ICRR 13534 Report Number : ICRR13534 IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted : 06/30/2011 PROJ ID : P099185 Appraisal Actual Project Name : Emergency US$M ): Project Costs (US$M): 4.50 6.43 Rehabilitation Of The Drainage And Flood Protection System Of Banda Aceh Country : Indonesia Loan /Credit (US$M Loan/ ): US$M): 4.50 6.27 Sector Board : TR US$M ): Cofinancing (US$M): 0 0.16 Sector (s): Flood protection (80%) General water sanitation and flood protection sector (20%) Theme (s): Infrastructure services for private sector development (67% - P) Other social protection and risk management (33% - S) L/C Number : Board Approval Date : 04/06/2006 Partners involved : Closing Date : 06/30/2008 12/31/2009 Evaluator : Panel Reviewer : Group Manager : Group : Anna Amato George T. K. Pitman IEG ICR Review 1 IEGPS1 2. Project Objectives and Components: a. Objectives: According to the PAD (page 4) the Project Development Objective (PDO) was “to quickly re-establish functionality of the storm water and marine flood protection systems damaged by the tsunami and earthquake .
Группа Всемирного банка · Implementation Completion Report Review
Indonesia - Emergency Rehabilitation Of The Drainage And Flood Protection System Of Banda Aceh
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Implementation Completion Report Review
Страна
Индонезия
Источник
Всемирный банк