Группа Всемирного банка · Procurement Plan

Ethiopia - Second Phase of the Protection of Basic Services Project : procurement plan (Vol. 2 of 2) : Procurement plan for services

Эфиопия Всемирный банк
Открыть оригинал документа

Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.

Полный текст

Page 1 Spec proc Notice Advert Plan 31-May-10 10-Jun-10 25-Jun-10 25-Jun-10 25-Jul-10 09-Aug-10 18-Aug-10 Plan 31-Aug-10 15-Sep-10 30-Sep-10 30-Dec-10 06-Jan-11 Actual Actual Plan 31-May-10 10-Jun-10 25-Jun-10 30-Jun-10 15-Jul-10 Plan 06-Aug-10 21-Aug-10 20-Sep-10 27-Sep-10 Actual Actual Plan 31-May-10 10-Jun-10 25-Jun-10 30-Jun-10 15-Jul-10 Plan 06-Aug-10 21-Aug-10 20-Sep-10 27-Sep-10 Plan 31-May-10 05-Jun-10 10-Jun-10 15-Jun-10 20-Jun-10 Plan 30-Jun-10 05-Jul-10 04-Aug-10 11-Aug-10 Actual Actual NCB/PBS /WASH /NO 4 Total Amount Post Post Post 3 Procurement of Solar panel NCB/PBS /WASH /NO 3 1 4 Pinting of WaSH inventory and M&E forms 1 1 1 NCB Post Loan # IDA credit-H477-ET and IDA Grant 4578-ET Description Number Of Lots Estimated Amount In US$ Prior/Post Review Country/ Organization Federal Democratic Republic of Ethiopia, Ministry of Water Resources Project/Program PBS Phase II project Subprogram D actvities-WaSH M&E Stregthening Procurement plan Of Goods On- line UNDP Gateway Nat press No Objection Date Inculding specs and Draft Bid Documents 1 2 Procurement of servers, computers and anti-virus software NCB/PBS /WASH /NO 1 NCB/PBS /WASH /NO 2 Procurement of GPS List Of Contracts Contract Implimentation A rrival of Goods Submission Bid EvaluationRrport O pening of Letter of Credit I nsepection Final Acceptance Contract Fanalization Bidding period Date Contract Signature Preparation &Submittion by Ex Agency Packiging Number Selection Method Bid Inivaation Date Plan vs Actual 550,400.00 36,000.00 Quantities draft SPN 432,200.00 Pre/Post Qualification Basic Data Shopping 46,200.00 Post Post Post Shopping 36,000.00 Shopping Post Date Contract Award Bid Closing/ Opening Cotract Amount In US$ No-objection Date Plan vs Actual Bid Evaluation Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Page 10 Contract Type Plan 10-May-10 25-May-10 Plan 04-Jun-10 24-Jun-10 05-Jul-10 12-Jul-10 22-Jul-10 28-Jul-10 Plan Actual Actual Actual Plan 01-Sep-10 06-Sep-10 13-Sep-10 28-Sep-10 08-Oct-10 Plan 15-Oct-10 15-Nov-10 30-Nov-10 06-Dec-10 16-Dec-10 31-Dec-10 Plan Actual Actual Actual Plan 15-Sep-10 20-Sep-10 27-Sep-10 12-Oct-10 27-Oct-10 Plan 03-Nov-10 03-Dec-10 13-Dec-10 23-Dec-10 06-Jan-11 17-Jan-11 Plan Actual Actual Actual SSS/ Single Source Selection is prefered because it is assumed that the consultant who was employed for the pilot phase will again be used for the roll out of the M&E-MIS Strengthening in 300 woredas. 3 1 1 1 NCB/PBS /WASH /NO 7 2 1 QCBS 150,000.00 Lump Sum 150,000.00 143,400.00 QCBS Lump Sum SSS Lump Sum Proposal/TOR Submission/Ope ning Date No-objection Evaluation Report(T) Submission Evaluation Report(T) Plan Vs Actual Opening Financial Report Request for EOI Short On- line UNDP Gateway Nat press Lead-time before shortlist Submission Date No-Objection Date (Where Required) List Consultant Proposal Evaluation and Negotation for projects Plan vs Actual Inivation Date Preparation Evaluation Report(T)&(F) Negotations(N) Proposals Technical(T) Financial(F) and Negotation(N) Plan vs Actual Post Prior/Post Review No Objection Date Prior Post Request for Preparation 5 Total Amount Consultant for WaSH M&E-MIS roll out for 300 woredas/sites and Consultant for WaSH M&E-MIS System Quality assessment Consultant for WaSH service/ schemes facilities assessment NCB/PBS /WASH /NO 5 NCB/PBS /WASH /NO 6 Preparation &Submittion by Ex Agency Packiging Number Number Of Lots Selection Method Lump Sum/time Based Procurement plan of Services Country/ Organization Description Basic Data Loan # IDA credit-H477-ET and IDA Grant 4578-ET Federal Democratic Republic of Ethiopia, Ministry of Water Resources PBS Phase II project Subprogram D actvities- WaSH M&E Stregthening Project/Program 443,400.00 Page 11 02-Aug-10 16-Aug-10 23-Aug-10 30-Aug-10 Plan 09-Sep-10 08-Dec-10 07-Jan-11 Actual 12-Jan-11 19-Jan-11 28-Jan-11 Plan 07-Feb-11 08-Apr-11 09-May-11 Actual 27-Jan-11 03-Feb-11 14-Feb-11 Plan 24-Feb-11 25-Apr-11 10-May-11 Actual Implementation Contract Signature Final Report Submission Date No-objection Date Contract Amount Contract Award Draft Report Final Cost Plan vs Actual Contract Consultancy Completed Fainalisation Contract Contract Draft Mobilization Advance Payment

Основные сведения
Тип документа Procurement Plan
Дата принятия
Страна Эфиопия
Источник Всемирный банк