63022 2011 SAMPLE PROCUREMENT PLAN BURKINA FASO ProGRAMME REGIONAl DE FACILITATION des Transports ET TRANSIT ROUTIERs EN AFRIQUE DE L’OUEST (PRFTTAO) Crédit N°. 4438 – BF I. General 1. Project information: BURKINA FASO; Borrower : BURKINA FASO ; Project Name : Projet Régional de Facilitation des Transports et du Transit Routier en Afrique de l’Ouest (PRFTTAO); Loan/Credit No. Crédit IDA N°4438 – BF 2. Bank’s approval Date of the procurement Plan: 16 mars 2011 3. Date of General Procurement Notice: 04 avril 2009 dans le DG Market 4. Period covered by this procurement plan: Année 2011 II. Goods and Works and non-consulting services 1. Prior Review Threshold: Procurement Method Prior Review Threshold Comments 1. ICB and LIB (Goods) $US 500 000 Prior review 2. NCB (Goods) $US 500 000< X > 50 000 Post review 3. ICB (Works) $US 3 000 000 Prior review 4. NCB (Works) $US 3 000 000< X > 50 000 Post review 5 CF (Goods) $US 50 000 Post review 6 CF (Works) $US 50 000 Post review 2. Prequalification. Non applicable 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Pratique commerciale décrite dans le manuel d’opération de l’accord de crédit 4. Reference to (if any) Project Operational/Procurement Manual: Manuel des procedures administratives, financières et comptables version révisée de juin 2006 Any Other Special Procurement Arrangements: Non applicable 1 5. Procurement Packages with Methods and Time Schedule 1 2 3 4 5 6 7 8 9 Re Contract Estima Procur Prequ Domesti Review Expected Comme f. (Description) d ement alifica c by Bid- nts No Cost Metho tion Preferen Bank Opening . d (yes/n ce (Prior / Date o) (yes/no) Post) Matériels et mobiliers de Post 1 42,11 CF No No 02/2011 bureau Achat de fournitures de Post 2 21,05 CF No No 02/2011 bureau Acquisition de matériel Post 3 spécifique des forces de 135,85 AON No No 08/2011 l’ordre Duplication des outils Post méthodologiques en 4 matière de protection de 21,05 CF No No 03/2011 l'environnement (Dépliants affiches, etc) III. Selection of Consultants 1. Prior Review Threshold: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) $US 300 000 Prior review SFQTC 2. Competitive Methods (Firms) $US 100 000 Prior review SFQ 3 Competitive Methods (Firms) $US 100 000 Prior review SMC 4 Competitive Methods $US 50 000 Prior review (Consultants individuals) CI 5 Single Source (Firms) ED Tous les contrats Prior review 2 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $ 100 000 équivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: Non applicable 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 7 Re Description of Assignment Estimate Selectio Review Expected Comments f. d n by Bank Proposals No Cost Method (Prior / Submission . (US$ 000) Post) Date Etude diagnostique sur le 1 renforcement et amélioration de la 80,00 SFQTC Post 08/2011 signalisation routière sur le corridor Recrutement d’un Consultant en Post 2 vue de dispenser une formation au 60,00 SFQ 07/2011 profit du SGES/MID Audit des activités de la passation Post 3 10,00 CI 07/2011 des marchés 4 Revue à mi-parcours du PRFTTAO 40,00 CI Post 07/2011 5 Rapport d'achèvement du PST-2 44,00 CI Post 08/2011 Audit technique externe des Post 6 10,00 CI 09/2011 travaux du PRFTTAO Elaboration du manuel de Post procédures de gestion administrative, comptable et 7 20,00 CI 01/2011 financière de l’agence des travaux d’infrastructures du Burkina (AGETIB) élaboration du manuel de Post procédures technique de l’agence 8 20,00 CI 01/2011 des travaux d’infrastructures du Burkina (AGETIB) 3
Группа Всемирного банка · Procurement Plan
Africa - West Africa Regional Transport and Transit Facilitation Project : procurement plan : Burkina Faso - Programme Régional de Facilitation des Transports El Transit Routiers En Afrique de L'Ouest (PRFTTAO) : procurement plan
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Procurement Plan
Источник
Всемирный банк