Indonesia - ID-Aceh-Infra. Reconstr Enabling Program (IREP) : P100218 - Implementation Status Results Report : Sequence 06

Индонезия Всемирный банк
Открыть оригинал документа

Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.

Полный текст

 The World Bank Report No: ISR5029 Implementation Status & Results Indonesia ID-Aceh-Infra. Reconstr Enabling Program (IREP) (P100218) Public Disclosure Copy Operation Name: ID-Aceh-Infra. Reconstr Enabling Program (IREP) (P100218) Project Stage: Implementation Seq.No: 6 Status: ARCHIVED Archive Date: Country: Indonesia Approval FY: 2006 Product Line: Recipient Executed Activities Region: EAST ASIA AND PACIFIC Lending Instrument: Emergency Recovery Loan Implementing Agency(ies): Ministry of Public Works Key Dates Board Approval Date 30-Jun-2006 Original Closing Date 31-Oct-2009 Planned Mid Term Review Date 30-Sep-2008 Last Archived ISR Date 29-Mar-2011 Effectiveness Date 13-Sep-2006 Revised Closing Date 31-Dec-2011 Actual Mid Term Review Date 19-Dec-2008 Project Development Objectives Project Development Objective (from Project Appraisal Document) The objective of the Project it to support the BRR's strategy for infrastructure reconstruction by providing high quality technical assistance (TA) in order to ensure that infrastructure program management, planning, design and construction management follow adequate standards, and to support BRR in overall coordination of the infrastructure reconstruction program. Has the Project Development Objective been changed since Board Approval of the Project? Yes No Component(s) Component Name Component Cost Infrastructure Program Management 13.00 West Coast Consultants 4.26 Nias Consultants 6.12 Strategic Consultants 14.39 Financial Management 2.72 Public Disclosure Copy Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Moderate Implementation Status Overview The Infrastructure Reconstruction Enabling Project (IREP) has provided indispensable support in the reconstruction of infrastructure damaged or destroyed by the 2004 tsunami and Page 1 of 4 The World Bank Report No: ISR5029 2005 earthquake in Aceh and North Sumatra. So far the project has helped enable and improve the implementation of over 56 sub-projects in the water supply, roads, ports, drainage and flood protection sectors in a sustainable manner by ensuring proper standards for design, tendering, construction supervision, financial management and safeguards management. In addition, the project has provided extensive capacity building for local and national staff in project design review, management and supervision. Public Disclosure Copy Locations Country First Administrative Division Location Planned Actual Indonesia Daerah Istimewa Aceh Daerah Istimewa Aceh ✔ ✔ Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Post Tsunami infrastructure reconstruction and Text Value NA The framework based on the Framework developed and development Monitoring Framework for Aceh performance indicators of the applied. and Nias. project has been adopted and the PMU updates it regularily. Date 01-Sep-2006 30-Oct-2011 31-Dec-2011 Comments Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target A strategic plan for infrastructure reconstruction Text Value NA Plan exists and has been Plan exists and has been in Aceh and Nias exists. utilized throughout the utilized throughout the project. Date 01-Sep-2006 30-Oct-2011 31-Dec-2011 Comments Completed Donors and other stakeholders are consulted Text Value NA Donors are continuously Donors are continuously on the plan and design of projects that support updated on implementation of updated on implementation of implementation of the strategic infrastructure the strategic the strategic infrastructure reconstruction plan. reconstruction plan. Public Disclosure Copy Date 01-Sep-2006 30-Oct-2011 31-Dec-2011 Comments Completed Proper safeguard measures are integrated into Text Value Safeguards framework is IPM consultants had IPM consultants will have project preparation. established established a project tracking established a project tracking system that incorporate s all system that incorporate s all safeguards aspects of safeguards aspects of projects and BRR and the projects and BRR agrees to MoPW adhere to safeguards the adhere to safeguards practices. practices. Page 2 of 4 The World Bank Report No: ISR5029 Indicator Name Core Unit of Measure Baseline Current End Target Date 01-Sep-2006 30-Oct-2011 31-Dec-2011 Comments Completed Public Disclosure Copy Projects funded by BRR through IRFF are Text Value None Initial and updated Initial and updated matched to articulated demands of local investments plans were investments plans will be governments. discussed and agreed on with discussed and agreed local government and other withlocal government stakeholders. All O&M MoUs stakeholders. All O&M MoUs had been signed with local signed by local government. government Date 01-Sep-2006 30-Oct-2011 31-Dec-2011 Comments Completed Works meet the specifications of the technical Text Value NA The Quality of performed All works comply with the designs. works meets the standards of design specifications good practice as specified in the design specifications. Date 30-Oct-2011 31-Dec-2011 Comments Completed Data on Financial Performance (as of 29-Nov-2011) Financial Agreement(s) Key Dates Project Loan No. Status Approval Date Signing Date Effectiveness Date Closing Date P100218 TF-56894 Effective 13-Jul-2006 13-Jul-2006 13-Sep-2006 31-Dec-2011 Disbursements (in Millions) Project Loan No. Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P100218 TF-56894 Effective USD 42.00 42.00 0.00 34.89 7.11 83.00 Public Disclosure Copy Disbursement Graph Page 3 of 4 The World Bank Report No: ISR5029 Public Disclosure Copy Key Decisions Regarding Implementation This is the last Implementation Support mission as the project will close on December 31, 2011. Restructuring History CD Approved on 10-Jan-2009, Level two Approved on 29-Jun-2010 Related Projects There are no related projects. Public Disclosure Copy Page 4 of 4

Основные сведения
Тип документа Implementation Status and Results Report
Дата принятия
Страна Индонезия
Источник Всемирный банк