Dist. Beed Rehabilitation work of Bhairavnath W.U.A. on A2 GOL-2 3.9 NCB 0.00 0.00 0.00 0.42 3.40 0.00 0.00 3.820 R.F. Canal of Golangri M.I.Poject Bhutekarwa WUA/Comm 63 BKD-2 Rehabilitation of dist.system 10.94 4.37 4.37 2.19 10.94 di unity level WUA/Comm R BKD-2 Rehabilitation of dist.system 10.94 2.73 5.47 2.73 10.94 unity level Rehabilitation of Main Canal/ Minors under 1355 R2 BKD-2 jurisdiction of Bapuji W.U.A.on Bhutekarwadi 11.99 NCB 2.998 5.995 2.998 11.990 minor Project Tq. Ahmedpur Dist. Latur Rehabilitation work of Bapuji WUA on A2 BKD-2 12.49 NCB 0.00 0.00 0.75 6.62 5.63 0.00 0.00 13.00 Bhutekarwadi M.I. Project WUA/Comm 64 Badur BAD-2 Rehabilitation of dist.system 2.45 1.10 0.98 0.37 2.45 unity level WUA/Comm R BAD-2 Rehabilitation of dist.system 2.45 0.61 1.47 0.37 2.45 unity level 2/24/2011 wua_prmpkg_r4 224 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 WUA/Comm 65 Bagalwadi BAG-2 Rehabilitation of dist.system 1.96 0.88 0.78 0.29 1.96 unity level WUA/Comm R BAG-2 Rehabilitation of dist.system 1.96 0.49 1.18 0.29 1.96 unity level Rehabilitation of Main Canal Distributories/ minors under jurisdiction of Jai Hanuman WUA 1356 R2 BAG-2 2.12 NCB 0.530 1.060 0.530 2.120 No.1 on L.B. Canal of Bagalwadi Minor Irrigation Tank Tq. Tuljapur Dist. Osmanabad Rehabilitation work of Jai Hanuman W.U.A. A2 BAG-2 2.21 NCB 0.00 0.00 0.00 0.55 1.53 0.13 0.00 2.21 No.1 on Bagalwadi M.I. Project WUA/Comm 66 Yemai YEM-2 Rehabilitation of dist.system 4.76 2.14 1.90 0.71 4.76 unity level WUA/Comm R YEM-2 Rehabilitation of dist.system 4.76 1.19 2.86 0.71 4.76 unity level Rehabilitation of R.B. main canal Km from 0 to 2.56 of Yemai M.I. Tank under the jurisdiction 1357 R2 YEM-2/1 1.9 NCB 0.475 0.950 0.475 1.900 of Jagdamba WUA Dhanegaon Tq. Tuljapur Dist. Osmanabad Rehabilatation of distributories/ minors under A2 YEM-2/1 1.99 NCB 0.00 0.00 0.00 0.64 1.35 0.00 0.00 1.99 jurisdiction of Jagdamba WUA No.1 Rehabilitation of R.B. main canal Km from 2.56 to 3.70 of Yemai M.I. Tank under the 1358 R2 YEM-2/2 3.2 NCB 0.800 1.600 0.800 3.200 jurisdiction of Yemai No.2 WUA Dhanegaon Tq. Tuljapur Dist. Osmanabad Rehabilatation of distributories/ minors under A2 YEM-2/2 3.42 NCB 0.00 0.00 0.00 1.00 2.42 0.00 0.00 3.42 jurisdiction of Yemai No.2 WUA WUA/Comm 70 Mozari MOZ-2 Rehabilitation of dist.system 12.98 5.19 5.19 2.60 12.98 unity level WUA/Comm R MOZ-2 Rehabilitation of dist.system 12.98 3.24 6.49 3.24 12.98 unity level 1359 R2 MOZ-2 Warahad W.U.A. Sonkhas 14.77 NCB 1.477 8.124 5.170 14.770 Rehabilitation work of Mozari Minor Project A2 MOZ-2 Tq. Barshi Takli Dist. Akola For Warahad 12.98 NCB W.U.A. Sonkhas (Package MOZ-2) Rehabilitation work of Mozari Minor Project A2/1 MOZ-2 Tq. Barshi Takli Dist. Akola For Warahad 12.98 NCB W.U.A. Sonkhas (Package MOZ-2) 2/24/2011 wua_prmpkg_r4 225 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Mozari Minor Project A2 MOZ-2 Tq. Barshi Takli Dist. Akola For Warahad 12.98 NCB W.U.A. Sonkhas (Package MOZ-2) Rehabilitation work of Mozari Minor Project A2/1 MOZ-2 Tq. Barshi Takli Dist. Akola For Warahad 15.07 NCB 3.27 13.99 17.26 W.U.A. Sonkhas (Package MOZ-2) WUA/Comm 71 Adol ADO-2 Rehabilitation of dist.system 14.38 5.75 5.75 2.88 14.38 unity level WUA/Comm R ADO-2 Rehabilitation of dist.system 14.38 3.59 7.19 3.59 14.38 unity level R3 ADO-2/1 a)Shri Murdeshwar water users Association Ritha 23.3 NCB 13.98 9.32 23.30 Rehabilitation of Distribution system of RBC A3 ADO-2/1 Main canal and minors of Adol Project.Shri 14.87 NCB 1.29 9.63 3.95 14.870 Murdeshwar water users Association Rithad R3 ADO-2/2 b)Shri Gajanan Maharaj wua Shirsala. NCB 0.00 Rehabilitation of Distribution system of LBC A3 ADO-2/2 Main canal and minors of Adol M.I. Project.Shri 6.537 NCB 3.01 1.56 1.97 6.537 Gajanan Maharaj wua Shirsala. WUA/Comm 72 Singdoh SIN-2 Rehabilitation of dist.system 3.61 1.62 1.44 0.54 3.61 unity level WUA/Comm R SIN-2 Rehabilitation of dist.system 3.61 0.90 2.17 0.54 3.61 unity level 1360 R2 SIN-2 Singdoh W.U.A.Singdoh 6.41 NCB 0.32 3.205 2.885 6.410 Rehabilitation work of Singhdoh Minor Project A2 SIN-2 Tq. Mangrulpir Dist. Washim For Singdoh 4.4 NCB 0.00 0.03 0.03 0.00 3.68 0.74 0.00 4.475 W.U.A.Singdoh (Package SIN-2) WUA/Comm 74 Vidrupa VDR-2 Rehabilitation of dist.system 13.81 5.52 5.52 2.76 13.81 unity level WUA/Comm R VDR-2 Rehabilitation of dist.system 13.81 3.45 6.91 3.45 13.81 unity level R3 VDR-2/1 a) Satwai water users Association , Dhanora 26.464 NCB 15.88 10.59 26.46 Modernisation & Repairs to Main canal from RD 0 To 6810 M. & Minor No.1 & 2 of Vidrupa A3 VDR-2/1 11.452 NCB 1.644 6.456 3.35 11.452 Project. Satwai water users Association , Dhanora b) Changdevi water users Association, R3 VDR-2/2 NCB 0.00 Changephal 2/24/2011 wua_prmpkg_r4 226 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Modernisation & Repairs to Distributory & its A3 VDR-2/2 Sub-Minor of Vidrupa Project.Changdevi water 3.818 NCB 0.500 2.240 1.08 3.818 users Association, Changephal c) Vitthal Rukhmai water users Association R3 VDR-2/3 NCB 0.00 ,Rumhna Modernisation & Repairs to Main canal from RD 6810 To 13180 M. & Minor No.3,4 & 5 of A3 VDR-2/3 6.653 NCB 0.655 4.055 1.94 6.653 Vidrupa Project.Vitthal Rukhmai water users Association ,Rumhna WUA/Comm 77 Zilpa ZIL-2 Rehabilitation of dist.system 7.55 3.40 3.02 1.13 7.55 unity level WUA/Comm R ZIL-2 Rehabilitation of dist.system 7.55 1.89 4.53 1.13 7.55 unity level Zilpa Minor Irrigation Project. Rehabilitation & Modernisation of Main Canal & Minors at WUA 1361 R2 ZIL-2 8.841 NCB 2.210 4.421 2.210 8.841 level for "SHRIRAM Water Users Association", Zilpa. Tah - Katol Dist - Nagpur Rehabiliation work of Zilpa Minor Project Tq. A2 ZIL-2 6.387 NCB Katol Distt. Nagpur for Shriram WUAZilpa WUA/Comm 82 Itoli ITO-2 Rehabilitation of dist.system 5.88 2.65 2.35 0.88 5.88 unity level WUA/Comm R ITO-2 Rehabilitation of dist.system 5.88 unity level Itoli Pani Wapar Sanstha Itoli Regd No. 1362 R2 ITO-2 4.93 NCB 1.233 2.465 1.233 4.930 2/EE.CID, Chandrapur Dt. 1.7.06 Rehabilation work of Itoli M.I. Project Tq. A2 ITO-2 Ballarpur Distt. Chandrapur for Itoli Pani Wapar 2.099 NCB 0 0 0 0.91 0.38 0.81 0.00 2.10 Sanstha Itoli. WUA/Comm 85 Ashti ASH-2 Rehabilitation of dist.system 9.09 3.64 3.64 1.82 9.09 unity level WUA/Comm R ASH-2 Rehabilitation of dist.system 9.09 2.27 4.54 2.27 9.09 unity level Harit-Kranti PaniWapar Sanstha Asti Regd 1363 R2 ASH-2 No. 6/EE.WID, Wardha 12.38 NCB 3.095 6.190 3.095 12.380 Dt. 20.12.2007 2/24/2011 wua_prmpkg_r4 227 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilation work of Asti M.I. Tq. Ashti, Dist. A2 ASH-2 Wardha for Harit-Kranti PaniWapar Sanstha 9.85 NCB 0.00 0.00 0.00 5.19 4.79 0.55 0.00 10.53 Asti WUA/Comm 86 Savangi SAV-2 Rehabilitation of dist.system 8.15 3.26 3.26 1.63 8.15 unity level WUA/Comm R SAV-2 Rehabilitation of dist.system 8.15 2.04 4.07 2.04 8.15 unity level Bali Raja PaniWapar Sahkari Sanstha 1364 R2 SAV-2 Sawangi Regd No. 2/EE.WID, Wardha 6.78 NCB 1.695 3.390 1.695 6.780 Dt. 20.12.2007 Rehabilation work of Sawangi M.I. Project Tq. A2 SAV-2 Arvi Distt. Wardha for Bali Raja PaniWapar 3.321 NCB 0.00 0.00 0.00 1.13 1.05 1.32 0.00 3.50 Sahkari Sanstha Sawangi WUA/Comm 91 Bhalawani BLW-2 Rehabilitation of dist.system 9.12 4.10 3.65 1.37 9.12 unity level WUA/Comm R BLW-2 Rehabilitation of dist.system 9.12 unity level 1365 R2 BLW-2 Shri Dhokeshwar WUA 7.307 NCB 1.827 3.654 1.827 7.307 Shri Kapri Water User's AssociationBhalawani A2 BLW-2 NCB Tal. Parner Dist. Ahmednagar Shri Kapri Water User's AssociationBhalawani A2/1 BLW-2 7.03 NCB 0 0 0.00 2.05 1.23 3.75 0.00 7.030 Tal. Parner Dist. Ahmednagar WUA/Comm 93 Tikhol TIK-2 Rehabilitation of dist.system 6.42 2.89 2.57 0.96 6.42 unity level WUA/Comm R TIK-2 6.42 1.61 3.85 0.96 6.42 unity level 1366 R2 TIK-2 Shri Kapri WUA 9.689 NCB 2.422 4.845 2.422 9.689 Shri Dhokeshwar Water User's A2 TIK-2 AssociationTakli Dhokeshwar Tal. Parner Dist. 7.44 NCB 0 0 2.85 1.43 3.54 0.00 0.00 7.82 Ahmednagar Mohari WUA/Comm 94 MHP-2 Rehabilitation of dist.system 4.04 1.82 1.62 0.61 4.04 Pathardi unity level WUA/Comm R MHP-2 Rehabilitation of dist.system 4.04 unity level 1367 R2 MHP-2 Shri Renukadevi WUA 4.226 NCB 1.057 2.113 1.057 4.226 2/24/2011 wua_prmpkg_r4 228 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Shri Renuka Devi Water User's Association A2 MHP-2 3.92 NCB 0 0 0.91 2.91 0.27 0.00 0.00 4.09 Kargaon Tal. Pathardi Dist. Ahmednagar WUA/Comm 95 Dastapur DAS-2 Rehabilitation of dist.system 5.73 2.58 2.29 0.86 5.73 unity level WUA/Comm R DAS-2 Rehabilitation of dist.system 5.73 1.43 3.44 0.86 5.73 unity level 1)Banjaribaba W.U.A.Ltd Talegaon Th. Tq. 1368 R2 DAS-2 6.70 NCB 0.34 3.350 3.015 6.700 Tiosa. Rehabilitation work of Dastapur Minor Project Tq. Amravati Dist. Amravati For A2 DAS-2 6.23 NCB 3.55 2.68 6.23 1)Banjaribaba W.U.A.Ltd Talegaon Th. Tq. Tiosa. (Package DAS-2) WUA/Comm 96 Malkhed MAL-2 Rehabilitation of dist.system 25.93 10.37 10.37 5.19 25.93 unity level WUA/Comm R MAL-2 Rehabilitation of dist.system 25.93 3.89 12.96 9.07 25.93 unity level 1369 R2 MAL-2/1 1)Shivar W.U.A.Ltd. Baslapur Tq.Chandur Rly. 5.40 NCB 0.27 2.700 2.430 5.400 Rehabilitation work of Malkhed Minor Project Tq.C.Rly Dist. Amravati For 1)Shivar A2 MAL-2/1 6.50 NCB 1.45 1.82 3.46 6.73 W.U.A.Ltd. Baslapur Tq.Chandur Rly. (Package MAL-2) 2)Bhagirath W.U.A.Ltd. Chandur Rly 1370 R2 MAL-2/2 5.70 NCB 0.29 2.850 2.565 5.700 Tq.Chandur Rly. Rehabilitation work of Malkhed Minor Project Tq. C.Rly Dist. Amravati For 2)Bhagirath A2 MAL-2/2 6.50 NCB 0.45 0.00 6.05 6.50 W.U.A.Ltd. Chandur Rly Tq.Chandur Rly. (Package MAL-2) 3)Pataleshwar W.U.A.Ltd. Manjarkhed 1371 R2 MAL-2/3 3.80 NCB 0.19 1.900 1.710 3.800 Tq.Chandur Rly. Rehabilitation work of Malkhed Minor Project Tq. C.Rly Dist. Amravati For 3)Pataleshwar A2 MAL-2/3 4.59 NCB 0.82 3.49 0.11 4.42 W.U.A.Ltd. Manjarkhed Tq.Chandur Rly. (Package MAL-2) 4)Jagdamba W.U.A.Ltd. Shivani Tq.Chandur 1372 R2 MAL-2/4 4.20 NCB 0.21 2.100 1.890 4.200 Rly. 2/24/2011 wua_prmpkg_r4 229 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Malkhed Minor Project Tq. C.Rly Dist. Amravati For 4)Jagdamba A2 MAL-2/4 4.90 NCB 1.16 3.63 0.15 4.94 W.U.A.Ltd. Shivani Tq.Chandur Rly. (Package MAL-2) 1373 R2 MAL-2/5 5)Gayatri W.U.A.Ltd. Songaon Tq.Chandur Rly. 4.70 NCB 0.24 2.350 2.115 4.700 Rehabilitation work of Malkhed Minor Project Tq. C.Rly Dist. Amravati For 5)Gayatri A2 MAL-2/5 4.77 NCB 0.88 3.71 0.38 4.97 W.U.A.Ltd. Songaon Tq.Chandur Rly. (Package MAL-2) 6)Dhanashri W.U.A.Ltd. Dhanora Mhali 1374 R2 MAL-2/6 6.20 NCB 0.31 3.100 2.790 6.200 Tq.Chandur Rly. Rehabilitation work of Malkhed Minor Project Tq. C.Rly Dist. Amravati For 6)Dhanashri A2 MAL-2/6 3.45 NCB 1.19 2.25 0.30 3.74 W.U.A.Ltd. Dhanora Mhali Tq.Chandur Rly. (Package MAL-2) WUA/Comm 97 Satnoor STN-2 Rehabilitation of dist.system 4.95 2.23 1.98 0.74 4.95 unity level WUA/Comm R Rehabilitation of dist.system 4.95 1.24 2.97 0.74 4.95 unity level 1375 R2 STN-2 1)Janta W.U.A.Ltd. ShendurjanaghatTq. Warud 2.00 NCB 0.10 1.000 0.900 2.000 Rehabilitation work of Satnoor Minor Project Tq. Warud Dist. Amravati For 1)Janta A2 STN-2 1.40 Shopping W.U.A.Ltd. ShendurjanaghatTq. Warud (Package STN-2) Rehabilitation work of Satnoor Minor Project Tq. Warud Dist. Amravati For 1)Janta A2/1 STN-2/1 1.47 Shopping 1.4 1.40 W.U.A.Ltd. ShendurjanaghatTq. Warud (Package STN-2) 2)Jaikisan W.U.A.Ltd. ShendurjanaghatTq. 1376 R2 STN-2 3.25 NCB 0.16 1.625 1.463 3.250 Warud Rehabilitation work of Satnoor Minor Project Tq. Warud Dist. Amravati For 2)Jaikisan A2 STN-2/2 3.68 NCB 3.68 3.68 W.U.A.Ltd. ShendurjanaghatTq. Warud (Package STN-2) WUA/Comm 98 Saraswati SAR-2 Rehabilitation of dist.system 4.22 1.90 1.69 0.63 4.22 unity level 2/24/2011 wua_prmpkg_r4 230 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 WUA/Comm R SAR-2 Rehabilitation of dist.system 4.22 1.06 2.53 0.63 4.22 unity level 1)Saraswati W.U.A.Ltd.Chandur Rly 1377 R2 SAR-2 5.00 NCB 0.25 2.500 2.250 5.000 Tq.Chandur Rly. Rehabilitation work of Sarswati Minor Project Tq. C.Rly Dist. Amravati For 1)Saraswati A2 SAR-2 5.06 NCB 0 3.75 1.47 5.22 W.U.A.Ltd.Chandur Rly Tq.Chandur Rly. (Package SAR-2) WUA/Comm 100 Pardeshwadi PAR-2 Rehabilitation of dist.system 6.53 2.94 2.61 0.98 6.53 unity level WUA/Comm R PAR-2 Rehabilitation of dist.system 6.53 1.63 3.92 0.98 6.53 unity level Ramdas Swami Water User Association, Ltd. 1378 R2 PAR-2 7.234 NCB 1.447 3.617 2.170 7.234 Ramrai Tq. Gangapur. Rehablitation of Canal & Distributory of Pardeshwadi M. I. Tank Tq.Gangapur Dist. A2 PAR-2 7.24 NCB 0 0 0 0.56 0.00 7.40 0.00 7.96 Aurangabad For Ramdas Swami WUA Ltd. Ramrai. WUA/Comm 101 Banoti BAN-2 Rehabilitation of dist.system 11.93 4.77 4.77 2.39 11.93 unity level WUA/Comm R BAN-2 Rehabilitation of dist.system 11.93 2.98 5.97 2.98 11.93 unity level Hiwra Water User Association, Ltd. Wadi / 1379 R2 BAN-2 10.895 NCB 2.179 5.448 3.269 10.895 Banoti Tq. soygaon. Rehablitation of Canal & Distributory of Banoti M. I. Tank Tq.Soygaon Dist. Aurangabad. for A2 BAN-2 10.98 NCB 0 0 0 1.59 1.10 8.30 0.00 10.99 Hiwra WUA Ltd. Wadi WUA/Comm 102 Kelgaon KEL-2 Rehabilitation of dist.system 8.31 3.32 3.32 1.66 8.31 unity level WUA/Comm R KEL-2 Rehabilitation of dist.system 8.31 2.08 4.16 2.08 8.31 unity level Murdeshwar Water User Association, Ltd. 1380 R2 KEL-2 9.141 NCB 1.828 4.571 2.742 9.141 Kelgaon Tq. sillod Rehablitation of Canal & Distributory of Kelgaon M. I. Tank Tq.Sillod Dist. Aurangabad. A2 KEL-2 9.47 NCB 0 0 0 1.36 0.62 7.60 0.00 9.58 For Murdeshwar WUA Ltd. Kelgaon 2/24/2011 wua_prmpkg_r4 231 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 WUA/Comm 109 Kharshipar KHA-2 Rehabilitation of dist.system 7.95 3.18 3.18 1.59 7.95 unity level WUA/Comm R KHA-2 Rehabilitation of dist.system 7.95 1.99 3.97 1.99 7.95 unity level 1381 R2 KHA-2 Panchashil W.U.A. Khursipar 8.260 NCB 2.065 4.130 2.065 8.260 Rehabilitaion and Modernization of canal system A2 KHA-2 under Panchshil W.U.A. Kesalwada 4.35 NCB 0.00 0.00 0.00 1.82 2.53 0.00 0.00 4.350 Ta. Lakhani Distt. Bhandara WUA/Comm 110 Kotha KOT-2 Rehabilitation of dist.system 13.16 5.26 5.26 2.63 13.16 unity level WUA/Comm R KOT-2 Rehabilitation of dist.system 13.16 1.97 6.58 4.61 13.16 unity level 1382 R2 KOT-2 Gangajal W.U.A. Rengepar/Kotha 10.390 NCB 2.598 5.195 2.598 10.390 Rehabilitaion and Modernization of canal system under Gangajal W.U.A. Rengepar/Kotha Ta. R3 KOT-2 8.117 NCB 1.00 7.117 8.12 Lakhani Distt. Bhandara Rehabilitaion and Modernization of canal system under Gangajal W.U.A. Rengepar/Kotha Ta. A3 KOT-2 9.68 NCB 0.00 0.00 0.00 0.00 6.22 3.46 0.00 9.68 Lakhani Distt. Bhandara WUA/Comm 111 Kawlewada KWW-2 Rehabilitation of dist.system 4.51 2.03 1.80 0.68 4.51 unity level WUA/Comm R KWW-2 Rehabilitation of dist.system 4.51 1.13 2.70 0.68 4.51 unity level 1383 R2 KWW-2 Kawalewada W.U.A. Kawalewada 5.274 NCB 1.319 2.637 1.319 5.274 Rehabilitaion and Modernization of canal system A2 KWW-2 under Kawlewada W.U.A. Kawlewada 5.44 NCB Ta. Tumsar Distt. Bhandara Rehabilitaion and Modernization of canal system A2/1 KWW-2 under Kawlewada W.U.A. Kawlewada 5.18 NCB 0.00 0.00 0.00 0.00 3.20 2.24 0.00 5.440 Ta. Tumsar Distt. Bhandara WUA/Comm 112 Wahi WAH-2 Rehabilitation of dist.system 4.98 2.24 1.99 0.75 4.98 unity level WUA/Comm R WAH-2 Rehabilitation of dist.system 4.98 1.24 2.99 0.75 4.98 unity level 1384 R2 WAH-2 Wahi W.U.A. Wahi 4.573 NCB 1.143 2.287 1.143 4.573 2/24/2011 wua_prmpkg_r4 232 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitaion and Modernization of canal system A2 WAH-2 under Wahi W.U.A. Wahi Ta. Paoni Distt. 4.57 NCB Bhandara Rehabilitaion and Modernization of canal system A2/1 WAH-2 under Wahi W.U.A. Wahi Ta. Paoni Distt. 4.53 NCB 0.00 0.00 0.00 1.66 0.85 1.87 0.00 4.380 Bhandara WUA/Comm 113 Nagthana NAG-2 Rehabilitation of dist.system 6.06 2.73 2.42 0.91 6.06 unity level WUA/Comm R NAG-2 Rehabilitation of dist.system 6.06 1.51 3.63 0.91 6.06 unity level 1385 R2 NAG-2 Nagthana W.U.A. Andhalgaon 13.700 NCB 3.425 6.850 3.425 13.700 Rehabilitaion and Modernization of canal system R3 NAG-2 under Nagthana W.U.A. Andhalgaon Ta. Mohadi 9.42 NCB 1.00 8.42 9.42 Distt. Bhandara Rehabilitaion and Modernization of canal system A3 NAG-2 under Nagthana W.U.A. Andhalgaon Ta. Mohadi 10.54 NCB 0.00 0.00 0.00 0.00 7.46 3.08 0.00 10.54 Distt. Bhandara WUA/Comm 115 Andhera AND-2 Rehabilitation of dist.system 3.14 1.41 1.26 0.47 3.14 unity level WUA/Comm R AND-2 Rehabilitation of dist.system 3.14 0.78 1.88 0.47 3.14 unity level 1386 R2 AND-2 Gangajal WUA Gunjala 5.70 NCB 0.29 2.850 2.565 5.700 Rehabilitation work of Andhera Minor Project A2 AND-2 Tq. D.Raja Dist. Buldana For gangajal W.U.A. 4.48 NCB 2.08 2.32 4.40 Gunjala (Package AND-2) WUA/Comm 116 Garkhed GAR-2 Rehabilitation of dist.system 5.95 2.68 2.38 0.89 5.95 unity level WUA/Comm R GAR-2 Rehabilitation of dist.system 5.95 1.49 3.57 0.89 5.95 unity level 1387 R2 GAR-2 Jalganga W.U.A.Garkhed 6.85 NCB 0.34 3.425 3.083 6.850 Rehabilitation work of Garkhed Minor Project A2 GAR-2 Tq. Sindkhed .Raja Dist. Buldana For Jalganga 6.20 NCB 0 3.13 4.00 7.13 W.U.A.Garkhed (Package GAR-2) WUA/Comm 117 Titvi TIT-2 Rehabilitation of dist.system 9.04 3.62 3.62 1.81 9.04 unity level WUA/Comm R TIT-2 Rehabilitation of dist.system 9.04 2.26 4.52 2.26 9.04 unity level 1388 R2 TIT-2 Mungsaji Maharaj W.U.A. Titwi 10.40 NCB 0.52 5.200 4.680 10.400 2/24/2011 wua_prmpkg_r4 233 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Titwi Minor Project Tq. A2 TIT-2 Lonar Dist. Buldana For Mungsaji Maharaj 10.53 NCB 5.00 6.00 11.000 W.U.A. Titwi (Package TIT-2) WUA/Comm 118 Zari ZAR-2 Rehabilitation of dist.system 3.82 1.72 1.53 0.57 3.82 unity level WUA/Comm R ZAR-2 Rehabilitation of dist.system 3.82 0.95 2.29 0.57 3.82 unity level 1389 R2 ZAR-2 AdrshaW.U.A.Ambhoda 6.20 NCB 0.31 3.100 2.790 6.200 Rehabilitation work of Zari Minor Project Tq. A2 ZAR-2 Buldana Dist. Buldana For 4.17 NCB 0 1.43 2.62 4.05 AdrshaW.U.A.Ambhoda (Package ZAR-2) WUA/Comm 119 Telhara TEL-2 Rehabilitation of dist.system 5.89 2.65 2.36 0.88 5.89 unity level WUA/Comm R TEL-2 Rehabilitation of dist.system 5.89 1.47 3.53 0.88 5.89 unity level 1390 R2 TEL-2 Painganga W.U.A. Borgaon kakde 5.50 NCB 0.28 2.750 2.475 5.500 Rehabilitation work of Telhara Minor Project A2 TEL-2 Tq. Chikhali Dist. Buldana For Painganga 6.510 NCB 0 3.31 3.05 6.36 W.U.A. Borgaon kakde (Package TEL-2) WUA/Comm 120 Mudza MUD-2 Rehabilitation of dist.system 6.23 2.80 2.49 0.93 6.23 unity level WUA/Comm R MUD-2 Rehabilitation of dist.system 6.23 1.56 3.74 0.93 6.23 unity level Pani Wapar Sanstha Mudza Redg No. 1391 R2 MUD-2 10.32 NCB 2.580 5.160 2.580 10.320 5/EE.CID, Chandrapur Dt. 5.7.06 Rehabilation work of Mudza M.I. Project Tq. A2 MUD-2 Bramhapuri Distt. Chandrapur for Pani Wapar 6.930 NCB 0 0 0 3.43 2.78 0.72 0.00 6.93 Sanstha Mudza WUA/Comm 121 Janala JNL-2 Rehabilitation of dist.system 12.73 5.09 5.09 2.55 12.73 unity level WUA/Comm R JNL-2 Rehabilitation of dist.system 12.73 3.18 6.36 3.18 12.73 unity level Jalvikas Pani Wapar Sanstha Janala Regd 1392 R2 JNL-2 No. 6/Tq. Chimur Distt. Chandrapur Dt. 14.30 NCB 3.575 7.150 3.575 14.300 6.7.06 Rehabilation work of Janala M.I. Project Tq. A2 JNL-2 Mul Distt. Chandrapur for Jalvikas Pani Wapar 4.355 NCB 0 0 0 1.26 0.59 2.50 0.00 4.36 Sanstha Janala 2/24/2011 wua_prmpkg_r4 234 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 WUA/Comm 122 Sondo SON-2 Rehabilitation of dist.system 12.12 4.85 4.85 2.42 12.12 unity level WUA/Comm R SON-2 Rehabilitation of dist.system 12.12 3.03 6.06 3.03 12.12 unity level Milind Pani Wapar Sanstha Sondo Ha. 1393 R2 SON-2 Yergaran Regd No. 1/EE.CID, Chandrapur 4.44 NCB 1.110 2.220 1.110 4.440 Dt. 1.7.2006 Rehabilation work of Sondo M.I. Project Tq. A2 SON-2 Rajura Distt.Gadchiroli for Milind Pani Wapar 5.736 NCB 0 0 0 0.44 0.93 4.36 0.00 5.74 Sanstha Sondo Ha. Yergaran. WUA/Comm 123 Dongargaon DOG-2 Rehabilitation of dist.system 8.82 3.53 3.53 1.76 8.82 unity level WUA/Comm R DOG-2 Rehabilitation of dist.system 8.82 2.21 4.41 2.21 8.82 unity level Shetkari Vikas Paniwapar Sanstha 1394 R2 DOG-2 15.89 NCB 3.973 7.945 3.973 15.890 Dongargaon, Regd no. 1/EE.WID, Wardha Rehabilation work of Dongargaon M.I. Project A2 DOG-2 Tq. Chimur Distt. Chandrapur for Jai Kisan Pani 10.060 NCB 0 0 0 4.68 4.07 1.34 0.00 10.09 Wapar Sanstha Dongargaon. WUA/Comm 124 Kusarla KUS-2 Rehabilitation of dist.system 7.22 2.89 2.89 1.44 7.22 unity level WUA/Comm R KUS-2 Rehabilitation of dist.system 7.22 1.80 4.33 1.08 7.22 unity level Pani Wapar Sansta Kusarla Regd No. 1395 R2 KUS-2 19.60 NCB 4.900 9.800 4.900 19.600 4/EE.CID, Chandrapur Dt. 6.7.06 Rehabilation work of Kursarla M.I. Project Tq. A2 KUS-2 Nagbhir Distt. Chandrapur for Pani Wapar 8.435 NCB 0 0 0 4.31 0.63 3.50 0.00 8.44 Sansta Kusarla WUA/Comm 125 Rudrapur RUD-2 Rehabilitation of dist.system 4.36 1.96 1.75 0.65 4.36 unity level WUA/Comm R RUD-2 Rehabilitation of dist.system 4.36 1.09 2.62 0.65 4.36 unity level Pani Wapar Sansta Rudrapur Regd No. 1396 R2 RUD-2 4.77 NCB 1.193 2.385 1.193 4.770 7/EE.CID, Chandrapur Dt. 7.7.06 Rehabilation work of Rudrapur M.I. Project Tq. A2 RUD-2 Sawali Distt. Chandrapur for Pani Wapar Sansta 3.272 NCB 0 0 0 1.47 0.89 0.92 0.00 3.27 Rudrapur 2/24/2011 wua_prmpkg_r4 235 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 WUA/Comm 126 Dhanora DHA-2 Rehabilitation of dist.system 3.87 1.74 1.55 0.58 3.87 unity level WUA/Comm R DHA-2 Rehabilitation of dist.system 3.87 0.97 2.32 0.58 3.87 unity level Ganga Pani Wapar Sanstha Dhanora Regd 1397 R2 DHA-2 1.91 Shopping 0.191 1.242 0.478 1.910 No. 3/EE.GID, Gadchiroli Dt. 20.9.06 Rehabilation work of Dhanora M.I. Project Tq. A2 DHA-2 Dhanora Distt.Gadchiroli for Ganga Pani Wapar 2.911 NCB 0 0 0 0.58 1.91 0.43 0.00 2.91 Sanstha Dhanora WUA/Comm 127 Yelgur YEL-2 Rehabilitation of dist.system 5.25 2.36 2.10 0.79 5.25 unity level WUA/Comm R YEL-2 Rehabilitation of dist.system 5.25 1.31 3.15 0.79 5.25 unity level Persapen Pani Wapar Sanstha Yelgur 1398 R2 YEL-2 Regd No. 4/EE.GID, Gadchiroli Dt. 8.59 NCB 0.859 4.725 3.007 8.590 20.9.2006 Rehabilation work of Yelgur M.M. Project Tq. Aheri Distt.Gadchiroli for Persapen Pani Wapar A2 YEL-2 2.682 NCB 0 0 0 0.63 0.72 2.77 0.00 4.12 Sanstha Yelgur Regd No. 4/EE.GID, Gadchiroli Dt. 20.9.2006 WUA/Comm 128 Rajgatta RAJ-2 Rehabilitation of dist.system 6.14 2.76 2.45 0.92 6.14 unity level WUA/Comm R RAJ-2 Rehabilitation of dist.system 6.14 1.53 3.68 0.92 6.14 unity level Kisan Pani Wapar Sanstha Rajgatta Regd 1399 R2 RAJ-2 3.87 NCB 0.387 2.129 1.355 3.870 No. 5/EE.GID, Gadchiroli Dt. 20.9.06 Rehabilation work of Rajgatta M.M. Project A2 RAJ-2 Tq. Gadchiroli Distt.Gadchiroli for Kisan Pani 4.525 NCB 0 0 0 0.40 1.76 2.37 0.00 4.53 Wapar Sanstha Rajgatta. Bodagha- WUA/Comm 129 BOD-2 Rehabilitation of dist.system 6.38 2.87 2.55 0.96 6.38 Tukumba unity level WUA/Comm R BOD-2 Rehabilitation of dist.system 6.38 1.60 3.83 0.96 6.38 unity level Jai Shriram Pani Wapar Sanstha Boddha 1400 R2 BOD-2 Tukum No. 6/ EE.GID, Gadchiroli Dt. 10.90 NCB 1.090 5.995 3.815 10.900 20.9.06 2/24/2011 wua_prmpkg_r4 236 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilation work of Boddha M.I. Project Tq. Wadsa Distt.Gadchiroli for Boddha M.I. A2 BOD-2 4.602 NCB 0 0 0 0.00 2.34 2.27 0.00 4.602 Project Tq. Wadsa Distt.Gadchiroli for Jai Shriram Pani Wapar Sanstha Boddha WUA/Comm 130 Lagam LAG-2 Rehabilitation of dist.system 4.48 unity level WUA/Comm R LAG-2 Rehabilitation of dist.system 4.48 unity level Jai Laxmi Pani Wapar Sanstha Lagam No. 1401 R2 LAG-2 15.56 NCB 1.556 8.558 5.446 15.560 1/EE.GID, Gadchiroli Dt. 20.9.2006 Rehabilation work of Lagam M.I. Project Tq. Mulchera Distt.Gadchiroli for Lagam M.I. A2 LAG-2 10.23 NCB 0 0 0 1.01 1.77 7.45 0.00 10.229 Project Tq. Mulchera Distt.Gadchiroli for Jai Laxmi Pani Wapar Sanstha Lagam WUA/Comm 131 Ankhoda ANK-2 Rehabilitation of dist.system 2.61 1.17 1.04 0.39 2.61 unity level WUA/Comm R ANK-2 Rehabilitation of dist.system 2.61 unity level Wainganga Pani Wapar Sanstha Ankhoda 1402 R2 ANK-2 Regd No. 532/EE.GID, Gadchiroli Dt. 11.31 NCB 1.131 6.221 3.959 11.310 20.12.06 Rehabilation work of Ankhoda M.I. Project Tq. A2 ANK-2 Chamorshi Distt. Gadchiroli for Wainganga Pani 2.989 NCB 0 0 0 1.00 0.20 1.79 0.00 2.989 Wapar Sanstha Ankhoda WUA/Comm 132 Rengepar REN-2 Rehabilitation of dist.system 17.00 6.80 6.80 3.40 17.00 unity level WUA/Comm R REN-2 Rehabilitation of dist.system 17.00 2.55 8.50 5.95 17.00 unity level 1403 R2 REN-2 1) WUA Level Dhanori 5.024 NCB 1.256 2.512 1.256 5.024 Rehabiliation of Irrigation system for Jai A2 REN-2 Gauridoh W U A Dhanori of Rengepar 4.607 NCB 0.00 0.00 0.00 3.00 1.94 0.00 0.00 4.95 M.I.Tank 1404 R2 REN-2 2) WUA Level Lendezari/Murpar 9.94 NCB 0.994 5.467 3.479 9.940 Rehabiliation of Irrigation system for Jai A2 REN-2 Hanuman W U A Lendezari/Murpar of 3.250 NCB 0.00 0.00 0.00 1.84 0.94 0.50 0.00 3.28 Rengepar M.I.Tank. 1405 R2 REN-2 3) WUA Level Mundipar 5.488 NCB 1.372 2.744 1.372 5.488 2/24/2011 wua_prmpkg_r4 237 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabiliation of Irrigation system for Jai A2 REN-2 Gauyatri Mata W U A Mundipar of Rengepar 5.695 NCB 0.00 0.00 0.00 1.65 4.39 0.10 0.00 6.14 M.I.Tank 1406 R2 REN-2 4) WUA Level Kosamtondi 4.011 NCB 1.003 2.006 1.003 4.011 Rehabiliation of Irrigation system for Jai A2 REN-2 Vitthal Rakhumai W U A Kosamtondi of 4.12 NCB 0.00 0.00 0.00 1.58 2.58 0.16 0.00 4.33 Rengepar M.I.Tank WUA/Comm 133 Aktatola AKT-2 Rehabilitation of dist.system 10.11 4.04 4.04 2.02 10.11 unity level WUA/Comm R AKT-2 Rehabilitation of dist.system 10.11 2.53 5.06 2.53 10.11 unity level 1407 R2 AKT-2 WUA Level 10.11 NCB 1.011 5.561 3.539 10.110 Rehabiliation of Irrigation system for Jal A2 AKT-2 Bhumiputra W U A Chilhati of Aktitola 9.58 NCB 0.00 0.00 0.00 1.95 4.84 2.79 0.00 9.58 M.I.Tank. WUA/Comm 134 Hari HAR-2 Rehabilitation of dist.system 8.30 3.32 3.32 1.66 8.30 unity level WUA/Comm R HAR-2 Rehabilitation of dist.system 8.30 2.07 4.15 2.07 8.30 unity level 1408 R2 HAR-2 WUA Level Gangazari 3.222 NCB 0.806 1.611 0.806 3.222 Rehabiliation of Irrigation system for Harit A2 HAR-2 3.098 NCB 0.00 0.00 0.00 1.06 1.32 0.72 0.00 3.10 Kranti W U A Gangazari of Hari M.I.Tank 1409 R2 HAR-2 WUA Level Majitpur 6.069 NCB 1.517 3.035 1.517 6.069 Rehabiliation of Irrigation system for A2 HAR-2 5.739 NCB 0.00 0.00 0.00 2.48 1.10 2.16 0.00 5.74 Kharrobadev W U A Majitpur of Hari M.I.Tank WUA/Comm 135 Pipriya PIP-2 Rehabilitation of dist.system 5.99 2.70 2.40 0.90 5.99 unity level WUA/Comm R PIP-2 Rehabilitation of dist.system 5.99 1.50 3.60 0.90 5.99 unity level 1410 R2 PIP-2 WUA Level NCB 0.000 0.000 0.000 0.000 Rehabiliation of Irrigation system for A2 PIP-2 5.693 NCB 0.00 0.00 0.00 2.71 1.58 1.40 0.00 5.693 Kachargad W U A of Pipariya M.I.Tank WUA/Comm 136 Salegaon SGN-2 Rehabilitation of dist.system 22.15 8.86 8.86 4.43 22.15 unity level WUA/Comm R SGN-2 Rehabilitation of dist.system 22.15 3.32 11.07 7.75 22.15 unity level 1411 R2 SGN-2 WUA Level Lohara 22.15 NCB 2.215 12.183 7.753 22.150 2/24/2011 wua_prmpkg_r4 238 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabiliation of Irrigation system for Saibaba A2 SGN-2 20.02 NCB 0.00 0.00 0.00 10.96 7.96 1.10 0.00 20.02 W U A Lohara of Salegaon M.I.Tank WUA/Comm 137 Gumdoh GUM-2 Rehabilitation of dist.system 16.35 6.54 6.54 3.27 16.35 unity level WUA/Comm R GUM-2 Rehabilitation of dist.system 16.35 2.45 8.18 5.72 16.35 unity level 1412 R2 GUM-2 WUA Level Navergaon 16.35 NCB 1.635 8.993 5.723 16.350 Rehabiliation of Irrigation system for Tirupti A2 GUM-2 8.982 NCB 0.00 0.00 0.00 1.15 4.94 2.89 0.00 8.98 W U A Navargaon of Gumdoh M.I.Tank. WUA/Comm 138 Purjal PUR-2 Rehabilitation of dist.system 7.27 2.91 2.91 1.45 7.27 unity level WUA/Comm R PUR-2 Rehabilitation of dist.system 7.27 1.82 4.36 1.09 7.27 unity level 1413 R2 PUR 2 Purjal M.I.Tank 6.18 NCB 2.163 4.017 6.180 Rehabilitation of Distribution system of canal of A2 PUR 2 Purjal M.I.Tank Tq.Aundha (N) Dist. Hingoli for 5.57 NCB Jaiprabhu w.U.A. Ltd.,Purjal Rehabilitation of Distribution system of canal of R3 PUR 2 Purjal M.I.Tank Tq.Aundha (N) Dist. Hingoli for 6.874 NCB 4.124 2.750 6.87 Jaiprabhu w.U.A. Ltd.,Purjal Rehabilitation of Distribution system of canal of A3 PUR 2 Purjal M.I.Tank Tq.Aundha (N) Dist. Hingoli for 6.87 NCB 0 0.00 0 0.65 3.19 3.03 0.00 6.87 Jaiprabhu w.U.A. Ltd.,Purjal WUA/Comm 139 Parola PRL-2 Rehabilitation of dist.system 7.06 2.82 2.82 1.41 7.06 unity level WUA/Comm R PRL-2 Rehabilitation of dist.system 7.06 1.77 4.24 1.06 7.06 unity level 1414 R2 PAR 2 Parola M.I.Tank 5.43 NCB 1.901 3.530 5.430 Rehabilitation work of Canal system for Parola A2 PAR 2 M.I.Tank, Tq.Aundha (N) Dist. Hingoli for 5.349 NCB 0 0.00 0 3.11 0.89 1.35 0.00 5.35 Shivshakti W.U.A. Ltd., Parola WUA/Comm 140 Bothi BOT-2 Rehabilitation of dist.system 7.91 3.16 3.16 1.58 7.91 unity level WUA/Comm R BOT-2 Rehabilitation of dist.system 7.91 1.98 3.95 1.98 7.91 unity level 1415 R2 BOT 2 Bothi M.I.Tank 8.745 NCB 3.061 5.684 8.745 2/24/2011 wua_prmpkg_r4 239 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Canal system for Bothi A2 BOT 2 M.I.Tank Tq.Kalamnuri Dist.Hingoli for Shri 8.187 NCB 0 0.00 0 3.49 0.90 3.80 0.00 8.19 Gajanan Maharaj W.U.A. Ltd., Kandli. WUA/Comm 141 Savana SAN-2 Rehabilitation of dist.system 5.62 2.53 2.25 0.84 5.62 unity level WUA/Comm R SAN-2 Rehabilitation of dist.system 5.62 1.40 3.37 0.84 5.62 unity level 1416 R2 SAN-2 Sawana M.I.Tank 5.56 NCB Rehabilitation work for main canal of Sawna R3 SAN-2 M.I.Tank Tq.Sengaon Dist.Hingoli for Late 5.56 NCB 0.83 3.06 1.67 5.56 Shivajirao Deshmukh WUA Sawana Rehabilitation work for main canal of Sawna R4 SAN-2 M.I.Tank for Late Shivajirao Deshmukh WUA 5.672 NCB 4.20 1.47 5.67 Sawana WUA/Comm 142 Keli KEI-2 Rehabilitation of dist.system 8.03 3.21 3.21 1.61 8.03 unity level WUA/Comm R KEI-2 Rehabilitation of dist.system 8.03 2.01 4.01 2.01 8.03 unity level 1417 R2 KEI-2 Keli M.I.Tank -- NCB Rehabilitation work for main canal of Keli R3 KEI-2 M.I.Tank Tq.Aundha,Dist.Hingoli for Jai 8.03 NCB 1.20 4.41 2.41 8.03 Bajrangabli WUA, Keli Rehabilitation work for main canal of Keli A3 KEI-2 M.I.Tank Tq.Aundha,Dist.Hingoli for Jai 8.29 NCB 0 0.00 0 0.00 0.60 7.00 0.69 8.29 Bajrangabli WUA, Keli WUA/Comm 143 Ghordari GHO-2 Rehabilitation of dist.system 6.49 2.92 2.60 0.97 6.49 unity level WUA/Comm R GHO-2 Rehabilitation of dist.system 6.49 1.62 3.89 0.97 6.49 unity level 1418 R2 GHO-2 Ghordari M.I.Tank -- NCB Rehabilitation work for main canal of Ghordari R3 GHO-2 M.I.Tank Tq.Sengaon Dist.Hingoli for Sadgir 6.49 NCB 0.97 3.57 1.95 6.49 Baba WUA Ghordari. Rehabilitation work for main canal of Ghordari A3 GHO-2 M.I.Tank Tq.Sengaon Dist.Hingoli for Sadgir 6.26 NCB 0 0.00 0 0.06 4.67 1.54 0.00 6.26 Baba WUA Ghordari. WUA/Comm 144 Konad KON-2 Rehabilitation of dist.system 17.54 7.01 7.01 3.51 17.54 unity level 2/24/2011 wua_prmpkg_r4 240 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 WUA/Comm R KON-2 Rehabilitation of dist.system 17.54 2.63 8.77 6.14 17.54 unity level Jagdamba Water User Association, Ltd. Konad 1419 R2 KON-2 10.89 NCB 2.178 5.445 3.267 10.890 Tq. Jafrabad. Rehablitation of Canal & Distributory of Konad M. I. Tank Tq.Jafrabad Dist. Jalna. For A2 KON-2 11.53 NCB 0 0 0 6.59 2.18 2.73 0.00 11.49 Jagdamba WUA Ltd. Konad WUA/Comm 145 Paratwadi PRT-2 Rehabilitation of dist.system 2.96 1.33 1.18 0.44 2.96 unity level WUA/Comm R PRT-2 Rehabilitation of dist.system 2.96 0.74 1.77 0.44 2.96 unity level Ramdas Swami Water User Association, Ltd. 1420 R2 PAR-2 7.234 NCB 1.447 3.617 2.170 7.234 Ramrai Tq. Gangapur. Rehablitation of Canal & Distributory of Paratwadi M. I. Tank Tq.Partur Dist. Jalna. For A2 PAR-2 1.91 NCB 0 0 0 0.13 0.00 1.80 0.00 1.93 Jai Bajrang WUA Ltd. Hastur Tanda, WUA/Comm 147 Pimperkheda PMK-2 Rehabilitation of dist.system 7.58 unity level WUA/Comm R PMK-2 Rehabilitation of dist.system 7.58 unity level Pundlikbwa Water User Association, Ltd. 1421 R2 PMK-2 8.234 NCB 1.647 4.117 2.470 8.234 Pimperkheda Tq. Mantha Rehablitation of Canal & Distributory of A2 PMK-2 Pimperkheda M. I. Tank Tq.Mantha Dist. Jalna. 8.31 NCB 0 0 0 2.26 1.65 4.50 0.00 8.41 For Pundlik Bua WUA Ltd. Pimparkheda, WUA/Comm 151 Nivale NVL-2 Rehabilitation of dist.system 5.93 2.37 2.37 1.19 5.93 unity level WUA/Comm R NVL-2 Rehabilitation of dist.system 5.93 2.37 2.37 1.19 5.93 unity level Rehabilitation of Main Canal/ Minors under 1422 R2 NVL-2 jurisdiction of Baliraja W.U.A. of Neoli minor 6.45 NCB 1.613 3.225 1.613 6.450 Project Tq. Latur Dist. Latur Rehabilitation of Main canal & minors under A2 NVL-2 jurisdiction of Neoli WUA of Neoli M.I.Project 7.02 NCB 0.00 0.00 0.00 1.52 5.50 0.00 0.00 7.02 Tq.Dist. Latur 2/24/2011 wua_prmpkg_r4 241 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Kasar WUA/Comm 152 KAS-2 Rehabilitation of dist.system 8.44 walkunda unity level WUA/Comm R KAS-2 Rehabilitation of dist.system 8.44 unity level Rehabilitation of main canal under the 1423 R2 KAS-2 jurisdiction of Mahadev WUA of Kasar 7.93 NCB 1.983 3.965 1.983 7.930 Balkunda Minor Project Tq. Nilanga Dist. Latur Rehabilitation of Main canal under jurisdiction A2 KAS-2 of Mahadev WUA of Kasarbalkunda M.I.Project 7.93 NCB Tq.Nilanga Dist. Latur Rehabilitation of Main canal under jurisdiction A2/1 KAS-2 of Mahadev WUA of Kasarbalkunda M.I.Project 8.63 NCB 0.00 0.00 0.00 4.24 4.41 0.00 0.00 8.65 Tq.Nilanga Dist. Latur WUA/Comm 153 Gotala GOT-2 Rehabilitation of dist.system 11.73 unity level WUA/Comm R GOT-2 Rehabilitation of dist.system 11.73 unity level Rehabilitation of Main Canal/ Minors under 1424 R2 GOT-2 jurisdiction of Baliraja W.U.A. of Gotala minor 12.8 NCB 3.200 6.400 3.200 12.800 Project Tq. Ahmedpur Dist. Latur Rehabilatation of distributories/ minors under A2 GOT-2 14.07 NCB 0.00 0.00 0.00 4.64 2.99 6.44 0.00 14.07 jurisdiction of Baliraja WUA WUA/Comm 154 Nagathana NGT-2 Rehabilitation of dist.system 20.56 8.22 8.22 4.11 20.56 unity level WUA/Comm R NGT-2 Rehabilitation of dist.system 20.56 3.08 10.28 7.20 20.56 unity level Rehabilitation of R.F. Main Canal/ Minors under jurisdiction of Shivchatrapati W.U.A. of 1425 R2 NGT-2/1 5.65 NCB 1.130 2.825 1.695 5.650 Nagthana minor Project Tq. Ahmedpur Dist. Latur Rehabilatation of distributories/ minors under A2 NGT-2/1 6.19 NCB 0.00 0.00 0.00 0.24 0.60 5.35 0.00 6.19 jurisdiction of Shivachatrapati WUA 2/24/2011 wua_prmpkg_r4 242 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation of L.F. main canal from ch 8240 to 13500 m & minors under jurisdiction of sant 1426 R2 NGT-2/2 5.68 NCB 1.136 2.840 1.704 5.680 Dnyaneshwar W.U.A. of Nagthana minor project Tq. Ahmedpur Dist. Latur. Rehabilitation of L.F. Main Canal from Ch 8240 to 13500 m.& Minors under Jurisdiction of A2 NGT-2/2 5.96 NCB 0.00 0.00 0.00 0.30 0.50 5.16 0.00 5.96 Sant Dyaneshwar W.U.A.of Nagthana M.I.Project Rehabilitation of R.F. Main Canal/ Minors under 1427 R2 NGT-2/3 jurisdiction of Haritkranti W.U.A. of Nagthana 11.05 NCB 2.763 5.525 2.763 11.050 minor Project Tq. Ahmedpur Dist. Latur Rehabilatation of distributories/ minors under A2 NGT-2/3 12.11 NCB 0.00 0.00 0.00 3.95 8.14 0.00 0.00 12.09 jurisdiction of Haritkranti WUA WUA/Comm 156 Botezari BOZ-2 Rehabilitation of dist.system 7.96 3.18 3.18 1.59 7.96 unity level WUA/Comm R BOZ-2 Rehabilitation of dist.system 7.96 1.99 3.98 1.99 7.96 unity level Botezari Minor Irrigation Project. Rehabilitation & Modernisation of Main Canal & Minors at 1428 R2 BOZ-2 WUA level for Adarsha- Water Users 9.130 NCB 2.283 4.565 2.283 9.130 Association", Botezari Tah - Umred Dist - Nagpur Rehabiliation work of Botezari Minor Project A2 BOZ-2 Tq. Bhiwapur Distt. Nagpur for Adarsh WUA 9.266 NCB 5.25 5.39 10.64 Botezari WUA/Comm 157 Salaimeta SMT-2 Rehabilitation of dist.system 15.48 6.19 6.19 3.10 15.48 unity level WUA/Comm R SMT-2 Rehabilitation of dist.system 15.48 unity level Salaimendha Minor Irrigation Project. Rehabilitation & Modernisation of Main Canal & 1429 R2 SMT-2 Minors at WUA level for "WANJARIMATA 15.277 NCB 3.819 7.639 3.819 15.277 Water Users Association", Salaimendha. Tah - Hingna Dist - Nagpur Rehabiliation work of Salaimendha Minor Proj. R3 URA-2 Tq. Hingna Distt. Nagpur for Wanjarimata WUA 15.30 NCB 7.65 7.65 15.30 Salaimendha 2/24/2011 wua_prmpkg_r4 243 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabiliation work of Salaimendha Minor Proj. R4 URA-2 Tq. Hingna Distt. Nagpur for Wanjarimata WUA 15.3 NCB 10.00 5.30 15.30 Salaimendha WUA/Comm 158 Urakundapar URA-2 Rehabilitation of dist.system 16.89 6.75 6.75 3.38 16.89 unity level WUA/Comm R URA-2 Rehabilitation of dist.system 16.89 2.53 8.44 5.91 16.89 unity level Urkudapar Minor Irrigation Project. Rehabilitation & Modernisation of Main Canal & 1430 R2 URA-2/1 Minors at WUA level for "Shree Mahalaxmi - 11.084 NCB 2.771 5.542 2.771 11.084 Water Users Association", Urkudapar Tah - Bhiwapur Dist - Nagpur Rehabiliation work of Urkudapar Minor Project A2 URA-2/1 Tq. Bhiwapur Distt. Nagpur for Mahalaxmi 10.58 NCB WUA Urkudapar Rehabiliation work of Urkudapar Minor Project A2/1 URA-2/1 Tq. Bhiwapur Distt. Nagpur for Mahalaxmi 10.883 NCB 6.18 4.70 10.88 WUA Urkudapar Urkudapar Minor Irrigation Project. Rehabilitation & Modernisation of Main Canal & 1431 R2 URA-2/2 Minors at WUA level for "Shree Ganesh - Water 7.955 NCB 1.989 3.978 1.989 7.955 Users Association", Urkudapar Tah - Bhiwapur Dist - Nagpur Rehabiliation work of Urkudapar Minor Project A2 URA-2/2 Tq. Bhiwapur Distt. Nagpur for Ganesh WUA 7.422 NCB 1.856 3.711 1.856 7.422 Urkudapar Rehabiliation work of Urkudapar Minor Project A2/1 URA-2/2 Tq. Bhiwapur Distt. Nagpur for Ganesh WUA 7.591 NCB 4.09 3.50 7.59 Urkudapar WUA/Comm 159 Sattighat SAG-2 Rehabilitation of dist.system 6.48 2.91 2.59 0.97 6.48 unity level WUA/Comm R SAG-2 Rehabilitation of dist.system 6.48 1.62 3.89 0.97 6.48 unity level Satighat Minor Irrigation Project. Rehabilitation & Modernisation of Main Canal & Minors at 1432 R2 SAG-2 WUA level for "-Jai Satimata Water Users 7.288 NCB 1.822 3.644 1.822 7.288 Association", Satighat Tah - Kuhi Dist - Nagpur 2/24/2011 wua_prmpkg_r4 244 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Satighat Minor Irrigation Project. Rehabilitation & Modernisation of Main Canal & Minors at A2 SAG-2 WUA level for "-Jai Satimata Water Users 7.22 NCB Association", Satighat Tah - Kuhi Dist - Nagpur Satighat Minor Irrigation Project. Rehabilitation & Modernisation of Main Canal & Minors at A2/1 SAG-2 WUA level for "-Jai Satimata Water Users 7.488 NCB 2.67 4.82 7.49 Association", Satighat Tah - Kuhi Dist - Nagpur WUA/Comm 160 Suwardhara SUW-2 Rehabilitation of dist.system 11.40 5.13 4.56 1.71 11.40 unity level WUA/Comm R SUW-2 Rehabilitation of dist.system 11.40 2.85 5.70 2.85 11.40 unity level Suwardhara Minor Irrigation Project. Rehabilitation & Modernisation of Main Canal & 1433 R2 SUW-2 Minors at WUA level for "JAI KISAN 12.520 NCB 3.130 6.260 3.130 12.520 JALPURTI Water Users Association", Suwardhara. Tah - Parsheoni Dist - Nagpur Rehabiliation work of Suwardhara Minor A2 SUW-2 Project Tq. Parshioni Distt. Nagpur for Jaikisa 8.536 NCB 4.27 4.27 8.54 Jal Purti WUA Suwardhara WUA/Comm 161 Kumari KUM-2 Rehabilitation of dist.system 7.60 3.04 3.04 1.52 7.60 unity level WUA/Comm R KUM-2 Rehabilitation of dist.system 7.60 1.90 3.80 1.90 7.60 unity level Khumari Minor Irrigation Project. Rehabilitation & Modernisation of Main Canal & Minors at 1434 R2 KUM-2 WUA level for "SAIKRUPA Water Users 8.759 NCB 2.190 4.380 2.190 8.759 Association", Salaimendha. Tah - Ramtek Dist - Nagpur Rehabiliation work of Khumari Minor Project A2 KUM-2 Tq. Ramtek Distt. Nagpur for Saikrupa WUA 9.198 NCB 1.09 4.29 4.45 9.83 Khumari WUA/Comm 162 Karala KAR-2 Rehabilitation of dist.system 6.64 2.99 2.66 1.00 6.64 unity level WUA/Comm R KAR-2 Rehabilitation of dist.system 6.64 1.66 3.99 1.00 6.64 unity level 2/24/2011 wua_prmpkg_r4 245 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1435 R2 KAR 2 Karla M.I.Tank Tq.Umri 3.433 NCB 1.202 2.231 3.433 Rehabilitation work of Canal system for Karla A2 KAR 2 M.I.Tank Tq.Umri Dist.Nanded for Mohinibaba 3.974 NCB 0 0.00 0 0.00 0.00 3.97 0.00 3.97 W.U.A. Ltd., Karla WUA/Comm 163 Mulzara MUL-2 Rehabilitation of dist.system 8.65 3.89 3.46 1.30 8.65 unity level WUA/Comm R MUL-2 Rehabilitation of dist.system 8.65 2.16 4.33 2.16 8.65 unity level 1436 R2 MUL 2 Mulzara M.I.Tank Tq.Kinwat 6.194 NCB 2.168 4.026 6.194 Rehabilitation work of Canal system for Mulzara A2 MUL 2 M.I.Tank Tq.Kinwat Dist. Nanded for Sawitribai 7.536 NCB 0 0.00 1.58 0.77 0.00 5.18 0.00 7.53 Phule W.U.A. Ltd., Mulzara WUA/Comm 164 Sugaon SUG-2 Rehabilitation of dist.system 11.07 4.98 4.43 1.66 11.07 unity level WUA/Comm R SUG-2 Rehabilitation of dist.system 11.07 2.77 5.54 2.77 11.07 unity level 1437 R2 SUG 2 Sugaon M.I.Tank Tq.Loha NCB 0.000 0.000 0.000 Rehabilitation work of Canal system for Sugaon A2 SUG 2 M.I.Tank Tq.Loha Parmeshwar W.U.A. 5.79 NCB Ltd.,Sugaon. (Re call) Rehabilitation work of Canal system for Sugaon A2/1 SUG 2 M.I.Tank Tq.Loha Parmeshwar W.U.A. 6.135 NCB 0 0.00 2.12 1.92 0.00 2.09 0.00 6.13 Ltd.,Sugaon.(Re call) WUA/Comm 166 Kedarnath KED-2 Rehabilitation of dist.system 23.57 9.43 9.43 4.71 23.57 unity level WUA/Comm R KED-2 Rehabilitation of dist.system 23.57 3.54 11.78 8.25 23.57 unity level 1438 R2 KED 2 Kedarnath M.I.Tank Tq.Hadgaon 20.617 NCB 4.123 10.309 6.185 20.617 Rehabilitation of Distribution system of canal of A2 KED 2 Kedarnath M.I.Tank for Shivkrapa W.U.A. Ltd., 21.8 NCB Kedarnath Rehabilitation of Distribution system of canal of A2/1 KED 2 Kedarnath M.I.Tank for Shivkrapa W.U.A. Ltd., 21.8 NCB Kedarnath Rehabilitation of Distribution system of canal of R3 KED 2 Kedarnath M.I.Tank for Shivkrapa W.U.A. Ltd., 22.903 NCB 3.43545 12.59665 6.8709 22.90 Kedarnath 2/24/2011 wua_prmpkg_r4 246 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation of Distribution system of canal of A3 KED 2 Kedarnath M.I.Tank for Shivkrapa W.U.A. Ltd., 22.9 NCB 0 0.00 0 5.43 2.67 14.80 0.00 22.9 Kedarnath WUA/Comm 167 Akharga AKH-2 Rehabilitation of dist.system 4.92 2.22 1.97 0.74 4.92 unity level WUA/Comm R AKH-2 Rehabilitation of dist.system 4.92 1.23 2.95 0.74 4.92 unity level 1439 R2 AKH 2 Akharga M.I.Tank 6.199 NCB 2.170 4.029 6.199 Rehabilitation work of Canal system for Akharga A2 AKH 2 M.I.Tank Tq.Mukhed,Dist.Nanded for Shri 6.459 NCB 0 0.00 2.19 2.05 2.22 0.00 0.00 6.46 Sambhaji W.U.A. Ltd., Honwadaj. WUA/Comm 168 Thangaon THA-2 Rehabilitation of dist.system 5.58 2.51 2.23 0.84 5.58 unity level WUA/Comm R THA-2 Rehabilitation of dist.system 5.58 1.39 3.35 0.84 5.58 unity level WUA/Comm 169 Ramshej RAM-2 Rehabilitation of dist.system 6.84 3.08 2.74 1.03 6.84 unity level WUA/Comm R RAM-2 Rehabilitation of dist.system 6.84 1.71 4.10 1.03 6.84 unity level Banganga Water Users Co-Operative Society, 1440 R2 RAM-2 6.71 NCB 1.678 3.355 1.678 6.710 Dhakambe, Tal.Dindori, Dist.Nashik Rehabilitation Work of RAMSHEJ M.I. Project Tq. Dindori., Dist.Nashik (Package RAM-2 ) for A2 RAM-2 6.64 NCB 0 0 0.00 6.10 1.51 0.00 0.00 7.61 Banganga W.U.A.Ltd. Dhakambe Tq.-- Dindori,Dist- Nashik WUA/Comm 170 Eklahare EKL-2 Rehabilitation of dist.system 4.57 2.06 1.83 0.69 4.57 unity level WUA/Comm R EKL-2 Rehabilitation of dist.system 4.57 1.14 2.74 0.69 4.57 unity level Unanda Water Users Co-Operative Society, 1441 R2 EKL-2 3.73 NCB 0.933 1.865 0.933 3.730 Eklahare, Tal.Dindori, Dist.Nashik Rehabilitation Work of EKLAHARE M.I. Project Tq. Dindori., Dist.Nashik (Package EKL- A2 EKL-2 5.56 NCB 0 0 0.00 3.16 2.98 0.00 0.00 6.15 2 ) for Unanda W.U.A.Ltd. Eklahare / Chousale, Tq.-Dindori,Dist- Nashik WUA/Comm 172 Pethsangvi PET-2 Rehabilitation of dist.system 3.74 1.68 1.50 0.56 3.74 unity level 2/24/2011 wua_prmpkg_r4 247 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 WUA/Comm R PET-2 Rehabilitation of dist.system 3.74 0.93 2.24 0.56 3.74 unity level Borgaon WUA/Comm 173 BOR-2 Rehabilitation of dist.system 9.51 3.80 3.80 1.90 9.51 (Dha) unity level WUA/Comm R BOR-2 Rehabilitation of dist.system 9.51 2.38 4.76 2.38 9.51 unity level WUA/Comm 174 Kolhegaon KOL-2 Rehabilitation of dist.system 7.65 3.06 3.06 1.53 7.65 unity level WUA/Comm R 7.65 1.91 3.82 1.91 7.65 unity level WUA/Comm 175 Devdhanora DEV-2 Rehabilitation of dist.system 4.74 2.13 1.90 0.71 4.74 unity level WUA/Comm R 4.74 1.19 2.85 0.71 4.74 unity level WUA/Comm 177 Ambegaon BEG-2 Rehabilitation of dist.system 6.12 2.76 2.45 0.92 6.12 unity level WUA/Comm R BEG-2 Rehabilitation of dist.system 6.12 1.53 3.67 0.92 6.12 unity level Jai Jijau Water User Association Ltd. Kolhawadi 1442 R2 BEG-2 3.53 NCB 0.883 1.765 0.883 3.530 Tq.Manwat Rehablitation work of Ambegaon M. I. Project A2 BEG-2 Tq.Manvat Dist. Parbhani, For Jai Jeejau 5.71 NCB WUA Ltd. Kolhawadi Tq.Manvat. Rehablitation work of Ambegaon M. I. Project A2/1 BEG-2 Tq.Manvat Dist. Parbhani, For Jai Jeejau 5.71 NCB WUA Ltd. Kolhawadi Tq.Manvat. Rehablitation work of Ambegaon M. I. Project R3 BEG-2 Tq.Manvat Dist. Parbhani, For Jai Jeejau 5.71 NCB 2.855 2.855 5.71 WUA Ltd. Kolhawadi Tq.Manvat. Rehablitation work of Ambegaon M. I. Project A3/1 BEG-2 Tq.Manvat Dist. Parbhani, For Jai Jeejau 5.71 NCB WUA Ltd. Kolhawadi Tq.Manvat. Rehablitation work of Ambegaon M. I. Project A3/2 BEG-2 Tq.Manvat Dist. Parbhani, For Jai Jeejau 5.71 NCB WUA Ltd. Kolhawadi Tq.Manvat. Rehablitation work of Ambegaon M. I. Project A3/3 BEG-2 Tq.Manvat Dist. Parbhani, For Jai Jeejau 6.382 NCB 2.171 4.211 6.38 WUA Ltd. Kolhawadi Tq.Manvat. 2/24/2011 wua_prmpkg_r4 248 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 WUA/Comm 178 Nakhatwadi NAK-2 Rehabilitation of dist.system 3.48 1.57 1.39 0.52 3.48 unity level WUA/Comm R NAK-2 Rehabilitation of dist.system 3.48 0.87 2.09 0.52 3.48 unity level Kedareshwar Maharaj Water User Association 1443 R2 NAK-2 3.72 NCB 0.930 1.860 0.930 3.720 Ltd. Ukhali (Bk) Tq.Sonpeth Rehablitation work of Nakhatwadi M. I. Project Tq. Sonpeth Dist. Parbhani, For Shri A2 NAK-2 3.85 NCB 0 0.803 3.045 3.848 Keareshwar WUA Ltd. Ukhali (Bk) Tq. Sonpeth WUA/Comm 179 Devgaon DVG-2 Rehabilitation of dist.system 6.85 3.08 2.74 1.03 6.85 unity level WUA/Comm R DVG-2 Rehabilitation of dist.system 6.85 1.71 4.11 1.03 6.85 unity level Shri.DatareshwarWater User Association Ltd. 1444 R2 DVG-2 3.38 NCB 0.845 1.690 0.845 3.380 Kotha Tq.Jintoor Rehablitation work of Deogaon M. I. Project A2 DVG-2 Tq.Jintur Dist. Parbhani, For Shri Datareshwar 3.74 NCB 0 0.681 3.359 4.04 WUA Ltd. Kotha Tq.Jintur WUA/Comm 180 Wadali WAD-2 Rehabilitation of dist.system 7.05 2.82 2.82 1.41 7.05 unity level WUA/Comm R WAD-2 Rehabilitation of dist.system 7.05 1.76 4.23 1.06 7.05 unity level Shri.Narsinh Water User Association Ltd. Warud 1445 R2 WAD-2 5.25 NCB 1.313 2.625 1.313 5.250 (Narsinh) Tq.Jintoor Rehablitation work of Wadali M. I. Project A2 WAD-2 Tq.Jintur Dist. Parbhani, For Narshimha WUA 4.35 NCB 0 0.223 0 4.342 4.565 Ltd. WARUD (N) Tq.Jintur WUA/Comm 181 Marsul MRL-2 Rehabilitation of dist.system 4.49 2.02 1.80 0.67 4.49 unity level WUA/Comm R MRL-2 Rehabilitation of dist.system 4.49 1.12 2.70 0.67 4.49 unity level 1446 R2 MRL 2 Marsul M.I.Tank 2.8 NCB 0.980 1.820 2.800 Rehabilitation work of Canal system for Marsul A2 MRL 3 M.I.Tank Tq. Purna Dist. Parbhani for 2.677 NCB 0 0.00 0 2.00 0.00 0.68 0.00 2.68 Hiwreshwar W.U.A. Ltd., Hiwra (Bk) WUA/Comm 182 Ambazari AMZ-2 Rehabilitation of dist.system 8.08 3.23 3.23 1.62 8.08 unity level 2/24/2011 wua_prmpkg_r4 249 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 WUA/Comm R AMZ-2 Rehabilitation of dist.system 8.08 2.02 4.04 2.02 8.08 unity level Sant Adkuji Maharaj PaniWapar Sahkari 1447 R2 AMZ-2 Sanstha Maryadit Dahegaon (Mustara) 21.60 NCB 5.400 10.800 5.400 21.600 Regd No. 5/EE.WID, Wardha Rehabilation work of Ambazari M.I. Project Tq. Arvi Distt. Wardha for Sant Adkuji Maharaj A2 AMZ-2 14.081 NCB 0.00 0.00 0.00 3.98 2.43 7.67 0.00 14.08 PaniWapar Sahkari Sanstha Maryadit Dahegaon (Mustara) WUA/Comm 183 Kawadi KAW-2 Rehabilitation of dist.system 3.96 1.78 1.58 0.59 3.96 unity level WUA/Comm R KAW-2 Rehabilitation of dist.system 3.96 0.99 2.38 0.59 3.96 unity level Kailaspuri Maharaj PaniWapar Sanstha, 1448 R2 KAW-2 Kawadi Regd No. 7/EE.WID, Wardha 4.08 NCB 1.020 2.040 1.020 4.080 Dt. 20.12.2007 Rehabilation work of Kawadi M.I. Tq. Arvi, A2 KAW-2 Dist. Wardha for Kailaspuri Maharaj PaniWapar 4.214 NCB 0.00 0.00 0.00 0.13 3.40 0.60 0.00 4.13 Sanstha, Kawadi WUA/Comm 184 Umari UMA-2 Rehabilitation of dist.system 8.46 3.38 3.38 1.69 8.46 unity level WUA/Comm R UMA-2 Rehabilitation of dist.system 8.46 2.11 4.23 2.11 8.46 unity level Nirguni Maharaj PaniWapar Sahkari 1449 R2 UMA-2 Sanstha Maryadit Umri Regd No. 26.86 NCB 6.715 13.430 6.715 26.860 4/EE.WID, Wardha Dt. 20.12.2006 Rehabilation work of Umri M.I. Tq. Arvi Distt. A2 UMA-2 Wardha for Nirguni Maharaj PaniWapar Sahkari 15.3 NCB 0.00 0.00 0.00 5.21 8.27 3.40 0.00 16.89 Sanstha Maryadit Umri WUA/Comm 185 Anjiborkhedi ANJ-2 Rehabilitation of dist.system 8.44 3.38 3.38 1.69 8.44 unity level WUA/Comm R ANJ-2 Rehabilitation of dist.system 8.44 2.11 4.22 2.11 8.44 unity level Anjiborkhedi Pani Wapar Sanstha , Anjiborkhedi R2 ANJ-2 11.56 NCB 2.890 5.780 2.890 11.560 Regd No. 8/EE WID< Wardha dt 20.12.08 Rehabilation work of Anji-Borkhedi M.I. Project A2 ANJ-2 for Anji-Borkhedi Pani Wapar Sanstha, Anji 8.585 NCB 0.00 0.00 0.00 2.92 3.09 3.00 0.00 9.01 Borkhedi 2/24/2011 wua_prmpkg_r4 250 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Kannamwarg WUA/Comm 186 KAN-2 Rehabilitation of dist.system 4.64 2.09 1.86 0.70 4.64 ram unity level WUA/Comm R KAN-2 Rehabilitation of dist.system 4.64 1.16 2.78 0.70 4.64 unity level Kannamwargram Pani Wapar Sahkari 1450 R2 KAN-2 Sanstha Maryadit Kannamwargram Regd 18.16 NCB 4.540 9.080 4.540 18.160 No. 3/EE.WID, Wardha Rehabilation work of Kannamwargram M.I. Project Tq. Karanji Distt. Wardha for A2 KAN-2 8.194 NCB 0 0 0 6.26 1.71 0.25 0.00 8.21 Kannamwargram Pani Wapar Sahkari Sanstha Maryadit Kannamwargram WUA/Comm 187 Dongargaon DON-2 Rehabilitation of dist.system 12.66 5.07 5.07 2.53 12.66 unity level WUA/Comm R DON-2 Rehabilitation of dist.system 12.66 3.17 6.33 3.17 12.66 unity level Jai Kisan Pani Wapar Sanstha Dongargaon 1451 R2 DON-2 Regd No. 3/ EE.CID, Chandrapur 17.24 NCB 4.310 8.620 4.310 17.240 Dt. 3.7.2007 Rehabilation work of Dongargaon M.I. Project A2 DON-2 Tq. Seloo Dist. Wardha for Shetkari Vikas 12.409 NCB 0.00 0.00 0.00 3.23 4.85 4.64 0.00 12.71 Paniwapar Sanstha Dongargaon. WUA/Comm 188 Asola-Ingole ASO-2 Rehabilitation of dist.system 7.56 3.02 3.02 1.51 7.56 unity level WUA/Comm R ASO-2 Rehabilitation of dist.system 7.56 1.89 3.78 1.89 7.56 unity level 1452 R2 ASO-2 Shri Pitamber Maharaj W.U.A.Kondoli 15.34 NCB 0.77 7.670 6.903 15.340 Rehabilitation work of Asola (I) Minor Project A2 ASO-2 Tq. Manora Dist. Washim For Shri Pitamber 6.30 NCB 0.00 0.03 0.03 0.14 3.10 3.21 0.00 6.51 Maharaj W.U.A.Kondoli (Package ASO-2) WUA/Comm 189 Koyali KOY-2 Rehabilitation of dist.system 3.15 1.42 1.26 0.47 3.15 unity level WUA/Comm R KOY-2 Rehabilitation of dist.system 3.15 0.79 1.89 0.47 3.15 unity level 1453 R2 KOY-2 Adarsha Kisan W.U.A.Shirputi. 3.70 NCB 0.19 1.850 1.665 3.700 Rehabilitation work of Koyali Minor Project A2 KOY-2 Tq. Risod Dist. Washim For Adarsha Kisan 3.42 NCB 0.00 0.03 0.03 0.89 2.54 0.00 0.00 3.49 W.U.A.Shirputi. (Package KOY-2) 2/24/2011 wua_prmpkg_r4 251 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 WUA/Comm 190 Motasawanga MOT-2 Rehabilitation of dist.system 16.96 6.79 6.79 3.39 16.96 unity level WUA/Comm R MOT-2 Rehabilitation of dist.system 16.96 2.54 8.48 5.94 16.96 unity level 1454 R2 MOT-2 Govind baba W.U.A.Nimbi 28.90 NCB 1.45 14.450 13.005 28.900 Rehabilitation work of Motsawanga Minor A2 MOT-2 Project Tq. Mangrulpir Dist.Washim For 21.63 NCB 0.00 0.03 0.03 3.96 16.02 1.70 0.00 21.73 Govind baba W.U.A.Nimbi (Package MOT-2) WUA/Comm 191 Sonkhas SON-2 Rehabilitation of dist.system 5.28 2.37 2.11 0.79 5.28 unity level WUA/Comm R SON-2 Rehabilitation of dist.system 5.28 1.32 3.17 0.79 5.28 unity level 1455 R2 SON-2 Shri. Rushi Maharaj W.U.A.Sonkhas 6.10 NCB 0.31 3.050 2.745 6.100 Rehabilitation work of Sonkhas Minor Project A2 SON-2 Tq. Malegaon Dist. Washim For Shri. Rushi 5.88 NCB 0.00 0.03 0.03 0.80 5.29 0.00 0.00 6.15 Maharaj W.U.A.Sonkhas (Package SON-2) WUA/Comm 192 Shirputi SRP-2 Rehabilitation of dist.system 7.75 3.10 3.10 1.55 7.75 unity level WUA/Comm R SRP-2 Rehabilitation of dist.system 7.75 1.94 3.88 1.94 7.75 unity level 1456 R2 SRP-2 Shri. Sevadas W.U.A.Shirputi. 8.91 NCB 0.45 4.455 4.010 8.910 Rehabilitation work of Shirputi Minor Project A2 SRP-2 Tq. Washim Dist. Washim For Shri. Sevadas 6.22 NCB 0.00 0.03 0.03 3.46 2.82 0.00 0.00 6.33 W.U.A.Shirputi. (Package SRP-2) WUA/Comm 193 Hiwara HWR-2 Rehabilitation of dist.system 3.92 1.76 1.57 0.59 3.92 unity level WUA/Comm R HWR-2 Rehabilitation of dist.system 3.92 0.98 2.35 0.59 3.92 unity level 1457 R2 HWR-2 Kamalganga W.U.A.Hiwaralahe 7.80 NCB 0.39 3.900 3.510 7.800 Rehabilitation work of Hiwara Lahe Minor Project Tq. Karanja Dist. Washim For A2 HWR-2 4.58 NCB 0.00 0.03 0.02 0.01 4.06 0.53 0.00 4.65 Kamalganga W.U.A.Hiwaralahe (Package HWR- 2) WUA/Comm 194 Ghoti GHT-2 Rehabilitation of dist.system 6.42 2.89 2.57 0.96 6.42 unity level WUA/Comm R GHT-2 Rehabilitation of dist.system 6.42 1.61 3.85 0.96 6.42 unity level 2/24/2011 wua_prmpkg_r4 252 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1458 R2 GHT-2 Shri.Saibaba W.U.A. Ghoti 7.50 NCB 0.38 3.750 3.375 7.500 Rehabilitation work of Ghoti Minor Project Tq. A2 GHT-2 Kalamb Dist. Yavatmal For Shri.Saibaba 7.22 NCB 1.61 5.62 7.23 W.U.A. Ghoti (Package GHT-2) WUA/Comm 195 Ningnoor NNG-2 Rehabilitation of dist.system 9.62 3.85 3.85 1.92 9.62 unity level WUA/Comm R NNG-2 Rehabilitation of dist.system 9.62 2.40 4.81 2.40 9.62 unity level 1459 R2 NNG-2 Shri.Jaikisan W.U.A. Nignoor. 11.10 NCB 0.56 5.550 4.995 11.100 Rehabilitation work of Nignoor Minor Project Tq. Umarkhed Dist. Yavatmal For A2 NNG-2 11.60 NCB 0 0.52 2.89 8.22 11.63 Shri.Jaikisan W.U.A. Nignoor. (Package NNG- 2) WUA/Comm 196 Dudhana DUD-2 Rehabilitation of dist.system 3.14 1.41 1.26 0.47 3.14 unity level WUA/Comm R DUD-2 Rehabilitation of dist.system 3.14 0.78 1.88 0.47 3.14 unity level 1460 R2 DUD-2 Jaibajrang W.U.A. Dudhana 3.75 NCB 0.19 1.875 1.688 3.750 Rehabilitation work of Dudhana Minor Project A2 DUD-2 Tq. Yavatmal Dist. Yavatmal For Jaibajrang 3.71 NCB 0.39 3.33 3.72 W.U.A. Dudhana (Package DUD-2) WUA/Comm 197 Eklara ELA-2 Rehabilitation of dist.system 4.85 2.18 1.94 0.73 4.85 unity level WUA/Comm R ELA-2 Rehabilitation of dist.system 4.85 1.21 2.91 0.73 4.85 unity level 1461 R2 ELA-2 Gurudeo W.U.A. Eklara 5.60 NCB 0.28 2.800 2.520 5.600 Rehabilitation work of Eklara Minor Project A2 ELA-2 Tq. Ralegaon Dist. Yavatmal For Gurudeo 5.56 NCB 0.53 5.04 5.57 W.U.A. Eklara (Package ELA-2) WUA/Comm 198 Khadakdoh KHD-2 Rehabilitation of dist.system 8.61 3.44 3.44 1.72 8.61 unity level WUA/Comm R KHD-2 Rehabilitation of dist.system 8.61 2.15 4.31 2.15 8.61 unity level 1462 R2 KHD-2 Shri.Ganesh W.U.A. Khadakdoh. 10.00 NCB 0.50 5.000 4.500 10.000 Rehabilitation work of Khadakdoh Minor Project Tq. Zari Jamani Dist. Yavatmal For A2 KHD-2 10.29 NCB 6.28 4.01 10.29 Shri.Ganesh W.U.A. Khadakdoh.(Package KHD- 2) 2/24/2011 wua_prmpkg_r4 253 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 WUA/Comm 199 Karanji KRJ-2 Rehabilitation of dist.system 6.36 2.86 2.54 0.95 6.36 unity level WUA/Comm R KRJ-2 Rehabilitation of dist.system 6.36 1.59 3.81 0.95 6.36 unity level 1463 R2 KRJ-2 Karanji W.U.A. Karanji 10.00 NCB 1.000 5.500 3.500 10.000 Rehabilitation work of Karanji Minor Project A2 KRJ-2 Tq. Kelapur Dist. Yavatmal For Karanji 7.68 NCB 0 0.64 7.04 7.68 W.U.A. Karanji (Package KRJ-2) WUA/Comm 202 Karanjivane KJV-2 Rehabilitation of dist.system 3.28 1.48 1.31 0.49 3.28 unity level WUA/Comm R KJV-2 Rehabilitation of dist.system 3.28 0.82 1.97 0.49 3.28 unity level 1464 R2 KJV 2 Shri Kisan WUW Karangivane 3.5 NCB 0.700 1.750 1.050 3.500 Rehabilitation work of KARANJIVANE MI A2 KJV 2 Project Tal. Kagal Dist. Kolhapur (Package No. 3.62 NCB 3.62 3.62 KJV II)forShri Kisan WUA Karanjivane. WUA/Comm 203 Benikre BNK-2 Rehabilitation of dist.system 4.46 2.01 1.78 0.67 4.46 unity level WUA/Comm R BNK-3 Rehabilitation of dist.system 4.46 1.11 2.67 0.67 4.46 unity level 1465 R2 BNK 2 Shri Jotirling WUA Benikre 4.63 NCB 0.926 2.315 1.389 4.630 Rehabilitation work of BENIKRE MI Project A2 BNK 2 Tal.Kagal Dist. Kolhapur (Package No. BNK 5.14 NCB 1.663 0.628 2.849 5.14 II)for Joytirling WUA Benikre. WUA/Comm 204 Man Padale MPD-2 Rehabilitation of dist.system 6.33 2.85 2.53 0.95 6.33 unity level WUA/Comm R MPD-3 Rehabilitation of dist.system 6.33 1.58 3.80 0.95 6.33 unity level Shri Tatyasahab Kore Warana WUA Ltd. 1466 R2 MPD 2 5.45 NCB 1.090 2.725 1.635 5.450 Manpadale Rehabilitation work of MANPADALE MI Project Tal. Hatkangle Dist.Kolhapur (Package A2 MPD 2 5.62 NCB 0 2.897 2.723 5.62 No. MPD II)for Tatyasaheb KoreWaranaWUA Manpadale. WUA/Comm 206 Narewadi NAR-2 Rehabilitation of dist.system 6.25 unity level WUA/Comm R NAR-2 Rehabilitation of dist.system 6.25 unity level 2/24/2011 wua_prmpkg_r4 254 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 WUA/Comm 208 Tintraj TIN-2 Rehabilitation of dist.system 3.58 1.61 1.43 0.54 3.58 unity level WUA/Comm R TIN-2 Rehabilitation of dist.system 3.58 0.90 2.15 0.54 3.58 unity level Rehabilitation of Main Canal Distributories/ minors under jurisdiction of Krishna WUA No.1 1467 R2 TIN-2 2.3 NCB 0.575 1.150 0.575 2.300 on L.B. Canal of Tintraj Minor Irrigation Tank Tq. Bhoom Dist. Osmanabad Rehabilitation work of Krishna W.U.A. No.1 A2 TIN-2 2.41 NCB 0.00 0.00 0.00 0.18 1.23 1.00 0.00 2.41 Tintraj M.I. Project WUA/Comm 209 Harni HRN-2 Rehabilitation of dist.system 21.63 8.65 8.65 4.33 21.63 unity level WUA/Comm R HRN-2 Rehabilitation of dist.system 21.63 3.24 10.81 7.57 21.63 unity level Rehabilitation of Main Canal Distributories/ minors under jurisdiction of Jaishankar WUA 1468 R2 HRN-2/1 5.12 NCB 1.280 2.560 1.280 5.120 No.1 on L.B. Canal of Harni Minor Irrigation Tank Tq. Tuljapur Dist. Osmanabad Rehabilatation of dy/ minors under jurisdiction A2 HRN-2/1 5.12 NCB of Jai Shankar WUA 1 Rehabilatation of dy/ minors under jurisdiction A2/1 HRN-2/1 5.57 NCB 0.00 0.00 0.00 1.76 3.81 0.00 0.00 5.57 of Jai Shankar WUA1 Rehabilitation of Main Canal Distributories/ minors under jurisdiction of Jaimalhar WUA 1469 R2 HRN-2/2 3.55 NCB 0.888 1.775 0.888 3.550 No.3 on L.B. Canal of Harni Minor Irrigation Tank Tq. Tuljapur Dist. Osmanabad Rehabilitation and Main canal and Dy./ Minors under jurisdiction of Jay Malahar WUA No.3 A2 HRN-2/2 3.84 NCB 0.00 0.00 0.00 0.94 2.90 0.00 0.00 3.84 L/B Canal of Harni M.I.Tank Tq.Tuljapur Dist.Osmanabad Rehabilitation of Main Canal Distributories/ minors under jurisdiction of Jai Ganesh WUA 1470 R2 HRN-2/3 2.58 NCB 0.645 1.290 0.645 2.580 No.4 on L.B. Canal of Harni Minor Irrigation Tank Tq. Tuljapur Dist. Osmanabad Rehabilatation of distributories/ minors under A2 HRN-2/3 2.65 NCB 0.00 0.00 0.00 1.00 1.56 0.09 0.00 2.65 jurisdiction of Jai Ganesha WUA No.4 2/24/2011 wua_prmpkg_r4 255 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation of R.B. main canal Km from 0 to 4 of Harni M.I. Project under the jurisdiction of 1471 R2 HRN-2/4 2.26 NCB 0.565 1.130 0.565 2.260 WUA No.9 Katgaon Tq. Tuljapur Dist. Osmanabad Rehabilitation and Main canal of km.from 0.00 to 4.00 of Harni M.I.Project under jurisdiction A2 HRN-2/4 2.48 NCB 0.00 0.00 0.00 0.30 2.18 0.00 0.00 2.48 of JayAmbe WUA No.9 ( R.B.C.) Katgaon Tq.Tuljapur Dist.Osmanabad Rehabilitation of R.B. main canal Km from 4 to 7.6 of Harni M.I. Project under the jurisdiction 1472 R2 HRN-2/5 2.21 NCB 0.553 1.105 0.553 2.210 of Jay Renuka WUA No.10 Katgaon Tq. Tuljapur Dist. Osmanabad Rehabilitation and Main canal and of km.from 4 to 7.60 of Harni M.I.Project under jurisdiction A2 HRN-2/5 2.42 NCB 0.00 0.00 0.00 0.30 2.12 0.00 0.00 2.42 of Jay Renuka WUA No.10 Katgaon Tq.Tuljapur Dist.Osmanabad Rehabilitation of R.B. main canal Km from 7.6 to 12.20 of Harni M.I. Project under the 1473 R2 HRN-2/6 2.05 NCB 0.513 1.025 0.513 2.050 jurisdiction of Jay yedeshwary WUA No.11 Katgaon Tq. Tuljapur Dist. Osmanabad Rehabilitation of R/F Main canal from Km.7.60 to 12.20 of Harni M.I.Project under jurisdiction A2 HRN-2/6 2.11 NCB 0.00 0.00 0.00 0.36 1.75 0.00 0.00 2.11 of Yedeshwari WUA No.11 Katgaon Tq.Tuljapur Dist.Osmanabad Rehabilitation of Main Canal Distributories/ 1474 R2 HRN-2/7 minors under jurisdiction of Jaimalhar WUA 1.32 Shopping 0.330 0.858 0.132 1.320 No.2 Tandulwadi Rehabilitation of Main Canal Distributories/ A2 HRN-2/7 minors under jurisdiction of Jaimalhar WUA 1.31 Shopping No.2 Tandulwadi Rehabilitation and Modernization works to Harni M.I.Project LBC km.9.18 to 10.125 under A2/1 HRN-2/7 1.38 Shopping 0.00 0.00 0.00 0.82 0.56 0.00 0.00 1.38 jurisdiction of Jai Malhar WUA No.02 Tandulwadi Tq.& Dist.S.Solapur Rehabilitation of Main Canal Distributories/ 1475 R2 HRN-2/8 minors under jurisdiction of Jai-kiasan WUA 0.948 Shopping 0.237 0.616 0.095 0.948 No.5 Arali 2/24/2011 wua_prmpkg_r4 256 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation of Main Canal Distributories/ A2 HRN-2/8 minors under jurisdiction of Jai-kiasan WUA 0.94 Shopping No.5 Arali Rehabilitation of Main Canal Distributories/ A2/1 HRN-2/8 minors under jurisdiction of Jai-kiasan WUA 0.99 Shopping 0.00 0.00 0.00 0.37 0.62 0.00 0.00 0.99 No.5 Arali Rehabilitation of Main Canal Distributories/ 1476 R2 HRN-2/9 minors under jurisdiction of Jai-jawan WUA 1.53 Shopping 0.383 0.995 0.153 1.530 No.6 Keshegaon Rehabilitation of Main Canal Distributories/ A2 HRN-2/9 minors under jurisdiction of Jai-jawan WUA 1.53 Shopping No.6 Keshegaon Rehabilitation and Modernization works to Harni M.I.Project LBC km.21.50 to 24.00 under A2/1 HRN-2/9 1.61 Shopping 0.00 0.00 0.00 0.96 0.65 0.00 0.00 1.61 jurisdiction of Jai Jawan WUA No.06 KeshegaonTq.Tuljapur Dist.Osmanabad Rehabilitation of Main Canal Distributories/ 1477 R2 HRN-2/10 minors under jurisdiction of Shreeram WUA 1.05 Shopping 0.263 0.683 0.105 1.050 No.7 Musti Rehabilitation of Main Canal Distributories/ A2 HRN-2/10 minors under jurisdiction of Shreeram WUA 1.04 Shopping No.7 Musti Rehabilitation of Main Canal Distributories/ A2/1 HRN-2/10 minors under jurisdiction of Shreeram WUA 1.09 Shopping 0.00 0.00 0.00 0.89 0.20 0.00 0.00 1.09 No.7 Musti Rehabilitation of Main Canal Distributories/ 1478 R2 HRN-2/11 minors under jurisdiction of Jai-jagdamba WUA 0.51 Shopping 0.128 0.332 0.051 0.510 No.8 Darsanal Rehabilitation of Main Canal Distributories/ A2 HRN-2/11 minors under jurisdiction of Jai-jagdamba WUA 0.51 Shopping No.8 Darsanal Rehabilitation and Modernization works to Harni M.I.Project LBC.km.24.00 to 24.510 A2/1 HRN-2/11 0.5 Shopping under jurisdiction of Jai Jagdamba WUA No.08 Darshnal Tq.Akkalkot Dist.Solapur Rehabilitation and Modernization works to Harni M.I.Project LBC.km.24.00 to 24.510 A2/2 HRN-2/11 0.53 Shopping 0.00 0.00 0.00 0.37 0.16 0.00 0.00 0.53 under jurisdiction of Jai Jagdamba WUA No.08 Darshnal Tq.Akkalkot Dist.Solapur 2/24/2011 wua_prmpkg_r4 257 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation of Main Canal Distributories/ 1479 R2 HRN-2/12 minors under jurisdiction of Kalikamata WUA 0.86 Shopping 0.215 0.559 0.086 0.860 No.12 Tanduwadi Rehabilitation and Modernization works to Harni M.I.Project RBC.km.12.20 to 13.60 under A2 HRN-2/12 0.86 Shopping jurisdiction of Jai Kalikamata WUA No.12 Tandulwadi Dist.S.Solapur Rehabilitation and Modernization works to Harni M.I.Project RBC.km.12.20 to 13.60 under A2/1 HRN-2/12 0.9 Shopping 0.00 0.00 0.00 0.21 0.68 0.00 0.00 0.89 jurisdiction of Jai Kalikamata WUA No.12 Tandulwadi Dist.S.Solapur WUA/Comm 210 Pilanwadi PIL-2 Rehabilitation of dist.system 5.46 2.46 2.18 0.82 5.46 unity level WUA/Comm R PIL-2 Rehabilitation of dist.system 5.46 1.36 3.28 0.82 5.46 unity level 1480 R2 PIL-2 Shree Gajanan WUA, Pilanwadi, Tal : Purandar 6.16 NCB 1.540 3.080 1.540 6.160 Rehabilitation work of Pilanwadi M. I. Project A2 PIL-2 Tal : Purandar, Dist : Pune for Shri Gajanana 6.27 NCB 0 0 2.68 1.85 1.5 0.24 6.27 WUA Pilanwadi WUA/Comm 211 Walen WAL-2 Rehabilitation of dist.system 6.31 2.84 2.52 0.95 6.31 unity level WUA/Comm R WAL-2 Rehabilitation of dist.system 6.31 1.58 3.78 0.95 6.31 unity level 1481 R2 WAL-2 Shree Waghjai Canal WUA, Walen, Tal : Mulshi 6.21 NCB 1.553 3.105 1.553 6.210 Rehabilitation work of Walen M. I. Project Tal : A2 WAL-2 6.21 NCB Mulshi, Dist : Pune for Waghjai WUA Walen Rehabilitation work of Walen M. I. Project Tal : A2/1 WAL-2 6.21 NCB Mulshi, Dist : Pune for Waghjai WUA Walen Rehabilitation work of Walen M. I. Project Tal : A2/2 WAL-2 6.21 NCB Mulshi, Dist : Pune for Waghjai WUA Walen Rehabilitation work of Walen M. I. Project Tal : R3 WAL-2 7 NCB 4 3 7.00 Mulshi, Dist : Pune for Waghjai WUA Walen Rehabilitation work of Walen M. I. Project Tal : A3/1 WAL-2 6.83 NCB Mulshi, Dist : Pune for Waghjai WUA Walen 2/24/2011 wua_prmpkg_r4 258 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Walen M. I. Project Tal : A3/2 WAL-2 6.83 NCB 0 0 0 0 1 5.83 0.00 6.83 Mulshi, Dist : Pune for Waghjai WUA Walen WUA/Comm 212 Alegaon ALE-2 Rehabilitation of dist.system 3.91 1.76 1.56 0.59 3.91 unity level WUA/Comm R ALE-2 Rehabilitation of dist.system 3.91 0.98 2.35 0.59 3.91 unity level 1482 R2 ALE-2 Saikrupa WUA, Alegaon, Tal : Shirur 6.22 NCB 0.622 3.421 2.177 6.220 Rehabilitation work of Alegaon M. I. Project Tal A2 ALE-2 6.21 NCB : Shirur, Dist : Pune for Saikrupa WUA Alegaon Rehabilitation work of Alegaon M. I. Project Tal R3 ALE-2 5.77 NCB 0.5 3 2.27 5.77 : Shirur, Dist : Pune for Saikrupa WUA Alegaon Rehabilitation work of Alegaon M. I. Project Tal A3/1 ALE-2 5.77 NCB : Shirur, Dist : Pune for Saikrupa WUA Alegaon Rehabilitation work of Alegaon M. I. Project Tal A3 ALE-2 5.77 NCB 0 0 0 0 2.02 3.75 0.00 5.77 : Shirur, Dist : Pune for Saikrupa WUA Alegaon WUA/Comm 213 Mahur MAH-2 Rehabilitation of dist.system 5.67 2.55 2.27 0.85 5.67 unity level WUA/Comm R MAH-2 Rehabilitation of dist.system 5.67 1.42 3.40 0.85 5.67 unity level 1483 R2 MAH-2 Mahurjari WUA, Mahur, Tal : Purandar 6.09 NCB 1.523 3.045 1.523 6.090 Rehabilitation work of Mahur M. I. Project Tal : A2 MAH-2 6.07 NCB 0 0 2 0.91 1.5 1.66 6.07 Purandar, Dist : Pune for Mahurjai WUA Mahur WUA/Comm 214 Pimpoli PIM-2 Rehabilitation of dist.system 5.28 2.37 2.11 0.79 5.28 unity level WUA/Comm R PIM-2 Rehabilitation of dist.system 5.28 1.32 3.17 0.79 5.28 unity level 1484 R2 PIM-2 Okareshwar WUA, Pimpoli, Tal : Mulshi 6.06 NCB 1.515 3.030 1.515 6.060 Rehabilitation work of Pimpoli M. I. Project Tal A2 PIM-2 : Mulshi, Dist : Pune for Omkareshwar WUA 6.06 NCB Pimpoli Rehabilitation work of Pimpoli M. I. Project Tal A2/1 PIM-2 : Mulshi, Dist : Pune for Omkareshwar WUA 6.35 NCB 0 0 0 0 0.88 5.47 0.00 6.35 Pimpoli 2/24/2011 wua_prmpkg_r4 259 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 WUA/Comm 215 Diwale DIW-2 Rehabilitation of dist.system 5.80 2.61 2.32 0.87 5.80 unity level WUA/Comm R DIW-2 Rehabilitation of dist.system 5.80 1.45 3.48 0.87 5.80 unity level 1485 R2 DIW-2 Balaji WUA, Diwale, Tal : Bhor 6.28 NCB 1.570 3.140 1.570 6.280 Rehabilitation work of Diwale M. I. Project Tal : A2 DIW-2 6.32 NCB 0.00 0.00 1.20 4.57 0.44 0.11 6.32 Bhor, Dist : Pune for Balaji WUA Diwale WUA/Comm 216 Sidhunath SID-2 Rehabilitation of dist.system 11.02 4.41 4.41 2.20 11.02 unity level WUA/Comm R SID-2 Rehabilitation of dist.system 11.02 2.76 6.61 1.65 11.02 unity level 1486 R2 SID - 2 Shri. Vithal WUA Sidhanath,Daribadchi, Jalihal 10.87 NCB 2.174 5.435 3.261 10.870 Rehabilitation work of SIDTHNATH MI Project A2 SID - 2 Tal. Jath Dist. Sangli (Package No. SID II)for 11.725 NCB 0.857 5.019 5.849 11.73 Vithal WUA Sidthnath. WUA/Comm 217 Dighanchi DIG-2 Rehabilitation of dist.system 8.65 3.46 3.46 1.73 8.65 unity level WUA/Comm R DIG-2 Rehabilitation of dist.system 8.65 2.16 5.19 1.30 8.65 unity level 1487 R2 DIG - 2 Udayraj WUA dighanchi 9.33 NCB 1.866 4.665 2.799 9.330 Rehabilitation work of DIGHANCHI MI Project A2 DIG - 2 Tal. Atpadi Dist. Sangli (Package No. DIG II)for 10.179 NCB 0 5.346 4.833 10.18 Udayraj WUA Dighanchi. WUA/Comm 218 Kadegaon KAE-2 Rehabilitation of dist.system 5.52 2.49 2.21 0.83 5.52 unity level WUA/Comm R KAE-2 Rehabilitation of dist.system 5.52 1.38 3.31 0.83 5.52 unity level 1488 R2 KAE-2 Govindgiri WUA Kadegaon 3.22 NCB 0.644 1.610 0.966 3.220 Rehabilitation work of KADEGAON MI Project A2 KAE-2 Tal.Kadegaon Dist. Sangli (Package No. KDG 3.46 NCB 0.155 1.3468 1.9584 3.46 II)for Govidgiri WUA Kadegaon. WUA/Comm 219 Anjani AJN-2 Rehabilitation of dist.system 6.50 2.93 2.60 0.98 6.50 unity level WUA/Comm R AJN-2 Rehabilitation of dist.system 6.50 1.63 3.90 0.98 6.50 unity level 1489 R2 ANJ - 2 Srimati bhagirathi Ramrao Patil WUA Anjani 5.87 NCB 1.174 2.935 1.761 5.870 2/24/2011 wua_prmpkg_r4 260 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of ANJANI MI Project Tal.Tasgaon Dist. Sangli (Package No. ANJ A2 ANJ - 2 6.198 NCB 2.555 2.384 1.654 0.534 7.13 II)for Smt. Bhagirthi Rajaram Patil WUA Anjani. WUA/Comm 220 Kuchi KUC-2 Rehabilitation of dist.system 4.52 2.03 1.81 0.68 4.52 unity level WUA/Comm R KUC-3 Rehabilitation of dist.system 4.52 1.13 2.71 0.68 4.52 unity level 1490 R2 KUC - 2 Dhanlaxmi WUA Kuchi. 5.00 NCB 1.000 2.500 1.500 5.000 Rehabilitation work of KUCHI MI Project A2 KUC - 2 Tal.Kavathemahankal Dist. Sangli (Package No. 5.373 NCB 0.155 3 2.262 0.493 5.91 KUC II)for Dhanlaxami WUA Kuchi. WUA/Comm 221 Linganur LIN-2 Rehabilitation of dist.system 3.96 1.78 1.58 0.59 3.96 unity level WUA/Comm R LIN-3 Rehabilitation of dist.system 3.96 0.99 2.38 0.59 3.96 unity level 1491 R2 LIN - 2 Kad deo WUA Lingnoor 4.17 NCB 0.834 2.085 1.251 4.170 Rehabilitation work of LINGNOOR MI Project A2 LIN - 2 Tal. Miraj Dist. Sangli (Package No. LIN II)for 4.624 NCB 0.155 1 2.3843 1.0847 4.62 Kaddeo WUA Lingnoor. WUA/Comm 222 Hivre HIV-2 Rehabilitation of dist.system 6.62 2.98 2.65 0.99 6.62 unity level WUA/Comm R HIV-2 Rehabilitation of dist.system 6.62 1.65 3.97 0.99 6.62 unity level 1492 R2 HIV-2 Yemaidevi WUA, Jam Kd, Tal : Koregaon 7.46 NCB 1.865 3.730 1.865 7.460 Rehabilitation work of Hiware M. I. Project Tal : A2 HIV-2 Koregaon, Dist : Satara for Yamaidevi WUA 6.911 NCB 0.00 0.00 0.00 2.53 0.46 3.92 0.00 6.91 Jamb WUA/Comm 223 Tambave TAM-2 Rehabilitation of dist.system 11.80 4.72 4.72 2.36 11.80 unity level WUA/Comm R TAM-2 Rehabilitation of dist.system 11.80 2.95 7.08 1.77 11.80 unity level 1493 R2 TAM-2/1 Aradgaon WUA, Aaradgaon, Tal : Phaltan 5.61 NCB 1.403 2.805 1.403 5.610 Rehabilitation work of Tambve M. I. Project Tal A2 TAM-2/1 : Phaltan, Dist : Satara for Aradgaon WUA 5.218 NCB 0.00 0.00 0.00 0.84 0.67 3.71 0.00 5.22 Aradgaon 1494 R2 TAM-2/2 Shri Sant Dnyeshwar WUA, Tambve, Tal : Phalta 6.44 NCB 1.610 3.220 1.610 6.440 2/24/2011 wua_prmpkg_r4 261 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Tambve M. I. Project Tal A2 TAM-2/2 : Phaltan, Dist : Satara for Shree Sant Dnyeshwar 5.728 NCB 0.00 0.00 0.00 1.03 0.00 4.70 0.00 5.73 WUA Tambve WUA/Comm 225 Mayani MYN-2 Rehabilitation of dist.system 21.78 8.71 8.71 4.36 21.78 unity level WUA/Comm R MYN-2 Rehabilitation of dist.system 21.78 5.45 13.07 3.27 21.78 unity level 1495 R2 MYN-2 Sidhanath WUA, Mayani, Tal : Khatav 21.70 NCB 2.170 11.935 7.595 21.700 Rehabilitation work of Mayani M. I. Project Tal : A2 MYN-2 Khatav, Dist : Satara for Sidhanath WUA 11.658 NCB 0.00 0.00 0.00 0.00 0.00 11.66 0.00 11.66 Mayani WUA/Comm 226 Nandval NDV-2 Rehabilitation of dist.system 4.30 1.93 1.72 0.64 4.30 unity level WUA/Comm R NDV-2 Rehabilitation of dist.system 4.30 1.07 2.58 0.64 4.30 unity level 1496 R2 NDV-2 Mhataba WUA, Nandwal, Tal : Koregaon 4.94 NCB 1.235 2.470 1.235 4.940 Rehabilitation work of Nandwal M. I. Project Tal A2 NDV-2 : Koregaon, Dist : Satara for Mhatoba WUA 4.645 NCB 0.00 0.00 0.00 0.92 0.00 3.72 0.00 4.65 Nandwal Rehabilitation work of Satewadi M. I. Project Satewadi SAT-2 Tal : Khatav, Dist : Satara for Januvai WUA Satewadi Rehabilitation work of Satewadi M. I. Project A2 SAT-2 Tal : Khatav, Dist : Satara for Januvai WUA 1.089 Shopping 0.00 0.00 0.00 0.25 0.51 0.33 0.00 1.09 Satewadi Rehabilitation work of Pingali M. I. Project Tal : Pingali PIN-2 Man, Dist : Satara for Shri Sidhanath WUA 0 Dahiwadi Rehabilitation work of Pingali M. I. Project Tal : A2 PIN-2/1 Man, Dist : Satara for Shri Sidhanath WUA 5.882 NCB 0.00 0.00 0.00 2.44 0.00 3.44 0.00 5.88 Dahiwadi Rehabilitation work of Pingali M. I. Project Tal : A2 PIN-2/2 Man, Dist : Satara for Shri Pingaljai WUA 3.96 NCB 0.00 0.00 0.00 1.32 0.00 2.64 0.00 3.96 Pingali WUA/Comm 227 Banganga BGG-2 Rehabilitation of dist.system 13.18 5.93 5.27 1.98 13.18 unity level WUA/Comm R BGG-2 Rehabilitation of dist.system 13.18 3.30 7.91 1.98 13.18 unity level 1497 R2 BGG-2/1 Shrimant Maloji Raje WUA No 1, Kurwali Kd, T 1.30 Shopping 0.325 0.845 0.130 1.300 2/24/2011 wua_prmpkg_r4 262 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Banganga M. I. Project A2 BGG-2/1 Tal : Phaltan, Dist : Satara for Shrimant 1.282 Shopping 0.00 0.00 0.00 0.46 0.00 0.82 0.00 1.28 Malojiraji WUA No.1 Wathar, Tal : Phaltan 1498 R2 BGG-2/2 Shrimant Maloji Raje WUA No 2, Tawadi, Tal : P 6.08 NCB 1.520 3.040 1.520 6.080 Rehabilitation work of Banganga M. I. Project A2 BGG-2/2 Tal : Phaltan, Dist : Satara for Shrimant 5.73 NCB 0.00 0.00 0.00 0.00 0.00 5.73 0.00 5.73 Malojiraji WUA No.2 Tawadi, Tal : Phaltan 1499 R2 BGG-2/3 Shrimant Maloji Raje WUA No 3, Wathar Nimba 5.82 NCB 1.455 2.910 1.455 5.820 Rehabilitation work of Banganga M. I. Project A2 BGG-2/3 Tal : Phaltan, Dist : Satara for Shrimant 5.337 NCB 0.00 0.00 0.00 0.99 0.00 4.35 0.00 5.34 Malojiraji WUA No.3 Wathar, Tal : Phaltan WUA/Comm 228 Rampur RPR-2 Rehabilitation of dist.system 5.80 2.61 2.32 0.87 5.80 unity level WUA/Comm R RPR-2 Rehabilitation of dist.system 5.80 1.45 3.48 0.87 5.80 unity level 1) REHABILITATION & MODERNIZATION OF MAIN CANAL KM.0/000 TO 8/641 & 1500 R2 RPR-2 MINOR-1 OF RAMPUR M.I.TANK 6.16 NCB 1.848 3.696 0.616 6.160 TAL:SOUTH SOLAPUR , DIST-SOLAPUR ( MAHADEO WUA RAMPUR) Rehabilation & Moderization of Main Canal KM.0/000 to 8/641 & Minor-1 of Rampur A2 RPR-2 M.I.Tank Tal:South Solapur , Dist-Solapur 5 NCB 4.12 0.77 0.97 5.86 (NCB-11) ( Mahadeo WUA Rampur) (Package RPR-2) Padwalkarwa WUA/Comm 229 PWK-2 Rehabilitation of dist.system 5.54 2.49 2.21 0.83 5.54 di unity level WUA/Comm R PWK-2 Rehabilitation of dist.system 5.54 1.38 3.32 0.83 5.54 unity level (1) REHABILITATION & MODERNIZATION OF MAIN CANAL KM.0/000 TO 4/000 OF 1501 R2 PWK-2/1 PADWALKARWADI M.I.TANK 4.12 NCB 1.236 2.472 0.412 4.120 TAL:MANGALWEDHA,DIST- SOLAPUR ( AHILYADEVI WUA PADWALKARWADI) 2/24/2011 wua_prmpkg_r4 263 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 (1) Rehabilation & Moderization of Main Canal KM.0/000 TO 4/000 OF Padwalkarwadi A2 PWK-2/1 M.I.Tank Tal:Mangalwedha, Dist- Solapur 3.74 NCB 1.18 2.26 0.52 3.96 (NCB-04) (Ahilyadevi WUA Padwalkarwadi) (PackagePWK-2) (2) REHABILITATION WORK OF MAIN CANAL KM.4/000 TO 6/155 OF 1502 R2 PWK-2/2 PADWALKARWADI M.I.TANK 2.18 NCB 0.654 1.308 0.218 2.180 TAL:MANGALWEDHA,DIST- SOLAPUR ( MAHADEO WUA LONAR) (2) Rehabilation & Moderization of Main Canal KM.4/000 TO 6/155 OF Padwalkarwadi A2 PWK-2/2 M.I.TANK Tal:Mangalwedha, Dist- Solapur 2.23 NCB 0.56 1.75 0.35 2.66 (NCB-08) (Mah WUA LONAR) (PackagePWK-2) WUA/Comm 230 Sirwalwadi SWW-2 Rehabilitation of dist.system 7.91 3.16 3.16 1.58 7.91 unity level WUA/Comm R SWW-2 Rehabilitation of dist.system 7.91 1.98 4.75 1.19 7.91 unity level (1) REHABILITATION & MODERNIZATION OF OF DY.NO.1 & MINOR NO 1 & 2 OF SHIRWALWADI M.I.TANK 1503 R2 SWW-2/1 3.49 NCB 1.047 2.094 0.349 3.490 TAL:AKKALKOT, DIST-SOLAPUR ( PANCHLINGESHWAR WUA SHIRWALWADI) REHABILITATION OF DIST. CH. 0/000 TO 0/500, A2 SWW-2/2 MINOR NO.1 CH.0/000 TO 1/410 & MINOR NO.2 3.086 NCB 2.170 0.540 0.650 3.36 CH.0/000 TO 1/890 OF SHIRWALWADI M.I.TANK TAL:AKKALKOT DIST-SOLAPUR (2) REHABILITATION & MODERNIZATION OF MAIN CANAL KM. 0/000 TO 5/100 OF 1504 R2 SWW-2/2 SHIRWALWADI M.I.TANK 4.92 NCB 1.476 2.952 0.492 4.920 TAL:AKKALKOT , DIST-SOLAPUR ( BHAIRAVNATH WUA SADLAPUR) REHABILITATION OF MAIN CANAL KM. 0/000 TO A2 SWW-2/2 5/100 OF SHIRWALWADI M.I.TANK TAL:AKKALKOT 4.269 NCB 2.660 1.120 0.960 4.74 , DIST-SOLAPUR 2/24/2011 wua_prmpkg_r4 264 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 WUA/Comm 231 Hanjagi HAN-2 Rehabilitation of dist.system 5.15 2.32 2.06 0.77 5.15 unity level WUA/Comm R HAN-2 Rehabilitation of dist.system 5.15 1.29 3.09 0.77 5.15 unity level 1) REHABILITATION & MODERNIZATION OF MAIN CANAL KM.0/000 TO 3/000 OF 1505 R2 HAN-2 HANJGI M.I.TANK TAL:AKKALKOT , 4.76 NCB 1.428 2.856 0.476 4.760 DIST-SOLAPUR ( HANUMAN WUA HANJAGI) REHABILITATION OF CANAL KM.0/000 TO 3/000 OF A2 HAN-2 4.300 NCB 3.910 0.740 0.110 4.76 HANJGI M.I.TANK TAL:AKKALKOT , DIST-SOLAPUR WUA/Comm 232 Chincholi CHI-2 Rehabilitation of dist.system 11.60 4.64 4.64 2.32 11.60 unity level WUA/Comm R CHI-2 Rehabilitation of dist.system 11.60 2.90 6.96 1.74 11.60 unity level (1) REHABILITATION & MODERNIZATION OF MAIN CANAL KM.0/000 TO 5/070 AND 1506 R2 CHI-2/1 CHINCHOLI Dy OF CHINCHOLI M.I.TANK 4.73 NCB 1.419 2.838 0.473 4.730 TAL:SANGOLA,DIST- SOLAPUR ( JAI MALHAR WUA CHINCHOLII) REHABILITATION OF MAIN CANAL KM.0/000 TO A2 CHI-2/1 5/070 AND CHINCHOLI MINOR OF CHINCHOLI 6.579 NCB 3.760 2.860 0.950 7.57 M.I.TANK TAL:SANGOLA, DIST-SOLAPUR (2) REHABILITATION & MODERNIZATIONOF MAIN CANAL KM.5/070 TO 7/100 AND BAMANI Dy OF 1507 R2 CHI-2/2 CHINCHOLI M.I.TANK TAL:SANGOLA, 6.85 NCB 2.055 4.110 0.685 6.850 DIST- SOLAPUR ( HANUMAN WUA BAMANI) REHABILITATION OF MAIN CANAL KM.5/070 TO A2 CHI-2/2 7/100 AND BAMANI DIST.KM. 0/00 TO 3/260 OF 5.190 NCB 3.630 1.010 0.730 5.37 CHINCHOLI M.I.TANK TAL:SANGOLA, DIST- SOLAPUR WUA/Comm 234 Kanadi KND-2 Rehabilitation of dist.system 3.30 1.48 1.32 0.49 3.30 unity level WUA/Comm R KND-2 Rehabilitation of dist.system 3.30 0.82 1.98 0.49 3.30 unity level 1508 R2 KND-2 Jai Hanuman W.U.A. Kanadi 10.66 NCB 0.53 5.330 4.797 10.660 2/24/2011 wua_prmpkg_r4 265 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Kanadi Minor Project A2 KND-2 Tq. Barshi Takli Dist. Akola For Jai Hanuman 3.72 NCB W.U.A. Kanadi (Package KND-2) Rehabilitation work of Kanadi Minor Project A2/1 KND-2 Tq. Barshi Takli Dist. Akola For Jai Hanuman 3.72 NCB W.U.A. Kanadi (Package KND-2) Rehabilitation work of Kanadi Minor Project A2/2 KND-2 Tq. Barshi Takli Dist. Akola For Jai Hanuman 3.90 NCB 2.92 1.52 4.44 W.U.A. Kanadi (Package KND-2) WUA/Comm 235 Tuljapur TJP-2 Rehabilitation of dist.system 1.95 0.88 0.78 0.29 1.95 unity level WUA/Comm R TJP-2 Rehabilitation of dist.system 1.95 0.49 1.17 0.29 1.95 unity level 1509 R2 TJP-2 Tuljabhawani W.U.A. Tuljapur 4.05 NCB 0.20 2.025 1.823 4.050 Rehabilitation work of Tuljapur Minor Project A2 TJP-2 Tq. Patur Dist.Akola For Tuljabhawani 2.26 NCB 0 1.38 0.89 2.27 W.U.A. Tuljapur (Package TJP-2) WUA/Comm 237 Dharur DHR-2 Rehabilitation of dist.system 2.78 1.25 1.11 0.42 2.78 unity level WUA/Comm R DHR-2 Rehabilitation of dist.system 2.78 0.69 1.67 0.42 2.78 unity level 1510 R2 DHR-2 Dharureshwar W.U.A. Dharur 6.91 NCB 0.35 3.455 3.110 6.910 Rehabilitation work of Dharur Minor Project A2 DHR-2 Tq. Akot Dist.Akola For Dharureshwar 3.17 NCB W.U.A. Dharur (Package DHR-2 ) Rehabilitation work of Dharur Minor Project A2/1 DHR-2 Tq. Akot Dist.Akola For Dharureshwar 3.17 NCB W.U.A. Dharur (Package DHR-2 ) Rehabilitation work of Dharur Minor Project A2/2 DHR-2 Tq. Akot Dist.Akola For Dharureshwar 3.17 NCB W.U.A. Dharur (Package DHR-2 ) Rehabilitation work of Dharur Minor Project A2/3 DHR-2 Tq. Akot Dist.Akola For Dharureshwar 3.17 NCB W.U.A. Dharur (Package DHR-2 ) 2/24/2011 wua_prmpkg_r4 266 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of Dharur Minor Project R3 DHR-2 Tq. Akot Dist.Akola For Dharureshwar 3.17 NCB 0.4755 1.7435 0.951 3.17 W.U.A. Dharur (Package DHR-2 ) Rehabilitation work of Dharur Minor Project A3 DHR-2 Tq. Akot Dist.Akola For Dharureshwar 3.63 NCB 2 2 4.00 W.U.A. Dharur (Package DHR-2 ) WUA/Comm 238 Isapur ISP-2 Rehabilitation of dist.system 3.17 1.42 1.27 0.47 3.17 unity level WUA/Comm R ISP-2 Rehabilitation of dist.system 3.17 0.79 1.90 0.47 3.17 unity level 1511 R2 ISP-2 Jai Bhawani W.U.A. Pimpalgaon Chambhare 14.75 NCB 0.74 7.375 6.638 14.750 Rehabilitation work of Isapur Minor Project Tq. A2 ISP-2 Barshi Takli Dist. Akola For Jai Bhawani 3.79 NCB 0 1.46 2.94 4.40 W.U.A. Pimpalgaon Chambhare (Package ISP-2) Pimpalgaonh WUA/Comm 239 PPG-2 Rehabilitation of dist.system 3.32 1.50 1.33 0.50 3.32 ande unity level WUA/Comm R PPG-2 Rehabilitation of dist.system 3.32 0.83 1.99 0.50 3.32 unity level 1512 R2 PPG-2 Shri. Shenkeshwar W.U.A. Jamekeshwar 10.48 NCB 0.52 5.240 4.716 10.480 Rehabilitation work of P.Hande Minor Project Tq.Barshi Takli Dist. Akola For Shri. A2 PPG-2 3.67 NCB 0 3.78 0.26 4.04 Shenkeshwar W.U.A. Jamekeshwar (Package PPG-2) WUA/Comm 240 Salai SLI-2 Rehabilitation of dist.system 4.52 2.03 1.81 0.68 4.52 unity level WUA/Comm R SLI-2 Rehabilitation of dist.system 4.52 1.13 2.71 0.68 4.52 unity level 1512 R2 SLI-2 1) JaikisanW.U.A.Ltd. Salai Tq.Dharni 5.25 NCB 0.26 2.625 2.363 5.250 Rehabilitation work of Salai Minor Project Tq. Dharni Dist. Amravati For 1) A2 SLI-2 5.35 NCB 0 0.00 5.76 5.76 JaikisanW.U.A.Ltd. Salai Tq.Dharni (Package SLI-2) WUA/Comm 241 Khatijapur KTJ-2 Rehabilitation of dist.system 6.76 3.04 2.70 1.01 6.76 unity level WUA/Comm R KTJ-2 Rehabilitation of dist.system 6.76 1.69 4.06 1.01 6.76 unity level 2/24/2011 wua_prmpkg_r4 267 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1)Ambarajibaba W.U.A.Ltd.Parsapur 1512 R2 KTJ-2 2.90 NCB 0.15 1.450 1.305 2.900 Tq.Achalpur Rehabilitation work of Khatizapur Minor Project Tq.Achalpur Dist. Amravati For A2 KTJ-2 3.04 NCB 0 2.20 0.85 3.05 1)Ambarajibaba W.U.A.Ltd.Parsapur Tq.Achalpur (Package KTJ-2) Rehabilitation work of Khatizapur Minor Project Tq.Achalpur Dist. Amravati For 2) A2 KTJ-2 4.99 NCB 0 4.20 0.94 5.14 JaikisanW.U.A.Ltd. Parsapur Tq.Achalpur (Package KTJ-2) Pimpalgaonn WUA/Comm 242 PGN-2 Rehabilitation of dist.system 5.11 2.30 2.04 0.77 5.11 ath unity level WUA/Comm R PGN-2 Rehabilitation of dist.system 5.11 1.28 3.06 0.77 5.11 unity level 1513 R2 PGN-2 Kamalnath W.U.A.Pimgaon Nath 6.50 NCB 0.33 3.250 2.925 6.500 Rehabilitation work of P.Nath Minor Project A2 PGN-2 Tq. Khamgaon Dist. Buldana For Kamalnath 6.08 NCB 0 5.59 0.47 6.06 W.U.A.Pimgaon Nath (Package PGN-2) Rehabilitation work of Pimpal shenda Minor Project Tq. Murtizapur Dist.Akola For Vitthal Pimpalshenda PGS-2 Rukhmai W.U.A. Pimpalshenda (Package PGS- 2) Rehabilitation work of Pimpal shenda Minor Project Tq. Murtizapur Dist.Akola For Vitthal R4 Rukhmai W.U.A. Pimpalshenda (Package PGS- 2) Rehabilitation work of Pimpal shenda Minor Project Tq. Murtizapur Dist.Akola For Vitthal A4 8.31 NCB 2.77 6.37 9.14 Rukhmai W.U.A. Pimpalshenda (Package PGS- 2) WUA/Comm 243 Chougaon CHG-2 Rehabilitation of dist.system 10.81 4.33 4.33 2.16 10.81 unity level WUA/Comm R CHG-2 Rehabilitation of dist.system 10.81 2.70 6.49 1.62 10.81 unity level 1514 R2 CHG-2 Rehabilitation of dist. system 11.871 NCB 2.374 5.936 3.561 11.871 Rehabilitation Work of Canal System of A2 CHG-2 Chaougoan Minor Project Tal Dist Dhule For 11.28 NCB Ch Chaogaon WUA Chaugaon Tal Dist Dhule 2/24/2011 wua_prmpkg_r4 268 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation Work of Canal System of A2/1 CHG-2 Chaougoan Minor Project Tal Dist Dhule For 11.71 NCB 5.38 3.3 3.03 11.71 Ch Chaogaon WUA Chaugaon Tal Dist Dhule WUA/Comm 244 Mitgaon MIT-2 Rehabilitation of dist.system 2.11 0.95 0.84 0.32 2.11 unity level WUA/Comm R MIT-2 Rehabilitation of dist.system 2.11 0.53 1.27 0.32 2.11 unity level 1515 R2 MIT-2 Rehabilitation of dist. system 2.317 NCB 0.463 1.159 0.695 2.317 Rehabilitation Work of Canal System of Mitgaon A2 MIT-2 Minor Project Tal Shirpur Dist Dhule For Ch 2.20 NCB Mitgaoj WUA Malkatar Tal Shipur Dist Dhule Rehabilitation Work of Canal System of Mitgaon A2/1 MIT-2 Minor Project Tal Shirpur Dist Dhule For Ch 2.31 NCB 1.13 0.8 0.38 2.31 Mitgaoj WUA Malkatar Tal Shipur Dist Dhule WUA/Comm 246 Budaki BDK-2 Rehabilitation of dist.system 7.14 2.86 2.86 1.43 7.14 unity level WUA/Comm R BDK-2 Rehabilitation of dist.system 7.14 1.78 4.28 1.07 7.14 unity level 1516 R2 BDK-2 Rehabilitation of dist. system 8.159 NCB 1.632 4.080 2.448 8.159 Rehabilitation work of canal system of Budaki A2 BDK-2 Minor Project Tal. Shirpur Dist. Dhule For Ch 7.77 NCB Budaki WUA Borade Tal Shirpur Rehabilitation work of canal system of Budaki A2/1 BDK-2 Minor Project Tal. Shirpur Dist. Dhule For Ch 8.15 NCB 1.66 2.03 4.46 8.15 Budaki WUA Borade Tal Shirpur WUA/Comm 247 Kothare KTH-2 Rehabilitation of dist.system 9.60 3.84 3.84 1.92 9.60 unity level WUA/Comm R KTH-2 Rehabilitation of dist.system 9.60 2.40 5.76 1.44 9.60 unity level 1517 R2 KTH-2 Rehabilitation of dist. system 6.662 NCB 1.332 3.331 1.999 6.662 Rehabilation work of canal systme of Kothare A2 KTH-2 M.I. Tal Dist Dhule For Ch Jai Bhole WUA 6.81 NCB 1.07 2.17 3.57 6.81 Amarale Tal Shindhkheda WUA/Comm 249 Velhale VEL-2 Rehabilitation of dist.system 4.74 2.13 1.90 0.71 4.74 unity level 2/24/2011 wua_prmpkg_r4 269 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 WUA/Comm R VEL-2 Rehabilitation of dist.system 4.74 1.19 2.85 0.71 4.74 unity level Rehabilition work in the jurdicition of Jivandhara W U Asso Velhale for right bank 1518 R2 VEL-2 NCB 0.000 0.000 0.000 0.000 canal of Velhale M.I.Tank Tal.Bhusawal dist Jalgaon Rehabilitation work in the jurisdiction of Jiwan Dhara Water User Association Velhale for A2 VEL-2 5.59 NCB Right Bank Canal of Velhale M.I.Tank Tal. Bhusawal Dist. Jalgaon Rehabilitation work in the jurisdiction of Jiwan Dhara Water User Association Velhale for A2/1 VEL-2 5.30 NCB Right Bank Canal of Velhale M.I.Tank Tal. Bhusawal Dist. Jalgaon Rehabilitation work in the jurisdiction of Jiwan Dhara Water User Association Velhale for A2/2 VEL-2 5.30 NCB Right Bank Canal of Velhale M.I.Tank Tal. Bhusawal Dist. Jalgaon Rehabilitation work in the jurisdiction of Jiwan Dhara Water User Association Velhale for A2/3 VEL-2 5.30 NCB Right Bank Canal of Velhale M.I.Tank Tal. Bhusawal Dist. Jalgaon Rehabilitation work in the jurisdiction of Jiwan Dhara Water User Association Velhale for R3 VEL-2 5.69 NCB 0.2845 3.6985 1.707 5.69 Right Bank Canal of Velhale M.I.Tank Tal. Bhusawal Dist. Jalgaon Rehabilitation work in the jurisdiction of Jiwan Dhara Water User Association Velhale for A3 VEL-2 5.96 NCB 0.00 0.00 0.00 0.00 1.00 4.96 5.96 Right Bank Canal of Velhale M.I.Tank Tal. Bhusawal Dist. Jalgaon WUA/Comm 251 Badrakha BDR-2 Rehabilitation of dist.system 4.36 1.96 1.75 0.65 4.36 unity level WUA/Comm R BDR-2 Rehabilitation of dist.system 4.36 1.09 2.62 0.65 4.36 unity level Rehabilition work in the jurdicition of Navalai 1519 R2 BDR-2 Mata W U Asso Badarkha for right bank canal 5.019 NCB 1.255 2.510 1.255 5.019 of Badarkha M.I.Tank Tal.Pachora dist Jalgaon 2/24/2011 wua_prmpkg_r4 270 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work in the jurisdiction A2 BDR-2 of NavliMata WUA Badarkha On Right 4.77 NCB Bank Canal for Badarkha M.I.Tank Tal.- Pachora Rehabilitation work in the jurisdiction A2/1 BDR-2 of NavliMata WUA Badarkha On Right 4.98 NCB 0.00 0.00 0.00 0.95 0.50 3.58 0.00 5.03 Bank Canal for Badarkha M.I.Tank Tal.- Pachora WUA/Comm 252 Shewaga SWG-2 Rehabilitation of dist.system 7.26 2.90 2.90 1.45 7.26 unity level WUA/Comm R SWG-2 Rehabilitation of dist.system 7.26 1.81 4.35 1.09 7.26 unity level Rehabilition work in the jurdicition of Sant 1520 R2 SWG-2 Gajanan W U Asso.Shevga on RBC 3.929 NCB 0.786 1.965 1.179 3.929 Shevga Tal Jamner dist Jalgaon Rehabilitation work in the jurisdiction A2 SWG-2/1 of Sant Gajanan WUA Shevaga On 3.73 NCB Right Bank Canal for Shevaga M.I.Tank Tal.- Jamner Rehabilitation work in the jurisdiction A2/1 SWG-2/1 of Sant Gajanan WUA Shevaga On 3.91 NCB 0.00 0.00 0.00 0.00 1.33 2.58 0.00 3.91 Right Bank Canal for Shevaga M.I.Tank Tal.- Jamner Rehabilitation work in the jurisdiction A2 SWG-2/2 of Ramdevji Baba WUA Shevaga On 4.07 NCB Left Bank Canal for Shevaga M.I.Tank Tal.- Jamner Rehabilitation work in the jurisdiction A2/1 SWG-2 of Ramdevji Baba WUA Shevaga On 4.25 NCB 0.00 0.00 0.00 0.00 1.00 3.25 0.00 4.25 Left Bank Canal for Shevaga M.I.Tank Tal.- Jamner WUA/Comm 253 Kanakraj KNK-2 Rehabilitation of dist.system 4.29 1.93 1.71 0.64 4.29 unity level 2/24/2011 wua_prmpkg_r4 271 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 WUA/Comm R KNK-2 Rehabilitation of dist.system 4.29 1.07 2.57 0.64 4.29 unity level Rehabilitation work of Kankaraj Minor A2 KNK-2 Project under Shri.Sant Somagir 4.32 NCB Maharaj WUA Bhilali Tal.Parola Rehabilitation work of Kankaraj Minor A2/1 KNK-2 Project under Shri.Sant Somagir 4.53 NCB 0.84 0.25 3.44 4.53 Maharaj WUA Bhilali Tal.Parola WUA/Comm 256 Ambebara ABB-2 Rehabilitation of dist.system 13.00 5.20 5.20 2.60 13.00 unity level WUA/Comm R ABB-2 Rehabilitation of dist.system 13.00 3.25 7.80 1.95 13.00 unity level 1521 R2 ABB-2 Rehabilitation of dist. system 6.965 NCB 1.393 3.483 2.090 6.965 Rehabilitation work of Canal System of A2 ABB-2 Ambebara Minor Project Tal Nandurbar Dist 7.43 NCB 7.43 7.43 Nandurbar WUA/Comm 257 Dudhakheda DHK-2 Rehabilitation of dist.system 6.25 2.81 2.50 0.94 6.25 unity level WUA/Comm R DHK-2 Rehabilitation of dist.system 6.25 1.56 3.75 0.94 6.25 unity level 1522 R2 DHK-2 Rehabilitation of dist. system 6.78 NCB 1.356 3.390 2.034 6.780 Rehabilitation work of Canal System of A2 DHK-2 Dudhakheda Minor Project Tal Shahada Dist 6.42 NCB 6.42 6.42 Nandurbar WUA/Comm 258 Khadkuna KDK-2 Rehabilitation of dist.system 13.61 5.45 5.45 2.72 13.61 unity level WUA/Comm R KDK-2 Rehabilitation of dist.system 13.61 3.40 8.17 2.04 13.61 unity level 1523 R2 KDK-2 Rehabilitation of dist. system 14.584 NCB 2.917 7.292 4.375 14.584 Rehabilation work of canal systme of Khadkuna A2 KDK-2 M.I. Tal Akkalkuwa Dist Nandurbar For Ch Jay 14.84 NCB 4.33 10.51 14.84 Yogeshwar WUA Khadkuna Tal Akkalkuwa WUA/Comm 260 Khekada KKD-2 Rehabilitation of dist.system 6.31 2.84 2.52 0.95 6.31 unity level WUA/Comm R KKD-2 Rehabilitation of dist.system 6.31 1.58 3.78 0.95 6.31 unity level 1524 R2 KKD-2 Rehabilitation of dist. system 5.966 NCB 1.193 2.983 1.790 5.966 2/24/2011 wua_prmpkg_r4 272 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation work of canal system of Khekada A2 KKD-2 Minor Project Tal. Navapur Dist. Nandurbar For 5.64 NCB Ch Gaymukh WUA Khekada Tal Akkalkuwa Rehabilitation work of canal system of Khekada A2/1 KKD-2 Minor Project Tal. Navapur Dist. Nandurbar For 5.91 NCB 5.91 5.91 Ch Gaymukh WUA Khekada Tal Akkalkuwa WUA/Comm 262 Khadakozar KKZ-2 Rehabilitation of dist.system 25.56 10.22 10.22 5.11 25.56 unity level WUA/Comm R KKZ-2 Rehabilitation of dist.system 25.56 6.39 15.34 3.83 25.56 unity level Ha Bha Pa Harekrishna Baba Water Use's 1525 R2 KKZ-2/1 Co.Operative Society, Devargaon, 16.32 NCB 1.632 8.160 6.528 16.320 Tal.Chandwad, Dist.Nashik Rehabilitation Work of KHADAKOZAR M.I. Project Tq. Chandawad., Dist.Nashik (Package R3 KKZ-2/1 15.85 NCB 7.924 7.924 15.85 KKZ-2 ) for Harehrushana Baba W.U.A.Ltd. Devargaon Tq.Chandawad,Dist_ Nashik Rehabilitation Work of KHADAKOZAR M.I. Project Tq. Chandawad., Dist.Nashik (Package A3 KKZ-2/1 18.39 NCB 0 0 0.00 0.00 6.84 11.55 0.00 18.39 KKZ-2 ) for Harehrushana Baba W.U.A.Ltd. Devargaon Tq.Chandawad,Dist_ Nashik Kedrai Water Users Co.-Operative Society, 1526 R2 KKZ-2/2 4.04 NCB 0.404 2.020 1.616 4.040 Khadak Malegaon, Tal.Niphad, Dist. Nashik Rehabilitation Work of KHADAKOZAR M.I. Project Tq. Chandawad., Dist.Nashik (Package R3 KKZ-2/2 4.04 NCB 2.022 2.022 4.04 KKZ-2 ) for Kedrai W.U.A.Ltd. Khadakmalegaon Tq.Niphad,Dist Nashik Rehabilitation Work of KHADAKOZAR M.I. Project Tq. Chandawad., Dist.Nashik (Package A3 KKZ-2/2 4.11 NCB 0 0 0.00 0.00 1.86 1.93 0.32 4.11 KKZ-2 ) for Kedrai W.U.A.Ltd. Khadakmalegaon Tq.Niphad,Dist Nashik WUA/Comm 264 Warandh WAR-2 Rehabilitation of dist.system 2.81 1.27 1.13 0.42 2.81 unity level WUA/Comm R WAR-2 Rehabilitation of dist.system 2.81 0.70 1.69 0.42 2.81 unity level 2/24/2011 wua_prmpkg_r4 273 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1527 R2 WAR-2 Varandha W.U.A.No28 Varandha. 2.107 NCB 0.527 1.370 0.211 2.107 Rehabilitation of Main Canal of Varandh M.I. A2 WAR-2 Scheme Tal. Mahad Dist. Raigad Maharashtra- 2.209 NCB 2.21 2.21 India. WUA/Comm 265 Bhilawale BHI-2 Rehabilitation of dist.system 2.11 0.95 0.84 0.32 2.11 unity level WUA/Comm R BHI-2 Rehabilitation of dist.system 2.11 0.53 1.27 0.32 2.11 unity level 1528 R2 BHI-2 Bhilawale W.U.A.No.25 Bhilawale 1.022 Shopping 0.256 0.664 0.102 1.022 Rehabilitation work of Main Canal of Bhilawale A2 BHI-2 M.I.Scheme Tal. Panvel,Dist. Raigad 1.065 Shopping 0.84 0.84 Maharashtra-India. WUA/Comm 266 Unhere UNH-2 Rehabilitation of dist.system 2.21 unity level WUA/Comm R2 UNH-2 Rehabilitation of dist.system 2.21 unity level Rehabilitation work of R.C.C. & P.V.C. underground pipe Distribution system of Unhere A2 UNH-2 2.211 NCB 2.21 2.21 M.I.scheme Tal. Sudhagad,Dist. Raigad Maharashtra-India. WUA/Comm 267 Awasare AWA-2 Rehabilitation of dist.system 2.37 1.07 0.95 0.36 2.37 unity level WUA/Comm R AWA-2 Rehabilitation of dist.system 2.37 unity level 1529 R2 AWA-2 Awasare W.U.A.No.26 Awasare. 1.407 Shopping 0.352 0.915 0.141 1.407 Rehabilitation work of Main Canal of Ausare A2 AWA-2 M.I.Scheme Tal. Panvel,Dist. Raigad 1.469 Shopping 1.317 1.32 Maharashtra-India. WUA/Comm 268 Usran USR-2 Rehabilitation of dist.system 2.37 1.07 0.95 0.36 2.37 unity level WUA/Comm R USR-2 Rehabilitation of dist.system 2.37 0.59 1.42 0.36 2.37 unity level 1530 R2 USR-2 Usaran W.U.A.No27Usaran. 1.346 Shopping 0.337 0.875 0.135 1.346 Rehabilitation work of Main Canal of Usaran A2 USR-2 M.I.Scheme Tal. Panvel,Dist. Raigad 1.403 Shopping 0.00 Maharashtra-India. WUA/Comm 269 Shirawali SRW-2 Rehabilitation of dist.system 1.33 0.60 0.53 0.20 1.33 unity level 2/24/2011 wua_prmpkg_r4 274 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 WUA/Comm R SRW-2 Rehabilitation of dist.system 1.33 0.33 0.80 0.20 1.33 unity level Mata Waghjai W.U.A.Sukivali RIDS / 01 / 06- 1531 R2 SRW -2 3.77 NCB 0.943 1.885 0.943 3.770 07 Rehabilitation of Shirwali M.I.scheme Mata R3 SRW -2 3.77 NCB 1.885 1.885 3.77 Waghjai Wua Sukivali Rehabilitation of Shirwali M.I.scheme Mata R4 SRW -2 18.53 NCB 10.0 8.53 18.53 Waghjai Wua Sukivali WUA/Comm 271 Vhel VHL-2 Rehabilitation of dist.system 1.68 unity level WUA/Comm R VHL-2 Rehabilitation of dist.system 1.68 unity level 1532 R2 VHL - 2 Shri Datta W.U.A. Vhel RIDS / 03 / 06-07 4.03 NCB Rehabilitation of Vhel M.I.schemeShri.Datta R3 VHL - 2 16.04 NCB 2.406 9.624 4.01 16.04 Wua Ltd Vhel Rehabilitation of Vhel M.I.schemeShri.Datta A3 VHL - 2 3.605 NCB 0.212 1 0.215 1.43 Wua Ltd Vhel WUA/Comm 272 Kalawande KDE-2 Rehabilitation of dist.system 2.06 0.93 0.82 0.31 2.06 unity level WUA/Comm R KDE-2 Rehabilitation of dist.system 2.06 0.51 1.24 0.31 2.06 unity level Shri Kalvande water Users Assosiation Ltd. 1533 R2 KDE - 2 1.89 NCB 0.473 0.945 0.473 1.890 Kalvande RIDS / 02 / 06-07 Shri Kalvande water Users Assosiation Ltd. A2/1 KDE - 2 1.943 Shopping Kalvande RIDS / 02 / 06-07 Rehabilitation of Kalwande M.I.scheme Tq A2/2 KDE - 2 1.943 Shopping 0 1.968 1.97 Chiplun Dist.Ratnagiri WUA/Comm 275 Oras ORS-2 Rehabilitation of dist.system 2.61 1.17 1.04 0.39 2.61 unity level WUA/Comm R ORS-2 Rehabilitation of dist.system 2.61 0.65 1.56 0.39 2.61 unity level Shri Kamanadevi water Users Assosiation Ltd. 1534 R2 ORS - 2 2.25 NCB Oras.IPI /04/06-07 Rehabilitation of Oras M.I.schemeShri. A2 ORS - 2 2.291 NCB 0 1.773 0.848 2.62 Kamanadevi Wua Oras WUA/Comm 276 Harkul HKL-2 Rehabilitation of dist.system 2.20 0.99 0.88 0.33 2.20 unity level WUA/Comm R HKL-2 Rehabilitation of dist.system 2.20 0.55 1.32 0.33 2.20 unity level 2/24/2011 wua_prmpkg_r4 275 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Shri Pavanai water Users Assosiation Ltd. 1535 R2 HKL - 2 4.75 NCB Harkul.IPI /05/06-07 Rehabilitation of Harkul M.I.scheme R3 HKL - 2 4.085 NCB 0.61275 2.451 1.02125 4.09 Shri.Pavanai Wua Ltd Harkul Rehabilitation of Harkul M.I.scheme A3/1 HKL - 2 4.085 NCB Shri.Pavanai Wua Ltd Harkul Rehabilitation of Harkul M.I.scheme A3/2 HKL - 2 4.417 NCB 0.178 1.4 0.177 1.76 Shri.Pavanai Wua Ltd Harkul WUA/Comm 277 Madkhol MDK-2 Rehabilitation of dist.system 2.61 1.17 1.04 0.39 2.61 unity level WUA/Comm R MDK-2 Rehabilitation of dist.system 2.61 0.65 1.56 0.39 2.61 unity level Shri Bharadi Devi water Users Assosiation Ltd. 1536 R2 MDK-2 1.93 NCB 0.483 0.965 0.483 1.930 Madkhol, Harkul.IPI /06/06-07 Rehabilitation of Madkhol M.I.scheme Tq A2 MDK-2 Sawantwadi Dist.SindhudurgShri.Bharadidevi 1.932 Shopping Wua Madkhol Rehabilitation of Madkhol M.I.scheme Tq A2 MDK-2 Sawantwadi Dist.SindhudurgShri.Bharadidevi 1.859 Shopping 0 1.35 1.35 Wua Madkhol WUA/Comm 278 Shirgaon SIR-2 Rehabilitation of dist.system 2.05 0.92 0.82 0.31 2.05 unity level WUA/Comm R SIR-2 Rehabilitation of dist.system 2.05 0.51 1.23 0.31 2.05 unity level Shri Gangeshwer water Users Assosiation Ltd. 1537 R2 SIR-2 1.15 Shopping 0.288 0.748 0.115 1.150 Shirgaon IPI /02/06-07 Rehabilitation of Shirgaon M.I.schemeShri. A2 SIR-2 Gangeshwar Water Users Association 1.147 Shopping Ltd.Shirgaon Rehabilitation of Shirgaon M.I.schemeShri. A2 SIR-2 Gangeshwar Water Users Association 1.145 Shopping 0 1.136 1.14 Ltd.Shirgaon WUA/Comm 279 Nileli NIL-2 Rehabilitation of dist.system 2.03 unity level WUA/Comm R NIL-2 Rehabilitation of dist.system 2.03 unity level Shri Lingeshwar Pawanadevi water Users 1538 R2 NIL - 2 2.26 NCB 0.565 1.130 0.565 2.260 Assosiation Ltd. Nileli IPI /03/06-07 2/24/2011 wua_prmpkg_r4 276 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation of Nileli A2 NIL - 2 M.I.schemeShri.Lingeshwar Pavnadevi Sahkari 2.282 NCB 0 2.11 0.684 2.79 wua Nileli. WUA/Comm 280 Amboli ALI-2 Rehabilitation of dist.system 2.51 1.13 1.01 0.38 2.51 unity level WUA/Comm R ALI-2 Rehabilitation of dist.system 2.51 unity level Shri Dev Mauli water Users Assosiation Ltd. 1539 R2 ALI-2 2.24 NCB 0.560 1.120 0.560 2.240 Amboli IPI /07/06-07 Rehabilitation ofAmboli M.I.scheme Shri.Dev A2 ALI-2 1.82 Shopping 0 4.00 4.00 Mauli Wua Amboli WUA/Comm 281 Velholi VLI-2 Rehabilitation of dist.system 3.27 1.47 1.31 0.49 3.27 unity level WUA/Comm R VLI-2 Rehabilitation of dist.system 3.27 0.82 1.96 0.49 3.27 unity level Ridhinath Water User Association, Velholi. Tal. 1540 R2 VLI-2 3.86 NCB 0.965 1.930 0.965 3.860 Shahapur Ridhinath Water User Association, Velholi. Tal. A2 VLI-2 3.861 NCB Shahapur Ridhinath Water User Association, Velholi. Tal. R3 VLI-2 3.861 NCB 1.931 1.931 3.86 Shahapur Ridhinath Water User Association, Velholi. Tal. A3 VLI-2 5.641 NCB 5.64 5.64 Shahapur WUA/Comm 282 Jamburde JBD-2 Rehabilitation of dist.system 3.36 unity level WUA/Comm R JBD-2 Rehabilitation of dist.system 3.36 unity level Sidhagad Water User Association, Jambhurde. 1541 R2 JBD-2 72.85 NCB 18.213 36.425 18.213 72.850 Tal. Murbad Sidhagad Water User Association, Jambhurde. R3 JBD-2 5.42 NCB 2.71 2.71 5.42 Tal. Murbad Rehabilitatio of Water user Association level work of Caal system of Jamburde M.I. Scheme, R4 JBD-2 9.62 NCB 9.62 9.62 Tal. Murbad, Dist. Thane Siddhagad Water Users Assosition, Jamburde WUA/Comm 283 Devkope DVK-2 Rehabilitation of dist.system 3.17 1.42 1.27 0.47 3.17 unity level WUA/Comm R DVK-2 Rehabilitation of dist.system 3.17 unity level 2/24/2011 wua_prmpkg_r4 277 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Deocop Water User Association, Deocop Tal. 1542 R2 DVK-2 1.667 Shopping 0.417 1.084 0.167 1.667 Palghar Rehabiliation of Main Canal & Distribution Net A2 DVK-2 Work of Deocope Minor Irrigation Scheme 1.586 Shopping 0.294 1.04 0.25 1.59 Tal.Palghar Dist.Thane Maharashtra-India. WUA/Comm 284 Usgaon USG-2 Rehabilitation of dist.system 3.65 1.64 1.46 0.55 3.65 unity level WUA/Comm R USG-2 Rehabilitation of dist.system 3.65 unity level Nityanand Water User Association, Usgaon. Tal. 1543 R2 USG-2 94.5 NCB 23.625 47.250 23.625 94.500 Bhiwandi Nityanand Water User Association, Usgaon. Tal. R3 USG-2 12.05 NCB 6.025 6.025 12.05 Bhiwandi Rehabilitatio of Water user Association level work of Caal system of Usgaon M.I. Scheme, R4 USG-2 11.85 NCB 11.85 11.85 Tal. Bhiwandi Dist. ThaneNityanand Water Users Assosition, Usgaon WUA/Comm 285 Kharade KAD-2 Rehabilitation of dist.system 2.91 1.31 1.16 0.44 2.91 unity level WUA/Comm R KAD-2 Rehabilitation of dist.system 2.91 0.73 1.74 0.44 2.91 unity level Shri Swami Samarth Water User Association, 1544 R2 KAD-2 38.56 NCB 9.640 19.280 9.640 38.560 Kharade. Tal. Shahapur Shri Swami Samarth Water User Association, R3 KAD-2 6.929 NCB 3.4645 3.4645 6.93 Kharade. Tal. Shahapur Rehabilitatio of Water user Association level work of Caal system of Kharade M.I. Scheme, R4 KAD-2 6.6 NCB 6.60 6.60 Tal. Shahapur Dist. Thane Shri Smarth Water Users Assosition, Kharade. WUA/Comm 286 Dongaste DGT-2 Rehabilitation of dist.system 2.37 1.07 0.95 0.36 2.37 unity level WUA/Comm R DGT-2 Rehabilitation of dist.system 2.37 0.59 1.42 0.36 2.37 unity level Mandagni Water User Association, Dongaste 1545 R2 DGT-2 2.794 NCB 0.699 1.397 0.699 2.794 Tal. Wada 2/24/2011 wua_prmpkg_r4 278 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabiliation of Main Canal & Distribution Net A2 DGT-2 Work of Dongaste Minor Irrigation Scheme 2.766 NCB 1.59 0.58 0.60 2.77 Tal.Palghar Dist.ThaneMaharashtra-India. Rehabiliation work of Gadmoushi MI Project Ta. Gadmoushi GAD-2 Nagbhid Dist. Chandrapur for Water User Association. Rehabiliation work of Gadmoushi MI Project Ta. R4 GAD-2 Nagbhid Dist. Chandrapur for Water User 20 NCB 10.00 10.00 20.00 Association. Rehabiliation work of Kunghada MI Project Ta. Kunghada KUN-2 Chamorshi Dist. Chandrapur for Water User Association. Rehabiliation work of Kunghada MI Project Ta. R4 KUN-2 Chamorshi Dist. Chandrapur for Water User 13.08 NCB 6.54 6.54 13.08 Association. Rehabilitation & Modernization of canal system Amgaon AMG-2 of Amgaon M.I.Tank Ta. Bhandara Dist.Bhandara Rehabilitation & Modernization of canal system R4 AMG-2 of Amgaon M.I.Tank 6.17 NCB 0.00 5.00 1.17 6.17 Ta. Bhandara Dist.Bhandara Rehabilitation & Modernization of canal system Dodmazari DOD-2 of Dodmazari M.I.Tank Ta. Bhandara Dist.Bhandara Rehabilitation & Modernization of canal system R4 DOD-2 of Dodmazari M.I.Tank 5.75 NCB 0.00 4.00 1.75 5.75 Ta. Bhandara Dist.Bhandara Rehabilitation & Modernization of canal system Salebardi SAL-2 of Salebardi M.I.Tank Ta. Sakoli Dist.Bhandara Rehabilitation & Modernization of canal system R4 SAL-2 of Salebardi M.I.Tank 8.54 NCB 5.00 3.54 8.54 Ta. Sakoli Dist.Bhandara Construction of canal for Hari Om W.U.A. Pangadi PAN-2 Lendezari of Pangadi M.I.Project. Construction of canal for Hari Om W.U.A. R4 PAN-2/1 2.798 NCB 0.00 2.80 0.00 2.80 Lendezari of Pangadi M.I.Project. 2/24/2011 wua_prmpkg_r4 279 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of canal for Laxmi W.U.A. R4 PAN-2/2 12.01 NCB 0.00 12.01 0.00 12.01 Chutiya of Pangadi M.I.Project. Construction of canal for Gurudatta W.U.A. Bhajepar Bhabhadya BHA-2 of Bhadbhadya M.I.Project. Construction of canal for Gurudatta W.U.A. R4 BHA-2 16.65 NCB 0.00 16.65 0.00 16.65 Bhajepar of Bhadbhadya M.I.Project. 0.00 830.32 794.13 360.87 0.00 0.00 1,985.31 Total for Minor Projects 1542.15 346.49 847.89 347.78 1,542.16 R3_Total for Minor Projects 1544 50.395 794.748 594.431 104.233 1,544 R4_Total for Minor Projects 1700.83 0 0.2 50.524 374.763 521.96 624.94 146.48 1718.86 Note: There is change in the earlier reported expenditure figures.Figures reported in R4 revision are the actual expenditure as per field record as against the probable expenditure reported earlier. 2/24/2011 wua_prmpkg_r4 280 Maharashtra Water Sector Improvement Project Procurement Packaging and Schedule for Drainage Works Financial Implementation Schedule Revision 4 (Rs in Millions) Sr. Name of Package Description of Works/goods Estimate Method of PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total No Project Nos. d cost Procurement (Rs. in ICB/NCB Million) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 For Drainage Schemes Renovation Of Drainage Wua Level 101 Pkgs 44.09 Schemes( 101) works Renovation Of Drainage Wua Level R 101 Pkgs 44.09 Schemes( 101) works Renovation Of Drainage Wua Level R2 101 Pkgs 44.09 44.09 Schemes( 101) works Renovation Of Drainage Wua Level R3 101 Pkgs 44.09 Schemes( 101) works Renovation Of Drainage GHOD Gd-5 Schemes under Ghod LBC 1 R4 Gd-5/1 E & I Kashti-B Drainage Scheme 0.16 Shopping 0.00 0.00 0.00 0.00 0.00 0.16 0.00 0.16 2 R4 Gd-5/2 Chimbhla-2 Drainage Scheme 0.17 Shopping 0.00 0.00 0.00 0.00 0.00 0.17 0.00 0.17 3 R4 Gd-5/3 Kashti-A Drainage Scheme 0.48 Shopping 0.00 0.00 0.00 0.00 0.00 0.48 0.00 0.48 4 R4 Gd-5/4 Kashti-B Drainage Scheme 1.70 Shopping 0.00 0.00 0.00 0.00 0.00 1.70 0.00 1.70 5 R4 Gd-5/5 Wangdari-A Drainage Scheme 1.16 Shopping 0.00 0.00 0.00 0.00 0.00 1.16 0.00 1.16 6 R4 Gd-5/6 Wangdari-B Drainage Scheme 1.48 Shopping 0.00 0.00 0.00 0.00 0.00 1.48 0.00 1.48 7 R4 Gd-5/7 E & I Kashti-A Drainage Scheme 0.17 Shopping 0.00 0.00 0.00 0.00 0.00 0.17 0.00 0.17 Nimgaon Khalu Drainage 8 R4 Gd-5/8 0.09 Shopping 0.00 0.00 0.00 0.00 0.00 0.09 0.00 0.09 Scheme 9 R4 Gd-5/9 Kashti-C Drainage Scheme 0.56 Shopping 0.00 0.00 0.00 0.00 0.00 0.56 0.00 0.56 10 R4 Gd-5/10 Kashti-C-2 Drainage Scheme 0.07 Shopping 0.00 0.00 0.00 0.00 0.00 0.07 0.00 0.07 11 R4 Gd-5/11 Gar Drainage Scheme 1.02 Shopping 0.00 0.00 0.00 0.00 0.00 1.02 0.00 1.02 12 R4 Gd-5/12 Limpangaon Drainage Scheme 1.45 Shopping 0.00 0.00 0.00 0.00 0.00 1.45 0.00 1.45 13 R4 Gd-5/13 Shedgaon Drainage Scheme 0.58 Shopping 0.00 0.00 0.00 0.00 0.00 0.58 0.00 0.58 14 R4 Gd-5/14 Addl. Shegaon Drainage Scheme 0.22 Shopping 0.00 0.00 0.00 0.00 0.00 0.22 0.00 0.22 15 R4 Gd-5/15 Addl. Pedgaon Drainage Scheme 1.09 Shopping 0.00 0.00 0.00 0.00 0.00 1.09 0.00 1.09 16 R4 Gd-5/16 Addl. Ajnuj Drainage Scheme 0.91 Shopping 0.00 0.00 0.00 0.00 0.00 0.91 0.00 0.91 17 R4 Gd-5/17 Pedgaon Drainage Scheme 1.52 Shopping 0.00 0.00 0.00 0.00 0.00 1.52 0.00 1.52 18 R4 Gd-5/18 Ajnuj Drainage Scheme 1.79 Shopping 0.00 0.00 0.00 0.00 0.00 1.79 0.00 1.79 Addl. Shegaon-2 Drainage 19 R4 Gd-5/19 0.17 Shopping 0.00 0.00 0.00 0.00 0.00 0.17 0.00 0.17 Scheme Addl.Pedgaon-3 Drainage 20 R4 Gd-5/20 0.19 Shopping 0.00 0.00 0.00 0.00 0.00 0.19 0.00 0.19 Scheme 21 R4 Gd-5/21 Kharanala Drainage Scheme 0.48 Shopping 0.00 0.00 0.00 0.00 0.00 0.48 0.00 0.48 22 R4 Gd-5/22 Shendewadi Drainage Scheme 0.35 Shopping 0.00 0.00 0.00 0.00 0.00 0.35 0.00 0.35 2/24/2011 Drainage_R4 1 Maharashtra Water Sector Improvement Project Sr. Name of Package Description of Works/goods Estimate Method of PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total No Project Nos. d cost Procurement (Rs. in ICB/NCB Million) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 23 R4 Gd-5/23Kawathe Drainage Scheme 0.72 Shopping 0.00 0.00 0.00 0.00 0.00 0.72 0.00 0.72 24 R4 Gd-5/24Gar AC Drainage Scheme 0.05 Shopping 0.00 0.00 0.00 0.00 0.00 0.03 0.02 0.05 25 R4 Gd-5/25Jalalpur Drainage Scheme 1.77 Shopping 0.00 0.00 0.00 0.00 0.00 1.00 0.77 1.77 26 R4 Gd-5/26Bhambora Drainage Scheme 1.35 Shopping 0.00 0.00 0.00 0.00 0.00 1.00 0.35 1.35 27 R4 Gd-5/27Baradgaon Drainage Scheme 0.79 Shopping 0.00 0.00 0.00 0.00 0.00 0.40 0.39 0.79 28 R4 Gd-5/28Khed Drainage Scheme 2.56 NCB 0.00 0.00 0.00 0.00 0.00 1.80 0.76 2.56 Renovation Of Drainage GHOD Gd-6 Schemes under Ghod RBC 29 R4 Gd-6/1 Mandawgan Drainage Scheme 1.53 Shopping 0.00 0.00 0.00 0.00 0.00 1.53 0.00 1.53 30 R4 Gd-6/2 Wadgaon Rasai Drainage Scheme 0.61 Shopping 0.00 0.00 0.00 0.00 0.00 0.61 0.00 0.61 31 R4 Gd-6/3 Kuruli Drainage Scheme 0.29 Shopping 0.00 0.00 0.00 0.00 0.00 0.29 0.00 0.29 32 R4 Gd-6/4 Bedkinala Drainage Scheme 1.22 Shopping 0.00 0.00 0.00 0.00 0.00 1.22 0.00 1.22 33 R4 Gd-6/5 Pimpalsuti-1 Drainage Scheme 0.94 Shopping 0.00 0.00 0.00 0.00 0.00 0.94 0.00 0.94 34 R4 Gd-6/6 Pimpalsuti-2 Drainage Scheme 0.86 Shopping 0.00 0.00 0.00 0.00 0.00 0.86 0.00 0.86 35 R4 Gd-6/7 Chinchani Drainage Scheme 0.22 Shopping 0.00 0.00 0.00 0.00 0.00 0.22 0.00 0.22 36 R4 Gd-6/8 Ranjangaon Drainage Scheme 0.14 Shopping 0.00 0.00 0.00 0.00 0.00 0.14 0.00 0.14 37 R4 Gd-6/9 Ganegaon Drainage Scheme 2.42 NCB 0.00 0.00 0.00 0.00 0.00 2.42 0.00 2.42 38 R4 Gd-6/10 Addl.Mandawgan 1.25 Shopping 0.00 0.00 0.00 0.00 0.00 1.25 0.00 1.25 39 R4 Gd-6/11 Sadalgaon Drainage Scheme 0.39 Shopping 0.00 0.00 0.00 0.00 0.00 0.39 0.00 0.39 40 R4 Gd-6/12 Babhulsar Drainage Scheme 0.29 Shopping 0.00 0.00 0.00 0.00 0.00 0.29 0.00 0.29 41 R4 Gd-6/13 Nagargaon Drainage Scheme 0.43 Shopping 0.00 0.00 0.00 0.00 0.00 0.43 0.00 0.43 Renovation Of Drainage KUKADI Kuk-7 Schemes under Kukadi LBC 42 R4 Kuk-7/1 Jawala - 1 Drainage Scheme 0.18 Shopping 0.00 0.00 0.00 0.00 0.00 0.18 0.00 0.18 43 R4 Kuk-7/2 Jawala - 2 Drainage Scheme 0.16 Shopping 0.00 0.00 0.00 0.00 0.00 0.16 0.00 0.16 44 R4 Kuk-7/3 Jawala - 3 Drainage Scheme 0.05 Shopping 0.00 0.00 0.00 0.00 0.00 0.05 0.00 0.05 45 R4 Kuk-7/4 Nighoj Drainage Scheme 0.08 Shopping 0.00 0.00 0.00 0.00 0.00 0.08 0.00 0.08 46 R4 Kuk-7/5 Patharwadi Drainage Scheme 0.16 Shopping 0.00 0.00 0.00 0.00 0.00 0.16 0.00 0.16 47 R4 Kuk-7/6 Gunore Drainage Scheme 0.13 Shopping 0.00 0.00 0.00 0.00 0.00 0.13 0.00 0.13 48 R4 Kuk-7/7 Ralegaon Therpal-1 Drainage Scheme 0.1 Shopping 0.00 0.00 0.00 0.00 0.00 0.10 0.00 0.10 49 R4 Kuk-7/8 Ralegaon Therpal-2 Drainage Scheme 0.03 Shopping 0.00 0.00 0.00 0.00 0.00 0.03 0.00 0.03 50 R4 Kuk-7/9 Mhase Drainage Scheme 0.07 Shopping 0.00 0.00 0.00 0.00 0.00 0.07 0.00 0.07 51 R4 Kuk-7/10 Kohkadi Drainage Scheme 0.05 Shopping 0.00 0.00 0.00 0.00 0.00 0.05 0.00 0.05 52 R4 Kuk-7/11 Hakigatpur Drainage Scheme 0.06 Shopping 0.00 0.00 0.00 0.00 0.00 0.06 0.00 0.06 Renovation Of Drainage MULA Mula-6 Schemes under Mula Baragaon Nandur -2 Drainage 53 R4 Mula-6/1 0.25 Shopping 0.00 0.00 0.00 0.00 0.00 0.25 0.00 0.25 Scheme 54 R4 Mula-6/2 Varale Vasti Drainage Scheme 0.73 Shopping 0.00 0.00 0.00 0.00 0.00 0.73 0.00 0.73 2/24/2011 Drainage_R4 2 Maharashtra Water Sector Improvement Project Sr. Name of Package Description of Works/goods Estimate Method of PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total No Project Nos. d cost Procurement (Rs. in ICB/NCB Million) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 55 R4 Mula-6/3 Momin Akhada Drainage Scheme 1.00 Shopping 0.00 0.00 0.00 0.00 0.00 1.00 0.00 1.00 56 R4 Mula-6/4 Sade-1 Drainage Scheme 0.10 Shopping 0.00 0.00 0.00 0.00 0.00 0.10 0.00 0.10 57 R4 Mula-6/5 Sade-2 Drainage Scheme 0.13 Shopping 0.00 0.00 0.00 0.00 0.00 0.13 0.00 0.13 58 R4 Mula-6/6 Umbre -1 Drainage Scheme 0.84 Shopping 0.00 0.00 0.00 0.00 0.00 0.84 0.00 0.84 59 R4 Mula-6/7 Umbre -2 Drainage Scheme 1.13 Shopping 0.00 0.00 0.00 0.00 0.00 1.13 0.00 1.13 60 R4 Mula-6/8 Kukkadwedha Drainage Scheme 0.48 Shopping 0.00 0.00 0.00 0.00 0.00 0.48 0.00 0.48 61 R4 Mula-6/9 Digras -1 Drainage Scheme 0.28 Shopping 0.00 0.00 0.00 0.00 0.00 0.28 0.00 0.28 Mula- 62 R4 Pimpri Avghad-1 Drainage Scheme 0.20 Shopping 0.00 0.00 0.00 0.00 0.00 0.20 0.00 0.20 6/10 Mula- 63 R4 Brahmani-2 Drainage Scheme 1.51 Shopping 0.00 0.00 0.00 0.00 0.00 1.51 0.00 1.51 6/11 Mula- Brahmani Chedgaon Drainage 64 R4 Scheme 0.72 Shopping 0.00 0.00 0.00 0.00 0.00 0.72 0.00 0.72 6/12 Mula- 65 R4 Tarodi Drainage Scheme 0.11 Shopping 0.00 0.00 0.00 0.00 0.00 0.11 0.00 0.11 6/13 Mula- 66 R4 Pimpri Shahali Drainage Scheme 0.35 Shopping 0.00 0.00 0.00 0.00 0.00 0.35 0.00 0.35 6/14 Mula- 67 R4 Gidegaon Drainage Scheme 0.99 Shopping 0.00 0.00 0.00 0.00 0.00 0.99 0.00 0.99 6/15 Mula- Sultanpur Bhavi Nimgaon -1 Drainage 68 R4 Scheme 0.62 Shopping 0.00 0.00 0.00 0.00 0.00 0.62 0.00 0.62 6/16 Mula- 69 R4 Gogalgaon -1 Drainage Scheme 0.87 Shopping 0.00 0.00 0.00 0.00 0.00 0.87 0.00 0.87 6/17 Mula- 70 R4 Maktapur Drainage Scheme 0.58 Shopping 0.00 0.00 0.00 0.00 0.00 0.58 0.00 0.58 6/18 Mula- 71 R4 Georai -1 Drainage Scheme 0.26 Shopping 0.00 0.00 0.00 0.00 0.00 0.26 0.00 0.26 6/19 Mula- 72 R4 Dighi Drainage Scheme 0.69 Shopping 0.00 0.00 0.00 0.00 0.00 0.69 0.00 0.69 6/20 Mula- Shirasgaon-1 Drainage 73 R4 0.48 Shopping 0.00 0.00 0.00 0.00 0.00 0.48 0.00 0.48 6/21 Scheme Mula- ChilekhanWadi Drainage 74 R4 0.47 Shopping 0.00 0.00 0.00 0.00 0.00 0.47 0.00 0.47 6/22 Scheme Mula- 75 R4 Deogaon Shahapur 0.39 Shopping 0.00 0.00 0.00 0.00 0.00 0.39 0.00 0.39 6/23 2/24/2011 Drainage_R4 3 Maharashtra Water Sector Improvement Project Sr. Name of Package Description of Works/goods Estimate Method of PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total No Project Nos. d cost Procurement (Rs. in ICB/NCB Million) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Mula- 76 R4 Sultanpur Drainage Scheme 0.87 Shopping 0.00 0.00 0.00 0.00 0.00 0.87 0.00 0.87 6/24 Mula- 77 R4 Galnimb Drainage Scheme 0.09 Shopping 0.00 0.00 0.00 0.00 0.00 0.09 0.00 0.09 6/25 Mula- 78 R4 Sonai -2 Drainage Scheme 0.27 Shopping 0.00 0.00 0.00 0.00 0.00 0.27 0.00 0.27 6/26 Mula- 79 R4 Sonai -5 Drainage Scheme 0.36 Shopping 0.00 0.00 0.00 0.00 0.00 0.36 0.00 0.36 6/27 Mula- 80 R4 Sonai -6 Drainage Scheme 0.55 Shopping 0.00 0.00 0.00 0.00 0.00 0.55 0.00 0.55 6/28 Mula- 81 R4 Sonai -12 Drainage Scheme 0.22 Shopping 0.00 0.00 0.00 0.00 0.00 0.22 0.00 0.22 6/29 Mula- Wanjarwadi Drainage 82 R4 1.61 Shopping 0.00 0.00 0.00 0.00 0.00 1.61 0.00 1.61 6/30 Scheme Mula- 83 R4 Kangoni Drainage Scheme 0.55 Shopping 0.00 0.00 0.00 0.00 0.00 0.55 0.00 0.55 6/31 Mula- 84 R4 Rastapur -2 Drainage Scheme 0.23 Shopping 0.00 0.00 0.00 0.00 0.00 0.23 0.00 0.23 6/32 Mula- 85 R4 Rastapur -4 Drainage Scheme 0.16 Shopping 0.00 0.00 0.00 0.00 0.00 0.16 0.00 0.16 6/33 Mula- MhalasPimpalgaon Drainage 86 R4 0.30 Shopping 0.00 0.00 0.00 0.00 0.00 0.30 0.00 0.30 6/34 Scheme Mula- 87 R4 Chanda- 2 Drainage Scheme 0.22 Shopping 0.00 0.00 0.00 0.00 0.00 0.22 0.00 0.22 6/35 Mula- Kharwandi -1 Drainage 88 R4 0.42 Shopping 0.00 0.00 0.00 0.00 0.00 0.42 0.00 0.42 6/36 Scheme Mula- Kharwandi -2 Drainage 89 R4 0.50 Shopping 0.00 0.00 0.00 0.00 0.00 0.50 0.00 0.50 6/37 Scheme Mula- 90 R4 Sonai -11 Drainage Scheme 0.16 Shopping 0.00 0.00 0.00 0.00 0.00 0.16 0.00 0.16 6/38 Mula- 91 R4 Jalke Kd Drainage Scheme 0.84 Shopping 0.00 0.00 0.00 0.00 0.00 0.84 0.00 0.84 6/39 Mula- Vadala Bahiroba Drainage 92 R4 0.66 Shopping 0.00 0.00 0.00 0.00 0.00 0.66 0.00 0.66 6/40 Scheme Mula- Mali Chinchore-2 Drainage 93 R4 0.39 Shopping 0.00 0.00 0.00 0.00 0.00 0.39 0.00 0.39 6/41 Scheme Mula- Mali Chinchore-3 Drainage 94 R4 0.27 Shopping 0.00 0.00 0.00 0.00 0.00 0.27 0.00 0.27 6/42 Scheme Mula- Bhanashivre-1 Drainage 95 R4 0.78 Shopping 0.00 0.00 0.00 0.00 0.00 0.78 0.00 0.78 6/43 Scheme 2/24/2011 Drainage_R4 4 Maharashtra Water Sector Improvement Project Sr. Name of Package Description of Works/goods Estimate Method of PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total No Project Nos. d cost Procurement (Rs. in ICB/NCB Million) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Mula- Babhulkhede -1 Drainage 96 R4 0.46 Shopping 0.00 0.00 0.00 0.00 0.00 0.46 0.00 0.46 6/44 Scheme Mula- NipaniNingaon Drainage 97 R4 0.36 Shopping 0.00 0.00 0.00 0.00 0.00 0.36 0.00 0.36 6/45 Scheme Mula- 98 R4 Khadke Drainage Scheme 0.27 Shopping 0.00 0.00 0.00 0.00 0.00 0.27 0.00 0.27 6/46 Mula- Handi Nimgaon Drainage 99 R4 0.42 Shopping 0.00 0.00 0.00 0.00 0.00 0.42 0.00 0.42 6/47 Scheme Mula- 100 R4 Mukindipur Drainage Scheme 0.30 Shopping 0.00 0.00 0.00 0.00 0.00 0.30 0.00 0.30 6/48 Construction of New Drainage Wua Level 49 Pkgs 48.28 Schemes (49) works Construction of New Drainage Wua Level R 49 Pkgs 48.28 Schemes (49) works Construction of New Drainage Wua Level R2 49 Pkgs 48.28 48.28 Schemes (49) works Construction of New Drainage Wua Level R3 49 Pkgs 48.28 Schemes (49) works Construction of New Drainage GHOD Gd-7 Schemes under Ghod LBC * Hangewadi-2 Drainage Scheme 0.37 Proposed for dele 101 R4 Gd-7/1 Sangavi Drainage Scheme 1.02 Shopping 0 0 0.00 0.00 0.00 1.02 0.00 1.02 * Chimbhla-1 Drainage Scheme 0.51 ition from farmers * Chimbhla-3 Drainage Scheme 0.45 * Chimbhla-4 Drainage Scheme 0.39 * Chimbhla-5 Drainage Scheme 0.49 102 R4 Gd-7/2 Addl. Kawathe Drainage Scheme 2.48 NCB 0 0 0.00 0.00 0.00 2.48 0.00 2.48 103 R4 Gd-7/3 Deulwadi Drainage Scheme 0.85 Shopping 0 0 0.00 0.00 0.00 0.85 0.00 0.85 * Addl. Siddhatek 0.21 st Proposed for dele 104 R4 Gd-7/4 Kashti-D Drainage Scheme 0.51 Shopping 0 0 0.00 0.00 0.00 0.51 0.00 0.51 105 R4 Gd-7/5 Addl. Gar Drainage Scheme 0.44 Shopping 0 0 0.00 0.00 0.00 0.44 0.00 0.44 Addl. Pedgaon-2 Drainage * 0.78 Scheme Addl. Pedgaon-5 Drainage * 0.20 Scheme Bhambora Holamwasti Drainage 106 R4 Gd-7/6 0.48 Shopping 0 0 0 0 0 0.30 0.18 0.48 Scheme 107 R4 Gd-7/7 Kawathe-2 Drainage Scheme 1.10 Shopping 0 0 0 0 0 0.80 0.30 1.1 108 R4 Gd-8/1 Tandali Drainage Scheme 0.88 Shopping 0 0 0 0 0 0.88 0.00 0.88 109 R4 Gd-8/2 Babhulsar-2 Drainage Scheme 0.54 Shopping 0 0 0 0 0 0.54 0.00 0.54 2/24/2011 Drainage_R4 5 Maharashtra Water Sector Improvement Project Sr. Name of Package Description of Works/goods Estimate Method of PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total No Project Nos. d cost Procurement (Rs. in ICB/NCB Million) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Addl.Mandawgan-2 Drainage 110 R4 Gd-8/3 1.14 Shopping 0 0 0 0 0 1.14 0.00 1.14 Scheme Ganegaon Nagare mala Drainage 111 R4 Gd-8/4 1.70 Shopping 0 0 0 0 0 1.70 0.00 1.7 Scheme Addl. Wadgaon Rasai Drainage 112 R4 Gd-8/5 0.35 Shopping 0 0 0 0 0 0.35 0.00 0.35 Scheme 113 R4 Gd-8/6 Mandawgan Drainage Scheme 1.39 Shopping 0 0 0 0 0 1.39 0.00 1.39 Mandawgan Chakor mala 114 R4 Gd-8/7 0.54 Shopping 0 0 0 0 0 0.54 0.00 0.54 Drainage Scheme Inamgaon Gandhle mala 115 R4 Gd-8/8 1.38 Shopping 0 0 0 0 0 1.38 0.00 1.38 Drainage Scheme Inamgaon Machale wasti 116 R4 Gd-8/9 0.89 Shopping 0 0 0 0 0 0.89 0.00 0.89 Drainage Scheme Inamgaon Darepat Drainage 117 R4 Gd-8/10 1.54 Shopping 0 0 0 0 0 1.54 0.00 1.54 Scheme 118 R4 Gd-8/11 Adl. Ganegaon Drainage Scheme 0.65 Shopping 0 0 0 0 0 0.65 0.00 0.65 119 R4 Gd-8/12 Shirasgaon-2 Drainage Scheme 0.85 Shopping 0 0 0 0 0 0.85 0.00 0.85 120 R4 Gd-8/13 Kuruli-2 Drainage Scheme 0.82 Shopping 0 0 0 0 0 0.82 0.00 0.82 121 R4 Gd-8/14 Adl. Kuruli Drainage Scheme 0.49 Shopping 0 0 0 0 0 0.49 0.00 0.49 122 R4 Gd-8/15 Nagargaon-2 Drainage Scheme 1.48 Shopping 0 0 0 0 0 1.48 0.00 1.48 Adl. Nagargaon Drainage 123 R4 Gd-8/16 0.36 Shopping 0 0 0 0 0 0.36 0.00 0.36 Scheme 124 R4 Gd-8/17 Ranjangaon-2 Drainage Scheme 3.21 NCB 0 0 0 0 0 3.21 0.00 3.21 125 R4 Gd-8/18 dl. Bedkinala Drainage Scheme 0.98 Shopping 0 0 0 0 0 0.98 0.00 0.98 126 R4 Gd-8/19 Pimpalsuti-1/2 Drainage Scheme 0.48 Shopping 0 0 0 0 0 0.48 0.00 0.48 Construction of New Drainage MULA Mula-7 Schemes under Mula Bhanashivre-2 Drainage 0.48 0.48 127 R4 Mula-7/1 0.48 Shopping 0 0 0 0 0 0 Scheme Barhanpur -1 Drainage 1.61 1.61 128 R4 Mula-7/2 1.61 Shopping 0 0 0 0 0 0 Scheme 129 R4 Mula-7/3 Kauthe Drainage Scheme 2.20 NCB 0 0 0 0 0 2.20 0 2.20 130 R4 Mula-7/4 Rahuri -1 Drainage Scheme 0.93 Shopping 0 0 0 0 0 0.93 0 0.93 131 R4 Mula-7/5 Tamaswadi Drainage Scheme 0.26 Shopping 0 0 0 0 0 0.26 0 0.26 132 R4 Mula-7/6 Digras -2 Drainage Scheme 0.71 Shopping 0 0 0 0 0 0.71 0 0.71 2/24/2011 Drainage_R4 6 Maharashtra Water Sector Improvement Project Sr. Name of Package Description of Works/goods Estimate Method of PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total No Project Nos. d cost Procurement (Rs. in ICB/NCB Million) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 BaragoanNandur-3 Drainage 0.77 0.77 133 R4 Mula-7/7 0.77 Shopping 0 0 0 0 0 0 Scheme Gogalgaon-2 Drainage 0.55 0.55 134 R4 Mula-7/8 0.55 Shopping 0 0 0 0 0 0 Scheme 135 R4 Mula-7/9 Rahuri-2 Drainage Scheme 0.31 Shopping 0 0 0 0 0 0.31 0 0.31 Mula- 136 R4 Sonai-3 Drainage Scheme 1.45 Shopping 0 0 0 0 0 1.45 0 1.45 7/10 Mula- 137 R4 Sonai-10 Drainage Scheme 0.83 Shopping 0 0 0 0 0 0.83 0 0.83 7/11 Mula- 138 R4 Rastapur -3 Drainage Scheme 0.55 Shopping 0 0 0 0 0 0.55 0 0.55 7/12 Mula- Rastapur-Kauthe Drainage 139 R4 0.90 Shopping 0 0 0 0 0 0.90 0 0.90 7/13 Scheme Mula- Malichinchore-1 Drainage 140 R4 0.26 Shopping 0 0 0 0 0 0.26 0 0.26 7/14 Scheme Total for Drainage Schemes 92.37 92.37 R Total for Drainage Schemes 92.37 92.37 R2 Total for Drainage Schemes 92.37 92.37 R3 Total for Drainage Schemes 92.370 92.37 R4 R4_Total for Drainage Schemes 97.46 97.46 97.46 Note There is change in the earlier reported expenditure figures.Figures reported i expenditure as per field record as against the probable expenditure reported earlier. 2/24/2011 Drainage_R4 7 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Procurement Packaging Plan and Implementation Schedule For Civil Works Of ComponenFinancial Implementation Plan. Revision No:4 (Excluding WUA Buildings) (Rs in Millions) Name of Package Description of Works/goods Estimated Method of Component Nos. cost Procurement (Rs. in ICB/NCB PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total Million) 2 3 4 5 6 7 8 9 10 11 12 13 14 MWRRA RA-BLD1 Construction of new building for MWRRA 25 NCB 5 10 10 25 R Purchase of office premises for MWRRA 130 1 NA 130 130 R2 Purchase of office premises for MWRRA 25 NCB 5 10 10 25 deleted deleted Institutional ID-CV1 Upgradation & furnishing of existing ESC 3.4 NCB Restructuring Building @ Nasik 1.36 2.04 3.40 & Capacity Building of R Upgradation & furnishing of existing ESC 5.28 NCB Building @ Nasik including computer center @ 5.28 5.28 acoustic etc complete A Upgradation & furnishing of existing ESC 5.504 NCB 4.315 2.99 7.31 Building @ Nasik ID-CV2 Upgradation & furnishing of existing Hostel 5.89 NCB Buildings & Quarter converted to Hostel at 0.88 3.24 1.77 5.89 Nasik R Upgradation & furnishing of existing Hostel 7.16 NCB Buildings & Quarter converted to Hostel at 7.16 7.16 Nasik A Upgradation & furnishing of existing Hostel 7.513 NCB Buildings & Quarter converted to Hostel at 4.661 3.772 8.43 Nasik ID-CV3 Construction including furnishing of Lecture 7 NCB Hall and Hostel Building & Renovation of 2.10 3.85 1.05 7.00 existing facilities for RTC Pune R Construction including furnishing of Lecture 10.18 NCB Hall and Hostel Building & Renovation of 10.18 10.18 existing facilities for RTC Pune A Construction including furnishing of Lecture 10.18 NCB Hall and Hostel Building & Renovation of existing facilities for RTC Pune 2/24/2011 otprm 33 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Name of Package Description of Works/goods Estimated Method of Component Nos. cost Procurement (Rs. in ICB/NCB PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total Million) 2 3 4 5 6 7 8 9 10 11 12 13 14 R2 Construction including furnishing of Lecture 10.18 NCB Hall and Hostel Building & Renovation of 7 3.18 10.18 existing facilities for RTC Pune A2 Construction including furnishing of Lecture 10.18 NCB Hall and Hostel Building & Renovation of existing facilities for RTC Pune R3 Construction including furnishing of Lecture 10.18 NCB Hall and Hostel Building & Renovation of 6.108 4.072 10.18 existing facilities for RTC Pune A3 Construction including furnishing of Lecture 15.502 NCB Hall and Hostel Building & Renovation of 0.588 14.912 15.50 existing facilities for RTC Pune ID-CV5 Construction & furnishing of Lecture Halls and 6.5 NCB Computer Lab; Conversion of Type-2 Quarter into Hostel Building and Renovation including 1.95 3.58 0.98 6.50 furnishing etc. of existing Lecture Hall at RTC Nagpur R Construction & furnishing of Lecture Halls and 5.09 NCB Computer Lab; Conversion of Type-2 Quarter into Hostel Building and Renovation including 5.09 5.09 furnishing etc. of existing Lecture Hall at RTC Nagpur A Construction & furnishing of Lecture Halls and 6.05 NCB Computer Lab; Conversion of Type-2 Quarter 1.054 4.899 1.248 7.201 into Hostel Building and Renovation including furnishing etc. of existing Lecture Hall at RTC ID-CV6 Establishing Computer Centre at ESC Nasik 1.5 NCB and furnishing of Training Halls and CE/SE 1 0.5 1.50 Cabins. R Establishing Computer Centre at ESC Nasik 1.5 NCB and furnishing of Training Halls and CE/SE 1.5 1.50 Cabins. R2 Establishing Computer Centre at ESC Nasik 1.5 NCB and furnishing of Training Halls and CE/SE 1.5 1.5 Cabins. Procured comp furniture through goods & equipments 2/24/2011 otprm 34 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Name of Package Description of Works/goods Estimated Method of Component Nos. cost Procurement (Rs. in ICB/NCB PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total Million) 2 3 4 5 6 7 8 9 10 11 12 13 14 ID-CV8 Renovation of Training cell @ DIRD NIL R Renovation of Training cell @ DIRD 0.85 Shopping A Renovation of Training cell @ DIRD 0.804 Shopping 0.804 0.804 ID-CV9 Renovation of soil lab @ DIRD NIL R Renovation of soil lab @ DIRD 0.4 Shopping 0.4 0.40 A Renovation of soil lab @ DIRD 0.478 Shopping 0.478 0.478 Strengthenin WL-CV1 Improvement to Residential and Non 1 DGSD/Shopping g & capacity Residential Buildings in WALMI Campus 0.8 0.2 1.00 Building of WALMI R Improvement & Maintenance to Residential 4.85 NCB and Non Residential Buildings,including upgradation of hostels & renovation of 4 0.85 4.85 drainage & drinking water suooly lines in WALMI Campus A Improvement & Maintenance to Residential NCB and Non Residential Buildings,including upgradation of hostels & renovation of 2.864 3.398 3.398 drainage & drinking water suooly lines in WALMI Campus WL-CV2 Construction of two Dug wells & drilling of 1 DGSD/Shopping 0.8 0.2 1.00 existing wells R Construction of two Dug wells & drilling of 0.958 Shopping 0.5 0.45 0.95 existing wells A Construction of two Dug wells & drilling of Shopping 1.049 0.383 0.007 0.390 existing wells WL-CV7 Electrical Re-wiring of Hostel Buildings 0.5 DGSD/Shopping 0.1 0.4 0.50 R Electrical Re-wiring of Residential and Non 1.83 Shopping 1.5 0.33 1.83 Residential Buildings incld Hostel Buildings A Electrical Re-wiring of Residential and Non Shopping Residential Buildings incld Hostel Buildings 2.287 2.283 2.283 WL-CV10 Repairs to percolation tank including 0.8 DGSD/Shopping distribution net work to augment water 0.40 0.40 0.80 availability 2/24/2011 otprm 35 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Name of Package Description of Works/goods Estimated Method of Component Nos. cost Procurement (Rs. in ICB/NCB PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total Million) 2 3 4 5 6 7 8 9 10 11 12 13 14 R Repairs to percolation tank including 0.87 Shopping distribution net work to augment water 0.87 0.87 availability A Repairs to percolation tank including Shopping distribution net work to augment water 1.114 0.999 0.999 availability HY-WL7 Supply of Hydraulic Lab equipments toWALMI newly added from R Supply of Hydraulic Lab equipments toWALMI 0.230 Shopping 0.14 0.09 0.230 R2 Supply of Hydraulic Lab equipments toWALMI 0.230 Shopping 0.23 0.230 deleted Agriculture RNAPT- Rennovation of Agro-polyclinic of Thane 1.4 NCB Support ASS-1 Division (Package-1)---7 Services R2 Rennovation of Agro-polyclinic of Thane 0.4 shopping 0.4 0.4 district R3 Rennovation of Agro-polyclinic of Thane 0.4 shopping 0.4 0.4 district Rennovation of APC(Wada, Khutal) of Thane shopping A3 district 0.4 0.4 0.4 R2 Rennovation of Agro-polyclinic & District 0.7 shopping Training Center of Ratnagri district 0.7 0.7 R3 Rennovation of Agro-polyclinic & District 0.7 shopping Training Center of Ratnagri district 0.7 0.7 Rennovation of APC (Mudhe) & DTC (Pomendi) shopping A3 1.188 1.188 1.188 of Ratnagri district R2 Rennovation of Agro-polyclinic of 0.4 shopping Sindudurg district 0.4 0.4 R3 Rennovation of Agro-polyclinic of 0.4 shopping Sindudurg district 0.4 0.4 Rennovation of APC (Nandgaon, Mangaon) of shopping A3 Sindudurg district 0.36 0.36 0.36 2/24/2011 otprm 36 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Name of Package Description of Works/goods Estimated Method of Component Nos. cost Procurement (Rs. in ICB/NCB PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total Million) 2 3 4 5 6 7 8 9 10 11 12 13 14 R2 Rennovation of Agro-polyclinic & District 0.9 shopping Training Center of Raigad district 0.9 0.9 R3 Rennovation of Agro-polyclinic & District 0.9 shopping Training Center of Raigad district 0.9 0.9 Rennovation of APC (Killa, Lonare) of Raigad 0.4 shopping A3 0.4 0.4 district R4 Rennovation of DTC of Raigad district 1 shopping 1 1 RNAPP- Rennovation of Agro-polyclinic of Pune NCB ASS-2 Division (Package-2)---7 R2 Rennovation of Agro-polyclinic of Pune 0.4 shopping district 0.4 0.4 R3 Rennovation of Agro-polyclinic of Pune 0.4 shopping 0.4 0.4 district Rennovation of APC& District Training Centre of NCB R4 Pune district 1.4 1.4 1.4 R2 Rennovation of Agro-polyclinic & District 1.1 shopping Training Center of Ahmednagar district 1.1 1.1 R3 Rennovation of Agro-polyclinic & District 1.1 shopping Training Center of Ahmednagar district 1.1 1.1 Rennovation of APC(Rahuri) of Ahmednagar shopping A3 0.2 0.2 0.2 district Rennovation of APC& DTC of Ahmednagar shopping R4 1.4 1.4 1.4 district R2 Rennovation of Agro-polyclinic & District 0.9 shopping Training Center of Solapur district 0.9 0.9 R3 Rennovation of Agro-polyclinic & District 0.9 shopping 0.9 0.9 Training Center of Solapur district Rennovation of APC & DTC of Solapur district 1.4 shopping R4 1.4 1.4 2/24/2011 otprm 37 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Name of Package Description of Works/goods Estimated Method of Component Nos. cost Procurement (Rs. in ICB/NCB PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total Million) 2 3 4 5 6 7 8 9 10 11 12 13 14 RNAPK- Rennovation of Agro-polyclinic of Kolhapur 1.4 NCB ASS-3 Division (Package-3)---7 R2 Rennovation of Agro-polyclinic of Kolhapur 0.4 shopping district 0.4 0.4 R3 Rennovation of Agro-polyclinic of Kolhapur 0.4 shopping 0.4 0.4 district Rennovation of APC(Jaisinghpur) of Kolhapur shopping A3 0.184 0.184 0.184 district Rennovation of APC(Gadhinglaj) of Kolhapur shopping R4 0.188 0.188 0.188 district R2 Rennovation of Agro-polyclinic of Sangli 0.4 shopping district 0.4 0.4 R3 Rennovation of Agro-polyclinic of Sangli 0.4 shopping 0.4 0.4 district Rennovation of APC(Jat & Tasgaon) of Sangli shopping A3 0.386 0.386 0.386 district R2 Rennovation of Agro-polyclinic of Satata 1.1 shopping district 1.1 1.1 R3 Rennovation of Agro-polyclinic of Satata 1.1 shopping 1.1 1.1 district Rennovation of APC(Dahiwadi & Waduj) of Satara 0.4 shopping R4 district 0.4 0.4 RNAPNS- Rennovation of Agro-polyclinic of Nasik 1.6 NCB ASS-4 Division (Package-4)---8 R2 Rennovation of Agro-polyclinic & District 0.9 shopping Training Center of Nasik district 0.9 0.9 R3 Rennovation of Agro-polyclinic & District 0.9 shopping Training Center of Nasik district 0.9 0.9 Rennovation of APC(Pimpari& Chandwad) & DTC shopping A3 (Dindori) of Nashik district 1.331 1.331 1.331 2/24/2011 otprm 38 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Name of Package Description of Works/goods Estimated Method of Component Nos. cost Procurement (Rs. in ICB/NCB PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total Million) 2 3 4 5 6 7 8 9 10 11 12 13 14 R2 Rennovation of Agro-polyclinic & District 0.9 shopping Training Center of Jalgaon district 0.9 0.9 R3 Rennovation of Agro-polyclinic & District 0.9 shopping 0.9 0.9 Training Center of Jalgaon district Rennovation of APC (Yawal & Chopada) & DTC shopping A3 (Mamurabad) of Jalgaon district 1.135 1.135 1.135 R2 Rennovation of Agro-polyclinic & District 0.9 shopping Training Center of Dhule district 0.9 0.9 R3 Rennovation of Agro-polyclinic & District 0.9 shopping Training Center of Dhule district 0.9 0.9 Rennovation of APC (Sakri, Sindkheda) & DTC shopping A3 (Pimpri) of Dhule district 1.239 1.239 1.239 R2 Rennovation of Agro-polyclinic of 0.4 shopping Nandurbar 0.4 0.4 R3 Rennovation of Agro-polyclinic of 0.4 shopping 0.4 0.4 Nandurbar Rennovation of APC (Kalambu, Navapur) of shopping R4 Nandurbar District 0.4 0.4 0.4 RNAPAU- Rennovation of Agro-polyclinic of 1.2 NCB ASS-5 Aurangabad Division (Package-5)---6 R2 Rennovation of Agro-polyclinic & District 0.9 shopping Training Center of Aurangabad district 0.9 0.9 R3 Rennovation of Agro-polyclinic & District 0.9 shopping Training Center of Aurangabad district 0.9 0.9 Rennovation of APC (Vaijapur, Narsinghpur) & shopping A3 DTC (Aurangabad) of Aurangabad district 1.127 1.061 0.066 1.127 2/24/2011 otprm 39 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Name of Package Description of Works/goods Estimated Method of Component Nos. cost Procurement (Rs. in ICB/NCB PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total Million) 2 3 4 5 6 7 8 9 10 11 12 13 14 R2 Rennovation of Agro-polyclinic of Jalna 0.4 shopping district 0.4 0.4 R3 Rennovation of Agro-polyclinic of Jalna 0.4 shopping 0.4 0.4 district Rennovation of APC (Bhokardan, Samangaon) of 0.4 shopping R4 0.4 0.4 Jalna district R2 Rennovation of Agro-polyclinic & District 0.9 shopping 0.9 0.9 Training Center of Beed district R3 Rennovation of Agro-polyclinic & District 0.9 shopping 0.9 0.9 Training Center of Beed district Rennovation of APC (Jalgaon, Rajurinavgan) & 1.4 shopping R4 1.4 1.4 DTC (Bindusara) of Beed district RNAPL- Rennovation of Agro-polyclinic of Latur 1.6 NCB ASS-6 Division (Package-6)---8 R2 Rennovation of Agro-polyclinic of Latur 0.2 shopping district 0.2 0.2 R3 Rennovation of Agro-polyclinic of Latur 0.2 shopping 0.2 0.2 district Rennovation of APC(Nilanga) & DTC (Chakur) of shopping A3 Latur district 1.09 1.09 1.09 R2 Rennovation of Agro-polyclinic & District 0.9 shopping Training Center of Parbhani district 0.9 0.9 R3 Rennovation of Agro-polyclinic & District 0.9 shopping Training Center of Parbhani district 0.9 0.9 Rennovation of APC (Gangakhed, Jintur) of shopping A3 Parbhani district 0.27 0.27 0.27 R2 Rennovation of Agro-polyclinic of Hingoli 0.2 shopping district 0.2 0.2 R3 Rennovation of Agro-polyclinic of Hingoli 0.2 shopping 0.2 0.2 district Rennovation of APC (Hingoli) of Hingoli district 0.199 shopping A3 0.17 0.029 0.199 2/24/2011 otprm 40 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Name of Package Description of Works/goods Estimated Method of Component Nos. cost Procurement (Rs. in ICB/NCB PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total Million) 2 3 4 5 6 7 8 9 10 11 12 13 14 R2 Rennovation of Agro-polyclinic & District 0.9 shopping 0.9 0.9 Training Center of Osmanabad district R3 Rennovation of Agro-polyclinic & District 0.9 shopping Training Center of Osmanabad district 0.9 0.9 Rennovation of APC (Dhoki, Yermala) & DTC 1.266 shopping A3 (Tuljapur) of Osmanabad district 1.266 1.266 R2 Rennovation of Agro-polyclinic & District 0.9 shopping Training Center of Nanded 0.9 0.9 R3 Rennovation of Agro-polyclinic & District 0.9 shopping Training Center of Nanded 0.9 0.9 Rennovation of APC (Pardi, Degular) & DTC 1.4 shopping A3 (Dhanegaon) of Nanded 1.087 0.313 1.4 RNAPAM- Rennovation of Agro-polyclinic of Amravati 1.6 NCB ASS-7 Division (Package-7)---8 R2 Rennovation of Agro-polyclinic & District 0.7 shopping Training Center of Amravati district 0.7 0.7 R3 Rennovation of Agro-polyclinic & District 0.7 shopping Training Center of Amravati district 0.7 0.7 Rennovation of APC (Kusumkot) & DTC 1.2 shopping R4 (Chandurrailway) of Amravati district 1.2 1.2 R2 Rennovation of Agro-polyclinic of Washim 0.4 shopping district 0.4 0.4 R3 Rennovation of Agro-polyclinic of Washim 0.4 shopping district 0.4 0.4 Rennovation of APC (Vitholi, Wanoja) of Washim 0.4 shopping R4 0.4 0.4 district 2/24/2011 otprm 41 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Name of Package Description of Works/goods Estimated Method of Component Nos. cost Procurement (Rs. in ICB/NCB PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total Million) 2 3 4 5 6 7 8 9 10 11 12 13 14 R2 Rennovation of Agro-polyclinic & District 0.7 shopping Training Center of Buldhana district 0.7 0.7 R3 Rennovation of Agro-polyclinic & District 0.7 shopping Training Center of Buldhana district 0.7 0.7 Rennovation of APC& DTC of Buldhana district 0.959 shopping A3 0.959 0.959 Rennovation of APC (w Khanderao) Buldhana 0.2 R4 0.2 0.2 district R2 Rennovation of Agro-polyclinic & District 1.1 shopping Training Center of Akola district 1.1 1.1 R3 Rennovation of Agro-polyclinic & District 1.1 shopping 1.1 1.1 Training Center of Akola district Rennovation of APC& DTC of Akola district 1.6 shopping R4 1.6 1.6 R2 Rennovation of Agro-polyclinic & District 0.7 shopping Training Center of Yavatmal district 0.7 0.7 R3 Rennovation of Agro-polyclinic & District 0.7 shopping 0.7 0.7 Training Center of Yavatmal district Rennovation of APC (Wirud)& DTC (Kalamb) of 1.2 shopping R4 Yavatmal district 1.2 1.2 RNAPNP- Rennovation of Agro-polyclinic of Nagpur 1.8 NCB ASS-8 Division (Package-8)---9 R2 Rennovation of Agro-polyclinic & District 0.7 shopping 0.7 0.7 Training Center of Nagpur district R3 Rennovation of Agro-polyclinic & District 0.7 shopping 0.7 0.7 Training Center of Nagpur district Rennovation of APC (Hiwara Bajar) & DTC 1.2 shopping R4 1.2 1.2 (Gondkhairi) of Nagpur district R2 Rennovation of Agro-polyclinic of Wardha 0.4 shopping district 0.4 0.4 R3 Rennovation of Agro-polyclinic of Wardha 0.4 shopping 0.4 0.4 district 2/24/2011 otprm 42 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Name of Package Description of Works/goods Estimated Method of Component Nos. cost Procurement (Rs. in ICB/NCB PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total Million) 2 3 4 5 6 7 8 9 10 11 12 13 14 Rennovation of APC (Talegaon, Virul) of Wardha shopping R4 district 0.4 0.4 0.4 R2 Rennovation of Agro-polyclinic & District 0.7 shopping 0.7 0.7 Training Center of Bhandara district R3 Rennovation of Agro-polyclinic & District 0.7 shopping 0.7 0.7 Training Center of Bhandara district Rennovation of APC (Palora) & DTC (Pahela) of 1.2 shopping R4 1.2 1.2 Bhandara district R2 Rennovation of Agro-polyclinic & District 0.9 shopping Training Center of Chandrapur district 0.9 0.9 R3 Rennovation of Agro-polyclinic & District 0.9 shopping Training Center of Chandrapur district 0.9 0.9 Rennovation of APC (Ekarjuna , Malewada) & 1.4 shopping R4 DTC (Chandrapur) of Chandrapur district 1.4 1.4 R2 0.4 shopping Rennovation of Agro-polyclinic of 0.4 0.4 Gadchiroli district R3 Rennovation of Agro-polyclinic of 0.4 shopping 0.4 0.4 Gadchiroli district Rennovation of APC (Krishnasagar, Sonapur) of 0.4 shopping R4 Gadchiroli district 0.4 0.4 R2 Rennovation of Agro-polyclinic & District shopping 0.7 0.7 0.7 Training Center of Gondia district R3 Rennovation of Agro-polyclinic & District shopping 0.7 0.7 0.7 Training Center of Gondia district Rennovation of APC (Hiwara) & DTC (Karanja) of 1.2 shopping R4 1.2 1.2 Gondia district REISA- Rennovation of existing infrastructure of 2.50 NCB 2.50 2.50 ASS-1 SAEMTI REISA- Rennovation of existing infrastructure of 2.50 NCB ASS-2 SAEMTI R2 Rennovation of existing infrastructure of 1.66 Shopping SAEMTI 1.66 1.66 2/24/2011 otprm 43 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Name of Package Description of Works/goods Estimated Method of Component Nos. cost Procurement (Rs. in ICB/NCB PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total Million) 2 3 4 5 6 7 8 9 10 11 12 13 14 R3 Rennovation of existing infrastructure of 1.66 Shopping 1.66 1.66 SAEMTI R4 Rennovation of existing infrastructure of SAEMTI 1.78 Shopping 1.78 1.78 deleted R2 Rennovation of existing infrastructure of 1.66 Shopping 1.66 1.66 SAEMTI R3 Rennovation of existing infrastructure of 1.66 Shopping 1.66 1.66 SAEMTI R2 Rennovation of existing infrastructure of 1.66 Shopping 1.66 1.66 SAEMTI R3 Rennovation of existing infrastructure of 1.66 Shopping 1.66 1.66 SAEMTI REIRA- Rennovation of existing infrastructure of 2.0 NCB ASS-1 RAEMTI R2 Rennovation of existing infrastructure of 2.0 Shopping 2.0 2.0 RAEMTI R3 Rennovation of existing infrastructure of 2.0 Shopping 2 2 RAEMTI Rennovation of existing infrastructure of RAEMTI Shopping R4 2.77 2.77 2.77 (Amaravati) REIRA- Rennovation of existing infrastructure of 2.0 NCB ASS-2 RAEMTI R2 Rennovation of existing infrastructure of 2.0 Shopping 2.0 2.0 RAEMTI R3 Rennovation of existing infrastructure of 2.0 Shopping 2 2 RAEMTI Rennovation of existing infrastructure of RAEMTI Shopping R4 8.041 8.041 8.041 (Nashik) REIRA- Rennovation of existing infrastructure of 2.0 NCB ASS-3 RAEMTI R2 Rennovation of existing infrastructure of 2.0 Shopping 2.0 2.0 SAEMTI R3 Rennovation of existing infrastructure of 2.0 Shopping 2 2 SAEMTI Rennovation of existing infrastructure of RAEMTI Shopping R4 3.052 3.052 3.052 (Kolhapur) REIRA- Rennovation of existing infrastructure of 2.0 NCB ASS-4 RAEMTI 2/24/2011 otprm 44 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Name of Package Description of Works/goods Estimated Method of Component Nos. cost Procurement (Rs. in ICB/NCB PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total Million) 2 3 4 5 6 7 8 9 10 11 12 13 14 R2 Rennovation of existing infrastructure of 2.0 Shopping 2.0 2.0 RAEMTI R3 Rennovation of existing infrastructure of 2.0 Shopping 2 2 RAEMTI Rennovation of existing infrastructure of RAEMTI Shopping R4 3.165 3.165 3.165 (Aurangabad) REIRA- Rennovation of existing infrastructure of 2.0 NCB ASS-5 RAEMTI R Rennovation of existing infrastructure of 2.0 Shopping 2.0 2.0 RAEMTI R3 Rennovation of existing infrastructure of 2.0 Shopping 2 2 RAEMTI REIRA- Rennovation of existing infrastructure of 2.0 NCB ASS-6 RAEMTI R Rennovation of existing infrastructure of 2.0 Shopping 2.0 2.0 RAEMTI R3 Rennovation of existing infrastructure of 2.0 Shopping 2 2 RAEMTI REIRA- Rennovation of existing infrastructure of 2.0 NCB ASS-7 RAEMTI R Rennovation of existing infrastructure of Shopping 2.0 2.0 RAEMTI 2.0 R3 Rennovation of existing infrastructure of Shopping 2 2 RAEMTI 2.0 RPCU-1 Renovation of Project Co-ordination 1.1 Shopping 1.1 1.1 Unit(PCU) office building at Pune R3 Renovation of Project Co-ordination 1.1 Shopping 1.1 1.1 Unit(PCU) office building at Pune Renovation of Project Co-ordination Unit(PCU) 1.1 Shopping R4 1.1 1.1 office building at Pune Piloting User AQL-CV1 Construction of Piezometer-Satara-20 2.00 NCB 0.25 1.75 2.00 Centered R Construction of Piezometer-Satara-20 2.00 Force Account 2.00 2.00 R2 Construction of Piezometer-Satara-20 2.00 Force Account 2.00 2.00 A2 Construction of Piezometer-Satara-6 0.258 Force Account 0.158 0.100 0.258 AQL-CV2 Construction of Piezometer-Beed-20 2.00 NCB 0.25 1.75 2.00 R Construction of Piezometer-Beed-20 2.00 Force Account 2.00 2.00 R2 Construction of Piezometer-Beed-20 2.00 Force Account 2.00 2.00 A2 Construction of Piezometer-Beed-10 0.08 Force Account 0.467 0.467 AQL-CV3 Construction of Piezometer-Jalna-20 2.00 NCB 0.25 1.75 2.00 2/24/2011 otprm 45 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Name of Package Description of Works/goods Estimated Method of Component Nos. cost Procurement (Rs. in ICB/NCB PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total Million) 2 3 4 5 6 7 8 9 10 11 12 13 14 R Construction of Piezometer-Jalna-20 2.00 Force Account 2.00 2.00 R2 Construction of Piezometer-Jalna-20 2.00 Force Account 2.00 2.00 A2 Construction of Piezometer-Jalna-10 0.06 Force Account 0.108 0.152 0.131 0.005 0.396 AQL-CV4 Construction of Piezometer-Amaravati-20 2.00 NCB 0.25 1.75 2.00 R Construction of Piezometer-Amaravati-20 2.00 Force Account R2 Construction of Piezometer-Amaravati-20 2.00 Force Account 2.00 2.00 deleted deleted AQL-CV5 Construction of UGB-Satara-5 1.00 DGSD / Shoppin 0.25 0.75 1.00 R Construction of UGB-Satara-5 1.00 Community Leve 0.50 0.5 1.00 R3 Construction of UGB-Satara-5 1.00 Community Leve 1.0 1.00 R4 Construction of Cement Nala Band 4- Budh - Community Satara 0.40 Level 0.4 0.4 R4 Construction of Cement Nala Band 3 - Community Shindewadi -Satara 0.40 Level 0.4 0.4 R4 Construction of Cement Nala Band 3 - Community 0.40 Level 0.4 0.4 Naganathwadi -Satara R4 Construction of Cement Nala Band 4 -Lalgun - Community 0.40 0.4 0.4 Satara Level R4 Construction of Cement Nala Band 3 - Community 0.40 Level 0.4 0.4 Fadtarwadi (Ner) -Satara AQL-CV6 Construction of UGB-Beed-5 1.00 DGSD / Shoppin 0.25 0.75 1.00 R Construction of UGB-Beed-5 1.00 Community Leve 0.50 0.5 1.00 R3 Construction of UGB-Beed-5 1.00 Community Leve 1.0 1.00 Deleted Deleted AQL-CV7 Construction of UGB-Jalna-5 1.00 DGSD / Shoppin 0.25 0.75 1.00 R Construction of UGB-Jalna-5 1.00 Community Leve 0.50 0.5 1.00 R3 Construction of UGB-Jalna-5 1.00 Community Leve 1.0 1.00 Deleted Deleted AQL-CV8 Construction of UGB-Amaravati-5 1.00 DGSD / Shoppin 0.25 0.75 1.00 R Construction of UGB-Amaravati-5 1.00 Community Leve 0.50 0.5 1.00 R3 Construction of UGB-Amaravati-5 1.00 Community Leve 1.0 1.00 Deleted Deleted AQL-CV9 Construction of PT-Satara-5 2.00 NCB 0.5 1.50 2.00 R Construction of PT-Satara-5 2.00 Community Leve 1.00 1.0 2.00 R3 Construction of PT-Satara-5 2.00 Community Leve 2.0 2.00 Deleted Deleted AQL-CV10 Construction of PT-Beed-5 2.00 NCB 0.5 1.50 2.00 R Construction of PT-Beed-5 2.00 Community Leve 1.00 1.0 2.00 2/24/2011 otprm 46 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Name of Package Description of Works/goods Estimated Method of Component Nos. cost Procurement (Rs. in ICB/NCB PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total Million) 2 3 4 5 6 7 8 9 10 11 12 13 14 R3 Construction of PT-Beed-5 2.00 Community Leve 2.0 2.00 Deleted Deleted AQL-CV11 Construction of PT-Jalna-5 2.00 NCB 0.5 1.50 2.00 R Construction of PT-Jalna-5 2.00 Community Leve 1.00 1.0 2.00 R3 Construction of PT-Jalna-5 2.00 Community Leve 2.0 2.00 Deleted Deleted AQL-CV12 Construction of PT-Amaravati-5 2.00 NCB 0.5 1.50 2.00 R Construction of PT-Amaravati-5 2.00 Community Leve 1.00 1.00 2.00 R3 Construction of PT-Amaravati-5 2.00 Community Leve 2.0 2.00 Deleted Deleted AQL-CV13 Construction of Artificial recharge-Satara-13 0.13 DGSD / Shoppin 0.13 0.13 R Construction of Artificial recharge-Satara-13 0.13 Community Leve 0.07 0.07 0.13 R3 Construction of Artificial recharge-Satara-13 0.13 Community Leve 0.13 0.13 Deleted Deleted AQL-CV14 Construction of Artificial recharge-Beed -13 0.13 DGSD / Shoppin 0.13 0.13 R Construction of Artificial recharge-Beed -13 0.13 Community Leve 0.07 0.07 0.13 R3 Construction of Artificial recharge-Beed -13 0.13 Community Leve 0.13 0.13 Deleted Deleted AQL-CV15 Construction of Artificial recharge-Jalna-12 0.12 DGSD / Shoppin 0.12 0.12 R Construction of Artificial recharge-Jalna-12 0.12 Community Leve 0.06 0.06 0.12 R3 Construction of Artificial recharge-Jalna-12 0.12 Community Leve 0.12 0.12 Deleted Deleted AQL-CV16 Construction of Artificial recharge-Amaravati- 0.12 DGSD / Shoppin 0.12 0.12 12 R Construction of Artificial recharge-Amaravati- 0.12 Community Leve 0.06 0.06 0.12 12 R3 Construction of Artificial recharge-Amaravati- 0.12 Community Leve 0.12 0.12 12 Deleted Deleted AQL-CV17 Renovation of Ponds / Tanks Satara-26 1.30 DGSD / Shoppin 0.30 1.00 1.30 R Renovation of Ponds / Tanks Satara-26 1.30 Community Leve 0.65 0.65 1.30 R3 Renovation of Ponds / Tanks Satara-26 1.30 Community Leve 1.30 1.30 Deleted Deleted AQL-CV18 Renovation of Ponds / Tanks Beed-16 0.80 DGSD / Shoppin 0.20 0.60 0.80 2/24/2011 otprm 47 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Name of Package Description of Works/goods Estimated Method of Component Nos. cost Procurement (Rs. in ICB/NCB PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total Million) 2 3 4 5 6 7 8 9 10 11 12 13 14 R Renovation of Ponds / Tanks Beed-16 0.80 Community Leve 0.40 0.40 0.80 R3 Renovation of Ponds / Tanks Beed-16 0.80 Community Leve 0.80 0.80 Deleted Deleted AQL-CV19 Renovation of Ponds / Tanks Jalna-10 0.50 DGSD / Shoppin 0.10 0.40 0.50 R Renovation of Ponds / Tanks Jalna-10 0.50 Community Leve 0.25 0.25 0.50 R3 Renovation of Ponds / Tanks Jalna-10 0.50 Community Leve 0.50 0.50 Deleted Deleted AQL-CV20 Renovation of Ponds / Tanks Amaravati-8 0.40 DGSD / Shoppin 0.15 0.25 0.40 R Renovation of Ponds / Tanks Amaravati-8 0.40 Community Leve 0.2 0.20 0.40 R3 Renovation of Ponds / Tanks Amaravati-8 0.40 Community Leve 0.40 0.40 Deleted Deleted AQL-CV21 Construction of Trenches for recharge Satara- 1.00 DGSD / Shoppin 0.25 0.75 1.00 5 R Construction of Trenches for recharge Satara- 1.00 Community Leve 0.5 0.5 1.00 5 R3 Construction of Trenches for recharge Satara- 1.00 Community Leve 1.00 1.00 5 Deleted Deleted AQL-CV22 Construction of Trenches for recharge Beed-5 1.00 DGSD / Shoppin 0.25 0.75 1.00 R Construction of Trenches for recharge Beed-5 1.00 Community Leve 0.5 0.50 1.00 R3 Construction of Trenches for recharge Beed-5 1.00 Community Leve 1.00 1.00 Deleted Deleted AQL-CV23 Construction of Trenches for recharge Jalna-5 1.00 DGSD / Shoppin 0.25 0.75 1.00 R Construction of Trenches for recharge Jalna-5 1.00 Community Leve 0.5 0.50 1.00 R3 Construction of Trenches for recharge Jalna-5 1.00 Community Leve 1.00 1.00 Deleted Deleted AQL-CV24 Construction of Trenches for recharge 1.00 DGSD / Shoppin 0.25 0.75 1.00 Amaraavti-5 R Construction of Trenches for recharge 1.00 Community Leve 0.5 0.50 1.00 R3 Construction of Trenches for recharge 1.00 Community Leve 1.00 1.00 Deleted Deleted AQL-CV25 Watershed Dev & Afforestation Satara 0.25 DGSD / Shoppin 0.06 0.19 0.25 R Watershed Dev & Afforestation Satara 0.25 Community Leve 0.13 0.13 0.25 R3 Watershed Dev & Afforestation Satara 0.25 Community Leve 0.25 0.25 Deleted Deleted 2/24/2011 otprm 48 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Name of Package Description of Works/goods Estimated Method of Component Nos. cost Procurement (Rs. in ICB/NCB PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total Million) 2 3 4 5 6 7 8 9 10 11 12 13 14 AQL-CV26 Watershed Dev & Afforestation Beed 0.25 DGSD / Shoppin 0.06 0.19 0.25 R Watershed Dev & Afforestation Beed 0.25 Community Leve 0.13 0.13 0.25 R3 Watershed Dev & Afforestation Beed 0.25 Community Leve 0.25 0.25 Deleted Deleted AQL-CV27 Watershed Dev & AfforestationJalna 0.25 DGSD / Shoppin 0.06 0.19 0.25 R Watershed Dev & AfforestationJalna 0.25 Community Leve 0.13 0.13 0.25 R3 Watershed Dev & AfforestationJalna 0.25 Community Leve 0.25 0.25 Deleted Deleted AQL-CV28 Watershed Dev & Afforestation Amaravati 0.25 DGSD / Shoppin 0.07 0.18 0.25 R Watershed Dev & Afforestation Amaravati 0.25 Community Leve 0.125 0.125 0.25 R3 Watershed Dev & Afforestation Amaravati 0.25 Community Leve 0.25 0.25 Deleted Deleted AQL-CV29 Construction of UCM Structure Satara 1.00 DGSD / Shoppin 0.15 0.85 1.00 R Construction of UCM Structure Satara 1.00 Community Leve 0.5 0.5 1.00 R3 Construction of UCM Structure Satara 1.00 Community Leve 1.00 1.00 Deleted Deleted AQL-CV30 Construction of UCM Structure Beed 1.00 DGSD / Shoppin 0.25 0.75 1.00 R Construction of UCM Structure Beed 1.00 Community Leve 0.5 0.50 1.00 R3 Construction of UCM Structure Beed 1.00 Community Leve 1.00 1.00 Deleted Deleted AQL-CV31 Construction of UCM Structure Jalna 1.00 DGSD / Shoppin 0.25 0.75 1.00 R Construction of UCM Structure Jalna 1.00 Community Leve 0.5 0.50 1.00 R3 Construction of UCM Structure Jalna 1.00 Community Leve 1.00 1.00 Deleted Deleted AQL-CV32 Construction of UCM StructureAmaravati 1.00 DGSD / Shoppin 0.25 0.75 1.00 R Construction of UCM StructureAmaravati 1.00 Community Leve 0.5 0.50 1.00 R3 Construction of UCM StructureAmaravati 1.00 Community Leve 1.00 1.00 Deleted Deleted R4 Newly proposed structures instead of those structures mentioned in AQL CV4 & AQL-cv 6 to AQL cv32 R4 Construction of Cement Nala Band No.1 - 0.274 Community Vardhangad - Satara Level Construction of Cement Nala Band No.1 - Community A4 0.274 0.048 0.161 0.065 0.274 Vardhangad - Satara Level 2/24/2011 otprm 49 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Name of Package Description of Works/goods Estimated Method of Component Nos. cost Procurement (Rs. in ICB/NCB PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total Million) 2 3 4 5 6 7 8 9 10 11 12 13 14 R4 Construction of Cement Nala Band No.2 - 0.352 Community Vardhangad - Satara Level Construction of Cement Nala Band No.2 - Community A4 0.352 0.062 0.290 0.352 Vardhangad - Satara Level R4 Construction of Cement Nala Band No.3 - 0.301 Community Vardhangad - Satara Level Construction of Cement Nala Band No.3 - Community A4 0.301 0.053 0.177 0.071 0.301 Vardhangad - Satara Level R4 Construction of Cement Nala Band No.1 - 0.345 Community Budh - Satara Level Construction of Cement Nala Band No.1 - Community A4 0.345 0.061 0.284 0.345 Budh - Satara Level R4 Construction of Cement Nala Band No.2 - 0.325 Community Budh - Satara Level Construction of Cement Nala Band No.2 - Community A4 0.325 0.325 0.325 Budh - Satara Level R4 Construction of Cement Nala Band No.3 - 0.325 Community Budh - Satara Level Construction of Cement Nala Band No.3 - Community A4 0.325 0.325 0.325 Budh - Satara Level R4 Construction of Cement Nala Band No.1 - 0.197 Community Pangarkhel- Satara Level Construction of Cement Nala Band No.1 - Community A4 0.197 0.035 0.162 0.197 Pangarkhel- Satara Level R4 Construction of Cement Nala Band No.2 - 0.368 Community Pangarkhel- Satara Level Construction of Cement Nala Band No.2 - Community A4 0.368 0.281 0.087 0.368 Pangarkhel- Satara Level R4 Construction of Cement Nala Band No.1 - 0.325 Community Kalewadi- Satara Level Construction of Cement Nala Band No.1 - Community A4 0.325 0.325 0.325 Kalewadi- Satara Level R4 Construction of Cement Nala Band No.2 - 0.325 Community Kalewadi- Satara Level Construction of Cement Nala Band No.2 - Community A4 0.325 0.325 0.325 Kalewadi- Satara Level R4 Construction of Cement Nala Band No.1 - 0.345 Community Shindewadi- Satara Level 2/24/2011 otprm 50 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Name of Package Description of Works/goods Estimated Method of Component Nos. cost Procurement (Rs. in ICB/NCB PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total Million) 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Cement Nala Band No.1 - Community A4 0.345 0.061 0.203 0.081 0.345 Shindewadi- Satara Level R4 Construction of Cement Nala Band No.2 - 0.272 Community Shindewadi- Satara Level Construction of Cement Nala Band No.2 - Community A4 0.272 0.048 0.224 0.272 Shindewadi- Satara Level R4 Construction of Cement Nala Band No.1 - 0.467 Community Anpatwadi- Satara Level Construction of Cement Nala Band No.1 - Community A4 0.467 0.067 0.015 0.385 0.467 Anpatwadi- Satara Level R4 Construction of Cement Nala Band No.2 - 0.262 Community Anpatwadi- Satara Level Construction of Cement Nala Band No.2 - Community A4 0.262 0.046 0.216 0.262 Anpatwadi- Satara Level R4 Construction of Cement Nala Band No.1 - 0.353 Community Rajapur- Satara Level Construction of Cement Nala Band No.1 - Community A4 0.353 0.062 0.291 0.353 Rajapur- Satara Level R4 Construction of Cement Nala Band No.2 - 0.223 Community Rajapur- Satara Level Construction of Cement Nala Band No.2 - Community A4 0.223 0.039 0.184 0.223 Rajapur- Satara Level R4 Construction of Cement Nala Band No.1 - 0.178 Community Navalewadi- Satara Level Construction of Cement Nala Band No.1 - Community A4 0.178 0.031 0.147 0.147 Navalewadi- Satara Level R4 Construction of Cement Nala Band No.2 - 0.214 Community Navalewadi- Satara Level Construction of Cement Nala Band No.2 - Community A4 0.214 0.038 0.176 0.214 Navalewadi- Satara Level R4 Construction of Cement Nala Band No.1 - 0.362 Community Manjarwadi- Satara Level Construction of Cement Nala Band No.1 - Community A4 0.362 0.064 0.298 0.362 Manjarwadi- Satara Level R4 Construction of Cement Nala Band No.2 - 0.274 Community Manjarwadi- Satara Level Construction of Cement Nala Band No.2 - Community A4 0.274 0.048 0.226 0.274 Manjarwadi- Satara Level 2/24/2011 otprm 51 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Name of Package Description of Works/goods Estimated Method of Component Nos. cost Procurement (Rs. in ICB/NCB PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total Million) 2 3 4 5 6 7 8 9 10 11 12 13 14 R4 Construction of Cement Nala Band - 0.325 Community Katewadi- Satara Level Construction of Cement Nala Band - Community A4 0.325 0.325 0.325 Katewadi- Satara Level R4 Construction of Cement Nala Band No.1 - 0.315 Community Pusegaon- Satara Level Construction of Cement Nala Band No.1 - Community A4 0.315 0.056 0.259 0.315 Pusegaon- Satara Level R4 Construction of Cement Nala Band No.2 - 0.325 Community Pusegaon- Satara Level Construction of Cement Nala Band No.2 - Community A4 0.325 0.325 0.325 Pusegaon- Satara Level R4 Construction of Cement Nala Band No.1 - 0.270 Community Garawadi- Satara Level Construction of Cement Nala Band No.1 - Community A4 0.270 0.040 0.230 0.270 Garawadi- Satara Level R4 Construction of Cement Nala Band No.2 - 0.303 Community Garawadi- Satara Level Construction of Cement Nala Band No.2 - Community A4 0.303 0.053 0.250 0.303 Garawadi- Satara Level R4 Construction of Cement Nala Band No.1 - 0.177 Community Nagnathwadi- Satara Level Construction of Cement Nala Band No.1 - Community A4 0.177 0.031 0.146 0.177 Nagnathwadi- Satara Level R4 Construction of Cement Nala Band No.2 - 0.350 Community Nagnathwadi- Satara Level Construction of Cement Nala Band No.2 - Community A4 0.350 0.053 0.297 0.350 Nagnathwadi- Satara Level R4 Construction of Cement Nala Band No.1 - 0.156 Community Chinchani- Satara Level Construction of Cement Nala Band No.1 - Community A4 0.156 0.027 0.129 0.156 Chinchani- Satara Level R4 Construction of Cement Nala Band No.2 - 0.189 Community Chinchani- Satara Level Construction of Cement Nala Band No.2 - Community A4 0.189 0.033 0.156 0.189 Chinchani- Satara Level R4 Construction of Cement Nala Band No.1 - 0.242 Community Pawarwadi- Satara Level 2/24/2011 otprm 52 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Name of Package Description of Works/goods Estimated Method of Component Nos. cost Procurement (Rs. in ICB/NCB PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total Million) 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Cement Nala Band No.1 - Community A4 0.242 0.043 0.199 0.242 Pawarwadi- Satara Level R4 Construction of Cement Nala Band No.2 - 0.286 Community Pawarwadi- Satara Level Construction of Cement Nala Band No.2 - Community A4 0.286 0.051 0.235 0.286 Pawarwadi- Satara Level R4 Construction of Cement Nala Band No.1 - 0.325 Community Wetane- Satara Level Construction of Cement Nala Band No.1 - Community A4 0.325 0.325 0.325 Wetane- Satara Level R4 Construction of Cement Nala Band No.2 - 0.325 Community Wetane- Satara Level Construction of Cement Nala Band No.2 - Community A4 0.325 0.325 0.325 Wetane- Satara Level R4 Construction of Cement Nala Band No.1 - 0.248 Community Ransingwadi- Satara Level Construction of Cement Nala Band No.1 - Community A4 0.248 0.044 0.146 0.058 0.248 Ransingwadi- Satara Level R4 Construction of Cement Nala Band No.2 - 0.287 Community Ransingwadi- Satara Level Construction of Cement Nala Band No.2 - Community A4 0.287 0.051 0.169 0.067 0.287 Ransingwadi- Satara Level R4 Construction of Cement Nala Band No.1 - 0.279 Community Pandharwadi- Satara Level Construction of Cement Nala Band No.1 - Community A4 0.279 0.049 0.164 0.066 0.279 Pandharwadi- Satara Level R4 Construction of Cement Nala Band No.2 - 0.346 Community Pandharwadi- Satara Level Construction of Cement Nala Band No.2 - Community A4 0.346 0.061 0.204 0.081 0.346 Pandharwadi- Satara Level R4 Construction of Cement Nala Band No.3 - 0.480 Community Pandharwadi- Satara Level Construction of Cement Nala Band No.3 - Community A4 0.480 0.085 0.283 0.112 0.480 Pandharwadi- Satara Level R4 Construction of Cement Nala Band No.1 - 0.367 Community Mol- Satara Level Construction of Cement Nala Band No.1 - Community A4 0.367 0.065 0.302 0.367 Mol- Satara Level 2/24/2011 otprm 53 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Name of Package Description of Works/goods Estimated Method of Component Nos. cost Procurement (Rs. in ICB/NCB PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total Million) 2 3 4 5 6 7 8 9 10 11 12 13 14 R4 Construction of Cement Nala Band No.2 - 0.353 Community Mol- Satara Level Construction of Cement Nala Band No.2 - Community A4 0.353 0.062 0.291 0.353 Mol- Satara Level R4 Construction of Cement Nala Band No.3 - 0.325 Community Mol- Satara Level Construction of Cement Nala Band No.3 - Community A4 0.325 0.325 0.325 Mol- Satara Level R4 Construction of Cement Nala Band No.1 - 0.233 Community Lalgun- Satara Level Construction of Cement Nala Band No.1 - Community A4 0.233 0.041 0.192 0.233 Lalgun- Satara Level R4 Construction of Cement Nala Band No.2 - 0.292 Community Lalgun- Satara Level Construction of Cement Nala Band No.2 - Community A4 0.292 0.051 0.241 0.292 Lalgun- Satara Level R4 Construction of Cement Nala Band No.3 - 0.298 Community Lalgun- Satara Level Construction of Cement Nala Band No.3 - Community A4 0.298 0.053 0.245 0.298 Lalgun- Satara Level R4 Construction of Cement Nala Band No.1 - 0.299 Community Diskal- Satara Level Construction of Cement Nala Band No.1 - Community A4 0.299 0.053 0.246 0.299 Diskal- Satara Level R4 Construction of Cement Nala Band No.2 - 0.202 Community Diskal- Satara Level Construction of Cement Nala Band No.2 - Community A4 0.202 0.036 0.166 0.202 Diskal- Satara Level R4 Construction of Cement Nala Band No.3 - 0.258 Community Diskal- Satara Level Construction of Cement Nala Band No.3 - Community A4 0.258 0.045 0.213 0.258 Diskal- Satara Level R4 Construction of Cement Nala Band No.4 - 0.309 Community Diskal- Satara Level Construction of Cement Nala Band No.4 - Community A4 0.309 0.055 0.254 0.309 Diskal- Satara Level R4 Construction of Cement Nala Band No.1 - 0.274 Community Ner- Satara Level 2/24/2011 otprm 54 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Name of Package Description of Works/goods Estimated Method of Component Nos. cost Procurement (Rs. in ICB/NCB PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total Million) 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Cement Nala Band No.1 - Community A4 0.274 0.048 0.226 0.274 Ner- Satara Level R4 Construction of Cement Nala Band No.2 - 0.345 Community Ner- Satara Level Construction of Cement Nala Band No.2 - Community A4 0.345 0.061 0.284 0.345 Ner- Satara Level Construction of Cement Nala Band No.4 - Community R4 0.350 0.350 0.350 Vardhangad- Satara Level Construction of Cement Nala Band No.4 - Community R4 0.350 0.350 0.350 Shindewadi- Satara Level Construction of Cement Nala Band No.3 - Community R4 0.350 0.350 0.350 Anpatwadi- Satara Level Construction of Cement Nala Band No.3 - Community R4 0.350 0.350 0.350 Rajapur- Satara Level Construction of Cement Nala Band No.4 - Community R4 0.350 0.350 0.350 Rajapur- Satara Level Construction of Cement Nala Band No.3 - Community R4 0.350 0.350 0.350 Pusegaon- Satara Level Construction of Cement Nala Band No.4 - Community R4 0.350 0.350 0.350 Pusegaon- Satara Level Construction of Cement Nala Band No.4 - Community R4 0.350 0.350 0.350 Nagnathwadi- Satara Level Construction of Cement Nala Band No.3 - Community R4 0.350 0.350 0.350 Chinchani- Satara Level Construction of Cement Nala Band No.3 - Community R4 0.350 0.350 0.350 Pawarwadi- Satara Level Construction of Cement Nala Band No.3 - Community R4 0.350 0.350 0.350 Ransingwadi- Satara Level Construction of Cement Nala Band No.4 - Community R4 0.350 0.350 0.350 Pandharwadi- Satara Level Construction of Cement Nala Band No.4 - Community R4 0.350 0.350 0.350 Mol- Satara Level Construction of Cement Nala Band No.5 - Community R4 0.350 0.350 0.350 Lalgun- Satara Level Construction of Cement Nala Band No.6 - Community R4 0.350 0.350 0.350 Lalgun- Satara Level Construction of Cement Nala Band No.5 - Community R4 0.350 0.350 0.350 Diskal- Satara Level 2/24/2011 otprm 55 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Name of Package Description of Works/goods Estimated Method of Component Nos. cost Procurement (Rs. in ICB/NCB PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total Million) 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Cement Nala Band No.4 - Community R4 0.350 0.350 0.350 Phadtarwadi-Ner- Satara Level R4 Construction of Cement Nala Band - Pimperkhed-Beed Construction of Cement Nala Band - Community A4 0.527 0.079 0.448 0.527 Pimperkhed-Beed Level R4 Construction of Cement Nala Band 1- Hiwara - Beed Construction of Cement Nala Band 1- Community A4 0.468 0.070 0.398 0.468 Hiwara - Beed Level R4 Construction of Cement Nala Band 1- Suleman Deola - Beed Construction of Cement Nala Band 1- Community A4 0.493 0.074 0.419 0.493 Suleman Deola - Beed Level R4 Construction of Cement Nala Band - Bhojewadi - Beed Construction of Cement Nala Band - Community A4 0.476 0.071 0.405 0.476 Bhojewadi - Beed Level R4 Construction of Cement Nala Band 1 - Mhasobachiwadi - Beed Construction of Cement Nala Band 1 - Community A4 0.408 0.061 0.347 0.408 Mhasobachiwadi - Beed Level R4 Construction of Cement Nala Band 2 - Mhasobachiwadi - Beed Construction of Cement Nala Band 2 - Community A4 0.408 0.061 0.347 0.408 Mhasobachiwadi - Beed Level R4 Construction of Cement Nala Band 1- Tagadkhel - Beed Construction of Cement Nala Band 1- Community A4 0.536 0.080 0.456 0.536 Tagadkhel - Beed Level R4 Construction of Cement Nala Band - Gangadevi - Beed Construction of Cement Nala Band - Community A4 0.595 0.089 0.506 0.595 Gangadevi - Beed Level R4 Construction of Cement Nala Band 1- Shedala - Beed Construction of Cement Nala Band 1- Community A4 0.502 0.075 0.427 0.502 Shedala - Beed Level 2/24/2011 otprm 56 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Name of Package Description of Works/goods Estimated Method of Component Nos. cost Procurement (Rs. in ICB/NCB PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total Million) 2 3 4 5 6 7 8 9 10 11 12 13 14 R4 Construction of Cement Nala Band 1- Velturi 1- Beed Construction of Cement Nala Band 1- Community A4 0.608 0.091 0.517 0.608 Velturi 1- Beed Level R4 Construction of Cement Nala Band 1 - Gaukhel - Beed Construction of Cement Nala Band 1 - Community A4 0.490 0.073 0.417 0.490 Gaukhel - Beed Level R4 Construction of Cement Nala Band 2 - Gaukhel - Beed Construction of Cement Nala Band 2 - Community A4 0.490 0.073 0.417 0.490 Gaukhel - Beed Level Construction of Cement Nala Band 3- Community R4 0.550 0.550 0.550 Gaukhel-Beed Level Construction of Cement Nala Band 2- Community R4 0.600 0.600 0.600 Tagadkhel-Beed Level Construction of Cement Nala Band 2- Community R4 0.600 0.600 0.600 Suleman Deola-Beed Level Construction of Cement Nala Band 2- Community R4 0.600 0.600 0.600 Shedala-Beed Level Construction of Cement Nala Band 2- Community R4 0.600 0.600 0.600 Hiwara-Beed Level Construction of Cement Nala Band - Community R4 0.550 0.550 0.550 Lodhewadi-Beed Level Construction of Cement Nala Band 2- Community R4 0.600 0.600 0.600 Velturi-Beed Level R4 Construction of Cement Nala Band 1- 0.429 Community Lodhewadi-Jalna Level Construction of Cement Nala Band 1- Community A4 0.429 0.075 0.354 0.429 Lodhewadi-Jalna Level R4 Construction of Cement Nala Band 1- 0.264 Community Talni-Jalna Level Construction of Cement Nala Band 1- Community A4 0.264 0.046 0.081 0.137 0.264 Talni-Jalna Level R4 Construction of Cement Nala Band - 0.393 Community Talegaon-1-Jalna Level Construction of Cement Nala Band - Community A4 0.393 0.069 0.068 0.256 0.393 Talegaon-1-Jalna Level 2/24/2011 otprm 57 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Name of Package Description of Works/goods Estimated Method of Component Nos. cost Procurement (Rs. in ICB/NCB PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total Million) 2 3 4 5 6 7 8 9 10 11 12 13 14 R4 Construction of Cement Nala Band - 0.417 Community Talegaon-2-Jalna Level Construction of Cement Nala Band - Community A4 0.417 0.073 0.344 0.417 Talegaon-2-Jalna Level R4 Construction of Cement Nala Band 1- 0.294 Community Pimpri-Jalna Level Construction of Cement Nala Band 1- Community A4 0.294 0.294 0.294 Pimpri-Jalna Level R4 Construction of Cement Nala Band 1- 0.362 Community Khadgaon-Jalna Level Construction of Cement Nala Band 1- Community A4 0.362 0.063 0.082 0.217 0.362 Khadgaon-Jalna Level R4 Construction of Cement Nala Band - 0.349 Community Latifpur-Jalna Level Construction of Cement Nala Band - Community A4 0.349 0.061 0.070 0.218 0.349 Latifpur-Jalna Level R4 Construction of Cement Nala Band - 0.498 Community Ramnagar-Jalna Level Construction of Cement Nala Band - Community A4 0.498 0.087 0.124 0.287 0.498 Ramnagar-Jalna Level R4 Construction of Cement Nala Band - Ita- 0.617 Community Jalna Level Construction of Cement Nala Band - Ita- Community A4 0.617 0.108 0.509 0.617 Jalna Level Construction of Cement Nala Band 2- Community R4 0.450 0.450 0.450 Lodhewadi-Jalna Level Construction of Cement Nala Band 2- Community R4 0.450 0.450 0.450 Talni-Jalna Level Construction of Cement Nala Band 2- Community R4 0.450 0.450 0.450 Pimpri-Jalna Level Construction of Cement Nala Band 2- Community R4 0.450 0.450 0.450 Khadgaon-Jalna Level Construction of Earthen Nala Band --Beed R4 Construction of Earthen Nala Band - 0.170 Community Pimperkhed-Beed Level Construction of Earthen Nala Band - Community A4 0.170 0.025 0.145 0.170 Pimperkhed-Beed Level 2/24/2011 otprm 58 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Name of Package Description of Works/goods Estimated Method of Component Nos. cost Procurement (Rs. in ICB/NCB PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total Million) 2 3 4 5 6 7 8 9 10 11 12 13 14 R4 Construction of Earthen Nala Band - Community Suleman Deola -Beed 0.170 Level Construction of Earthen Nala Band - Community A4 0.170 0.025 0.145 0.170 Suleman Deola -Beed Level R4 Construction of Earthen Nala Band - 0.350 Community Bhojewadi -Beed Level Construction of Earthen Nala Band - Community A4 0.350 0.052 0.298 0.350 Bhojewadi -Beed Level R4 Construction of Earthen Nala Band - 0.290 Community Gangadevi-Beed Level Construction of Earthen Nala Band - Community A4 0.290 0.043 0.247 0.290 Gangadevi-Beed Level R4 Construction of Earthen Nala Band - 0.250 Community Shedala-Beed Level Construction of Earthen Nala Band - Community A4 0.250 0.037 0.213 0.250 Shedala-Beed Level R4 Construction of Earthen Nala Band - 0.250 Community Velturi -Beed Level Construction of Earthen Nala Band - Community A4 0.250 0.038 0.213 0.250 Velturi -Beed Level R4 Construction of Earthen Nala Band - 0.209 Community Lodhewadi-Jalna Level Construction of Earthen Nala Band - Community A4 0.209 0.036 0.173 0.209 Lodhewadi-Jalna Level R4 Construction of Earthen Nala Band - Talni- 0.075 Community Jalna Level Construction of Earthen Nala Band - Talni- Community A4 0.075 0.013 0.062 0.075 Jalna Level R4 Construction of Earthen Nala Band - 0.094 Community Khadgaon-Jalna Level Construction of Earthen Nala Band - Community A4 0.094 0.016 0.078 0.094 Khadgaon-Jalna Level R4 Construction of Earthen Nala Band - 0.150 Community Latifpur-Jalna Level Construction of Earthen Nala Band - Community A4 0.150 0.026 0.055 0.069 0.150 Latifpur-Jalna Level R4 Construction of Earthen Nala Band - 0.153 Community Ramnagar-Jalna Level 2/24/2011 otprm 59 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Name of Package Description of Works/goods Estimated Method of Component Nos. cost Procurement (Rs. in ICB/NCB PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total Million) 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Earthen Nala Band - Community A4 0.153 0.027 0.044 0.082 0.153 Ramnagar-Jalna Level R4 Construction of Earthen Nala Band - Ita- 0.073 Community Jalna Level Construction of Earthen Nala Band - Ita- Community A4 0.073 0.012 0.061 0.073 Jalna Level R4 Construction of Gabbion - Pimperkhed- 0.190 Community Construction of Gabbion - Pimperkhed- Community A4 0.190 0.028 0.162 0.190 Beed Level R4 Construction of Gabbion - Hiwara -Beed 0.425 Community A4 Construction of Gabbion - Hiwara -Beed 0.425 Community 0.064 0.361 0.425 R4 Construction of Gabbion - Tagkhel -Beed 0.350 Community Construction of Gabbion - Tagkhel -Beed Community A4 0.350 0.052 0.298 0.350 Level R4 0.323 Community Construction of Gabbion - Pimpri- Jalna Level Construction of Gabbion - Pimpri- Jalna Community A4 0.323 0.323 0.323 Level R4 Construction of Gabbion - Ramnagar- 0.323 Community Jalna Level Construction of Gabbion - Ramnagar- Community A4 0.323 0.323 0.323 Jalna Level R4 Desilting of existing CNB - Suleman Deola - 0.190 Community Beed Level Desilting of existing CNB - Suleman Deola - Community A4 0.190 0.028 0.162 0.190 Beed Level R4 0.130 Community Desilting of existing CNB - Shedala - Beed Level Desilting of existing CNB - Shedala - Beed Community A4 0.130 0.019 0.111 0.130 Level Piloting RM-COM1 Rehabilitation & Modernization of Natuwadi 46 NCB Commerciali Medium Scheme 9.43 21.61 14.96 46.00 zation of R 46 NCB 23.00 23 46.00 R3 Rehabilitation & Modernization of Natuwadi 46 NCB Medium Scheme 23.00 23.00 46.00 2/24/2011 otprm 60 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Name of Package Description of Works/goods Estimated Method of Component Nos. cost Procurement (Rs. in ICB/NCB PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total Million) 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitation & Modernization of Natuwadi R4 Medium Scheme 46 NCB 23.00 23.00 46.00 RM-COM2 Rehabilitation & Modernization of Minor 15 NCB Scheme no.1 for contract farming 4.85 10.15 15.00 R Rehabilitation & Modernization of Minor 10 NCB Scheme no.1 for contract farming 5.00 5 10.00 R3 Rehabilitation & Modernization of Minor 10 NCB Scheme no.1 for contract farming 5.00 5.00 10.00 Rehabilitation & Modernization of Minor 10 NCB R4 Scheme no.1 for contract farming 5.00 5.00 10.00 RM-COM3 Rehabilitation & Modernization of Minor 15 NCB Scheme no2 for contract farming 4.85 10.15 15.00 R Rehabilitation & Modernization of Minor 10 NCB 5.00 5 10.00 Scheme 2 for contract farming R3 Rehabilitation & Modernization of Minor 10 NCB 5.00 5.00 10.00 Scheme 2 for contract farming Rehabilitation & Modernization of Minor 10 NCB R4 5.00 5.00 10.00 Scheme 2 for contract farming RM-COM4 Rehabilitation & Modernization of Minor nil Scheme no.3 for contract farming R Rehabilitation & Modernization of Minor 10 NCB Scheme no.3 for contract farming 5.00 5 10.00 R3 Rehabilitation & Modernization of Minor 10 NCB 5.00 5.00 10.00 Scheme no.3 for contract farming Rehabilitation & Modernization of Minor 10 NCB R4 Scheme no.3 for contract farming 5.00 5.00 10.00 Revised MIS Pkages 4 76 38 38 76 Project RE-PMU1 Renovation of Office premises 2.5 NCB 0.625 1.25 0.625 2.50 Preparation R Renovation of Office premises 2 Shopping 2.00 2.00 A Renovation of Office premises 2.15 Shopping 2.15 2.15 R3 Total (G) 5 78.15 2.15 38.00 38.00 78.15 Total 291 40 105 121 25 0 0 291 Total R 393 0 48 166 97 83 0 393 Total Revised 2 333 0 21 105 104 93 10 333 Total Revised 3 338 0 21 8 0 164 144 338 2/24/2011 otprm 61 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Name of Package Description of Works/goods Estimated Method of Component Nos. cost Procurement (Rs. in ICB/NCB PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total Million) 2 3 4 5 6 7 8 9 10 11 12 13 14 Total Revised 4 216 0 16 16 9 15 126 38 220 Note: There is change in the earlier reported expenditure figures.Figures reported in R4 revision are the actual exp probable expenditure reported earlier. 2/24/2011 otprm 62 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Financial Implementation Plan Procurement Packaging Plan and Implementation Sched Revision No:4 (Rs in Millions) Sr. No Name Package Description of Works/goods Method PY-1 Estimat PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. of ed cost Compo Procurem (Rs. in nent ent Million) ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 WUA WU-CV1 Construction of small office building for 113.25 This involv 22.65 45.30 45.30 113.25 formati WUAs on and capacit y building R Construction of small office building for 113.25 This involv 22.65 45.30 45.30 113.25 WUAs R3 Construction of small office building for 154 Shopping 77.10 77.10 154.20 WUAs Office Building for WUA Banganga B-BGG-2 Office Building to Shrimant Malojiraje WUA 1 R4 B-BGG-2/1 No.1 Wathar Tal. Phaltan Dist. Satara 0.30 Shopping 0.30 0.30 Office Building to Shrimant Malojiraje WUA 2 R4 B-BGG-2/2 No.2 Tawadi Tal. Phaltan Dist. Satara 0.30 Shopping 0.30 0.30 Office Building to Shrimant Malojiraje WUA 3 R4 B-BGG-2/3 No.3 Wathar Tal. Phaltan Dist. Satara 0.30 Shopping 0.30 0.30 Tambve B-TAM2 Office Building for WUA Office Building to Shri Sant Dnyeshwar WUA 4 R4 B-TAM2/1 Aradgaon Tal. Phaltan Dist. Satara 0.30 Shopping 0.30 0.30 Office Building to Aradgaon WUA Aradgaon 5 R4 B-TAM2/2 Tal. Phaltan Dist. Satara 0.30 Shopping 0.30 0.30 Office Building to Yamai Devi WUA Jamb Tal. Hivare B-HIV-2 Koregaon Dist. Satara Office Building to Yamai Devi WUA Jamb Tal. 6 R4 B-HIV-2 Koregaon Dist. Satara 0.30 Shopping 0.30 0.30 Nandawa Office Building to Mhatogba WUA Nandwal B-NDV-2 l Tal. Koregaon Dist. Satara Office Building to Mhatogba WUA Nandwal 7 R4 B-NDV-2 Tal. Koregaon Dist. Satara 0.30 Shopping 0.30 0.30 Office Building to Siddharth WUA Dahiwadi Satewadi B-SAT-2 Dist. Satara Office Building to Siddharth WUA Dahiwadi 8 R4 B-SAT-2 Dist. Satara 0.30 Shopping 0.30 0.30 Pingali B-PIN-2 Office Building for WUA Office Building to Pingali WUA Pingali Tal. 9 R4 B-PIN-2/1 Man Dist. Satara 0.30 Shopping 0.30 0.30 2/24/2011 otpr_wuaBldg 75 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Office Building to Aradgaon WUA Aradgaon 10 R4 B-PIN-2/2 Tal. Phaltan Dist. Satara 0.30 Shopping 0.30 0.30 Office Building to Siddharth WUA Mayani Mayani B-MYN-2 Tal. Khatau, Dist. Satara Office Building to Siddharth WUA Mayani 11 R4 B-MYN-2 Tal. Khatau, Dist. Satara 0.30 Shopping 0.30 0.30 HInganga Office Building to Bhiravnath WUA B-HIN-2 on Hingangaon Tal. Phaltan, Dist. Satara Office Building to Bhiravnath WUA 12 R4 B-HIN-2 Hingangaon Tal. Phaltan, Dist. Satara 0.30 Shopping 0.30 0.30 Office Building to Balaji WUA Diwale Tal. Diwale B-DIW-2 Bhor, Dist. Pune Office Building to Balaji WUA Diwale Tal. 13 R4 B-DIW-2 Bhor, Dist. Pune 0.30 Shopping 0.30 0.30 Office Building to Mahurjai WUA Mahur Tal. Mahur B-MAH-2 Purandar, Dist. Pune Office Building to Mahurjai WUA Mahur Tal. 14 R4 B-MAH-2 Purandar, Dist. Pune 0.30 Shopping 0.30 0.30 Office Building to Gajanan WUA Pilanwadi Pilanwadi B-PIL-2 Tal. Purandar, Dist. Pune Office Building to Gajanan WUA Pilanwadi 15 R4 B-PIL-2 Tal. Purandar, Dist. Pune 0.30 Shopping 0.30 0.30 Office Building to Omkareshwar WUA Pimpoli Pimpoli B-PIM-2 Tal. Mulshi, Dist. Pune Office Building to Omkareshwar WUA Pimpoli 16 R4 B-PIM-2 Tal. Mulshi, Dist. Pune 0.30 Shopping 0.30 0.30 Office Building to MuktaiDevi WUA Wafgaon Wafgaon B-WAF-2 Tal. Khed, Dist. Pune Office Building to MuktaiDevi WUA Wafgaon 17 R4 B-WAF-2 Tal. Khed, Dist. Pune 0.30 Shopping 0.30 0.30 Office Building to Waghjai WUA Walen Tal. Walen B-WAL-2 Mulshi, Dist. Pune Office Building to Waghjai WUA Walen Tal. 18 R4 B-WAL-2 Mulshi, Dist. Pune 0.30 Shopping 0.30 0.30 Office Building to Saikrupa WUA Alegaon Alegaon B-ALE-2 Tal. Shirur, Dist. Pune Office Building to Saikrupa WUA Alegaon 19 R4 B-ALE-2 Tal. Shirur, Dist. Pune 0.30 Shopping 0.30 0.30 Shirsupha Office Building to Shirsai WUA Ravangaon B-SUP-2 l Tal. Daund, Dist. Pune Office Building to Shirsai WUA Ravangaon 20 R4 B-SUP-2 Tal. Daund, Dist. Pune 0.30 Shopping 0.30 0.30 Office Building to Ratnadeep WUA Ratnapur Ratnapur B-RAT-2 Tal. Jamkhed, Dist. Ahmednagar 2/24/2011 otpr_wuaBldg 76 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Office Building to Ratnadeep WUA Ratnapur 21 R4 B-RAT-2 Tal. Jamkhed, Dist. Ahmednagar 0.30 Shopping 0.30 0.30 Sukhana B-Suk-3 Construction of WUA Office Building Shri Vishwanand WUA Ltd. Pimpari Tq. 22 R4 B-Suk-3/1 0.30 Shopping 0.30 0.30 & Dist. Aurangabad Padmashri Sakharampant Pawar WUA 23 R4 B-Suk-3/2 0.30 Shopping 0.30 0.30 Ltd., Pimpari. Tq. & Dist. Aurangabad Jai Malhar WUA Ltd. Pimpari Tq. & Dist. 24 R4 B-Suk-3/3 0.30 Shopping 0.30 0.30 Aurangabad 25 R4 B-Suk-3/4 Ambika WUA Ltd. DiaGavhon 0.30 Shopping 0.30 0.30 26 R4 B-Suk-3/5 Sant Tukaram WUA Ltd.Sanjkheda 0.30 Shopping 0.30 0.30 27 R4 B-Suk-3/6 Shri Krishna WUA Ltd. Sanjkheda. 0.30 Shopping 0.30 0.30 Jai Bajrang WUA Ltd. 28 R4 B-Suk-3/7 Pimpalgaon. Tq. Paithan Dist. 0.30 Shopping 0.30 0.30 Aurangabad. Sai WUA Ltd. Adul , Tq. Paithan Dist. 29 R4 B-Suk-3/8 0.30 Shopping 0.30 0.30 Aurangabad. Chintamani WUA Ltd. Adul, Tq. Paithan 30 R4 B-Suk-3/9 0.30 Shopping 0.30 0.30 Dist. Aurangabad. B-Suk- Siddheshwar WUA Ltd. Adul Tq. Paithan 31 R4 0.30 Shopping 0.30 0.30 3/10 Dist. Aurangabad. B-Suk- Sandipan WUA Ltd. Heetapur. Tq. Paithan 32 R4 0.30 Shopping 0.30 0.30 3/11 Dist. Aurangabad. Office Building for Shri.Wamanrao Mandvi B-MDV-2 Bordikar WUA Ltd. Khardadi Tq.Jintur Dist.Parbhani Office Building for Shri.Wamanrao 33 R4 B-MDV-2 Bordikar WUA Ltd. Khardadi Tq.Jintur 0.30 Shopping 0.20 0.10 0.30 Dist.Parbhani Office Building for Shri. Kedareshwar Nakhat B-NAK-2 Maharaj WUA Ltd. Ukkhali (Bk) wadi Tq.Sonpeth Dist.Parbhani Office Building for Shri. Kedareshwar 34 R4 B-NAK-2 Maharaj WUA Ltd. Ukkhali (Bk) 0.30 Shopping 0.20 0.10 0.30 Tq.Sonpeth Dist.Parbhani Office Buildingfor Shri.Narshinha WUA Wadali B-WAD-2 Ltd.Warud (N) Tq.Jintur Office Buildingfor Shri.Narshinha WUA 35 R4 B-WAD-2 0.30 Shopping 0.20 0.10 0.30 Ltd.Warud (N) Tq.Jintur 2/24/2011 otpr_wuaBldg 77 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Deogao Office Building for Shri.Datareshwar B-DVG-2 n WUA Ltd.Kotha Tq.Jintur Dist.Parbhani. Office Building for Shri.Datareshwar 36 R4 B-DVG-2 0.30 Shopping 0.20 0.10 0.30 WUA Ltd.Kotha Tq.Jintur Dist.Parbhani. Office Building for Shri.Sant Mahipati Tandulw B-TAN-2 Maharaj WUA Ltd.Tanduulwadi Tq.Palam adi Dist.Parbhani. Office Building for Shri.Sant Mahipati 37 R4 B-TAN-2 Maharaj WUA Ltd.Tanduulwadi Tq.Palam 0.30 Shopping 0.20 0.10 0.30 Dist.Parbhani. Ambega Office Buildingfor Jai Jijau WUA Ltd. B-BEG-2 on Kolhawadi Tq.Manwat Dist.Parbhani. Office Buildingfor Jai Jijau WUA Ltd. 38 R4 B-BEG-2 0.30 Shopping 0.20 0.10 0.30 Kolhawadi Tq.Manwat Dist.Parbhani. Pimperk B-PMK-2 Pundlik Bua WUA Ltd. Pimparkheda heda 39 R4 B-PMK-2 Pundlik Bua WUA Ltd. Pimparkheda 0.30 Shopping -- 0.30 0.30 Jai Bajrang WUA Ltd. Paratwadi B-PAR-2 Hastur Tanda Jai Bajrang WUA Ltd. 40 R4 B-PAR-2 0.30 Shopping -- 0.30 0.30 Hastur Tanda Jagdamba WUA Ltd. Konad B-KON-2 Konad 41 R4 B-KON-2 Jagdamba WUA Ltd. Konad 0.30 Shopping -- 0.30 0.30 Bharaj B-BHA-2 Shamgir Baba WUA Ltd.Bharaj 42 R4 B-BHA-2 Shamgir Baba WUA Ltd.Bharaj 0.30 Shopping -- 0.30 0.30 Kelgaon B-KEL-2 Murdeshwar WUA Ltd.Kelgaon 43 R4 B-KEL-2 Murdeshwar WUA Ltd. Kelgaon 0.30 Shopping -- 0.30 0.30 Banoti B-BAN-2 Hiwra WUA Ltd.Wadi 44 R4 B-BAN-2 Hiwra WUA Ltd.Wadi 0.30 Shopping -- 0.30 0.30 Pardeshwad B-PAR-2 Ramdas Swami WUA Ltd. Ramrai. 45 R4 B-PAR-2 Ramdas Swami WUA Ltd. Ramrai. 0.30 Shopping -- 0.30 0.30 Ranjangao B-RJN-2 Devi Daxayani WUA Ltd. Ranjangaon 46 R4 B-RJN-2 Devi Daxayani WUA Ltd. Ranjangaon 0.30 Shopping -- 0.30 0.30 Adol B-ADO-2 Const.of Office building for WUA Const.of Office building for murdeshwar 47 R4 B-ADO-2/1 0.10 Shopping 0.00 0.10 0.00 0.10 WUA Rithad. Const.of Office building for Gajahan 48 R4 B-ADO-2/2 0.10 Shopping 0.00 0.10 0.00 0.10 Maharej WUA Shirsala. 49 R4 B-ADO-2/3 Const.of Office building for P.L.A 0.20 Shopping 0.00 0.20 0.00 0.20 2/24/2011 otpr_wuaBldg 78 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Vidrupa B-VDR-2 Const.of Office building for WUA Const.of Office building for Satwai WUA 50 R4 B-VDR-2/1 0.10 Shopping 0.00 0.10 0.00 0.10 Dhanora Const.of Office building for viththal 51 R4 B-VDR-2/2 0.10 Shopping 0.00 0.10 0.00 0.10 Rukhamai WUA Rumna Const.of Office building for Changdevi 52 R4 B-VDR-2/3 0.10 Shopping 0.00 0.10 0.00 0.10 WUA Changephal 53 R4 B-VDR-2/4 Const.of Office building for P.L.A 0.20 Shopping 0.00 0.20 0.00 0.20 Construction of Office building Mangi B-Mng-3 2/24/2011 otpr_wuaBldg 79 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Office building for Sangmeshwar WUA 54 R4 B-Mng-3/1 0.26 Shopping 0.26 0.26 2/24/2011 otpr_wuaBldg 80 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Office building for Shivshankar WUA 55 R4 B-Mng-3/2 0.26 Shopping 0.26 0.26 2/24/2011 otpr_wuaBldg 81 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Office building for Nagnath WUA 56 R4 B-Mng-3/3 0.26 Shopping 0.26 0.26 2/24/2011 otpr_wuaBldg 82 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Office building for Kamladevi WUA 57 R4 B-Mng-3/4 0.26 Shopping 0.26 0.26 2/24/2011 otpr_wuaBldg 83 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Office building for Shaneshwar WUA 58 R4 B-Mng-3/5 0.26 Shopping 0.26 0.26 2/24/2011 otpr_wuaBldg 84 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Office building for Pandurang WUA 59 R4 B-Mng-3/6 0.26 Shopping 0.26 0.26 2/24/2011 otpr_wuaBldg 85 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Office building for Adinath WUA 60 R4 B-Mng-3/7 0.26 Shopping 0.26 0.26 2/24/2011 otpr_wuaBldg 86 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Office building for Seenamai WUA 61 R4 B-Mng-3/8 0.26 Shopping 0.26 0.26 2/24/2011 otpr_wuaBldg 87 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Office building for Shri Ganesh Right Bank CLA 62 R4 B-Mng-3/9 0.26 Shopping 0.26 0.26 2/24/2011 otpr_wuaBldg 88 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Office building for Shri Datta kripa Left Bank CLA 63 R4 B-Mng-3/10 0.26 Shopping 0.26 0.26 2/24/2011 otpr_wuaBldg 89 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Office building for Shri Ashtavinayak PLA 64 R4 B-Mng-3/11 0.36 Shopping 0.36 0.36 Hotagi B-HOT-2 Construction of Office building 0.00 2/24/2011 otpr_wuaBldg 90 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Office building for Shivacharya WUA 65 R4 B-HOT-2/1 0.26 Shopping 0.26 0.26 2/24/2011 otpr_wuaBldg 91 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Office building for Revalsidha WUA 66 R4 B-HOT-2/2 0.26 Shopping 0.26 0.26 2/24/2011 otpr_wuaBldg 92 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Office building for Shri Sidheshwar PLA 67 R4 B-HOT-2/3 0.36 Shopping 0.36 0.36 Pathari B-PTH-2 Construction of Office building 2/24/2011 otpr_wuaBldg 93 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Office building for Sanjivani i WUA 68 R4 B-PTH-2/1 0.26 Shopping 0.26 0.26 Construction of Office building for Mahadev WUA 69 R4 B-PTH-2/2 0.26 Shopping 0.26 0.26 Construction of Office building for Shri Sadguru PLA 70 R4 B-PTH-2/3 0.36 Shopping 0.36 0.36 2/24/2011 otpr_wuaBldg 94 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rampur B-RPR-2 Construction of Office building 0.00 Construction of Office building for Mahadev WUA 71 R4 B-RPR-2 0.26 Shopping 0.26 0.26 Padwalk Construction of Office building B-PWK-2 arwadi Construction of Office building for Ahilyadevi WUA 72 R4 B-PWK-2/1 0.26 Shopping 0.26 0.26 Construction of Office building for 73 R4 B-PWK-2/2 0.26 Shopping 0.26 0.26 Mahadev WUA Construction of Office building for Shri 74 R4 B-PWK-2/3 0.36 Shopping 0.36 0.36 Saint sadguru balumama PLA Shirwal Construction of Office building B-SWW-2 wadi Construction of Office building for 75 R4 B-SWW-2/1 0.26 Shopping 0.26 0.26 Panchlingeshwar WUA 2/24/2011 otpr_wuaBldg 95 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Office building for 76 R4 B-SWW-2/2 0.26 Shopping 0.26 0.26 Bhairavnath WUA Construction of Office building for Shri 77 R4 B-SWW-2/3 0.36 Shopping 0.36 0.36 Jai Hanuman PLA Hanjagi B-HAN-2 Construction of Office building Construction of Office building for Jai 78 R4 B-HAN-2/1 0.26 Shopping 0.26 0.26 Hanuman WUA Construction of Office building for Jai 79 R4 B-HAN-2/2 0.26 Shopping 0.26 0.26 Malhar WUA Chincho Construction of Office building B-CHI-2 li Construction of Office building for Jai 80 R4 B-CHI-2/1 0.26 Shopping 0.26 0.26 Hanuman WUA Construction of Office building for 81 R4 B-CHI-2/2 0.36 Shopping 0.36 0.36 Ahilyadevi PLA Construction of Building for WUA of Pus Pus B-PUS-4 Major Project Tq.Pusad Dist.Yavatmal Construction of Building for WUA of Pus Major Project Tq.Pusad Dist.Yavatmal For 82 R4 B-PUS-4/1 0.08 Shopping 0.08 0 0.08 Shrisant Lobhiwant W.U.A. Mungshi. (Package PUS-4) Construction of Building for WUA of Pus Major Project Tq.Pusad Dist.Yavatmal For 83 R4 B-PUS-4/2 0.08 Shopping 0.08 0 0.08 Khode Maharaj W.U.A.Banshi. (Package PUS-4) Construction of Building for WUA of Pus Major Project Tq.Pusad Dist.Yavatmal For 84 R4 B-PUS-4/3 0.08 Shopping 0.08 0 0.08 Shri Shivshakti W.U.A. Pimpalkhuta (Package PUS-4) Rehabilitation work of Pus Major Project Tq.Pusad Dist.Yavatmal For Shri 85 R4 B-PUS-4/4 0.08 Shopping 0.08 0 0.08 Ambikadevi W.U.A Eranda (Package PUS- 4) Construction of Building for WUA of Pus Major Project Tq.Pusad Dist.Yavatmal For 86 R4 B-PUS-4/5 0.08 Shopping 0.08 0 0.08 Shri Swami Samarth W.U.A Warud (Package PUS-4) 2/24/2011 otpr_wuaBldg 96 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Building for WUA of Pus Major Project Tq.Pusad Dist.Yavatmal For 87 R4 B-PUS-4/6 0.08 Shopping 0.08 0 0.08 Shri.Annapurna W.U.A.Itawa (Package PUS-4) Construction of Building for WUA of Pus Major Project Tq.Pusad Dist.Yavatmal For 88 R4 B-PUS-4/7 0.08 Shopping 0.08 0 0.08 Maulikrupa W.U.A. Loni (Package PUS-4) Construction of Building for WUA of Pus Major Project Tq.Pusad Dist.Yavatmal For 89 R4 B-PUS-4/8 0.08 Shopping 0.08 0 0.08 Jaikisan W.U.Aaregaon (Package PUS-4) Construction of Building for WUA of Pus Major Project Tq.Pusad Dist.Yavatmal For 90 R4 B-PUS-4/9 0.08 Shopping 0.08 0 0.08 Sau.Renuka Jadhao W.U.A. Bhtanmba (Package PUS-4) Construction of Building for WUA of Pus Major Project Tq.Pusad Dist.Yavatmal For B-PUS- 91 R4 Ramji Maharaj W.U.A. Hegdi/Bhatamba 0.08 Shopping 0.08 0 0.08 4/10 (Package PUS-4) Construction of Building for WUA of Pus B-PUS- Major Project Tq.Pusad Dist.Yavatmal For 92 R4 0.08 Shopping 0.08 0 0.08 4/11 Sri.Sadbhawna W.U.A. Katkheda (Package PUS-4) Construction of Building for WUA of Pus B-PUS- Major Project Tq.Pusad Dist.Yavatmal For 93 R4 0.08 Shopping 0.08 0 0.08 4/12 Shri,Rushibaba W.U.A. Katkheda (Package PUS-4) Construction of Building for WUA of Pus B-PUS- Major Project Tq.Pusad Dist.Yavatmal For 94 R4 0.08 Shopping 0.08 0 0.08 4/13 Shri.Ayodhya W.U.A. Hudi (Package PUS- 4) Construction of Building for WUA of Pus Major Project Tq.Pusad Dist.Yavatmal For B-PUS- 95 R4 Shri.Ramchandra Maharaj W.U.A. Tarodi 0.08 Shopping 0.08 0 0.08 4/14 (Package PUS-4) 2/24/2011 otpr_wuaBldg 97 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Building for WUA of Pus B-PUS- Major Project Tq.Pusad Dist.Yavatmal For 96 R4 0.08 Shopping 0.08 0 0.08 4/15 Hajisaheb W.U.A. Pimpalgaon. (Package PUS-4) Construction of Building for WUA of Pus B-PUS- Major Project Tq.Pusad Dist.Yavatmal For 97 R4 0.08 Shopping 0.08 0 0.08 4/16 Shri.Kaneshwar W.U.A. Kanha. (Package PUS-4) Construction of Building for WUA of Pus B-PUS- Major Project Tq.Pusad Dist.Yavatmal For 98 R4 0.08 Shopping 0.08 0 0.08 4/17 Chtrapati Shahu Maharaj W.U.A. Gunj. (Package PUS-4) Construction of Building for WUA of Pus B-PUS- Major Project Tq.Pusad Dist.Yavatmal For 99 R4 0.08 Shopping 0.08 0 0.08 4/18 JaiHanuman W.U.A. Gunj (Package PUS- 4) Construction of Building for WUA of Pus B-PUS- Major Project Tq.Pusad Dist.Yavatmal For 100 R4 0.08 Shopping 0.08 0 0.08 4/19 Govind Maharaj W.U.A. Weni. (Package PUS-4) Construction of Building for WUA of Pus B-PUS- Major Project Tq.Pusad Dist.Yavatmal For 101 R4 0.08 Shopping 0.08 0 0.08 4/20 Jijamata W.U.A. Sawana (Package PUS-4) Construction of Building for WUA of Pus B-PUS- Major Project Tq.Pusad Dist.Yavatmal For 102 R4 0.08 Shopping 0.08 0 0.08 4/21 ShivParvati W.U.A. Pimpalgaon. (Package PUS-4) Construction of Building for WUA of Pus B-PUS- Major Project Tq.Pusad Dist.Yavatmal For 103 R4 0.08 Shopping 0.08 0 0.08 4/22 Jai Bhole W.U.A. Bhojla (Package PUS-4) Construction of Building for WUA of Pus B-PUS- Major Project Tq.Pusad Dist.Yavatmal For 104 R4 0.08 Shopping 0.08 0 0.08 4/23 Sri.SiddiVinayak W.U.A. Bhojla (Package PUS-4) Construction of Building for WUA of Pus B-PUS- Major Project Tq.Pusad Dist.Yavatmal For 105 R4 0.08 Shopping 0.08 0 0.08 4/24 Vasant Jaldhara W.U.A. Pardi. (Package PUS-4) 2/24/2011 otpr_wuaBldg 98 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Building for WUA of Pus B-PUS- Major Project Tq.Pusad Dist.Yavatmal For 106 R4 0.09 Shopping 0.09 0 0.09 4/25 Swami Vivekanand W.U.A. Waltur. (Package PUS-4) Construction of Building for WUA of Pus B-PUS- Major Project Tq.Pusad Dist.Yavatmal For 107 R4 0.09 Shopping 0.09 0 0.09 4/26 Dhankeshwar W.U.A. Nimbhi. (Package PUS-4) Construction of Building for WUA of Pus B-PUS- Major Project Tq.Pusad Dist.Yavatmal For 108 R4 0.09 Shopping 0.09 0 0.09 4/27 Sri.Sant Dudhadhari W.U.A. Borgadi. (Package PUS-4) Construction of Building for WUA of Pus B-PUS- Major Project Tq.Pusad Dist.Yavatmal For 109 R4 0.09 Shopping 0.09 0 0.09 4/28 Nawnath W.U.A. Bori. (Package PUS-4) Construction of Building for WUA of Pus B-PUS- Major Project Tq.Pusad Dist.Yavatmal For 110 R4 0.08 Shopping 0.08 0 0.08 4/29 SriKrushna W.U.A. Shelu. (Package PUS- 4) Construction of Building for WUA of Pus B-PUS- Major Project Tq.Pusad Dist.Yavatmal For 111 R4 0.08 Shopping 0.08 0 0.08 4/30 Bhyanbaba W.U.A. Pokhari. (Package PUS-4) Construction of Building for WUA of Katepur Katepurna Medium Project Tq.Barshi B-KAT-3 na Takli Dist.Akola For Malkoji Maharaj W.U.A.Dhaga (Package KAT-3) Construction of Building for WUA of Katepurna Medium Project Tq.Barshi 112 R4 B-KAT-3/1 0.09 Shopping 0.09 0 0.09 Takli Dist.Akola For Malkoji Maharaj W.U.A.Dhaga (Package KAT-3) Construction of Building for WUA of Katepurna Medium Project Tq.Barshi 113 R4 B-KAT-3/2 0.09 Shopping 0.09 0 0.09 Takli Dist.Akola For Wasundara W.U.A.Khothari (Package KAT-3) 2/24/2011 otpr_wuaBldg 99 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Building for WUA of Katepurna Medium Project Tq.Barshi 114 R4 B-KAT-3/3 Takli Dist.Akola For Jalpurna 0.09 Shopping 0.09 0 0.09 W.U.A.Borgaon Manju (Package KAT-3) Construction of Building for WUA of Katepurna Medium Project Tq.Barshi 115 R4 B-KAT-3/4 0.09 Shopping 0.09 0 0.09 Takli Dist.Akola For Mohadi Maharaj W.U.A. Khadka (Package KAT-3 ) Construction of Building for WUA of Katepurna Medium Project Tq.Barshi 116 R4 B-KAT-3/5 0.09 Shopping 0.09 0 0.09 Takli Dist.Akola For Ramgopal W.U.A. Shahapur (Package KAT-3 ) Construction of Building for WUA of Katepurna Medium Project Tq.Barshi 117 R4 B-KAT-3/6 0.09 Shopping 0.09 0 0.09 Takli Dist.Akola For Krushi Mitra W.U.A.Sangvamel. (Package KAT-3 ) Construction of Building for WUA of Katepurna Medium Project Tq.Barshi 118 R4 B-KAT-3/7 0.09 Shopping 0.09 0 0.09 Takli Dist.Akola For Sultan pur W.U.A.Dhothardi (Package KAT-3 ) Construction of Building for WUA of Katepurna Medium Project Tq.Barshi 119 R4 B-KAT-3/8 0.09 Shopping 0.09 0 0.09 Takli Dist.Akola For Avdhut Maharaj W.U.A.,Bahirkhed (Package KAT-3 ) Construction of Building for WUA of Katepurna Medium Project Tq.Barshi 120 R4 B-KAT-3/9 0.09 Shopping 0.09 0 0.09 Takli Dist.Akola For Annapurna W.U.A.Palso (Package KAT-3 ) Construction of Building for WUA of Katepurna Medium Project Tq.Barshi 121 R4 B-KAT-3/10 0.09 Shopping 0.09 0 0.09 Takli Dist.Akola For Shri Krupa W.U.A.Dapura (Package KAT-3 ) Construction of Building for WUA of Katepurna Medium Project Tq.Barshi 122 R4 B-KAT-3/11 0.09 Shopping 0.09 0 0.09 Takli Dist.Akola For Shri Gurudev W.U.A.Waki (Package KAT-3 ) 2/24/2011 otpr_wuaBldg 100 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Building for WUA of Katepurna Medium Project Tq.Barshi 123 R4 B-KAT-3/12 0.09 Shopping 0.09 0 0.09 Takli Dist.Akola For Bhagirath W.U.A.Telkhed. (Package KAT-3 ) Construction of Building for WUA of Katepurna Medium Project Tq.Barshi 124 R4 B-KAT-3/13 0.09 Shopping 0.09 0 0.09 Takli Dist.Akola For Keshav Raj W.U.A.Anvi Mirzapur (Package KAT-3 ) Construction of Building for WUA of Katepurna Medium Project Tq.Barshi 125 R4 B-KAT-3/14 0.09 Shopping 0.09 0 0.09 Takli Dist.Akola For Kisan W.U.A., Borgaon Manju (Package KAT-3 ) Construction of Building for WUA of Katepurna Medium Project Tq.Barshi 126 R4 B-KAT-3/15 0.09 Shopping 0.09 0 0.09 Takli Dist.Akola For Gajanan Maharaj W.U.A.Ramgaon. (Package KAT-3 ) Construction of Building for WUA of Katepurna Medium Project Tq.Barshi 127 R4 B-KAT-3/16 0.09 Shopping 0.09 0 0.09 Takli Dist.Akola For Jairam Baba W.U.A. Sangva Mel (Package KAT-3 ) Construction of Building for WUA of Katepurna Medium Project Tq.Barshi 128 R4 B-KAT-3/17 0.09 Shopping 0.09 0 0.09 Takli Dist.Akola For Majlapur W.U.A. Majlapur (Package KAT-3 ) Construction of Building for WUA of Katepurna Medium Project Tq.Barshitakali 129 R4 B-KAT-3/18 Dist.Akola for Chandikadevi Water Users 0.09 Shopping 0.09 0 0.09 Association Pailpada. Construction of Building for WUA of Katepurna Medium Project Tq.Barshitakali 130 R4 B-KAT-3/19 Dist.Akola for Shri Swami Samartha 0.09 Shopping 0.09 0 0.09 Maharaj Water Users Association Gondapur. Construction of Building for WUA of Katepurna Medium Project Tq.Barshitakali 131 R4 B-KAT-3/20 0.09 Shopping 0.09 0 0.09 Dist.Akola for Bahirkhed Dy. Water Users Association Dahigaon. 2/24/2011 otpr_wuaBldg 101 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Building for WUA of Katepurna Medium Project Tq.Barshitakali 132 R4 B-KAT-3/21 Dist.Akola for Shri Chindaji Maharaj 0.09 Shopping 0.09 0 0.09 Water Users Association Datala. Construction of Building for WUA of Katepurna Medium Project Tq.Barshitakali 133 R4 B-KAT-3/22 0.09 Shopping 0.09 0 0.09 Dist.Akola for Borgaon Dy Water Users Association Borgaon. Construction of Building for WUA of Katepurna Medium Project Tq.Barshitakali 134 R4 B-KAT-3/23 Dist.Akola for Mohamadpur Water Users 0.09 Shopping 0.09 0 0.09 Association Mohamadpur. Construction of Building for WUA of Katepurna Medium Project Tq.Barshitakali 135 R4 B-KAT-3/24 0.09 Shopping 0.09 0 0.09 Dist.Akola for Bhatori Dy. Water Users Association Bhatori. Construction of Building for WUA of Katepurna Medium Project Tq.Barshitakali 136 R4 B-KAT-3/25 Dist.Akola for Shri Krishna Water Users 0.09 Shopping 0.09 0 0.09 Association Kaulkhed. Construction of Building for WUA of Koradi Medium Project Tq. Mehkar Dist. Koradi B-KOR-3 Buldana For Kalyana Erandoli Faijalpur W.U.A.Kalyana (Package KOR-3) Construction of Building for WUA of Koradi Medium Project Tq. Mehkar Dist. 137 R4 B-KOR-3/1 0.06 Shopping 0.06 0 0.06 Buldana For Kalyana Erandoli Faijalpur W.U.A.Kalyana (Package KOR-3) Construction of Building for WUA of Koradi Medium Project Tq. Mehkar Dist. 138 R4 B-KOR-3/2 0.06 Shopping 0.06 0 0.06 Buldana For Krushi Kanya W.U.A.Mehkar (Package KOR-3) 2/24/2011 otpr_wuaBldg 102 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Building for WUA of Koradi Medium Project Tq. Mehkar Dist. 139 R4 B-KOR-3/3 0.06 Shopping 0.06 0 0.06 Buldana For Bartala Mehkar W.U.A.Mehkar (Package KOR-3) Construction of Building for WUA of Koradi Medium Project Tq. Mehkar Dist. 140 R4 B-KOR-3/4 0.06 Shopping 0.06 0 0.06 Buldana For Sarangpur Jaitala W.U.A.Sarangpur (Package KOR-3) Construction of Building for WUA of Koradi Medium Project Tq. Mehkar Dist. 141 R4 B-KOR-3/5 0.06 Shopping 0.06 0 0.06 Buldana For Haldhar W.U.A. Dadulgavan (Package KOR-3) Construction of Building for WUA of Koradi Medium Project Tq. Mehkar Dist. 142 R4 B-KOR-3/6 Buldana For Sultanpur Dadulgavan 0.06 Shopping 0.06 0 0.06 Ganpur W.U.A.Sultanpur (Package KOR- 3) Rehabilitation work of Koradi Medium Project Tq. Mehkar Dist. Buldana For 143 R4 B-KOR-3/7 0.06 Shopping 0.06 0 0.06 Antri Deshmukh W.U.A.A'Deshmukh (Package KOR-3) Construction of Building for WUA of Koradi Medium Project Tq. Mehkar Dist. 144 R4 B-KOR-3/8 0.06 Shopping 0.06 0 0.06 Buldana For Bori W.U.A. Bori (Package KOR-3) Construction of Building for WUA of Koradi Medium Project Tq. Mehkar Dist. 145 R4 B-KOR-3/9 0.06 Shopping 0.06 0 0.06 Buldana For Shri W.U.A.Bori (Package KOR-3) Construction of Building for WUA of Koradi Medium Project Tq. Mehkar Dist. 146 R4 B-KOR-3/10 0.06 Shopping 0.06 0 0.06 Buldana For Gohgaon W.U.A.Gohgaon (Package KOR-3) Construction of Building for WUA of Koradi Medium Project Tq. Mehkar Dist. 147 R4 B-KOR-3/11 0.06 Shopping 0.06 0 0.06 Buldana For Wakad W.U.A. Wakad (Package KOR-3) 2/24/2011 otpr_wuaBldg 103 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Building for WUA of Koradi Medium Project Tq. Mehkar Dist. 148 R4 B-KOR-3/12 0.06 Shopping 0.06 0 0.06 Buldana For Borakhedi W.U.A. Borakhedi (Package KOR-3) Construction of Building for WUA of Koradi Medium Project Tq. Mehkar Dist. 149 R4 B-KOR-3/13 0.06 Shopping 0.06 0 0.06 Buldana For Mahatma Phule W.U.A. D.Mali Wakad (Package KOR-3) Construction of Building for WUA of Khadak Khadakdoh Minor Project Tq. Zari Jamani B-KHD-2 doh Dist. Yavatmal For Shri.Ganesh W.U.A. Khadakdoh.(Package KHD-2) Construction of Building for WUA of Khadakdoh Minor Project Tq. Zari Jamani 150 R4 B-KHD-2 0.15 Shopping 0.15 0 0.15 Dist. Yavatmal For Shri.Ganesh W.U.A. Khadakdoh.(Package KHD-2) Construction of Building for WUA of Karanji Minor Project Tq. Kelapur Dist. Karanji B-KRJ-2 Yavatmal For Karanji W.U.A. Karanji (Package KRJ-2) Construction of Building for WUA of Karanji Minor Project Tq. Kelapur Dist. 151 R4 B-KRJ-2 0.15 Shopping 0.15 0 0.15 Yavatmal For Karanji W.U.A. Karanji (Package KRJ-2) Construction of Building for WUA of Eklara Minor Project Tq. Ralegaon Dist. Eklara B-ELA-2 Yavatmal For Gurudeo W.U.A. Eklara (Package ELA-2) Construction of Building for WUA of Eklara Minor Project Tq. Ralegaon Dist. 152 R4 B-ELA-2 0.15 Shopping 0.15 0 0.15 Yavatmal For Gurudeo W.U.A. Eklara (Package ELA-2) Construction of Building for WUA of Ghoti Minor Project Tq. Kalamb Dist. Ghoti B-GHT-2 Yavatmal For Shri.Saibaba W.U.A. Ghoti (Package GHT-2) 2/24/2011 otpr_wuaBldg 104 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Building for WUA of Ghoti Minor Project Tq. Kalamb Dist. 153 R4 B-GHT-2 0.15 Shopping 0.15 0 0.15 Yavatmal For Shri.Saibaba W.U.A. Ghoti (Package GHT-2) Construction of Building for WUA of Dudhana Minor Project Tq. Yavatmal Dudhana B-DUD-2 Dist. Yavatmal For Jaibajrang W.U.A. Dudhana (Package DUD-2) Construction of Building for WUA of Dudhana Minor Project Tq. Yavatmal 154 R4 B-DUD-2 0.15 Shopping 0.15 0 0.15 Dist. Yavatmal For Jaibajrang W.U.A. Dudhana (Package DUD-2) Construction of Building for WUA of Nignoor Minor Project Tq. Umarkhed Nignoor B-NNG-2 Dist. Yavatmal For Shri.Jaikisan W.U.A. Nignoor. (Package NNG-2) Construction of Building for WUA of Nignoor Minor Project Tq. Umarkhed 155 R4 B-NNG-2 0.15 Shopping 0.15 0 0.15 Dist. Yavatmal For Shri.Jaikisan W.U.A. Nignoor. (Package NNG-2) Construction of Building for WUA of P.Hande Minor Project Tq.Barshi Takli P.Hande B-PPG-2 Dist. Akola For Shri. Shenkeshwar W.U.A. Jamekeshwar (Package PPG-2) Construction of Building for WUA of P.Hande Minor Project Tq.Barshi Takli 156 R4 B-PPG-2 0.15 Shopping 0.15 0 0.15 Dist. Akola For Shri. Shenkeshwar W.U.A. Jamekeshwar (Package PPG-2) Construction of Building for WUA of Mozari Minor Project Tq. Barshi Takli Mozari B-MOZ-2 Dist. Akola For Warahad W.U.A. Sonkhas (Package MOZ-2) Construction of Building for WUA of Mozari Minor Project Tq. Barshi Takli 157 R4 B-MOZ-2 0.15 Shopping 0.15 0 0.15 Dist. Akola For Warahad W.U.A. Sonkhas (Package MOZ-2) Construction of Building for WUA of Kanadi Minor Project Tq. Barshi Takli Kanadi B-KND-2 Dist. Akola For Jai Hanuman W.U.A. Kanadi (Package KND-2) 2/24/2011 otpr_wuaBldg 105 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Building for WUA of Kanadi Minor Project Tq. Barshi Takli 158 R4 B-KND-2 0.15 Shopping 0.15 0 0.15 Dist. Akola For Jai Hanuman W.U.A. Kanadi (Package KND-2) Construction of Building for WUA of Isapur Minor Project Tq. Barshi Takli Isapur B-ISP-2 Dist. Akola For Jai Bhawani W.U.A. Pimpalgaon Chambhare (Package ISP-2) Construction of Building for WUA of Isapur Minor Project Tq. Barshi Takli 159 R4 B-ISP-2 0.10 Shopping 0.10 0 0.10 Dist. Akola For Jai Bhawani W.U.A. Pimpalgaon Chambhare (Package ISP-2) Construction of Building for WUA of Tuljapur Minor Project Tq. Patur Tuljapur B-TJP-2 Dist.Akola For Tuljabhawani W.U.A. Tuljapur (Package TJP-2) Construction of Building for WUA of Tuljapur Minor Project Tq. Patur 160 R4 B-TJP-2 0.10 Shopping 0.10 0 0.10 Dist.Akola For Tuljabhawani W.U.A. Tuljapur (Package TJP-2) Construction of Building for WUA of Pimpal shenda Minor Project Tq. Pimpalshend B-PGS-2 Murtizapur Dist.Akola For Vitthal Rukhmai W.U.A. Pimpalshenda (Package PGS-2) Construction of Building for WUA of Pimpal shenda Minor Project Tq. 161 R4 B-PGS-2 Murtizapur Dist.Akola For Vitthal 0.10 Shopping 0.10 0 0.10 Rukhmai W.U.A. Pimpalshenda (Package PGS-2) Construction of Building for WUA of Dharur Minor Project Tq. Akot Dharur B-DHR-2 Dist.Akola For Dharureshwar W.U.A. Dharur (Package DHR-2 ) Construction of Building for WUA of Dharur Minor Project Tq. Akot 162 R4 B-DHR-2 0.15 Shopping 0.15 0 0.15 Dist.Akola For Dharureshwar W.U.A. Dharur (Package DHR-2 ) 2/24/2011 otpr_wuaBldg 106 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Building for WUA of Vyaghra Minor Project Tq. Motala Dist. Vyaghra B-VYG-2 Buldana For Vikasganga W.U.A.Dahigaon (Package VYG-2) Construction of Building for WUA of Vyaghra Minor Project Tq. Motala Dist. 163 R4 B-VYG-2/1 0.10 Shopping 0.10 0 0.10 Buldana For Vikasganga W.U.A.Dahigaon (Package VYG-2) Construction of Building for WUA of Vyaghra Minor Project Tq. Motala Dist. 164 R4 B-VYG-2/2 0.10 Shopping 0.10 0 0.10 Buldana For Jay Durge W.U.A.Chinchkhed kd. (Package VYG-2) Construction of Building for WUA of Vyaghra Minor Project Tq. Motala Dist. 165 R4 B-VYG-2/3 Buldana For Jai Jagdamba W.U.A. 0.10 Shopping 0.10 0 0.10 Wadaji & Main Canal 1 to 14 KM (Package VYG-2) Construction of Building for WUA of Vyaghra Minor Project Tq. Motala Dist. 166 R4 B-VYG-2/4 0.10 Shopping 0.10 0 0.10 Buldana For Jaldhara W.U.A.Malegaon (Package VYG-2) Construction of Building for WUA of Vyaghra Minor Project Tq. Motala Dist. 167 R4 B-VYG-2/5 0.10 Shopping 0.10 0 0.10 Buldana For Gokul W.U.A.Malegaon (Package VYG-2) Construction of Building for WUA of Vyaghra Minor Project Tq. Motala Dist. 168 R4 B-VYG-2/6 0.10 Shopping 0.10 0 0.10 Buldana For Sant Gajanan Maharaj W.U.A.Wadaji (Package VYG-2) Construction of Building for WUA of Vyaghra Minor Project Tq. Motala Dist. 169 R4 B-VYG-2/7 0.10 Shopping 0.10 0 0.10 Buldana For Sant Muktabai W.U.A.Harankhed (Package VYG-2) Construction of Building for WUA of Vyaghra Minor Project Tq. Motala Dist. 170 R4 B-VYG-2/8 0.15 Shopping 0.15 0 0.15 Buldana For Mahabali W.U.A. Aland (Package VYG-2) 2/24/2011 otpr_wuaBldg 107 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Building for WUA of Garkhed Minor Project Tq. Sindkhed Garkhed B-GAR-2 .Raja Dist. Buldana For Jalganga W.U.A.Garkhed (Package GAR-2) Construction of Building for WUA of Garkhed Minor Project Tq. Sindkhed 171 R4 B-GAR-2 0.15 Shopping 0.15 0 0.15 .Raja Dist. Buldana For Jalganga W.U.A.Garkhed (Package GAR-2) Construction of Building for WUA of Titwi Minor Project Tq. Lonar Dist. Titwi B-TIT-2 Buldana For Mungsaji Maharaj W.U.A. Titwi (Package TIT-2) Construction of Building for WUA of Titwi Minor Project Tq. Lonar Dist. 172 R4 B-TIT-2 0.10 Shopping 0.10 0 0.10 Buldana For Mungsaji Maharaj W.U.A. Titwi (Package TIT-2) Construction of Building for WUA of P.Nath Minor Project Tq. Khamgaon P.Nath B-PGN-2 Dist. Buldana For Kamalnath W.U.A.Pimgaon Nath (Package PGN-2) Construction of Building for WUA of P.Nath Minor Project Tq. Khamgaon 173 R4 B-PGN-2 0.10 Shopping 0.10 0 0.10 Dist. Buldana For Kamalnath W.U.A.Pimgaon Nath (Package PGN-2) Construction of Building for WUA of Zari Minor Project Tq. Buldana Dist. Zari B-ZAR-2 Buldana For AdrshaW.U.A.Ambhoda (Package ZAR-2) Construction of Building for WUA of Zari Minor Project Tq. Buldana Dist. 174 R4 B-ZAR-2 0.10 Shopping 0.10 0 0.10 Buldana For AdrshaW.U.A.Ambhoda (Package ZAR-2) Construction of Building for WUA of Andhera Minor Project Tq. D.Raja Dist. Andhera B-AND-2 Buldana For gangajal W.U.A. Gunjala (Package AND-2) Construction of Building for WUA of Andhera Minor Project Tq. D.Raja Dist. 175 R4 B-AND-2 0.10 Shopping 0.10 0 0.10 Buldana For gangajal W.U.A. Gunjala (Package AND-2) 2/24/2011 otpr_wuaBldg 108 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Building for WUA of Telhara Minor Project Tq. Chikhali Dist. Telhara B-TEL-2 Buldana For Painganga W.U.A. Borgaon kakde (Package TEL-2) Construction of Building for WUA of Telhara Minor Project Tq. Chikhali Dist. 176 R4 B-TEL-2 0.10 Shopping 0.10 0 0.10 Buldana For Painganga W.U.A. Borgaon kakde (Package TEL-2) Construction of Building for WUA of Shekdari B-SHK-2 Shekdari Minor Project Tq. Warud Dist. Amravati Construction of Building for WUA of Shekdari Minor Project Tq. Warud Dist. 177 R4 B-SHK-2/1 Amravati For 1)Kapileshwar 0.10 Shopping 0.10 0 0.10 W.U.A.Ltd.Temburkheda Tq. Warud (Package SHK-2) Construction of Building for WUA of Shekdari Minor Project Tq. Warud Dist. 178 R4 B-SHK-2/2 Amravati For 2 ) Satpuda 0.10 Shopping 0.10 0 0.10 W.U.A.Ltd.Temburkheda Tq. Warud (Package SHK-2) Construction of Building for WUA of Shekdari Minor Project Tq. Warud Dist. 179 R4 B-SHK-2/3 Amravati For 3)Trivani 0.10 Shopping 0.10 0 0.10 W.U.A.Ltd.Temburkheda Tq. Warud (Package SHK-2) Construction of Building for WUA of Shekdari Minor Project Tq. Warud Dist. 180 R4 B-SHK-2/4 Amravati For 4)Baliraja W.U.A.Ltd. 0.10 Shopping 0.10 0 0.10 Temburkheda Tq. Warud (Package SHK- 2) Construction of Building for WUA of Shekdari Minor Project Tq. Warud Dist. 181 R4 B-SHK-2/5 0.10 Shopping 0.10 0 0.10 Amravati For 5)Gangotri W.U.A.Ltd. Isambari Tq. Warud (Package SHK-2) 2/24/2011 otpr_wuaBldg 109 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Building for WUA of Shekdari Minor Project Tq. Warud Dist. 182 R4 B-SHK-2/6 0.10 Shopping 0.10 0 0.10 Amravati For 6)Trimurti W.U.A.Ltd Jarud Tq.Warud. (Package SHK-2) Construction of Building for WUA of Shekdari Minor Project Tq. Warud Dist. 183 R4 B-SHK-2/7 0.10 Shopping 0.10 0 0.10 Amravati For 7)Amrutdhara W.U.A.Ltd. Jarud Tq. Warud (Package SHK-2) Construction of Building for WUA of Shekdari Minor Project Tq. Warud Dist. 184 R4 B-SHK-2/8 0.10 Shopping 0.10 0 0.10 Amravati For 8)Bhagirath W.U.A.Ltd. Bahada Tq. Warud (Package SHK-2) Construction of Building for WUA of Shekdari Minor Project Tq. Warud Dist. 185 R4 B-SHK-2/9 0.10 Shopping 0.10 0 0.10 Amravati For 9)Trushnatrupti W.U.A.Ltd Benoda Tq. Warud. (Package SHK-2) Construction of Building for WUA of Dastapur Minor Project Tq. Amravati Dastapur B-DAS-2 Dist. Amravati For 1)Banjaribaba W.U.A.Ltd Talegaon Th. Tq. Tiosa. (Package DAS-2) Construction of Building for WUA of Dastapur Minor Project Tq. Amravati 186 R4 B-DAS-2 Dist. Amravati For 1)Banjaribaba 0.10 Shopping 0.10 0 0.10 W.U.A.Ltd Talegaon Th. Tq. Tiosa. (Package DAS-2) Construction of Building for WUA of Malkhed B-MAL-2 Malkhed Minor Project Tq.C.Rly Dist. Amravati Construction of Building for WUA of Malkhed Minor Project Tq.C.Rly Dist. 187 R4 B-MAL-2/1 Amravati For 1)Shivar W.U.A.Ltd. 0.10 Shopping 0.10 0 0.10 Baslapur Tq.Chandur Rly. (Package MAL- 2) 2/24/2011 otpr_wuaBldg 110 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Building for WUA of Malkhed Minor Project Tq. C.Rly Dist. 188 R4 B-MAL-2/2 Amravati For 2)Bhagirath W.U.A.Ltd. 0.10 Shopping 0.10 0 0.10 Chandur Rly Tq.Chandur Rly. (Package MAL-2) Construction of Building for WUA of Malkhed Minor Project Tq. C.Rly Dist. 189 R4 B-MAL-2/3 Amravati For 3)Pataleshwar W.U.A.Ltd. 0.10 Shopping 0.10 0 0.10 Manjarkhed Tq.Chandur Rly. (Package MAL-2) Construction of Building for WUA of Malkhed Minor Project Tq. C.Rly Dist. 190 R4 B-MAL-2/4 Amravati For 4)Jagdamba W.U.A.Ltd. 0.10 Shopping 0.10 0 0.10 Shivani Tq.Chandur Rly. (Package MAL- 2) Construction of Building for WUA of Malkhed Minor Project Tq. C.Rly Dist. 191 R4 B-MAL-2/5 Amravati For 5)Gayatri W.U.A.Ltd. 0.10 Shopping 0.10 0 0.10 Songaon Tq.Chandur Rly. (Package MAL- 2) Construction of Building for WUA of Malkhed Minor Project Tq. C.Rly Dist. 192 R4 B-MAL-2/6 Amravati For 6)Dhanashri W.U.A.Ltd. 0.10 Shopping 0.10 0 0.10 Dhanora Mhali Tq.Chandur Rly. (Package MAL-2) Construction of Building for WUA of Satnoor Minor Project Tq. Warud Dist. Satnoor B-STN-2 Amravati For 1)Janta W.U.A.Ltd. ShendurjanaghatTq. Warud (Package STN- 2) Construction of Building for WUA of Satnoor Minor Project Tq. Warud Dist. 193 R4 B-STN-2/1 Amravati For 1)Janta W.U.A.Ltd. 0.10 Shopping 0.10 0 0.10 ShendurjanaghatTq. Warud (Package STN- 2) Construction of Building for WUA of Satnoor Minor Project Tq. Warud Dist. 194 R4 B-STN-2/2 Amravati For 2)Jaikisan W.U.A.Ltd. 0.10 Shopping 0.10 0 0.10 ShendurjanaghatTq. Warud (Package STN- 2) 2/24/2011 otpr_wuaBldg 111 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Building for WUA of Sarswati Minor Project Tq. C.Rly Dist. Saraswati B-SAR-2 Amravati For 1)Saraswati W.U.A.Ltd.Chandur Rly Tq.Chandur Rly. (Package SAR-2) Construction of Building for WUA of Sarswati Minor Project Tq. C.Rly Dist. 195 R4 B-SAR-2 Amravati For 1)Saraswati 0.12 Shopping 0.12 0.00 0.12 W.U.A.Ltd.Chandur Rly Tq.Chandur Rly. (Package SAR-2) Construction of Building for WUA of Khatizapur B-KTJ-2 Khatizapur Minor Project Tq.Achalpur Dist. Amravati Construction of Building for WUA of Khatizapur Minor Project Tq.Achalpur 196 R4 B-KTJ-2/1 Dist. Amravati For 1)Ambarajibaba 0.15 Shopping 0.15 0.00 0.15 W.U.A.Ltd.Parsapur Tq.Achalpur (Package KTJ-2) Construction of Building for WUA of Khatizapur Minor Project Tq.Achalpur 197 R4 B-KTJ-2/2 0.15 Shopping 0.15 0.00 0.15 Dist. Amravati For 2) JaikisanW.U.A.Ltd. Parsapur Tq.Achalpur (Package KTJ-2) Construction of Building for WUA of Salai Minor Project Tq. Dharni Dist. Salai B-SLI-2 Amravati For 1) JaikisanW.U.A.Ltd. Salai Tq.Dharni (Package SLI-2) Construction of Building for WUA of Salai Minor Project Tq. Dharni Dist. 198 R4 B-SLI-2 0.15 Shopping 0.15 0.00 0.15 Amravati For 1) JaikisanW.U.A.Ltd. Salai Tq.Dharni (Package SLI-2) Mata Waghjai Water Users Association Shirawal B-SRW-2 Sukivali Rehabilitation of Shirwali i M.I.scheme Tq Khed Dist.Ratnagiri Mata Waghjai Water Users Association 199 R4 B-SRW-2 Sukivali Rehabilitation of Shirwali 0.20 Shopping 0.00 0.20 0.20 M.I.scheme Tq Khed Dist.Ratnagiri Shri.Datta Water Users Association Ltd Vhel B-VHL-2 Vhel Rehabilitation of Vhel M.I.scheme Tq Lanja Dist.Ratnagiri 2/24/2011 otpr_wuaBldg 112 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Shri.Datta Water Users Association Ltd 200 R4 B-VHL-2 Vhel Rehabilitation of 0.20 Shopping 0.20 0.00 0.20 Vhel M.I.scheme Tq Lanja Dist.Ratnagiri Shri. Kalwande Water Users Association Kalwan B-KDE-2 Ltd.Kalwande.Rehabilitation of Kalwande de M.I.scheme Tq Chiplun Dist.Ratnagiri Shri. Kalwande Water Users Association 201 R4 B-KDE-2 Ltd.Kalwande.Rehabilitation of Kalwande 0.20 Shopping 0.00 0.20 0.20 M.I.scheme Tq Chiplun Dist.Ratnagiri Shri.Bharadidevi Water Users Association Madkho Madkhol Rehabilitation of Madkhol B-MDK-2 l M.I.scheme Tq Sawantwadi Dist.Sindhudurg Shri.Bharadidevi Water Users Association Madkhol Rehabilitation of Madkhol 202 R4 B-MDK-2 0.20 Shopping 0.00 0.20 0.20 M.I.scheme Tq Sawantwadi Dist.Sindhudurg Shri.Lingeshwar Pavnadevi Paniwapar Nileli B-NIL-2 Sanstha.Ltd Nileli.Rehabilitation of Nileli M.I.scheme Tq Kudal Dist.Sindhudurg Shri.Lingeshwar Pavnadevi Paniwapar 203 R4 B-NIL-2 Sanstha.Ltd Nileli.Rehabilitation of Nileli 0.20 Shopping 0.00 0.20 0.20 M.I.scheme Tq Kudal Dist.Sindhudurg Shri. Gangeshwar Water Users Association Shirgao B-SIR-2 Ltd.Shirgaon.Rehabilitation of Shirgaon n M.I.scheme Tq Deogad Dist.Sindhudurg Shri. Gangeshwar Water Users Association 204 R4 B-SIR-2 Ltd.Shirgaon.Rehabilitation of Shirgaon 0.20 Shopping 0.00 0.20 0.20 M.I.scheme Tq Deogad Dist.Sindhudurg Shri. Devi Harda Sateri Water Users Association Dodamarg Rehabilitation of Shirwal B-SHI-2 Shirwal M.I.scheme Tq Dodamarg Dist.Sindhudurg 2/24/2011 otpr_wuaBldg 113 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Shri. Devi Harda Sateri Water Users Association Dodamarg Rehabilitation of 205 R4 B-SHI-2 0.20 Shopping 0.00 0.20 0.20 Shirwal M.I.scheme Tq Dodamarg Dist.Sindhudurg Shri. Dev Gandheshwar Water Users Tithaval Association Ltd.Tithwali Rehabilitation of B-TTH-2 i Tithwali M.I.scheme Tq Vaibhavwadi Dist.Sindhudurg Shri. Dev Gandheshwar Water Users Association Ltd.Tithwali Rehabilitation of 206 R4 B-TTH-2 0.20 Shopping 0.00 0.20 0.20 Tithwali M.I.scheme Tq Vaibhavwadi Dist.Sindhudurg Shri.PavanaDevi Water Users Association Harkul B-HKL-2 Ltd Harkul Rehabilitation of Harkul M.I.scheme Tq Kankavli Dist.Sindhudurg Shri.PavanaDevi Water Users Association 207 R4 B-HKL-2 Ltd Harkul Rehabilitation of Harkul 0.20 Shopping 0.20 0.00 0.20 M.I.scheme Tq Kankavli Dist.Sindhudurg Shri. Kamanadevi Water Users Association Oras B-ORS-2 Oras.Rehabilitation of Oras M.I.scheme Tq Kudal Dist.Sindhudurg Shri. Kamanadevi Water Users Association 208 R4 B-ORS-2 Oras.Rehabilitation of Oras M.I.scheme Tq 0.20 Shopping 0.00 0.20 0.20 Kudal Dist.Sindhudurg Shri.Dev Mauli Water Users Association Ltd Amboli.Rehabilitation ofAmboli Amboli B-ALI-2 M.I.scheme Tq Sawantwadi Dist.Sindhudurg Shri.Dev Mauli Water Users Association Ltd Amboli.Rehabilitation ofAmboli 209 R4 B-ALI-2 0.20 Shopping 0.00 0.20 0.20 M.I.scheme Tq Sawantwadi Dist.Sindhudurg Krishna B-KRI-2 Construction of Office building of WUA Canal Construction of Office building of WUA 210 R4 B-KRI-2/1 0.24 Shopping 0.24 0 0.24 Godadagari WUA Kodoli Construction of Office building of WUA 211 R4 B-KRI-2/2 0.25 Shopping 0.25 0 0.25 Hanuman WUA Havali 2/24/2011 otpr_wuaBldg 114 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Office building of WUA 212 R4 B-KRI-2/3 0.25 Shopping 0.25 0 0.25 Jotirling WUA Shere Construction of Office building of WUA 213 R4 B-KRI-2/4 0.26 Shopping 0.26 0 0.26 Hanuman WUA Gondi Construction of Office building of WUA 214 R4 B-KRI-2/5 0.26 Shopping 0.26 0 0.26 Machindranath WUA K.M.Gad Construction of Office building of WUA 215 R4 B-KRI-2/6 0.26 Shopping 0.26 0 0.26 Rajdharvadhan WUA Kole Construction of Office building of WUA 216 R4 B-KRI-2/7 0.26 Shopping 0.26 0 0.26 Sitadevi WUA Shirate Construction of Office building of WUA 217 R4 B-KRI-2/8 Krantishinh Nana Patil WUA Yede 0.27 Shopping 0.27 0 0.27 Machindra Construction of Office building of WUA 218 R4 B-KRI-2/9 0.26 Shopping 0.26 0 0.26 Sadguru WUA Rethare Haranaksh B-KRI- Construction of Office building of WUA 219 R4 0.26 Shopping 0.26 0 0.26 2/10 Ganesh WUA Dudhari B-KRI- Construction of Office building of WUA 220 R4 0.26 Shopping 0.26 0 0.26 2/11 Datta WUA Takari B-KRI- Construction of Office building of WUA 221 R4 0.25 Shopping 0.25 0 0.25 2/12 Baliraja WUA Dhahyari B-KRI- Construction of Office building of WUA 222 R4 0.26 Shopping 0.26 0 0.26 2/13 Jotarling WUA Ghogaon B-KRI- Construction of Office building of WUA 223 R4 0.25 Shopping 0.25 0 0.25 2/14 Krishnakath WUA Dudhondi B-KRI- Construction of Office building of WUA 224 R4 0.27 Shopping 0.27 0 0.27 2/15 Shramik WUA Pundi B-KRI- Construction of Office building of WUA 225 R4 0.25 Shopping 0.25 0 0.25 2/16 Krishnamai WUA Burli B-KRI- Construction of Office building of WUA 226 R4 0.24 Shopping 0.24 0 0.24 2/17 Krishnamai WUA Amanapur-1 B-KRI- Construction of Office building of WUA 227 R4 0.25 Shopping 0.25 0 0.25 2/18 Krishnamai WUA Amanapur-2 B-KRI- Construction of Office building of WUA 228 R4 0.26 Shopping 0.26 0 0.26 2/19 Krishivikas WUA Gondilwadi B-KRI- Construction of Office building of WUA 229 R4 0.28 Shopping 0.28 0 0.28 2/20 Sidhanath WUA Yelavi B-KRI- Construction of Office building of WUA 230 R4 0.29 Shopping 0.29 0 0.29 2/21 Brahamanand WUA Yelavi Minor 0 2/24/2011 otpr_wuaBldg 115 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Office building of WUA Lingnur B-LIN-2 Kadadev WUA Lingnur Construction of Office building of WUA 231 R4 B-LIN-2 0.25 Shopping 0.25 0 0.25 Kadadev WUA Lingnur Construction of Office building of WUA Shegaon B-SHE-2 Jai Sahakar WUA Shegaon Construction of Office building of WUA 232 R4 B-SHE-2 0.26 Shopping 0.26 0 0.26 Jai Sahakar WUA Shegaon Sidhanat Construction of Office building of WUA B-SID-2 h Vithal WUA Sidhanath Construction of Office building of WUA 233 R4 B-SID-2 0.26 Shopping 0.26 0 0.26 Vithal WUA Sidhanath Construction of Office building of WUA Anjani B-AJN-2 Shrimati Bhagirathi & Patil WUA Anjani Construction of Office building of WUA 234 R4 B-AJN-2 0.26 Shopping 0.26 0 0.26 Shrimati Bhagirathi & Patil WUA Anjani Kadegao Construction of Office building of WUA B-KAE-2 n Govindgiri WUA Kadegaon Construction of Office building of WUA 235 R4 B-KAE-2 0.27 Shopping 0.27 0 0.27 Govindgiri WUA Kadegaon Atpadi B-AAT-2 Construction of Office building of WUA B-AAT- Construction of Office building of WUA 236 R4 0.26 Shopping 0.26 0 0.26 2/1 Atpadi Talav WUA Atpadi B-AAT- Construction of Office building of WUA 237 R4 0.26 Shopping 0.26 0 0.26 2/2 Sidhanath WUA Atpadi Diganch Construction of Office building of WUA B-DIG-2 i Udayraj WUA Dighanchi Construction of Office building of WUA 238 R4 B-DIG-2 0.25 Shopping 0.25 0.25 Udayraj WUA Dighanchi Karanji Construction of Office building of Shri. B-KJV-2 wane Kisan WUA Karanjiwane Construction of Office building of Shri. 239 R4 B-KJV-2 0.30 Shopping 0.30 0.30 Kisan WUA Karanjiwane Kandalg Construction of Office building of Shri. B-KDL-2 aon Mahalaxmi WUA Kandalgaon Construction of Office building of Shri. 240 R4 B-KDL-2 0.30 Shopping 0.30 0.30 Mahalaxmi WUA Kandalgaon 2/24/2011 otpr_wuaBldg 116 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Office building of Shri. Benikre B-BNK-2 Jotyriling WUA Benikre Construction of Office building of Shri. 241 R4 B-BNK-2 0.30 Shopping 0.30 0.30 Jotyriling WUA Benikre Manpad Construction of Office building of Shri. B-MPD-2 ale Tatayasaheb Kore WUA Manpadale Construction of Office building of Shri. 242 R4 B-MPD-2 0.30 Shopping 0.30 0.30 Tatayasaheb Kore WUA Manpadale Construction of Office building of Shri. Shendri B-SHN-2 Kalbhairav WUA Shendri Construction of Office building of Shri. 243 R4 B-SHN-2 0.30 Shopping 0.30 0.30 Kalbhairav WUA Shendri Mula Constructing New office Building For Mul-8 WUA Constructing New office Building in Mula Irrigation Colony Mukindpur @ Newasa fata for the following WUA - Hanuman W U A Mukindpur, 244 R4 Mul-8/1 Pawanganpati WUA Newasa, 1.45 Shopp ing 1.45 1.45 Mauli WUA Mukindpur, Trivenishwar WUA Handinimgaon. and Shri Sant Dnyneshwar CLA Newasa and Bhagyoday DLA Newasa Constructing New office Building in Mula Irrigation Colony Sonai for the following WUA - 245 R4 Mul-8/2 Swamisamarth W U A Sonai, 0.77 Shopp ing 0.77 0.77 SantMadhavbaba WUA No. 1 Landewadi, SantMadhavbaba WUA No. 2 Landewadi Renukamata WUA Belhekarwadi Constructing New office Building in Mula Irrigation Colony Sonai for the following WUA - 246 R4 Mul-8/3 Yashwant W U A Sonai, 0.58 Shopp ing 0.58 0.58 Jagdamba WUA Belhekarwadi, Janseva WUA No. Landewadi 2/24/2011 otpr_wuaBldg 117 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Constructing New office Building in Mula Irrigation Colony Ghodegaon for the following WUA - 247 R4 Mul-8/4 Sant Uadasi W U A Shinganapur 0.78 Shopp ing 0.78 0.78 Jaibhavani WUA No. Sonai Vishasrao WUA Sonai Rameshwar WUA Sonai Constructing New office Building in Mula Irrigation Colony Ghodegaon for the following WUA - 248 R4 Mul-8/5 Bhairavnath W U A Chanda 0.59 Shopp ing 0.59 0.59 Ghodeshwari WUA No. Ghodegaon Sant Dhyaneshwar WUA Kharwandi Constructing New office Building 249 R4 Mul-8/6 0.19 Shopp ing 0.19 0.19 Hanuman WUA Karajgaon Constructing New office Building 250 R4 Mul-8/7 1.19 Shopp ing 1.19 1.19 Shrinath WUA Watapur Constructing New office Building Datta 251 R4 Mul-8/8 0.20 Shopp ing 0.20 0.20 WUA Chanda Office building for WUA Dongargaon Dongarg M.I. Project Tq. Seloo Dist. Wardha for B-DON-2 aon M.I. Shetkari Vikas Paniwapar Sanstha Dongargaon. Office building for WUA Dongargaon M.I. Project Tq. Seloo Dist. Wardha for 252 R4 B-DON-2 0.20 Shopping 0.20 0 0.20 Shetkari Vikas Paniwapar Sanstha Dongargaon. Anji - Office building for WUA Anji-Borkhedi Borkhed B-ANJ-2 M.I. Project for Anji-Borkhedi Pani Wapar i M.I. Sanstha, Anji Borkhedi Office building for WUA Anji-Borkhedi 253 R4 B-ANJ-2 M.I. Project for Anji-Borkhedi Pani Wapar 0.20 Shopping 0.20 0 0.20 Sanstha, Anji Borkhedi 2/24/2011 otpr_wuaBldg 118 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Office building for WUAKawadi M.I. Tq. Kawadi B-KAW-2 Arvi, Dist. Wardha for Kailaspuri Maharaj M.I. PaniWapar Sanstha, Kawadi Office building for WUAKawadi M.I. Tq. 254 R4 B-KAW-2 Arvi, Dist. Wardha for Kailaspuri Maharaj 0.20 Shopping 0.20 0 0.20 PaniWapar Sanstha, Kawadi Office building for WUA Asti M.I. Tq. Asti B-ASH-2 Ashti, Dist. Wardha for Harit-Kranti M.I. PaniWapar Sanstha Asti Office building for WUA Asti M.I. Tq. 255 R4 B-ASH-2 Ashti, Dist. Wardha for Harit-Kranti 0.29 Shopping 0.29 0 0.29 PaniWapar Sanstha Asti Office building for WUA Sawangi M.I. Sawangi B-SAV-2 Project Tq. Arvi Distt. Wardha for Bali M.I. Raja PaniWapar Sahkari Sanstha Sawangi Office building for WUA Sawangi M.I. 256 R4 B-SAV-2 Project Tq. Arvi Distt. Wardha for Bali 0.20 Shopping 0.20 0 0.20 Raja PaniWapar Sahkari Sanstha Sawangi Office building for WUA Umri M.I. Tq. Umri B-UMA-2 Arvi Distt. Wardha for Nirguni Maharaj M.I. PaniWapar Sahkari Sanstha Maryadit Umri Office building for WUA Umri M.I. Tq. 257 R4 B-UMA-2 Arvi Distt. Wardha for Nirguni Maharaj 0.20 Shopping 0.20 0 0.20 PaniWapar Sahkari Sanstha Maryadit Umri Office building for WUA Ambazari M.I. Ambaza Project Tq. Arvi Distt. Wardha for Sant B-AMZ-2 ri M.I. Adkuji Maharaj PaniWapar Sahkari Sanstha Maryadit Dahegaon (Mustara) Office building for WUA Ambazari M.I. Project Tq. Arvi Distt. Wardha for Sant 258 R4 B-AMZ-2 0.20 Shopping 0.20 0 0.20 Adkuji Maharaj PaniWapar Sahkari Sanstha Maryadit Dahegaon (Mustara) Office building for WUA Kannamwargram Kannam M.I. Project Tq. Karanji Distt. Wardha for wargram B-KAN-2 Kannamwargram Pani Wapar Sahkari M.I. Sanstha Maryadit Kannamwargram 2/24/2011 otpr_wuaBldg 119 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Office building for WUA Kannamwargram M.I. Project Tq. Karanji Distt. Wardha for 259 R4 B-KAN-2 0.20 Shopping 0.20 0 0.20 Kannamwargram Pani Wapar Sahkari Sanstha Maryadit Kannamwargram Office building for WUA Ankhoda M.I. Ankhod B-ANK-2 Project Tq. Chamorshi Distt. Gadchiroli for a M.I. Wainganga Pani Wapar Sanstha Ankhoda Office building for WUA Ankhoda M.I. 260 R4 B-ANK-2 Project Tq. Chamorshi Distt. Gadchiroli for 0.20 Shopping 0.20 0 0.20 Wainganga Pani Wapar Sanstha Ankhoda Office building for WUA Boddha M.I. Project Tq. Wadsa Distt.Gadchiroli for Boddha B-BOD-2 Boddha M.I. Project Tq. Wadsa M.I. Distt.Gadchiroli for Jai Shriram Pani Wapar Sanstha Boddha Office building for WUA Boddha M.I. Project Tq. Wadsa Distt.Gadchiroli for 261 R4 B-BOD-2 Boddha M.I. Project Tq. Wadsa 0.20 Shopping 0.20 0 0.20 Distt.Gadchiroli for Jai Shriram Pani Wapar Sanstha Boddha Office building for WUA Lagam M.I. Project Tq. Mulchera Distt.Gadchiroli for Lagam B-LAG-2 Lagam M.I. Project Tq. Mulchera M.I. Distt.Gadchiroli for Jai Laxmi Pani Wapar Sanstha Lagam Office building for WUA Lagam M.I. Project Tq. Mulchera Distt.Gadchiroli for 262 R4 B-LAG-2 Lagam M.I. Project Tq. Mulchera 0.20 Shopping 0.20 0 0.20 Distt.Gadchiroli for Jai Laxmi Pani Wapar Sanstha Lagam Office building for WUA Dhanora M.I. Dhanora Project Tq. Dhanora Distt.Gadchiroli for B-DHA-2 M.I. Dhanora M.I. Tq. Dhanora Distt.Gadchiroli for Ganga Pani Wapar Sanstha Dhanora 2/24/2011 otpr_wuaBldg 120 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Office building for WUA Dhanora M.I. Project Tq. Dhanora Distt.Gadchiroli for 263 R4 B-DHA-2 0.20 Shopping 0.20 0 0.20 Dhanora M.I. Tq. Dhanora Distt.Gadchiroli for Ganga Pani Wapar Sanstha Dhanora Office building for WUA Yelgur M.M. Yelgur Project Tq. Aheri Distt.Gadchiroli for B-YEL-2 M.M. Persapen Pani Wapar Sanstha Yelgur Regd No. 4/EE.GID, Gadchiroli Dt. 20.9.2006 Office building for WUA Yelgur M.M. Project Tq. Aheri Distt.Gadchiroli for 264 R4 B-YEL-2 0.20 Shopping 0.20 0 0.20 Persapen Pani Wapar Sanstha Yelgur Regd No. 4/EE.GID, Gadchiroli Dt. 20.9.2006 Office building for WUA Rajgatta M.M. Rajgatta B-RAJ-2 Project Tq. Gadchiroli Distt.Gadchiroli M.M. for Kisan Pani Wapar Sanstha Rajgatta. Office building for WUA Rajgatta M.M. 265 R4 B-RAJ-2 Project Tq. Gadchiroli Distt.Gadchiroli 0.20 Shopping 0.20 0 0.20 for Kisan Pani Wapar Sanstha Rajgatta. Office building for WUA Sondo M.I. Sondo Project Tq. Rajura Distt.Gadchiroli for B-SON-2 M.I. Milind Pani Wapar Sanstha Sondo Ha. Yergaran. Office building for WUA Sondo M.I. Project Tq. Rajura Distt.Gadchiroli for 266 R4 B-SON-2 0.20 Shopping 0.20 0 0.20 Milind Pani Wapar Sanstha Sondo Ha. Yergaran. Office building for WUA Itoli M.I. Project Itoli B-ITO-2 Tq. Ballarpur Distt. Chandrapur for Itoli M.I. Pani Wapar Sanstha Itoli. Office building for WUA Itoli M.I. Project 267 R4 B-ITO-2 Tq. Ballarpur Distt. Chandrapur for Itoli 0.20 Shopping 0.20 0 0.20 Pani Wapar Sanstha Itoli. Office building for WUA Rudrapur M.I. Rudrapu B-RUD-2 Project Tq. Sawali Distt. Chandrapur for r M.I. Pani Wapar Sansta Rudrapur 2/24/2011 otpr_wuaBldg 121 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Office building for WUA Rudrapur M.I. 268 R4 B-RUD-2 Project Tq. Sawali Distt. Chandrapur for 0.20 Shopping 0.20 0 0.20 Pani Wapar Sansta Rudrapur Office building for WUA Dongargaon M.I. Dongarg B-DOG-2 Project Tq. Chimur Distt. Chandrapur for aon M.I. Jai Kisan Pani Wapar Sanstha Dongargaon. Office building for WUA Dongargaon M.I. 269 R4 B-DOG-2 Project Tq. Chimur Distt. Chandrapur for 0.20 Shopping 0.20 0 0.20 Jai Kisan Pani Wapar Sanstha Dongargaon. Office building for WUA Janala M.I. Janala B-JNL-2 Project Tq. Mul Distt. Chandrapur for M.I. Jalvikas Pani Wapar Sanstha Janala Office building for WUA Janala M.I. 270 R4 B-JNL-2 Project Tq. Mul Distt. Chandrapur for 0.20 Shopping 0.20 0 0.20 Jalvikas Pani Wapar Sanstha Janala Office building for WUA Kursarla M.I. Kursarla B-KUS-2 Project Tq. Nagbhir Distt. Chandrapur for M.I. F20Pani Wapar Sansta Kusarla Office building for WUA Kursarla M.I. 271 R4 B-KUS-2 Project Tq. Nagbhir Distt. Chandrapur for 0.20 Shopping 0.20 0 0.20 F20Pani Wapar Sansta Kusarla Office building for WUA Mudza M.I. Mudza B-MUD-2 Project Tq. Bramhapuri Distt. Chandrapur M.I. for Pani Wapar Sanstha Mudza Office building for WUA Mudza M.I. 272 R4 B-MUD-2 Project Tq. Bramhapuri Distt. Chandrapur 0.20 Shopping 0.20 0 0.20 for Pani Wapar Sanstha Mudza Office building for WUA Gadmoushi M.I. Gadmou B-GAD-2 Project Tq. Nagbhir Distt. Chandrapur for shi Pani Wapar Sanstha Gadmoushi Office building for WUA Gadmoushi M.I. 273 R4 B-GAD-2 Project Tq. Nagbhir Distt. Chandrapur for 0.20 Shopping 0.20 0 0.20 Pani Wapar Sanstha Gadmoushi 2/24/2011 otpr_wuaBldg 122 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Office building for WUA Kunghada M.I. Kungha B-KUN-2 Project Tq. Chamorshi Distt. Gadchiroli da for Pani Wapar Sanstha Kunghada Office building for WUA Kunghada M.I. 274 R4 B-KUN-2 Project Tq. Chamorshi Distt. Gadchiroli 0.20 Shopping 0.20 0 0.20 for Pani Wapar Sanstha Kunghada Pench B-PCH-6 Construction of WUA office building Construction of WUA office building for Hariganga 275 R4 B-PCH-6/1 Water User Association Ltd. Kalapata Ta. Parseaoni 0.30 Shopping 0.30 0 0.30 Dist Nagpur Construction of WUA office building forKrushiganga 276 R4 B-PCH-6/2 WUA, Mahuli Ta. Parshioni Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forSujalam 277 R4 B-PCH-6/3 Sufalam WUA, Nayakund Ta.Parshioni Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forSant Kabir 278 R4 B-PCH-6/4 WUA, Umari Ta.Parshioni Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forJiwanvikash 279 R4 B-PCH-6/5 WUA, Gundhari Ta.Parseoni, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Pench B-PCH-7 Construction of WUA office building Construction of WUA office building for Jai Kisan 280 R4 B-PCH-7/1 WUA, Borda Tah.Parseoni Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building for Jai Bajrang 281 R4 B-PCH-7/2 WUA, Wagholi, Ta.Parsheoni, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forJagruti 282 R4 B-PCH-7/3 WUA, Khadala Ta.Parshioni , Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forGanga 283 R4 B-PCH-7/4 Kaweri WUA, Tekadi Ta.Parshioni , Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forShetakri 284 R4 B-PCH-7/5 Vikash WUA, Borda Ta.Parshioni Dist. Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forBhagirathi 285 R4 B-PCH-7/6 WUA, Keradi TaParshioni Dist. Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forShrikrishna 286 R4 B-PCH-7/7 WUA, Bakhari Ta.Parshioni Dist. Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forGangotri 287 R4 B-PCH-7/8 WUA, Borda Ta.Parshioni Dist. Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forKrishna 288 R4 B-PCH-7/9 Kaweri WUA, Warada Ta.Parshioni Dist. Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forAmrutdhara 289 R4 B-PCH-7/10 WUA, Nilaj Ta.Parshioni Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forJai Durga 290 R4 B-PCH-7/11 WUA, Gahuhiwara Ta.Parshioni Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forNav Durga 291 R4 B-PCH-7/12 WUA, Mehandi Ta.Parshioni Dist. Nagpur 0.30 Shopping 0.30 0 0.30 2/24/2011 otpr_wuaBldg 123 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of WUA office building forDattatraya 292 R4 B-PCH-7/13 WUA, Khedi Ta.Parshioni Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forGurudeo 293 R4 B-PCH-7/14 WUA, Khopadi Ta.Mouda Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forKandri Kisan 294 R4 B-PCH-7/15 WUA, Kandri Ta.Parshioni Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forVaishnavi 295 R4 B-PCH-7/16 WUA, Yesamba Ta.Parseoni, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forSharda 296 R4 B-PCH-7/17 WUA, Ghatrohana Ta.Parseoni, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forSaraswati 297 R4 B-PCH-7/18 WUA, Nandagaon Ta. Parshioni, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building for Saibaba 298 R4 B-PCH-7/19 Water User Association Ltd. Tekadi Ta. Parseaoni 0.30 Shopping 0.30 0 0.30 Dist Nagpur Pench B-PCH-8 Construction of WUA office building Construction of WUA office building for Pragatishil 299 R4 B-PCH-8/1 Shetkari WUA. Narsala, Ta.Mauda, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building for Jai Kisan 300 R4 B-PCH-8/2 Jalsamrudhi WUA, Marodi, Ta.Mauda, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forJankalyan 301 R4 B-PCH-8/3 WUA Nilaj Ta.Parshioni, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forKrushivikash 302 R4 B-PCH-8/4 & Jalvyawasthapan WUA, Bori (Singori) 0.30 Shopping 0.30 0 0.30 Ta Parshioni Dist Nagpur Construction of WUA office building forSwayamsewa 303 R4 B-PCH-8/5 WUA, Nisatkheda Ta.Mouda Dist. Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forRani 304 R4 B-PCH-8/6 Awantibai WUA, Ajani Ta.Ramtek Dist. Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forJansewa 305 R4 B-PCH-8/7 WUA, Satak Ta.Parshioni Dist. Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forAdarsh 306 R4 B-PCH-8/8 Shetkari WUA, Yesamba Ta.Mouda Dist. Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forPragatisheel 307 R4 B-PCH-8/9 WUA, Telankhedi Ta.Parshioni Dist. Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forJai Bhole 308 R4 B-PCH-8/10 WUA, Chacher Ta.Mouda Dist. Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building 309 R4 B-PCH-8/11 forLaxminarayana WUA, Chacher Ta.Mouda 0.30 Shopping 0.30 0 0.30 Dist Nagpur Construction of WUA office building 310 R4 B-PCH-8/12 forNagdwarswami WUA, Hiwara Ta.Mouda Dist. 0.30 Shopping 0.30 0 0.30 Nagpur Construction of WUA office building forBappuji 311 R4 B-PCH-8/13 Buwa WUA, Asti Ta. Mouda Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forJai Bajarang 312 R4 B-PCH-8/14 WUA, Kumbhapur Ta.Mouda Dist.Nagpur 0.30 Shopping 0.30 0 0.30 2/24/2011 otpr_wuaBldg 124 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of WUA office building forGangakaveri 313 R4 B-PCH-8/15 WUA, Salwa Ta.Parshioni , Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forJal Laxmi 314 R4 B-PCH-8/16 WUA, Tarsa Ta.Mouda , Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forJai Ganga 315 R4 B-PCH-8/17 Maa WUA, Babdeo Ta.Mouda , Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forChacradhar 316 R4 B-PCH-8/18 Swami WUA, Sawargaon Ta. Dist.Bhandara 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forMaa Durga 317 R4 B-PCH-8/19 Bhawani WUA, Higana Ta.Mouda Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forJai 318 R4 B-PCH-8/20 Matrubhumi WUA, Mouda Ta.Mouda Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forSamarth 319 R4 B-PCH-8/21 WUA, Gangner Ta.Mouda Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forJaldhara 320 R4 B-PCH-8/22 WUA, singori Ta.Parshioni Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forWainganga 321 R4 B-PCH-8/23 WUA, Mangali Ta.Mouda Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forGangapurti 322 R4 B-PCH-8/24 WUA, Nisatkheda Ta. Mouda Dist. Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forWainganga 323 R4 B-PCH-8/25 WUA,Kerdi Ta. Parshioni Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forAmarjyoti 324 R4 B-PCH-8/26 WUA, Khandala, Ta.Mouda Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forMaha Durga 325 R4 B-PCH-8/27 WUA, Satak Ta.Parsioni, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forDhanlaxmi 326 R4 B-PCH-8/28 WUA, Telegkhedi Ta.Parsioni, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forJankalyankari 327 R4 B-PCH-8/29 WUA, Banpuri Ta.Parsioni, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forKhedi WUA, 328 R4 B-PCH-8/30 Khedi Ta.Parseoni, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forJai Ambe 329 R4 B-PCH-8/31 WUA, Nimkheda Ta.Parseoni, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forSwami 330 R4 B-PCH-8/32 Samartha WUA, Mouda Ta.Mouda , Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forKoteshwar 331 R4 B-PCH-8/33 WUA, Nagardhan Ta.Ramek, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forAnnapurna 332 R4 B-PCH-8/34 WUA, Nagardhan Ta.Ramtek, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forVasundhara 333 R4 B-PCH-8/35 WUA, Hiwara Ta.Ramtek, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building for Ambika 334 R4 B-PCH-8/36 Water User Association Ltd. Nimkheda Ta.Parseaoni 0.30 Shopping 0.30 0 0.30 Dist Nagpur Construction of WUA office building for Jai 335 R4 B-PCH-8/37 durgamata Water User Association Ltd. Nawegaon 0.30 Shopping 0.30 0 0.30 Ta Mouda Dist Nagpur 2/24/2011 otpr_wuaBldg 125 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of WUA office building for Jai 336 R4 B-PCH-8/38 Swarswati Maa Water User Association Ltd.Babdeo 0.30 Shopping 0.30 0 0.30 Ta Mouda Dist Nagpur Construction of WUA office building for Mayamawali 337 R4 B-PCH-8/39 Water User Association Ltd. Kumbhari Ta.Mouda 0.30 Shopping 0.30 0 0.30 Dist Nagpur Construction of WUA office building for Jai Ganga 338 R4 B-PCH-8/40 Water User Association Ltd. Dhamangaon Ta.Mouda 0.30 Shopping 0.30 0 0.30 Dist Nagpur Pench B-PCH-9 Construction of WUA office building Construction of WUA office building forJaikisan 339 R4 B-PCH-9/1 WUA, Kachurwahi Ta. Ramtek Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forPawansut 340 R4 B-PCH-9/2 WUA, Khaperkheda Ta.Mouda , Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building for Jaltarang 341 R4 B-PCH-9/3 WUA, Aroli Tah.Mouda Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building for Jan Seva 342 R4 B-PCH-9/4 WUA, Chokhala Tah.Mouda Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building for Shri Sai 343 R4 B-PCH-9/5 WUA, Tuman.Barshi Tah.Mouda Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building for Shetkari 344 R4 B-PCH-9/6 WUA, Barshi Tah.Mouda Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building for Parmatma 345 R4 B-PCH-9/7 WUA, Pardi, Ta.Mauda, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building for Shrikrishna 346 R4 B-PCH-9/8 WUA, Nimkheda, Ta.Mauda, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forJaldhara 347 R4 B-PCH-9/9 WUA. Ejani Ta. Ramtek, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forJai Ganesh 348 R4 B-PCH-9/10 WUA. Rajoli Ta.Mouda Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forPanchasheel 349 R4 B-PCH-9/11 WUA, chichala Ta.Ramtek , Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forShetkari 350 R4 B-PCH-9/12 WUA, Chichala Ta.Ramtek , Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forSangrampur 351 R4 B-PCH-9/13 WUA, Sangrampur Ta.Ramtek , Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forJai Bhole 352 R4 B-PCH-9/14 WUA, Hatodi Ta.Ramtek , Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forVighnaharta 353 R4 B-PCH-9/15 WUA, Chacher Ta.Mouda , Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forGanesh 354 R4 B-PCH-9/16 WUA, Lohdongari Ta.Ramtek , Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forJankalyan 355 R4 B-PCH-9/17 WUA, Kharda Ta.Mouda , Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forGurudeo 356 R4 B-PCH-9/18 WUA, Dhani Ta.Ramtek, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forMahatma 357 R4 B-PCH-9/19 WUA, Rajoli Ta.Mouda , Dist.Nagpur 0.30 Shopping 0.30 0 0.30 2/24/2011 otpr_wuaBldg 126 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of WUA office building forBhagyodaya 358 R4 B-PCH-9/20 WUA, Reoral Ta.Ramtek , Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forAdarsh 359 R4 B-PCH-9/21 WUA, Khaparkheda Ta.Mouda , Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forAjangaon 360 R4 B-PCH-9/22 WUA, Ajangaon Ta.Mouda , Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forJai 361 R4 B-PCH-9/23 Shrikrishna WUA, Khodagaon Ta.Ramtek , 0.30 Shopping 0.30 0 0.30 Dist Nagpur Construction of WUA office building forJivan Vikash 362 R4 B-PCH-9/24 WUA, Kirnapur Ta.Ramtek , Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forShriram 363 R4 B-PCH-9/25 WUA, Nimkheda Ta.Mouda, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forSant Gajanan 364 R4 B-PCH-9/26 WUA, Tarsa Ta.Mouda, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forShree Balaji 365 R4 B-PCH-9/27 WUA, Tuman Ta.Mouda, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building 366 R4 B-PCH-9/28 forNarayanswami WUA, Chichala Ta.Ramtek, 0.30 Shopping 0.30 0 0.30 Dist Nagpur Construction of WUA office building forAdarsh 367 R4 B-PCH-9/29 WUA, Nerla (Lohdongari) Ta.Ramtek, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forShree Sant 368 R4 B-PCH-9/30 Eknath WUA, Isapur Ta.Mouda, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forNawargaon 369 R4 B-PCH-9/31 WUA, Nawargaon Ta.Ramtek, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forBhagirath 370 R4 B-PCH-9/32 WUA, Lohadongari Ta.Ramtek, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forPragati 371 R4 B-PCH-9/33 WUA, Isapur/ Tharsa Ta.Mouda, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forShri Hari 372 R4 B-PCH-9/34 WUA, Barshi Ta. Mouda, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forJiwanjyoti 373 R4 B-PCH-9/35 WUA, Tarodi Ta. Mouda, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forEkata WUA, 374 R4 B-PCH-9/36 Nerla Ta.Ramtek, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forNadaji 375 R4 B-PCH-9/37 WUA, Nandapuri Ta.Ramtek, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forJai Shiv 376 R4 B-PCH-9/38 WUA, Dudhala Ta.Mouda, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building for Jalvikas 377 R4 B-PCH-9/39 Water User Association Ltd. Kodamendhi Ta.Mouda 0.30 Shopping 0.30 0 0.30 Dist Nagpur Construction of WUA office building for Jiwansathi 378 R4 B-PCH-9/40 Water User Association Ltd. Nandgaon Ta.Mouda 0.30 Shopping 0.30 0 0.30 Dist Nagpur Construction of WUA office building for Virsi 379 R4 B-PCH-9/41 Bhendala Water User Association Ltd. Virsi 0.30 Shopping 0.30 0 0.30 Ta Mouda Dist Nagpur 2/24/2011 otpr_wuaBldg 127 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of WUA office building for Nawegaon 380 R4 B-PCH-9/42 Dhanla Water User Association Ltd. Dhanala 0.30 Shopping 0.30 0 0.30 Ta Mouda Dist Nagpur Construction of WUA office building for Mangali Teli 381 R4 B-PCH-9/43 Water User Association Ltd. Mangli (Teli) Ta.Mouda 0.30 Shopping 0.30 0 0.30 Dist Nagpur Construction of WUA office building for Rajoli 382 R4 B-PCH-9/44 Rewaral Wagholi Dhanala Water User Association 0.30 Shopping 0.30 0 0.30 Ltd Rewaral Ta Mouda Dist Nagpur Construction of WUA office building for Sambrudhi 383 R4 B-PCH-9/45 Water User Association Ltd. Dharmapuri Ta.Mouda 0.30 Shopping 0.30 0 0.30 Dist Nagpur Construction of WUA office building forSurganga 384 R4 B-PCH-9/46 WUA, Pardi Ta.Mohadi Dist. Bhandara 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forPimpalgaon 385 R4 B-PCH-9/47 WUA, Pimpalgaon Ta.Mohadi Dist.Bhandara 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forJagruti 386 R4 B-PCH-9/48 WUA, Salaimeta.Hansapur Ta.Ramtek , Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building for Jai Ganga 387 R4 B-PCH-9/49 WUA, Dahegaon Tah.Mohadi Dist.Bhandara 0.30 Shopping 0.30 0 0.30 Construction of WUA office building for Jan Kalyani 388 R4 B-PCH-9/50 WUA, Hardoli, Tah.Mohadi Dist.Bhandara 0.30 Shopping 0.30 0 0.30 Construction of WUA office building for Shivshakti 389 R4 B-PCH-9/51 WUA, Waigaon Tah.Mouda Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building for Harit Kranti 390 R4 B-PCH-9/52 WUA, Mandesar Tah.Mohadi Dist.Bhandara 0.30 Shopping 0.30 0 0.30 Construction of WUA office building for Shivani 391 R4 B-PCH-9/53 WUA, Shivani, Ta.Mohadi, Dist.Bhandara 0.30 Shopping 0.30 0 0.30 Construction of WUA office building for Jai Ganesh 392 R4 B-PCH-9/54 WUA, Wadegaon, Ta.Mohadi,Dist.Bhandara 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forJalaganga 393 R4 B-PCH-9/55 WUA Panchala .Lohara Ta.Ramtek, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forBoteshewar 394 R4 B-PCH-9/56 WUA. Rampur Ta.Mohadi, Dist.Bhandara 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forMaa 395 R4 B-PCH-9/57 Bamleshwari WUA Adegaon, Ta.Mauda, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forAkashaganga 396 R4 B-PCH-9/58 WUA. Morgaon Ta.Mohadi Dist.Bhandara 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forAdarsha 397 R4 B-PCH-9/59 WUA. Bondri Ta.Mohadi, Dist.Bhandara 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forJai Bajarang 398 R4 B-PCH-9/60 WUA. Kanhalgaon Ta.Mohadi Dist.Bhandara 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forAcharya 399 R4 B-PCH-9/61 Vinoba Bhave WUA. Panjara Ta.Mohadi, 0.30 Shopping 0.30 0 0.30 Dist Bhandara Construction of WUA office building forSaibaba 400 R4 B-PCH-9/62 WUA.Chorkhamari Ta.Mohadi, Dist.Bhandara 0.30 Shopping 0.30 0 0.30 2/24/2011 otpr_wuaBldg 128 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of WUA office building forJai Bajaranga 401 R4 B-PCH-9/63 WUA. Khairalanji Ta.Mohadi, Dist.Bhandara 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forJai Hanuman 402 R4 B-PCH-9/64 WUA.Salebardi Ta.Mohadi, Dist.Bhandara 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forJeevadayeeni 403 R4 B-PCH-9/65 WUA. Khutsaori Ta.Mohadi, Dist.Bhandara 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forSaibaba 404 R4 B-PCH-9/66 WUA. Pimpalgaon Ta.Mauda, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forPrerana 405 R4 B-PCH-9/67 WUA. Beradepar Ta.Mouda Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forKandri 406 R4 B-PCH-9/68 WUA, Kandri Ta.Mohadi, Dist.Bhandara 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forJai Kisan 407 R4 B-PCH-9/69 Bahuuddeya WUA, Sawangi Ta.Ramek, Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forGeetanjali 408 R4 B-PCH-9/70 WUA, Aroli Ta.Mouda , Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forDhusala 409 R4 B-PCH-9/71 WUA, Dhusala Ta.Mohadi, Dist.Bhandara 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forEkatmik 410 R4 B-PCH-9/72 WUA ,Kathalabodi Dhanla Ta.Mouda , Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forPragati 411 R4 B-PCH-9/73 WUA, Navegaon Ta.Mohadi, Dist.Bhandara 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forJamb WUA, 412 R4 B-PCH-9/74 Jamb Ta.Ta.Mohadi, Dist.Bhandara 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forAdarsha 413 R4 B-PCH-9/75 WUA, Chichkheda Ta.Mouda , Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forBhagyodaya 414 R4 B-PCH-9/76 WUA, Waigaon Ta.Mouda , Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forSirsoli 415 R4 B-PCH-9/77 WUA, Sirsoli Ta.Mouda , Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forWakeshwar 416 R4 B-PCH-9/78 WUA, Wakeshwar Ta.Mouda , Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forJaladhara 417 R4 B-PCH-9/79 WUA, Khamari (Bz) Ta.Mohadi Dist.Bhandara 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forSamarth 418 R4 B-PCH-9/80 WUA, Bhandewadi Ta.Ramtek Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forKrushivikash 419 R4 B-PCH-9/81 WUA, Dhanoli Ta.Mouda Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forNavyuwak 420 R4 B-PCH-9/82 WUA, Dhanoli Ta.Mouda Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forPragati 421 R4 B-PCH-9/83 WUA, Khandala Ta. Ramtek Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forShriram 422 R4 B-PCH-9/84 WUA, Sirsoli Ta. Mohadi Dist. Bhandara 0.30 Shopping 0.30 0 0.30 2/24/2011 otpr_wuaBldg 129 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of WUA office building forMahasangh 423 R4 B-PCH-9/85 WUA, Masala Ta.Ramtek Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forMaa Sharda 424 R4 B-PCH-9/86 WUA, Bori Ta.Mouda Dist.Nagpur 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forJai Shriram 425 R4 B-PCH-9/87 WUA, Pandharabodi Ta.Mohadi, Dist.Bhandara 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forChicholi 426 R4 B-PCH-9/88 WUA, Chicholi Ta.Mohadi, Dist.Bhandara 0.30 Shopping 0.30 0 0.30 Construction of WUA office building forChhatrapati 427 R4 B-PCH-9/89 Shivaji Maharaj WUA, Pandarabodi Ta.Mohadi, 0.30 Shopping 0.30 0 0.30 Dist Bhandara Construction of WUA office building for Wainganga 428 R4 B-PCH-9/90 Water User Association Ltd. Ghotibori Ta.Ramtek 0.30 Shopping 0.30 0 0.30 Dist Nagpur Construction of WUA office building for Kirnapur 429 R4 B-PCH-9/91 Water User Association Ltd.Kirnapur Ta.Ramtek 0.30 Shopping 0.30 0 0.30 Dist Nagpur Construction of WUA office building for Shivganga 430 R4 B-PCH-9/92 Water User Association Ltd.Shiwani Ta. Mohadi 0.30 Shopping 0.30 0 0.30 Dist Bhandara Pench-6 B-PCH-6 Construction of WUA Office Building Construction of Office Building for 431 R4 B-PCH-6/1 0.30 Shopping 0.30 0 0.30 Dattatraya WUA Patansawangi Construction of Office Building for 432 R4 B-PCH-6/2 0.30 Shopping 0.30 0 0.30 Mahantbaba WUA Palora Construction of Office Building for 433 R4 B-PCH-6/3 0.30 Shopping 0.30 0 0.30 Tajuddinbaba WUA Mahadula Construction of Office Building for 434 R4 B-PCH-6/4 0.30 Shopping 0.30 0 0.30 Nandaji WUA Khandala Construction of Office Building for 435 R4 B-PCH-6/5 0.30 Shopping 0.30 0 0.30 Shetkari WUA Pawangaon Construction of Office Building for 436 R4 B-PCH-6/6 0.30 Shopping 0.30 0 0.30 Tajbaba WUA Waki Construction of Office Building for 437 R4 B-PCH-6/7 0.30 Shopping 0.30 0 0.30 Patimata WUA Parshioni Construction of Office Building for 438 R4 B-PCH-6/8 0.30 Shopping 0.30 0 0.30 Shetkari Bahu Uddheshiya WUA Itgaon Construction of Office Building for 439 R4 B-PCH-6/9 0.30 Shopping 0.30 0.30 Ambika WUA Itangoti B-PCH- Construction of Office Building for 440 R4 0.30 Shopping 0.30 0.30 6/10 Krushivikas WUA Gosewadi B-PCH- Construction of Office Building for 441 R4 0.30 Shopping 0.30 0.30 6/11 Shriram WUA Patansawangi 2/24/2011 otpr_wuaBldg 130 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 B-PCH- Construction of Office Building for 442 R4 0.30 Shopping 0.30 0.30 6/12 Prerana WUA Ranala B-PCH- Construction of Office Building for Jai 443 R4 0.30 Shopping 0.30 0.30 6/13 Durga WUA Patansawangi B-PCH- Construction of Office Building for 444 R4 0.30 Shopping 0.30 0.30 6/14 Shivkrupa WUA Dahegaon B-PCH- Construction of Office Building for Pragati 445 R4 0.30 Shopping 0.30 0.30 6/15 WUA Khairy B-PCH- Construction of Office Building - for 446 R4 0.30 Shopping 0.30 0.30 6/16 Shraddha WUA Kawatha B-PCH- Construction of Office Building - for 447 R4 0.30 Shopping 0.30 0.30 6/17 Samruddhi WUA Kalamna B-PCH- Construction of Office Building for 448 R4 0.30 Shopping 0.30 0.30 6/18 Haritkranti WUA Tamswadi B-PCH- Construction of Office Building - for Sant 449 R4 0.30 Shopping 0.30 0.30 6/19 Gadgebaba WUA Itgaon B-PCH- Construction of Office Building for Jai 450 R4 0.30 Shopping 0.30 0.30 6/20 Santoshi Maa WUA Dahegaon B-PCH- Construction of Office Building for 451 R4 0.30 Shopping 0.30 0.30 6/21 Matoshri WUA Pipla B-PCH- Construction of Office Building for Om 452 R4 0.30 Shopping 0.30 0.30 6/22 WUA Ghorpad B-PCH- Construction of Office Building for 453 R4 0.30 Shopping 0.30 0.30 6/23 Shrikrushna WUA Karambhad Construction of Office Building for B-PCH- 454 R4 Parsodi Gundari Kisan Vikas WUA 0.30 Shopping 0.30 0.30 6/24 Gundari B-PCH- Construction of Office Building for Sant 455 R4 0.30 Shopping 0.30 0.30 6/25 Vasantbaba WUAParshioni B-PCH- Construction of Office Building for 456 R4 0.30 Shopping 0.30 0.30 6/26 Shivshakti WUA Pipla B-PCH- Construction of Office Building for 457 R4 0.30 Shopping 0.30 0.30 6/27 Gajanan Maharaj WUA Ranala B-PCH- Construction of Office Building for Sant 458 R4 0.30 Shopping 0.30 0.30 6/28 Tukaram Maharaj WUA Sonegaon B-PCH- Construction of Office Building for 459 R4 0.30 Shopping 0.30 0.30 6/29 Rukhmini WUA Gada B-PCH- Construction of Office Building for 460 R4 0.30 Shopping 0.30 0.30 6/30 Jaihanuman WUA Lonkhairy 2/24/2011 otpr_wuaBldg 131 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 B-PCH- Construction of Office Building for 461 R4 0.30 Shopping 0.30 0.30 6/31 Trimurti WUA Mahalgaon B-PCH- Construction of Office Building for 462 R4 0.30 Shopping 0.30 0.30 6/32 Shriram WUA Parshioni B-PCH- Construction of Office Building for 463 R4 0.30 Shopping 0.30 0.30 6/33 Nageshwar WUA Babhulwada B-PCH- Construction of Office Building for 464 R4 0.30 Shopping 0.30 0.30 6/34 Jiwandhara WUA Awandhi B-PCH- Construction of Office Building - for Om 465 R4 0.30 Shopping 0.30 0.30 6/35 Jaibhole WUA Karambhad Construction of Office Building - for Sant B-PCH- 466 R4 Dhyaneshwar Mauli WUA Gawana 0.26 Shopping 0.30 0.30 6/36 Garanda B-PCH- Construction of Office Building for 467 R4 0.30 Shopping 0.30 0.30 6/37 Bajrang WUA Lihigaon B-PCH- Construction of Office Building for 468 R4 0.30 Shopping 0.30 0.30 6/38 Mahuli WUA Khapa B-PCH- Construction of Office Building for Vittal 469 R4 0.30 Shopping 0.30 0.30 6/39 Rukhmini WUA Pipla B-PCH- Construction of Office Building for 470 R4 0.30 Shopping 0.30 0.30 6/40 Jaishankar WUA Pota B-PCH- Construction of Office Building for Kamal 471 R4 0.30 Shopping 0.30 0.30 6/41 WUA Karambhad B-PCH- Construction of Office Building Nilkanth 472 R4 0.30 Shopping 0.30 0.30 6/42 WUA Gada B-PCH- Construction of Office Building for 473 R4 0.30 Shopping 0.30 0.30 6/43 Yeshwant WUA Shirpur PCH-7 B-PCH-7 Construction of WUA Office Building B-PCH-7 Construction of Office Building for 474 R4 0.30 Shopping 0.30 0.30 /1 Dattaguru WUA Zullar B-PCH-7 Construction of Office Building for 475 R4 0.30 Shopping 0.30 0.30 /2 Saibaba WUA Gada B-PCH-7 Construction of Office Building for 476 R4 0.30 Shopping 0.30 0.30 /3 Jiwanvakas WUA Ungaon B-PCH-7 Construction of Office Building for Sant 477 R4 0.30 Shopping 0.30 0.30 /4 Dhyaneshwar WUA Wadoda B-PCH-7 Construction of Office Building for 478 R4 0.30 Shopping 0.30 0.30 /5 Jansewa WUA Chehadi B-PCH-7 Construction of Office Building - for 479 R4 0.30 Shopping 0.30 0.30 /6 Sarvodaya WUA Neri 2/24/2011 otpr_wuaBldg 132 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 B-PCH-7 Construction of Office Building for 480 R4 0.30 Shopping 0.30 0.30 /7 Amarjoti WUA Bhowari B-PCH-7 Construction of Office Building for Sant 481 R4 0.30 Shopping 0.30 0.30 /8 Bramheshwar WUA Sonegaon B-PCH-7 Construction of Office Building for Sant 482 R4 0.30 Shopping 0.30 0.30 /9 Gadgebaba WUA Neri B-PCH-7 Construction of Office Building for Sant 483 R4 0.30 Shopping 0.30 0.30 /10 Dhyaneshwar WUA Gada B-PCH-7 Construction of Office Building for Jai 484 R4 0.30 Shopping 0.30 0.30 /11 Hanuman WUA Bhowari Kanholi B-KAN-3 Construction of WUA Office Building Nalla B-KAN- Construction of Office Building for Janta 485 R4 0.30 Shopping 0.30 0.30 3/1 WUA Khapri (Moreshwar) B-KAN- Construction of Office Building for 486 R4 0.30 Shopping 0.30 0.30 3/2 Navjivan WUA Kanholibara B-KAN- Construction of Office Building for Jai 487 R4 0.30 Shopping 0.30 0.30 3/3 Jawan Jai Kisan WUA Kanholibara B-KAN- Construction of Office Building for 488 R4 0.30 Shopping 0.30 0.30 3/4 Shetkari WUA Takalghat B-KAN- Construction of Office Building for 489 R4 0.30 Shopping 0.30 0.30 3/5 Viktubaba WUA Takalghat B-KAN- Construction of Office Building for 490 R4 0.30 Shopping 0.30 0.30 3/6 Jaibhole WUA Asola Suwardh Construction of Office Building for B-SUW-2 ara Jaikisan Jal Purti WUA Suwardhara Construction of Office Building for 491 R4 B-SUW-2 0.30 Shopping 0.30 0.30 Jaikisan Jal Purti WUA Suwardhara Construction of Office Building for Khumari B-KUM-2 Saikrupa WUA Khumari Construction of Office Building for 492 R4 B-KUM-2 0.30 Shopping 0.30 0.30 Saikrupa WUA Khumari Construction of Office Building for Zilpa B-ZIL-2 Shriram WUAZilpa Construction of Office Building for 493 R4 B-ZIL-2 0.30 Shopping 0.30 0.30 Shriram WUAZilpa Construction of Office Building for Adarsh Botezari B-BOZ-2 WUA Botezari Construction of Office Building for Adarsh 494 R4 B-BOZ-2 0.30 Shopping 0.30 0.30 WUA Botezari 2/24/2011 otpr_wuaBldg 133 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of Office Building for Jai Satighat B-SAG-2 Satimata WUA Satighat Construction of Office Building for Jai 495 R4 B-SAG-2 0.30 Shopping 0.30 0.30 Satimata WUA Satighat Urkudap B-UAR-2 Construction of WUA Office Building ar B-UAR-2 Construction of Office Building for 496 R4 0.30 Shopping 0.30 0.30 (1/2) Ganesh WUA Urkudapar B-UAR-2 Construction of Office Building for 497 R4 0.30 Shopping 0.30 0.30 (2/2) Mahalaxmi WUA Urkudapar Ukarwa Construction of Office Building for B-UKR-2 hi Jaidurga WUA Ukarwahi Construction of Office Building for 498 R4 B-UKR-2 0.30 Shopping 0.30 0.30 Jaidurga WUA Ukarwahi Salai - Construction of Office Building for SMT-2 mendha Wanjarimata WUA Salaimendha Construction of Office Building for 499 R4 SMT-2 0.30 Shopping 0.30 0.30 Wanjarimata WUA Salaimendha Gharni B-GHR-3 Construction of office building B-GHR- Construction of office building for 500 R4 0.30 Shopping 0.20 0.10 0.30 3/1 Shivshakti WUA No1 B-GHR- Construction of office building for 501 R4 0.30 Shopping 0.20 0.10 0.30 3/2 Shivshakti WUA No2 B-GHR- Construction of office building for Vitthal 502 R4 0.30 Shopping 0.20 0.10 0.30 3/3 WUA B-GHR- Construction of office building forVithai 503 R4 0.30 Shopping 0.20 0.10 0.30 3/4 WUA B-GHR- Construction of office building for 504 R4 0.30 Shopping 0.20 0.10 0.30 3/5 Narsinha WUA B-GHR- Construction of office building for Veer 505 R4 0.30 Shopping 0.20 0.10 0.30 3/6 Hanuman WUA B-GHR- Construction of office building for 506 R4 0.30 Shopping 0.20 0.10 0.30 3/7 Anantpal WUA B-GHR- Construction of office building for 507 R4 0.30 Shopping 0.20 0.10 0.30 3/8 Bhagwanbaba WUA Construction of office building for Baludeo Kambali B-KAM-3 Maharaj WUA Construction of office building for Baludeo 508 R4 B-KAM- 3 0.30 Shopping 0.20 0.10 0.30 Maharaj WUA 2/24/2011 otpr_wuaBldg 134 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of office building for Belgaon B-BEL- 2 Jagdamba WUA Construction of office building for 509 R4 B-BEL- 2 0.30 Shopping 0.20 0.10 0.30 Jagdamba WUA Construction of office building for Golangri B-GOL-2 Bhairavnath WUA Construction of office building for 510 R4 B-GOL-2 0.30 Shopping 0.20 0.10 0.30 Bhairavnath WUA Bhuteka Construction of office building for Bapuji B-BKD- 2 rwadi WUA Construction of office building for Bapuji 511 R4 B-BKD- 2 0.30 Shopping 0.20 0.10 0.30 WUA Bagalwa Construction of office building for Jai B-BAG-2 di Hanuman WUA Construction of office building for Jai 512 R4 B-BAG-2 0.30 Shopping 0.20 0.10 0.30 Hanuman WUA Yemai B-YEM- 2 Construction of office building B-YEM- Construction of office building 513 R4 0.30 Shopping 0.20 0.10 0.30 2/1 forJagdamba WUA No1 B-YEM- Construction of office building forYemai 514 R4 0.30 Shopping 0.20 0.10 0.30 2/2 WUA No.2 Construction of office building for Neoli Neoli B-NVL- 2 WUA Construction of office building for Neoli 515 R4 B-NVL- 2 0.30 Shopping 0.20 0.10 0.30 WUA Kasasr balkund B-KAS- 2 Construction of office building a B-KAS- Construction of office building 516 R4 0.30 Shopping 0.20 0.10 0.30 2/1 forMahadev WUA B-KAS- Construction of office building for 517 R4 0.30 Shopping 0.20 0.10 0.30 2/2 Siddheshwar WUA B-GOT- Gotala B2 B-GOT- Construction of office building for Baliraja 518 R4 0.30 Shopping 0.20 0.10 0.30 B2 WUA Nagthan B-NGT-2 Construction of office building for WUA a B-NGT- Construction of office building 519 R4 0.30 Shopping 0.20 0.10 0.30 2/1 forShivchatrapati WUA 2/24/2011 otpr_wuaBldg 135 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 B-NGT- Construction of office building forSant 520 R4 0.30 Shopping 0.20 0.10 0.30 2/2 Dyaneshwar WUA B-NGT- Construction of office building 521 R4 0.30 Shopping 0.20 0.10 0.30 2/3 forHaritkranti WUA B-NGT- Construction of office building for 522 R4 0.30 Shopping 0.20 0.10 0.30 2/4 Narsihna WUA Construction of office building forKrishna Tintraj B-TIN- 2 WUA Construction of office building forKrishna 523 R4 B-TIN- 2 0.30 Shopping 0.20 0.10 0.30 WUA Harni B-HRN- 2 Construction of office building for WUA B-HRN- Construction of office building forJai 524 R4 0.30 Shopping 0.20 0.10 0.30 2/1 Shankar WUA No.1 B-HRN- Construction of office building forJai 525 R4 0.30 Shopping 0.20 0.10 0.30 2/2 Malhar WUA No3 B-HRN- Construction of office building forJai 526 R4 0.30 Shopping 0.20 0.10 0.30 2/3 Ganesh WUA No4 B-HRN- Construction of office building for Jai 527 R4 0.30 Shopping 0.20 0.10 0.30 2/4 Ambe WUA No9 B-HRN- Construction of office building forJai 528 R4 0.30 Shopping 0.20 0.10 0.30 2/5 Renuka WUA No.10 B-HRN- Construction of office building for Jai 529 R4 0.30 Shopping 0.20 0.10 0.30 2/6 yedeshwari WUA No.11 B-HRN- Construction of office building forJai 530 R4 0.30 Shopping 0.20 0.10 0.30 2/7 Malhar WUA No.2 B-HRN- Construction of office building forJai 531 R4 0.30 Shopping 0.20 0.10 0.30 2/8 Kisan WUA No.5 B-HRN- Construction of office building forJai 532 R4 0.30 Shopping 0.20 0.10 0.30 2/9 Jawan WUA No.6 B-HRN- Construction of office building forJai 533 R4 0.30 Shopping 0.20 0.10 0.30 2/10 Shriram WUA No7 B-HRN- Construction of office building forJai 534 R4 0.30 Shopping 0.20 0.10 0.30 2/11 Jagdamba WUA No.8 B-HRN- Construction of office building forJai 535 R4 0.30 Shopping 0.20 0.10 0.30 2/12 Kalimata WUA No.12 Waghad B-Wag-2 Constructing combined office Building R4 B-Wag-2 Constructing combined office Building 2/24/2011 otpr_wuaBldg 136 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Constructing combined office Building @ Ozer for Jai Yogeshwar, Mahatma Jyotirao 536 A4 B-Wag-2/1 0.756 Shopping 0 0 0 0.71 0.01 0.04 0.00 0.76 Fule & Banganga WUA Ozer Tal.Niphad Dist Nashik Constructing office building @ Nilwandi 537 A4 B-Wag-2/2 0.319 Shopping 0 0 0 0 0.30 0.02 0.00 0.32 for Kanifnath WUA Nilwandi Tal.Dindori Constructing office building @ Kadwa 538 A4 B-Wag-2/3 Mhalungi for Mauli Adiwashi WUA 0.32 Shopping 0 0 0 0.00 0.00 0.31 0.02 0.32 Kadwa Mhalungi Tal.Dindori Constructing office building @ Awankhed 539 A4 B-Wag-2/4 0.32 Shopping 0 0 0 0.00 0.00 0.30 0.02 0.32 for R.G.Patil WUA Valkhed Tal.Dindori Constructing office building @ Nigdol for 540 A4 B-Wag-2/5 0.32 Shopping 0 0 0 0.00 0.00 0.31 0.02 0.32 Mahalaxmi WUA Nigdol Tal.Dindori Constructing office building @ Hatnore for 541 A4 B-Wag-2/6 0.32 Shopping 0 0 0 0.00 0.30 0.02 0.00 0.32 Kolwan WUA Hatnore Tal. Dindori Constructing office building @ Dindori for 542 A4 B-Wag-2/7 Ganesh, Lt.Balasaheb Raje & Mohalban 0.91 Shopping 0 0 0 0.00 0.86 0.05 0.00 0.91 WUA Dindori Tal.Dindori Constructing office building @ Dindori for Dr.Babasaheb Ambedkar, Let Popatrao 543 A4 B-Wag-2/8 0.91 Shopping 0 0 0 0.00 0.86 0.05 0.00 0.91 Jadhav & Manki Parisar WUA Dindori Tal.Dindori Constructing office Building @ Mohadi 544 A4 B-Wag-2/9 for Waghad Project Leval W.U.A. Mohadi 1.58 Shopping 0 0 0 0.00 0.36 1.15 0.08 1.58 Tal.Dindori Dist Nashik Constructing Office Building for W.U.A KhadakOza B-KKZ-2 Constructing Office Building for W.U.A R4 B-KKZ-2 Constructing Office Building for B-KKZ- Harekrishna Baba W.U.A at Devargaon 545 A4 0.27 Shopping 0 0 0 0.00 0.09 0.18 0.00 0.27 2/1 for KhadakOzar M.I. Tank, Tal.- Chandwad , Dist. - Nashik Constructing Office Building for Kedrai B-KKZ- W.U.A at Khadakmalegaon Tal - Niphad 546 A4 0.27 Shopping 0 0 0 0.00 0.09 0.18 0.00 0.27 2/2 for KhadakOzar M.I. Tank, Tal.- Chandwad , Dist. - Nashik 2/24/2011 otpr_wuaBldg 137 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Constructing Office Building for W.U.A Eklahare B-EKL-2 Constructing Office Building for Unanda W.U.A at Eklahare/ Chousale for Eklahare R4 B-EKL-2 M.I. Tank, Tal.- Dindori, Dist. - Nashik Constructing Office Building for Unanda W.U.A at Eklahare/ Chousale for Eklahare 547 A4 B-EKL-2 0.33 Shopping 0 0 0 0.00 0.11 0.22 0.00 0.33 M.I. Tank, Tal.- Dindori, Dist. - Nashik Constructing Office Building for W.U.A Ramshej B-RAM-2 Constructing Office Building for Banganga W.U.A at Dhakambe for R4 B-RAM-2 Ramshej M.I. Tank, Tal.- Dindiri, Dist. - Nashik Constructing Office Building for Banganga W.U.A at Dhakambe for 548 A4 B-RAM-2 0.33 Shopping 0 0 0 0.00 0.11 0.22 0.00 0.33 Ramshej M.I. Tank, Tal.- Dindiri, Dist. - Nashik Pench B-PCH-9 Constructions of WUA office building Constructions of WUA office building for 549 R4 B-PCH-9/1 0.30 Shopping 0.30 0.30 Jaidurga WUA, Pahuni. Constructions of WUA office building for 550 R4 B-PCH-9/2 0.30 Shopping 0.30 0.30 Gurukrupa WUA, Pahuni. Constructions of WUA office building for 551 R4 B-PCH-9/3 0.30 Shopping 0.30 0.30 Mahalgaon WUA, Mahalgaon Constructions of WUA office building for 552 R4 B-PCH-9/4 0.30 Shopping 0.30 0.30 Pachgoan WUA, Pachgaon Constructions of WUA office building for 553 R4 B-PCH-9/5 0.30 Shopping 0.30 0.30 Mohgaon (devi) WUA Mohgaon/d Constructions of WUA office building for 554 R4 B-PCH-9/6 0.30 Shopping 0.30 0.30 Mahalaxmi WUA, Revaral (Khandala) Constructions of WUA office building for 555 R4 B-PCH-9/7 0.30 Shopping 0.30 0.30 Datta WUA, Beed Constructions of WUA office building for 556 R4 B-PCH-9/8 0.30 Shopping 0.30 0.30 Shetakari WUA, Satona Constructions of WUA office building for 557 R4 B-PCH-9/9 0.30 Shopping 0.30 0.30 Bahuuddeshiy WUA, Sirsi 2/24/2011 otpr_wuaBldg 138 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Constructions of WUA office building for 558 R4 B-PCH-9/10 0.30 Shopping 0.30 0.30 Indira WUA, Dahegaon Constructions of WUA office building for 559 R4 B-PCH-9/11 0.30 Shopping 0.30 0.30 Shriram WUA, Neri Constructions of WUA office building for 560 R4 B-PCH-9/12 0.30 Shopping 0.30 0.30 Nisarg WUA, Devmundhari Constructions of WUA office building for 561 R4 B-PCH-9/13 0.30 Shopping 0.30 0.30 Krushisamppan WUA, Khursipar Constructions of WUA office building for 562 R4 B-PCH-9/14 0.30 Shopping 0.30 0.30 Jalpurti WUA, Chikhali Constructions of WUA office building for 563 R4 B-PCH-9/15 0.30 Shopping 0.30 0.30 Kharabi WUA, Kharbi Constructions of WUA office building for 564 R4 B-PCH-9/16 0.30 Shopping 0.30 0.30 Jai Bhavani WUA, Devmundhari Constructions of WUA office building for 565 R4 B-PCH-9/17 0.30 Shopping 0.30 0.30 Dhanla WUA, Dhanla Constructions of WUA office building for 566 R4 B-PCH-9/18 0.30 Shopping 0.30 0.30 Nagdeo WUA, Dhanla Constructions of WUA office building for 567 R4 B-PCH-9/19 0.30 Shopping 0.30 0.30 Pragati WUA, Dahegaon Constructions of WUA office building for 568 R4 B-PCH-9/20 0.30 Shopping 0.30 0.30 Shivshankar WUA, Hattidoi Constructions of WUA office building for 569 R4 B-PCH-9/21 0.30 Shopping 0.30 0.30 Asti WUA, Dahegaon Constructions of WUA office building for 570 R4 B-PCH-9/22 0.30 Shopping 0.30 0.30 Khandala WUA, Khandala Constructions of WUA office building for 571 R4 B-PCH-9/23 0.30 Shopping 0.30 0.30 Gurukrupa WUA, Adasa Constructions of WUA office building for 572 R4 B-PCH-9/24 0.30 Shopping 0.30 0.30 Gramvikas WUA, Chikhlabodi Constructions of WUA office building for 573 R4 B-PCH-9/25 0.30 Shopping 0.30 0.30 Adarsh WUA, Neri Constructions of WUA office building for 574 R4 B-PCH-9/26 0.30 Shopping 0.30 0.30 Shioni WUA, Ghormundhari Constructions of WUA office building for 575 R4 B-PCH-9/27 0.30 Shopping 0.30 0.30 Khokarla WUA, Khokarla Constructions of WUA office building for 576 R4 B-PCH-9/28 0.30 Shopping 0.30 0.30 Shetkari WUA, Mohadura Constructions of WUA office building for 577 R4 B-PCH-9/29 0.30 Shopping 0.30 0.30 Niharwani WUA, Niharwani 2/24/2011 otpr_wuaBldg 139 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Constructions of WUA office building for 578 R4 B-PCH-9/30 0.30 Shopping 0.30 0.30 Ekta WUA, Gopiwada Constructions of WUA office building for 579 R4 B-PCH-9/31 0.30 Shopping 0.30 0.30 Adarsh WUA, Chikha Constructions of WUA office building for 580 R4 B-PCH-9/32 0.30 Shopping 0.30 0.30 Charbha WUA, Charbha Constructions of WUA office building for 581 R4 B-PCH-9/33 0.30 Shopping 0.30 0.30 Bothali WUA, Bothali. Constructions of WUA office building for 582 R4 B-PCH-9/34 0.30 Shopping 0.30 0.30 Pipari WUA, Pipari Constructions of WUA office building for 583 R4 B-PCH-9/35 0.30 Shopping 0.30 0.30 Bhandara WUA, Bhandara Constructions of WUA office building for 584 R4 B-PCH-9/36 0.30 Shopping 0.30 0.30 Chicholi WUA, Chicholi Constructions of WUA office building for 585 R4 B-PCH-9/37 0.30 Shopping 0.30 0.30 Wangepar WUA, Pipari Constructions of WUA office building for 586 R4 B-PCH-9/38 0.30 Shopping 0.30 0.30 Mahadula WUA, Mahadula Constructions of WUA office building for 587 R4 B-PCH-9/39 0.30 Shopping 0.30 0.30 Dhabha WUA, Dhabha Constructions of WUA office building for 588 R4 B-PCH-9/40 0.30 Shopping 0.30 0.30 Gayatri WUA, Dhanla Constructions of WUA office building for 589 R4 B-PCH-9/41 0.30 Shopping 0.30 0.30 Jay Laxmi WUA, Nawargaon Constructions of WUA office building for 590 R4 B-PCH-9/42 0.30 Shopping 0.30 0.30 Panjra WUA, Panjra Constructions of WUA office building for 591 R4 B-PCH-9/43 0.30 Shopping 0.30 0.30 Pragati WUA, Bhosa Construction of W.U.A. office building @ B-WAH-2 Wahi Wahi Construction of W.U.A. office building @ 592 R4 WAH-2-B 0.30 Shopping 0.30 0.30 Wahi Construction of W.U.A. office @ B-KWW-2 Kawalewad Kawalewada Construction of W.U.A. office @ 593 R4 B-KWW-2 0.30 Shopping 0.30 0.30 Kawalewada Construction of W.U.A. office @ B-KHA-2 Khursipar Khursipar Construction of W.U.A. office @ 594 R4 B-KHA-2 0.30 Shopping 0.30 0.30 Khursipar 2/24/2011 otpr_wuaBldg 140 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of W.U.A. office @ Rengepar B-KOT-2 Rengepar/Kotha Construction of W.U.A. office @ 595 R4 B-KOT-2 0.30 Shopping 0.30 0.30 Rengepar/Kotha B-NAG-2 Construction of W.U.A. office @ Nagthana Nagthana 596 R4 B-NAG-2 Construction of W.U.A. office @ Nagthana 0.30 Shopping 0.30 0.30 Amgaon B-AMG-2 Construction of W.U.A. office@ Amgaon 597 R4 B-AMG-2 Construction of W.U.A. office@ Amgaon 0.30 Shopping 0.30 0.30 Construction of W.U.A. office@ Dodmazar B-DOD-2 Dodmazari Construction of W.U.A. office@ 598 R4 B-DOD-2 0.30 Shopping 0.30 0.30 Dodmazari Salebardi B-SAL-2 Construction of W.U.A. office @ Salebardi 599 R4 B-SAL-2 Construction of W.U.A. office @ Salebardi 0.30 Shopping 0.30 0.30 Rengepar B-REN-2 Construction of W.U.A. office building Construction of W.U.A. office building for Jai 600 R4 B-REN-2/1 Hanuman W.U.A. Lendezari / Murpar of Rengepar 0.30 Shopping 0.30 0.30 M.I.Tank. Construction of W.U.A. office building for Jai 601 R4 B-REN-2/2 Gouridoh W.U.A. Dhanori of Rengepar M.I.Tank. 0.30 Shopping 0.30 0.30 Construction of W.U.A. office building for Jai 602 R4 B-REN-2/3 Gayatrimata W.U.A. Mundipar of Rengepar 0.30 Shopping 0.30 0.30 M.I.Tank. Construction of W.U.A. office building for Jai 603 R4 B-REN-2/4 Vitthal Rukhamai W.U.A. Kosamtondi of 0.30 Shopping 0.30 0.30 Rengepar M.I.Tank. Hari B-HAR-2 Construction of W.U.A. office building Construction of W.U.A. office building for 604 R4 B-HAR-2/1 Kharrobadeo W.U.A. Majitpur of Hari M.I.Tank. 0.30 Shopping 0.30 0.30 Construction of W.U.A. office building for 605 R4 B-HAR-2/2 Haritkranti W.U.A. Gangazari of Hari M.I.Tank. 0.30 Shopping 0.30 0.30 Construction of W.U.A. office building for Saibaba Salegaon B-SGN-2 W.U.A. Lohara of Salegaon M.I.Tank. Construction of W.U.A. office building for Saibaba 606 R4 B-SGN-2 W.U.A. Lohara of Salegaon M.I.Tank. 0.30 Shopping 0.30 0.30 Construction of W.U.A. office building for Aktitola B-AKT-2 Jalbhumiputra W.U.A. Chilhati of Aktitola M.I.Tank. 2/24/2011 otpr_wuaBldg 141 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of W.U.A. office building for 607 R4 B-AKT-2 Jalbhumiputra W.U.A. Chilhati of Aktitola 0.30 Shopping 0.30 0.30 M.I.Tank. Construction of W.U.A. office building for Pipariya B-PIP-2 Kachargarh W.U.A. Pipariya of Pipariya M.I.Tank. Construction of W.U.A. office building for 608 R4 B-PIP-2 Kachargarh W.U.A. Pipariya of Pipariya M.I.Tank. 0.30 Shopping 0.30 0.30 Construction of W.U.A. office building for Trupti Gumdoh B-GUM-2 W.U.A. Nawargaon of Gumdoh M.I.Tank. Construction of W.U.A. office building for Trupti 609 R4 B-GUM-2 W.U.A. Nawargaon of Gumdoh M.I.Tank. 0.30 Shopping 0.30 0.30 Pangadi B-PAN-2 Construction of W.U.A. office building Construction of W.U.A. office building for Hari Om 610 R4 B-PAN-2/1 W.U.A. Lendezari of Pangdi M.I.Tank. 0.30 Shopping 0.30 0.30 Construction of W.U.A. office building for Laxmi 611 R4 B-PAN-2/2 W.U.A. Chutiya of Pangdi M.I.Tank. 0.30 Shopping 0.30 0.30 Construction of W.U.A. office building for Bhadbhad B-BHA-2 Gurudatta W.U.A. Bhajepar of Bhadbhadyai ya M.I.Tank. Construction of W.U.A. office building for 612 R4 B-BHA-2 Gurudatta W.U.A. Bhajepar of Bhadbhadyai 0.30 Shopping 0.30 0.30 M.I.Tank. Itiadoh B-Iti-4 Construction of WUA Office Building. W.U.A. No.1 Gajanan WUA, Bondgaon 0.30 Shopping 613 R4 B-Iti-4/1 0.30 0.30 (Sur.) W.U.A. No.2 . Itiadoh Shetkari WUA, 0.30 Shopping 614 R4 B-Iti-4/2 0.30 0.30 Pratapgarh W.U.A. No.3 . Bhagirathi WUA, 0.30 Shopping 615 R4 B-Iti-4/3 0.30 0.30 Dinkarnagar W.U.A. No.4 . Jaibajarang WUA, 0.30 Shopping 616 R4 B-Iti-4/4 0.30 0.30 Chicholi W.U.A. No.5 . Tibetian WUA, Tibet 0.30 Shopping 617 R4 B-Iti-4/5 0.30 0.30 Camp 239 W.U.A. No.6 . Mahatma Jyotiba Fule 0.30 Shopping 618 R4 B-Iti-4/6 0.30 0.30 WUA, Navanitpur W.U.A. No.7 . Chhatrapati Shivaji 0.30 Shopping 619 R4 B-Iti-4/7 0.30 0.30 Maharaj WUA, Shiroli W.U.A. No.8 . Bahuuddeshiya WUA, 0.30 Shopping 620 R4 B-Iti-4/8 0.30 0.30 Mahurkuda 621 R4 B-Iti-4/9 W.U.A. No.9 . Jaidurga WUA, Nilaj 0.10 Shopping 0.10 0.10 W.U.A. No.10 . Sainath WUA, Arjuni 0.10 Shopping 622 R4 B-Iti-4/10 0.10 0.10 Mor. 2/24/2011 otpr_wuaBldg 142 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 W.U.A. No.11 . Swami Vivekanand 0.30 Shopping 623 R4 B-Iti-4/11 0.30 0.30 WUA, Mahagaon W.U.A. No.12 . Jaikisan WUA, Mahagaon 0.30 Shopping 624 R4 B-Iti-4/12 0.30 0.30 W.U.A. No.13 . Naoday WUA, Mahagaon 0.30 Shopping 625 R4 B-Iti-4/13 0.30 0.30 W.U.A. No.14 . Sahu Maharaj WUA, 0.30 Shopping 626 R4 B-Iti-4/14 0.30 0.30 Bori W.U.A. No.15 . Samruddhi WUA, Itkheda 0.30 Shopping 627 R4 B-Iti-4/15 0.30 0.30 628 R4 B-Iti-4/16 W.U.A. No.16 . Kaveri WUA, Puyar 0.30 Shopping 0.30 0.30 629 R4 B-Iti-4/17 W.U.A. No.17 . Wainganga WUA, Soni 0.30 Shopping 0.30 0.30 630 R4 B-Iti-4/18 W.U.A. No.18 . Yamuna WUA, Sawangi 0.30 Shopping 0.30 0.30 W.U.A. No.19 . Rashtrasant Tukdoji 0.30 Shopping 631 R4 B-Iti-4/19 0.30 0.30 Maharaj WUA, Chaprad W.U.A. No.20 . Gajanan Baba WUA, 0.30 Shopping 632 R4 B-Iti-4/20 0.30 0.30 Kanhalgaon W.U.A. No.21 . Gadhavi Nadi WUA, 0.30 Shopping 633 R4 B-Iti-4/21 0.30 0.30 Madeghat W.U.A. No.22 . Saibaba WUA, Lakhandur 0.10 Shopping 634 R4 B-Iti-4/22 0.10 0.10 W.U.A. No.23 . Shri Ganesh WUA, 0.30 Shopping 635 R4 B-Iti-4/23 0.30 0.30 Pimpalgaon (Kohali) W.U.A. No.24 . Shri Shri Gurudeo WUA, 0.30 Shopping 636 R4 B-Iti-4/24 0.30 0.30 Pimpalgaon 637 R4 B-Iti-4/25 W.U.A. No.25 . Adarsh WUA, Lakhandur 0.30 Shopping 0.30 0.30 W.U.A. No.26 . Samarth Ramdas WUA, 0.30 Shopping 638 R4 B-Iti-4/26 0.30 0.30 Chicholi W.U.A. No.27 . Kisan WUA, Dandegaon 0.30 Shopping 639 R4 B-Iti-4/27 0.30 0.30 W.U.A. No.28 . Chaitanya WUA, 0.30 Shopping 640 R4 B-Iti-4/28 0.30 0.30 Dharmapuri (Bothali) W.U.A. No.29 . Jai Viderbh WUA, 0.30 Shopping 641 R4 B-Iti-4/29 0.30 0.30 Manegaon W.U.A. No.30 . Haritkranti WUA, Jaitpur 0.10 Shopping 642 R4 B-Iti-4/30 0.10 0.10 (Barva) W.U.A. No.31 . Sant Tukaram WUA, 0.30 Shopping 643 R4 B-Iti-4/31 0.30 0.30 Khamkhura 644 R4 B-Iti-4/32 W.U.A. No.32 . Jijao WUA, Khamkhura 0.30 Shopping 0.30 0.30 2/24/2011 otpr_wuaBldg 143 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 W.U.A. No.33 . Jai Hanuman WUA, 0.30 Shopping 645 R4 B-Iti-4/33 0.30 0.30 Korambi W.U.A. No.34 . Shri Ganesh WUA, 0.30 Shopping 646 R4 B-Iti-4/34 0.30 0.30 Korambitola W.U.A. No.35 . Maa Ganga WUA, 0.30 Shopping 647 R4 B-Iti-4/35 0.30 0.30 Arjunnagar W.U.A. No.36 . Maa Durga WUA, 0.30 Shopping 648 R4 B-Iti-4/36 0.30 0.30 Gaurnagar/ Asoli W.U.A. No.37 . Jai Kisan WUA, Ekalpur 0.30 Shopping 649 R4 B-Iti-4/37 0.30 0.30 650 R4 B-Iti-4/38 W.U.A. No.38 . Bhagirath WUA, Visora 0.30 Shopping 0.30 0.30 651 R4 B-Iti-4/39 W.U.A. No.39 . Tulsai WUA, Tulsi 0.30 Shopping 0.30 0.30 652 R4 B-Iti-4/40 W.U.A. No.40 . Amgaon WUA, Amgaon 0.30 Shopping 0.30 0.30 W.U.A. No.41 . Sainath WUA, Virsi 0.10 Shopping 653 R4 B-Iti-4/41 0.10 0.10 Tukum 654 R4 B-Iti-4/42 W.U.A. No.42 . Nainpur WUA, Nainpur 0.30 Shopping 0.30 0.30 655 R4 B-Iti-4/43 W.U.A. No.43 . Gurudeo WUA, Kokadi 0.30 Shopping 0.30 0.30 W.U.A. No.44 . Zari Zari WUA, Zari Fari 0.30 Shopping 656 R4 B-Iti-4/44 0.30 0.30 W.U.A. No.45 . Dhanlaxmi WUA, 0.30 Shopping 657 R4 B-Iti-4/45 0.30 0.30 Usegaon 658 R4 B-Iti-4/46 W.U.A. No.46 . Gajanan WUA, Kurud 0.30 Shopping 0.30 0.30 W.U.A. No.47 . Sharda WUA, Shivarajpur 0.30 Shopping 659 R4 B-Iti-4/47 0.30 0.30 W.U.A. No.48 . Shraddheya WUA, 0.30 Shopping 660 R4 B-Iti-4/48 0.30 0.30 Kondhala W.U.A. No.49 . Shri Ganesh WUA, Kasavi 0.30 Shopping 661 R4 B-Iti-4/49 0.30 0.30 W.U.A. No.50 . Shri Saibaba WUA, 0.10 Shopping 662 R4 B-Iti-4/50 0.10 0.10 Antaraji 663 R4 B-Iti-4/51 W.U.A. No.51 . Jai Durga WUA, Palora 0.30 Shopping 0.30 0.30 664 R4 B-Iti-4/52 W.U.A. No.52 . HariOm WUA, Armori 0.10 Shopping 0.10 0.10 W.U.A. No.53 . Vitthal Rakhumai WUA, 0.10 Shopping 665 R4 B-Iti-4/53 0.10 0.10 Armori W.U.A. No.54 . Jai Shriram WUA, 0.30 Shopping 666 R4 B-Iti-4/54 0.30 0.30 Saygaon W.U.A. No.55 . Wainganga WUA, Arsoda 0.30 Shopping 667 R4 B-Iti-4/55 0.30 0.30 Kal/Am B-Kal-3 Construction of WUA office building ba 2/24/2011 otpr_wuaBldg 144 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of office building Work for 668 R4 B-Kal-3/1 Water Users Association NO. 1Khamb, Tal 0.30 Shopping 0.15 0.15 0.30 Roha Construction of office building Work 669 R4 B-Kal-3/2 forWater Users Association NO. 2 0.30 Shopping 0.15 0.15 0.30 Deokanhe , Tal Roha Construction of office building Work for 670 R4 B-Kal-3/3 Water Users Association NO. 3 Pingalsai , 0.30 Shopping 0.15 0.15 0.30 Tal Roha Construction of office building Work for 671 R4 B-Kal-3/4 Water Users Association NO. 4 ,Kansai , 0.30 Shopping 0.15 0.15 0.30 Tal Roha Construction of office building Work for 672 R4 B-Kal-3/5 Water Users Association NO. 5 Ambewadi, 0.30 Shopping 0.15 0.15 0.30 Tal Roha Construction of office building Work for 673 R4 B-Kal-3/6 Water Users Association NO. 6 Killa , Tal 0.30 Shopping 0.15 0.15 0.30 Roha Construction of office building Work for 674 R4 B-Kal-3/7 Water Users Association NO. 7 Talaghar, 0.30 Shopping 0.15 0.15 0.30 Tal Roha Construction of office building Work for 675 R4 B-Kal-3/8 Water Users Association NO. 8 Wadhavan, 0.30 Shopping 0.15 0.15 0.30 Tal Mangaon Construction of office building Work for 676 R4 B-Kal-3/9 Water Users Association NO. 9 Dakhane, 0.30 Shopping 0.15 0.15 0.30 Tal Mangaon Construction of office building Work for 677 R4 B-Kal-3/10 Water Users Association NO.10 Uttekhol, 0.30 Shopping 0.15 0.15 0.30 Tal Mangaon Construction of office building Work for 678 R4 B-Kal-3/11 Water Users Association NO.11 Dhalghar, 0.30 Shopping 0.15 0.15 0.30 Tal Mangaon Construction of office building Work for 679 R4 B-Kal-3/12 Water Users Association NO. 12 Wave Tal 0.30 Shopping 0.15 0.15 0.30 Mangaon Construction of office building Work for 680 R4 B-Kal-3/13 Water Users Association NO. 13 Unegaon, 0.30 Shopping 0.15 0.15 0.30 Tal Mangaon 2/24/2011 otpr_wuaBldg 145 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of office building Work for 681 R4 B-Kal-3/14 Water Users Association NO. 14 Repoli 0.30 Shopping 0.15 0.15 0.30 Tal Mangaon Construction of office building Work for 682 R4 B-Kal-3/15 Water Users Association NO. 15 0.30 Shopping 0.15 0.15 0.30 Goregaon, Tal Mangaon Construction of office building Work for 683 R4 B-Kal-3/16 Water Users Association NO. 16, Deoli, 0.30 Shopping 0.15 0.15 0.30 Tal Mangaon Construction of office building Work for 684 R4 B-Kal-3/17 Water Users Association NO. 17. Pahel, 0.30 Shopping 0.15 0.15 0.30 Tal Mangaon Construction of office building Work for 685 R4 B-Kal-3/18 Water Users Association NO.18, Indapur, 0.30 Shopping 0.15 0.15 0.30 Tal Mangaon Construction of office building Work for 686 R4 B-Kal-3/19 Water Users Association NO. 19, 0.30 Shopping 0.15 0.15 0.30 Koshimble, Tal Mangaon Construction of office building Work for 687 R4 B-Kal-3/20 Water Users Association NO.20, Sale, Tal 0.30 Shopping 0.15 0.15 0.30 Mangaon Construction of office building Work for 688 R4 B-Kal-3/21 Water Users Association NO. 21, Umroli, 0.30 Shopping 0.15 0.15 0.30 Tal Mangaon Construction of office building Work for 689 R4 B-Kal-3/22 Water Users Association NO. 22, Surav, 0.30 Shopping 0.15 0.15 0.30 Tal Mangaon Construction of office building Work for 690 R4 B-Kal-3/23 Water Users Association NO. 23, Morba, 0.30 Shopping 0.15 0.15 0.30 Tal Mangaon Construction of office building Work for 691 R4 B-Kal-3/24 Water Users Association NO.24, Dahivali, 0.30 Shopping 0.15 0.15 0.30 Tal Mangaon Construction of office building Work for Bhilwal B-BHI-2 W.U.A. on Bihilwale M.I.S Tal Khalapur , e Dist Raigad Construction of office building Work for 692 R4 B-BHI-2 W.U.A. on Bihilwale M.I.S Tal Khalapur , 0.30 Shopping 0.15 0.15 0.30 Dist Raigad 2/24/2011 otpr_wuaBldg 146 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of office building Work for Ausere B-AWA-2 W.U.A. on Ausere M.I.S Tal Karjat , Dist Raigad Construction of office building Work for 693 R4 B-AWA-2 W.U.A. on Ausere M.I.S Tal Karjat , Dist 0.30 Shopping 0.15 0.15 0.30 Raigad Construction of office building Work for Usran B-USR-2 W.U.A. on Usran M.I.S Tal -Panvel , Dist Raigad Construction of office building Work for 694 R4 B-USR-2 W.U.A. on Usran M.I.S Tal -Panvel , Dist 0.30 Shopping 0.15 0.15 0.30 Raigad Construction of office building Work for Warand B-WAR-2 W.U.A. on Warandh M.I.S Tal -Mahad , h Dist Raigad Construction of office building Work for 695 R4 B-WAR-2 W.U.A. on Warandh M.I.S Tal -Mahad , 0.30 Shopping 0.15 0.15 0.30 Dist Raigad Construction of office building Work for Unhere B-UNH-2 W.U.A. on Unhere M.I.S Tal Sudhagad , Dist Raigad Construction of office building Work for 696 R4 B-UNH-2 W.U.A. on Unhere M.I.S Tal Sudhagad , 0.30 Shopping 0.15 0.15 0.30 Dist Raigad Construction of office building Work for Kondga B-KDG-2 W.U.A. on Kondgaon M.I.S. Tal on Sudhagad , Dist Raigad Construction of office building Work for 697 R4 B-KDG-2 W.U.A. on Kondgaon M.I.S. Tal 0.30 Shopping 0.15 0.15 0.30 Sudhagad , Dist Raigad Construction of office building Work for Shrigao B-SHR-2 W.U.A. on Shrigaon M.I.S. Tal-Alibag , n Dist Raigad Construction of office building Work for 698 R4 B-SHR-2 W.U.A. on Shrigaon M.I.S. Tal-Alibag , 0.30 Shopping 0.15 0.15 0.30 Dist Raigad Construction of office building work for Devkop B-DVK-2 water user association om Devkope e M.I.Scheme Tal Palghar Dist.Thane 2/24/2011 otpr_wuaBldg 147 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of office building work for 699 R4 B-DVK-2 water user association om Devkope 0.30 shopping 0.06 0.24 0.30 M.I.Scheme Tal Palghar Dist.Thane Construction of office building work for Raitale B-RAI-2 water user association on RaitaleM.I.Scheme Tal Dahanu Dist.Thane Construction of office building work for 700 R4 B-RAI-2 water user association on 0.30 shopping 0.06 0.24 0.30 RaitaleM.I.Scheme Tal Dahanu Dist.Thane Construction of office building work for Dongast B-DGT-2 water user association on Dongaste e M.I.Scheme Tal.Wada Dist.Thane Construction of office building work for 701 R4 B-DGT-2 water user association on Dongaste 0.30 shopping 0.06 0.24 0.30 M.I.Scheme Tal.Wada Dist.Thane Construction of office building work for Velholi B-VLI-2 water user associati on on Velholi M.I.Scheme Tal Shahapur Dist.Thane Construction of office building work for 702 R4 B-VLI-2 water user associati on on Velholi 0.30 shopping 0.06 0.24 0.30 M.I.Scheme Tal Shahapur Dist.Thane Construction of office building work for Thakur B-THK-2 water user association on Thakurwadi wadi M.I.SchemeTal. Murbad Dist.Thane Construction of office building work for 703 R4 B-THK-2 water user association on Thakurwadi 0.30 shopping 0.06 0.24 0.30 M.I.SchemeTal. Murbad Dist.Thane Construction of office building work for Usagaon B-USG-2 water user association on Usgaon M.I.SchemeTal.BhiwandiDist.Thane Construction of office building work for 704 R4 B-USG-2 water user association on Usgaon 0.30 shopping 0.06 0.24 0.30 M.I.SchemeTal.BhiwandiDist.Thane Construction of office building work for Jambhur B-JBD-2 water user association on Jamubhurde de M.I.SchemeTal.MurbadDist.Thane 2/24/2011 otpr_wuaBldg 148 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of office building work for 705 R4 B-JBD-2 water user association on Jamubhurde 0.30 shopping 0.06 0.24 0.30 M.I.SchemeTal.MurbadDist.Thane Construction of office building work for Kharade B-KAD-2 water user association on Kharade M.I.SchemeTal.Shahapur Dist.Thane Construction of office building work for 706 R4 B-KAD-2 water user association on Kharade 0.30 shopping 0.06 0.24 0.30 M.I.SchemeTal.Shahapur Dist.Thane Sonkhs B-SON-2 Const. Of Office building for WUA 707 R4 B-SON-2 Const. Of Office building for WUA 0.45 Shopping 0.45 0.45 Shirputi B-SRP-2 Const. Of Office building for WUA 708 R4 B-SRP-2 Const. Of Office building for WUA 0.40 Shopping 0.40 0.40 Asola Const. Of Office building for WUA B-ASO-2 Ingole 709 R4 B-ASO-2 Const. Of Office building for WUA 0.40 Shopping 0.40 0.40 Singdoh B-SIN-2 Const. Of Office building for WUA 710 R4 B-SIN-2 Const. Of Office building for WUA 0.40 Shopping 0.40 0.40 Motsaw Const. Of Office building for WUA B-MOT-2 anga 711 R4 B-MOT-2 Const. Of Office building for WUA 0.40 Shopping 0.40 0.40 Koyali B-KOR-2 Const. Of Office building for WUA 712 R4 B-KOR-2 Const. Of Office building for WUA 0.45 Shopping 0.45 0.45 Hiwara Const. Of Office building for WUA B-HWR-2 Lahe 713 R4 B-HWR-2 Const. Of Office building for WUA 0.40 Shopping 0.40 0.40 Manar B-Man-4 Construction of WUA Buildings B-Man-4/1 Const. of office building for Gajanan WUA R4 Takali B-Man-4/1 Const. of office building for Gajanan WUA 0.480 714 A4 Shopping 0 0.00 0 0.00 0.49 0.00 0.49 Takali R4 B-Man-4/2 Jai kisan WUA Tembhurni 0.3 Shopping 715 0.3 0.3 R4 B-Man-4/3 Shri.Shivsamb WUA Palsgaon' 0.3 Shopping 716 0.3 0.3 R4 B-Man-4/4 Jay Shiv shnkar WUA Koutha 0.3 Shopping 717 0.3 0.3 R4 B-Man-4/5 Shri Sai WUA Degaon 0.3 Shopping 718 0.3 0.3 2/24/2011 otpr_wuaBldg 149 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 R4 B-Man-4/6 Jay Hanuman WUA Sujlegaon 0.3 Shopping 719 0.3 0.3 R4 B-Man-4/7 Baliraj WUA Khargaon 0.3 Shopping 720 0.3 0.3 R4 B-Man-4/8 Jay Ambika WUA Kuntur 0.3 Shopping 721 0.3 0.3 R4 B-Man-4/9 Shri Datta WUA Hottala 0.3 Shopping 722 0.3 0.3 R4 B-Man- Venkteshwar WUA Tembhurni 0.3 Shopping 723 0.3 0.3 4/10 R4 B-Man- Gnaneshwar WUA Chitmogra 0.3 Shopping 724 0.3 0.3 4/11 R4 B-Man- Sangameshwar WUA Khatgaon 0.3 Shopping 725 0.3 0.3 4/12 R4 B-Man- Jay Baliraj WUA Kothala 0.3 Shopping 726 0.3 0.3 4/13 R4 B-Man- Yogeshwar WUA Alandi 0.3 Shopping 727 0.3 0.3 4/14 R4 B-Man- Walmiki WUA Thadisawli 0.3 Shopping 728 0.3 0.3 4/15 R4 B-Man- Parbateshwar WUA Ekliml 0.3 Shopping 729 0.3 0.3 4/16 R4 B-Man- Jay Malinath WUA Bhopala 0.3 Shopping 730 0.3 0.3 4/17 R4 B-Man- Sant Shiromani WUA Jakapur 0.3 Shopping 731 0.3 0.3 4/18 R4 B-Man- Vithaleshwar WUA Degaon 0.3 Shopping 732 0.3 0.3 4/19 R4 B-Man- Jay Kedrnath WUA dampur 0.3 Shopping 733 0.3 0.3 4/20 R4 B-Man- Mahlsakant WUA Kuntur 0.3 Shopping 734 0.3 0.3 4/21 R4 B-Man- Rehabilitation works of WUA Gangagir 0.3 Shopping 735 0.3 0.3 4/22 WUA Koklegaon R4 B-Man- Kisn viks QUA tkli 0.3 Shopping 736 0.3 0.3 4/23 R4 B-Man- Shetkari Viks Nigaon 0.3 Shopping 737 0.3 0.3 4/24 R4 B-Man- Sant Tulsirm Kundheli 0.3 Shopping 738 0.3 0.3 4/25 2/24/2011 otpr_wuaBldg 150 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 R4 B-Man- Ganesh Pardwadi 0.3 Shopping 739 0.3 0.3 4/26 R4 B-Man- Remehwar Satgaon 0.3 Shopping 740 0.3 0.3 4/27 R4 B-Man- Gurudev WU Hussa 0.3 Shopping 741 0.3 0.3 4/28 R4 B-Man- Anusayamata Kumbhare WUA 0.3 Shopping 742 0.3 0.3 4/29 R4 B-Man- Sidheshwar WUA Raher 0.3 Shopping 743 0.3 0.3 4/30 R4 B-Man- Jai Mahkali WUA Kngthi 0.3 Shopping 744 0.3 0.3 4/31 R4 B-Man- Jai Hnumn Co.op. Shirur 0.3 Shopping 745 0.3 0.3 4/32 R4 B-Man- Rokdeshwr Co.op.Ratoli 0.3 Shopping 746 0.3 0.3 4/33 R4 B-Man- Nathoba Co.op.Ratoli 0.3 Shopping 747 0.3 0.3 4/34 R4 B-Man- Jai Shivaji Co.o.Mugaon 0.3 Shopping 748 0.3 0.3 4/35 R4 B-Man- Parbateshwar Co.op. Marwali 0.3 Shopping 749 0.3 0.3 4/36 R4 B-Man- Sai baba Co.op.Dhanora 0.3 Shopping 750 0.3 0.3 4/37 R4 B-Man- Jai Shivray Co.op.Nrsi 0.3 Shopping 751 0.3 0.3 4/38 R4 B-Man- Shiva Coop.Dhnora 0.3 Shopping 752 0.3 0.3 4/39 Akharga B-AKH-2 Shri Sambhaji WUA. Akharga M..I.Tank 753 R4 B-AKH-2 Shri Sambhaji WUA. Akharga M..I.Tank 0.3 Shopping 0.3 0.3 Nichpur B-NCH-2 Darbaji Darade WUA. Nichpur M..I.Tank 754 R4 B-NCH-2 Darbaji Darade WUA. Nichpur M..I.Tank 0.3 Shopping 0.3 0.3 Mulzara B-MUL 2 Savitribai Phuley WUA. Mulzara M..I.Tank R4 B-MUL 2 Savitribai Phuley WUA. Mulzara 0.3 Shopping 755 0.3 0.3 M..I.Tank Sugaon B-SUG-2 Parmeshwar WUA.Sugaon M..I.Tank 756 R4 B-SUG-2 Parmeshwar WUA.Sugaon M..I.Tank 0.3 Shopping 0.3 0.3 Karla B-KAR 2 Mohini Baba WUA. Karla M..I.Tank 757 R4 B-KAR 2 Mohini Baba WUA. Karla M..I.Tank 0.3 Shopping 0.3 0.3 2/24/2011 otpr_wuaBldg 151 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Kedarna B-KED-2 Shivkripa WUA. Kedarnath M..I.Tank th 758 R4 B-KED-2 Shivkripa WUA. Kedarnath M..I.Tank 0.3 Shopping 0.3 0.3 Pimprala B-PPL 2 Basweshwar WUA. Pimprala M..I.Tank 759 R4 B-PPL 2 Basweshwar WUA. Pimprala M..I.Tank 0.3 Shopping 0.3 0.3 Parola B-PRL-2 Shivshakti W.U.A. Ltd., Parola 760 R4 B-PRL-2 Shivshakti W.U.A. Ltd., Parola 0.3 Shopping 0.3 0.3 Walki B-WAL 2 Shri Krapa W.U.A. Ltd., Walki 761 R4 B-WAL 2 Shri Krapa W.U.A. Ltd., Walki 0.3 Shopping 0.3 0.3 Purjal B-PUR 2 Jaiprabhu w.U.A. Ltd.,Purjal 762 R4 B-PUR 2 Jaiprabhu w.U.A. Ltd.,Purjal 0.3 Shopping 0.3 0.3 Bothi B-BOT-2 Shri Gajanan Maharaj W.U.A. Ltd., Kandli. R4 B-BOT-2 Shri Gajanan Maharaj W.U.A. Ltd., 0.3 Shopping 763 0.3 0.3 Kandli. Kalamnuri B-KLM-2 Shri Sant Dudhari W.U.A.Ltd, Salegaon. 764 R4 B-KLM-2 Shri Sant Dudhari W.U.A.Ltd, Salegaon. 0.3 Shopping 0.3 0.3 Keli B-KEI-2 Jai Bajrangabli WUA, Keli 765 R4 B-KEI-2 Jai Bajrangabli WUA, Keli 0.3 Shopping 0.3 0.3 Ghordari B-GHO-2 Sadgir Baba WUA Ghordari. 766 R4 B-GHO-2 Sadgir Baba WUA Ghordari. 0.3 Shopping 0.3 0.3 Marsul B-MRL-2 Hiwreshwar W.U.A. Ltd., Hiwra (Bk) 767 R4 B-MRL-2 Hiwreshwar W.U.A. Ltd., Hiwra (Bk) 0.3 Shopping 0.3 0.3 Sawana B-SAN-2 Late Shivajirao Deshmukh WUA Sawana 768 R4 B-SAN-2 Late Shivajirao Deshmukh WUA Sawana 0.3 Shopping 0.3 0.3 Ghod B-Gd-4 Construction of WUA office Bulidings Construction of New office Bulidings @ A3 B-Gd-4/1 1.383 Shopping wua site no. 32 to 36 of GLBC Construction of New office Bulidings @ 769 R4 B-Gd-4/1 1.383 Shopping 0 1.38 0 1.38 wua site no. 32 to 36 of GLBC Construction of New office Bulidings @ A3 B-Gd-4/2 1.535 Shopping wua site no. 49 to 52 &55of GRBC Construction of New office Bulidings @ 770 R4 B-Gd-4/2 1.535 Shopping 0 1.54 0 1.54 wua site no. 49 to 52 &55of GRBC Construction of New office Bulidings @ A3 B-Gd-4/3 1.395 Shopping wua site no. 1,2,4, to 6 of GLBC Construction of New office Bulidings @ 771 R4 B-Gd-4/3 1.395 Shopping 0 1.40 0 1.40 wua site no. 1,2,4, to 6 of GLBC 2/24/2011 otpr_wuaBldg 152 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Construction of New office Bulidings @ 772 R4 B-Gd-4/4 1.084 Shopping 0 1.08 0 1.08 wua site no.9,10,11 & 12 of GLBC Construction of New office Bulidings @ 773 R4 B-Gd-4/5 1.125 Shopping 0 1.13 0 1.13 wua site no.24,25,27,28 of GLBC Construction of New office Bulidings @ 774 R4 B-Gd-4/6 1.515 Shopping 0 1.52 0 1.52 wua site no. 43 to 47 of GRBC Construction of New office Bulidings @ 775 R4 B-Gd-4/7 1.153 Shopping 0 1.15 0 1.15 wua site no. 26,29,30 & 31 of GLBC Construction of New office Bulidings @ 776 R4 B-Gd-4/8 1.713 Shopping 0 1.71 0 1.71 wua site no. 3,7,8,16,17 & 18 of GLBC Construction of New office Bulidings @ 777 R4 B-Gd-4/9 1.152 Shopping 0 1.15 0 1.15 wua site no. 13 to 15 &21 of GLBC Construction of New office Bulidings @ 778 R4 B-Gd-4/10 1.218 Shopping 0 1.22 0 1.22 wua site no. 39 to 42 of GRBC Construction of New office Bulidings @ 779 R4 B-Gd-4/11 1.49 Shopping 0 1.49 0 1.49 wua site no. 37,38,48,53 & 54 of GRBC Construction of New office Bulidings @ 780 R4 B-Gd-4/12 1.154 Shopping 0 1.15 0 1.15 wua site no. 19,20,22 & 23 of GLBC Hatnur Constructing Office Building for W.U.A B-Hat-4_5 Repairs to Building of Anjale WUA Anjale B-Hat- Tal. Yawal Dist. Jalgaon. Repairs to 781 R4 0.4 Shopping 0.40 0.40 4_5/1 Building of Borawal Takarkheda WUA Borawal Tal. Yawal Dist. Jalgaon. B-Hat- Repairs to Building of Piloda WUA Piloda 782 R4 0.4 Shopping 0.40 0.40 4 5/2 Tal. Chopda Dist. Jalgaon. Repairs to Building of Pungaon Minor No. B-Hat- 783 R4 1 WUA Kolnhavi Tal. Yawal Dist. 0.4 Shopping 0.40 0.40 4_5/3 Jalgaon. Repairs to Building of Pungaon Minor No. B-Hat- 784 R4 2 WUA Kolnhavi Tal. Yawal Dist. 0.4 Shopping 0.40 0.40 4_5/4 Jalgaon. B-Hat- Repairs to Building of Mitawali WUA 785 R4 0.4 Shopping 0.40 0.40 4 5/5 Mitawali Tal. Chopda Dist. Jalgaon. Repairs to Building of Kalbhairav WUA B-Hat- 786 R4 Kamalgaon Chandsani Tal. Chopda Dist. 0.4 Shopping 0.40 0.40 4_5/6 Jalgaon. Repairs to Building of Rukhankheda WUA B-Hat- 787 R4 Rukhankheda Tal. Chopda Dist. Jalgaon. 0.4 Shopping 0.40 0.40 4_5/7 2/24/2011 otpr_wuaBldg 153 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 B-Hat- Repairs to Building of Pragati WUA 788 R4 0.4 Shopping 0.40 0.40 4 5/8 Hated Bk. Tal. Chopda Dist. Jalgaon. B-Hat- Repairs to Building of Gaurav WUA 789 R4 0.4 Shopping 0.40 0.40 4 5/9 Hated Bk. Tal. Chopda Dist. Jalgaon. Repairs to Building of Manwel W U Asso. Manwel for Manwel Minor of B-Hat- 790 R4 Piloda dy of HRBC Tal Yawal Dist 0.4 Shopping 0.40 0.40 4_5/10 Jalgaon Repairs to Building of Sant Tukadoji B-Hat- Water User Association, Sampule for 791 R4 0.4 Shopping 0.40 0.40 4_5/11 Kurwel Dy, Minor 3 of HRBC Tal. Chopda Dist. Jalgaon Repairs to Building of Sainath WUA B-Hat- 792 R4 Manjarehole for vele Dy. 2 & It's minor of 0.4 Shopping 0.40 0.40 4_5/12 H.R.B.C. Tal. Chopda Dist. Jalgaon. Repairs to Building of Sanjivani WUA B-Hat- Pungaon,for sub-minor 1 & 2 of Pungaon 793 R4 0.4 Shopping 0.40 0.40 4_5/13 minor 1 of H.R.B.C. Tal. Yawal Dist. Jalgaon. Repairs to Building of Shirsad Water User B-Hat- Association, Shirsad for Shirsad and Dev 794 R4 0.4 Shopping 0.40 0.40 4_5/14 Minor of HRBC Tal. Yawal Dist. Jalgaon Repairs to Building of Kalbhairav Water User Association, Mangrul for Mangrul B-Hat- 795 R4 Dy. Ch. 3500 m. to 4300 m. and its minor 0.4 Shopping 0.40 0.40 4_5/15 of HRBC Tal. Chopda Dist. Jalgaon Repairs to Building of Sati Kamalaja Devi B-Hat- Water User Association, Chahardi for Sub 796 R4 0.4 Shopping 0.40 0.40 4_5/16 Minor 1 of Chahardi Dy. of HRBC Tal. Chopda Dist. Jalgaon Repairs to Building of Borawal Sangavi B-Hat- Water User Association, Borawal for 797 R4 0.4 Shopping 0.40 0.40 4_5/17 Sangavi & Borawal Minor of HRBC Tal. Yawal Dist. Jalgaon 2/24/2011 otpr_wuaBldg 154 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Repairs to Building of Manudevi Water User Association, Adawad of Vathar Dy B-Hat- Ch. 2100 m. to 3600 m. & its Sub Minor 798 R4 0.4 Shopping 0.40 0.40 4_5/18 and Gawali Dy and its Sub Minor of Hatnur Right Bank Canal Tal. Chopda Dist. Jalgaon Repairs to Building of Tapi Water User Association, Vadgaon of Adawad Dy Ch. B-Hat- 2700 m. to 5700 m. and its Vadgaon Sub 799 R4 0.4 Shopping 0.40 0.40 4_5/19 Minor of Adawad Dy. of Hatnur Right Bank Canal Tal. Chopda Dist. Jalgaon Repairs to Building of ShriDatta WUA B-Hat- 800 R4 Tawase Br. For minor No.6 of Kurvel 0.4 Shopping 0.40 0.40 4_5/20 Dy.of HRBC Tal.- Chopda Dist. Jalgaon. Repairs to Building of Swami Shitalnath Water User Association, Nimgavan for B-Hat- 801 R4 Minor No. 7 of Kurvel Dy. of Hatnur Right 0.4 Shopping 0.40 0.40 4_5/21 Bank Canal Tal. Chopda Dist. Jalgaon Repairs to Building of Jai Hind Water User Association, Chahardi for Sub Minor No. 6 B-Hat- 802 R4 of Chahardi Dy. of Hatnur Right Bank 0.4 Shopping 0.40 0.40 4_5/22 Canal Tal. Chopda Dist. Jalgaon Repairs to Building of Satpuda Water User B-Hat- Association, Dambhurni for Sub Minor 1 803 R4 0.4 Shopping 0.40 0.40 4_5/23 & 2 of Pungaon Minor No.1 of HRBC Tal. Yawal Dist. Jalgaon Repairs to Building of Jai Durga Mata Water User Association, Adawad for B-Hat- Adawad Dy Ch. 2000 m. to 2700 m. and 804 R4 0.4 Shopping 0.40 0.40 4_5/24 its Loni MInor & Sub Minor 1,2,3 of Adawad Dy of HRBC Tal. Chopda Dist. Jalgaon Repairs to Building of Jogeshwar Water User Association, Adawad for Sub Minor B-Hat- 805 R4 and its Sub Minor 1 & 2 of Adawad Dy. of 0.4 Shopping 0.40 0.40 4_5/25 HRBC Tal. Chopda Dist. Jalgaon 2/24/2011 otpr_wuaBldg 155 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Repairs to Building of Maharana Pratap B-Hat- Water User Association, Deogaon for 806 R4 0.4 Shopping 0.40 0.40 4_5/26 Deogaon Minor with Sub Minor of HRBC Tal. Chopda Dist. Jalgaon Repairs to Building of Ekvira WUA B-Hat- Khadgaon-Gorgawale for minor no.1&2 of 807 R4 0.4 Shopping 0.40 0.40 4_5/27 Kurvel Dy. Of HRBC Tal.- Chopda Dist. Jalgaon. Repairs to Building of Nagnath Water User Association, Kurvel for Minor 5 and direct B-Hat- 808 R4 Outlets OL 19 to 24 & OR 24 to 28 of 0.4 Shopping 0.40 0.40 4_5/28 Kurvel Dy. of HRBC Tal. Chopda Dist. Jalgaon Repairs to Building of Manudevi Water B-Hat- User Association, Chahardi for Sub Minor 809 R4 0.4 Shopping 0.40 0.40 4_5/29 No. 2 of Chahardi Dy. of HRBC Tal. Chopda Dist. Jalgaon Repairs to Building of Swami Vivekanand Water User Association Mangrul for Sub B-Hat- 810 R4 Minor 1 & Sub Minor A & B of Gorgavale 0.4 Shopping 0.40 0.40 4_5/30 A Dy. of HRBC Tal. Chopda Dist. Jalgaon Repairs to Building of Jay Bajrang Water User Association Tandulwadi for direct B-Hat- 811 R4 outlet OL 38 to 55 & OR 45 to 57 of 0.4 Shopping 0.40 0.40 4_5/31 Kurvel Dy. of HRBC Tal. Chopda Dist. Jalgaon Repairs to Building of Tapi Mai Water B-Hat- User Association Chahardi for sub Minor 812 R4 0.4 Shopping 0.40 0.40 4_5/32 No. 7 & 8 of Chahardi Dy. of HRBC Tal. Chopda Dist. Jalgaon Repairs to Building of Raj Mata Ahilyadevi Water User Association B-Hat- 813 R4 Chahardi for Sub Minor 1,2,3 of Dhupe Dy 0.4 Shopping 0.40 0.40 4_5/33 No. 1 of HRBC Tal. Chopda Dist. Jalgaon Repairs to Building of Shri Ram Water B-Hat- User Association Tavase Bk. for Sub 814 R4 0.4 Shopping 0.40 0.40 4_5/34 Minor 1 to 5 of Vele Dy.-1 of HRBC Tal. Chopda Dist. Jalgaon 2/24/2011 otpr_wuaBldg 156 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Repairs to Building of Rameshwar W U B-Hat- Asso Dhanwadi for sub Minor no 4 of 815 R4 0.4 Shopping 0.40 0.40 4_5/35 Kurvel dy of HRBC Tal Chopada dist Jalgaon Repairs to Building of Nimgaon Rajora W B-Hat- U Asso Rajora for Nimgaon Minor 816 R4 0.4 Shopping 0.40 0.40 4_5/36 Rajora Minor of Anjale dy of HRBC Tal Yawal dist Jalgaon Repairs to Building of Panchak Water User B-Hat- Association Panchak for Panchak Minor 817 R4 0.4 Shopping 0.40 0.40 4_5/37 with Sub Minor of HRBC Tal. Chopda Dist. Jalgaon Repairs to Building of Ramnath Baba B-Hat- Water User Association Khedi Bhokari for 818 R4 0.4 Shopping 0.40 0.40 4_5/38 Sub Minor No. 2 of Gorgavale A Dy. of HRBC Tal. Chopda Dist. Jalgaon Repairs to Building of Khanderao Water User Association Gorgavale Kh. for B-Hat- 819 R4 Gorgavale A Dy. Ch. 4500 to 5900 Mtr. 0.4 Shopping 0.40 0.40 4_5/39 and Sub Minor No. 3 of Gorgavale A Dy. of HRBC Tal. Chopda Dist. Jalgaon Repairs to Building of Shri Datta Water B-Hat- User Association Chahardi for Sub Minor 820 R4 0.4 Shopping 0.40 0.40 4_5/40 No. 4, 5 of Dhupe Dy. No. 1 of HRBC Tal. Chopda Dist. Jalgaon Repairs to Building of Jagruti Water User B-Hat- Association Hated Kh. for Sub Minor 1 821 R4 0.4 Shopping 0.40 0.40 4_5/41 and 1 A of Dhupe Dy No. 2 of HRBC Tal. Chopda Dist. Jalgaon Repairs to Building of Chatrapati Water User Association Mangrul for Mangrul Dy B-Hat- 822 R4 No. 2, Ch. 1200 to 2400 and Sub Minor of 0.4 Shopping 0.40 0.40 4_5/42 Mangrul Dy No. 2 of HRBC Tal. Chopda Dist. Jalgaon Repairs to Building of Vitthal Rukhamai B-Hat- WUA Dhanwadi for Sub-minor no.1 to 7 823 R4 0.4 Shopping 0.40 0.40 4_5/43 of Dhanwadi Dy. Of HRBC Tal.- Chopda Dist. Jalgaon. 2/24/2011 otpr_wuaBldg 157 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Repairs to Building of Kal Bhairav Water User Association Kolamba for Direct outlet B-Hat- 824 R4 OL 10 to 18 and OR 14 to 23 of Kurvel 0.4 Shopping 0.40 0.40 4_5/44 Dy. of HRBC Tal. Chopda Dist. Jalgaon Repairs to Building of Tulaja Bhawani B-Hat- Water User Association Gorgavale for 825 R4 0.4 Shopping 0.40 0.40 4_5/45 Direct outlet OL 1 to 9 & OR 1 to 13 of HRBC Tal. Chopda Dist. Jalgaon Repairs to Building of Jai Shivrai Water User Association Chahardi for Sub Minor B-Hat- 826 R4 No. 1, 2 of Akulkheda Dy and Akulkheda 0.4 Shopping 0.40 0.40 4_5/46 Dy of HRBC Tal. Chopda Dist. Jalgaon Repairs to Building of Sant Dnyaneshwar B-Hat- Water User Association Chahardi for 827 R4 0.4 Shopping 0.40 0.40 4_5/47 Akulkheda Dy No. 2 with its Sub Minors of HRBC Tal. Chopda Dist. Jalgaon Repairs to Building of Swami Samarth Water User Association Khachane for B-Hat- 828 R4 Direct Outlet OL 25 to 37 and OR 29 to 0.4 Shopping 0.40 0.40 4_5/48 44 of Kurvel Dy of HRBC Tal. Chopda Dist. Jalgaon Repairs to Building of Pargaon Water User B-Hat- Association Pargaon for Pargaon Minor 829 R4 0.4 Shopping 0.40 0.40 4_5/49 with Sub Minor of HRBC Tal. Chopda Dist. Jalgaon Repairs to Building of Yawal WUA Yawal B-Hat- for sur-minor 1, 2 & Tembhi Minor of 830 R4 0.4 Shopping 0.40 0.40 4_5/50 H.R.B.C. Tal. Yawal Dist. Jalgaon. Repairs to Building of Dagadi Water User B-Hat- 831 R4 Association Dagadi for Dagadi Minor of 0.4 Shopping 0.40 0.40 4_5/51 HRBC Tal. Yawal Dist. Jalgaon Repairs to Building of Dambhurni Water B-Hat- User Association Dambhurni for 832 R4 0.4 Shopping 0.40 0.40 4_5/52 Dambhurni Minor 1, 2 & 3 of HRBC Tal. Yawal Dist. Jalgaon 2/24/2011 otpr_wuaBldg 158 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Repairs to Building of Jai Maharashtra Water User Association Mangrul for B-Hat- 833 R4 Gorgavale B Dy. and Sub Minor of 0.4 Shopping 0.40 0.40 4_5/53 Gorgavale B Dy. of HRBC Tal. Chopda Dist. Jalgaon Repairs to Building of Shrushti Water User B-Hat- Association Hated for Sub Minor 2 & 3 of 834 R4 0.4 Shopping 0.40 0.40 4_5/54 Dhupe Dy. No. 2 of HRBC Tal. Chopda Dist. Jalgaon Repairs to Building of Jaishree Dadaji B-Hat- Water User Association Nimgavhan for 835 R4 0.4 Shopping 0.40 0.40 4_5/55 Minor No. 8 & 9 of Kurvel Dy. of HRBC Tal. Chopda Dist. Jalgaon Repairs to Building of Jai Bhawani Water B-Hat- User Association Chahardi for Sub Minor 836 R4 0.4 Shopping 0.40 0.40 4_5/56 3,4 & 5 of Chahardi Dy of HRBC Tal. Chopda Dist. Jalgaon Panzar Construction of Office Building for WUA a B-Pan-3 Construction of Building for Ch Karmvir 837 R4 B-Pan-3/1 0.4 Shopping 0.40 0.40 Tanaji Chiman Patil WUA Digave Construction of Building for Ch Dhandai 838 R4 B-Pan-3/2 0.4 Shopping 0.40 0.40 Mata WUAKasare Construction of Building for Ch Punai 839 R4 B-Pan-3/3 0.4 Shopping 0.40 0.40 WUA Kagare Construction of Building for Ch 840 R4 B-Pan-3/4 0.4 Shopping 0.40 0.40 Dhanlakshmi WUA Chhail Construction of Building for Ch Kanaiylal 841 R4 B-Pan-3/5 0.4 Shopping 0.40 0.40 Chhatrapati WUA Chhail Construction of Building for Ch Rajeshri 842 R4 B-Pan-3/6 0.4 Shopping 0.40 0.40 Chhatrapati WUA Kasare Construction of Building for Ch Pragati 843 R4 B-Pan-3/7 0.4 Shopping 0.40 0.40 WUA Digave Construction of Building for Ch Khaleswar 844 R4 B-Pan-3/8 0.4 Shopping 0.40 0.40 WUA Pimpalner Construction of Building for Ch Sant 845 R4 B-Pan-3/9 0.4 Shopping 0.40 0.40 Tukaram WUA Umbhare B-Pan- Construction of Building for Ch Dhangai 846 R4 0.4 Shopping 0.40 0.40 3/10 WUA Chikase 2/24/2011 otpr_wuaBldg 159 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 B-Pan- Construction of Building for Ch Sai Baba 847 R4 0.4 Shopping 0.40 0.40 3/11 WUA Samoda B-Pan- Construction of Building for Ch Ekvira 848 R4 0.4 Shopping 0.40 0.40 3/12 Mata WUAPimpaner B-Pan- Construction of Building for Ch Karmvir 849 R4 0.4 Shopping 0.40 0.40 3/13 Tanaji Chiman Patil WUA Degaon B-Pan- Construction of Building for Ch Kanumata 850 R4 0.4 Shopping 0.40 0.40 3/14 WUA Malanjan B-Pan- Construction of Building for Ch 851 R4 0.4 Shopping 0.40 0.40 3/15 Ghangeswar WUA Degaon Repairs to Building of Ramdevji Baba WUA Shevaga On Left Bank Canal for Shevaga B-SWG-2 Shevaga M.I.Tank @ Shevaga Tal.- Jamner Dist. Jalgaon. Repairs to Building of Ramdevji Baba WUA Shevaga On Left Bank Canal for 852 R4 B-SWG-2 0.4 Shopping 0.40 0.40 Shevaga M.I.Tank @ Shevaga Tal.- Jamner Dist. Jalgaon. Repairs to Building of Harivitthal WUA Galan Of Right Bank Canal for Galan Galan B-GLN-2 M.I.Tank. @ Galan Tal. Pachora Dist. Jalgaon. Repairs to Building of Harivitthal WUA Galan Of Right Bank Canal for Galan 853 R4 B-GLN-2 0.4 Shopping 0.40 0.40 M.I.Tank. @ Galan Tal. Pachora Dist. Jalgaon. Repairs to Building of Sant Gajanan WUA Shevaga On Right Bank Canal for Shevaga Shevaga B-SWG-2 M.I.Tank @ Shevaga Tal.- Jamner Dist. Jalgaon. Repairs to Building of Sant Gajanan WUA Shevaga On Right Bank Canal for Shevaga 854 R4 B-SWG-2 0.4 Shopping 0.40 0.40 M.I.Tank @ Shevaga Tal.- Jamner Dist. Jalgaon. Repairs to Building of NavliMata WUA Badarkh Badarkha On Right Bank Canal for B-BDR-2 a Badarkha M.I.Tank @ Badarkha Tal.- Pachora Dist. Jalgaon. 2/24/2011 otpr_wuaBldg 160 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Repairs to Building of NavliMata WUA Badarkha On Right Bank Canal for 855 R4 B-BDR-2 0.4 Shopping 0.40 0.40 Badarkha M.I.Tank @ Badarkha Tal.- Pachora Dist. Jalgaon. Repairs to Building of Jiwan Dhara Water User Association Velhale for Right Bank Velhale B-VEL-2 Canal of Velhale M.I.Tank Tal. Bhusawal Dist. Jalgaon Repairs to Building of Jiwan Dhara Water User Association Velhale for Right Bank 856 R4 B-VEL-2 0.4 Shopping 0.40 0.40 Canal of Velhale M.I.Tank Tal. Bhusawal Dist. Jalgaon Kankraj B-KNK-2 Construction of Building WUA 857 R4 B-KNK-2 Construction of Building WUA 0.4 Shopping 0.40 0.40 Hatgaon- Construction of Building WUA B-HGN-2 1 858 R4 B-HGN-2 Construction of Building WUA 0.4 Shopping 0.40 0.40 Construction of Building for Ch Jagdamba Nimgul B-NIM-2 WUA Nimgul Construction of Building for Ch Jagdamba 859 R4 B-NIM-2 0.4 Shopping 0.40 0.40 WUA Nimgul Chaugao Construction of Building for Ch Chaugaon n B-CHG-2 WUA Chaugaon Construction of Building for Ch Chaugaon 860 R4 B-CHG-2 0.4 Shopping 0.40 0.40 WUA Chaugaon Khekda Construction of Building for Ch Gaymukh B-KKD-2 WUA Chaugaon Khekada Construction of Building for Ch Gaymukh 861 R4 B-KKD-2 0.4 Shopping 0.40 0.40 WUA Chaugaon Khekada Ambeba Construction of Building for Ch Jayshiv ra B-ABB-2 Shankar WUA Aste Construction of Building for Ch Jayshiv 862 R4 B-ABB-2 0.4 Shopping 0.40 0.40 Shankar WUA Aste Khadku Construction of Building for Ch Jay na B-KDK-2 Yogeswar WUA Khadakuna Construction of Building for Ch Jay 863 R4 B-KDK-2 0.4 Shopping 0.40 0.40 Yogeswar WUA Khadakuna 2/24/2011 otpr_wuaBldg 161 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Sr. No Name Package Description of Works/goods Estimat Method PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total of Nos. ed cost of Compo (Rs. in Procurem nent Million) ent ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Dhudha Construction of Building for Ch Jeevan B-DHK-2 kheda Ganga WUA Asalod Construction of Building for Ch Jeevan 864 R4 B-DHK-2 0.4 Shopping 0.40 0.40 Ganga WUA Asalod Khaperk Construction of Building for Ch Run B-KPK-2 heda Mocheswar WUA Jaynagar Construction of Building for Ch Run 865 R4 B-KPK-2 0.4 Shopping 0.40 0.40 Mocheswar WUA Jaynagar Kondav Construction of Building for Ch Shiv al B-KOD-2 Krupa WUA Jaynagar Construction of Building for Ch Shiv 866 R4 B-KOD-2 0.4 Shopping 0.40 0.40 Krupa WUA Jaynagar Construction of Building for Ch Budaki Budki B-BDK-2 WUA Boradi Construction of Building for Ch Budaki 867 R4 B-BDK-2 0.4 Shopping 0.40 0.40 WUA Boradi Construction of Building for Ch Meetgaon Mitgaon B-MIT-2 WUA Meetgaon Construction of Building for Ch Meetgaon 868 R4 B-MIT-2 0.4 Shopping 0.40 0.40 WUA Meetgaon Construction of Building for Ch Jaybhole Kothare KTH-2 WUA Amarale Construction of Building for Ch Jaybhole 869 R4 B-BDK-2 0.4 Shopping 0.40 0.40 WUA Amarale Total Revised 4 258 0 0 0 0.71 3.09 184.45 71.07 259.32 Note: There is change in the earlier reported expenditure figures.Figures reported in R4 revisio per field record as against the probable expenditure reported earlier. 2/24/2011 otpr_wuaBldg 162 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Procurement Plan for Consultancies (Excluding Agricultur Financial Implementation Schedule for Consultancy. Revision No4 (Rs in Millions) Method of Comp Estmated Package Sr. no Description of consultancy Procureme PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total onent Cost no nt 1 2 3 4 5 6 7 8 9 10 11 12 13 14 I Establishment and Operationalisation of MWRRA I Tariff study 2.5 RA-1 QCBS 1.00 1.50 2.50 R Tariff study 2.5 RA-1 QCBS 1.00 1.50 2.50 R2 Tariff study 2.5 RA-1 QCBS 1.00 1.50 2.50 Deleted Deleted ii Ground Water Study 2.5 RA-2 QCBS 1.50 1.00 2.50 R Ground Water Study 2.5 RA-2 QCBS 1.50 1.00 2.50 R2 Ground Water Study 2.5 RA-2 QCBS 1.50 1.00 2.50 Deleted Deleted iii Water Quality Study 2 RA-3 QCBS 0.50 1.50 2.00 R Water Quality Study 2 RA-3 QCBS 0.50 1.50 2.00 R2 Water Quality Study 2 RA-3 QCBS 0.50 1.50 2.00 Deleted Deleted iv Individual Consultants 2.50 RA-4 T 1.00 0.50 0.50 0.50 2.50 R Individual Consultants 1.50 RA-4 T 0.50 0.50 0.50 1.50 R2 Individual Consultants 0.90 RA-4 T 0.30 0.30 0.30 0.90 R2 Devlopement of website for MWRRA 0.30 RA-4/1 CQS 0.30 0.30 A2 Devlopement of website for MWRRA 0.725 RA-4/1 CQS 0.30 0.25 0.25 0.81 R2 Tally package customisation to suit 0.30 RA-4/2 SSS reporting to WB 0.30 0.30 A2 Tally package customisation to suit 0.276 RA-4/2 SSS 0.04 0.189 0.065 0.004 0.29 reporting to WB R3 Legal Consultants 0.30 RA-4/3 CQS 0.15 0.15 0.30 A3 Legal Assistance to MWRRA 0.979 RA-4/3 CQS R4 Legal Assistance to MWRRA 0.800 RA-4/3 SSS 0.800 0.800 R4 Extension of contructual appointment 0.400 RA-4/4 SSS 0.400 0.400 v Consultant for refurbishment of rom provision under S.N. 4 above authority's office 0.00 R Consultant for refurbishment of 1.00 RA-5 authority's office 1.00 1.00 A Consultant for refurbishment of 1.00 RA-5 1.000 authority's office 1.00 2/24/2011 r4ver1.xlsxCONR2PLAN 14 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Procurement Plan for Consultancies (Excluding Agricultur Financial Implementation Schedule for Consultancy. Revision No4 (Rs in Millions) Method of Comp Estmated Package Sr. no Description of consultancy Procureme PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total onent Cost no nt 1 2 3 4 5 6 7 8 9 10 11 12 13 14 II Restructuring of IDC i Consultancy for studies 2.00 IDC-1 QCBS 2.00 2.00 R Consultancy for studies 2.00 IDC-1 QCBS 2.00 2.00 R2 Consultancy for studies 2.00 IDC-1 QCBS 2.00 2.00 R3 Consultancy for studies 2.00 IDC-1 QCBS 2.00 2.00 R4 Consultancy for studies 2.00 IDC-1 QCBS 2.00 2.00 ii Change management 2.70 IDC-2 QCBS 1.00 1.70 2.70 R Change management 2.70 IDC-2 QCBS 2.70 2.70 R2 Change management 2.70 IDC-2 QCBS 2.70 2.70 R3 Change management 2.70 IDC-2 QCBS 2.70 2.70 R4 Change management 2.70 IDC-2 QCBS 2.70 2.70 III Restructuring of WRD i Training by NCCB,Ballabhgarh 15.00 ID-1 SSS 7.50 7.50 15.00 R Training by NCCB,Ballabhgarh 15.00 ID-1 SSS 7.50 7.50 15.00 A Training by NCCB,Ballabhgarh 4.00 ID-1 SSS 1.69 1.71 0.156 3.556 R4 Training for EE & Above 5.00 ID-1/1 SSS 5.00 5.000 ii Training by National Institute of Remote 0.50 ID-2 SSS Sensing, Deharadoon 0.50 0.50 R Training by National Institute of Remote 0.50 ID-2 SSS Sensing, Deharadoon 0.50 0.50 R2 Training by National Institute of Remote 0.50 ID-2 SSS Sensing, Deharadoon 0.50 0.50 R3 Training by National Institute of Remote 0.50 ID-2 SSS Sensing, Deharadoon 0.50 0.50 R4 Training by National Institute of Remote ID-2 SSS Sensing, Deharadoon 0.50 0.50 0.50 iii I.D.Restructuring 10.00 ID-3 QCBS 5.00 5.00 10.00 R I.D.Restructuring 10.00 ID-3 QCBS 5.00 5.00 10.00 R2 I.D.Restructuring 2.00 ID-3 SSS 2.00 2.00 Deleted Deleted V Integrated Computerised Information Systems 2/24/2011 r4ver1.xlsxCONR2PLAN 15 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Procurement Plan for Consultancies (Excluding Agricultur Financial Implementation Schedule for Consultancy. Revision No4 (Rs in Millions) Method of Comp Estmated Package Sr. no Description of consultancy Procureme PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total onent Cost no nt 1 2 3 4 5 6 7 8 9 10 11 12 13 14 i Enterprise MIS Consultancy, 25.00 MIS-1 QCBS Implementation Support and Project Management 5.00 10.00 10.00 25.00 R Enterprise MIS Consultancy, 123.23 MIS-1 QCBS Implementation Support and Project Management including Legacy Data Computerization: Business Functions & special purpose SW Development/Procurement & other Proprietary Software 24.65 49.29 49.29 123.23 R2 Enterprise MIS Consultancy, 123.23 MIS-1 QCBS Implementation Support and Project Management including Legacy Data Computerization: Business Functions & special purpose SW Development/Procurement & other Proprietary Software 24.65 49.29 49.29 123.23 The provision is shifted to G & Equipment category ii Project management consultancy for MIS-8 QCBS ICIS implementation R Project management consultancy for 11.40 MIS-8 QCBS ICIS implementation 3.42 2.28 2.28 2.28 1.14 11.40 A Project management consultancy for MIS-8 QCBS 13.76 ICIS implementation 2.73 2.70 8.33 13.76 Newly Included iii Consultancy for MIS of MWSIP R3 Consultancy for MIS of MWSIP 10.00 CON-3 As & when re 10.00 10.00 R4 Consultancy for MIS of MWSIP 10.00 CON-3 As & when re 10.00 10.00 VI & VII Rehabilitation and modernization & Dam Safety I Quality control & Quality assurance Audit 17.00 PR-1 QCBS for Nagpur & Amravati Region 0.50 3.90 5.00 4.39 2.48 0.73 17.00 R Quality control & Quality assurance Audit 17.00 PR-1 QCBS for Nagpur & Amravati Region 4.25 4.25 4.25 4.25 17.00 2/24/2011 r4ver1.xlsxCONR2PLAN 16 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Procurement Plan for Consultancies (Excluding Agricultur Financial Implementation Schedule for Consultancy. Revision No4 (Rs in Millions) Method of Comp Estmated Package Sr. no Description of consultancy Procureme PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total onent Cost no nt 1 2 3 4 5 6 7 8 9 10 11 12 13 14 R2 Quality control & Quality assurance Audit 17.00 PR-1 QCBS for Nagpur & Amravati Region 5.67 5.67 5.67 17.00 ii Quality control & Quality assurance Audit 16.00 PR-2 QCBS for A'bad and Nashik Region 0.45 3.57 4.80 4.13 2.43 0.62 16.00 R Quality control & Quality assurance Audit 16.00 PR-2 QCBS for A'bad and Nashik Region 4.00 4.00 4.00 4.00 16.00 R2 Quality control & Quality assurance Audit 16.00 PR-3 QCBS for A'bad and Nashik Region 5.33 5.33 5.33 16.00 iii Quality control & Quality assurance Audit 17.00 PR-3 QCBS for Pune and Konkan Region 0.50 3.90 5.00 4.39 2.48 0.73 17.00 R Quality control & Quality assurance Audit 17.00 PR-3 QCBS for Pune and Konkan Region 4.25 4.25 4.25 4.25 17.00 R2 Quality control & Quality assurance Audit 17.00 PR-3 QCBS for Pune and Konkan Region 5.67 5.67 5.67 17.00 A2 Consultancy services for third party 34.35 PR-1,2,3/1 FBS quality audit & quality monitoring of civil 4.07 1.63 10.50 8.00 24.20 works -- QCC A;bad. A2 Consultancy services for third party 17.93 PR-1,2,3/2 FBS quality audit & quality monitoring of civil works -- QCC Pune. 5.98 5.98 5.98 17.93 R4 Consultancy services for third party PR-1,2,3/2 FBS quality audit & quality monitoring of civil 38.82 10.00 28.82 38.82 works -- QCC Pune. iv Field Testing Quality control using mobile 15.00 PR-4 QCBS labs under SE(QC), Pune 0.53 3.35 4.40 3.87 2.28 0.57 15.00 R Field Testing Quality control using mobile 15.00 PR-4 QCBS labs under SE(QC), Pune 3.75 3.75 3.75 3.75 15.00 R2 Field Testing Quality control using mobile 15.00 PR-4 QCBS labs under SE(QC), Pune 5.00 5.00 5.00 15.00 v Field Testing Quality control using mobile 15.00 PR-5 QCBS labs under SE(QC), A'bad 0.53 3.35 4.40 3.87 2.28 0.57 15.00 R Field Testing Quality control using mobile 15.00 PR-5 QCBS labs under SE(QC), A'bad 3.75 3.75 3.75 3.75 15.00 2/24/2011 r4ver1.xlsxCONR2PLAN 17 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Procurement Plan for Consultancies (Excluding Agricultur Financial Implementation Schedule for Consultancy. Revision No4 (Rs in Millions) Method of Comp Estmated Package Sr. no Description of consultancy Procureme PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total onent Cost no nt 1 2 3 4 5 6 7 8 9 10 11 12 13 14 R2 Field Testing Quality control using mobile 15.00 PR-5 QCBS labs under SE(QC), A'bad 5.00 5.00 5.00 15.00 The provision is shifted to G & Equipment category vi*** Individual Consultants for Construction 4.33 PR-6 SSS supervision etc for Pune Region 0.14 0.95 1.25 1.09 0.68 0.23 4.34 R Individual Consultants for Construction 4.33 PR-6 ndividual Sel supervision etc for Pune Region 1.08 1.08 1.08 1.08 4.33 R2 Individual Consultants for Construction 4.33 PR-6 ndividual Sel supervision etc for Pune Region 1.08 1.08 1.08 1.08 4.33 Deleted Deleted vii*** Individual Consultants for Construction 4.33 PR-7 SSS supervision etc for Nagpur Region 0.14 0.95 1.25 1.09 0.68 0.23 4.34 R Individual Consultants for Construction 4.33 PR-7 ndividual Sel supervision etc for Nagpur Region 1.08 1.08 1.08 1.08 4.33 R2 Individual Consultants for Construction 4.33 PR-7 ndividual Sel supervision etc for Nagpur Region 1.08 1.08 1.08 1.08 4.33 Deleted Deleted viii*** Individual Consultants for Construction 4.33 PR-8 SSS supervision etc for Amravati Region 0.14 0.95 1.25 1.09 0.68 0.23 4.34 R Individual Consultants for Construction 4.33 PR-8 ndividual Sel supervision etc for Amravati Region 1.08 1.08 1.08 1.08 4.33 R2 Individual Consultants for Construction 4.33 PR-8 ndividual Sel supervision etc for Amravati Region 1.08 1.08 1.08 1.08 4.33 Deleted Deleted ix*** Individual Consultants for Construction 4.33 PR-9 SSS supervision etc for A'bad Region 0.14 0.95 1.25 1.09 0.68 0.23 4.34 R Individual Consultants for Construction 4.33 PR-9 ndividual Sel supervision etc for A'bad Region 1.08 1.08 1.08 1.08 4.33 R2 Individual Consultants for Construction 4.33 PR-9 ndividual Sel supervision etc for A'bad Region 1.08 1.08 1.08 1.08 4.33 Deleted Deleted x*** Individual Consultants for Construction 4.33 PR-10 SSS supervision etc for Nasik Region 0.13 0.95 1.25 1.09 0.68 0.23 4.33 2/24/2011 r4ver1.xlsxCONR2PLAN 18 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Procurement Plan for Consultancies (Excluding Agricultur Financial Implementation Schedule for Consultancy. Revision No4 (Rs in Millions) Method of Comp Estmated Package Sr. no Description of consultancy Procureme PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total onent Cost no nt 1 2 3 4 5 6 7 8 9 10 11 12 13 14 R Individual Consultants for Construction 4.33 PR-10 ndividual Sel supervision etc for Nasik Region 1.08 1.08 1.08 1.08 4.33 R2 Individual Consultants for Construction 4.33 PR-10 ndividual Sel supervision etc for Nasik Region 1.08 1.08 1.08 1.08 4.33 Deleted Deleted xi*** Individual Consultants for Construction 4.33 PR-11 SSS supervision etc for Konkan Region 0.13 0.95 1.25 1.09 0.68 0.23 4.33 R Individual Consultants for Construction 4.33 PR-11 ndividual Sel supervision etc for Konkan Region 1.08 1.08 1.08 1.08 4.33 R2 Individual Consultants for Construction 4.33 PR-11 ndividual Sel supervision etc for Konkan Region 1.08 1.08 1.08 1.08 4.33 Deleted Deleted VIII WUA formation i**** Hiring of services of institutional and 60.00 WUA-1 QCBS WUO advisors 10.00 25.00 25.00 60.00 R Hiring of services of institutional and 60.00 WUA-1 QCBS WUO advisors( 7 regions) 10.00 25.00 25.00 60.00 A Hiring of services of institutional and 6.62 WUA-1/1 QCBS 1.002 0.442 1.44 WUO advisors A'bad. A Hiring of services of institutional and WUA-1/2 QCBS WUO advisors Konkan R2 Hiring of services of institutional and 14.67 WUA-1/2 FBS WUO advisors Konkan 4.89 4.89 4.89 14.67 A2 Hiring of services of institutional and 10.38 WUA-1/2 FBS 1.00 2.86 4.25 3.19 11.30 WUO advisors Konkan R4 Hiring of services of institutional and WUA-1/2/1 FBS WUO under NRBC,NLBC & 13.07 2.00 11.07 13.07 Khadakwasla A Hiring of services of institutional and WUA-1/3 QCBS WUO advisors Nagpur R2 Hiring of services of institutional and 15.83 WUA-1/3 FBS WUO advisors Nagpur 5.28 5.28 5.28 15.84 A2 Hiring of services of institutional and 20.273 WUA-1/3 FBS 7.55 14.48 22.03 WUO advisors Nagpur 2/24/2011 r4ver1.xlsxCONR2PLAN 19 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Procurement Plan for Consultancies (Excluding Agricultur Financial Implementation Schedule for Consultancy. Revision No4 (Rs in Millions) Method of Comp Estmated Package Sr. no Description of consultancy Procureme PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total onent Cost no nt 1 2 3 4 5 6 7 8 9 10 11 12 13 14 A Hiring of services of institutional and WUA-1/4 QCBS WUO advisors Amravati R2 Hiring of services of institutional and 7.46 WUA-1/4 FBS WUO advisors Amravati 2.49 2.49 2.49 7.47 A2 Hiring of services of institutional and 10.236 WUA-1/4 FBS 2.50 4.76 1.86 9.11 WUO advisors Amravati A Hiring of services of institutional and WUA-1/5 QCBS WUO advisors Pune R2 Hiring of services of institutional and 9.48 WUA-1/5 FBS WUO advisors Pune 3.16 3.16 3.16 9.48 A2 Hiring of services of institutional and 13.056 WUA-1/5 FBS 0.50 5.55 3.92 3.09 13.06 WUO advisors Pune A Hiring of services of institutional and WUA-1/6 QCBS WUO advisors Nashik R2 Hiring of services of institutional and 15.28 WUA-1/6 FBS WUO advisors Nashik 5.09 5.09 5.09 15.27 A2 Hiring of services of institutional and 20.068 WUA-1/6 FBS 8.45 5.91 5.33 19.68 WUO advisors Nashik A Hiring of services of institutional and WUA-1/7 QCBS WUO advisors jalgaon R2 Hiring of services of institutional and 6.11 WUA-1/7 FBS WUO advisors jalgaon 2.04 2.04 2.04 6.12 A2 Hiring of services of institutional and 9.203 WUA-1/7 FBS 3.82 5.38 9.20 WUO advisors jalgaon IX Improved Water Management Practices i Bulk entittlement consultancy for Krishna 2.00 WET-1 QCBS Basin 0.40 0.40 0.40 0.40 0.40 2.00 R Bulk entittlement consultancy for Krishna 2.00 WET-1 QCBS Basin 0.50 0.50 0.50 0.50 2.00 R2 Bulk entittlement consultancy for Krishna 2.00 WET-1 QCBS Basin 0.66 0.68 0.66 2.00 Deleted Deleted ii Bulk entittlement consultancy for Tapi 2.00 WET-2 QCBS Basin 0.40 0.40 0.40 0.40 0.40 2.00 2/24/2011 r4ver1.xlsxCONR2PLAN 20 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Procurement Plan for Consultancies (Excluding Agricultur Financial Implementation Schedule for Consultancy. Revision No4 (Rs in Millions) Method of Comp Estmated Package Sr. no Description of consultancy Procureme PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total onent Cost no nt 1 2 3 4 5 6 7 8 9 10 11 12 13 14 R Bulk entittlement consultancy for Tapi 2.00 WET-2 QCBS Basin 0.50 0.50 0.50 0.50 2.00 R2 Bulk entittlement consultancy for Tapi 2.00 WET-2 QCBS Basin 0.67 0.67 0.67 2.00 Deleted Deleted iii Bulk entittlement consultancy for 2.00 WET-3 QCBS Vidarbha Region 0.40 0.40 0.40 0.40 0.40 2.00 R Bulk entittlement consultancy for 2.00 WET-3 QCBS Vidarbha Region 0.50 0.50 0.50 0.50 2.00 R2 Bulk entittlement consultancy for 2.00 WET-3 QCBS Vidarbha Region 0.67 0.67 0.67 2.00 Deleted Deleted iv Bulk entittlement consultancy for 2.00 WET-4 QCBS Godavari Marathwada region 0.40 0.40 0.40 0.40 0.40 2.00 R Bulk entittlement consultancy for 2.00 WET-4 QCBS Godavari Marathwada region 0.50 0.50 0.50 0.50 2.00 R2 Bulk entittlement consultancy for 2.00 WET-4 QCBS Godavari Marathwada region 0.67 0.67 0.67 2.00 Deleted Deleted v Bulk entittlement consultancy for Konkan 2.00 WET-5 QCBS Region 0.40 0.40 0.40 0.40 0.40 2.00 R Bulk entittlement consultancy for Konkan 2.00 WET-5 QCBS Region 0.50 0.50 0.50 0.50 2.00 R2 Bulk entittlement consultancy for Konkan 2.00 WET-5 QCBS Region 0.67 0.67 0.67 2.00 Deleted Deleted XI Social and Environment Management Plan I Tranining needs assessment 0.50 SEM-1 QCBS 0.20 0.30 0.50 R Tranining needs assessment 0.50 SEM-1 QCBS 0.20 0.30 0.50 R2 Tranining needs assessment 0.50 SEM-1 SSS 0.20 0.30 0.50 R3 Tranining needs assessment 0.50 SEM-1 CQS 0.25 0.25 0.50 R4 Tranining needs assessment 0.50 SEM-1 SBCQ 0.25 0.25 0.50 ii Prepration of awareness raising and 1.00 SEM-2 QCBS training materials 0.40 0.60 1.00 2/24/2011 r4ver1.xlsxCONR2PLAN 21 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Procurement Plan for Consultancies (Excluding Agricultur Financial Implementation Schedule for Consultancy. Revision No4 (Rs in Millions) Method of Comp Estmated Package Sr. no Description of consultancy Procureme PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total onent Cost no nt 1 2 3 4 5 6 7 8 9 10 11 12 13 14 R Prepration of awareness raising and 1.00 SEM-2 QCBS training materials 0.40 0.60 1.00 R2 Prepration of awareness raising and 1.00 SEM-2 QCBS training materials 0.60 0.40 1.00 This pkg is merged in pkg VI Tribal & gender development plan iv Review and strengthening of standard 2.00 SEM-4 QCBS specifications 0.40 1.60 2.00 R Review and strengthening of standard 2.00 SEM-4 QCBS specifications 0.40 1.60 2.00 R2 Review and strengthening of standard 2.00 SEM-4 QCBS specifications 1.60 0.40 2.00 Deleted Deleted v Semi annual social and Envt audit 8.00 SEM-5 QCBS 3.20 4.80 8.00 R Semi annual social and Envt audit 8.00 SEM-5 QCBS 3.20 4.80 8.00 R2 Semi annual social and Envt audit 8.00 SEM-5 CQ 4.80 3.20 8.00 R3 Semi annual social and Envt audit 8.00 SEM-5 CQS 4.00 4.00 8.00 R4 Semi annual social and Envt audit 8.00 SEM-5 SBCQ 4.00 4.00 8.00 vi Tribal and gender developoment plans 1.00 SEM-6 QCBS 0.40 0.60 1.00 R Tribal and gender developoment plans 1.00 SEM-6 QCBS 0.40 0.60 1.00 R2 Tribal and gender developoment plans 1.00 SEM-6 QCBS 0.60 0.40 1.00 R3 Tribal and gender developoment plans 1.50 SEM-6 CQS 1.50 1.50 R4 Tribal and gender developoment plans 1.00 SEM-6 SBCQ 1.00 1.00 vii Monitoring pesticide residues 1.00 SEM-7 QCBS 0.40 0.60 1.00 R Monitoring pesticide residues 1.00 SEM-7 QCBS 0.20 0.80 1.00 R2 Monitoring pesticide residues 1.00 SEM-7 QCBS 0.20 0.80 1.00 Deleted Deleted viii Social Assessment in tribal dominated 1.00 SEM-8 QCBS subproject 0.40 0.60 1.00 R Social Assessment in tribal dominated 1.00 SEM-8 QCBS subproject 0.40 0.60 1.00 R2 Social Assessment in tribal dominated 1.00 SEM-8 CQ subproject 0.60 0.40 1.00 R3 Social Assessment in tribal dominated 1.00 SEM-8 CQs subproject 1.00 1.00 2/24/2011 r4ver1.xlsxCONR2PLAN 22 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Procurement Plan for Consultancies (Excluding Agricultur Financial Implementation Schedule for Consultancy. Revision No4 (Rs in Millions) Method of Comp Estmated Package Sr. no Description of consultancy Procureme PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total onent Cost no nt 1 2 3 4 5 6 7 8 9 10 11 12 13 14 R4 Social Assessment in tribal dominated 1.00 SEM-8 SBCQ subproject 0.50 0.50 1.00 ix Social And Environment safeguard 28.80 SEM-9 To be identif compliances 7.20 7.20 7.20 7.20 28.80 R Social And Environment safeguard 28.80 SEM-9 To be identif compliances 7.20 7.20 7.20 7.20 28.80 R2 Social And Environment safeguard 28.80 SEM-9 To be identif compliances 7.20 7.20 14.40 28.80 R3 Social And Environment safeguard 28.80 SEM-9 To be identif compliances 14.40 14.40 28.80 R4 Social And Environment safeguard 28.80 SEM-9 Impact identi 14.40 14.40 28.80 compliances XII Piloting User Centered Aquifer level GroundWater Management # I NGOs/ Consultant for IEC 3.660 GW-1 SSS*** 1.00 2.66 3.66 R NGOs for Community mobilisation A,bad 3.818 GW-1/1 QCBS 0.76 0.76 0.76 0.76 0.76 3.82 A NGOs for Community mobilisation A,bad 3.577 GW-1/1 QCBS 0.18 1.22 1.40 R NGOs for community mobilation Pune 3.194 GW-1/2 QCBS region 0.80 0.80 0.80 0.80 3.19 A NGOs for community mobilation Pune 3.920 GW-1/2 QCBS 0.33 0.68 0.85 0.68 1.05 3.58 region R NGOs for community mobilization 2.709 GW-1/3 QCBS Amravati region 0.54 0.54 0.54 0.54 0.54 2.71 A NGOs for community mobilization GW-1/3 QCBS Amravati region 0.00 Deleted Deleted # ii Consultant for Social assessment 0.720 GW-2 QCBS perated 0.72 0.72 R Consultancy for Social assessment 1.064 GW-2 QCBS 0.21 0.21 0.21 0.21 0.21 1.06 A Consultancy for Social assessment 1.308 GW-2 QCBS 1.05 0.26 1.31 iii Consultant for IEC strategy 1.5 GW-3***** QCBS 1.50 1.50 R Consultant for IEC strategy 2.882 GW-3***** QCBS 0.58 0.58 0.58 0.58 0.58 2.88 A Consultant for IEC strategy 3.045 GW-3***** QCBS 0.16 0.79 0.61 1.22 0.27 3.05 iv Newly included 2/24/2011 r4ver1.xlsxCONR2PLAN 23 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Procurement Plan for Consultancies (Excluding Agricultur Financial Implementation Schedule for Consultancy. Revision No4 (Rs in Millions) Method of Comp Estmated Package Sr. no Description of consultancy Procureme PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total onent Cost no nt 1 2 3 4 5 6 7 8 9 10 11 12 13 14 R3 Engaging civil engineer for user centered 1.277 GW Individual acquifer level ground watermanagement consultant pilot in satara 1.28 1.28 A3 Engaging civil engineer for user centered 1.280 GW Sole acquifer level ground water management Source 0.16 0.24 0.88 1.28 pilot in satara R4 Engaging civil engineer for user centered 0.516 GW Individual acquifer level ground watermanagement consultant 0.52 0.52 pilot in Beed. R4 Engaging civil engineer for user centered 0.380 GW Individual acquifer level ground watermanagement consultant 0.38 0.38 pilot in Jalna R4 Social Development Specialist in Beed 1 0.480 GW Individual 0.48 0.48 R4 Social Development Specialist in Jalna 1 0.480 GW Individual 0.48 0.48 R4 Village Animators in Beed(One person 0.080 GW Individual 0.08 0.08 each for 10 Villages) consultant R4 Village Animators in Jalna(One person 0.072 GW Individual 0.07 0.07 each for 9 Villages) consultant XIII Piloting Commercialization of Irrigation Scheme Management I Commercialization of Natuwadi Medium 10.00 POS-1 QCBS project scheme 5.00 5.00 10.00 R Commercialization of Natuwadi Medium 10.00 POS-1 QCBS project scheme 10.00 10.00 R2 Commercialization of Selected one 10.00 POS-1 Provision und Medium project scheme 10.00 10.00 Deleted Deleted ii Commercialization of Minor projects, 6.00 POS-2 QCBS scheme no.1 , 2&3 3.00 3.00 6.00 R Commercialization of Minor projects, 6.00 POS-2 QCBS scheme no.1 , 2&3 6.00 6.00 R2 Commercialization of Minor projects, 6.00 POS-2 Provision und scheme no.1 , 2&3 6.00 6.00 Deleted Deleted XIV Project Preparation and Management Unit 2/24/2011 r4ver1.xlsxCONR2PLAN 24 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Procurement Plan for Consultancies (Excluding Agricultur Financial Implementation Schedule for Consultancy. Revision No4 (Rs in Millions) Method of Comp Estmated Package Sr. no Description of consultancy Procureme PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total onent Cost no nt 1 2 3 4 5 6 7 8 9 10 11 12 13 14 I Consultant for Social And Environment 4.00 PPU-1 CQ safeguard compliances at PMU level 0.40 0.80 1.20 0.80 0.80 4.00 R Enagement of Environmental Spl at 2.00 PPU-1 ndividual Sel PPMU for safeguard compliances 0.20 0.40 0.60 0.40 0.40 2.00 A Enagement of Environmental Spl at 1.25 PPU-1 ndividual Sel PPMU for safeguard compliances 0.20 0.25 0.25 0.25 0.30 1.25 ii Enagement of Social Dev Spl at PPMU PPU-2 Seperated fro for safeguard compliances Seperated from PPU-1 0.00 R Enagement of Social Dev Spl at PPMU 2.00 PPU-2 ndividual Sel for safeguard compliances 0.20 0.40 0.60 0.40 0.40 2.00 A Enagement of Social Dev Spl at PPMU 1.25 PPU-2 ndividual Sel for safeguard compliances 0.20 0.25 0.25 0.25 0.30 1.25 XV Monitoring & Evaluation i National firms for evaluation 46.00 EV-1 QCBS 8.00 8.00 10.00 10.00 10.00 46.00 R Monitoring & Evaluation for the project 46.00 EV-1 QCBS 4.60 10.35 10.35 10.35 10.35 46.00 A Monitoring & Evaluation for the project 65.00 EV-1 QCBS 2.99 13.47 13.84 19.15 14.95 64.40 XVI Information,Education & Communication i Firms for Information,education & 10.00 IEC-1 QCBS communication 5.00 3.00 2.00 0.00 10.00 R Firms for Information,education & 10.00 IEC-1 QCBS communication 5.00 3.00 2.00 10.00 A Firms for Information,education & 9.47 IEC-1 QCBS communication 0.42 0.88 0.66 1.99 8.00 2.00 13.95 XVII Consultancies 0.00 I Baseline Survey 5.00 CON-1 QCBS 5.00 5.00 R Baseline Survey 5.00 CON-1 QCBS 5.00 5.00 A Baseline Survey 4.40 CON-1 QCBS 1.79 1.34 1.66 4.79 ii Integrated Social & Environmental 5.00 CON-2 QCBS Assessment Study for 19 selected Schemes 5.00 5.00 R Integrated Social & Environmental 4.80 CON-2 QCBS Assessment Study for 19 selected Schemes 4.80 4.80 2/24/2011 r4ver1.xlsxCONR2PLAN 25 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT Procurement Plan for Consultancies (Excluding Agricultur Financial Implementation Schedule for Consultancy. Revision No4 (Rs in Millions) Method of Comp Estmated Package Sr. no Description of consultancy Procureme PY-1 PY-2 PY-3 PY-4 PY-5 PY-6 PY-7 Total onent Cost no nt 1 2 3 4 5 6 7 8 9 10 11 12 13 14 A Integrated Social & Environmental 4.80 CON-2 QCBS Assessment Study for 19 selected 4.80 Schemes 4.80 Newly Included iii Provision for National/ international workshops/seminars/conferences R3 Provision for National/ international 13.50 CON-3 As & when re workshops/seminars/conferences 13.50 13.50 R4 Provision for National/ international 13.50 CON-4 As & when re workshops/seminars/conferences 13.50 13.50 Total 643 90.00 202.00 180.00 75.00 59.00 37.00 643.00 Revised 620 4.80 64.86 167.94 176.03 128.14 78.21 619.98 Revised 2 636 4.80 22.21 114.82 173.62 170.52 149.75 635.72 Revised 3 443.17 7 3 23 49 100 153 333 Revised 4 371 7 3 9 28 54 122 137 359 2/24/2011 r4ver1.xlsxCONR2PLAN 26 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) Procurement Packaging Plan and Implementation Schedule for Goods & equipment Revision No. 4 (Rs in Millions) Sr. Package No. Name Of Component/ Description of Estimate Method of Market Estimate Preparati Banks No Date of Date of No goods d cost Procureme Survey prepared on of Bid objection Award of Completion (Rs. in nt (Month/Y & document to bidding Contract of Contract Million) ICB/NCB/ R) sanctione (Month/Y document Shopping d R) (Month/Y 1 2 3 4 5 6 7 8 9 10 11 I . MWRRA 1 PC-RA1 Supply of Photocopiers,fax,laptop 0.20 DGSD/Shoppin Jul-05 Aug-05 Sep-05 Not Reqd Dec-05 Jun-06 R Supply of Photocopiers 0.32 DGSD Jun-06 Jun-06 N.A. PAR Aug-06 Feb-07 A Supply of Photocopiers 0.185 DGSD Jun-06 Jun-06 N.A. PAR Aug_06 Mar_08 2 PH-RA2 Supply & Installation of Telephones & Epbx 0.10 DGSD/Shoppin Oct-05 Nov-05 Dec-05 Not Reqd Mar-06 Jun-06 R Supply & Installation of Telephones & Epbx 0.20 DGSD May-06 May-06 May-06 PAR Aug-06 Sep-06 A Supply & Installation of Telephones & Epbx 0.214 DGSD May-06 May-06 May-06 PAR Jul-06 Aug-06 6 CR-RA6 Supply of Cars to Authority's office 3.00 DGSD/Shoppin Nov-05 Dec-05 Jan-06 Not Reqd May-06 Jun-06 R Supply of Cars to Authority's chairman 0.73 Shopping N.A. Dec-05 Jan-06 PAR Dec-05 Dec-05 A Supply of Cars to Authority's chairman 0.599 Shopping N.A. Dec-05 Jan-06 PAR Dec-05 Jan-06 7 CR-RA7 Supply of Cars to Authority's office & 3.00 DGSD/Shoppin Aug-06 Sep-06 Oct-06 Not Reqd Feb-07 Jun-07 Secretary,etc R Supply of Cars to Authority's Secretary 0.50 DGSD Jul-06 Aug-06 N.A. PAR Sep-06 Dec-06 A Supply of Cars to Authority's Secretary 0.378 DGSD Jul-06 Aug-06 N.A. PAR Aug-06 Dec-06 2 new packages for computers. 167 PC-RA10 Supply of computers& peripherals nil nil nil nil nil nil nil R Supply of computers& peripherals 1.25 DGSD May-06 Jun-06 N.A. Post AR Sep-06 Nov-06 A Supply of computers& peripherals (RA 10/1) 0.59 DGSD May-06 Jun-06 N.A. Post AR Nov-06 Aug-07 A Supply of Servers & peripherals(RA 10/2) 0.195 DGSD May-06 Jun-06 N.A. Post AR Oct-07 Dec-07 A Supply of laptop (RA 10/3) 0.203 DGSD Jun-06 Jun-06 N.A. PAR Apr_07 Aug_07 168 PC-RA11 Supply of multi media projector nil nil nil nil nil nil nil R Supply of multi media projector 0.20 DGSD May-06 Jun-06 N.A. Post AR Oct-06 Nov-06 A Supply of multi media projector 0.14 DGSD May-06 Jun-06 N.A. Post AR Sep-06 Nov-06 R4 Procuring Audio Aids for the conference Hall of MWRRA A4 Procuring Audio Aids for the conference Hall of NCB 0.963 May-09 May-09 Aug-09 Post AR Nov-09 Feb-10 MWRRA r4ver1.xlsx Page 1 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) Sr. Package No. Name Of Component/ Description of Estimate Method of Market Estimate Preparati Banks No Date of Date of No goods d cost Procureme Survey prepared on of Bid objection Award of Completion (Rs. in nt (Month/Y & document to bidding Contract of Contract Million) ICB/NCB/ R) sanctione (Month/Y document Shopping d R) (Month/Y 1 2 3 4 5 6 7 8 9 10 11 III Restructuring of WRD 11 PC-ID1 Supply of Photocopiers to ESC & RTCs 0.6 DGSD/Shoppin Jun-05 Jul-05 Aug-05 Not Reqd Nov-05 May-06 R Supply of Photocopiers to ESC & RTCs 0.67 Shopping Mar-06 Apr-06 May-06 Not Reqd Sep-06 Dec-06 A Supply of Photocopiers to ESC & RTCs 0.68 Shopping Mar-06 Apr-06 May-06 Not Reqd Oct-06 Jan-07 12 PH-ID2 Supply & Installation of Telephones & Epbx and 0.18 DGSD/Shoppin Jun-05 Jul-05 Aug-05 Not Reqd Nov-05 May-06 fax to ESC & RTCs R Supply & Installation of Telephones & Epbx and 0.85 Shopping Mar-06 Apr-06 May-06 Not Reqd Sep-06 Dec-06 fax to ESC & RTCs A Supply & Installation of Telephones & Epbx and 0.061 Shopping Mar-06 Apr-06 May-06 Not Reqd Oct-06 Jan-07 fax to ESC & RTCs 13 AV-ID3 Supply of LCD projectors to ESC & RTCs. 1.50 NCB Jun-05 Jul-05 Aug-05 Post AR Nov-05 May-06 R Supply of LCD projectors to ESC & RTCs. 1.10 Shopping Mar-06 Apr-06 May-06 Post AR Sep-06 Nov-06 A Supply of LCD projectors to ESC & RTCs. 0.956 Shopping Mar-06 Apr-06 May-06 Post AR Oct-06 Jan-07 14 AV-ID4 Supply of Mini Home Theater, Fax Machine, 0.96 DGSD/Shoppin Jun-05 Jul-05 Aug-05 Not Reqd Nov-05 May-06 Slide projectors & OHP. Supply of UPS/Inverter, screens, black boards, Voice Recording system and audio systems for lecture halls,etc. at ESC & RTCs R Supply of Mini Home Theater, Fax Machine, 1.24 Shopping Mar-06 Apr-06 May-06 Not Reqd Sep-06 Nov-06 Slide projectors & OHP. Supply of UPS/Inverter, screens, black boards, Voice Recording system and audio systems for lecture halls,etc. at ESC & RTCs A Supply of Mini Home Theater, Fax Machine, 0.763 Shopping Mar-06 Apr-06 May-06 Not Reqd Oct-06 Jan-07 Slide projectors & OHP. Supply of UPS/Inverter, screens, black boards, Voice Recording system and audio systems for lecture halls,etc. at ESC & RTCs 177 AV-ID4/ 1 Supply of Mini Home Theater at ESC & RTCs 0.244 Shopping ewly include Jun-07 Jun-07 Not Reqd Jul-07 Sep-07 R2 Supply of Mini Home Theater at ESC & RTCs 0.244 Shopping Mar-06 Jun-07 Jun-07 Not Reqd Jul-07 Sep-07 A2 Supply of Mini Home Theater at ESC & RTCs 0.294 Shopping Mar-06 Jun-07 Jun-07 Not Reqd Mar-08 Mar-08 15 AV-ID6 Supply of Digital Video Cameras,Digital Still 0.28 DGSD/Shoppin Jun-05 Jul-05 Aug-05 Not Reqd Nov-05 May-06 Cameras for ESC & RTCs. R Supply of Digital Video Cameras,Digital Still 0.06 Shopping Mar-06 Apr-06 May-06 Not Reqd Sep-06 Nov-06 Cameras for ESC & RTCs. r4ver1.xlsx Page 2 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) Sr. Package No. Name Of Component/ Description of Estimate Method of Market Estimate Preparati Banks No Date of Date of No goods d cost Procureme Survey prepared on of Bid objection Award of Completion (Rs. in nt (Month/Y & document to bidding Contract of Contract Million) ICB/NCB/ R) sanctione (Month/Y document Shopping d R) (Month/Y 1 2 3 4 5 6 7 8 9 10 11 A Supply of Digital Video Cameras,Digital Still 0.071 Shopping Mar-06 Apr-06 May-06 Not Reqd Oct-06 Jan-07 Cameras for ESC & RTCs. 16 TR-ID7 Purchase of training aids such as slides, 2.10 These would be procured on as and when required basis throughout the project period cds,books etc. R Purchase of training aids such as slides, 2.10 These would be procured on as and when required basis throughout the project period cds,books etc. R3 Purchase of LCD Projector for WRD 2.10 NCB Aug-09 Sep-09 Oct-09 Post AR Jan-10 Jul-10 R4 Purchase of LCD Projector for WRD 2.10 NCB Aug-10 Sep-10 Oct-10 Post AR Jan-11 Jul-11 178 ID_CV2 (Part III Furniture for hostel @ ESC Nashik 0.83 newly included R2 Furniture for hostel & office @ Nashik,Pune & 0.812 Shopping Mar-07 Apr-07 May-07 Not Reqd Sep-07 Dec-07 Nagpur A2 (part I) Furniture for hostel & office @ Nashik,Pune & 0.408 Shopping Mar-07 Jun-07 Jul-07 Not Reqd Sep-07 Dec-07 Nagpur A2 ( part II ) Furniture for hostel & office @ Nashik,Pune & 0.686 Shopping Mar-07 Nov-07 Jan-08 Not Reqd Mar-08 May-08 Nagpur 179 ID_CV3 (Part III Furniture for Administrative Building @ RTC 0.63 newly included Pune R2 Box type steel cots for hostel Building @ 0.87 Shopping Mar-07 Apr-07 May-07 Not Reqd Sep-07 Dec-07 Pune,Nashik,Nagpur A2 Box type steel cots for hostel Building @ 0.89 Shopping Mar-07 Jun-07 Jul-07 Not Reqd Sep-07 Oct-07 Pune,Nashik,Nagpur 180 ID_CV6 Furniture for Administrative Building @ ESC 0.89 e newly includedwly included Nashik R2 Furnishing Comp table,A.C.,Water cooler etc 0.52 Shopping Mar-07 Apr-07 May-07 Not Reqd Sep-07 Dec-07 for office & hostel @ Nashik,Pune,Nagpur A2 (Part I) Furnishing Comp table,A.C.,Water cooler etc 0.034 Shopping Mar-07 Apr-07 Jul-07 Not Reqd Sep-07 Dec-07 for office & hostel @ Nashik,Pune,Nagpur A2 (Part II) Furnishing Comp table,A.C.,Water cooler,sofa 0.44 Shopping Mar-07 Apr-07 Jan-08 Not Reqd Mar-08 Mar-08 set,center table for office & hostel @ Nashik,Pune,Nagpur 181 ID_CV5 (Part III Furniture for Administrative Building @ RTC 0.77 e newly includedwly included Nagpur. R2 Furnishing material such as mattress,etc for 0.99 Shopping Apr-07 May-07 Not Reqd Sep-07 Dec-07 hostel building@Nagpur,Pune, Nashik. A2 (part I) Furnishing material such as mattress,etc for 0.923 Shopping Apr-07 May-07 Not Reqd Sep-07 Dec-07 hostel building@Nagpur,Pune, Nashik. A2(partII) Furnishing material such as mattress,etc for 0.089 Shopping Not Reqd Mar-08 Mar-08 hostel building@Nagpur,Pune, Nashik. r4ver1.xlsx Page 3 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) Sr. Package No. Name Of Component/ Description of Estimate Method of Market Estimate Preparati Banks No Date of Date of No goods d cost Procureme Survey prepared on of Bid objection Award of Completion (Rs. in nt (Month/Y & document to bidding Contract of Contract Million) ICB/NCB/ R) sanctione (Month/Y document Shopping d R) (Month/Y 1 2 3 4 5 6 7 8 9 10 11 17 MR-ID8 Remote sensing Data 20.73 NCB Aug-06 Sep-06 Oct-06 Post AR Feb-07 Aug-07 Acquisition,computerisation for Remote Sensing and regional level training for Meri R Remote sensing Data 20.73 NCB Jan-07 Feb-07 Mar-07 Post AR Jun-07 Jun-11 Acquisition,computerisation for Remote Sensing and regional level training for Meri 182 R2 Purchase of satellite images for MERI 6.80 DC Jan-07 Feb-07 Aug-07 Post AR Nov-07 Jan-08 R3 Purchase of satellite images for MERI 2.50 DC Aug-09 Sep-09 Mar-10 Post AR Nov-09 Jan-10 Deleted Deleted 183 R2 Software for MERI (MR-ID8/2) 4.93 NCB Jan-07 Feb-07 Aug-07 Post AR Nov-07 Jan-08 R3 ERDAS Imagine 9.3(For 10 no of licensed 1.17 DC Aug-09 Sep-09 Oct-09 Post AR Dec-09 Feb-10 copies) Deleted Deleted R3 Leica Photogrammetry Suite(For 5 no of licensed 0.58 DC Aug-09 Sep-09 Oct-09 Post AR Dec-09 Feb-10 copies) Deleted Deleted R3 ENVI + IDL(5 no Lc)+Kshmata(3 no lc) 0.87 DC Aug-09 Sep-09 Oct-09 Post AR Dec-09 Feb-10 Deleted Deleted R3 Upgradation of ERDAS Imagine(for 3 no) 0.25 DC Aug-09 Sep-09 Oct-09 Post AR Dec-09 Feb-10 Deleted Deleted R3 Gram++(For 10 no of licensed copies) 0.08 DC Aug-09 Sep-09 Oct-09 Post AR Dec-09 Feb-10 Deleted Deleted R3 Matlab and tools(For 2 no of licensed copies) 0.50 DC Aug-09 Sep-09 Oct-09 Post AR Dec-09 Feb-10 Deleted Deleted R3 GIS 9.3 Extensions Interoporatibility & survey 0.68 DC Aug-09 Sep-09 Oct-09 Post AR Dec-09 Feb-10 analyst(For 10 no of licensed copies) Deleted Deleted R3 Statistica + ANN(For 2 no of licensed copies) 0.28 DC Aug-09 Sep-09 Oct-09 Post AR Dec-09 Feb-10 Deleted Deleted 184 R2 Hardware for MERI(MR-ID8/3) 0.998 Shopping Jan-07 Feb-07 Aug-07 Post AR Nov-07 Jan-08 r4ver1.xlsx Page 4 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) Sr. Package No. Name Of Component/ Description of Estimate Method of Market Estimate Preparati Banks No Date of Date of No goods d cost Procureme Survey prepared on of Bid objection Award of Completion (Rs. in nt (Month/Y & document to bidding Contract of Contract Million) ICB/NCB/ R) sanctione (Month/Y document Shopping d R) (Month/Y 1 2 3 4 5 6 7 8 9 10 11 R3 Hardware for MERI(MR-ID8/3) 4.57 DGS&D Jul-09 Aug-09 Dec-09 Post AR Feb-10 Apr-10 R4 Hardware for MERI(MR-ID8/3) 4.57 DGS&D Jul-10 Aug-10 Sep-10 Post AR Nov-10 Mar-12 185 R2 Vector Maps for MERI(MR-ID8/4) 1.08 DC Jan-07 Feb-07 Aug-07 Post AR Nov-07 Jan-08 R3 Vector & Digital soil maps for MERI(MR- 1.44 DC Aug-09 Sep-09 Mar-10 Post AR Dec-09 Feb-10 ID8/4) Deleted Deleted 186 R2 Ground Truth collection for MERI(MR-ID8/5) 0.426 Shopping Jan-07 Feb-07 Aug-07 Post AR Nov-07 Jan-08 Ground Truth collection for MERI(MR-ID8/5) Shopping Sep-09 Oct-09 Apr-10 Post AR Jun-10 Aug-10 R3 0.43 Deleted Deleted 187 R2 Miscellaneous (Training books) for MERI(MR- 4.856 NCB Jan-07 Feb-07 Aug-07 Post AR Nov-07 Jan-10 ID8/6) Miscellaneous (Training books) for MERI(MR- NCB Oct-09 Nov-09 May-10 Post AR Jul-10 Sep-10 R3 7.02 ID8/6) Miscellaneous (Training books) for MERI(MR- NCB Jul-10 Aug-10 Sep-10 Post AR Nov-10 Mar-12 R4 7.02 ID8/6) 18 MR-ID9 Supply of New Equipments for Structural DGSD/Shopp Aug-06 Sep-06 Oct-06 Post AR Feb-07 Aug-07 Research and physics division and Material testing division of Meri R Supply of New Equipments for Structural 8.50 NCB Feb-06 Mar-06 Apr-06 Post AR Sep-06 Mar-06 Research and physics division,Material testing division and upgradation of Soil Testing lab of Meri A Supply of New Equipments for Structural NCB Feb-06 Mar-06 Apr-06 Post AR Mar-07 Research and physics division,Material testing 4.290 division and upgradation of Soil Testing lab of Meri 189 MR-ID9/1 Supply of New Equipments for Structural 0.220 NCB newly included newly included Research and physics division,Material testing division and upgradation of Soil Testing lab of Meri (Schedule 14 to 18) R2 Supply of New Equipments for Structural 0.220 NCB Feb-06 Mar-07 Apr-07 Post AR Sep-07 Dec-07 Research and physics division,Material testing division and upgradation of Soil Testing lab of Meri (Schedule 14 to 18) A2 Supply of New Equipments for Structural 0.053 Shopping Feb-06 Mar-07 Apr-07 Post AR Mar-08 Aug-08 Research and physics division,Material testing division and upgradation of Soil Testing lab of Meri (Schedule 16 to 18) r4ver1.xlsx Page 5 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) Sr. Package No. Name Of Component/ Description of Estimate Method of Market Estimate Preparati Banks No Date of Date of No goods d cost Procureme Survey prepared on of Bid objection Award of Completion (Rs. in nt (Month/Y & document to bidding Contract of Contract Million) ICB/NCB/ R) sanctione (Month/Y document Shopping d R) (Month/Y 1 2 3 4 5 6 7 8 9 10 11 21 MR-ID12 Supply of Generator and Solar Water Heater to 1.16 DGSD/Shoppin Aug-06 Sep-06 Oct-06 Not Reqd Jan-07 Jul-07 MERI. R Supply of Generator and Solar Water Heater to 1.16 Shopping Oct-06 Nov-06 Dec-06 Post AR Jan-07 Jul-07 MERI. R2 Supply of Generator and Solar Water Heater to 1.16 Shopping Nov-07 Dec-07 Jan-08 Post AR May-08 Aug-08 MERI. R3 Supply of Generator and Solar Water Heater to 3.81 Shopping Nov-07 Jul-09 Aug-09 Post AR Dec-09 Mar-10 MERI. Deleted Deleted 22 MR-ID13 Supply of Discharge measurement instruments 26.73 ICB Aug-06 Sep-06 Oct-06 Nov-06 Feb-07 Aug-07 to MERI R Supply of Discharge measurement instruments 1.50 Shopping Sep-06 Oct-06 Nov-06 Not reqd Feb-07 May-07 to MERI R2 Supply of Discharge measurement instruments 3.91 NCB Sep-06 Oct-06 Jul-07 Not reqd Oct-07 Jan-08 to MERI R3 Supply of Discharge measurement instruments 3.91 NCB Sep-06 Oct-09 Nov-09 Not reqd Feb-10 May-10 to MERI Deleted Deleted 23 MR-ID13 (A) Purchase of ten mobile vans for MERI Separated from MR-ID 13 above R Purchase of ten mobile vans for MERI 4.00 DGSD Dec-06 Jan-07 Feb-07 Post AR Jun-07 Sep-07 R2 Laboratory mobile Vans for MERI(MR-ID8/7) 2.50 DGSD Jan-07 Feb-07 Aug-07 Post AR Nov-07 Jan-08 R3 Laboratory mobile Vans for MERI(MR-ID8/7) 1.41 DGSD Jan-07 Aug-09 Dec-09 Post AR Feb-10 May-10 Deleted Deleted 23 WR-ID15 Supply of Wireless sets in Vidarbha Region 13.28 NCB Jan-06 Feb-06 Mar-06 Post AR Jul-06 Apr-07 R Supply of Wireless sets in Vidarbha Region 13.28 NCB Sep-06 Oct-06 Nov-06 Post AR Mar-07 Dec-07 R2 Supply of Wireless sets in Vidarbha Region 13.28 NCB Dec-07 Jan-08 Feb-08 Post AR Jun-08 Sep-08 Deleted Deleted 24 WR-ID16 Supply of Wireless sets in Godavari 19.00 NCB Jan-06 Feb-06 Mar-06 Post AR Jul-06 Apr-07 Marathwada Region R Supply of Wireless sets in Godavari 19.00 NCB Sep-06 Oct-06 Nov-06 Post AR Mar-07 Dec-07 Marathwada Region R2 Supply of Wireless sets in Godavari 19.00 NCB Dec-07 Jan-08 Feb-08 Post AR Jun-08 Sep-08 Marathwada Region Deleted Deleted 25 WR-ID17 Supply of Wireless sets in Tapi Basin 5.18 NCB Jan-06 Feb-06 Mar-06 Post AR Jul-06 Jan-07 R Supply of Wireless sets in Tapi Basin 5.18 NCB Sep-06 Oct-06 Nov-06 Post AR Mar-07 Dec-07 r4ver1.xlsx Page 6 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) Sr. Package No. Name Of Component/ Description of Estimate Method of Market Estimate Preparati Banks No Date of Date of No goods d cost Procureme Survey prepared on of Bid objection Award of Completion (Rs. in nt (Month/Y & document to bidding Contract of Contract Million) ICB/NCB/ R) sanctione (Month/Y document Shopping d R) (Month/Y 1 2 3 4 5 6 7 8 9 10 11 R2 Supply of Wireless sets in Tapi Basin 5.18 NCB Dec-07 Jan-08 Feb-08 Post AR Jun-08 Sep-08 Deleted Deleted 26 WR-ID18 Supply of Wireless Sets in Krishna Basin 12.54 NCB Jan-06 Feb-06 Mar-06 Post AR Jul-06 Mar-07 R Supply of Wireless Sets in Krishna Basin 12.54 NCB Sep-06 Oct-06 Nov-06 Post AR Mar-07 Dec-07 R2 Supply of Wireless Sets in Krishna Basin 12.54 NCB Dec-07 Jan-08 Feb-08 Post AR Jun-08 Sep-08 Deleted Deleted 27 JE-ID19 Supplyof Miscellaneous Items 0.04 DGSD/Shoppin Jan-06 Feb-06 Mar-06 Not Reqd Jun-06 Dec-06 R Supplyof Miscellaneous Items 0.04 Shopping Mar-06 Apr-06 May-06 Not Reqd Sep-06 Nov-06 R2 Supplyof Miscellaneous Items 0.04 Shopping Feb-07 Mar-07 Apr-07 Not Reqd Aug-07 Nov-07 A2 Supplyof Miscellaneous Items 0.44 Shopping Feb-07 Mar-07 Jun-07 Not Reqd Jan-08 Dec-08 169 DR-ID20 Laboratory equipment for upgradation of labs Newly included from saving from MR-ID13 under DIRD pune R Laboratory equipment for upgradation of labs 2.90 NCB May-06 Jun-06 Jul-06 PAR Sep-06 Mar-07 under DIRD pune A Laboratory equipment for upgradation of labs 2.205 NCB May-06 Jun-06 Jul-06 PAR Apr-07 Aug-07 under DIRD pune 189 R-ID20 /1 (Sch Laboratory equipment for upgradation of labs newly included under DIRD pune R2 Laboratory equipment for upgradation of labs DGSD Mar-07 Apr-07 Jun-07 PAR Jul-07 Dec-07 under DIRD pune 0.085 included in DR-ID 20 170 DR-ID21 Supply of equip for stalls at conventions Newly included from saving from MR-ID13 R Supply of equip for stalls at conventions 0.40 Shopping May-06 Jun-06 Jul-06 PAR Sep-06 Mar-07 R2 Supply of equip for stalls at conventions 0.40 Shopping May-06 Jun-06 Sep-07 PAR Nov-07 Apr-07 Deleted Deleted 193 DR-ID21/1 Supply of interactive meeting pad for meeting Newly included hall @ DIRD Pune R2 Supply of interactive meeting pad for meeting 0.246 Shopping May-06 Jun-06 Jul-07 PAR Aug-07 Nov-07 hall @ DIRD Pune A2 Supply of interactive meeting pad for meeting Shopping May-06 Jun-06 Jul-07 PAR May-08 Aug-08 0.246 hall @ DIRD Pune 171 DR-ID22 Supply of equip for meeting hall at DIRD pune Newly included from saving from MR-ID13 R Supply of equip for meeting hall at DIRD pune 1.27 Shopping May-06 Jun-06 Jul-06 PAR Sep-06 Mar-07 R2 Supply of equip for meeting hall at DIRD pune 1.27 Shopping May-06 Jun-06 Sep-07 PAR Oct-07 Dec-07 r4ver1.xlsx Page 7 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) Sr. Package No. Name Of Component/ Description of Estimate Method of Market Estimate Preparati Banks No Date of Date of No goods d cost Procureme Survey prepared on of Bid objection Award of Completion (Rs. in nt (Month/Y & document to bidding Contract of Contract Million) ICB/NCB/ R) sanctione (Month/Y document Shopping d R) (Month/Y 1 2 3 4 5 6 7 8 9 10 11 A2 Supply of A.C.(1.5 T)/HandiCam Digital camera Shopping May-06 Jun-06 Sep-07 PAR Jun-08 Jun-08 0.188 194 DR-ID22/1 Supply of invertar for meeting hall @ DIRD Newly included Pune R2 Supply of invertar for meeting hall @ DIRD 0.60 Shopping May-06 Jun-06 Jul-07 PAR Aug-07 Nov-07 Pune A2 Supply of invertar for meeting hall @ DIRD 0.60 Shopping May-06 Jun-06 Jul-07 PAR Nov-07 Nov-07 Pune 195 DR-ID22/2 Supply of Chairs for meeting hall @ DIRD Pune Newly included R2 Supply of Chairs for meeting hall @ DIRD Pune 0.25 Shopping May-06 Jun-06 Jul-07 PAR Aug-07 Nov-07 A2 Supply of Chairs for meeting hall @ DIRD Pune 0.246 Shopping May-06 Jun-06 Jul-07 PAR Nov-07 Nov-07 196 DR-ID22/3 Supply of DVD Player,LCD TV,LCD Projector Newly included for meeting hall @ DIRD Pune R2 Supply of DVD Player,LCD TV,LCD Projector 0.60 Shopping May-06 Jun-06 Jul-07 PAR Aug-07 Nov-07 for meeting hall @ DIRD Pune A2 Supply of DVD Player,LCD TV,LCD Projector May-06 Jun-06 Jul-07 PAR Feb-08 Feb-08 0.620 for meeting hall @ DIRD Pune 172 DR-ID23 Supply of advance survey equip for DIRD (incld Newly included from saving from MR-ID13 GPS) R Supply of advance survey equip for DIRD (incld 1.26 Shopping Aug-06 Sep-06 Oct-06 PAR Jan-07 Jun-07 GPS) R2 Supply of advance survey equip for DIRD (incld 1.26 Shopping Aug-06 Sep-06 Aug-07 PAR Nov-07 Mar-08 GPS) R3 Supply of advance survey equip for DIRD (incld 1.26 Shopping Aug-06 Dec-09 Mar-10 PAR Jun-10 Aug-10 GPS) R4 Supply of advance survey equip for DIRD (incld 1.26 Shopping GPS) 173 DR-ID24 Supply of advance survey equip for dird (incld Newly included from saving from MR-ID13 gps) R Supply of advance survey equip for dird (incld 1.07 Shopping Mar-07 Apr-07 May-07 PAR Jul-07 Oct-07 gps) R2 Supply of advance survey equip for dird (incld 1.07 Shopping Mar-07 Apr-07 Aug-07 PAR Nov-07 Mar-08 gps) R3 Supply of advance survey equip for dird (incld 1.07 Shopping Mar-07 Dec-09 Mar-10 PAR Jun-10 Aug-10 gps) R4 Supply of advance survey equip for dird (incld 1.07 Shopping Mar-07 Dec-10 Mar-11 PAR Jun-11 Aug-11 gps) 174 MR-ID25 Office furniture for Dam Safety Oganisation Newly included from saving from MR-ID13 r4ver1.xlsx Page 8 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) Sr. Package No. Name Of Component/ Description of Estimate Method of Market Estimate Preparati Banks No Date of Date of No goods d cost Procureme Survey prepared on of Bid objection Award of Completion (Rs. in nt (Month/Y & document to bidding Contract of Contract Million) ICB/NCB/ R) sanctione (Month/Y document Shopping d R) (Month/Y 1 2 3 4 5 6 7 8 9 10 11 R Office furniture for Dam Safety Oganisation 2.00 NCB Aug-06 Sep-06 Oct-06 PAR Jan-07 Jul-07 R2 Office furniture for Dam Safety Oganisation 2.00 NCB Aug-06 Sep-06 Aug-07 PAR Nov-07 Mar-08 R3 Office furniture for Dam Safety Oganisation 2.00 NCB Aug-06 Aug-09 Dec-09 Post AR Feb-10 May-10 R4 Office furniture for Dam Safety Oganisation 2.00 NCB Aug-06 Aug-10 Dec-10 Post AR Feb-11 May-11 175 MR-ID26 Office furniture for Central Design Newly included from saving from MR-ID13 Organisation R Office furniture for Central Design 3.10 NCB Aug-06 Sep-06 Oct-06 PAR Jan-07 Jul-07 Organisation R2 Office furniture for Central Design 2.60 Shopping Aug-06 Sep-06 Jun-07 Jul-07 Aug-07 Jan-08 Organisation A Office furniture for Central Design 0.380 Shopping Aug-06 Dec-07 Dec-07 PAR Feb-08 Mar-08 Organisation 190 MR-ID27 Meeting Hall furniture & Office furniture for Newly included from saving from MR-ID13 Central Design Organisation R2 Meeting Hall furniture & Office furniture for 0.445 Aug-06 Sep-06 Jun-07 Jul-07 Aug-07 Jan-08 Central Design Organisation A2 Meeting Hall furniture & Office furniture for 0.469 Shopping Aug-06 Dec-07 Dec-07 PAR Jan-09 Central Design Organisation IV WALMI cap bldg 28 OF-WL1 Supply of Office furniture 1.20 DGSD/Shoppin Oct-05 Nov-05 Dec-05 Not Reqd Mar-06 Sep-06 R Supply of Office furniture 2.10 NCB Jan-06 Apr-06 May-06 Not Reqd Sep-06 Mar-07 A Supply of Office furniture 1.465 NCB Jan-06 Apr-06 May-06 Not Reqd Dec-06 Mar-07 29 AC-WL2 Supply & Installation of Air conditioners 0.80 DGSD/Shoppin Oct-05 Nov-05 Dec-05 Not Reqd Mar-06 Sep-06 R Supply & Installation of Air conditioners 0.80 Shopping Jan-06 Apr-06 May-06 Not Reqd Jul-06 Aug-06 A Supply & Installation of Air conditioners 0.535 DGSD Jan-06 Apr-06 May-06 Not Reqd Nov-06 Dec-06 30 EQ-WL3 Provide and install Audio Visual equipments at 20.00 NCB Oct-05 Nov-05 Dec-05 Post AR Apr-06 Apr-07 Walmi R Provide and install Audio Visual equipments at 20.00 NCB Jul-06 Aug-06 Sep-06 Post AR Dec-06 Sep-07 Walmi R2 Provide and install Audio equipments at Walmi 6.00 NCB Mar-07 Apr-07 Sep-07 Post AR Dec-07 May-08 (EQ-WL3/1) R3 Provide and install Audio equipments at Walmi 6.00 NCB Mar-07 Apr-07 Sep-09 Post AR Dec-09 Jun-10 (EQ-WL3/1) R4 Provide and install Audio equipments at Walmi 6.00 NCB Mar-09 Apr-09 Oct-10 Post AR Jan-11 Jul-11 (EQ-WL3/1) R2 Provide and install video equipments at Walmi 12.00 NCB Mar-07 Apr-07 Nov-07 Post AR Feb-08 Jul-08 (EQ-WL3/2) deleted r4ver1.xlsx Page 9 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) Sr. Package No. Name Of Component/ Estimate Method of Market Estimate Description of Preparati Banks No Date of Date of No goods d cost Procureme Survey prepared on of Bid objection Award of Completion (Rs. in nt (Month/Y & document to bidding Contract of Contract Million) ICB/NCB/ R) sanctione (Month/Y document Shopping d R) (Month/Y 1 2 3 4 5 6 7 8 9 10 11 R2 Provide computers for Walmi labs (EQ-WL3/3) 2.00 NCB Mar-07 Apr-07 Nov-07 Post AR Feb-08 Jul-08 deleted These shall be provided at time of total h/w requirement for WRD & hence delete 31 AG-WL5 Supply of Agriculture Lab equipments 2.10 NCB Oct-05 Nov-05 Dec-05 Post AR Apr-06 Oct-06 toWALMI R Supply of Agriculture Lab equipments 1.895 NCB Jan-06 Apr-06 May-06 Post AR Sep-06 Mar-07 toWALMI A(part I) Supply of Agriculture Lab equipments to walmi 0.695 NCB Jan-06 Apr-06 May-06 Post AR Dec-06 Feb-07 A(part II) Supply of Tractor & accessories to walmi 0.680 Shopping Jan-06 May-08 Jun-08 Post AR Sep-08 32 HY-WL7 Supply of Hydraulic Lab equipments toWALMI 0.23 DGSD/Shoppin Oct-05 Nov-05 Dec-05 Not Reqd Mar-06 Sep-06 R Supply of Hydraulic Lab equipments toWALMI 0.230 Shopping Jan-06 Apr-06 May-06 PAR Nov-06 Aug-07 R2 Supply of Hydraulic Lab equipments toWALMI deleted & added to civil works plan as the package involved construction. 33 LB-WL9 Supply of Books for Liabrary 2.00 As and when required R Supply of Books for Liabrary 2.00 As and when required R3 Supply of Books for Liabrary 2.00 As and when required R4 Supply of Books for Liabrary 2.00 As and when required 34 PI-WL8 Supply of Pressurised Irrigation System to 2.40 NCB Oct-05 Nov-05 Dec-05 Post AR Apr-06 Oct-06 WALMI R Supply of Pressurised Irrigation System to 2.40 Sep-06 Oct-06 Nov-06 Post AR Mar-07 Sep-07 WALMI A Supply of Pressurised Irrigation System to 1.652 NCB Sep-06 Oct-06 Nov-06 Post AR Dec-06 Mar-07 WALMI 35 GS-WL10 Supply of Generator sets to WALMI 1.20 DGSD/Shoppin Dec-05 Jan-06 Feb-06 Not Reqd May-06 Nov-06 R Suppiy of 125 kVA & 50 kVA generator set to 1.90 NCB Apr-06 May-06 Jul-06 Post AR Nov-06 Mar-07 WALMI A Suppiy of 125 kVA & 50 kVA generator set to 1.82 NCB Apr-06 May-06 Jul-06 Post AR Apr-07 Jun-07 WALMI 36 COMIS1 Supply of Computers & accessories, UPS (incl. 16.36 NCB Oct-05 Nov-05 Dec-05 Post AR Apr-06 Apr-07 Printers) to Nagpur Region including office furniture R Supply, Installation and Commissioning of the 225.00 ICB Jun-07 Jul-07 Aug-07 Aug-07 Dec-07 Dec-08 Computers & accessories, networking equipment, UPS, incld peripherals for WRD r4ver1.xlsx Page 10 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) Sr. Package No. Name Of Component/ Description of Estimate Method of Market Estimate Preparati Banks No Date of Date of No goods d cost Procureme Survey prepared on of Bid objection Award of Completion (Rs. in nt (Month/Y & document to bidding Contract of Contract Million) ICB/NCB/ R) sanctione (Month/Y document Shopping d R) (Month/Y 1 2 3 4 5 6 7 8 9 10 11 R2 Supply, Installation and Commissioning of the 205.00 ICB Jun-07 Jul-07 Aug-07 Aug-07 Dec-07 Dec-08 Computers & accessories, networking equipment, UPS, incld peripherals for WRD R3 HardwareSupply, Installation and 207.00 ICB Sep-09 Oct-09 Nov-09 Nov-09 Mar-10 Sep-10 Commissioning of the Computers & accessories, networking equipment, UPS, incld peripherals for WRD R4 ICIS User level Hardware & Networking ICB Sep-10 Oct-10 Nov-10 Dec-10 Mar-11 Jul-11 Equipment 238.09 COMIS1/2 Supply of Desktops and Printers (COMIS1/2) R2 Supply of Desktops and Printers (COMIS1/2) 20.00 NCB Jul-07 Aug-07 Sep-07 Aug-07 Nov-07 Apr-08 A2 Supply of Desktops and Printers (COMIS1/2) NCB Jul-08 Aug-08 Sep-08 Aug-08 Nov-08 11.34 R3 Design,Development & Implementation of ICIS 123.23 ICB Dec-07 Jun-08 Oct-08 Oct-08 Jul-09 Dec-13 for WRD A3 Design,Development & Implementation of ICIS 176.547 ICB Dec-07 Jun-08 Oct-08 Oct-08 Jul-09 (Soft Ware) for WRD ICIS 425.98 46 LDMIS9 Legacy data acquisition 20.00 NCB Dec-05 Jan-06 Feb-06 Post AR May-06 Sep-07 R Remote sensing imageries acquisition 20.00 NCB As and when required R2 Remote sensing imageries acquisition 20.00 NCB As and when required R3 Remote sensing imageries acquisition 20.00 NCB As and when required R4 Remote sensing imageries acquisition 20.00 176 SW-MIS10 Off the shelf licensed softwares for CDO Newly included from saving from MR-ID13 R Off the shelf licensed softwares for CDO 1.00 Shopping Aug-06 Sep-06 Oct-06 PAR Dec-06 Jun-07 R2 Off the shelf licensed softwares for CDO 1.00 Shopping Aug-07 Sep-07 Oct-07 PAR Dec-07 Jun-08 R3 Off the shelf licensed softwares for CDO 1.00 Shopping As and when required R4 Off the shelf licensed softwares for CDO 1.00 I & VII Rehabilitation and modernization & Dam Safety 47 PC-RM1 Supply of Photocopiers 3.3 NCB Jun-05 Jul-05 Aug-05 Post AR Dec-05 Jun-06 R Supply of Photocopiers 6.6 NCB Jul-06 Aug-06 Sep-06 Post AR Dec-06 Jun-07 R2 Supply of Photocopiers 6.6 NCB Nov-07 Dec-07 Jan-08 Post AR May-08 Nov-08 R3 Supply of Photocopiers 6.6 NCB Nov-07 Dec-09 Jan-10 Post AR May-10 Nov-10 r4ver1.xlsx Page 11 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) Sr. Package No. Name Of Component/ Description of Estimate Method of Market Estimate Preparati Banks No Date of Date of No goods d cost Procureme Survey prepared on of Bid objection Award of Completion (Rs. in nt (Month/Y & document to bidding Contract of Contract Million) ICB/NCB/ R) sanctione (Month/Y document Shopping d R) (Month/Y 1 2 3 4 5 6 7 8 9 10 11 R4 Supply of Photocopiers 6.6 49 OF-RM3 Supply of Office furniture 7.58 NCB Oct-05 Nov-05 Dec-05 Post AR Apr-06 Oct-06 R Supply of Office furniture*** 22.74 DGSD/Shopping As and when required Provision is merged in WUA office furniture. 52 QC-RM6 Supply of QC LAB Equipment,for Pune 18.25 NCB Jun-05 Jul-05 Aug-05 Post AR Nov-05 Nov-06 R Supply of QC LAB Equipment,for QCC Pune 19.83 NCB Feb-06 Mar-06 May-06 Post AR Sep-06 Mar-07 A Supply of QC LAB Equipment,for QCC Pune NCB Feb-06 Mar-06 May-06 Post AR Dec-06 & Sep-07 10.365 Apr-07 192 QC-RM6/1 Supply of QC LAB Equipment,for Newly included QCCPune(For Schedule 8 & 10) R2 Supply of QC LAB Equipment,for QCC 0.71 Shopping Feb-06 Mar-06 Jun-07 Jul-07 Aug-07 Dec-07 Pune(For Schedule 8 & 10) A Supply of QC LAB Equipment,for QCC 0.342 Shopping Feb-06 Mar-06 Jun-07 Jul-07 Mar-08 Pune(For Schedule 8 & 10) 53 QC-RM7 Supply of QC LAB Equipment,for a'bad 18.25 NCB Jun-05 Jul-05 Aug-05 Post AR Nov-05 Nov-06 R Supply of QC LAB Equipment,for QCC A'bad 16.63 NCB Feb-06 Mar-06 May-06 Post AR Sep-06 Mar-07 A Supply of QC LAB Equipment,for QCC A'bad 7.246 NCB Feb-06 Mar-06 Jun-06 Post AR Dec-06 & Sep-07 Apr-07 192 QC-RM7/1 Newly included R2 Supply of QC LAB Equipment,for QCC A'bad 0.425 Shopping Feb-06 Mar-06 Jun-07 Post AR Aug-07 Dec-07 A Supply of QC LAB Equipment,for QCC A'bad 0.067 merged into QC-RM6/1 54 SI-RM8*** Supply of survey & scienific Instruments 12.10 NCB Aug-05 Sep-05 Oct-05 Post AR Jan-06 Oct-06 R Supply of survey & scienific Instruments 12.10 NCB Dec-06 Jan-07 Feb-07 Post AR Jun-07 Dec-07 R2 Supply of survey & scienific Instruments 12.10 NCB Dec-07 Jan-08 Feb-08 Post AR May-08 Feb-09 R3 Supply of survey & scienific Instruments 12.10 NCB Dec-09 Jan-10 Feb-10 Post AR May-10 Feb-11 R4 Supply of survey & scienific Instruments 12.10 NCB Dec-10 Jan-11 Feb-11 Post AR May-11 Feb-12 55 SI-RM9*** Supply of survey & scienific Instruments 12.10 NCB Dec-05 Jan-06 Feb-06 Post AR Feb-06 Aug-06 R Supply of survey & scienific Instruments 12.10 NCB Dec-06 Jan-07 Feb-07 Post AR Jun-07 Dec-07 R2 Supply of survey & scienific Instruments 12.10 NCB Dec-07 Jan-08 Feb-08 Post AR May-08 Feb-09 R3 Supply of survey & scienific Instruments 12.10 NCB Dec-09 Jan-10 Feb-10 Post AR May-10 Feb-11 R4 Supply of survey & scienific Instruments 12.10 NCB Dec-10 Jan-11 Feb-11 Post AR May-11 Feb-12 r4ver1.xlsx Page 12 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) Sr. Package No. Name Of Component/ Description of Estimate Method of Market Estimate Preparati Banks No Date of Date of No goods d cost Procureme Survey prepared on of Bid objection Award of Completion (Rs. in nt (Month/Y & document to bidding Contract of Contract Million) ICB/NCB/ R) sanctione (Month/Y document Shopping d R) (Month/Y 1 2 3 4 5 6 7 8 9 10 11 56 JE-RM10 Supply of Jeeps for Pune region 7.65 NCB Jun-05 Jul-05 Aug-05 Post AR Nov-05 Aug-06 R Supply of Jeeps lot 1 7.65 DGSD Aug-06 Sep-06 Oct-06 Post AR Dec-06 Mar-07 A Supply of Jeeps lot 1 3.99 DGSD Aug-06 Sep-06 Oct-06 Post AR Nov-06 Dec-06 57 JE-RM11 Supply of Jeeps for Konkan region 7.65 NCB Jun-05 Jul-05 Aug-05 Post AR Nov-05 Aug-06 R Supply of Jeeps lot 2 7.65 DGSD Dec-06 Jan-07 Feb-07 Post AR May-07 Aug-07 R2 Supply of Jeeps lot 2 7.65 DGSD Not reqd May-07 Jun-07 Post AR Sep-07 Jun-08 R3 Supply of Jeeps lot 2 7.65 DGSD Not reqd Feb-09 Mar-09 Post AR May-09 Feb-10 A3 Supply of Jeeps lot 2 8.746 DGSD Not reqd Feb-09 Mar-09 Post AR Jul-09 58 JE-RM12 Supply of Jeeps for Nashik region 7.65 NCB Jun-05 Jul-05 Aug-05 Post AR Nov-05 Aug-06 R Supply of Jeeps lot 3 7.65 DGSD Mar-07 Apr-07 May-07 Post AR Aug-07 Nov-07 R2 Supply of Jeeps lot 3 7.65 DGSD Not reqd Sep-07 Oct-07 Post AR Jan-08 Oct-08 R3 Supply of Jeeps lot 3 7.65 DGSD Not reqd Apr-09 May-09 Post AR Jul-09 Apr-10 R4 Supply of Jeeps lot 3 7.65 DGSD Not reqd Apr-10 May-10 Post AR Feb-11 Nov-11 59 JE-RM13 Supply of Jeeps for Nagpur region 7.65 NCB Jan-06 Feb-06 Mar-06 Post AR Jul-06 Apr-07 R Supply of Jeeps lot 4 7.65 DGSD Jun-07 Jul-07 Aug-07 Post AR Nov-07 Feb-08 R2 Supply of Jeeps lot 4 7.65 DGSD Not reqd May-08 Jun-08 Post AR Sep-08 Jun-09 R3 Supply of Jeeps lot 4 7.65 DGSD Not reqd Jun-09 Jul-09 Post AR Sep-09 Jun-10 R4 Supply of Jeeps lot 4 7.65 DGSD Not reqd Jun-10 Jul-10 Post AR Apr-11 Dec-11 60 JE-RM14 Supply of Jeeps for A'Bad region 7.65 NCB Jan-06 Feb-06 Mar-06 Post AR Jul-06 Apr-07 R Supply of Jeeps lot 5 7.65 DGSD Oct-06 Nov-06 Dec-06 Post AR Mar-07 Jun-07 R2 Supply of Jeeps lot 5 7.65 DGSD Not reqd Sep-08 Oct-08 Post AR Jan-09 Oct-09 R3 Supply of Jeeps lot 5 7.65 DGSD Not reqd Jul-09 Aug-09 Post AR Oct-09 Jul-10 R4 Supply of Jeeps lot 5 7.65 DGSD Not reqd Jul-10 Aug-10 Post AR Dec-10 Sep-11 61 JE-RM15 Supply of Jeeps to A'vati region 7.65 NCB Jan-06 Feb-06 Mar-06 Post AR Jul-06 Apr-07 R Supply of Jeeps lot 6 7.65 DGSD Dec-06 Jan-07 Feb-07 Post AR May-07 Aug-07 R2 Supply of Jeeps lot 6 7.65 DGSD Not reqd May-09 Jun-09 Post AR Sep-09 Jun-10 R3 Supply of Jeeps lot 6 7.65 DGSD Not reqd Aug-09 Sep-09 Post AR Nov-09 Aug-10 R4 Supply of Jeeps lot 6 7.65 DGSD Not reqd Aug-10 Sep-10 Post AR Jan-11 Oct-11 62 CR-RM12 Supply of cars 7.79 NCB Jun-05 Jul-05 Aug-05 Post AR Nov-05 Aug-06 R Supply of cars 7.79 DGSD Aug-06 Sep-06 Oct-06 Post AR Dec-06 Mar-07 A Supply of cars 2.25 DGSD Aug-06 Sep-06 Oct-06 Post AR Nov-06 Dec-06 63 CR-RM13 Supply of cars 7.79 NCB Jan-06 Feb-06 Mar-06 Post AR Jul-06 Jan-07 R Supply of cars 7.79 DGSD Dec-06 Jan-07 Feb-07 Post AR May-07 Aug-07 R2 Supply of cars 9.00 DGSD Dec-07 Jan-08 Feb-08 Post AR May-08 Jul-08 R3 Supply of cars 9.00 DGSD Mar-09 Apr-09 May-09 Post AR Jul-09 Sep-09 A3 Supply of cars 7.479 DGSD Mar-09 Apr-09 May-09 Post AR Jul-09 64 WC-RM14 Supply of water cooler 1.32 DGSD/Shoppin Oct-05 Nov-05 Dec-05 Not Reqd Mar-06 Sep-06 R Supply of water cooler 1.32 Shopping Jan-08 Feb-08 Mar-08 Post AR Jun-08 Dec-08 - Merged into ICIS package 65 CO-RM15 Supply of Air coolers 1.25 DGSD/Shoppin Jul-05 Aug-05 Sep-05 Not Reqd Dec-05 Jun-06 r4ver1.xlsx Page 13 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) Sr. Package No. Name Of Component/ Description of Estimate Method of Market Estimate Preparati Banks No Date of Date of No goods d cost Procureme Survey prepared on of Bid objection Award of Completion (Rs. in nt (Month/Y & document to bidding Contract of Contract Million) ICB/NCB/ R) sanctione (Month/Y document Shopping d R) (Month/Y 1 2 3 4 5 6 7 8 9 10 11 R2 Supply of Air coolers 2.50 NCB Jan-08 Feb-08 Mar-08 Post AR Jun-08 Dec-08 - Merged into ICIS package 67 Kal-G-1 Providing and installing Diesel Generator Set at 0.26 DGSD/Shoppin Not Reqd May-04 Nov-05 Not Reqd Feb-06 May-06 Kal dam site. R Providing and installing Diesel Generator Set at 0.26 Shopping Not Reqd Oct-06 Nov-06 Post AR Jan-07 Apr-07 Kal dam site. R2 Providing and installing Diesel Generator Set at 0.26 Shopping Not Reqd Aug-07 Sep-07 Post AR Nov-07 Feb-08 Kal dam site. R3 Providing and installing Diesel Generator Set at 0.26 Shopping Not Reqd Aug-09 Sep-09 Post AR Nov-09 Feb-10 Kal dam site. R4 Providing and installing Diesel Generator Set at 0.26 Shopping Not Reqd Aug-10 Sep-10 Post AR Nov-10 Feb-11 Kal dam site. 68 Pch-G-1 Providing and installing Diesel Generator Set at 1.30 DGSD/Shoppin Not Reqd May-04 Nov-05 Not Reqd Feb-06 May-06 Pench dam site. R Providing and installing Diesel Generator Set at 1.30 Shopping Not Reqd Oct-06 Nov-06 Post AR Jan-07 Apr-07 Pench dam site. R2 Providing and installing Diesel Generator Set at 1.30 NCB Not Reqd Aug-07 Sep-07 Post AR Nov-07 Feb-08 Pench dam site. R3 Providing and installing Diesel Generator Set at 1.3 NCB Not Reqd Aug-09 Sep-09 Post AR Nov-09 Feb-10 Pench dam site. R4 Providing and installing Diesel Generator Set at 1.3 NCB Not Reqd Aug-10 Sep-10 Post AR Nov-10 Feb-11 Pench dam site. 69 Pch-G-2 Providing and installing VT Pumps at Pench 3.78 NCB Not Reqd May-04 Jul-05 Post AR Oct-05 Jan-06 dam site. R Providing and installing VT Pumps at Pench 3.78 NCB Not Reqd Mar-07 Apr-07 Post AR Jul-07 Oct-07 dam site. R2 Providing and installing VT Pumps at Pench 3.78 NCB Not Reqd Aug-07 Sep-07 Post AR Nov-07 Feb-08 dam site. R3 Providing and installing VT Pumps at Pench 3.78 NCB Not Reqd Aug-09 Sep-09 Post AR Nov-09 Feb-10 dam site. R4 Providing and installing VT Pumps at Pench 3.78 NCB Not Reqd Aug-10 Sep-10 Post AR Nov-10 Feb-11 dam site. 70 Pch-G-3 Providing and installing digital seismological 3.00 NCB Not Reqd May-04 Nov-05 Post AR Feb-06 May-06 recording instrument at Pench dam site. R Providing and installing digital seismological 3.00 NCB Not Reqd Mar-07 Apr-07 Post AR Jul-07 Oct-07 recording instrument at Pench dam site. R2 Providing and installing digital seismological 3.00 NCB Not Reqd Aug-07 Sep-07 Post AR Nov-07 Feb-08 recording instrument at Pench dam site. r4ver1.xlsx Page 14 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) Sr. Package No. Name Of Component/ Description of Estimate Method of Market Estimate Preparati Banks No Date of Date of No goods d cost Procureme Survey prepared on of Bid objection Award of Completion (Rs. in nt (Month/Y & document to bidding Contract of Contract Million) ICB/NCB/ R) sanctione (Month/Y document Shopping d R) (Month/Y 1 2 3 4 5 6 7 8 9 10 11 R3 Providing and installing digital seismological 3 NCB Not Reqd Aug-09 Sep-09 Post AR Nov-09 Feb-10 recording instrument at Pench dam site. R4 Providing and installing digital seismological 3 NCB Not Reqd Aug-10 Sep-10 Post AR Nov-10 Feb-11 recording instrument at Pench dam site. 71 Pch-G-4 Providing and installing extended 0.44 DGSD/Shoppin Not Reqd May-04 Nov-05 Not Reqd Jan-06 Apr-06 Telecommunication system. on Pench project R Providing and installing extended 0.44 Shopping Not Reqd Mar-07 Apr-07 Post AR Jul-07 Oct-07 Telecommunication system. on Pench project R2 Providing and installing extended 0.44 Shopping Not Reqd Dec-07 Jan-08 Post AR Mar-08 Jun-08 Telecommunication system. on Pench project R3 Providing and installing extended 0.44 Shopping Not Reqd Dec-09 Jan-10 Post AR Mar-10 Jun-10 Telecommunication system. on Pench project R4 Providing and installing extended 0.44 Shopping Not Reqd Dec-10 Jan-11 Post AR Mar-11 Jun-11 Telecommunication system. on Pench project 72 Mul-G-1 Providing and installing Diesel Generator Set at 0.88 DGSD/Shoppin Not Reqd May-04 Jul-05 Not Reqd Oct-05 Jan-06 Mula dam site. R Providing and installing Diesel Generator Set at 0.88 Shopping Not Reqd Oct-06 Nov-06 Post AR Jan-07 Apr-07 Mula dam site. R2 Providing and installing Diesel Generator Set at 0.88 Shopping Not Reqd Aug-07 Sep-07 Post AR Nov-07 Feb-08 Mula dam site. R3 Providing and installing Diesel Generator Set at 0.88 Shopping Not Reqd Aug-09 Sep-09 Post AR Nov-09 Feb-10 Mula dam site. R4 Providing and installing Diesel Generator Set at 0.88 Shopping Not Reqd Aug-10 Sep-10 Post AR Nov-10 Feb-11 Mula dam site. 73 Hat-G-1 Supplying and erecting transformer at Hatnur 0.15 DGSD/Shoppin Not Reqd May-04 Nov-05 Not Reqd Feb-06 May-06 dam site. R Supplying and erecting transformer at Hatnur 0.15 Shopping Not Reqd Mar-07 Apr-07 Post AR Jun-07 Sep-07 dam site. R2 Supplying and erecting transformer at Hatnur 0.15 Shopping Not Reqd Aug-07 Sep-07 Post AR Nov-07 Feb-08 dam site. R3 Supplying and erecting transformer at Hatnur 0.15 Shopping Not Reqd Aug-09 Sep-09 Post AR Nov-09 Feb-10 dam site. R4 Supplying and erecting transformer at Hatnur 0.15 Shopping Not Reqd Aug-10 Sep-10 Post AR Nov-10 Feb-11 dam site. 74 Hat-G-2 Providing and installing Diesel Generator Set at 0.34 DGSD/Shoppin Not Reqd May-04 Nov-05 Not Reqd Feb-06 May-06 Hatnur dam site. R Providing and installing Diesel Generator Set at 0.34 Shopping Not Reqd Oct-06 Nov-06 Post AR Feb-07 May-07 Hatnur dam site. r4ver1.xlsx Page 15 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) Sr. Package No. Name Of Component/ Description of Estimate Method of Market Estimate Preparati Banks No Date of Date of No goods d cost Procureme Survey prepared on of Bid objection Award of Completion (Rs. in nt (Month/Y & document to bidding Contract of Contract Million) ICB/NCB/ R) sanctione (Month/Y document Shopping d R) (Month/Y 1 2 3 4 5 6 7 8 9 10 11 R2 Providing and installing Diesel Generator Set at 0.34 Shopping Not Reqd Aug-07 Sep-07 Post AR Nov-07 Feb-08 Hatnur dam site. R3 Providing and installing Diesel Generator Set at 0.34 Shopping Not Reqd Aug-09 Sep-09 Post AR Nov-09 Feb-10 Hatnur dam site. R4 Providing and installing Diesel Generator Set at 0.34 Shopping Not Reqd Aug-10 Sep-10 Post AR Nov-10 Feb-11 Hatnur dam site. 75 Hat-G-3 Supplying and erecting other electrical 0.33 DGSD/Shoppin Not Reqd May-04 Nov-05 Not Reqd Feb-06 May-06 equipment on Hatnur project. R Supplying and erecting other electrical 0.33 Shopping Not Reqd Mar-07 Apr-07 Post AR Jun-07 Sep-07 equipment on Hatnur project. R2 Supplying and erecting other electrical 0.33 Shopping Not Reqd Aug-07 Sep-07 Post AR Nov-07 Feb-08 equipment on Hatnur project. R3 Supplying and erecting other electrical 0.33 Shopping Not Reqd Aug-09 Sep-09 Post AR Nov-09 Feb-10 equipment on Hatnur project. R4 Supplying and erecting other electrical 0.33 Shopping Not Reqd Aug-10 Sep-10 Post AR Nov-10 Feb-11 equipment on Hatnur project. 76 Kat-G-1 Providing and installing Diesel Generator Set at 0.38 DGSD/Shoppin Not Reqd May-04 Nov-05 Not Reqd Feb-06 May-06 Katepurna dam site. R Providing and installing Diesel Generator Set at 0.38 Shopping Not Reqd Oct-06 Nov-06 Post AR Feb-07 May-07 Katepurna dam site. R2 Providing and installing Diesel Generator Set at 0.38 Shopping Not Reqd Aug-07 Sep-07 Post AR Nov-07 Feb-08 Katepurna dam site. R3 Providing and installing Diesel Generator Set at 0.38 Shopping Not Reqd Aug-09 Sep-09 Post AR Nov-09 Feb-10 Katepurna dam site. R4 Providing and installing Diesel Generator Set at 0.38 Shopping Not Reqd Aug-10 Sep-10 Post AR Nov-10 Feb-11 Katepurna dam site. 77 Kat-G-2 Providing and fixing automatic self recording 0.12 DGSD/Shoppin Not Reqd May-04 Nov-05 Not Reqd Feb-06 May-06 raingauge instrument on Katepurna dam R Providing and fixing automatic self recording 0.12 Shopping Not Reqd Oct-06 Nov-06 Post AR Jan-07 Apr-07 raingauge instrument on Katepurna dam R2 Providing and fixing automatic self recording 0.12 Shopping Not Reqd Aug-07 Sep-07 Post AR Nov-07 Feb-08 raingauge instrument on Katepurna dam R3 Providing and fixing automatic self recording 0.12 Shopping Not Reqd Aug-09 Sep-09 Post AR Nov-09 Feb-10 raingauge instrument on Katepurna dam R4 Providing and fixing automatic self recording 0.12 Shopping Not Reqd Aug-10 Sep-10 Post AR Nov-10 Feb-11 raingauge instrument on Katepurna dam 78 DS-EQ Additional machinary on dam 16.00 DGSD/ShoppinAs and when required R Additional machinary on dam*** 16.00 DGSD/ShoppinAs and when required R3 Additional machinary on dam*** 16.00 DGSD/ShoppinAs and when required R4 Additional machinary on dam*** 16.00 DGSD/Shopping r4ver1.xlsx Page 16 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) Sr. Package No. Name Of Component/ Description of Estimate Method of Market Estimate Preparati Banks No Date of Date of No goods d cost Procureme Survey prepared on of Bid objection Award of Completion (Rs. in nt (Month/Y & document to bidding Contract of Contract Million) ICB/NCB/ R) sanctione (Month/Y document Shopping d R) (Month/Y 1 2 3 4 5 6 7 8 9 10 11 iv Field Testing Quality control using mobile Newly included , Provision shifted from consultancy pkg labs R3 Field Testing Quality control using mobile 15.00 PR-4 QCBS Dec-09 Jan-10 Feb-10 Apr-10 Jul-10 labs R4 Field Testing Quality control using mobile 15.00 PR-4 QCBS Dec-10 Jan-11 Feb-11 Apr-11 Jul-11 labs VIII WUA formation 79 COMWU1 Supply of Computers & accessories (incl. 2.90 NCB Aug-06 Sep-06 Oct-06 Post AR Jan-07 Jul-07 Printers) for PLA major/medium projects R Supply of Computers & accessories (incl. 2.90 NCB Aug-07 Sep-07 Oct-07 Post AR Dec-07 Mar-08 Printers) for PLA major/medium projects R2 Supply of Computers & accessories (incl. 2.90 NCB Dec-08 Jan-09 Feb-09 Post AR Apr-09 Jul-09 Printers) for PLA major/medium projects R3 Supply of Computers & accessories (incl. 10.50 DGSD May-10 Jun-10 Jul-10 Post AR Sep-10 Dec-10 Printers) for PLA major/medium projects R4 Supply of Computers & accessories (incl. 10.50 DGSD May-11 Jun-11 Jul-11 Post AR Sep-11 Dec-11 Printers) for PLA major/medium projects 80 COMWU2 Supply of Computers & accessories (incl. 2.90 NCB Aug-07 Sep-07 Oct-07 Post AR Jan-08 Jul-08 Printers) for PLA major/medium projects R Supply of Computers & accessories (incl. 2.90 NCB Aug-08 Sep-08 Oct-08 Post AR Dec-08 Mar-09 Printers) for PLA major/medium projects R2 Supply of Computers & accessories (incl. 2.90 NCB Dec-08 Jan-09 Feb-09 Post AR Apr-09 Jul-09 Printers) for PLA major/medium projects R3 Supply of Computers & accessories (incl. 10.50 DGSD May-10 Jun-10 Jul-10 Post AR Sep-10 Dec-10 Printers) for PLA major/medium projects R4 Supply of Computers & accessories (incl. 10.50 DGSD May-11 Jun-11 Jul-11 Post AR Sep-11 Dec-11 Printers) for PLA major/medium projects 81 COMWU3 Supply of Computers & accessories (incl. 2.90 NCB Aug-08 Sep-08 Oct-08 Post AR Jan-09 Jul-09 Printers) for PLA major/medium projects R Supply of Computers & accessories (incl. 2.90 NCB Aug-09 Sep-09 Oct-09 Post AR Dec-09 Mar-10 Printers) for PLA major/medium projects R2 Supply of Computers & accessories (incl. 2.90 NCB Dec-08 Jan-09 Feb-09 Post AR Apr-09 Jul-09 Printers) for PLA major/medium projects R3 Supply of Computers & accessories (incl. 10.50 DGSD May-10 Jun-10 Jul-10 Post AR Sep-10 Dec-10 Printers) for PLA major/medium projects R4 Supply of Computers & accessories (incl. 10.50 DGSD May-11 Jun-11 Jul-11 Post AR Sep-11 Dec-11 Printers) for PLA major/medium projects r4ver1.xlsx Page 17 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) Sr. Package No. Name Of Component/ Description of Estimate Method of Market Estimate Preparati Banks No Date of Date of No goods d cost Procureme Survey prepared on of Bid objection Award of Completion (Rs. in nt (Month/Y & document to bidding Contract of Contract Million) ICB/NCB/ R) sanctione (Month/Y document Shopping d R) (Month/Y 1 2 3 4 5 6 7 8 9 10 11 84 TM-WU3*** Training Material 15.95 DGSD/ShoppinThese Procurement is of various small acessories and will be acquired on R Training Material 15.95 DGSD/ShoppinThese Procurement is b various small h d h i d of i h j acessories and d b be acquired on i will Sh i R3 Training Material 15.95 DGSD/ShoppinThese Procurement is of various small acessories and will be acquired on as and when required basis troughout the project period by Shopping R4 Training Material 15.95 DGSD/Shopping 86 EQ-WU5 Training equipment support to field training 0.67 DGSD/Shoppin Jun-05 Jul-05 Aug-05 Not Reqd Nov-05 May-06 group R Training equipment support to field training 4.00 NCB Apr-06 May-06 Aug-06 PAR Dec-06 Mar-07 group R2 Training equipment support to field training 4.00 NCB Aug-07 Sep-07 Oct-07 PAR Nov-07 Feb-08 group R3 Training equipment support to field training 4.00 NCB Aug-10 Sep-10 Oct-10 PAR Nov-10 Feb-11 group R4 Training equipment support to field training 4.00 Sep-11 Oct-11 Nov-11 PAR Dec-11 Mar-12 group IX Improved Water Management practices 92 OF-ET1 Supply of Office furniture 1.00 DGSD/Shoppin Aug-07 Sep-07 Oct-07 Not Reqd Nov-07 May-08 R Supply of Office furniture 1.00 DGSD/Shoppin Aug-07 Sep-07 Oct-07 Not Reqd Nov-07 May-08 R3 Supply of Office furniture 1.00 DGSD/Shoppin Aug-09 Sep-09 Oct-09 Not Reqd Nov-09 May-10 R4 Supply of Office furniture 1.00 DGSD/Shoppin Sep-10 Oct-10 Nov-10 Not Reqd Dec-10 Jun-11 X Strengthening Agriculture Support Services 93 ASS-EQ-1 Computer, Printer & other equipments for 2.25 NCB Jun-05 Jul-05 Sep-05 Post AR Jan-06 Jul-06 Village Support Group (package-1) R Computer, Printer & other equipments for 100 3 DGSD Jun-06 Jul-06 Sept-06 Not reqd Nov-06 Jan-07 Village Support Group (Krishi Vigyan Mandal) R2 Computer, Printer & other equipments for 100 3 DGSD Aug-07 Jul-07 Sept-07 Not reqd Nov-07 Jan-08 Village Support Group (Krishi Vigyan Mandal) A2 Computer, Printer & other equipments for 100 3.315 NCB Jul-08 Aug-08 Sep-08 Aug-08 Nov-08 Village Support Group (Krishi Vigyan Mandal) 94 ASS-EQ-2 Computer, Printer & other equipments for 3.00 NCB Jun-06 Jul-06 Sep-06 Post AR Jan-07 Jul-07 Village Support Group (package-2) R Computer, Printer & other equipments for 100 3.00 DGSD Sep-06 Oct-06 Nov-06 Not reqd Jan-07 Jun-07 Village Support Group (Krishi Vigyan Mandal) R2 Computer, Printer & other equipments for 100 3.00 DGSD Sep-07 Oct-07 Nov-07 Not reqd Jan-08 Feb-08 Village Support Group (Krishi Vigyan Mandal) r4ver1.xlsx Page 18 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) Sr. Package No. Name Of Component/ Description of Estimate Method of Market Estimate Preparati Banks No Date of Date of No goods d cost Procureme Survey prepared on of Bid objection Award of Completion (Rs. in nt (Month/Y & document to bidding Contract of Contract Million) ICB/NCB/ R) sanctione (Month/Y document Shopping d R) (Month/Y 1 2 3 4 5 6 7 8 9 10 11 A2 Computer, Printer & other equipments for 100 3.315 NCB Jul-08 Aug-08 Sep-08 Aug-08 Nov-08 Village Support Group (Krishi Vigyan Mandal) 95 ASS-EQ-3 Computer, Printer & other equipments for 3.75 NCB Jun-07 Jul-07 Sep-07 Post AR Jan-08 Jul-08 Village Support Group (package-3) R Computer, Printer & other equipments for 100 3.00 DGSD Dec-06 Jan-07 Feb-07 Not reqd Apr-07 Sep-07 Village Support Group (Krishi Vigyan Mandal) R2 Computer, Printer & other equipments for 100 3.00 DGSD May-08 Jun-08 Jul-08 Not reqd Aug-08 Sep-08 Village Support Group (Krishi Vigyan Mandal) A2 Computer, Printer & other equipments for 100 3.315 NCB Jul-08 Aug-08 Sep-08 Aug-08 Nov-08 Village Support Group (Krishi Vigyan Mandal) 96 ASS-EQ-4 Computer, Printer & Allied equipments for Agro- 1.62 NCB Jun-05 Jul-05 Sep-05 Post AR Jan-06 Jul-06 polyclinics (package-1) R Computer, Printer & Allied equipments for Agro- 3.6 DGSD Jun-06 Jul-06 Aug-06 Not reqd Oct-06 Mar-07 polyclinics (package-1) A2 Computer, Printer & Allied equipments for Agro- 3.315 NCB Jul-08 Aug-08 Sep-08 Aug-08 Nov-08 polyclinics (package-1) 99 ASS-EQ-7 Farm machinary & Implements for 10.5 NCB Jun-05 Jul-05 Sep-05 Post AR Jan-06 Jul-06 Demonstration & Custum hiring for Agro- polyclinics & DTCs R Hand operated Farm machinary & Implements 3.40 NCB May-07 Jun-07 Jul-07 Post AR Oct-07 Mar-08 for Demonstration & Custum hiring for DTCs R Bullock drawn Farm machinary & Implements 3.50 NCB May-07 Jun-07 Jul-07 Post AR Oct-07 Mar-08 for Demonstration & Custum hiring for DTCs R Power operated Farm machinary & Implements 3.60 NCB May-07 Jun-07 Jul-07 Post AR Oct-07 Mar-08 for Demonstration & Custum hiring for DTCs R2 Farm machinary & Implements for Proposal for deleting this and inclusion of cost under civilworks will be sent seperately Demonstration & Custum hiring for Agro- polyclinics & DTCs 106 ASS-EQ-14 Equipments for SAEMTI 0.10 Shopping Jun-05 Jul-05 Sep-05 Not Reqd Jan-06 Jul-06 R Equipments for SAEMTI & RAMETI 1.50 Shopping Jun-06 Jul-06 Aug-06 Post AR Nov-06 Mar-07 R2 Equipments for SAEMTI & RAMETI 1.50 NCB May-07 Jul-07 Sep-07 Post AR Oct-07 Jan-08 R3 Equipments for SAEMTI & RAMETI 1.50 NCB Jun-09 Jul-09 Sep-09 Post AR Nov-09 Jan-10 R4 Equipments for SAEMTI & RAMETI 0.30 NCB 7-Jul-10 15-Jul-10 1-Aug-10 Not reqd 30-Sep-10 31-Mar-11 107 ASS-EQ-15 Equipments for SAEMTI 0.10 Shopping Jun-06 Jul-06 Sep-06 Not Reqd Jan-07 Jul-07 R Equipments for SAEMTI & RAMETI 0.30 Shopping Jun-06 Jul-06 Aug-06 Post AR Nov-06 Mar-07 R2 Equipments for SAEMTI & RAMETI 0.30 NCB May-07 Jul-07 Sep-07 Post AR Oct-07 Jan-08 R3 Equipments for SAEMTI & RAMETI 0.30 NCB Feb-09 Apr-09 Jul-09 Post AR Nov-09 Jan-10 R4 Equipments for SAEMTI & RAMETI 0.30 NCB 7-Jul-10 15-Jul-10 1-Aug-10 Not reqd 30-Sep-10 31-Mar-11 114 ASS-EQ-22 Office Stationary & other Contigencies for 0.10 Shopping Jun-05 Jul-05 Sep-05 Not Reqd Jan-06 Jul-06 Project Co-ordination Unit at state level r4ver1.xlsx Page 19 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) Sr. Package No. Name Of Component/ Description of Estimate Method of Market Estimate Preparati Banks No Date of Date of No goods d cost Procureme Survey prepared on of Bid objection Award of Completion (Rs. in nt (Month/Y & document to bidding Contract of Contract Million) ICB/NCB/ R) sanctione (Month/Y document Shopping d R) (Month/Y 1 2 3 4 5 6 7 8 9 10 11 R Office Stationary & other Contigencies for 0.50 Shopping May-06 Jun-06 Jul-06 Post AR Sep-06 Jan-07 Project Co-ordination Unit at state level electronic equipment A Office Stationary & other Contigencies for 0.23 Shopping May-06 Jun-06 Jul-06 Post AR Sep-06 Mar-07 Project Co-ordination Unit at state level electronic equipment Social and Environment Management Plan 177 SEM-3*** Production of materials for awareness raising Shopping Included under consultancy earliear R Production of materials for awareness raising 5.00 Shopping Jan-08 Feb-08 Mar-08 Post AR May-08 May-10 R2 Production of materials for awareness raising 5.00 Shopping As and when required *** R3 Production of materials for awareness raising 5.00 Shopping As and when required *** R4 Production of materials for awareness raising 5.00 *** XII Piloting User Centered Aquifer Level Management 143 AQL-EQ1 Procurement of Computers, Accessories & 3.760 NCB Jul-05 Aug-05 Sep-05 Post AR Dec-05 Jun-06 Printers R Procurement of Computers, Accessories & 3.760 DGSD Aug-06 Sep-06 Oct-06 Post AR Jan-07 Jul-07 Printers R2 Procurement of Computers, Accessories & 1.490 DGSD Sep-06 Oct-06 Jan-07 Post AR Printers A2 Procurement of Computers 0.539 NCB Jul-08 Aug-08 Sep-08 Aug-08 Nov-08 144 AQL-EQ2 Procurement of Photocopiers 1.750 NCB Jul-05 Aug-05 Sep-05 Post AR Dec-05 Jun-06 R Procurement of Photocopiers 0.111 Shopping May-06 Jun-06 Jul-06 Post AR Oct-06 Mar-07 A Procurement of Photocopiers 0.468 Shopping May-06 Jun-06 Nov-06 Post AR Feb_07 Mar_07 145 AQL-EQ3 Procurement of Fax Machine 0.250 DGSD / Jul-05 Aug-05 Sep-05 Not Reqd Dec-05 Jun-06 R Procurement of Fax Machine 0.013 Sh i Shopping May-06 Jun-06 Jul-06 Post AR Oct-06 Mar-07 A Procurement of Fax Machine 0.133 Shopping May-06 Jun-06 Aug-06 Post AR Dec_06 Mar_07 147 AQL-EQ5 Procurement of Office Furnitures 0.500 DGSD / Jul-05 Aug-05 Sep-05 Not Reqd Dec-05 Jun-06 Shopping R Procurement of Office Furnitures 0.018 Shopping May-06 Jun-06 Jul-06 Post AR Oct-06 Mar-07 A Procurement of Office Furnitures 0.018 Shopping May-06 Jun-06 Jul-06 Post AR Rejected R2 Procurement of Office Furnitures 0.018 May-06 Jun-07 Jul-07 Post AR Oct-07 Mar-08 Shopping R3 Procurement of Office Furnitures 0.200 Shopping Jun-06 Apr-09 Jun-09 Post AR Aug-09 Sep-09 deleted deleted 148 AQL-EQ6 Procurement of Air Conditioners 0.650 DGSD / Jul-05 Aug-05 Sep-05 Not Reqd Dec-05 Jun-06 r4ver1.xlsx Page 20 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) Sr. Package No. Name Of Component/ Description of Estimate Method of Market Estimate Preparati Banks No Date of Date of No goods d cost Procureme Survey prepared on of Bid objection Award of Completion (Rs. in nt (Month/Y & document to bidding Contract of Contract Million) ICB/NCB/ R) sanctione (Month/Y document Shopping d R) (Month/Y 1 2 3 4 5 6 7 8 9 10 11 R Procurement of Air Conditioners 0.216 Shopping May-06 Jun-06 Jul-06 Post AR Oct-06 Mar-07 A Procurement of Air Conditioners 0.251 Shopping May-06 Jun-06 Jul-06 Post AR Mar 07 Mar 07 149 AQL-EQ7 Procurement of LCD 2.000 NCB Jul-05 Aug-05 Sep-05 Post AR Dec-05 Jun-06 R Procurement of LCD 0.556 Shopping May-06 Jun-06 Jul-06 Post AR Oct-06 Mar-07 A Procurement of LCD 0.578 Shopping May-06 Jun-06 Jul-06 Post AR Dec_06 Mar_07 150 AQL-EQ8 Procurment of Lap Tops 0.400 DGSD / Jul-05 Aug-05 Sep-05 Not Reqd Dec-05 Jun-06 R Procurment of Lap Tops 0.400 DGSD Aug-06 Sep-06 Oct-06 Post AR Jan-07 Jul-07 R2 Procurment of Lap Tops 0.400 DGSD Aug-07 Sep-07 Oct-07 Post AR Jan-08 Jul-08 A2 Procurment of Lap Tops 0.208 NCB Jul-08 Aug-08 Sep-08 Aug-08 Nov-08 151 AQL-EQ9 Procurement of Sprinkler Sets Satara 0.460 Community Jun-06 Aug-06 Oct-06 Not Reqd Jan-07 Mar-08 Level R2 Procurement of Sprinkler Sets Satara 0.460 Community Jun-07 Aug-07 Oct-07 Post AR Jan-08 Mar-09 Level Deleted Deleted 152 AQL-EQ10 Procurement of Sprinkler Sets Beed 0.920 ommunity Lev Jun-06 Aug-06 Oct-06 Not Reqd Jan-07 Mar-08 R2 Procurement of Sprinkler Sets Beed 0.920 ommunity Lev Jun-07 Aug-07 Oct-07 Post AR Jan-08 Mar-09 Deleted Deleted 153 AQL-EQ11 Procurement of Sprinkler Sets Jalna 2.032 ommunity Lev Jun-06 Aug-06 Oct-06 Not Reqd Jan-07 Mar-08 R2 Procurement of Sprinkler Sets Jalna 2.032 ommunity Lev Jun-07 Aug-07 Oct-07 Post AR Jan-08 Mar-09 Deleted Deleted 154 AQL-EQ12 Procurement of Sprinkler Sets Amaravati 0.230 ommunity Lev Jun-06 Aug-06 Oct-06 Not Reqd Jan-07 Mar-08 R2 Procurement of Sprinkler Sets Amaravati 0.230 ommunity Lev Jun-07 Aug-07 Oct-07 Post AR Jan-08 Mar-09 Deleted Deleted 155 AQL-EQ13 Procurement of Drip Irrigation sets Satara 0.690 ommunity Lev Jun-06 Aug-06 Oct-06 Not Reqd Jan-07 Mar-08 R2 Procurement of Drip Irrigation sets Satara 0.690 ommunity Lev Jun-07 Aug-07 Oct-07 Post AR Jan-08 Mar-09 Deleted Deleted 156 AQL-EQ14 Procurement of Drip Irrigation sets Beed 1.380 ommunity Lev Jun-06 Aug-06 Oct-06 Not Reqd Jan-07 Mar-08 R2 Procurement of Drip Irrigation sets Beed 1.380 ommunity Lev Jun-07 Aug-07 Oct-07 Post AR Jan-08 Mar-09 Deleted Deleted 157 AQL-EQ15 Procurement of Drip Irrigation sets Jalna 3.206 ommunity Lev Jun-06 Aug-06 Oct-06 Not Reqd Jan-07 Mar-08 R2 Procurement of Drip Irrigation sets Jalna 3.206 ommunity Lev Jun-07 Aug-07 Oct-07 Post AR Jan-08 Mar-09 Deleted Deleted 158 AQL-EQ16 Procurement of Drip Irrigation sets Amaravati 0.311 ommunity Lev Jun-06 Aug-06 Oct-06 Not Reqd Jan-07 Mar-08 R2 Procurement of Drip Irrigation sets Amaravati 0.311 ommunity Lev Jun-07 Aug-07 Oct-07 Post AR Jan-08 Mar-09 Deleted Deleted 159 AQL-EQ17 Procurement of Loggers and Proton 0.745 DGSD / Dec-05 Jan-06 Feb-06 Not Reqd May-06 Nov-06 Magnetometer Shopping r4ver1.xlsx Page 21 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) Sr. Package No. Name Of Component/ Description of Estimate Method of Market Estimate Preparati Banks No Date of Date of No goods d cost Procureme Survey prepared on of Bid objection Award of Completion (Rs. in nt (Month/Y & document to bidding Contract of Contract Million) ICB/NCB/ R) sanctione (Month/Y document Shopping d R) (Month/Y 1 2 3 4 5 6 7 8 9 10 11 R Procurement of Loggers and Proton 0.737 Shopping May-06 Jun-06 Jul-06 Post AR Oct-06 Mar-07 Magnetometer A Procurement of Loggers and Proton 0.702 Shopping May-06 Jun-06 Jul-06 Post AR Mar-07 Dec-07 Magnetometer 160 AQL-EQ18 Procurement of UV Spectrophotometer 0.80 DGSD / Dec-05 Jan-06 Feb-06 Not Reqd May-06 Nov-06 R Procurement of UV Spectrophotometer 0.82 Sh i Shopping May-06 Jun-06 Jul-06 Post AR Oct-06 Mar-07 A Procurement of UV Spectrophotometer 1.165 Shopping May-06 Jun-06 Jul-06 Post AR Mar_07 Dec_07 161 AQL-EQ19 Procurement of Deep Restivity Meter 1.00 DGSD / Dec-05 Jan-06 Feb-06 Not Reqd May-06 Nov-06 R Procurement of Deep Restivity Meter 1.05 Shopping May-06 Jun-06 Jul-06 Post AR Oct-06 Mar-07 A Procurement of Deep Restivity Meter 0.94 Shopping May-06 Jun-06 Jul-06 Post AR Mar_07 Dec_07 162 AQL-EQ20 Procurement of Rain Gauges 0.20 DGSD / Jul-05 Aug-05 Sep-05 Not Reqd Dec-05 Jun-06 R Procurement of Rain Gauges 0.36 Sh i Shopping May-06 Jun-06 Jul-06 Post AR Oct-06 Mar-07 A Procurement of Rain Gauges 0.266 Shopping May-06 Jun-06 Jul-06 Post AR Dec_06 Nov_07 163 AQL-EQ21 Procurement of Water Testing Kits 0.040 DGSD / Jul-05 Aug-05 Sep-05 Not Reqd Dec-05 Jun-06 Shopping R Procurement of Water Testing Kits 0.020 Shopping May-06 Jun-06 Jul-06 Post AR Oct-06 Mar-07 A Procurement of Water Testing Kits 0.020 Shopping May-06 Jun-06 Jul-06 Post AR Rejected R2 Procurement of Water Testing Kits 0.020 Shopping May-06 Jun-06 Jul-06 Post AR Jul-07 Dec-07 R3 Procurement of Water Testing Kits 0.040 Shopping May-06 Mar-09 Apr-09 Post AR Mar-10 Apr-10 Deleted deleted R Procurement of Remote Sensing Data Sets. 0.20 Direct Aug-06 Sep-06 Oct-06 Post AR Jan-07 Jul-07 R2 Procurement of Remote Sensing Data Sets. 0.20 t ti Direct * Aug-07 Sep-07 Oct-07 Post AR Jan-08 Jul-08 contracting* A Procurement of Remote Sensing Data Sets. First Direct Aug-07 Sep-07 Oct-07 Post AR Nov-07 Dec-07 0.110 cycle contracting* R3 Procurement of Remote Sensing Data Sets. Direct Aug-07 Sep-10 Oct-10 Post AR May-11 Jun-11 Second cycle to be procured 0.090 contracting* R4 Procurement of Remote Sensing Data Sets. Direct Aug-07 Sep-10 Oct-10 Post AR Sep-11 Sep-11 Second cycle to be procured 0.090 contracting* XIV Project Management Unit 165 OF-PMU1 Supply of Office furniture 1.50 DGSD/Shoppin As and when required R Supply of Office furniture 1.00 Shopping Dec-06 Jan-07 Feb-07 Post AR Apr-07 Oct-07 R2 Supply of Office furniture 1.00 Shopping Dec-08 Jan-09 Feb-09 Post AR Apr-09 Oct-09 178 OF-PMU2 nil R Supply of Office equipment 0.51 Shopping Aug-06 Aug-06 Sep-06 Post AR Nov-06 Mar-07 R2 Supply of Computers & peripherals 0.90 Shopping Aug-06 Aug-06 Sep-06 Post AR Nov-07 Mar-08 Included under MIS equip package r4ver1.xlsx Page 22 MAHARASHTRA WATER SECTOR IMPROVEMENT PROJECT (MWSIP) Sr. Package No. Name Of Component/ Description of Estimate Method of Market Estimate Preparati Banks No Date of Date of No goods d cost Procureme Survey prepared on of Bid objection Award of Completion (Rs. in nt (Month/Y & document to bidding Contract of Contract Million) ICB/NCB/ R) sanctione (Month/Y document Shopping d R) (Month/Y 1 2 3 4 5 6 7 8 9 10 11 2 1.90 Project Management Unit XVI Information ,Education and Communication 166 IEC-1 IEC materials 31.00 DGSD/ShoppinAs And When Required Basis R IEC materials *** 31.00 DGSD/ShoppinAs And When Required Basis R2 IEC materials *** 26.00 DGSD/ShoppinAs And When Required Basis R3 IEC materials *** 26.00 DGSD/ShoppinAs And When Required Basis 1 26.00 Information ,Education and Communication Total 870 Information ,Education and Communication Revised 681 Revised 2 676 Revised 3 801 Revised 4 746 Note * justification for the same is attached separately ** Post AR implies Post Award Review by the Bank *** Procurement will be decentralised hence prescribed thresholds are not infringed upon. r4ver1.xlsx Page 23
Группа Всемирного банка · Procurement Plan
India - Maharashtra Water Sector Improvement Project : procurement plan
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Procurement Plan
Страна
Индия
Источник
Всемирный банк