62664 Procurement Plan (including contract packaging) 30/03/2011Version I General 1.1 Project information: Country: China Sub-Borrower: Xi’an Municipal Government Project Name: Xi’an Urban Transport Project Loan/Credit No: 7558 -CHA Project ID: P0 Project Implementing Agencies: • XDRC: PMO in Xi’an Foreign Loan Management Office under Xi’an Development and Reform Commission. (XDRC) for overall project preparation, oversight and coordination. • IIC: Xi’an Infrastructure Investment General Co. (IIC) for overall project management, supervision and debit repayment. • MPWMC: Xi’an Municipal Public Works and Management Commission for Road Networks –Xi’an city component (RNC) • Huxian County Government: Huxian County Construction Bureau and Huxian DRC for Road Networks –Huxian component (RNH) • XMCB and XPTC Xi’an Municipal Communications Bureau (XMCB) and Xi’an Public Transport General Company (XPTC) for public transport component (PT) • XPSB: Xi’an Public Security Bureau Traffic Police Detachment (XPSB) for Traffic Management component (TM) • XEPB : Xi’an Municipal Environment Protection Bureau (XEPB) for Air Quality Management component (AQM) • XMCHB Xi’an Municipal Culture Heritage Bureau (XMCHB) for Culture Heritage – Ancient Roads in Han Chang’an city-Weiyang Palace component (CH1) • XCSWC : PMO in Xi’an Municipal City Wall Scenery Spot Committee (XCWSC) for Culture Heritage – Ming City Bicycle Network component (CH2) 1.2 Bank’s approval date of the Procurement Plan: Original___of 2007; Revision 1: __of 2008, Revision 2:__of 2009, Revision 3: __of 2010…] Period covered by the Procurement Plan (PP): 2007 -2011, The PP in the first year is ready to be implemented. The PP for rest years is only indicative subject to the adjustment approved by the Bank later. The cost estimate in original PP is based on the feasibility study (Huxian project is based on cost estimate of preliminary design). The cost estimates in the revised PP will be replaced by cost estimate based on the preliminary design and detailed construction design whenever the preliminary design and detailed construction design are completed. 1.3 Date of General Procurement Notice(GPN): Before any Specific procurement Notice(SPN) Advertisement for SPN: All ICB regardless of contract value and consultant contract above $200,000 shall be at least on a national newspaper and dgMarket & UNDB on line All NCB contracts above $2 million for Works and above $300,000 for Goods, all consultant contracts for firms regardless of contract value shall be at least on a national newspaper. All NCB contracts below $2 million for Works and below $300,000 for Goods shall be at least on a provincial newspaper. Disclosure information for bid/proposal evaluation and contract award: Bid evaluation and contract award information for all ICB procurement of works and goods, for all QCBS, QBS, CQS and SSS procurement of consultant services shall be published on UNDB on line and dgMarket in accordance with the stipulations in Bank’s procurement Guidelines. Disclosure of bid evaluation and contract award information for all NCB and Shopping procurement of works and goods will follow local procedures. 1.4 Procurement Method Threshold for Goods and Works and non-consulting services. Procurement Civil Works /Supply Goods Non-Consultant Services Method and Install 1. ICB >$20 million >$1,000,000 NA 2. NCB <$20 million <$1,000,000 NA 3. Shopping NA <$100,000 NA Note: NA = Not Applicable for the project 1.5 Prequalification : Bidders for contract value >$20 million under ICB Works shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. No prequalification, but post qualification, for all goods and NCB works under the project. 1.6 Domestic Preference: Domestic preference applies for ICB goods procurement only. No domestic preference for works contracts and NCB/Shopping contracts. 1.7 Procurement Method Thresholds for Selection of Consultants and Training Selection Method Consultant Firm Individual Training (for those including Consultant not included in trainings offered consultant services) by the firm(if any) 1. QCBS/QBS/FBS >$200,000 NA NA 2. CQ <$200,000 NA NA 3 Section V of NA Any value NA guidelines 1.8 Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $ 300,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 1.9 Prior Review Thresholds for Goods, Works, Non-consulting Services, Consultant Firm, Individual Consultant and Training Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Category Prior Review Threshold 1. Works >$4 million First NCB All design & contract drawings 2. Goods >$300.000 First Shopping contract 3. Non-Consultant Services NA NA 4. Consultant Firm >$100,000 First contract All TOR 5. Individuel Consultant >$50,000 First contract All TOR 6. Training NA NA All TOR In addition, the procurement for first contracts for each implementing agency and for each type procurement method, all drawings for civil works and all TOR for consultant services regardless of contract value shall also be sent to the Bank for prior review. (80% by value). II Reference to (if any) Project Operational/Procurement Manual: Procurement Manual prepared by IIC will be distribute to all procurement staff on. III Any Other Special Procurement Arrangements: NA. VI Procurement Packages with Methods and Time Schedule List of contract packages to be procured in the first year and late years: All TOR, preliminary design, detailed construction design and drawings for bidding documents shall be submitted to the Bank for prior review for all contracts including contracts subject to Bank post review. Prequalification apply for ICB works contracts and post qualification apply for NCB works and goods procurement. The letters at beginning of Contract No.: RN Road Network 1. RNC : Road Network in Xi’an City, 2. RNH : Road Network in Huxian, PT: Public Transport 3. PT1: Bus Interchange, 4. PT2: Bus Priority lanes, 5. PT3: Bus Maintenance Depot, TM: Traffic Management, 6. TM1: Area Traffic Control (ATC) 7. TM2: Road Safety 8. TM3: Enforcement & Road User Education (RUE) 9. TM4: Parking 10. TM5: Traffic Facilities AQ:Air Quality Management, 11. AQ1: Air Quality Monitoring Center 12. AQ2: MV Emission Inspection 13. AQ3: Air Quality Monitoring Network 14. AQ4: Information Management and Data Analysis 15. AQ5. TA for MV Emission Control CH: Cultural Heritage 16. CH1: Han Chang’an Weiyang Palace Han Dynasty Roads 17. CH2: Ming City Bicycle Route ID: Institutional Development 1 One U.S dollar is in equivalence of 6.61 Yuan RMB No Contract Contract name, feature Cost Estimates Cost Procure Prior review or Estimated Actual contract Contract . No. USD million/ actually ment post review contract signing year duration RMB 10K (RMB method signing year months 10K) RNC11 Yuxiangmen Interchange 11.33/8042 7830.6 NCB Prior review 2009-10 2009-12-25 15 1. 0.86 km Works RNC12 Changlemen Interchange 7.13/4712 NCB Prior review 2011 12 2. 0.8km (preliminary Works design amount7312) RNC13 South 1st Ring Road, 3.9km 91.06/60190 ICB Prior review 2012 30 3. (preliminary Works design amount52547) RNC21 2nd Ring Road North-East 10.44/7410 6896.8 NCB Prior review 2008-10 2008-11-30 18 4. Interchange(Stage 1.3 Works km RNC22 2nd Ring Road South-East 9.92/7044 7895.8 NCB Prior review 2009-7 2009-8-10 12 5. Interchange - 1.08 km Works RNC31 Tai Bai Nan-Zhang Ba 23.66/15642 ICB Prior review 2011 24 6. Interchange (preliminary Works 2.05 km design amount19285) Total 153.54/103040 22623.2 Notes: 1. All six contracts are civil works construction contracts. Equipment for pumping stations, lighting, ventilation and safety in RNC11, RNC12, and RNC13 is included in the civil works contracts. 2. RNC 13 will be divided into 2-3 packages after the completion of preliminary design. Contract packages for the Road Network Subcomponent in Huxian (RNH) No. Contract Contract name and Cost Estimates Cost Procurem Prior review or Estimated Actual Contract No. feature USD million/ actually ent post review contract contract duration RMB 10K (RMB 10K) methods signing signing year months year RNH5 Meipi Road 3.6km 4.05/2878 3097.7 NCB Prior review 2009-9 2009-11-17 12 1 Works RNH3 Lvgong Road 2.8km 4.38/3108 2800.3 NCB Prior review 2009-9 2009-11-17 12 2 Works RNH4 Railway Crossing 3.19/2266 2818 NCB Post review 2010 2010-05-28 18 3 (Underpass) on Works Lvgong Road 0.75km RNH1 Xincheng Road 5.1km 11.16/7374 NCB Prior review 2011 18 4 Works RNH2 Dongcheng Road 2km 4.27/2826 NCB Prior review 2011 18 5 Works Total 27.55/18402 8716 Notes: 1. RNH 4 is shown as a separate contract to RNH3 as it involves a railway crossing and will therefore be only open to contractors approved by China Railways. 2. Pumps are included in RNH4 Contract packages for Public Transport Component PT 1 Bus Rapid Transit No. Contract Contract name and Cost Estimates Cost Procurem Prior Estimated Actual contract Contract No. feature USD million/ actually ent review contract signing year duration RMB 10K (RMB 10K) methods or post signing year months review 1 PT1.1 South Bus Interchange 2.55/1686 NCB Post 2012 18 Civil Works Works review 2 PT1.2 Textile Town Bus 4.23/2795 NCB Prior 2012 18 Interchange Civil Works review Works 3 PT1.3 South Bus Interchange 0.77/507 NCB prior 2012 6 Facilities: Bus Goods review Performance Testing Equipments 4 PT1.5 Textile Town Bus 0.77/507 NCB prior 2012 6 Interchange Facilities: Goods review Bus Interchange Facilities and Bus Performance Testing Equipments Total 8.32/5495 PT2 Bus Priority Lanes No. Contract Contract name Cost Estimates Cost Procurem Prior Estimated Actual Contract No. USD million/ actually ent review or contract contract duration RMB 10K (RMB methods post signing signing year months 10K) review year 1 PT2.1 Weiyang-S/N Street- 3.77/2491 NCB post 2012 10 Chang’an R, 17.87km, 22 Works review stops 2 PT2.2 Hongqichang-Taihua R-1RR 2.46/1672 NCB post 2012 10 East-Taiyi R-Qujiang 23 Works review stops, 14.65 km 3 PT2.3 Jiefang R-Heping R-Dayanta 1.45/961 NCB post 2012 10 5.87km, 18 stops Works review 4 PT2.4 Keji R-Xixieqi R-Jixiang R- 1.87/1237 NCB post 2012 10 Xiaozai E&W R-Xiying R 25 Works review stops, 13.22 km 5 PT2.5 Laodong R-Gaoxin R, 9 stops, 0.98/647 NCB post 2012 10 5.34 km Works review 6 PT2.6 Xingqing R 6 stops, 3.07 km 0.65/432 NCB post 2012 10 Works review 7 PT2.7 Youyi R 9.97km, 13 stops 1.68/1113 NCB post 2012 10 Works review 8 PT2.8 Zhuhong R-Xinghuo R-1SS 1.95/1288 NCB post 2012 10 West-Taibai R 19 stops, 15.6 Works review km 9 PT2.9 Hangcheng R –Zhangbabei R 0.65/427 NCB post 2012 10 10 stops, 9.29 km Works review 10 PT2.10 Hongguan R-Fenghao R- 2.22/1468 NCB post 2012 10 Xiguanzhengjie-E&W Street- Works review Shiyuan R-Huzhu R-Hansen R 23 stops, 13.14 km 11 PT2.11 Zhangbadong R(Xiwanlukou- 0.89/586 NCB Post 2011 10 Zhuque Street) 4km, 8 stops Works review 12 PT 2.12 Xianningzong R-Xiangningxi 2.62/1734 NCB Post 2012 10 R-1SS South-Fengqing R Works review 10.56km, 27 stops 13 PT 2.13 Zhuque R (Zhangbadong R- 1.94/1280 NCB Post 2012 10 Zhuque Gate) 5.88km, 15 Works review stops Total 23.13/15336 PT3 Bus Depot ---Xinzhu Bus Depot No. Contract Contract name Cost Estimates Cost Procurement Prior Estimated Actual Contract No. USD million/ actually methods review contract contract duration RMB 10K (RMB 10K) or post signing signing months review year year 1 PT3.1 Depot Civil works 11.98/7921 NCB prior 2012 17 Works review 2 PT3.2 Automatic telescopic 0.29/190 NCB Post 2012 6 gate, washing station and Goods review petrol station 3 *PT3.3 Bus Performance Testing 0.27/181 NCB post 2012 6 Equipments Goods review 4 *PT3.4 Bus Repairing Testing 0.34/223 NCB prior 2012 6 Equipments Goods review 5 PT3.5 Bus repairing 0.26/169 NCB post 2012 6 machines tools Goods review 6 PT3.6 Office facility 0.30/200 NCB prior 2012 6 Goods review 7 PT3.7 Office furniture 0.22/144 NCB Post 2012 6 Goods review 8 PT3.8 Management facility 0.17/112 NCB Post 2012 6 Goods review Total 13.83/9140 *Notes: Xinzhu Bus Depot is also in land acquisition phase, PT3.3 and PT3.4 contract packages are not thinking to combine at present and they are not doing the preliminary design. Contract packages for Traffic Management Component – TM 1 Area Traffic Control No Contract Contract name Cost Estimates Cost Procurem Prior or Estimated Actual Contract No. USD million/ actually ent post contract contract duration RMB 10K (RMB 10K) methods review signing signing months year year 1 TM11 ATC, signals & controllers for ICB Prior 2012 24 200 road junctions & 9.62/6359 Goods review associated equipment 2 TM12 200 road junction NCB Prior 2012 24 5.36/3541 channelizations (see Note 1) works review CCTV traffic monitoring ICB Prior 2012 24 TM13 2.54/1685 3 cameras Goods review Engineering Project CQS Post 2012 24 TM13-1 0.05/33 Supervisor Service review 4 TM14 Wireless network of ICB Prior 2012 12 communications system for 1.45/958 Goods review ATC,CCTV,VMS Total 19.02/12576 Notes: 1. Includes 177 junctions mostly within MWC ATC, plus 23 junction allowance for other components. 2. Implementation of ATC is split into four contracts (TM 11-14) as experience has shown this is most efficient way to implement ATC TM 2 Road Safety No Contract Contract name Cost Estimates Cost Procurem Prior Estimated Actual Contract . No. USD million/ actually ent review contract contract duration RMB 10K (RMB methods or post signing signing months 10K) review year year 1 TM21 Traffic accident on-scene fast 0.21/141 QCBS Prior 2011 16 investigation system services review 2 TM22 Accident Remedial Measures - 0.71/470 NCB Prior 2012 18 Engineering, Enforcement, Goods review Education arising from AAS TA 3 TM23 Accident investigation vehicle 1.96/1293 1233.97 ICB Prior 2011-01 2010-12-20 18 Goods review Total 2.88/1904 1233.97 TM3 Enforcement and RUE No Contract Contract name Cost Estimates Cost Procurem Prior or Estimated Actual Contract . No. USD million/ actually ent post contract contract duration RMB 10K (RMB methods review signing signing months 10K) year year 1 TM31 Traffic integrated stage- 1.68/1108 QCBS Prior 2011 12 manage system services review TM32a Traffic information collect 2.34/1552.4 ICB Prior 2011 24 Goods review 2 TM32b Variable Message Sign(VMS) 1.42/941 ICB Prior 2011 24 Goods review Enforcement Cameras ICB Prior 2011 18 TM33 ("Electronic Police") 2.42/1600 Goods review 3 2 Pickup Trucks and 1 NCB Post 2011 18 TM33-1 Overhead Working Truck 0.12/80 Goods review 4 TM34 Road User Education (RUE) 1.12/740 QCBS Prior 2011 12 Development of Campaigns services review Total 8.97/5929 Notes: TM34 road users education (RUE) development of campaigns will be the optoelectronic and sound devices for demonstration in road-user training base, and the procurement model is to be determined. TM4 Parking No Contract Contract name Cost Estimates Cost Procurem Prior or Estimated Actual Contract No. USD million/ actually ent post contract contract duration RMB 10K (RMB method review signing signing months 10K) year year 1 TM41 Parking facilities & signs 1.05/696 ICB Prior 2011 24 (Supply and Install) Goods review Total 1.05/696 TM5Traffic Facilities - No Contract Contract name Cost Estimates Cost Procurem Prior or Estimated Actual Contract No. USD million/ actually ent post contract contract duration RMB 10K (RMB method review signing signing months 10K) year year 1 TM51 Traffic guardrail and special 2.09/1482 1215.43 ICB Prior 2010 2011-01-04 12 cleaning equipments Goods review 2 TM52 Equipment to apply & remove 0.24/171 118 NCB Post 2010 2010-05-21 6 thermoplastic lines Goods review Total 2.33/1653 1333.43 Contract packages for the Air Quality Management Component No. Contract Contract name Cost Estimates Cost Procurem Prior Estimated Actual Contract No. USD million/ actually ent review contract contract duration RMB 10K (RMB methods or post signing signing months 10K) review year year 1 AQ1.1 Air Quality Monitoring 6.66/4712.9 NCB Prior 2010 2010-12-01 30 Center Building 6398.58 Works review 2 AQ2.1-1a Automatic Noise 0.36/239.1 NCB Prior 2011 21 Monitoring System Goods review including Display Screen and 2 Ambient Air Quality Monitoring Sub- Stations(fixed monitoring point) 3 AQ2.1-1b Motor Vehicle Driving 0.36/239.1 NCB Prior 2012 12 Condition Pollution Goods review Emission Monitoring and 2 Automatic Traffic Pollution Monitoring sub-stations 4 AQ2.1-2 Motor Vehicle Tail Gas 0.32/212 NCB Prior 2011 12 Emission Remote Sensing Goods review Monitoring Equipment including one 17-seat monitoring vehicle 5 AQ2.2-1 Non-conventional pollutant 0.07/47.7 Shopping Post 2012 12 monitoring system for Goods review experimental 6 AQ2.2-2 Motor vehicle simple 1.06/699.6 ICB Prior 2011 12 operating condition Goods review monitoring system 7 AQ3.1 Ambient Air Quality 1.55/1022.8 1066.25 ICB Prior 2011-01 2010-11-20 18 monitoring vehicle and Goods review Motor Vehicle Tail Gas Emission Monitoring Vehicle AQ3.2b-1 Simple Information- 0.098/65 Shopping Post 2011 21 Processing System of Goods review 8 Monitoring Station STARLIMS software Shopping Post AQ3.2b-2 Simple Information- 0.024/15.8 Goods review 2011 21 Processing System of Monitoring Station hardware device AQ3.2b-3 Simple Information- 0.12/80 CQS Prior 2011 21 Processing System of Service review Monitoring Station STARLIMS software STARLIMS software consultancy &development system 9 AQ3.2d Equipments maintenance 0.48/318 NCB Prior 2012 12 and Spare Parts Goods review Replacement 10 AQ4.1 Online monitoring system 0.67/477 318+1 NCB Prior 2009 2010-04-20 12 for key air pollution Goods review source(10 sets) 11 AQ4.2 Air Quality Data Analysis 0.96/636 NCB Prior 2012 21 IT system Goods review 12 AQ5.1 Simple Data System for 0.11/80 78 CQS Prior 2009 2009-09-15 24 Motor Vehicle Emission Service review Pollution Monitoring in Xi’an AQ5.1- Simple Data System for 91.6 2010-04-30 12 1 supple Motor Vehicle Emission mental Pollution Monitoring in contract of Xi’an AQ5.1 13 AQ5.2 Xi’an Urban Traffic 0.186/125 CQS Prior 2011 36 Pollution Assessment Service review Prevention and Treatment Plan Total 13.028/8970 7971.43 In order to meet the requirements from Ministry of Environmental Protection, there should buy ten more sets of data sampler. Every data sampler needs 19000 RMB and the total contact amount increased 190000 RMB. Contract packages for Culture Heritage Component: CH 1 Han Changan Dynasty Weiyang Palace No. Contract Contract name Cost Estimates Cost Procurement Prior Estimated Actual Contract No. USD million/ actually methods review contract contract duration RMB 10K (RMB 10K) or post signing signing months review year year 1 CH1.1 5 Han road 8.4 km, 9.08/6446 8352.18 NCB Prior 2010 2010-11-26 18 110,000 m2 Works review 2 CH1.2 30 units of 8-seats electric 0.36/240 NCB Prior 2011 5 cars Goods review 3 CH1.3 100 units of bikes 0.018/12 Shopping Post 2011 5 Goods review 4 CH1.4 Site monitoring camera 0.11/70 NCB Post 2011 5 etc. Goods review total 9.568/6768 8352.18 CH2 Ming City Bicycle Route (CH2) No. Contract Contract name Cost Estimates Cost Procurem Prior Estimated Actual Contract No. USD million/ actually ent review contract contract duration RMB 10K (RMB methods or post signing signing months 10K) review year year 1 CH2.1 Shuncheng R bicycle streets NCB Prior 2011 18 (13.13km), Improvement of Works review 9.55/6312 the 16 Gates Lukou and contribution of 64 junctions 2 CH2.2 Bicycle lanes (17.58km) and NCB Prior 2011 18 14.11/9330 40 junctions Works review 3 CH2.3 Landscaping of bicycle NCB Post 2011 6 0.49/326 route sections (30.71km) Works review 4 CH2.4 Street furniture on 34 NCB Post 2011 6 3.77/2493 bicycle route sections Works review 5 CH2.5 5,000 unites of bicycles NCB, Prior 2012 3 0.45/300 Goods review Total 28.37/18761 Contract packages for the Institutional Development Component No. Contract Contract name Cost Cost Procurem Prior Estimated Actual Contract No. Estimates actually ent review contract contract duration USD (RMB 10K) methods or post signing signing months million/ review year year RMB 10K 1 ID1.1 Xian Urban Comprehensive 2.42/1600 QCBS Prior 2011 18 Strategic Transport Study Service review 2 ID1.2 Financial planning 0.91/600 a. ID1.2A General Equipment 0.13/86 85.902 ID1.2A1 Computer and other office equipments 47.805 Co 2009-11- mputer and 2009-10 7days Shopping post 11 0.099/65.6 printer Goods review 17.753 ca 2009-11- 2009-10 7days mera 26 ID1.2A2 Transportation Shopping post 2009-09- 0.031/20.4 2009-10 6 20.344 Goods review 24 b. ID1.2B Survey and Assessment CQS post 2009-09- 0.038/25 25 review 2009-10 6 Service 24 c. ID1.2C Domestic Review and post 0.14/90 50.6995 SOE 2009-10 16 Training review d. ID1.2D Technical Studies 0.19/127 ID1.2D1a The research on the reasonable degree of 27 CQS post 2010-1- 0.04/27 2009-11 6 Government debt of the Service review 28 budget and scale ID1.2D1b Establishment of Debt 27 warning model and post management model theory CQS review 2010-1- 0.04/27 2009-11 6 research Service 28 ID1.2D2 The research on 26 post 2010-1- Government debt CQS review 29 monitoring system 0.039/26 2009-11 6 Service ID1.2D3 The research on method of 21 post 2010-1- maintain value of CQS review 28 Government debt 0.032/21 2009-11 6 Service ID1.2D4 Reserve study on financial 26 CQS post 2010-5- reserves 0.039/26 review 2009-11 30 6 Service e. ID1.2E System Development 0.21/139 ID1.2E1 System Development CQS Prior 2010-5- 0.10/69 69 2010-01 6 Consultant Service Service review 31 ID1.2E2 System Development NCB post Equipment 0.11/70 2011 review Goods f. ID1.2F Policy Recommendation CQS post 2010-07- 0.03/20 19.8 2010-07 3 and General Report Service review 21 g. ID1.2G Evaluation Meeting and post 0.07/48 13.257 SOE 2010-10 3 Workshops review h. ID1.2H Assisting Project Prior 2009-09- Management For Financial SSS review 01 0.045/30 30 2009-09 16 Planning Service i ID1.2I Monograph Published Shopping post 2010-09- 0.053/35 35 2010-01 12 Results Goods review 30 ID2.1 TM-ATC Technical specification, bidding CQS post 3 0.076/50 50 2010 2010-08 6 documents and bid Service review evaluation. ID2.2 TM-Accident Analysis 0.076/50 CQS post 4 2011 6 Study Service review Domestic study tours and 5 ID3.1 0.21/150 25 training Shopping Post a ID3.1A General equipment 0.038/25 2011 6 Goods review post ID3.1B Study tour and training 0.19/125 SOE review ID3.1B1 Study tour and training 1 25 RMB 25 2009 2009-09 15Days b ID3.1B2 Study tour and training 2 20 RMB 20 2010 2010-09 15Days ID3.1B3 Study tour and training 3 20 RMB 2011 15Days ID3.1B4 Study tour and training 4 30 RMB 2012 15Days ID3.1B5 Study tour and training 5 30 RMB 2013 15Days International study tours post 6 ID3.2 0.71/500 SOE and training review a ID3.2A Study tour and training 1 40 RMB 39 2010 2010-09 1 b ID3.2B Study tour and training 2 40 RMB 2011 1 c ID3.2C Study tour and training 3 40 RMB 2012 1 d ID3.2D Study tour and training 4 40 RMB 2012 1 e ID3.2E Study tour and training 5 40 RMB 2013 1 f ID3.2F Study tour and training 6 100 RMB 100 2010 2010-10 1 g ID3.2G Study tour and training 7 100 RMB 100 2010 2010-10 1 h ID3.2H Study tour and training 8 100 RMB 2011 1 Notes: QCBS= Quality and Cost Based Selection, CQS = Selection, on Consultant Qualification PS The contract number with underline is the contract which had actual contract signing year.
Группа Всемирного банка · Procurement Plan
China - Xian Urban Transport Project : procurement plan
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Procurement Plan
Страна
Китай
Источник
Всемирный банк