Группа Всемирного банка · Implementation Status and Results Report

Indonesia - Indonesia: Scholarships Prog. for Strengthening Reforming Institutions : P118150 - Implementation Status Results Report : Sequence 01

Индонезия Всемирный банк
Открыть оригинал документа

Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.

Полный текст

 The World Bank Report No: ISR4477 Implementation Status & Results Indonesia Indonesia: Scholarships Prog. for Strengthening Reforming Institutions (P118150) Public Disclosure Copy Operation Name: Indonesia: Scholarships Prog. for Strengthening Reforming Project Stage: Implementation Seq.No: 1 Status: ARCHIVED Archive Date: Institutions (P118150) Country: Indonesia Approval FY: 2011 Product Line: IBRD/IDA Region: EAST ASIA AND PACIFIC Lending Instrument: Specific Investment Loan Implementing Agency(ies): Key Dates Board Approval Date 03-Mar-2011 Original Closing Date 31-Dec-2017 Planned Mid Term Review Date Last Archived ISR Date Effectiveness Date 15-Jun-2011 Revised Closing Date 31-Dec-2017 Actual Mid Term Review Date Project Development Objectives Project Development Objective (from Project Appraisal Document) The Development Objective of the proposed project is to build participating agencies capacity by (a) strengthening their human resources in core functional areas; and (b) enhancing their ability to initiate and manage reforms. Has the Project Development Objective been changed since Board Approval of the Project? Yes No Component(s) Component Name Component Cost Component 1: Degree Scholarships Program for Ministry of Finance ($34.5 million) 0.00 Component 2: Degree Scholarships and non-degree training, for the Bappenas cluster of 0.00 Participating Agencies ($70.2 million) Component 3: Program support ($7.9 million) 0.00 Public Disclosure Copy Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Overall Implementation Progress (IP) Satisfactory Overall Risk Rating Moderate Implementation Status Overview The Scholarships Program for Strengthening Reforming Institutions (SPIRIT) was approved by the World Bank Board on March 3, 2011 and became effective June 15, 2011 upon fulfillment of four conditions of effectiveness, namely (i) the establishment of the National Development Planning Agency (Bappenas) Project Implementation Unit (PIU); (ii) the establishment of the Ministry of Finance PIU; (iii) adoption of the Project Operations Manual (POM); and (iv) submission by the Government to the Bank of the legal opinion ratifying Page 1 of 4 The World Bank Report No: ISR4477 the Loan Agreement. Progress to date has been satisfactory. 133 scholars have been selected to begin degree programs in 2011 and early 2012. Current disbursements are $7.7 million, exceeding the $3m that was estimated for 2011 in the disbursement plan. Public Disclosure Copy Locations No Location data has been entered Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Increase in percentage of staff with the relevant Percentage Value competencies in the core priority areas of the participating agency, as based on needs and Date gap analysis Comments Percentage of respondents in the agency Percentage Value expressing satisfaction with the impact of the program on building agency capacity Date Comments Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target Technical competencies and gap analysis Text Value 22 HCDPs prepared conducted Date 01-Jan-2011 Comments Scholarships in priority areas Percentage Value Date Public Disclosure Copy Comments Scholar selection transparent and merit-based Percentage Value Date Comments Page 2 of 4 The World Bank Report No: ISR4477 Indicator Name Core Unit of Measure Baseline Current End Target Successful completion of training: Percentage Percentage Value of scholars completing their programs of study Date Public Disclosure Copy with GPA’s >3.0 (annual targets) Comments Effective scholar reintegration: Re-entry, Text Value placement, and career development policies in place Date Comments Program evaluation: Percentage of scholars Percentage Value expressing satisfaction with the program based on staff survey Date Comments Data on Financial Performance (as of 16-Aug-2011) Financial Agreement(s) Key Dates Project Loan No. Status Approval Date Signing Date Effectiveness Date Closing Date P118150 IBRD-80100 Effective 03-Mar-2011 18-Mar-2011 15-Jun-2011 31-Dec-2017 Disbursements (in Millions) Project Loan No. Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P118150 IBRD-80100 Effective USD 112.65 112.65 0.00 7.71 104.94 7.00 Disbursement Graph Public Disclosure Copy Page 3 of 4 The World Bank Report No: ISR4477 Public Disclosure Copy Key Decisions Regarding Implementation None Restructuring History There has been no restructuring to date. Related Projects There are no related projects. Public Disclosure Copy Page 4 of 4

Основные сведения
Тип документа Implementation Status and Results Report
Дата принятия
Страна Индонезия
Источник Всемирный банк