With dates revisions as of January 27, 2010 52985 KYRGYZ REPUBLIC: REDUCING TECHNICAL BARRIERS FOR ENTREPRENEURSHIP AND TRADE PROJECT PROCUREMENT PLAN - GOODS AND WORKS Contract Price Draft bidding Bank's NO to Bank's NO to Contract Bid No: Bid Ref Type Method Estimate Invitat. To Bidder Bid Opening Bid Eval. Report Contract Signature Bank's Review Docs and SPN bidding docs. Ctr. Awd. Completion (US$'000) 1. Technical Regulation Framework Component 1.1.4a Specialized literature for the TRAB G DC 10.00 n/a n/a n/a n/a n/a 15-Feb-07 On going 30Dec10 PR 24Jan08 1 1.1.4b Equipment for TRAB and expert committees G Shopping 19.65 9-Oct-07 n/a 12-Oct-07 26-Oct-07 3-Nov-07 n/a 21Nov07 completed 1.1.4c Development of website for the TRAB and equipment for its supporting G Shopping 8.58 4-Sep-07 n/a 28-Sep-07 26-Oct-07 3-Nov-07 n/a On going 31Oct10 1.1.6 Laboratory and related infrastructure equipment to 2 G ICB 250.00 1-Feb-10 16-Feb-10 2-Apr-10 1-Jul-10 29-Sep-10 14-Oct-10 14-Nov-10 14-Mar-11 PR support enforcement of training 1.2.2 a IT hardware and software to support establishment of the IIS on Technical Regulation and G ICB 800.00 10-Oct-09 25-Oct-09 9-Dec-09 9-Mar-10 7-Jun-10 22-Jun-10 23-Jul-10 20-Nov-10 PR WTO enquiry point on TBT and SPS 3 1.2.2.b IT equipment to establish the SPS WTO Enquiry 8Apr08 Point G Shopping 1.77 15-Feb-08 n/a 29-Feb-08 7-Mar-08 7-Mar-08 n/a 26Mar08 completed 2. Metrology and Standards Component 2.1.2; 2.1.3; 2.1.4 Metrology and calibration equipment 746.00 15-Mar-10 14-Apr-10 21-Apr-10 2-Jun-10 1-Aug-10 16-Aug-10 26-Aug-10 22-Feb-11 PR (parts, accessories, etalons, etc) 2.1.2; 2.1.3; 2.1.4.a Metrology and calibration equipment G ICB 420.00 14-Nov-08 29-Nov-08 1-Dec-08 22-Jan-09 25-Mar-09 27-Apr-09 25May09 30-Jan-10 PR 4 2.1.2; 2.1.3; 2.1.4.b Metrology and calibration equipment on temperature 330.00 14-Nov-08 29-Nov-08 1-Dec-08 22-Jan-09 25-Mar-09 27-Apr-09 27May09 30-Jan-10 PR 2.1.2; 2.1.3; 2.1.4.c Stone tables to the laboratory of 30Dec09 mass G Shopping 4.00 15-Oct-09 20-Oct-09 25-Oct-09 8-Nov-09 18-Nov-09 25-Nov-09 28Nov09 PR completed 2.1.5.a Equipment for Upgrading and calibration of ICB 130.00 15-Nov-10 30-Nov-10 14-Jan-11 15-Apr-11 14-Jul-11 28-Jul-11 27-Aug-11 31-Oct-10 equipment and
Группа Всемирного банка · Procurement Plan
Kyrgyz Republic - Reducing Technical Barriers for Entrepreneurship and Trade Project : procurement plan
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Procurement Plan
Источник
Всемирный банк