55089 Date : 03 December, 2005 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 UZR-1.1 Improvement of Ghior-Jabra Road and construction of 8.00 Km The Slice UZR-1.1 of Package Man/UZR-1 has been merged into Package Man/UZR-49 (Sl. No. 49) as a part of single package and transferred from 1st Phase to 2nd Phase. appurtenant structures. 01. Man/UZR-1 UZR-1.2 Improvement of Balirteck-Harirampur Road and 3.01 Km 3.01 Km 14.07 14.07 NCB Yes1 1/18/2004 7/21/2005 7/21/2005 10/25/2003 M/S Good Luck 100% 100% Completed construction of appurtenant structures. Trading Corporation UZR-2.1 Improvement of Kaliganj - Jamalpur road and 3.65 Km The Slice UZR-2.1 of Package Gaz/UZR-2 has been shifted to Package Gaz/UZR-32, Slice No. UZR-32.3 (Sl. No. 32) and transferred from 1st Phase to 2nd Phase. construction of appurtenant structures. 02. Gaz/UZR-2 UZR-2.2 Improvement of Kapasia - Monohordi Road and 14.23 Km 14.23 Km 66.81 66.81 NCB Yes 12/5/2003 6/7/2005 10/31/2007 12/1/2003 Joint Venture of 100% 100% construction of appurtenant structures. 1. Sarker Golam Mohammad Co. Ltd. & 2. Ismail Hossain 03. Mun/UZR-3 UZR-3.1 Improvement of Lauhajang-Goalimandra Hat and 2.20 Km 14.22 Km 16.17 92.92 NCB Yes 3/24/2004 9/25/2005 7/30/2006 3/18/2004 M/S. Columbia 100% 100% construction of appurtenant structures. Engineers Ltd UZR-3.2 Improvement of Betka - Tongibari road and construction 3.85 Km 15.67 12/14/2003 6/16/2005 8/10/2005 11/22/2003 M/S. Columbia 100% 100% of appurtenant structures. Engineers Ltd UZR-3.3 Improvement of Sreenagar - Tantar Road and 8.17 Km 61.09 12/14/2003 6/16/2005 12/31/2006 12/1/2003 Joint Venture of 84% 84% Cancelled construction of appurtenant structures. 1. Sarker Golam Mohammad Co. Ltd. & 2. Ismail Hossain 04. Nar/UZR-4 UZR-4.1 Improvement of Shibpur - Jallara bazar-Belabo road and 13.19 Km 19.21 Km 32.61 61.10 NCB Yes 1/6/2004 7/9/2005 2/28/2007 12/3/2003 Project Builders Ltd. 100% 100% construction of appurtenant structures. UZR-4.2 Improvement of Madhabdi - Kharia road and 6.02 Km 28.49 11/17/2003 5/20/2005 8/20/2005 11/10/2003 Joint Venture of 100% 100% construction of appurtenant structures. 1. M/S. Amzad Traders & 2. Shuchi Enterprise Ltd. 1 It was cleared by IDA as 1st phase contract. 1 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 05. Raj/UZR-5 UZR-5.1 Improvement of Anulia - Mohanganj road and 9.09 Km 22.48 Km 42.34 93.24 NCB Yes 12/27/2003 6/29/2005 11/30/2006 12/10/2003 AML-BCPL JV 100% 99% construction of appurtenant structures. UZR-5.2 Improvement of Rajabari - Kakonhat Road (Kundolia) 13.39 Km 50.91 12/27/2003 6/29/2005 12/15/2006 12/6/2003 Joint Venture of 100% 100% and construction of appurtenant structures. 1. Md Fazlur Rahman & 2. Md Azizul Alam 06. Nat/UZR-6 UZR-6.1 Improvement of Gurudaspur - Dharabarisha Road and 6.85 Km 20.50 Km 39.41 104.21 NCB Yes 12/15/2003 6/17/2005 2/28/2007 12/8/2003 Padma Associates and 100% 100% construction of appurtenant structures. Engineers Ltd. UZR-6.2 Improvement of Chowgram - Kaliganj GC and 7.95 Km 38.03 12/15/2003 6/17/2005 10/31/2006 12/8/2003 Padma Associates and 100% 100% construction of appurtenant structures. Engineers Ltd. UZR-6.3 Improvement of Dorappur R&H - Laxmipur GC and 5.70 Km 26.78 12/31/2003 7/3/2005 12/15/2005 12/21/2003 Kh. Mainul Islam 100% 100% construction of appurtenant structures. 07. Naw/UZR-7 UZR-7.1 Improvement of Kansarghat - Khaser hat and 8.56 Km 15.79 Km 47.24 72.89 NCB Yes 1/5/2004 7/8/2005 3/31/2006 12/13/2003 M/S Rising 100% 100% construction of appurtenant structures. Construction UZR-7.2 Improvement of Bongpur - Dobar Mohr road and 7.23 Km 25.66 12/20/2003 6/22/2005 11/30/2005 12/4/2003 Joint Venture of 100% 100% construction of appurtenant structures. 1. The Stone Steel & 2. Md Kamal Uddin 08. Nao/UZR-8 UZR-8.1 Improvement of Abadpukur hat-Kaliganj hat Road and 5.65 Km 19.18 Km 25.35 91.79 NCB Yes 1/1/2004 7/4/2005 6/20/2005 12/14/2003 Joint Venture of 100% 100% Completed construction of appurtenant structures. 1. Rising Construction & 2. PTSL UZR-8.2 Improvement of Chatra - Mohadebpur (Konjobon) road 13.53 Km 66.45 1/1/2004 7/4/2005 6/20/2005 12/18/2003 M/S Ataur Rahman 100% 100% Completed and construction of appurtenant structures. Khan 09. Bog/UZR-9 UZR-9.1 Improvement of Sultanganj - Perirhat road and 4.63 Km 9.95 Km 22.67 40.75 NCB Yes 11/30/2003 6/2/2005 9/15/2006 11/20/2003 M/S Rupayan 100% 100% construction of appurtenant structures. Prakaushali UZR-9.2 Improvement of Birgram - Khoma - Majira hat and 5.32 Km 18.08 11/15/2003 5/18/2005 6/30/2006 11/13/2003 Joint Venture of 100% 100% construction of appurtenant structures. 1. M/S Ethen Enterprise & 2. M/S Joya Construction 2 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 10. Bog/UZR-10 UZR-10.1 Improvement of Dupchanchia - Tindighi Road and 13.13 Km 26.11 Km 54.30 116.78 NCB Yes 12/18/2003 6/20/2005 7/30/2005 12/8/2003 M/S Islam Trading 100% 100% construction of appurtenant structures. Consortium Ltd. UZR-10.2 Improvement of Shariakandi - Chandanbasia Road and 12.98 Km 62.48 12/30/2003 7/2/2005 6/30/2006 12/23/2003 M/S Reza Construction 100% 100% construction of appurtenant structures. Ltd. 11. Sir/UZR-11 UZR-11.1 Improvement of Boalia R&H - Solanga GC Road and 6.43 Km 15.72 Km 31.91 79.00 0 Yes 2/20/2004 8/23/2005 8/31/2006 12/3/2003 M/S Haider 100% 100% construction of appurtenant structures. Construction Pvt. Ltd. UZR-11.2 Improvement of Horinathpur - Dhekuria GCM and 6.04 Km 29.85 2/19/2004 8/22/2005 5/15/2006 12/1/2003 M/S Rising 100% 100% construction of appurtenant structures. Construction UZR-11.3 Improvement of Sealcola R&H - Bohuli hat and 3.25 Km 17.23 2/11/2004 8/14/2005 4/30/2006 12/3/2003 Joint Venture of 100% 100% construction of appurtenant structures. 1. M/S Syed Nurul Huda & 2. M/S Abdul Motaleb Sheikh 12. Syl/UZR-12 UZR-12.1 Improvement of Atgram - Zakiganj Road and 11.95 Km 16.48 Km 71.72 95.20 NCB Yes 1/12/2004 7/15/2005 1/15/2007 12/15/2003 Joint Venture of 100% 100% construction of appurtenant structures. 1. Md. Sayhid Hasan & 2. M/S. Mortoza Enterprise UZR-12.2 Improvement of Kumargaon - Badaghat-Shiber bazar 4.53 Km 23.49 1/12/2004 7/15/2005 12/15/2005 12/3/2003 The Nirmitee Ltd 100% 100% and construction of appurtenant structures. 13. Dha/UZR-13 Improvement of Dhaka Aricha highway-Kalatipara GC 8.13 Km 12.43 Km 19.59 19.59 NCB Yes 1/6/2004 7/9/2005 3/30/2006 12/15/2003 M/S Columbia 30% 30% Contract via Vakurta bazar. and construction of appurtenant Engineers cancelled & structures. remaining works taken under Improvement of Dhaka Aricha RHD-Mugrakanda- 4.30 Km 0.00 0% 0% package no. M.pur.city prot. Embank. Road and construction of Dha/UZR-313 appurtenant structures. 14. Nara/UZR-14 Improvement of Taltola-Ananda bazar extended up to 15.86 Km 23.94 Km 188.15 188.15 NCB Yes 7/14/2005 1/15/2007 5/30/2008 7/7/2005 JV of Reza 100% 99% RHD-Dhaka-Chittagong road and construction of Construction Ltd & appurtenant structures. MBEL Improvement of Kanchan GC Somakhali bazar- 8.08 Km 0.00 Chanpara R&H Road and construction of appurtenant structures. 3 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 15. Raj/UZR-15 Improvement of Jholmolia hat - Mollahpara hat and 14.58 Km 16.08 Km 77.28 77.28 NCB Yes 12/27/2003 6/29/2005 12/30/2006 12/10/2003 ITCL-SEL -JV 96% 96% Contract construction of appurtenant structures. cancelled & Improvement of Arani - Galimpur Ferry ghat and 1.50 Km 0.00 0% 0% remaining works construction of appurtenant structures. taken under package no. Raj/UZR-15A 16. Pab/UZR-16 Improvement of Santhia 24 - Mile Azahar Afshar Road 4.29 Km 14.32 Km 58.54 58.54 NCB Yes 1/1/2004 7/4/2005 2/15/2006 12/14/2003 M/S Pubali 100% 100% and construction of appurtenant structures. Construction Co. Ltd Improvement of Dubila - Sreekol Road -Ataikula road 10.03 Km 0.00 100% 100% and construction of appurtenant structures. 17. Mou/UZR-17 Improvement of Gobindapur - Atghar - Ratgaon road 8.76 Km 19.42 Km 131.08 131.08 NCB Yes 12/21/2003 6/23/2005 3/31/2007 12/6/2003 Joint Venture of 100% 100% and construction of appurtenant structures. 1. The Nirmitee Ltd 2. M/S Abdus Samad & Improvement of Munshi bazar-Mokam bazar via 10.66 Km 0.00 3. M/S Abdul Hafiz 100% 100% Sonatiki road and construction of appurtenant structures. 18. Com/UZR-18 Improvement of Homna - Dulalpur Road and 8.00 Km 48.80 Km 401.63 401.63 ICB Yes 2/7/2008 8/10/2009 2/7/2010 1/31/2008 JV of Monico-ABC 64% 52% construction of 40 m bridge at chainage 9180 m including other appurtenant structures. Improvement of Homna - Meghna HQ upto Ferryghat 10.00 Km 0.00 Road and construction of appurtenant structures. Improvement of Batakandi - Raipur Road and 14.22 Km 0.00 construction of 45 m bridge at chainage 3700 m including other appurtenant structures. Improvement of Chandina - Dollai Nowabpur and 11.45 Km 0.00 construction of appurtenant structures. Improvement of Balutupa - Khaish Road and 5.13 Km 0.00 construction of appurtenant structures. 4 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 19. Bra/UZR-19 Improvement of B.Baria - Nabinagar via Sadekpur 14.00 Km 37.37 Km 415.51 415.51 ICB Yes 11/21/2007 5/24/2009 7/15/2010 11/12/2007 CEC-NAS JV 29% 18% Court case Road. and construction of appurtenant structures. against Improvement of Nasirnagar Fundauk - Chatiain and 8.70 Km 0.00 Cancelation construction of appurtenant structures. Improvement of Bottali - Bitghar Road and construction 7.68 Km of 50 m bridge at chainage 3650 m including other appurtenant structures. Improvement of Ashugonj - Talshahar Road and 4.55 Km 0.00 construction of appurtenant structures. Improvement of B.Baria - Talshahar Bazar and 10.12 Km 0.00 construction of appurtenant structures. 20. Cha/UZR-20 Improvement of Sepaikandi-Kalir Bazar-Bashurchar- 19.39 Km 39.52 Km 232.25 232.25 ICB Yes 10/7/2007 4/9/2009 5/31/2010 10/1/2007 Islam Trading 52% 50% Baushia Ferryghat-Dhaka : Ctg RHD Road (Chandpur Consortium Ltd. Portion) and construction of appurtenant structures. Improvement of Faridganj - Brahmanpara Road and 5.62 Km 0.00 construction of appurtenant structures. Improvement of Ibrahim B.T. Road (Chandpur-Lalpur 10.13 Km 0.00 GC) and construction of 30 m bridge at chainage 5766 m including other appurtenant structures. Improvement of Sepaikandi - Beltali Road and 4.39 Km 0.00 construction of appurtenant structures. 21. Sun/UZR-21 Improvement of Sunamgonj - Chhatak Road via 32.54 Km 48.49 Km 399.43 399.43 ICB Yes 2/15/2008 8/18/2009 10/10/2009 1/28/2008 Islam Trading 32% 24% Dowarabazar Road and construction of 40 m bridge at Consortium Ltd. chainage 10910 m including other appurtenant structures. Construction of 30 m bridge at chainage 13580 m 30.00 m 0.00 including other appurtenant structures. Construction of 50 m bridge at chainage 21525 m 50.00 m 0.00 including other appurtenant structures. Construction of 35 m bridge at chainage 23035 m 35.00 m 0.00 including other appurtenant structures. Improvement of Kaitak R&H - Sirajganj Bazar and 7.35 Km 0.00 construction of 30 m bridge at chainage 8000 m including other appurtenant structures. Improvement of Kalipur - Haidarpur Road 8.60 Km 0.00 5 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 22. Syl/UZR-22 Improvement of Tajpur - Balagonj Road and 15.18 Km 17.19 Km 57.24 57.24 NCB Yes 7/10/2005 1/11/2007 12/31/2007 7/2/2005 JV of TBL-PTSL Ltd. 65% 65% Contract construction of appurtenant structures. cancelled & remaining works Improvement of Doyameer - Dewan Bazar and 2.01 Km 0.00 0% 0% taken under construction of appurtenant structures. package no. 23. Naw/UZR-23 Improvement of Kalinagar Bairagipara - Sundarpur U.P. 5.45 Km Major portion of the road has been eroded by the adjacent river, for that reason the road is excluded from RTIP. 0% 0% Syl/UZR-22A road and construction of appurtenant structures. 24. Man/UZR-24 Improvement of Singair - Charigram Road (extension 10.59 Km 16.68 Km 154.56 154.56 NCB Yes 4/27/2005 10/29/2006 6/30/2009 4/20/2005 Pubali Construction 81% 81% Cancelled and upto Jamsha ghat) and construction of 36 m bridge at Company Ltd. payment chainage 1100 m including other appurtenant structures. finalized Improvement of Joymontop (at Binnadingi) - Maniknagar 6.09 Km 0.00 75% 70% and construction of appurtenant structures. 25. Mun/UZR-25 Improvement of Serajdikhan - Shaperchar Bazar and 7.24 Km 7.24 Km 28.25 28.25 NCB Yes 2/12/2005 8/16/2006 6/30/2007 2/2/2005 M/S Ismail Hossain 47% 47% After construction of 51 m bridge at chainage 600 m cancellation of including other appurtenant structures. this contract, the remaining work is being implemented through package no. Mun/UZR- Construction of 54 m bridge at chainage 4545 m 54.00 m 0.00 0% 0% 25A including other appurtenant structures. 26. Sun/UZR-26 Improvement of Dharmapassa - Joysree Road and 11.03 Km and The Package UZR-26 has been shifted to from 2nd Phase to 4th Phase and renamed as Package Sun/UZR-314 dividing into two slices, (Slice No. UZR-314.10% 314.2). 0% construction of 90 m bridge at chainage 5500 m including other appurtenant structures. 27. Bog/UZR-27 Improvement of Dhunat - Shariakandi Road and 19.00 Km 19.00 Km 172.94 172.94 NCB Yes 4/16/2006 10/18/2007 2/28/2009 4/10/2006 Mir Akhter Hossain 100% 95% construction of 30 m bridge at chainage 7250 m including other appurtenant structures. Construction of 30 m bridge at chainage 11030 m 30.00 m 0.00 including other appurtenant structures. Construction of 100 m bridge at chainage 6800 m 100.00 m 0.00 including other appurtenant structures. 6 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 28. Sun/UZR-28 Improvement of Biswamverpur - Shaktiarkhola via HQ 7.33 Km 7.33 Km 97.66 97.66 NCB Yes 10/19/2005 4/22/2007 3/31/2008 9/29/2005 Monico Ltd. 100% 100% Road and construction of 90 m bridge at chainage 5080 m including other appurtenant structures. 29. Bog/UZR-29 UZR-29.1 Improvement of Tarnihat - Chandonbaisha Road and 11.19 Km 11.19 Km 72.44 72.44 NCB Yes 5/17/2005 11/18/2006 4/28/2008 5/7/2005 M/S A.S. Construction 100% 100% construction of 35 m bridge at chainage 4140 m including other appurtenant structures. UZR-29.2 Improvement of Naruamala - Matidhali Road and 9.50 Km Phase. The Slice UZR-29.2 of Package Bog/UZR-29 has been shifted to Package Bog/UZR-307, Slice UZR-307.1 (Sl. No. 307) and transferred from 2nd Phase to 3rd 0% 0% construction of appurtenant structures. UZR-29.3 Improvement of Baluahat - Sukhanpukur and 3.50 Km Phase. The Slice UZR-29.3 of Package Bog/UZR-29 has been shifted to Package Bog/UZR-307, Slice UZR-307.2 (Sl. No. 307) and transferred from 2nd Phase to 3rd 0% 0% construction of appurtenant structures. 30. Nao/UZR-30 UZR-30.1 Improvement of Mirapara hat - Nithpur hat and 5.10 Km 10.41 Km 30.62 63.22 NCB Yes 5/3/2005 11/4/2006 10/15/2006 4/13/2005 M/S Ataur Rahman 100% 100% Completed construction of appurtenant structures. Khan UZR-30.2 Improvement of Gopinathpur - Mirapara hat and 5.31 Km 32.60 5/3/2005 11/4/2006 2/28/2007 4/13/2005 M/S Ataur Rahman 100% 100% Completed construction of appurtenant structures. Khan 31. Bra/UZR-31 UZR-31.1 Improvement of Saydabad - Kullahpathar Road and 14.20 Km 14.20 Km 63.99 63.99 NCB Yes 3/13/2005 9/14/2006 3/31/2008 2/12/2005 Joint Venture of 100% 100% construction of appurtenant structures. i) M/S Rising Construction ii) Parisha Trade System Ltd. UZR-31.2 Improvement of Akhaura Bara Bazar GC - Comilla - 5.94 Km This slice (UZR-31.2) has been excluded from RTIP as the road has already being improved under another project (RDP-20) of LGED. 0% 0% Sylhet RHD and construction of 30 m bridge at chainage 4500 m including other appurtenant structures. UZR-31.3 Improvement of Sahabajpur - Sahajadpur Road and 8.50 Km This slice (UZR-31.3) has been excluded from RTIP as the road has already being improved under another project (RDP-20) of LGED. 0% 0% construction of 30 m bridge at chainage 6620 m including other appurtenant structures. 32. Gaz/UZR-32 UZR-32.1 Improvement of Joydebpur - Pubali Road and 6.50 Km 16.75 Km 41.90 104.53 NCB Yes 4/8/2005 10/10/2006 12/31/2007 3/31/2005 Joint Venture of HCL & 100% 100% construction of appurtenant structures. RC UZR-32.2 Improvement of Kaliganj - Jangalia and construction of 6.50 Km 40.31 5/2/2005 11/3/2006 11/4/2006 3/24/2005 JV of SHK & FEL Ltd. 100% 100% appurtenant structures. UZR-32.3 Improvement of Kaliganj - Jamalpur road and 3.75 Km 22.32 5/2/2005 11/3/2006 6/10/2008 4/24/2005 Joint Venture of M/S of 100% 100% construction of appurtenant structures. Amzad Traders & Suchi Enterprise 7 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 33. Com/UZR-33 UZR-33.1 Improvement of Birallah R&H - Dhampti hat GC. Road 7.77 Km 13.27 Km 42.35 56.18 NCB Yes 4/7/2005 10/9/2006 3/31/2008 4/4/2005 Md. Abdul Mannan 77% 77% Contract and construction of appurtenant structures. cancelled and the remaining work being executed through new contract package no.Com/UZR- 33.1A UZR-33.2 Improvement of Noagaon - Panchkitta Road and 5.45 Km 13.83 5/26/2005 11/27/2006 6/30/2007 4/21/2005 Arab Contractor's (BD) 29% 29% Contract construction of 45 m bridge at chainage 3060 m Ltd. cancelled and including other appurtenant structures. the remaining work being executed through new contract package no.Com/UZR- 33.2A Construction of 45 m bridge at chainage 3500 m 45.00 m 0.00 0% 0% including other appurtenant structures. UZR-34.1 Improvement of Kachua - Raghunathpur GC and 3.00 Km This slice (UZR-34.1) has been excluded from RTIP as the road has already being improved under another project (RDP-20) of LGED. 0% 0% construction of appurtenant structures. 34. Cha/UZR-34 UZR-34.2 Improvement of Sendra - Palishara Bazar and 2.61 Km 2.61 Km 14.29 14.29 NCB No2 2/26/2005 8/30/2006 12/30/2006 2/19/2005 Mark Builders Ltd. 100% 100% Completed construction of appurtenant structures. 35. Joy/UZR-35 UZR-35.1 Improvement of Boiragipara - Matrai Hat Road and 3.06 Km 15.59 Km 14.29 66.74 NCB Yes 4/7/2005 10/9/2006 3/30/2008 4/4/2005 Ram Babu 100% 100% construction of appurtenant structures. UZR-35.2 Improvement of Kalai - Moslemgonj Road and 8.07 Km 30.46 4/6/2005 10/8/2006 3/31/2009 4/3/2005 Joint Venture of 75% 75% Cancelled and construction of appurtenant structures. (i) M/S Parisha Trade & remaining work System Ltd. will be (ii) M/S Ethen completed Enterprise through a new package UZR-35.3 Improvement of Itakhola - Shirotti and construction of 4.46 Km 22.00 4/3/2005 10/5/2006 11/30/2007 3/19/2005 Ram Babu 100% 100% appurtenant structures. 0% 0% 2 0% 0% Previously it was shown as a prior review contract alongwith Slice No. UZR-34.1. 8 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 36. Mou/UZR-36 UZR-36.1 Improvement of Rathuli - Azimgonj and construction of 2.54 Km 27.15 Km 20.50 135.83 NCB Yes 4/17/2005 10/19/2006 10/18/2006 3/17/2005 China Geo-Engineering 100% 100% 36 m bridge at chainage 2450 m including other Corporation appurtenant structures. UZR-36.2 Improvement of Sarker Bazar - Gurarai Bazar. and 9.65 Km 37.70 5/12/2005 11/13/2006 6/30/2007 4/2/2005 China Geo-Engineering 100% 100% construction of appurtenant structures. Corporation UZR-36.3 Improvement of Brahman Bazar - Fenchugonj and 14.96 Km 67.14 4/30/2005 11/1/2006 4/30/2007 3/17/2005 China Geo-Engineering 100% 100% construction of appurtenant structures. Corporation UZR-36.4 Construction of 48 m bridge at chainage 8300 m on 48.00 m 10.49 4/17/2005 10/19/2006 10/18/2006 3/28/2005 China Geo-Engineering 100% 100% Gobindapur-Atghar-Ratgaon Road. Corporation 37. Nar/UZR-37 UZR-37.1 Improvement of Raipura Upazila HQ - Narsingdi District 8.20 Km 11.51 Km 51.66 70.85 NCB Yes 3/11/2006 9/12/2007 6/30/2009 2/28/2006 Orient Trading & 100% 100% HQ Road and construction of appurtenant structures. Builder's Ltd UZR-37.2 Improvement of Narsingdi - Putia Road. and 3.31 Km 19.19 4/5/2005 10/7/2006 11/29/2006 3/29/2005 M/S Amzad Traders 100% 100% construction of appurtenant structures. 38. Sir/UZR-38 UZR-38.1 Improvement of Someshpur R&H - Randhunibari hat 2.74 Km 14.40 Km 32.66 60.67 NCB Yes 5/26/2005 11/27/2006 2/28/2009 5/11/2005 M/S Khondaker 100% 82% and construction of 60 m bridge at chainage 200 m Shaheen Ahamed including other appurtenant structures. UZR-38.2 Improvement of Songacha R&H - Bohuli Hat and 4.68 Km 16.08 5/20/2005 11/21/2006 12/31/2007 5/5/2005 Joint Venture of DJS 100% 100% construction of appurtenant structures. Consortium Ltd. UZR-38.3 Improvement of Dhamai kandi R&H - Solonga GC and 6.98 Km 11.93 5/24/2005 11/25/2006 6/30/2007 5/9/2005 Islam Trading 24% 24% Contract construction of appurtenant structures. Consortium Ltd. cancelled and the remaining work being executed through new contract package no. Sir/UZR-330 UZR-39.1 Improvement of Lalpur - Gopalpur Railway gate. and 6.55 Km Dropped from the project 0% 0% construction of appurtenant structures. 39. Nat/UZR-39 UZR-39.2 Improvement of Dattapara-Halsha UP to Chira Kola and 4.24 Km 4.24 Km 28.33 28.33 NCB No 7/25/2005 1/26/2007 6/30/2007 7/18/2005 M/S Rahaman 100% 100% construction of appurtenant structures. Construction 9 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 40. Syl/UZR-40 UZR-40.1 Improvement of Salutikar - Shaheber Bazar - Horipur 7.26 Km 10.91 Km 31.55 47.54 NCB Yes 2/15/2006 8/19/2007 6/30/2008 12/29/2005 JV of Taher Brothers 51% 51% Cancelled and construction of appurtenant structures. Ltd & Parisha Trade System Ltd. UZR-40.2 Improvement of Zakiganj - Dubag Bazar and 3.65 Km 15.99 11/27/2005 5/31/2007 2/29/2008 11/10/2005 PTSL-ATCO (JV) 72% 72% Cancelled construction of appurtenant structures. 41. Raj/UZR-41 UZR-41.1 Improvement of Bhawanigonj - Bandaikhara and 9.28 Km 15.78 Km 62.05 65.14 NCB Yes 3/28/2005 9/29/2006 3/31/2008 3/20/2005 AML-BCPL (JV) 88% 88% Contract construction of 90 m bridge at chainage 9110 m cancelled and including other appurtenant structures. the remaining work being executed through new contract package no. Raj/UZR-41.1A UZR-41.2 Improvement of Mundumala Hat to Hat bakoil (GCM) 6.50 Km 3.09 3/15/2005 9/16/2006 9/11/2006 3/5/2005 TE-SA-NH (JV) 18% 18% Contract road and construction of appurtenant structures. cancelled and the remaining work being executed through new contract package no. Raj/UZR-41.2A 42. Bog/UZR-42 Improvement of Omarpur - Dhupchanchia via Talora 24.00 Km The road has been transferred from LGED to RHD and consequently the package Bog/UZR-42 has been dropped from RTIP. 0% 0% Road. and construction of appurtenant structures. 43. Mun/UZR-43 Improvement of Sepaikandi-Kalir Bazar-Bashurchar- 4.85 Km 4.85 Km 52.10 52.10 NCB Yes 2/8/2006 8/12/2007 2/28/2010 1/16/2006 Project Builders Ltd. 59% 43% Baushia Ferryghat-Dhaka : Ctg RHD Road (Munshigonj Portion) and construction of appurtenant structures. 44. Mun/UZR-44 Improvement of Dhaka Mawa RHD at Tegharia-Bibir 9.75 Km 9.75 Km 62.64 62.64 NCB Yes 6/6/2005 12/8/2006 6/30/2007 5/29/2005 Pubali Construction 100% 100% Bazar-Shaper Bazar-Taltala hat GC-Betka Road Limited (Munshigonj Portion) and construction of appurtenant structures. 10 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 45. Hab/UZR-45 Improvement of Madhabpur R&H Nasirnagar Road and 3.12 Km As this road is improved by another project of LGED, so it is dropped. 0% 0% construction of appurtenant structures. Improvement of Mouzpur-ChangarBazar and 5.00 Km As this road is improved by another project of LGED, so it is dropped. 0% 0% construction of appurtenant structures. Improvement of Madhabpur - Chowmohani Bazar and 6.60 Km Major rehabilitation was found essential, so it has been taken under Maintenance program of RTIP. 0% 0% construction of appurtenant structures. Improvement of Monohoroadi H/Q - Panchabati Ferry 11.35 Km Major rehabilitation was found essential, so it has been taken under Maintenance program of RTIP. 0% 0% Ghat Road and construction of appurtenant structures. 46. Nar/UZR-46 Improvement of Brajerkandi R&H - Lakhpur Bazar and 6.23 Km 6.23 Km 27.12 27.12 NCB No 12/1/2005 6/4/2007 6/30/2008 11/14/2005 Bangladesh Business 100% 100% construction of appurtenant structures. Corporation 47. Nat/UZR-47 Improvement of Jonailhat -Dharabarisha hat Road and 7.60 Km As the both GCMs are connected with all-weather road & cost of the road is abnormally high, so it is dropped. 0% 0% construction of 30 m bridge at chainage 3900 m including other appurtenant structures. 48. Nao/UZR-48 Improvement of R&H Road Khalshi - Raigaon up to 8.20 Km Dropped from the project 0% 0% Matazi and construction of appurtenant structures. 49. Man/UZR-49 Improvement of Uthali - Paturia via Nali Road and 7.45 Km 14.76 Km 127.30 127.30 NCB Yes 10/2/2005 4/5/2007 11/30/2008 9/25/2005 JV of Orient Trading 100% 100% Completed construction of appurtenant structures. and Builders Ltd. (OTBL) & Kazi Improvement of Ghior-Jabra Road and construction of 7.31 Km 0.00 International appurtenant structures. Construction Ltd. (KICL) 11 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 50. Pab/UZR-50 Improvement of Mohela GCM - Sharatgonj GC via 6.78 Km 11.37 Km 13.80 13.80 NCB Yes 3/5/2006 9/6/2007 9/5/2007 2/22/2006 JV of TBL-PTSL 35% 35% Contract Parshadanga Hat Road and construction of appurtenant cancelled and structures. the remaining work being Improvement of Chatmohar R&H at Janata Bank- 4.59 Km 0.00 0% 0% executed Astomonisha GCCM via Noornagar and construction of through new 50 m bridge at chainage 4195 m including other contract appurtenant structures (100m & 158m bridge were package no. include). Pab/UZR-50A, Slice No. UZR- 51. Hab/UZR-51 Improvement of Baniachang - Azmirigonj Road via 15.53 Km 15.53 Km 5.97 5.97 NCB No 7/5/2006 1/6/2008 6/30/2008 6/5/2006 PCCL-BBC JV 10% 10% Contract Shibpasha Road. and construction of appurtenant cancelled and structures. the remaining work being executed through new contract package no. Hab/UZR-51A, Hab/UZR-51B, Hab/UZR-51C & Hab/UZR-51D 52. Syl/UZR-52 Improvement of Zakigonj - Vingair Bazar-Laxmi Bazar- 13.40 Km 13.40 Km 72.71 72.71 NCB Yes 5/23/2005 11/24/2006 4/30/2007 5/16/2005 Concord Pragatee 100% 100% Dubag Bazar and construction of appurtenant Consortium Ltd. structures. 53. Nao/UZR-53 UZR-53.1 Improvement of Bottali - Srimantapur Road and 6.36 Km 6.36 Km 0.00 0.00 NCB No Oct'06 Apr'08 0% 0% Dropped construction of appurtenant structures. UZR-53.2 Improvement of Niamatpur - Kharibari Chowbaria Road 4.31 Km This Slice (UZR-53.2) has been excluded from RTIP as the road is being improved under another project (RIDP-3) of LGED. 0% 0% and construction of appurtenant structures. 54. Nar/UZR-54 UZR-54.1 Improvement of Bajnabo RHD - Putia Bazar via Palpara 6.35 Km 6.35 Km 22.62 22.62 NCB No 12/1/2005 6/4/2007 6/30/2008 10/31/2005 Orient Trading & 100% 100% bazar and construction of 60 m bridge at chainage Builder's Ltd 6500 m including other appurtenant structures. UZR-54.2 Improvement of Baniadi R&H - Shibpur Bazar and 2.00 Km Major rehabilitation was found essential, so it has been taken under Maintenance program of RTIP. 0% 0% construction of appurtenant structures. UZR-55.1 Improvement of Dhaka Mawa RHD at Tegharia-Bibir 5.00 Km 0 The Slice UZR-55.1 of Package Dha/UZR-55 has been shifted to Package Dha/UZR-309 (Sl. No. 309) as a single package and transferred from 3rd Phase to 2nd Phase, 0 12 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 Bazar-Shaper Bazar-Taltala hat GC-Betka Road (Dhaka because the other portion of the same road (15 Km.) in Munshigonj district (package no. Mun/UZR-44) has also been shifted from 3rd phase to 2nd phase. 0 0 Portion) and construction of 65 m bridge at chainage 6720 m including other appurtenant structures. 55. Dha/UZR-55 UZR-55.2 Improvement of Kalatia - Amin Bazar via Hazratpur UP 8.50 Km 20.79 Km 58.17 187.73 NCB Yes 5/21/2006 11/22/2007 6/30/2008 5/10/2006 JV of BTI-MMBE 100% 100% and construction of appurtenant structures. UZR-55.3 Improvement of Hasnabad Power Station - Doleshar 12.29 Km 129.56 5/20/2006 11/21/2007 5/7/2008 5/8/2006 Orient Trading & 100% 100% Bibir Bazar and construction of appurtenant structures. Builder's Ltd 56. Bog/UZR-56 UZR-56.1 Improvement of Sonahata-Bagbari Road via Berebari 7.14 Km 36.20 Km 23.74 135.46 NCB Yes 4/26/2005 10/28/2006 12/30/2007 4/10/2005 M/S S. S. Engineers 43% 43% Contract and construction of 45 m bridge at chainage 875 m cancelled and including other appurtenant structures. the remaining work being executed through new contract package no. Bog/UZR-56.1A UZR-56.2 Improvement of Simabari - Ranir hat Road and 15.20 Km 24.84 6/12/2005 12/14/2006 6/30/2007 6/2/2005 M/S Ismail Hossain 35% 35% Contract construction of appurtenant structures. cancelled and the remaining work being executed through new contract package no. Bog/UZR-56.2A, Slice no. UZR- 56.2A.1 & UZR- 56.2A.2 UZR-56.3 Improvement of Durgapur - Jamadarpukur Road and 13.86 Km 86.88 7/5/2005 1/6/2007 11/30/2007 6/26/2005 Islam Trading 100% 100% construction of appurtenant structures. Consortium Ltd. 57. Gaz/UZR-57 UZR-57.1 Improvement of Giaspur Bazar - Aral Bazar and 9.47 Km 19.65 Km 75.54 119.25 NCB Yes 6/7/2006 12/9/2007 12/31/2009 5/31/2006 M/S Rising 88% 74% construction of appurtenant structures. Construction 13 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 UZR-57.2 Improvement of Sreepur - Gusahinga Bazar and 6.78 Km 23.04 6/8/2006 12/10/2007 8/31/2008 6/1/2006 JV of M/S Moyen 59% 59% Cancelled construction of appurtenant structures. Uddin Bashi & LM Traders UZR-57.3 Improvement of Baliadi R&H to Chandabaha and 3.40 Km 20.66 6/1/2006 12/3/2007 6/30/2009 5/25/2006 JV of M/S SH & Akhter 65% 65% Cancelled and construction of appurtenant structures. remaining work will be completed through a new package Gaz/UZR-57.3A 14 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 58. Com/UZR-58 UZR-58.1 Improvement of Doulkhar - Boxgonj Road and 15.00 Km 24.38 Km 73.39 121.74 NCB Yes 4/12/2005 10/14/2006 7/15/2008 4/6/2005 M/S Surma 87% 87% Cancelled construction of appurtenant structures. International UZR-58.2 Improvement of Barura bazar - Adda GC Road and 9.38 Km 48.35 6/11/2005 12/13/2006 7/30/2008 4/21/2005 JV of 94% 69% construction of appurtenant structures. i) Alhaj Abdul Haque ii) M/S. Taher & Sons and iii) Rana International Builders UZR-59.1 Improvement of Katakhali - Gondamara Road and 10.45 Km This Slice (UZR-59.1) has been excluded from RTIP as the road is being improved under another project (RDP-20) of LGED. 0% 0% construction of appurtenant structures. 59. Cha/UZR-59 UZR-59.2 Improvement of Haimchar - Rampur Bazar GC and 4.30 Km 4.30 Km 28.27 28.27 NCB No 3/21/2006 9/22/2007 4/30/2008 2/28/2006 Md. Moshiur Rahman 100% 100% Completed construction of appurtenant structures. Chowdhury 60. Mun/UZR-60 UZR-60.1 Improvement of Kanakshar - Nagerhat Bazar and 3.12 Km 5.64 Km 4.97 14.09 NCB No 11/27/2005 5/31/2007 12/31/2008 11/20/2005 Haider Construction 32% 32% Cancelled and construction of appurtenant structures. Pvt. Ltd. remaining works will be completed through new package Mun/UZR-60.1A UZR-60.2 Improvement of Khanbari-Goalimandra and construction 2.52 Km 9.12 4/20/2006 10/22/2007 10/15/2007 4/4/2006 M.S Bashundhara 40% 40% Cancelled of appurtenant structures. 61. Nao/UZR-61 UZR-61.1 Improvement of Nischintapur - Mirapara hat and 2.19 Km 8.76 Km 10.13 10.13 NCB No 4/2/2006 10/4/2007 2/28/2008 3/22/2006 Milon-Bhuiyan JV 100% 87% Completed construction of appurtenant structures. UZR-61.2 Improvement of Deluabari-Chalk Gowri Road and 6.57 Km 0.00 Oct'06 Apr'08 0% 0% Dropped construction of appurtenant structures. 0% 0% 0% 0% UZR-62.1 Improvement of Sonaichandi - Chuthipur Road and 2.15 Km As this road has been transffered to RHD, so it is dropped. 0% 0% construction of appurtenant structures. 62. Naw/UZR-62 UZR-62.2 Improvement of Dobarmore - Akkelpur hat Road. and 8.05 Km 8.05 Km 44.40 44.40 NCB Yes 1/30/2006 8/3/2007 8/3/2007 1/19/2006 Kh. Shaheen Ahmed 100% 100% construction of appurtenant structures. UZR-63.1 Improvement of Sreekal - Ataikola and construction of 7.00 Km As this road is improved by another project of LGED, so it is dropped. 0% 0% appurtenant structures. 15 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 63. Pab/UZR-63 UZR-63.2 Improvement of Bera - Natiabari R&H Road. and 4.08 Km 4.08 Km 15.60 15.60 NCB No 12/12/2005 6/15/2007 6/15/2007 11/27/2005 Sarkar Golam 100% 100% construction of appurtenant structures. Mohammad 64. Raj/UZR-64 UZR-64.1 Improvement of Tetulia - Bagha and construction of 7.60 Km 7.60 Km 33.52 33.52 NCB Yes 1/11/2006 7/15/2007 4/30/2008 1/3/2006 Sarkar Golam 100% 100% appurtenant structures. Mohammad UZR-64.2 Improvement of Mirzagonj Bazar - Harirampur Hat and 3.60 Km As this road has been transferred to RHD, so it is dropped. 0% 0% construction of appurtenant structures. 65. Syl/UZR-65 UZR-65.1 Improvement of Beali Bazar - BrhammonBazar and 4.15 Km 8.58 Km 19.87 47.46 NCB Yes 4/24/2005 10/26/2006 2/29/2008 4/17/2005 The Joint Venture of 100% 100% construction of appurtenant structures. (i) M/S Mahmud Mamun & (ii) Suchi Enterprise Ltd. UZR-65.2 Improvement of Gowainghat - Radhanagor and 4.43 Km 27.60 2/15/2005 8/19/2006 1/31/2008 2/8/2005 CEC-RC, JV 100% 100% construction of appurtenant structures. 66. Joy/UZR-66 UZR-66.1 Improvement of Hitchmi - Madhainagar road and 3.93 Km 10.00 Km 18.13 35.59 NCB Yes 10/19/2005 4/22/2007 3/30/2008 10/12/2005 Md. Nazir Hossain 100% 100% construction of appurtenant structures. UZR-66.2 Improvement of Itkhola - Jamalgonj and construction of 6.07 Km 17.47 11/9/2005 5/13/2007 7/31/2008 11/2/2005 JV of (i) Parisha Trade 65% 65% Cancelled appurtenant structures. System Ltd. (ii) Ethen Enterprise 67. Hab/UZR-67 UZR-67.1 Improvement of Nabigonj - Inathgonj Road and 8.83 Km 8.83 Km 55.48 55.48 NCB Yes 12/13/2005 6/16/2007 4/30/2008 11/30/2005 M/S Basic Engineering 100% 100% construction of appurtenant structures. & Azad and Brother UZR-67.2 Improvement of Chunarughat - Assampara - Balla Road 4.40 Km Major rehabilitation was found essential, so it has been taken under Maintenance program of RTIP. 0% 0% and construction of appurtenant structures. 68. Gaz/UR-1 Azmatpur-Narun road 3.06 Km 3.06 Km 10.30 10.30 NCB No 6/3/2005 12/5/2006 12/31/2007 4/26/2005 JV of M/S FEL-SHK 100% 100% 69. Gaz/UR-2 Baliadi-Dhaljoria Dubail road 5.07 Km 5.07 Km 15.11 15.11 NCB No 4/12/2005 10/14/2006 4/30/2008 4/4/2005 JV of M/S Olive & Rifat 100% 100% Enterprise 70. Nara/UR-3 Haijadi UP-Probhakordi road 6.00 Km 6.00 Km 15.55 15.55 NCB No 3/31/2005 10/2/2006 9/30/2006 3/22/2005 Joint Venture of 100% 100% (i) M/S SCM Construction (ii) M/S Ratna Enterprise (iii) Mohammadi Traders 71. Nara/UR-4 Sanmandi UP Office-Kaikertek bazar Darikandi, 3.03 Km 3.03 Km 11.02 11.02 NCB No 3/31/2005 10/2/2006 9/30/2006 3/22/2005 M/S SCM-Ahasan- 100% 100% Sonakhali, Panchpir Darga road Ratna 16 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 72. Man/UR-5 Upazila HQ (Bhatara)-Dighulia UP Office via Enam 7.30 Km 7.30 Km 26.89 26.89 NCB No 3/31/2005 10/2/2006 3/30/2009 3/24/2005 JV of M/S Garpara 100% 83% Bengrua road Construction 73. Man/UR-6 Teota UP Office-Jafargonj GC (Poyla) road 5.80 Km 5.80 Km 18.77 18.77 NCB No 4/10/2005 10/12/2006 6/30/2007 4/3/2005 M/S M. R. Enterprise 100% 100% Completed 74. Sir/UR-7 Dubil-Amsara road 7.24 Km 7.24 Km 18.43 18.43 NCB No 5/6/2005 11/7/2006 4/30/2007 4/21/2005 M/S Turna Enterprise 100% 100% 75. Sir/UR-8 Songacha DR-Songacha UP road 6.28 Km 6.28 Km 12.38 12.38 NCB No 5/19/2005 11/20/2006 12/31/2007 5/4/2005 M/S A. S. Construction 100% 100% 76. Bog/UR-9 Bihigram hat-Baldakuri road 5.26 Km 5.26 Km 2.88 2.88 NCB No 5/14/2005 11/15/2006 6/30/2007 5/7/2005 M/S SRF Joint Venture 37% 37% Contract cancelled and the remaining work being executed through new contract package no. Bog/UR-9A 77. Bog/UR-10 Palikukrul (Nungola UP)-Uchalbaria hat road 3.60 Km 3.60 Km 8.92 8.92 NCB No 4/5/2005 10/7/2006 2/25/2007 3/29/2005 M/S Pabons 100% 100% 78. Bog/UR-11 Perirhat-Tarnihat via Mohishban UP road 5.00 Km 5.00 Km 13.39 13.39 NCB No 5/14/2005 11/15/2006 11/14/2006 5/4/2005 M/S Ataur Rahaman 100% 100% Khan 79. Bog/UR-12 Malancha hat-Jamgram UP 4.30 Km 4.30 Km 3.84 3.84 NCB No 4/30/2005 11/1/2006 6/30/2007 4/25/2005 M/S Mahmud & Badrul 42% 42% Contract Joint Venture cancelled and the remaining work being executed through new contract package no. Bog/UR-12A 80. Raj/UR-13 Goalpara-Pakri UP 3.50 Km 3.50 Km 7.61 7.61 NCB No 5/24/2005 11/25/2006 11/18/2006 5/15/2005 Khandakar Mainul 100% 100% Islam 81. Raj/UR-14 Hatgangopara-Gobindapara UP 6.20 Km 6.20 Km 17.35 17.35 NCB No 5/25/2005 11/26/2006 1/20/2007 5/18/2005 M/S Khandakar Shahin 100% 100% Ahmed 82. Raj/UR-15 Gaonpara Bazar-Bhalukgachi UP road via Sharishabari 13.89 Km 13.89 Km 31.40 31.40 NCB Yes 6/14/2005 12/16/2006 9/30/2008 6/7/2005 Md. Fazlur Rahman & 100% 96% hat Md. Kamal Uddin JV 17 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 83. Raj/UR-16 Darshanpara UP-Baghdhani road 8.50 Km 8.50 Km 9.30 9.30 NCB No 5/16/2005 11/17/2006 4/30/2008 4/23/2005 Parisha Trade System 68% 68% Contract Ltd. cancelled and the remaining work being executed through new contract package no. Raj/UR-16A 84. Nat/UR-17 Lalpur Bonpara R&H-Madhubari Chowhat (Moniruddin 10.40 Km 10.40 Km 33.59 33.59 NCB Yes 7/25/2005 1/26/2007 10/30/2007 7/18/2005 M/S Mita Construction 100% 100% Akand)-Kadimchilan UP Office road 85. Nat/UR-18 Patulhat-Khajura UP Office 7.40 Km 7.40 Km 30.18 30.18 NCB Yes 12/18/2005 6/21/2007 6/18/2007 12/8/2005 M/S Habib Ahsan Babu 100% 100% 86. Naw/UR-19 Radhanagar UP-Akkelpur GC via Jamil road 1.15 Km 1.15 Km 4.51 4.51 NCB No 4/25/2005 10/27/2006 10/26/2006 4/20/2005 Md. Kamal Uddin 100% 100% 87. Naw/UR-20 Nachole UP Office (Bholar more)-Pirpur hat 6.70 Km 6.70 Km 19.10 19.10 NCB No 4/30/2005 11/1/2006 10/31/2006 4/24/2005 Md. Fazlur Rahman 100% 100% 88. Pab/UR-21 Chhaikhola Upazila road-Kachihata UP road 2.20 Km 2.20 Km 5.33 5.33 NCB No 4/16/2005 10/18/2006 9/16/2006 4/9/2005 M/S Orin Engineers 100% 100% 89. Pab/UR-22 Shayamnagar GC-Raninagar UP road 6.47 Km 6.47 Km 4.86 4.86 NCB No 6/22/2005 12/24/2006 10/31/2008 6/18/2005 Habib Traders & 36% 36% Canclled Shamsuzzaman JV 90. Joy/UR-23 Balighata UP Office-Jibonpur-Baghjana UP road 9.25 Km 9.25 Km 29.46 29.46 NCB Yes 4/10/2005 10/12/2006 10/31/2008 4/1/2005 Md. Nazir Hossain 100% 97% 91. Joy/UR-24 Akkelpur-Rukindipur UP Office via Jamalgonj 9.14 Km 9.14 Km 26.34 26.34 NCB No 4/9/2005 10/11/2006 12/30/2007 4/3/2005 JV of (i) M/S Parisha 100% 100% Charmatha road Trade System Ltd. (ii) M/S Ethen Enterprise 92. Nao/UR-25 Bakroil-Mandain-Ustihat road 8.62 Km 8.62 Km 13.94 13.94 NCB No 5/3/2005 11/4/2006 3/31/2008 4/12/2005 M/S Parisha Trade 81% 81% After System Ltd. cancellation of this contract, the remaining work is being implemented through package no. Nao/UR- 25A. Payment finalized 93. Nao/UR-26 Shihara UP-Ladipur road 4.17 Km 4.17 Km 11.65 11.65 NCB No 4/25/2005 10/27/2006 11/15/2007 4/6/2005 Md. Fazlur Rahman 100% 100% Completed 94. Dha/UR-27 Sutarpara UP Office-Halerbazar road 1.26 Km 1.26 Km 3.84 3.84 NCB No 4/9/2005 10/11/2006 10/31/2006 3/24/2005 M/S United Builders 100% 100% 18 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 95. Dha/UR-28 Shikaripara UP-Jamsha bazar via Bishompur road 9.00 Km 9.00 Km 30.43 30.43 NCB Yes 3/7/2005 9/8/2006 12/30/2006 2/24/2005 J.V of Delco 100% 100% Engineering & Jewel Engineering 96. Dha/UR-29 Gangutia UP Office-Kawali bazar road 8.14 Km 8.14 Km 17.29 17.29 NCB No 3/7/2005 9/8/2006 4/30/2008 2/24/2005 J.V of Delco 82% 82% Cancelled Engineering & Jewel Engineering 97. Nar/UR-30 Charsindur UP-Jamtala bazar via Chalana road 3.25 Km 3.25 Km 10.80 10.80 NCB No 4/6/2005 10/8/2006 12/31/2006 3/21/2005 M/S Hossain & Sons 100% 100% 98. Nar/UR-31 Bajnabo UP Office-Bhangarghat-Belabo road 2.58 Km 2.58 Km 6.10 6.10 NCB No 6/1/2005 12/3/2006 8/20/2007 5/17/2005 M/S Shahil Enterprise 100% 100% 99. Mun/UR-32 Chander bazar-Subachani road 3.35 Km 3.35 Km 9.22 9.22 NCB No 4/4/2005 10/6/2006 3/15/2007 3/28/2005 Pearl Engineering & 100% 100% Construction 100. Mun/UR-33 Masadgaon-Kahetara-Nagerhat road 2.71 Km 2.71 Km 4.25 4.25 NCB No 3/23/2005 9/24/2006 6/30/2007 3/14/2005 M/S Serajul Islam 57% 57% Contract cancelled and the remaining work being executed through new contract package no. Mun/UR-33A 101. Mun/UR-34 Bakultala-Banglabazar road 3.72 Km 3.72 Km 11.83 11.83 NCB No 4/10/2005 10/12/2006 3/31/2008 3/30/2005 Haider Construction 85% 85% Cancelled (Pvt) Ltd. 102. Com/UR-35 Nabagram-Munshirhat-Kadoir road 9.80 Km 9.80 Km 24.48 24.48 NCB No 3/20/2005 9/21/2006 6/30/2007 3/14/2005 Eva Overseas 100% 100% Corporation 103. Com/UR-36 Monohargonj-Hasnabad road 8.06 Km 8.06 Km 13.92 13.92 NCB No 3/21/2005 9/22/2006 6/30/2008 3/12/2005 M/S Tushar Enterprise 45% 45% Cancelled 104. Com/UR-37 Pipulia-Hazatkhola-Bagmara road 1.64 Km 1.64 Km 1.86 1.86 NCB No 3/19/2005 9/20/2006 9/13/2006 3/14/2005 Desh Development 26% 26% Cancelled Corporation 105. Com/UR-38 Pipulia-Hazatkhola road 2.10 Km 2.10 Km 1.14 1.14 NCB No 3/21/2005 9/22/2006 9/13/2006 3/14/2005 M/S Kamal 25% 25% Contract Construcrion cancelled and the remaining work being executed through new contract package no. Com/UR-38A 19 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 106. Com/UR-39 Pipulia-Bagmara via Hazatkhola road 6.55 Km 6.55 Km 19.42 19.42 NCB No 4/20/2005 10/22/2006 5/30/2007 4/13/2005 Eva Overseas 77% 77% Cancelled Corporation 107. Com/UR-40 Sanchail-Bangura road 8.47 Km 8.47 Km 16.72 16.72 NCB No 4/9/2005 10/11/2006 7/30/2008 3/28/2005 Shah Islam 55% 55% Cancelled Corporation Ltd. 108. Bra/UR-41 Naogaon Bazar-Pattar UP Office upto 2.90 Km 2.90 Km 7.81 7.81 NCB No 3/25/2005 9/26/2006 9/19/2006 3/5/2005 M/S Azad & Brothers 100% 100% 109. Bra/UR-42 Binauti UP Office (Rauth hat bazar)-Tinlakhpir via 6.99 Km 6.99 Km 26.20 26.20 NCB No 10/22/2005 4/25/2007 10/31/2008 10/12/2005 Project Builders Ltd. 100% 94% Nemtabad bazar road 110. Bra/UR-43 Akhaura (Fire Brigade)-Khalajura-Gazir bazar- 4.16 Km 4.16 Km 5.15 5.15 NCB No 7/24/2005 1/25/2007 6/30/2008 7/12/2005 Mr. Sayedur Rahman 37% 37% Cancelled Abdullahpur (Checkpost) road 111. Cha/UR-44 Palakhal-Aliara road 3.38 Km 3.38 Km 11.97 11.97 NCB No 4/9/2005 10/11/2006 12/30/2007 4/3/2005 M/S Property 100% 100% Completed Construction 112. Cha/UR-45 Shahapur-Aliara road 3.15 Km 3.15 Km 10.33 10.33 NCB No 5/11/2005 11/12/2006 3/30/2007 5/2/2005 M/S. Shahid Brothers 100% 100% Completed 113. Syl/UR-46 Bandhaghat-Mogalgaon UP Office road 4.95 Km 4.95 Km 16.56 16.56 NCB No 5/1/2005 11/2/2006 12/31/2006 4/24/2005 The Nirmitee Ltd. 100% 100% 114. Syl/UR-47 Tajpur-Charishabpur-Mandaruka-Khadimpur road 12.50 Km 12.50 Km 42.09 42.09 NCB Yes 6/8/2005 12/10/2006 4/3/2007 5/28/2005 China Geo-Engineering 100% 100% Corporation 115. Syl/UR-48 Nakikhali-Chanpur-Singerkach bazar road 9.80 Km 9.80 Km 25.55 25.55 NCB No 6/9/2005 12/11/2006 6/15/2008 6/2/2005 M/S M. Alam 100% 100% 116. Mou/UR-49 Amtail-Kadupur road 2.45 Km 2.45 Km 6.86 6.86 NCB No 5/7/2005 11/8/2006 11/6/2006 4/21/2005 M/S. Md. Ilias 100% 100% 117. Mou/UR-50 Paschim Kadamhata MP bazar-Syamerbhanga road 3.98 Km 3.98 Km 8.91 8.91 NCB No 5/9/2005 11/10/2006 11/10/2006 4/19/2005 Md. Monayem Khan 100% 100% 118. Mou/UR-51 Asian RHD-Uttarbag UP Office road 1.13 Km 1.13 Km 2.17 2.17 NCB No 4/17/2005 10/19/2006 10/18/2006 4/2/2005 M.A. Matin 90% 90% Canclled 119. Mou/UR-52 Bauli-Nijbahadurpur road 8.85 Km 8.85 Km 16.13 16.13 NCB No 5/12/2005 11/13/2006 11/30/2008 4/27/2005 M.A.H.A.I JV 75% 55% Contract cancelled and the remaining work being executed through new contract package no. Mou/UR-52A 120. Hab/UR-53 Chunarughat-Paikpara UP Office 6.50 Km 6.50 Km 21.99 21.99 NCB No 3/24/2005 9/25/2006 12/12/2006 3/15/2005 M/S Azad and Brothers 100% 100% 121. Hab/UR-54 Islampur-Gulgaon via Chichircoat-Chalkrampur road 7.20 Km 7.20 Km 22.80 22.80 0 No 6/5/2005 12/7/2006 3/31/2010 5/23/2005 JV of AMR Consortium 100% 90% Decission need to make revised estimate 20 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 122. Sun/UR-55 Palash-Salukabad-Jinarpur road 5.80 Km 5.80 Km 16.19 16.19 NCB No 5/10/2005 11/11/2006 12/15/2008 5/6/2005 Joint Venture of (i) M/S 100% 100% Belal Enterprise (ii) M/S Mahbub Enterprise (iii) M/S Priti Enterprise 123. Sun/UR-56 Pagla-Birgaon road 4.50 Km 4.50 Km 10.43 10.43 NCB No 5/10/2005 11/11/2006 4/30/2007 5/4/2005 Joint Venture of 100% 100% (i) Royal Trading Corporation (ii) Badrul Huda Mukul (iii) M/S F. Islam Construction 124. Sun/UR-57 Shahpur-Teranagar-Lalbazar road 2.56 Km 2.56 Km 4.99 4.99 NCB No 5/10/2005 11/11/2006 4/30/2007 4/29/2005 Joint Venture of 100% 100% (i) A.T.M. Misbah (ii) M/S Nurul Islam 125. Sun/UR-58 Dewrai-Sewra road 4.15 Km 4.15 Km 8.36 8.36 NCB No 5/10/2005 11/11/2006 1/11/2008 4/29/2005 Joint Venture of 100% 100% (i) Soweb Enterprise (ii) Shamim Ahmed (iii) Nazrul Islam 126. Raj/UR-59 Alipur hat-Puran Taherpur Kekarutala via Noapara UP 10.22 Km 10.22 Km 25.61 25.61 NCB No 5/7/2005 11/8/2006 11/10/2006 4/7/2005 TSL-RIB JV 100% 100% road 127. Nao/UR-60 Rasulpur UP Badmallikpur hat-Sarakdanga hat road 7.20 Km 7.20 Km 19.60 19.60 NCB No 5/3/2005 11/4/2006 3/30/2007 4/13/2005 Mr. Moyen Uddin 100% 100% Completed (Bashi) 128. Dha/UR-61 Bismile(at Dhaka- Aricha Hway)-Zirabo-Eaarpur UP 5.65 Km 5.65 Km 10.45 10.45 NCB No 7/5/2005 1/6/2007 11/28/2007 6/27/2005 J.V of Delco 100% 100% Office Engineering & Jewel Engineering 129. Dha/UR-62 Jalsa RHD-Suapur GC via Sutipara UP Office 6.00 Km 6.00 Km 11.27 11.27 NCB No 12/15/2005 6/18/2007 3/28/2008 11/27/2005 Can Enterprise 100% 100% 130. Gaz/UR-63 Nagori UP Office-Amarul bazar 4.30 Km 4.30 Km 12.56 12.56 NCB No 12/13/2005 6/16/2007 6/11/2006 12/5/2005 The Joint Venture of 100% 100% M/S Olive & Rifat Enterprise 131. Man/UR-64 Pakuria bazar-Pucca UZR via Baliakhora UP road 2.00 Km 2.00 Km 5.67 5.67 NCB No 12/14/2005 6/17/2007 6/17/2007 12/7/2005 M/S Good Luck 100% 100% Completed Trading Corporation 21 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 132. Man/UR-65 Paila UP-Singiuri UP 3.29 Km 3.29 Km 2.85 2.85 NCB No 2/20/2006 8/24/2007 6/30/2008 2/13/2006 M/S M. M. Traders 35% 35% Cancelled and payment finalized 133. Man/UR-66 Boyra UP-Kanthapara Bazar via Lesergonj Bazar 3.05 Km 3.05 Km 6.21 6.21 NCB No 12/14/2005 6/17/2007 12/30/2007 12/7/2005 M/S Good Luck 76% 76% Cancelled and Trading Corporation remaining work will be completed through a new package Man/UR-66A 134. Nara/UR-67 Chowdhuribari GC-Kalagachia UP Office road 3.10 Km As this road is improved by another project of LGED, so it is dropped. 0% 0% 135. Nar/UR-68 Shilmandi UP Office RHD-Madhabdi GC road via 4.65 Km 4.65 Km 15.79 15.79 NCB No 4/11/2006 10/13/2007 10/9/2007 4/5/2006 M/S Amzad Traders 100% 100% Fultala bazar road 136. Nar/UR-69 Kathalia UP Office-Rangpur bazar via Fazurkandi bazar 4.50 Km 4.50 Km 13.29 13.29 NCB No 12/19/2005 6/22/2007 12/31/2007 11/29/2005 Haider Construction 100% 100% road (Pvt.) Ltd. 137. Mun/UR-70 Kolapara UP Office-Dakhin Paiksha bazar via 2.00 Km 2.00 Km 6.11 6.11 NCB No 2/8/2006 8/12/2007 5/31/2009 1/23/2006 Proxima International 100% 93% Samaspur 138. Mun/UR-71 Baligaon Baily bridge-Norpur road 3.60 Km 3.60 Km 11.48 11.48 NCB No 8/21/2006 2/22/2008 6/30/2009 7/26/2006 M/S Fair Builder's 100% 88% 139. Raj/UR-72 Bargachi UP-Haider hat via Talgachi 4.50 Km Dropped as the scheme did not seem technically feasible 0% 0% 140. Nao/UR-73 Manda UP Office-Pirpali Gopalparhat road 7.65 Km 7.65 Km 20.61 20.61 NCB No 11/21/2005 5/25/2007 1/15/2008 11/13/2005 Parisha Trade system 100% 100% Completed Ltd. 141. Nao/UR-74 Dhamoirhat UP office-Biharinagar Bazar 4.77 Km 4.77 Km 13.19 13.19 NCB No 11/21/2005 5/25/2007 6/15/2009 11/6/2005 Road & Bridge Eng. 100% 97% Completed Co. Ltd. 142. Nat/UR-75 Arjunpur Boromhat UP Office-Durgapur hat 8.25 Km 8.25 Km 26.15 26.15 NCB No 3/6/2006 9/7/2007 5/30/2008 2/25/2006 Md. Zamilur Rahman 100% 99% Khan 143. Naw/UR-76 Ranihati UO Office-Golaperhat via Vama 2.95 Km 2.95 Km 7.91 7.91 NCB No 9/25/2005 3/29/2007 3/28/2007 9/18/2005 Md. Saidur Rahman 100% 100% Consturction Ltd. 144. Sir/UR-77 Dhangora UP Office-Baikanthapur bazar 6.00 Km 6.00 Km 16.95 16.95 NCB No 11/22/2005 5/26/2007 5/24/2007 11/14/2005 JV of M/S Alpona 100% 100% Construction , M/S SI Construction and Joy Traders 145. Pab/UR-78 Ruppur UP Office-Kanpur bazar 2.00 Km As this road is improved by another project of LGED, so it is dropped. 0% 0% 22 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 146. Pab/UR-79 Handial UP Office-Shamaj bazar 6.00 Km 6.00 Km 11.26 11.26 NCB No 2/7/2006 8/11/2007 9/30/2008 1/28/2006 JV of M/S Pabon's & 70% 70% Cancelled and The Bhuiya Engineer's remaining work will be completed through a new package Pab/UR- 79A 147. Pab/UR-80 Dhulauri UP-Boalmari bazar 4.20 Km 4.20 Km 12.57 12.57 NCB No 12/31/2005 7/4/2007 6/5/2007 12/20/2005 M/S Abdul Kader 100% 100% 148. Bog/UR-81 Mothurapur UP-Gopalnagar UP 4.39 Km 4.39 Km 10.46 10.46 NCB No 2/18/2006 8/22/2007 8/18/2007 2/9/2006 M/S Alam Construction 100% 100% 149. Joy/UR-82 Joypurhat-Nurpur road via Kuisabar 5.00 Km 5.00 Km 13.12 13.12 NCB No 8/17/2005 2/18/2007 4/30/2008 8/10/2005 M/S Alam Construction 100% 100% 150. Cha/UR-83 Kalipur-Gazra Bazar 5.22 Km 5.22 Km 4.89 4.89 NCB No 1/10/2006 7/14/2007 4/30/2008 1/1/2006 M/S Bashundhara 31% 31% Cancelled and remaining work will be completed through a new package Cha/UR-83A. Final bidd paid 151. Cha/UR-84 Tamta UP-Khudra Ferry Ghat 3.00 Km 3.00 Km 11.58 11.58 NCB No 1/3/2006 7/7/2007 2/28/2008 12/5/2005 Peal Engineering & 100% 100% Completed Construction 152. Cha/UR-85 Ashrafpur-Payelgacha road 2.92 Km 2.92 Km 7.72 7.72 NCB No 2/21/2006 8/25/2007 5/31/2008 2/14/2006 M/S Proma 100% 100% Completed International 153. Mou/UR-86 Ohanlghat-Raysres-Shimultala bazar road 4.00 Km 4.00 Km 10.01 10.01 NCB No 12/8/2005 6/11/2007 4/15/2008 11/23/2005 M.A. H.M.I JV 100% 100% 154. Sun/UR-87 Patharia-Banglabazar(Up to Bhatipara UP Office) 5.00 Km 5.00 Km 22.34 22.34 NCB No 10/15/2007 4/17/2009 6/16/2009 5/29/2007 JV of (i) M/S Mahbub 100% 100% Enterprise & (ii) M/S. Hasan Enterprise 155. Sun/UR-88 Adabazar-Horinathpur(Up to Laxmipur UP) 2.50 Km 2.50 Km 6.96 6.96 NCB No 12/12/2005 6/15/2007 12/30/2007 12/4/2005 M/S. Humayun Kabir 100% 100% 156. Hab/UR-89 Anwarpur-Gopalgonj bazar road 8.03 Km 8.03 Km 13.75 13.75 NCB No 11/6/2005 5/10/2007 4/30/2008 10/26/2005 S.S.A.A. Brothers 100% 100% 157. Gaz/UR-90 Bormi-Vatipara road 5.00 Km 5.00 Km 16.22 16.22 NCB No 1/23/2006 7/27/2007 12/30/2007 1/15/2006 M/S. Parisha Trade 100% 100% System Ltd 158. Syl/UR-91 Pirijpur-Sonarhat Monortal road 5.00 Km 5.00 Km 25.38 25.38 NCB No 9/12/2007 3/15/2009 11/15/2009 8/28/2007 M/S Unnayan 100% 97% Engineers & Associates 23 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 159. Nat/UR-92 Ratal-Behas road 7.45 Km 7.45 Km 20.76 20.76 NCB No 5/17/2006 11/18/2007 3/31/2008 5/10/2006 JV of M/S North Bengal 100% 100% Enterprise, M/S Islam Construction & Mir Habibul Alam 160. Bog/UR-93 Chandihara hat-Raynagar UP road 6.16 Km 6.16 Km 16.65 16.65 NCB No 11/30/2005 6/3/2007 5/29/2007 11/17/2005 M/S Ataur Rahman 100% 100% Khan 161. Sir/UR-94 Someshpur-Baniagati College (Bhangabari UP)- 4.60 Km 4.60 Km 13.16 13.16 NCB No 3/7/2006 9/8/2007 3/30/2008 3/1/2006 M/S Md. 100% 100% Mukundogati bazar road Shamsuzzaman 162. Sir/UR-95 Ekdala-Sunamukhin via Sattikri road 2.09 Km 2.09 Km 5.80 5.80 NCB No 1/27/2005 7/31/2006 6/29/2007 1/20/2005 M/S Sakil Enterprise 100% 100% 163. Mun/UR-96 Aldi R&H-K. Shimulia UP Office road 1.50 Km 1.50 Km 5.19 5.19 NCB No 4/26/2006 10/28/2007 10/21/2007 4/18/2006 M/S Punam Enterprise 100% 100% 164. Nara/UR-97 Pagla-Godnail UP Office 3.20 Km 3.20 Km 10.99 10.99 NCB No 1/6/2006 7/10/2007 7/6/2007 12/28/2005 M/S S. Islam & 100% 100% Brothers 165. Pab/UR-98 Manik hat-Bikramaditta via Daspara 5.30 Km 5.30 Km 4.86 4.86 NCB No 8/7/2006 2/8/2008 2/8/2008 8/1/2006 S.S Engineering & 30% 30% Cancelled and Construction Ltd. remaining works will be completed through new package Pab/UR- 98A 166. Dha/UR-99 (a) Saver GC-CRP-Laltech-Saver UP office road 4.90 Km 4.90 Km 17.18 17.18 NCB No 7/12/2006 1/13/2008 11/30/2008 6/28/2006 M/S Orient Trade 71% 71% Cancelled and (b) From Monu Baperir Dhal-Rajabari Bazar via International remaining works Borhanibag road will be completed through new package Dha/UR-99A 167. Man/UR-100 Balirteck hat-Shatti hat road 1.75 Km 1.75 Km 3.15 3.15 NCB No 5/22/2006 11/23/2007 5/21/2007 5/15/2006 M/S Hossain 100% 100% Completed Construction 168. Dha/TP-1 Dhamrai-Dhantara GC Road 2.24 Km 2.24 Km 0.10 0.10 NS No Jun'05 Sep'05 9/14/2005 169. Dha/TP-2 Sreerampur-Suapur GC Road 2.00 Km 3.80 Km 0.08 0.16 NS No Jun'05 Sep'05 9/14/2005 Sutipara-Nannar Road 1.80 Km 0.08 170. Dha/TP-3 Suapur-Savar Road 2.00 Km 3.80 Km 0.08 0.16 NS No Jun'05 Sep'05 9/14/2005 Dhamrai-Kalampu GC Road 1.80 Km 0.08 171. Dha/TP-4 Sutarpara UP Office-Haller Bazar Road 1.26 Km 1.26 Km 0.05 0.05 NS No Jun'05 Sep'05 9/14/2005 24 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 172. Gaz/TP-5 Kapasia-Monohordi Road 11.00 Km 16.00 Km 0.47 0.68 NS No Jun'05 Sep'05 9/14/2005 Kapasia-Ranigonj Road 5.00 Km 0.21 173. Gaz/TP-6 Kaligonj-Jangalia Road 6.35 Km 10.00 Km 0.27 0.42 NS No Jun'05 Sep'05 9/14/2005 Azmatpur-Naurn Road 3.65 Km 0.15 174. Gaz/TP-7 Kaligonj-Jamalpur-Showraid-Kalihasi-Taragonj 3.65 Km 9.40 Km 0.15 0.40 NS No Jun'05 Sep'05 9/14/2005 (Ranigonj)Road Nalsata-Ulukhola Road 5.75 Km 0.24 175. Man/TP-8 Manikgonj-Singair RHD at Betila to Balirteck hat Road 10.00 Km 13.02 Km 0.05 0.05 NS No 7/18/2005 7/26/2005 7/26/2005 7/11/2005 M/S Rangamati 100% 100% Completed Nursery Balirteck-Harirampur Road 3.02 Km 0.00 176. Man/TP-9 Manikgonj-Bangladesh hat Road 5.81 Km 13.21 Km 0.18 0.18 NS No 7/18/2005 7/26/2005 7/26/2005 7/11/2005 M/S Rangamati 100% 100% Completed Nursery Manikgonj-Singair R & H at Mitora to Burundi hat Road 7.40 Km 0.00 177. Man/TP-10 Baliati DR-Delduar GC via Pakutia Road 10.86 Km 10.86 Km 0.37 0.37 NS No 7/18/2005 7/26/2005 7/26/2005 7/11/2005 M/S Rangamati 100% 100% Completed Nursery 178. Man/TP-11 Saturia GC-Daragram GC 6.00 Km 9.90 Km 0.29 0.29 NS No 7/18/2005 7/26/2005 7/26/2005 7/11/2005 M/S Rangamati 100% 100% Completed Nursery Nayadingl NHW-Katigram GC Road 3.90 Km 0.00 179. Sir/TP-12 Boalia R&H-Solanga GC Road. 6.43 Km 6.43 Km 0.27 0.27 NS No Jun'05 Sep'05 9/14/2005 180. Sir/TP-13 Upazila Head Quater (Jamtoli GC) DR (Alokdiar)- 8.00 Km 8.00 Km 0.34 0.34 NS No Jun'05 Sep'05 9/14/2005 Balarampur GC Road. 181. Sir/TP-14 Upazila HQ toNagorerpurThana Border Road 2.50 Km 2.50 Km 0.11 0.11 NS No Jun'05 Sep'05 9/14/2005 182. Sir/TP-15 Dhangara GC-Bagbati GC Road. 4.00 Km 4.00 Km 0.17 0.17 NS No Jun'05 Sep'05 9/14/2005 183. Sir/TP-16 Shialkole RD -Bahuli GCRoad. 1.90 Km 1.90 Km 0.08 0.08 NS No Jun'05 Sep'05 9/14/2005 184. Bog/TP-17 Dupchachia-Namuza Road via Tindighi GC Road. 12.50 Km 12.50 Km 0.53 0.53 NS No Jun'05 Sep'05 9/14/2005 185. Bog/TP-18 Sultanganj-Perirhat Road 4.45 Km 9.77 Km 0.19 0.41 NS No Jun'05 Sep'05 9/14/2005 Birgram-Kharnahat-Majhira Road 5.32 Km 0.23 186. Pab/TP-19 Bhangura-Austomonidha Road 6.00 Km 6.00 Km 0.39 0.39 NS No 7/16/2005 10/14/2005 10/14/2005 7/4/2005 100% 187. Pab/TP-20 Najirgonj-Aminpur Road 7.50 Km 7.50 Km 0.00 0.00 NS No Jun'05 Sep'05 Dropped 188. Pab/TP-21 Santhia-24miles Road 4.00 Km 4.00 Km 0.00 0.00 NS No 8/19/2005 11/17/2005 11/17/2005 7/4/2005 Dropped 189. Pab/TP-22 Jalalpur-Akdonto Road 4.50 Km 10.50 Km 0.31 0.91 NS No 8/19/2005 11/17/2005 11/17/2005 8/9/2005 100% Dublia-Ataikola Road 6.00 Km 0.61 100% 190. Nat/TP-23 Rayna More-Junial GC Road 8.10 Km 8.10 Km 0.17 0.17 NS No 8/19/2005 9/18/2005 9/14/2005 8/9/2005 191. Nat/TP-24 Gurudaspur-Dharabaria Road 5.50 Km 5.50 Km 0.23 0.23 NS No Jun'05 Sep'05 9/14/2005 192. Nat/TP-25 Chowgram-Kaligang Road 10.40 Km 10.40 Km 0.44 0.44 NS No Jun'05 Sep'05 9/14/2005 25 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 193. Nat/TP-26 Darabpur-Laxmipur Road 4.60 Km 8.25 Km 0.19 0.35 NS No Jun'05 Sep'05 9/14/2005 Halsha GC-HaybatpurRHD Road 3.65 Km 0.15 194. Nao/TP-27 Deluabari GC to ChowbariaGC Road 4.10 Km 4.10 Km 0.17 0.17 NS No Jun'05 Sep'05 9/14/2005 195. Nao/TP-28 Battali GC-MandaThana R&H Road (Niamatpur Portion) 5.00 Km 18.00 Km 0.11 0.38 NS No Jun'05 Sep'05 9/14/2005 Battali GC-Chowbaria GC (Manda) (Niamatpur Portion) 7.50 Km 0.16 Road Chatra GC-Pungi Ghat Upazila Road 5.50 Km 0.12 196. Nao/TP-29 Raninagar-Abadpukur GC Road 5.00 Km 5.00 Km 0.21 0.21 NS No Jun'05 Sep'05 9/14/2005 197. Naw/TP-30 Gomostapur GC-Dobar More GC Road 7.00 Km 7.00 Km 0.19 0.19 NS No 6/22/2005 7/3/2005 7/3/2005 6/19/2005 Khaleda Nursery 198. Naw/TP-31 Kansat Ghat-Khasher hat Road 4.00 Km 4.00 Km 0.17 0.17 NS No 6/22/2005 7/3/2005 7/3/2005 6/19/2005 M/S Shapla Nursery 199. Bra/TP-32 Tinlacpir R& H-Shimrai Road 9.00 Km 9.00 Km 0.95 0.95 NS No Jun'05 Sep'05 9/14/2005 Joniprio Nursery 200. Bra/TP-33 Kuti-Shimrai Road under Kasba Upazila 5.00 Km 8.00 Km 0.53 0.84 NS No Jun'05 Sep'05 9/14/2005 Baneful Nursery Kasba-Akhaurahimrail Road 3.00 Km 0.32 201. Bra/TP-34 Nasirnagar GC-Chatiain GC Road via Tilpara Road 3.00 Km 3.00 Km 0.32 0.32 NS No Jun'05 Sep'05 9/14/2005 Baneful Nursery 202. Bra/TP-35 Bitghar bazar-B-Baria road & R&H via Kurghar hat road 4.00 Km 10.00 Km 0.20 0.57 NS No Jun'05 Sep'05 9/14/2005 M/S Subaj Nursery Ginodpur R&H road to GC road via Satmur UP road 6.00 Km 0.36 203. Nar/TP-36 Sagordi R & H to Barachapa GC Road 6.00 Km 6.00 Km 0.25 0.25 NS No Jun'05 Sep'05 9/14/2005 204. Com/TP-37 Muradnagar-Eliotganj Road 16.00 Km 16.00 Km 0.23 0.23 NS No Jun'05 Sep'05 9/14/2005 205. Com/TP-38 Comilla-Fakirbazar-Shaldanadi Road 11.80 Km 11.80 Km 0.61 0.61 NS No Jun'05 Sep'05 9/14/2005 206. Com/TP-39 Madhiya-Nowabpur-Rahimanagor Road 15.00 Km 15.00 Km 0.25 0.25 NS No Jun'05 Sep'05 9/14/2005 207. Com/TP-40 Barura-Ebberpur road via Rammohan bazar Road 10.50 Km 10.50 Km 0.22 0.22 NS No Jun'05 Sep'05 9/14/2005 208. Com/TP-41 Barakok-Pitambardi Road 1.00 Km 1.00 Km 0.03 0.03 NS No Jun'05 Sep'05 9/14/2005 209. Mun/TP-42 Lauhajang-Goalimandra Hat Road. 2.00 Km 2.00 Km 0.08 0.08 NS No Jun'05 Sep'05 9/14/2005 210. Mun/TP-43 Sreenagar-Tantar Road. 7.75 Km 7.75 Km 0.31 0.31 NS No Jun'05 Sep'05 9/14/2005 211. Mun/TP-44 Sirajdikhan-Kusumpur to Nawpara Road. 5.00 Km 5.80 Km 0.17 0.20 NS No Jun'05 Sep'05 9/14/2005 Taltola GC to Munshigonj-Sreenagar Road. 0.80 Km 0.03 212. Mun/TP-45 Kuchiamora RHD to Sekhernagar Road via Sayedpur 5.50 Km 5.50 Km 0.19 0.19 NS No Jun'05 Sep'05 9/14/2005 and Chitrokot Road. 213. Mou/TP-46 Saifur Rahman circular road [ RHD (Haldigul)- 22.00 Km 22.00 Km 0.46 0.46 NS No Jun'05 Sep'05 9/14/2005 Kalarbazau-Balagonj-chandighat road ] 26 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 214. Mou/TP-47 Munshibazar GC-Munshibazar Shamsemagor RHD 6.00 Km 6.00 Km 0.13 0.13 NS No Jun'05 Sep'05 9/14/2005 road via Rameswarpur Road 215. Mou/TP-48 Agunsi-Agiun-Pudinapur 5.00 Km 5.00 Km 0.05 0.05 NS No Jun'05 Sep'05 9/14/2005 216. Hab/TP-49 Paikpara-SadhurBazar Road 8.00 Km 8.00 Km 0.09 0.09 NS No 8/18/2005 9/14/2005 9/14/2005 Md. Abdullah 100% 217. Hab/TP-50 Azmiriganj-Kakialsco Road 6.50 Km 6.50 Km 0.27 0.27 NS No Jun'05 Sep'05 9/14/2005 218. Hab/TP-51 Azmiriganj-Paharpur Road 4.00 Km 4.00 Km 0.17 0.17 NS No Jun'05 Sep'05 9/14/2005 219. Hab/TP-52 Syedpure-Inathgang Road 8.00 Km 8.00 Km 0.18 0.18 NS No Jun'05 Sep'05 9/14/2005 Md. Abdullah 100% 220. Hab/TP-53 Baniachong GC-Markuli (Kadirganj) GC Road 1.00 Km 1.00 Km 0.04 0.04 NS No Jun'05 Sep'05 9/14/2005 221. Hab/TP-54 Islampur-Chalitatala via Upazila H.Q. Road 1.00 Km 1.00 Km 0.04 0.04 NS No Jun'05 Sep'05 9/14/2005 222. Cha/TP-55 Khila Bazar GC- Chitoshi Bazar GC Chandighat road 5.00 Km 5.00 Km 0.21 0.21 NS No Jun'05 Sep'05 9/14/2005 223. Cha/TP-56 Nayergaon Bordoil Sachar-Via patim bordi Road. 7.14 Km 18.41 Km 0.29 0.77 NS No Jun'05 Sep'05 9/14/2005 Machukhal-Naraqyanpur-Bolakhal Road 11.27 Km 0.48 224. Nao/TP-57 Nazipur-Shapahar R&H Road at Mamudpur to Shibpur 4.00 Km 8.00 Km 0.08 0.17 NS No Jun'05 Sep'05 9/14/2005 Road Shapahar-Agrdigun FRB Road 4.00 Km 0.08 225. Dha/TP-58 Konakhola Rajabari Road 2.00 Km 2.00 Km 0.03 0.03 NS No Jun'05 Sep'05 9/14/2005 226. Bog/TP-59 Shariakandi-Chadanbaisha Road 6.67 Km 6.67 Km 0.28 0.28 NS No Jun'05 Sep'05 9/14/2005 227. Sir/TP-60 Horinathpur-Dakuria GCM Road 6.00 Km 6.00 Km 0.23 0.23 NS No Jun'05 Sep'05 9/14/2005 228. Cha/TP-61 Rupsha GC-Palishara GC via Khajuria Road 5.00 Km 5.00 Km 0.21 0.21 NS No Jun'05 Sep'05 9/14/2005 229. Cha/TP-62 Belchow Bazar R & H Ramchandapur Bazar- 8.00 Km 8.00 Km 0.34 0.34 NS No Jun'05 Sep'05 9/14/2005 Sameshpur River Ghat Road 230. Mou/TP-63 Sreemangal-Shindurkhan Road 4.00 Km 4.00 Km 0.08 0.08 NS No Jun'05 Sep'05 9/14/2005 231. Mou/TP-64 Bhunabir Shamsergonj-Athangiri Road 5.00 Km 5.00 Km 0.11 0.11 NS No Jun'05 Sep'05 9/14/2005 232. Raj/TP-65 Kashim Bazar-Baya Road 7.90 Km 7.90 Km 0.01 0.01 NS No Jun'05 Sep'05 9/14/2005 233. Raj/TP-66 Tanore-Chowbaria Road 11.77 Km 11.77 Km 0.02 0.02 NS No Jun'05 Sep'05 9/14/2005 234. Raj/TP-67 Mundumala hat to Kakon hat Road 9.36 Km 9.36 Km 0.01 0.01 NS No Jun'05 Sep'05 9/14/2005 235. Raj/TP-68 Talanda-Keshor hat (St From Hatishali) Road 5.54 Km 5.54 Km 0.01 0.01 NS No Jun'05 Sep'05 9/14/2005 236. Raj/TP-69 Saranjay-Pacca Road More-Pakerhat-Mundumala Road 21.05 Km 21.05 Km 0.02 0.02 NS No Jun'05 Sep'05 9/14/2005 237. Raj/TP-70 Bhabanigonj -Ashangonj Road 12.50 Km 12.50 Km 0.34 0.34 NS No Jun'05 Sep'05 9/14/2005 238. Raj/TP-71 Bhabanigonj -Jhikra Road 9.25 Km 9.25 Km 0.21 0.21 NS No Jun'05 Sep'05 9/14/2005 239. Raj/TP-72 Taherpur-Mohangonj Road 11.45 Km 11.45 Km 0.25 0.25 NS No Jun'05 Sep'05 9/14/2005 240. Raj/TP-73 Machmoil-Hatgangopara Road 4.50 Km 4.50 Km 0.13 0.13 NS No Jun'05 Sep'05 9/14/2005 241. Raj/TP-74 Machmoil-Mohangonj Road 6.00 Km 6.00 Km 0.13 0.13 NS No Jun'05 Sep'05 9/14/2005 242. Raj/TP-75 Bhawanigonj-Kesorhat Road 14.27 Km 14.27 Km 0.08 0.08 NS No Jun'05 Sep'05 9/14/2005 27 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 243. Raj/TP-76 Shikdary-Taherpur Road 9.41 Km 9.41 Km 0.10 0.10 NS No Jun'05 Sep'05 9/14/2005 244. Raj/TP-77 Bhawanigonj-Hatgangopara Road 9.40 Km 9.40 Km 0.07 0.07 NS No Jun'05 Sep'05 9/14/2005 245. Raj/TP-78 Jhalmiloa GC-Mollapara GC Road 15.10 Km 15.10 Km 0.63 0.63 NS No Jun'05 Sep'05 9/14/2005 246. Raj/TP-79 Rajabari-Kakonhat (Kondulia) Road 13.45 Km 13.45 Km 0.57 0.57 NS No Jun'05 Sep'05 9/14/2005 247. Raj/TP-80 Anulia-Mohangonj Road 9.09 Km 9.09 Km 0.34 0.34 NS No Jun'05 Sep'05 9/14/2005 248. TP81-TP200 Supply & Planting of Saplings 1152.10 Km 44.00 44.00 NS No Jun'06 Sep'06 249. (120 Packages) TP201-TP300 Supply & Planting of Saplings 900.00 Km 38.50 38.50 NS No Jun'07 Sep'07 250. (100 Packages) Dha/MTN-1 Dhamrai-Dhantara GC Road 2.24 Km 2.24 Km 0.16 0.16 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 251. Dha/MTN-2 Sreerampur-Suapur GC Road 2.00 Km 3.80 Km 0.13 0.25 CP (through No Jun'05 Jun'07 6/14/2007 LCS) Sutipara-Nannar Road 1.80 Km 0.13 252. Dha/MTN-3 Suapur-Savar Road 2.00 Km 3.80 Km 0.13 0.25 CP (through No Jun'05 Jun'07 6/14/2007 LCS) Dhamrai-Kalampu GC Road 1.80 Km 0.13 253. Dha/MTN-4 Sutarpara UP Office-Haller Bazar Road 1.26 Km 1.26 Km 0.09 0.09 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 254. Gaz/MTN-5 Kapasia-Monohordi Road 11.00 Km 16.00 Km 0.69 1.01 CP (through No Jun'05 Jun'07 6/14/2007 LCS) Kapasia-Ranigonj Road 5.00 Km 0.31 255. Gaz/MTN-6 Kaligonj-Jangalia Road 6.35 Km 10.00 Km 0.41 0.63 CP (through No Jun'05 Jun'07 6/14/2007 LCS) Azmatpur-Naurn Road 3.65 Km 0.22 256. Gaz/MTN-7 Kaligonj-Jamalpur-Showraid-Kalihasi-Taragonj 3.65 Km 9.40 Km 0.22 0.60 CP (through No Jun'05 Jun'07 6/14/2007 (Ranigonj)Road LCS) Nalsata-Ulukhola Road 5.75 Km 0.38 28 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 257. Man/MTN-8 Manikgonj-Singair RHD at Betila to Balirteck hat Road 10.00 Km 13.02 Km 0.63 0.82 CP (through No Jun'05 Jun'07 6/14/2007 LCS) Balirteck-Harirampur Road 3.02 Km 0.19 258. Man/MTN-9 Manikgonj-Bangladesh hat Road 5.81 Km 13.21 Km 0.19 0.66 CP (through No Jun'05 Jun'07 6/14/2007 LCS) Manikgonj-Singair R & H at Mitora to Burundi hat Road 7.40 Km 0.47 259. Man/MTN-10 Baliati DR-Delduar GC via Pakutia Road 10.86 Km 10.86 Km 0.35 0.35 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 260. Man/MTN-11 Saturia GC-Daragram GC 6.00 Km 9.90 Km 0.19 0.31 CP (through No Jun'05 Jun'07 6/14/2007 LCS) Nayadingl NHW-Katigram GC Road 3.90 Km 0.13 261. Sir/MTN-12 Boalia R&H-Solanga GC Road. 6.43 Km 6.43 Km 0.41 0.41 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 262. Sir/MTN-13 Upazila Head Quater (Jamtoli GC) DR (Alokdiar)- 8.00 Km 8.00 Km 0.50 0.50 CP (through No Jun'05 Jun'07 6/14/2007 Balarampur GC Road. LCS) 263. Sir/MTN-14 Upazila HQ toNagorerpurThana Border Road 2.50 Km 2.50 Km 0.16 0.16 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 264. Sir/MTN-15 Dhangara GC-Bagbati GC Road. 4.00 Km 4.00 Km 0.26 0.26 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 265. Sir/MTN-16 Shialkole RD -Bahuli GCRoad. 1.90 Km 1.90 Km 0.13 0.13 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 266. Bog/MTN-17 Dupchachia-Namuza Road via Tindighi GC Road. 12.50 Km 12.50 Km 0.79 0.79 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 267. Bog/MTN-18 Sultanganj-Perirhat Road 4.45 Km 9.77 Km 0.29 0.42 CP (through No Jun'05 Jun'07 6/14/2007 LCS) Birgram-Kharnahat-Majhira Road 5.32 Km 0.13 268. Pab/MTN-19 Bhangura-Austomonidha Road 6.00 Km 6.00 Km 0.19 0.19 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 269. Pab/MTN-20 Najirgonj-Aminpur Road 7.50 Km 7.50 Km 0.25 0.25 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 270. Pab/MTN-21 Santhia-24miles Road 4.00 Km 4.00 Km 0.25 0.25 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 29 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 271. Pab/MTN-22 Jalalpur-Akdonto Road 4.50 Km 10.50 Km 0.16 0.53 CP (through No Jun'05 Jun'07 6/14/2007 LCS) Dublia-Ataikola Road 6.00 Km 0.38 272. Nat/MTN-23 Rayna More-Junial GC Road 8.10 Km 8.10 Km 0.26 0.26 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 273. Nat/MTN-24 Gurudaspur-Dharabaria Road 5.50 Km 5.50 Km 0.35 0.35 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 274. Nat/MTN-25 Chowgram-Kaligang Road 10.40 Km 10.40 Km 0.71 0.71 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 275. Nat/MTN-26 Darabpur-Laxmipur Road 4.60 Km 8.25 Km 0.29 0.52 CP (through No Jun'05 Jun'07 6/14/2007 LCS) Halsha GC-HaybatpurRHD Road 3.65 Km 0.23 276. Nao/MTN-27 Deluabari GC to ChowbariaGC Road 4.10 Km 4.10 Km 0.13 0.13 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 277. Nao/MTN-28 Battali GC-MandaThana R&H Road (Niamatpur Portion) 5.00 Km 18.00 Km 0.16 0.62 CP (through No Jun'05 Jun'07 6/14/2007 LCS) Battali GC-Chowbaria GC (Manda) (Niamatpur Portion) 7.50 Km 0.26 Road Chatra GC-Pungi Ghat Upazila Road 5.50 Km 0.20 278. Nao/MTN-29 Raninagar-Abadpukur GC Road 5.00 Km 5.00 Km 0.32 0.32 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 279. Naw/MTN-30 Gomostapur GC-Dobar More GC Road 7.00 Km 7.00 Km 0.23 0.23 CP (through No 7/1/2005 6/30/2007 6/30/2007 6/24/2005 Khaleda Nursery LCS) 280. Naw/MTN-31 Kansat Ghat-Khasher hat Road 4.00 Km 4.00 Km 0.26 0.26 CP (through No 7/1/2005 6/30/2007 6/30/2007 6/26/2005 M/S Shapla Nursery LCS) 281. Bra/MTN-32 Tinlacpir R& H-Shimrai Road 9.00 Km 9.00 Km 0.57 0.57 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 282. Bra/MTN-33 Kuti-Shimrai Road under Kasba Upazil 5.00 Km 8.00 Km 0.31 0.50 CP (through No Jun'05 Jun'07 6/14/2007 LCS) Kasba-Akhaurahimrail Road 3.00 Km 0.19 283. Bra/MTN-34 Nasirnagar GC-Chatiain GC Road via Tilpara Road 3.00 Km 3.00 Km 0.19 0.19 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 30 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 284. Bra/MTN-35 Bitghar bazar-B-Baria road & R&H via Kurghar hat road 4.00 Km 10.00 Km 0.13 0.33 CP (through No Jun'05 Jun'07 6/14/2007 LCS) Ginodpur R&H road to GC road via Satmur UP road 6.00 Km 0.20 285. Nar/MTN-36 Sagordi R & H to Barachapa GC Road 6.00 Km 6.00 Km 0.38 0.38 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 286. Com/MTN-37 Muradnagar-Eliotganj Road 16.00 Km 16.00 Km 0.50 0.50 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 287. Com/MTN-38 Comilla-Fakirbazar-Shaldanadi Road 11.80 Km 11.80 Km 0.49 0.49 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 288. Com/MTN-39 Madhiya-Nowabpur-Rahimanagor Road 15.00 Km 15.00 Km 0.47 0.47 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 289. Com/MTN-40 Barura-Ebberpur road via Rammohan bazar Road 10.50 Km 10.50 Km 0.36 0.36 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 290. Com/MTN-41 Barakok-Pitambardi Road 1.00 Km 1.00 Km 0.03 0.03 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 291. Mun/MTN-42 Lauhajang-Goalimandra Hat Road. 2.00 Km 2.00 Km 0.13 0.13 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 292. Mun/MTN-43 Sreenagar-Tantar Road. 7.75 Km 7.75 Km 0.50 0.50 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 293. Mun/MTN-44 Sirajdikhan-Kusumpur to Nawpara Road. 5.00 Km 5.80 Km 0.31 0.37 CP (through No Jun'05 Jun'07 6/14/2007 LCS) Taltola GC to Munshigonj-Sreenagar Road. 0.80 Km 0.06 294. Mun/MTN-45 Kuchiamora RHD to Sekhernagar Road via Sayedpur 5.50 Km 5.50 Km 0.35 0.35 CP (through No Jun'05 Jun'07 6/14/2007 and Chitrokot Road. LCS) 295. Mou/MTN-46 Saifur Rahman circular road [ RHD (Haldigul)- 22.00 Km 22.00 Km 0.72 0.72 CP (through No Jun'05 Jun'07 6/14/2007 Kalarbazau-Balagonj-chandighat road ] LCS) 296. Mou/MTN-47 Munshibazar GC-Munshibazar Shamsemagor RHD 6.00 Km 6.00 Km 0.20 0.20 CP (through No Jun'05 Jun'07 6/14/2007 road via Rameswarpur Road LCS) 297. Mou/MTN-48 Agunsi-Agiun-Pudinapur 5.00 Km 5.00 Km 0.16 0.16 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 298. Hab/MTN-49 Paikpara-SadhurBazar Road 8.00 Km 8.00 Km 0.51 0.51 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 299. Hab/MTN-50 Azmiriganj-Kakialsco Road 6.50 Km 6.50 Km 0.42 0.42 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 300. Hab/MTN-51 Azmiriganj-Paharpur Road 4.00 Km 4.00 Km 0.26 0.26 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 31 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 301. Hab/MTN-52 Syedpure-Inathganj Road 8.00 Km 8.00 Km 0.51 0.51 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 302. Hab/MTN-53 Baniachong GC-Markuli (Kadirganj) GC Road 1.00 Km 1.00 Km 0.06 0.06 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 303. Hab/MTN-54 Islampur-Chalitatala via Upazila H.Q. Road 1.00 Km 1.00 Km 0.06 0.06 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 304. Cha/MTN-55 Khila Bazar GC- Chitoshi Bazar GC Chandighat road 5.00 Km 5.00 Km 0.32 0.32 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 305. Cha/MTN-56 Nayergaon Bordoil Sachar-Via patim bordi Road. 7.14 Km 18.41 Km 0.45 1.19 CP (through No Jun'05 Jun'07 6/14/2007 LCS) Machukhal-Naraqyanpur-Bolakhal Road 11.27 Km 0.74 306. Nao/MTN-57 Nazipur-Shapahar R&H Road at Mamudpur to Shibpur 4.00 Km 8.00 Km 0.13 0.26 CP (through No Jun'05 Jun'07 6/14/2007 Road LCS) Shapahar-Agrdigun FRB Road 4.00 Km 0.13 307. Dha/MTN-58 Konakhola Rajabari Road 2.00 Km 2.00 Km 0.07 0.07 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 308. Bog/MTN-59 Shariakandi-Chadanbaisha Road 6.67 Km 6.67 Km 0.42 0.42 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 309. Sir/MTN-60 Horinathpur-Dakuria GCM Road 6.00 Km 6.00 Km 0.39 0.39 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 310. Cha/MTN-61 Rupsha GC-Palishara GC via Khajuria Road 5.00 Km 5.00 Km 0.31 0.31 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 311. Cha/MTN-62 Belchow Bazar R & H Ramchandapur Bazar- 8.00 Km 8.00 Km 0.51 0.51 CP (through No Jun'05 Jun'07 6/14/2007 Sameshpur River Ghat Road LCS) 312. Mou/MTN-63 Sreemangal-Shindurkhan Road 4.00 Km 4.00 Km 0.13 0.13 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 313. Mou/MTN-64 Bhunabir Shamsergonj-Athangiri Road 5.00 Km 5.00 Km 0.16 0.16 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 32 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 314. Raj/MTN-65 Kashim Bazar-Baya Road 7.90 Km 7.90 Km 0.26 0.26 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 315. Raj/MTN-66 Tanore-Chowbaria Road 11.77 Km 11.77 Km 0.40 0.40 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 316. Raj/MTN-67 Mundumala hat to Kakon hat Road 9.36 Km 9.36 Km 0.30 0.30 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 317. Raj/MTN-68 Talanda-Keshor hat (St From Hatishali) Road 5.54 Km 5.54 Km 0.20 0.20 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 318. Raj/MTN-69 Saranjay-Pacca Road More-Pakerhat-Mundumala Road 21.05 Km 21.05 Km 0.41 0.41 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 319. Raj/MTN-70 Bhabanigonj -Ashangonj Road 12.50 Km 12.50 Km 0.40 0.40 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 320. Raj/MTN-71 Bhabanigonj -Jhikra Road 9.25 Km 9.25 Km 0.30 0.30 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 321. Raj/MTN-72 Taherpur-Mohangonj Road 11.45 Km 11.45 Km 0.36 0.36 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 322. Raj/MTN-73 Machmoil-Hatgangopara Road 4.50 Km 4.50 Km 0.16 0.16 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 323. Raj/MTN-74 Machmoil-Mohangonj Road 6.00 Km 6.00 Km 0.20 0.20 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 324. Raj/MTN-75 Bhawanigonj-Kesorhat Road 14.27 Km 14.27 Km 0.24 0.24 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 325. Raj/MTN-76 Shikdary-Taherpur Road 9.41 Km 9.41 Km 0.16 0.16 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 33 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 326. Raj/MTN-77 Bhawanigonj-Hatgangopara Road 9.40 Km 9.40 Km 0.15 0.15 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 327. Raj/MTN-78 Jhalmiloa GC-Mollapara GC Road 15.10 Km 15.10 Km 0.94 0.94 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 328. Raj/MTN-79 Rajabari-Kakonhat (Kondulia) Road 13.45 Km 13.45 Km 0.87 0.87 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 329. Raj/MTN-80 Anulia-Mohangonj Road 9.09 Km 9.09 Km 0.58 0.58 CP (through No Jun'05 Jun'07 6/14/2007 LCS) 330. MTN81-MTN200 Off Pavement Maintenance & Tree Nursing 1152.10 Km 59.40 59.40 CP (through No Jun'06 Jun'08 (120 Packages) LCS) 331. MTN201-MTN300 Off Pavement Maintenance & Tree Nursing 900.00 Km 53.13 53.13 CP (through No Jun'07 Jun'08 (100 Packages) LCS) 332. SUR (1200 Construction of Structures on Union/Village Road (SUR) 15000.00 m 15000.00 m 2,763.21 2,763.21 NCB No Jul'04 Jun'10 90% 85% Packages) (Detail in Annex-A) 333. Joy/GCM-1 Improvement of Puranapail Hat under Joypurhat-S 1 No. 1 No. 4.07 4.07 NCB No 5/15/2005 5/15/2006 12/31/2006 5/8/2005 M/S S. A. Traders 100% 100% Upazila 334. Joy/GCM-2 Improvement of Hope Hat under Khetlal Upazila 1 No. 1 No. 4.75 4.75 NCB No 5/10/2005 5/10/2006 12/31/2006 4/27/2005 M/S Rabi & Brothers 100% 100% 335. Joy/GCM-3 Improvement of Matri Hat under Kalai Upazila 1 No. 1 No. 4.38 4.38 NCB No 4/30/2005 4/30/2006 3/25/2008 4/23/2005 Khan Brothers 100% 95% 336. Nat/GCM-4 Improvement of Rajapur under Baraigram Upazila 1 No. 1 No. 4.51 4.51 NCB No 7/25/2005 7/25/2006 3/31/2008 7/17/2005 Md. Aminul Haque 100% 97% 337. Nat/GCM-5 Improvement of Jonail under Baraigram Upazila 1 No. 1 No. 4.56 4.56 NCB No 8/14/2005 8/14/2006 3/31/2008 8/7/2005 M/S Podder 100% 21% Construction 338. Nat/GCM-6 Improvement of Kaliganj under Singra Upazila 1 No. 1 No. 4.42 4.42 NCB No 8/14/2005 8/14/2006 3/31/2008 8/7/2005 M/S. Hira Enterprise 100% 55% 339. Naw/GCM-7 Improvement of Shonaichondi Hat under Nachole 1 No. 1 No. 4.20 4.20 NCB No 9/7/2005 9/7/2006 9/6/2006 8/31/2005 M/S Mona Construction 100% 100% Upazila 340. Naw/GCM-8 Improvement of Rajbari Hat under Nachole Upazila 1 No. 1 No. 4.14 4.14 NCB No 3/21/2005 3/21/2006 3/20/2006 3/15/2005 Md. Saidur Rahman & 100% 100% Co. (Pvt.) Ltd. 341. Naw/GCM-9 Improvement of Kansat under Shibganj Upazila 1 No. 1 No. 4.17 4.17 NCB No 2/15/2005 2/15/2006 2/14/2006 2/1/2005 M/S Alam Construction 100% 100% 34 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 342. Gaz/GCM-10 Improvement of Shaoraid Bazar under Kaliganj Upazila 1 No. 1 No. 0.00 0.00 NCB No 5/15/2005 5/15/2006 5/15/2006 4/8/2005 M/S MITHU Enterprise 0% 0% Dropped due to land problem 343. Sun/GCM-11 Improvement of Rajaniganj Bazar under Derai Upazila 1 No. 1 No. 0.00 0.00 NCB No 8/15/2006 8/15/2007 8/15/2007 3/25/2005 M/S Sheli Enterprise 0% 0% Dropped 344. Sun/GCM-12 Improvement of Derai Bazar under Derai Upazila 1 No. 1 No. 0.00 0.00 NCB No 8/15/2006 8/15/2007 8/15/2007 3/25/2005 M/S Basu Nirman 0% 0% Dropped Sangstha 345. Sun/GCM-13 Improvement of Shyamarchar Bazar under Derai 1 No. 1 No. 5.99 5.99 NCB No 4/23/2009 4/23/2010 10/22/2009 4/13/2009 M/S Mamun 75% 70% 0 Upazila Construction 346. Sun/GCM-14 Improvement of Selimganj Bazar under Jamalganj 1 No. 1 No. 1.49 1.49 NCB No 8/1/2008 8/1/2009 8/31/2009 6/24/2008 Scheme Properties Ltd. 21% 21% Land dispute Upazila 347. Sun/GCM-15 Improvement of Mongalkata Bazar under Sunamganj-S 1 No. 1 No. 2.56 2.56 NCB No 7/1/2005 7/1/2006 6/30/2007 6/18/2005 M/S Mobarak Hossain 100% 100% Upazila 348. Sun/GCM-16 Improvement of Paglabazar under Sunamganj-S 1 No. 1 No. 2.48 2.48 NCB No 7/1/2005 7/1/2006 6/30/2006 6/18/2005 M/S Milon Kanti Dey 100% 100% Upazila 349. Sun/GCM-17 Improvement of Joynagar Bazar under Sunamganj-S 1 No. 1 No. 6.69 6.69 NCB No 11/20/2008 11/20/2009 11/19/2009 11/9/2008 Future Castle 75% 60% Upazila Construction 350. Com/GCM-18 Improvement of Homna Bazar under Homna Upazila 1 No. 1 No. 3.13 3.13 NCB No 11/22/2005 11/22/2006 6/30/2007 11/2/2005 M/S Basharat Ahmed 100% 95% 351. Com/GCM-19 Improvement of Dhalua Bazar under Nangalkot Upazila 1 No. 1 No. 3.25 3.25 NCB No 4/30/2005 4/30/2006 6/30/2007 4/16/2005 M/S. M.I. Construction 100% 100% 352. Com/GCM-20 Improvement of Nangalkot Bazar under Nangalkot 1 No. 1 No. 2.12 2.12 NCB No 3/15/2006 3/15/2007 6/30/2007 2/8/2006 M/S Surma 100% 100% Upazila International 353. Com/GCM-21 Improvement of Jhalom Bazar under Barua Upazila 1 No. 1 No. 0.71 0.71 NCB No 3/28/2006 3/28/2007 12/31/2007 3/21/2006 M/S M. A. Zaher 32% 32% Cancelled 354. Com/GCM-22 Improvement of Langnashar Bazar under Barua Upazila 1 No. 1 No. 1.13 1.13 NCB No 3/28/2006 3/28/2007 12/31/2007 3/21/2006 M/S. Choudhury 50% 50% Cancelled Traders 355. Com/GCM-23 Improvement of Chouddagram Bazar under 1 No. 1 No. 3.30 3.30 NCB No 4/27/2005 4/27/2006 8/31/2007 4/20/2005 Md. Faizullah 100% 100% Chauddagram Upazila 356. Com/GCM-24 Improvement of Gouripur Hat under Daudkandi Upazila 1 No. 1 No. 4.29 4.29 NCB No 6/18/2005 6/18/2006 3/30/2008 6/12/2005 Md. Faizullah 100% 100% 357. Com/GCM-25 Improvement of Masimpur under Daudkandi Upazila 1 No. 1 No. 0.00 0.00 NCB No Aug'06 Aug'07 0% 0% Dropped, LC unavailable 358. Com/GCM-26 Improvement of Batakandi Hat under Daudkandi Upazila 1 No. 1 No. 1.40 1.40 NCB No 6/10/2005 6/10/2006 3/6/2006 5/16/2005 The Engineer's & 40% 18% After partial work Construction Ltd. land problem arisen 35 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 359. Cha/GCM-27 Improvement of Sachar Hat under Kachua Upazila 1 No. 1 No. 3.92 3.92 NCB No 5/21/2005 5/21/2006 12/30/2006 5/14/2005 M/S Khan Traders 100% 100% Completed 360. Cha/GCM-28 Improvement of Rahimanagar Hat under Kachua 1 No. 1 No. 3.79 3.79 NCB No 6/11/2005 6/11/2006 12/30/2007 6/4/2005 M/S Nur Hossain 100% 100% Completed Upazila Traders 361. Cha/GCM-29 Improvement of Khila Bazar under Shaharasti Upazila 1 No. 1 No. 2.73 2.73 NCB No 6/25/2005 6/25/2006 6/30/2007 4/18/2005 M/S Zia Enterprise 100% 100% Completed 362. Cha/GCM-30 Improvement of Takhor Bazar under Shaharasti Upazila 1 No. 1 No. 2.12 2.12 NCB No 10/10/2005 10/10/2006 9/29/2006 9/11/2005 M/S Rabbi Traders 100% 100% Completed 363. Cha/GCM-31 Improvement of Rupsha Hat under Faridganj Upazila 1 No. 1 No. 3.31 3.31 NCB No 5/14/2005 5/14/2006 5/14/2006 5/7/2005 M/S Zia Enterprise 100% 100% Completed 364. Cha/GCM-32 Improvement of Kalir Bazar under Faridganj Upazila 1 No. 1 No. 1.96 1.96 NCB No 7/30/2005 7/30/2006 12/31/2006 3/16/2005 The Sun Flower 100% 100% Completed 365. Cha/GCM-33 Improvement of Rampur Hat under Faridganj Upazila 1 No. 1 No. 4.82 4.82 NCB No 8/14/2005 8/14/2006 12/30/2006 6/2/2005 M/S Zia Enterprise 100% 100% Completed 366. Cha/GCM-34 Improvement of Ishanbala Hat under Haimchar Upazila 1 No. 1 No. 5.81 5.81 NCB No 10/12/2005 10/12/2006 12/30/2006 5/11/2005 M/S Rokib Enterprise 100% 100% Completed 367. Cha/GCM-35 Improvement of Bakila Bazar under Haziganj Upazila 1 No. 1 No. 2.83 2.83 NCB No 5/10/2005 5/10/2006 9/28/2006 5/3/2005 Mizanur Rahman Liton 100% 100% Completed 368. Bra/GCM-36 Improvement of Mogra Rajdhargonj Bazar under 1 No. 1 No. 2.62 2.62 NCB No 8/21/2005 8/21/2006 6/30/2007 8/8/2005 M/S Tushi Enterprise 100% 100% Akhaura Upazila 369. Bra/GCM-37 Improvement of Sarail Bazar under Sarail Upazila 1 No. 1 No. 3.69 3.69 NCB No 4/18/2005 4/18/2006 3/31/2007 4/7/2005 Fazle Azim Engineers 100% 100% Ltd. 370. Bra/GCM-38 Improvement of Aurail Bazar under Sarail Upazila 1 No. 1 No. 3.84 3.84 NCB No 4/18/2005 4/18/2006 3/31/2007 4/7/2005 Sawdagar Traders 100% 100% 371. Bra/GCM-39 Improvement of Nurpur Bazar under B.Baria-S Upazila 1 No. 1 No. 4.03 4.03 NCB No 5/14/2005 5/14/2006 8/31/2006 4/10/2005 M/S Nilu Enterprise 100% 100% 372. Bra/GCM-40 Improvement of Singarbeel Hat under B.Baria-S Upazila 1 No. 1 No. 3.10 3.10 NCB No 5/14/2005 5/14/2006 8/31/2006 4/3/2005 M/S Khaled Enterprise 100% 100% 373. Dha/GCM-41 Improvement of Nannar Bazar under Dhamrai Upazila 1 No. As this GCM is improved by another project of LGED, so it is dropped. 374. Dha/GCM-42 Improvement of Kushura Hat under Dhamrai Upazila 1 No. 1 No. 5.20 5.20 NCB No 2/16/2006 2/16/2007 7/31/2008 2/1/2006 M/S Jewel Engineers 100% 98% 375. Dha/GCM-43 Improvement of Amin Bazar under Keraniganj Upazila 1 No. 1 No. 5.37 5.37 NCB No 5/20/2005 5/20/2006 7/20/2006 5/17/2005 M/S Bikalpa Trade 100% 100% International 376. Dha/GCM-44 Improvement of Bebir Bazar under Keraniganj Upazila 1 No. 1 No. 5.68 5.68 NCB No 5/20/2005 5/20/2006 8/7/2006 5/17/2005 JV of M/S Janata 100% 100% Trade International and M/S Abdur Rashid & Brothers 36 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 377. Man/GCM-45 Improvement of Shamganj under Daulatpur Upazila 1 No. 1 No. 0.00 0.00 NCB No Jul'07 Jul'08 M/S Goodluck Trading 0% 0% Dropped due to Corporatoin non-availibility of Local Contribution 378. Man/GCM-46 Improvement of Singair Hat under Singair Upazila 1 No. 1 No. 0.00 0.00 NCB No 8/15/2006 8/15/2007 8/15/2007 8/6/2005 M/S M.J. Joint Venture 0% 0% Cancelled due to land problem 379. Bog/GCM-47 Improvement of Zianagar Hat under Dupchanchia 1 No. 1 No. 4.94 4.94 NCB No 5/2/2005 5/2/2006 2/28/2008 4/25/2005 JV of M/S S.A. Runa 100% 100% Upazila 380. Bog/GCM-48 Improvement of Kumari Pandithpukur Hat under 1 No. Dropped from the project Nandigram Upazila 381. Bog/GCM-49 Improvement of Kharna Hat under Bogra-S Upazila 1 No. 1 No. 4.58 4.58 NCB No 5/15/2005 5/15/2006 6/30/2007 5/4/2005 Md. Fazlul Haque 100% 100% 382. Bog/GCM-50 Improvement of Bihar Hat under Shibganj Upazila 1 No. 1 No. 3.49 3.49 NCB No 4/2/2005 4/2/2006 9/30/2006 3/20/2005 M/S. S.M. Construction 100% 100% JV. 383. Bog/GCM-51 Improvement of Daridaha Hat under Shibganj Upazila 1 No. 1 No. 4.71 4.71 NCB No 8/17/2005 8/17/2006 1/31/2007 8/6/2005 M/S Islam Brothers 100% 100% 384. Bog/GCM-52 Improvement of Horikhali Hat under Sonatola Upazila 1 No. 1 No. 4.14 4.14 NCB No 8/14/2005 8/14/2006 5/30/2007 8/7/2005 M/S. Shafiq Traders 100% 100% 385. Bog/GCM-53 Improvement of Bibirpukur Hat under Kahalo Upazila 1 No. 1 No. 4.28 4.28 NCB No 8/17/2005 8/17/2006 4/30/2008 8/8/2005 M/S. Shmoun 100% 100% Enterprise 386. Nao/GCM-54 Improvement of Shabai Hat under Manda Upazila 1 No. 1 No. 4.99 4.99 NCB No 12/18/2005 12/18/2006 12/31/2007 8/9/2005 GR-NE JV 100% 100% Completed 387. Nao/GCM-55 Improvement of Samajpara Hat under Atrai Upazila 1 No. 1 No. 4.33 4.33 NCB No 10/10/2006 10/10/2007 5/31/2008 8/9/2005 SRI-MU JV 100% 100% Completed 388. Nao/GCM-56 Improvement of Chalkgoari under Mohadebpur Upazila 1 No. 1 No. 4.18 4.18 NCB No 8/13/2006 8/13/2007 3/31/2009 9/8/2005 SAMRR JV 100% 98% Completed 389. Nao/GCM-57 Improvement of Ganguria Hat under Porsha Upazila 1 No. 1 No. 4.63 4.63 NCB No 12/7/2005 12/7/2006 3/15/2007 8/9/2005 M/S JE & SI JV 100% 100% Completed 390. Nao/GCM-58 Improvement of Madail Hat under Patnitala Upazila 1 No. 1 No. 4.50 4.50 NCB No 2/2/2006 2/2/2007 4/25/2007 8/9/2005 SA-MRR JV 100% 100% Completed 391. Nao/GCM-59 Improvement of Fatepur Hat under Naogaon-S Upazila 1 No. 1 No. 3.90 3.90 NCB No 2/25/2006 2/25/2007 6/30/2007 8/9/2005 M/S Momin Const 100% 100% Completed 392. Nao/GCM-60 Improvement of Mangalbari Hat under Dhamoirhat 1 No. 1 No. 4.11 4.11 NCB No 3/7/2006 3/7/2007 12/31/2007 8/9/2005 Md. Tarek Hossain 100% 100% Completed Upazila 393. Nao/GCM-61 Improvement of Khoribari under Niamatpur Upazila 1 No. 1 No. 4.51 4.51 NCB No 12/5/2005 12/5/2006 12/4/2006 8/9/2005 M.S JE&SI JV 100% 100% Completed 37 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 394. Pab/GCM-62 Improvement of Shelonda Bazar under Santhia Upazila 1 No. 1 No. 0.00 0.00 NCB No Aug'07 Aug'08 0% 0% Dropped 395. Pab/GCM-63 Improvement of Bera Hat under Bera Upazila 1 No. 1 No. 2.97 2.97 NCB No 2/18/2007 2/18/2008 12/31/2008 2/11/2007 Afzal Hossain 100% 76% 396. Raj/GCM-64 Improvement of Kaliganj under Tanore Upazila 1 No. 1 No. 4.89 4.89 NCB No 8/7/2006 8/7/2007 8/30/2008 9/18/2005 M/S Raka Enterprise 100% 77% 397. Raj/GCM-65 Improvement of Bidirpur Hat under Godagari Upazila 1 No. 1 No. 3.99 3.99 NCB No 1/7/2006 1/7/2007 5/30/2007 11/2/2005 Md. Abdur Razzak 100% 100% 398. Raj/GCM-66 Improvement of Dopaghata Hat under Mohanpur 1 No. 1 No. 4.61 4.61 NCB No 10/1/2007 9/30/2008 10/30/2008 9/25/2005 M/S Raka Enterprise 100% 100% Upazila 399. Raj/GCM-67 Improvement of Hatgangapara under Bagmara Upazila 1 No. 1 No. 4.17 4.17 NCB No 1/3/2007 1/3/2008 1/2/2008 9/25/2005 Md. Musleh Uddin 100% 100% 400. Sir/GCM-68 Improvement of Horinathpur under Kazipur Upazila 1 No. 1 No. 3.90 3.90 NCB No 12/13/2005 12/13/2006 12/31/2007 12/6/2005 Md. Abdul Kuddus 100% 100% 401. Sir/GCM-69 Improvement of Tarash under Tarash Upazila 1 No. 1 No. 3.80 3.80 NCB No 11/1/2005 11/1/2006 1/31/2007 10/25/2005 Sree Prokash Chandra 100% 100% Sarker 402. Sir/GCM-70 Improvement of Baruhash under Tarash Upazila 1 No. 1 No. 0.00 0.00 NCB No Aug'07 Jul'08 0% 0% Dropped 403. Sir/GCM-71 Improvement of Udhonia Hat under Ullapara Upazila 1 No. 1 No. 5.27 5.27 NCB No 10/2/2005 10/2/2006 12/31/2007 9/25/2005 S. M. Liaquat Ali 100% 100% 404. Sir/GCM-72 Improvement of Dhangara under Raiganj Upazila 1 No. 1 No. 2.97 2.97 NCB No 1/16/2006 1/16/2007 11/30/2007 1/9/2006 M/S Pias Construction 100% 100% 405. Mun/GCM-73 Improvement of Kalma Bazar under Lauhajong Upazila 1 No. 1 No. 2.38 2.38 NCB No 6/29/2006 6/29/2007 6/21/2007 3/16/2006 M/S Ata Traders 100% 100% 406. Mun/GCM-74 Improvement of Dighirpar Hat under Tongibari Upazila 1 No. 1 No. 5.80 5.80 NCB No 4/16/2006 4/16/2007 8/30/2007 3/14/2006 M/S Ata Traders 100% 100% 407. Nar/GCM-75 Improvement of Barochapa Hat under Monohardi 1 No. 1 No. 4.32 4.32 NCB No 3/21/2006 3/21/2007 8/30/2008 3/14/2006 M/S Scan Associates 100% 77% Upazila Pvt. Ltd. 408. Sun/GCM-76 Improvement of Sirajganj Bazar under Chattak Upazila 1 No. 1 No. 0.31 0.31 NCB No 1/5/2006 1/5/2007 1/4/2007 12/18/2005 M/S Moni Construction 7% 7% Contract terminated due to land problem and payment settlement is underway 409. Sun/GCM-77 Improvement of Syedpur Bazar under Jaganathpur 1 No. 1 No. 2.12 2.12 NCB No 2/5/2006 2/5/2007 2/4/2007 12/19/2005 JCM & Engineers Ltd. 100% 100% Upazila 38 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 410. Sun/GCM-78 Improvement of Biswamberpur under Biswamberpur 1 No. 1 No. 0.00 0.00 NCB No Aug'07 Jul'08 Suroj Mia 0% 0% Dropped Upazila 411. Mou/GCM-79 Improvement of Adampur Bazar under Kamalganj 1 No. 1 No. 4.18 4.18 NCB No 1/30/2006 1/30/2007 1/16/2007 1/17/2006 Md. Abdul Mukith 100% 100% Upazila 412. Mou/GCM-80 Improvement of Digirpar Bazar under Moulvibazar-S 1 No. 1 No. 4.41 4.41 NCB No 5/16/2006 5/16/2007 5/2/2008 5/3/2006 Md Tufalel Ahmed 100% 100% Upazila 413. Mou/GCM-81 Improvement of Sarkar Bazar under Moulvibazar-S 1 No. 1 No. 5.12 5.12 NCB No 5/22/2006 5/22/2007 9/15/2007 3/9/2006 M/S. Bafdul Alam 100% 100% Upazila 414. Mou/GCM-82 Improvement of Braman Bazar under Kulaura Upazila 1 No. 1 No. 3.00 3.00 NCB No 1/16/2006 1/16/2007 3/31/2008 1/3/2006 Kamal Uddin 61% 61% Cancelled 415. Mou/GCM-83 Improvement of Rabir Bazar under Kulaura Upazila 1 No. 1 No. 5.69 5.69 NCB No 4/18/2006 4/18/2007 10/30/2007 1/17/2006 Md Muhibur Rahman 100% 100% 416. Mou/GCM-84 Improvement of Rajnagar under Rajnagar Upazila 1 No. 1 No. 0.00 0.00 NCB No 4/14/2006 4/14/2007 4/3/2007 1/1/2006 Md. Qumruzzaman 0% 0% Dropped 417. Mou/GCM-85 Improvement of Munshibazar under Rajnagar Upazila 1 No. 1 No. 1.55 1.55 NCB No 8/17/2006 8/17/2007 3/31/2008 1/9/2006 Md. Habibur Rahman 40% 31% Cancelled 418. Mou/GCM-86 Improvement of Dubar Hat under Sreemangal Upazila 1 No. 1 No. 4.57 4.57 NCB No 1/30/2006 1/30/2007 1/16/2007 1/17/2006 Md. Nazrul Islam 100% 100% 419. Hab/GCM-87 Improvement of Azmiriganj Bazar under Azmiriganj 1 No. 1 No. 5.51 5.51 NCB No 10/22/2006 10/22/2007 3/30/2008 7/27/2006 M/S Azad & Brothers 100% 100% Upazila 420. Hab/GCM-88 Improvement of Bahubal under Bahubal Upazila 1 No. 1 No. 4.64 4.64 NCB No 1/7/2006 1/7/2007 4/30/2007 10/31/2005 M/S Shaid Brothers 100% 100% 421. Dha/GCM-89 Improvement of Dhamrai Hat under Dhamrai Upazila 1 No. This GCM is dropped. 422. Hab/GCM-90 Improvement of Chunarughat Puran Bazar under 1 No. 1 No. 4.51 4.51 NCB No 5/7/2006 5/7/2007 10/30/2007 12/12/2005 M/S Shahid Brothers 100% 100% Chunarughat Upazila 423. Hab/GCM-91 Improvement of Bulla Bazar under Lakhai Upazila 1 No. 1 No. 4.14 4.14 NCB No 11/7/2007 11/6/2008 2/28/2009 7/27/2006 M/S Azad & Brothers 100% 93% 424. Cha/GCM-92 Improvement of Roghunathpur Hat under Kachua 1 No. 1 No. 4.96 4.96 NCB No 10/14/2007 10/13/2008 10/13/2008 10/8/2007 M/S Nur Hossain 100% 100% Completed Upazila Traders 425. Cha/GCM-93 Improvement of Palakhal Bazar under Kachua Upazila 1 No. 1 No. 3.82 3.82 NCB No 11/13/2005 11/13/2006 12/30/2007 9/29/2005 M/S Al-Amin Traders 100% 100% Completed 426. Cha/GCM-94 Improvement of Chitoshi Bazar under Shaharasti 1 No. Dropped from the project Upazila 427. Cha/GCM-95 Improvement of Faridganj Bazar under Faridganj 1 No. 1 No. 2.29 2.29 NCB No 2/9/2006 2/9/2007 2/8/2007 12/26/2005 M/S Zia Enterprise 100% 100% Completed Upazila 428. Cha/GCM-96 Improvement of Chandra Bazar under Faridganj Upazila 1 No. This Package (GCM-96) has been excluded from RTIP as the GCM is being improved under another project (RDP-20) of LGED. 39 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 429. Cha/GCM-97 Improvement of Charbhairabi Bazar under Haimchar 1 No. 1 No. 6.79 6.79 NCB No 11/7/2007 11/6/2008 3/30/2009 3/18/2007 M/S Khair Enterprise 99% 29% Upazila 430. Cha/GCM-98 Improvement of Rajargaon Bazar under Haziganj 1 No. This Package (GCM-98) has been excluded from RTIP as the GCM is being improved under another project (RDP-20) of LGED. Upazila 431. Syl/GCM-99 Improvement of Shahgoli Bazar under Zakiganj Upazila 1 No. 1 No. 4.44 4.44 NCB No 12/21/2006 12/21/2007 3/30/2008 12/5/2006 M/S Helal Uddin 100% 100% 432. Syl/GCM-100 Improvement of Chatul Bazar under Kanaighat Upazila 1 No. 1 No. 3.89 3.89 NCB No 2/5/2006 2/5/2007 4/6/2008 1/2/2006 ATCL International 100% 100% 433. Syl/GCM-101 Improvement of Rakuar Bazar under Golapganj Upazila 1 No. 1 No. 5.00 5.00 NCB No Nov'07 Oct'08 0% 0% Dropped 434. Syl/GCM-102 Improvement of Jaintapur Bazar under Jaintapur 1 No. 1 No. 4.93 4.93 NCB No 12/31/2008 12/31/2009 12/31/2009 12/21/2008 M/S Ripon Traders 100% 88% Upazila 435. Syl/GCM-103 Improvement of Sharapar Bazar under Beanibazar 1 No. 1 No. 5.00 5.00 NCB No Nov'07 Oct'08 0% 0% Dropped Upazila 436. Syl/GCM-104 Improvement of Goainghat under Goainghat Upazila 1 No. 1 No. 5.00 5.00 NCB No Nov'07 Oct'08 0% 0% Dropped 437. Syl/GCM-105 Improvement of Goala Bazar under Balaganj Upazila 1 No. 1 No. 2.34 2.34 NCB No 5/7/2007 5/6/2008 10/31/2008 4/16/2007 M/S Tisha & Tushar 37% 37% Cancelled Trade International 438. Syl/GCM-106 Improvement of Balaganj Bazar under Balaganj Upazila 1 No. 1 No. 1.32 1.32 NCB No 3/16/2008 3/16/2009 3/15/2009 3/10/2008 M/S Tisha & Tushar 85% 55% Cancelled Trade International 439. Bra/GCM-107 Improvement of Kuti Hat under Kasba Upazila 1 No. 1 No. 5.83 5.83 NCB No 5/3/2007 5/2/2008 11/30/2008 3/28/2007 M/S Haroonur Rashid 100% 100% 440. Bra/GCM-108 Improvement of Nayanpur Hat under Kasba Upazila 1 No. 1 No. 6.27 6.27 NCB No 6/18/2007 6/17/2008 12/31/2008 4/8/2007 M/S Nilu Enterprise 100% 100% 441. Bra/GCM-109 Improvement of Morichakandi Bazar under 1 No. 1 No. 0.00 0.00 NCB No Nov'07 Oct'08 0% 0% Dropped Bancharampur Upazila 442. Dha/GCM-110 Improvement of Doleshwar Bazar under Keraniganj 1 No. 1 No. 5.00 5.00 NCB No Nov'07 Oct'08 0% 0% Upazila 443. Dha/GCM-111 Improvement of Nawabganj Bazar under Nawabganj 1 No. 1 No. 4.26 4.26 NCB No 8/13/2006 8/13/2007 3/30/2008 8/3/2006 M/S Rafique Traders 100% 100% Upazila 444. Man/GCM-112 Improvement of Machain Hat under Horirampur Upazila 1 No. 1 No. 0.00 0.00 NCB No Nov'07 Oct'08 M/S M. R. Construction 0% 0% Dropped due to non-availability of Local contribution 40 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 445. Man/GCM-113 Improvement of Joymantop Hat under Singair Upazila 1 No. 1 No. 4.06 4.06 NCB No 8/31/2006 8/31/2007 8/30/2008 8/24/2006 M/S Dalan Traders Ltd. 100% 80% Completed 446. Bog/GCM-114 Improvement of Omarpur Hat under Nandigram Upazila 1 No. 1 No. 6.04 6.04 NCB No 12/26/2006 12/26/2007 1/31/2009 12/19/2006 M/S Nana Nati Welding 100% 100% Workshop 447. Bog/GCM-115 Improvement of Namuja Hat under Bogra-S Upazila 1 No. 1 No. 4.93 4.93 NCB No 12/6/2005 12/6/2006 3/15/2007 11/24/2005 M/S Rakib Traders 100% 100% 448. Bog/GCM-116 Improvement of Mokamtola Hat under Shibganj Upazila 1 No. 1 No. 4.96 4.96 NCB No 4/23/2005 4/23/2006 5/25/2008 4/11/2005 Nana Nati Mahmud 100% 100% Bulbul (JV) 449. Bog/GCM-117 Improvement of Shimabari Hat under Sherpur Upazila 1 No. 1 No. 4.10 4.10 NCB No 3/17/2008 3/17/2009 8/30/2009 3/11/2008 M/S Shamoli Traders 100% 83% 450. Nao/GCM-118 Improvement of Bandaikhara Hat under Atrai Upazila 1 No. 1 No. 6.57 6.57 NCB No 4/1/2007 3/31/2008 6/30/2008 3/25/2007 M/S Brothers 100% 100% Enterprise 451. Nao/GCM-119 Improvement of Kashiabari Hat under Atrai Upazila 1 No. 1 No. 6.00 6.00 NCB No 5/6/2007 5/5/2008 5/5/2008 4/22/2007 S. M. Rejaul Islam 100% 100% 452. Nao/GCM-120 Improvement of Pathakata Hat under Mohadebpur 1 No. 1 No. 0.00 0.00 0% 0% Dropped Upazila 453. Nao/GCM-121 Improvement of Betgari Hat under Raninagar Upazila 1 No. 1 No. 5.99 5.99 NCB No 16f/04/07 15f/04/08 4/15/2008 3/21/2007 Golam Rabbani 100% 100% 454. Nao/GCM-122 Improvement of Katkhair Hat under Naogaon-S Upazila 1 No. 1 No. 5.99 5.99 NCB No 4/1/2007 3/31/2008 3/31/2008 3/25/2007 M/S Nasif Construction 100% 100% 455. Nao/GCM-123 Improvement of Rangamati Hat under Dhamoirhat 1 No. 1 No. 6.10 6.10 NCB No 5/22/2007 5/21/2008 7/31/2008 5/15/2007 M/S JE & SI JV 100% 98% Upazila 456. Nao/GCM-124 Improvement of Shibpur Hat under Niamatpur Upazila 1 No. 1 No. 6.00 6.00 NCB No 5/22/2007 5/21/2008 5/21/2008 5/15/2007 M/S JE & SI JV 100% 100% 457. Pab/GCM-125 Improvement of Dogashi Hat under Pabna-S Upazila 1 No. 1 No. 0.00 0.00 NCB No Nov'07 Oct'08 0% 0% Dropped 458. Pab/GCM-126 Improvement of Chaikola Hat under Chatmohor Upazila 1 No. 1 No. 2.75 2.75 NCB No 12/5/2007 12/4/2008 11/28/2008 11/29/2007 M/S Tushar Enterprise 100% 100% 459. Raj/GCM-127 Improvement of Godagari Hat under Godagari Upazila 1 No. 1 No. 5.78 5.78 NCB No 9/17/2008 9/17/2009 9/10/2009 8/20/2008 M/S Hossain 100% 100% Enterprise 460. Raj/GCM-128 Improvement of Mohonganj Hat under Bagmara Upazila 1 No. 1 No. 0.00 0.00 NCB No Nov'07 Oct'08 0% 0% Dropped 461. Sir/GCM-129 Improvement of Katagari Hat under Tarash Upazila 1 No. 1 No. 5.23 5.23 NCB No 6/7/2007 6/6/2008 6/6/2008 5/31/2007 M/S Piash Construction 100% 100% 462. Sir/GCM-130 Improvement of Hatpangashi under Raiganj Upazila 1 No. 1 No. 5.71 5.71 NCB No 6/3/2007 6/2/2008 12/30/2009 5/27/2007 S. M. Liaquat Ali 95% 78% 41 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 463. Mun/GCM-131 Improvement of Noapara Hat under Lauhajong Upazila 1 No. 1 No. 0.00 0.00 NCB No Nov'07 Oct'08 0% 0% Local contribution not yet received 464. Mun/GCM-132 Improvement of Shaper Bazar under Sirajdikhan Upazila 1 No. 1 No. 2.46 2.46 NCB No 1/6/2008 1/5/2009 1/5/2009 12/4/2007 M/S S Sarker 100% 100% Enterprise 465. Sun/GCM-133 Improvement of Tahirpur Bazar under Tahirpur Upazila 1 No. 1 No. 0.00 0.00 NCB No Nov'07 Oct'08 0% 0% Dropped 466. Sun/GCM-134 Improvement of Daurai Hat under Jaganathpur Upazila 1 No. 1 No. 7.22 7.22 NCB No 4/20/2009 4/20/2010 10/22/2009 4/12/2009 M/S Hasan Enterprise 33% 0% 0 467. Com/GCM-135 Improvement of Jafarganj Bazar under Debidwar 1 No. 1 No. 4.22 4.22 NCB No Nov'07 Oct'08 0% 0% No LC available Upazila 468. Com/GCM-136 Improvement of Muradnagar Bazar under Muradnagar 1 No. 1 No. 5.00 5.00 NCB No Nov'07 Oct'08 0% 0% No LC available Upazila 469. Mou/GCM-137 Improvement of Shamsernagar Bazar under Kamalganj 1 No. 1 No. 1.25 1.25 NCB No 8/14/2007 8/13/2008 8/28/2008 7/24/2007 M/S Nesar Ahmed & 26% 0% Dropped due to Upazila Co. court case. Payment settlement under process 470. Mou/GCM-138 Improvement of Office Bazar under Moulvibazar-S 1 No. 1 No. 0.00 0.00 NCB No Nov'07 Oct'08 0% 0% Dropped due to Upazila L/C problem 471. Mou/GCM-139 Improvement of Fultola Bazar under Kulaura Upazila 1 No. 1 No. 0.00 0.00 NCB No 9/2/2007 9/1/2008 9/11/2008 8/28/2007 M/S Nesar Ahmed & 0% 0% Writ petition Co. under High Court Division 472. Mou/GCM-140 Improvement of Dasher Bazar under Baraleka Upazila 1 No. 1 No. 0.00 0.00 NCB No Nov'07 Oct'08 0% 0% Dropped due to L/C problem 473. Mou/GCM-141 Improvement of Sindurkham Bazar under Sreemangal 1 No. 1 No. 5.43 5.43 NCB No 3/6/2008 3/6/2009 6/5/2009 2/20/2008 M/S K. M. Mamunul 100% 100% Upazila Haque 474. Hab/GCM-142 Improvement of Kakailsew Chowdhuri Bazar under 1 No. 1 No. 4.51 4.51 NCB No 3/28/2007 3/27/2008 3/27/2008 3/18/2007 Aviram Das 100% 100% Azmiriganj Upazila 475. Hab/GCM-143 Improvement of Dubai Bazar under Bahubal Upazila 1 No. 1 No. 4.84 4.84 NCB No 9/5/2007 9/4/2008 12/31/2008 8/23/2007 M/S Chowdhury 100% 93% Enterprise 42 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 476. Hab/GCM-144 Improvement of Chatain Bazar under Madubpur Upazila 1 No. 1 No. 4.39 4.39 NCB No 3/28/2007 3/27/2008 3/31/2009 3/4/2007 Md.Taj Uddin 95% 87% Payment settlement under process 477. Syl/GCM-145 Improvement of Kaliganj Bazar under Zakiganj Upazila 1 No. 1 No. 1.58 1.58 NCB No 5/7/2007 5/6/2008 5/7/2008 4/25/2007 M/S Koli Enterprise 100% 100% 478. Syl/GCM-146 Improvement of Ramda Bazar under Beanibazar 1 No. 1 No. 5.00 5.00 NCB No Nov'07 Oct'08 0% 0% Dropped due to Upazila L/C problem 479. Syl/GCM-147 Improvement of Radanagar Bazar under Goainghat 1 No. 1 No. 3.87 3.87 NCB No 7/30/2007 7/29/2008 7/16/2008 7/15/2007 Shahin Ahmed (JV) 100% 100% 0 Upazila 480. Syl/GCM-148 Improvement of Dayamir Bazar under Balaganj Upazila 1 No. 1 No. 3.76 3.76 NCB No 5/7/2007 5/6/2008 5/7/2008 4/16/2007 Fazle Azim Engineers 100% 100% Ltd. 481. Hab/GCM-149 Improvement of Inatganj Bazar under Nabiganj Upazila 1 No. 1 No. 6.34 6.34 NCB No 7/18/2007 7/17/2008 4/30/2009 6/4/2007 Shahidul Islam 100% 67% Builders 482. Syl/GCM-150 Improvement of Fenchuganj Bazar under Fenchuganj 1 No. 1 No. 0.93 0.93 NCB No 7/20/2007 7/19/2008 7/20/2008 6/26/2007 M/S. Continental 14% 14% Cancelled Upazila Construction 483. Gaz/RJ-1 Improvement of Kaliganj Bazar Ghat (RJ) under Kaliganj 1 No. 1 No. 4.97 4.97 NCB No 4/24/2005 10/26/2006 1/31/2007 4/24/2005 M/S Amzad Traders 100% 100% Upazila 484. Gaz/RJ-2 Improvement of Chabagan Bazar Ghat (RJ) under 1 No. 1 No. 3.55 3.55 NCB No 4/5/2005 10/7/2006 12/31/2006 3/24/2005 Joint Venture of 100% 100% Kaliakoir Upazila M/S SP Consortium 485. Gaz/RJ-3 Improvement of Raghunathpur Hat Ghat (RJ) under 1 No. 1 No. 0.00 0.00 NCB No 8/1/2007 2/1/2009 Joint Venture of M/S 0% 0% Dropped due to Kaliakoir Upazila Olive Rifat & Sheraj non-availibility of Enterprise Local Contribution 486. Gaz/RJ-4 Improvement of Toknayan Bazar Ghat (RJ) under 1 No. 1 No. 5.38 5.38 NCB No 4/2/2005 10/4/2006 4/30/2007 3/24/2005 M/S Associate Builders 100% 100% Kapasia Upazila 487. Gaz/RJ-5 Improvement of Kapasia Bazar Ghat (RJ) under 1 No. 1 No. 6.08 6.08 NCB No 5/25/2005 11/26/2006 10/30/2007 5/17/2005 M/S Shaki Enter prise 100% 100% Kapasia Upazila 488. Nat/RJ-6 Improvement of Kaliganj Bazar Ghat (RJ) under Singra 1 No. 1 No. 3.25 3.25 NCB No 7/25/2005 1/26/2007 3/31/2008 7/17/2005 M/S Hira Enterprise 100% 91% Upazila 489. Sun/RJ-7 Improvement of Derai Hat Ghat (RJ) under Derai 1 No. 1 No. 0.00 0.00 NCB No 0% 0% Dropped Upazila 490. Sun/RJ-8 Improvement of Rajaniganj Hat Ghat (RJ) under Derai 1 No. 1 No. 0.00 0.00 NCB No 0% 0% Dropped Upazila 491. Sun/RJ-9 Improvement of Joynagar Hat Ghat (RJ) under 1 No. 1 No. 3.86 3.86 NCB No 5/28/2005 11/29/2006 12/31/2007 3/29/2005 JV of ATM. Misbah 81% 81% Cancelled Sunamganj-S Upazila 43 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 492. Com/RJ-10 Improvement of Daudkhandi Bazar Ghat (RJ) under 1 No. 1 No. 4.48 4.48 NCB No 5/26/2005 11/27/2006 5/30/2007 5/21/2005 Md. Faizullah 100% 100% Daudkhandi Upazila 493. Syl/RJ-11 Improvement of Khosrupur Ghat Ghat (RJ) under 1 No. 1 No. 3.81 3.81 NCB No 12/11/2005 6/14/2007 12/31/2008 6/27/2005 M/S. M. Alam 57% 57% Cancelled Balaganj Upazila 494. Syl/RJ-12 Improvement of Zokiganj Custom Bazar Ghat (RJ) 1 No. 1 No. 0.00 0.00 NCB No Aug'06 Feb'08 0% 0% Dropped under Zokiganj Upazila 495. Cha/RJ-13 Improvement of Dalir Ghat (RJ) under Chandpur-S 1 No. 1 No. 5.01 5.01 NCB No 12/29/2005 7/2/2007 10/30/2007 8/9/2005 M/S. Mizanur Rahman 100% 100% Completed Upazila Liton 496. Cha/RJ-14 Improvement of Chandra Ghat (RJ) under Faridganj 1 No. 1 No. 4.37 4.37 NCB No 11/30/2005 6/3/2007 5/31/2007 4/10/2005 The Sun Flower 100% 100% Completed Upazila 497. Bra/RJ-15 Improvement of Kuti Ghat (RJ) under Kasba Upazila 1 No. 1 No. 6.58 6.58 NCB No 11/5/2005 5/9/2007 12/31/2007 4/28/2005 M/S Bhuban 100% 100% Prokoushali & M/S Khaled Enterprise JV 498. Raj/RJ-16 Improvement of Bidirpur Ghat (RJ) under Godagari 1 No. 1 No. 3.77 3.77 NCB No 9/24/2005 3/28/2007 4/25/2008 6/18/2005 Taher Brothers Ltd. 100% 100% Upazila 499. Com/RJ-17 Improvement of Batakandi Ghat (RJ) under Daudkhandi 1 No. 1 No. 0.00 0.00 NCB No Oct'07 Apr'09 0% 0% Dropped Upazila 500. Syl/RJ-18 Improvement of Balaganj Bazar Ghat (RJ) under 1 No. 1 No. 7.90 7.90 NCB No 8/12/2009 8/12/2010 2/12/2011 8/5/2009 Md. Nowshad Miah 42% 0% Balaganj Upazila 501. Cha/RJ-19 Improvement of Khila Ghat (RJ) under Shahrasti Upazila 1 No. 1 No. 3.59 3.59 NCB No 4/16/2006 10/18/2007 12/30/2007 10/19/2005 Md. Abdul Haque 100% 100% Completed 502. Cha/RJ-20 Improvement of Charbhairabi Ghat (RJ) under Haimchar 1 No. Dropped from the project Upazila 503. Cha/RJ-21 Improvement of Faridganj Ghat (RJ) under Faridganj 1 No. 1 No. 2.58 2.58 NCB No 12/22/2005 6/25/2007 5/26/2007 10/12/2005 M/S Zia Enterprise 100% 100% Completed Upazila 504. Cha/RJ-22 Improvement of Haziganj Ghat (RJ) under Haziganj 1 No. 1 No. 5.15 5.15 NCB No 10/16/2005 4/19/2007 6/30/2008 10/9/2005 M/S. Selim Enterprise 100% 100% Completed Upazila 505. Bra/RJ-23 Improvement of Nasirnagar Ghat (RJ) under Nasirnagar 1 No. 1 No. 6.39 6.39 NCB No 6/8/2006 12/10/2007 9/30/2008 1/19/2006 M/S Nilu Enterprise 100% 100% Upazila 506. Bra/RJ-24 Improvement of Arual Ghat (RJ) under Sarail Upazila 1 No. 1 No. 4.55 4.55 NCB No 11/2/2005 5/6/2007 2/29/2008 10/19/2005 M/S G.M. Enterprise 100% 100% 507. Syl/RJ-25 Improvement of Ramda Bazar Ghat (RJ) under 1 No. 1 No. 8.15 8.15 NCB No 8/16/2007 2/16/2009 5/30/2009 7/31/2007 M/S Helal Uddin 100% 100% Beanibazar Upazila 508. Dha/RJ-26 Improvement of Kartikpur Ghat (RJ) under Dohar 1 No. 1 No. 4.98 4.98 NCB No 9/22/2005 3/26/2007 10/25/2007 9/15/2005 M/S Eastland 100% 100% Upazila Engineers 509. Man/RJ-27 Improvement of Jamshaha Ghat (RJ) under Singair 1 No. Dropped from the project Upazila 44 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 510. Bog/RJ-28 Improvement of Chamarpathalia Ghat (RJ) under 1 No. 1 No. 5.24 5.24 NCB No 9/13/2005 3/17/2007 6/30/2007 9/5/2005 S.S. Engineering & 100% 100% Sherpur Upazila Consortium Ltd. 511. Pab/RJ-29 Improvement of Sannsibandha Ghat (RJ) under Bera 1 No. 1 No. 0.00 0.00 NCB No Oct'07 Apr'09 ATCO International. 0% 0% Local Upazila contribution not yet deposited. Dropped 512. Nar/RJ-30 Improvement of Hasnabad Ghat (RJ) under Raipura 1 No. 1 No. 4.32 4.32 NCB No 12/12/2006 6/14/2008 12/30/2008 2/25/2006 M/S Prokalpo 100% 91% Upazila Bastobayon Ltd. 513. Nar/RJ-31 Improvement of Algi Bazar Ghat (RJ) under Raipura 1 No. 1 No. 0.00 0.00 NCB No Dec'07 Jun'09 0% 0% Dropped Upazila 514. Nar/RJ-32 Improvement of Sreenagar Ghat (RJ) under Narsingdi-S 1 No. 1 No. 6.72 6.72 6.72 No 12/12/2006 6/14/2008 6/11/2008 12/6/2006 M/S Hossain 100% 100% Upazila Construction 515. Nar/RJ-33 Improvement of Bakhonnagar Ghat (RJ) under 1 No. 1 No. 6.82 6.82 NCB No 9/20/2006 3/23/2008 6/30/2009 9/11/2006 JV of (i) M/S Hossain 100% 80% Narsingdi-S Upazila Construction & (ii) M/S Mojibur Traders 516. Nar/RJ-34 Improvement of Alokbali Ghat (RJ) under Narsingdi-S 1 No. 1 No. 0.00 0.00 NCB No Dec'07 Jun'09 0% 0% Dropped Upazila 517. Nara/RJ-35 Improvement of Tarabo Ghat (RJ) under Rupganj 1 No. 1 No. 0.00 0.00 NCB No Dec'07 Jun'09 0% 0% Dropped Upazila 518. Nara/RJ-36 Improvement of Belde Bazar Ghat (RJ) under Rupganj 1 No. 1 No. 6.40 6.40 NCB No 3/7/2007 9/7/2008 9/7/2008 3/1/2007 M/S Yousuf & 100% 100% Upazila Associates 519. Nara/RJ-37 Improvement of Sabdi Bazar Ghat (RJ) under Bandor 1 No. 1 No. 5.97 5.97 NCB No 4/11/2007 10/12/2008 10/11/2008 4/4/2007 M/S Darbar Trading 100% 100% Upazila Corporation 520. Nara/RJ-38 Improvement of Panchami Ghat (RJ) under Sonargaon 1 No. 1 No. 3.01 3.01 NCB No 12/15/2007 6/17/2009 6/6/2009 11/29/2007 M/S Ratna Enterprise 100% 100% Upazila 521. Mou/RJ-39 Improvement of Fgazipur Ghat (RJ) under Baraleka 1 No. 1 No. 0.00 0.00 NCB No Dec'07 Jun'09 0% 0% Dropped due to Upazila L/C problem 522. Mou/RJ-40 Improvement of Chandgram Ghat (RJ) under Baraleka 1 No. 1 No. 0.00 0.00 NCB No Dec'07 Jun'09 0% 0% Dropped due to Upazila L/C problem 523. Mou/RJ-41 Improvement of Kalar Ghat (RJ) under Rajnagar Upazila 1 No. 1 No. 0.00 0.00 NCB No Dec'07 Jun'09 0% 0% Dropped due to L/C problem 45 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 524. Hab/RJ-42 Improvement of Azmiriganj Ghat (RJ) under Azmiriganj 1 No. 1 No. 9.24 9.24 NCB No 2/17/2008 8/20/2009 8/20/2009 1/17/2008 M/S Azad & Brothers 100% 100% Upazila 525. Hab/RJ-43 Improvement of Paharpur Ghat (RJ) under Azmiriganj 1 No. 1 No. 7.96 7.96 NCB No 2/17/2008 8/20/2009 8/20/2009 1/17/2008 M/S Azad & Brothers 100% 100% Upazila 526. Mun/RJ-44 Improvement of Shaperchar Ghat (RJ) under 1 No. 1 No. 0.00 0.00 NCB No Dec'07 Jun'09 0% 0% Dropped due to Sirajdikhan Upazila land problem 527. Mun/RJ-45 Improvement of Aldi Bazar Ghat (RJ) under Tongibari 1 No. 1 No. 0.00 0.00 NCB No Dec'07 Jun'09 0% 0% Dropped due to Upazila land problem 528. Gaz/RPM-1 Maintenance of Kaliganj-Kapasia Road 16.00 Km 16.00 Km 25.81 25.81 NCB No 4/26/2004 4/26/2005 6/30/2006 4/26/2004 Joint Venture of 100% 100% 1. Amzad Traders 2. Suchi Enterprise 529. Nar/RPM-2 Maintenance of Chalakchar bazar-Kotiadi GC via 8.15 Km 8.15 Km 4.76 4.76 NCB No 4/10/2004 4/10/2005 9/28/2004 4/1/2004 M/S Project Builders 100% 100% Charmanadalia Ferryghat Road. Ltd. 530. Nar/RPM-3 Maintenance of Shibpur-Charsindur Road. 9.53 Km 9.53 Km 8.51 8.51 NCB No 11/7/2004 11/7/2005 5/25/2005 6/20/2004 Joint Venture of 100% 100% 1. Amzad Traders 2. Suchi Enterprise 531. Man/RPM-4 RPM-4.1 Maintenance of Singair-Baira Road. 7.70 Km 17.70 Km 5.55 20.88 NCB No 5/2/2004 5/2/2005 10/30/2004 4/21/2004 M/S M. R. Construction 100% 100% Completed RPM-4.2 Maintenance of Betila-Balirteck Road. 10.00 Km 15.33 5/2/2004 5/2/2005 2/28/2005 4/21/2004 M/S M. R. Construction 100% 100% Completed 532. Mun/RPM-5 RPM-5.1 Maintenance of Tongibari-Dighirpar Road 5.00 Km 15.57 Km 7.40 22.62 NCB No 12/1/2004 12/1/2005 11/24/2005 11/25/2004 Parisha Trade System 100% 100% Ltd. RPM-5.2 Maintenance of Serajdikhan-Taltala GC Road 7.97 Km 9.73 7/24/2004 7/24/2005 2/28/2006 7/17/2004 Desh Corporation Ltd. 69% 69% Contract cancelled and the remaining work will be executed through new contract package no. Mun/RPM-5.2A RPM-5.3 Maintenance of Nimtala-Shekhernagar Road 2.60 Km 5.50 5/30/2004 5/30/2005 11/30/2005 5/20/2004 M/S. Punam-Robel JV 100% 100% 533. Sun/RPM-6 RPM-6.1 Maintenance of Sunamgonj-Narayantala (Mongolkata) 4.30 Km 20.26 Km 4.11 27.48 NCB No 5/4/2004 5/4/2005 10/30/2005 4/15/2004 M/S Belal Enterprise 100% 100% Road. RPM-6.2 Maintenance of Jagannathpur-Biswanath Road 3.50 Km 5.85 5/4/2004 5/4/2005 9/4/2004 4/12/2004 M/S Abdus Samad 100% 100% 46 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 RPM-6.3 Maintenance of (a) Bhaberbazar-Syedpur-Goalabazar 9.46 Km 14.98 8/1/2004 8/1/2005 1/31/2006 7/29/2004 JV of M/S Nurul Islam 100% 100% Road Ch. 00-2210m (b) Maintenance of Bhaberbazar- Syedpur-Goalabazar Road Ch. 2210-9460m. RPM-6.4 Maintenance of Kaitak-Sirajgonj Road 3.00 Km 2.53 5/4/2004 5/4/2005 8/4/2005 4/15/2004 M/S Alam Construction 100% 100% 534. Bra/RPM-7 RPM-7.1 Maintenance of Kasba-Akhaura Road 7.50 Km 27.19 Km 11.85 43.80 NCB Yes 8/25/2004 8/25/2005 12/31/2005 8/17/2004 M/S Nilu Enterprise 100% 100% RPM-7.2 Maintenance of Akhaura Bara bazar-Singer bill GCC 5.45 Km 7.38 8/17/2004 8/17/2005 8/10/2005 8/10/2004 M/S Azad & Brothers 100% 100% Road. RPM-7.3 Maintenance of Mogra bazar-Kasba-Puran bazar GCC 4.08 Km 5.46 8/25/2004 8/25/2005 8/18/2005 8/17/2004 M/S Haroonur Rashid 100% 100% Road RPM-7.4 Maintenance of Chandura-Nurpur Road 10.16 Km 19.11 8/25/2004 8/25/2005 8/18/2005 8/17/2004 M/S Ashraf & Sons 100% 100% 535. Raj/RPM-8 RPM-8.1 Maintenance of Baya-Kashimbazar Road (Paba portion) 9.50 Km 25.20 Km 13.38 30.22 NCB Yes 9/19/2004 9/19/2005 9/11/2005 9/11/2004 SEL & BCPL- JV 100% 100% RPM-8.2 Maintenance of Baya-Kashimbazar Road (Tanore 8.00 Km 10.46 9/15/2004 9/15/2005 9/7/2005 8/23/2004 Md. Fazlur Rahman 100% 100% portion) RPM-8.3 Maintenance of Court-Darusha Road 7.70 Km 6.38 9/15/2004 9/15/2005 9/7/2005 8/23/2004 Mr. Tarek Hossain 100% 100% 47 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 536. Nat/RPM-9 RPM-9.1 Maintenance of Halsa GC-Haybatpur RHD Road 4.55 Km 22.30 Km 9.67 39.14 NCB Yes 9/15/2004 9/15/2005 12/15/2005 9/7/2004 M/S Mamun 100% 100% RPM-9.2 Maintenance of Raina mour-Jonail GC road 8.10 Km 16.03 5/17/2004 5/17/2005 5/10/2005 5/10/2004 Mita Construction 100% 100% RPM-9.3 Maintenance of Gurudaspur GC-Soykhola road 9.65 Km 13.44 5/17/2004 5/17/2005 5/10/2005 5/10/2004 M/S Rahman 100% 100% Construction 537. Pab/RPM-10 RPM-10.1 Maintenance of Nazirgonj-Kashinathpur via Aminpur 13.00 Km 22.40 Km 13.28 18.97 NCB No 4/17/2004 4/17/2005 12/27/2006 4/7/2004 Md. Shamsuzzaman 100% 100% Road RPM-10.2 Maintenance of Chatmohar R&H-Jonail GCCR via 4.70 Km 2.90 4/17/2004 4/17/2005 4/10/2005 4/8/2004 Mohd. Ali Ahsan 100% 100% Haripur UP Road RPM-10.3 Maintenance of Pabna D.H.Q old Polytechnic-Padma 4.70 Km 2.80 4/17/2004 4/17/2005 6/30/2005 4/8/2004 Md. Abdul Kader 100% 100% river ghat Road 538. Cha/RPM-11 RPM-11.1 Maintenance of Chandra-Ramgonj Road 19.00 Km 23.08 Km 13.76 18.31 NCB No 6/23/2004 6/23/2005 6/22/2005 6/15/2004 M/S Zia Enterprise 100% 100% Completed RPM-11.2 Maintenance of Chandpur-Chandra Road 4.08 Km 4.54 6/30/2004 6/30/2005 6/30/2005 6/24/2004 Mizanur Rahman Liton 100% 100% Completed 539. Nao/RPM-12 Maintenance of Raninagar-Abadpukur Road 14.20 Km 14.20 Km 12.14 12.14 NCB No 7/15/2004 7/15/2005 2/28/2006 5/31/2004 Joint Venture of 100% 100% Completed Md. Fazlur Rahaman & M/S. Alam Construction Ltd. 540. Sir/RPM-13 RPM-13.1 Maintenance of Muradpur Riverghat-Nagarpur Thana 6.00 Km 13.90 Km 7.03 21.01 NCB No 11/12/2004 11/12/2005 6/30/2005 11/1/2004 M/S Doyel 100% 100% Border road Construction RPM-13.2 Maintenance of Dhangara-Bagbati road 7.90 Km 13.98 7/22/2004 7/22/2005 7/19/2005 7/10/2004 JV of NA-FEAHB 100% 100% 541. Joy/RPM-14 Maintenance of Akkelpur-Tilokpur Road. 12.85 Km 12.85 Km 28.01 28.01 NCB No 4/4/2004 4/4/2005 8/10/2005 3/20/2004 M/S Hoque Enterprise 100% 100% 542. Naw/RPM-15 RPM-15.1 Maintenance of Bholahat-Argarahat Road 18.40 Km 29.70 Km 10.31 17.20 NCB No 5/20/2004 5/20/2005 5/29/2005 5/11/2004 Md. Fazlur Rahman 100% 100% RPM-15.2 Maintenance of Shibgonj GC-Khasherhat GC via 11.30 Km 6.89 5/5/2004 5/5/2005 6/30/2006 4/20/2004 Ram Babu 100% 100% Monakashahat Road 543. Bog/RPM-16 RPM-16.1 Maintenance of Matidali-Pirgacha Road 9.16 Km 29.21 Km 13.68 43.69 NCB Yes 9/15/2004 9/15/2005 11/30/2005 8/26/2004 M/S.Ataur Rahaman 100% 100% Khan RPM-16.2 Maintenance of Shibgonj-Charbakra Road 14.98 Km 22.71 9/30/2004 9/30/2005 5/20/2008 9/5/2004 The Bhuiyan Engineers 100% 100% Ltd. RPM-16.3 Maintenance of Adamdighi-Abadpukur Road 5.07 Km 7.30 9/29/2005 9/29/2006 1/25/2006 9/16/2004 M/S. S. S. Engineers 100% 100% 48 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 544. Dha/RPM-17 RPM-17.1 Maintenance of Dhamrai-Dhantara Road 16.50 Km 24.49 Km 22.06 37.80 NCB Yes 7/28/2004 7/28/2005 7/28/2005 7/8/2004 M/S Fair Construction 100% 100% RPM-17.2 Maintenance of Jirani Bazar-Shimulia Bazar Road 7.99 Km 15.74 7/27/2004 7/27/2005 7/27/2005 7/7/2004 Joint Venture of SM- 100% 100% Ahasan-Ratna Consortium 545. Com/RPM-18 Maintenance of Muradnagar-Elliotgonj Road 15.69 Km 15.69 Km 31.03 31.03 NCB Yes 7/25/2004 7/25/2005 1/30/2008 7/18/2004 M/S. Arab Contractors 100% 100% (BD) Ltd. 546. Com/RPM-19 RPM-19.1 Maintenance of Suagonj-Pipulia-South Bijoypur Road 16.10 Km 28.09 Km 33.01 52.33 NCB Yes 8/24/2004 8/24/2005 12/31/2007 8/12/2004 Eva Overseas 100% 100% Corporation RPM-19.2 Maintenance of Laksam-Monohargonj Road 11.99 Km 19.32 9/5/2004 9/5/2005 9/30/2006 8/31/2004 M/S Al-Haj Abdul 90% 90% Cancelled Haque RPM-19.3 Maintenance of Barkota-Nayergaon via Pitambardi 3.75 Km The road was severely affected by the last flood-2004, major flood damage rehabilitation is found essential, so recently it has been proposed to IDA for Flood Damage Rehabilitation (FDR) Program instead of previous proposal sent to IDA for re-bidding. 547. Mou/RPM-20 RPM-20.1 Maintenance of Kucharmahal Dighirpar-Kagabala- 11.00 Km 15.80 Km 11.21 14.44 NCB No 8/7/2004 8/7/2005 5/31/2005 7/19/2004 Md. Ilias 100% 100% Athangiri Road RPM-20.2 Maintenance of Daulotpur-Latu Sharoper Road 4.80 Km 3.23 8/7/2004 8/7/2005 5/31/2005 7/19/2004 Md. Monayem Khan 100% 100% 548. Syl/RPM-21 RPM-21.1 Maintenance of Bairagir Bazar GC-Singerkanch Bazar 2.80 Km 17.57 Km 6.42 21.27 NCB No 8/30/2004 8/30/2005 8/30/2005 8/23/2004 M/S Chowhdury & Co. 100% 100% GC Road RPM-21.2 Maintenance of Rampasha-Bairagir Bazar Road 2.10 Km 3.84 8/30/2004 8/30/2005 8/30/2005 8/23/2004 M/S Chowhdury & Co. 100% 100% RPM-21.3 Maintenance of Dayamir GC-Dewanbazar GC Road 5.20 Km 5.88 8/30/2004 8/30/2005 8/30/2005 8/23/2004 Joint Venture of 100% 100% i) Mahmud Mamun ii) Suchi Enterprise Ltd. RPM-21.4 Maintenance of Goalabazar GC-Khadimpur- 7.47 Km 5.13 8/30/2004 8/30/2005 8/30/2005 8/23/2004 M/S Chowhdury & Co. 100% 100% Jagannathpur GC Road 549. Syl/RPM-22 RPM-22.1 Maintenance of Dhaka Dakhin-Chandarpur-Beanibazar 2.33 Km Road Both of the roads was severely affected by the last flood-2004, major flood damage rehabilitation is found essential, so recently it has been RPM-22.2 Maintenance of Beanibazar-Chandarpur Road 3.85 Km proposed to IDA for Flood Damage Rehabilitation (FDR) Program instead of previous proposal sent to IDA for re-bidding. 49 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 550. Hab/RPM-23 RPM-23.1 Maintenance of Paikpara-Sadhurbazar Road 4.80 Km 11.80 Km 6.32 20.36 NCB No 7/21/2005 7/21/2006 7/13/2005 7/10/2005 Md. Golam Faruk 100% 100% RPM-23.2 Maintenance of Syedpur-Innathgonj Road 7.00 Km 14.04 9/5/2004 9/5/2005 12/31/2005 8/24/2004 Concord Pragatee 100% 100% Consortium Ltd. 551. Nara/RPM-24 RPM-24.1 Maintenance of Fatulla Post Office-Hazigonj Road 4.50 Km 18.10 Km 7.64 21.64 NCB No 7/24/2004 7/24/2005 7/24/2005 7/17/2004 Joint Venture of 100% 100% (i) SCM Construction (ii) M/S Ratna Enterprise (iii) M/S Ahasan Enterprise RPM-24.2 Maintenance of Rupshi R&H-Kanchan GC via Murapara 13.60 Km 14.00 5/6/2004 5/6/2005 5/6/2005 4/29/2004 M/S Abul Hossain 100% 100% GC Road 552. Nara/RPM-25 Maintenance of Uchitpura GC-Gopaldi GC via Gohordi- 5.00 Km 5.00 Km 7.44 7.44 NCB No 5/25/2004 5/25/2005 11/30/2005 5/12/2004 M/S Farazi Four Star & 100% 100% Khaserkandi-Ramchandradi Road Brothers 553. Gaz/RPM-26 RPM-26.1 Kapasia GC-Kaligonj GC 9.50 Km 17.00 Km 6.15 20.07 NCB No 5/10/2005 5/10/2006 5/9/2006 5/9/2005 M/S L. M. Traders 100% 100% RPM-26.2 Kapasia-Ranigonj GC road 7.50 Km 13.91 4/28/2005 4/28/2006 4/21/2006 4/21/2005 M/S Akter & SH JV 100% 100% 554. Dha/RPM-27 RPM-27.1 Kalatia-Balurtek-Bishaw road via Ramerkanda-Ruhitpur 13.70 Km 19.55 Km 28.40 35.38 NCB Yes 4/30/2005 4/30/2006 8/24/2006 4/28/2005 M/S A.H Enterprise 100% 100% road RPM-27.2 Kartikpur RHW - Barrah Hat GC. 5.85 Km 6.98 6/15/2005 6/15/2006 6/15/2006 6/8/2005 M/S Eastland 100% 100% Engineers 555. Man/RPM-28 RPM-28.1 Baliati-Lowhati GC via Pakutia (Delduar UZ) Road 10.86 Km 20.31 Km 14.75 29.38 NCB Yes 3/9/2005 3/9/2006 9/30/2006 3/3/2005 M/S Goodluck Trading 100% 100% Completed Corporatoin RPM-28.2 Uthuli-Jaforgonj GC road 9.45 Km 14.63 3/9/2005 3/9/2006 2/26/2007 3/3/2005 Joint Venture of 100% 100% Completed M/S M. R. Construction & Lucky Construction 556. Raj/RPM-29 Biraldaha Mazar-Noapara via Singa 13.40 Km 13.40 Km 3.87 3.87 NCB No 7/18/2005 7/18/2006 6/13/2006 7/9/2005 Bishway Construction 30% 30% Contract Pvt. Ltd. cancelled and the remaining work being executed through new contract package no. Raj/RPM-29A 50 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 557. Raj/RPM-30 Kanpara GC-Alipur RHD via Durgapur 15.48 Km 15.48 Km 9.53 9.53 NCB No 7/18/2005 7/18/2006 10/30/2006 7/9/2005 Bishway Construction 42% 42% Contract Pvt. Ltd. cancelled and the remaining work being executed through new contract package no. Raj/RPM-30A 558. Joy/RPM-31 RPM-31.1 Mongalbari-Shalpara road 5.54 Km 14.14 Km 10.50 17.13 NCB No 3/1/2005 3/1/2006 3/1/2006 2/9/2005 Md. Tarek Hossain 100% 100% RPM-31.2 Kalai-Boiragipara-Matrai road 6.60 Km 5.16 3/1/2005 3/1/2006 3/1/2006 2/12/2005 Ram Babu 100% 100% RPM-31.3 Itakhola-Molamgari GC 2.00 Km 1.47 3/1/2005 3/1/2006 3/1/2006 2/9/2005 Zia International 100% 100% Enterprise 559. Bog/RPM-32 RPM-32.1 Amtali-Daridaha-Fasitola road 14.80 Km 21.30 Km 28.17 41.31 NCB Yes 7/18/2005 7/18/2006 1/31/2008 7/6/2005 The Bhuiyan Engineer 100% 100% Ltd. RPM-32.2 Katham-Kaligonj RHD-Ponditpukur GC via Bhatra UP 6.50 Km 13.13 6/26/2005 6/26/2006 4/30/2007 6/23/2005 M/S SRF Joint Venture 100% 100% Office road 560. Bog/RPM-33 RPM-33.1 Bogra-Tornihat road (Sadar part) 5.90 Km 16.85 Km 8.81 19.17 NCB No 5/16/2005 5/16/2006 6/30/2006 5/9/2005 Mir Shariful Alam 100% 100% RPM-33.2 Bogra-Tornihat road (Gabtali part) 4.15 Km 3.52 5/14/2005 5/14/2006 6/15/2006 4/30/2005 SR Joint Venture 100% 100% RPM-33.3 Santahar-Tilokpur road 6.80 Km 6.84 4/30/2005 4/30/2006 4/29/2006 4/24/2005 M/S Milon Traders 100% 100% 561. Nao/RPM-34 RPM-34.1 Mamudpur R&H-Shibpur GC road 10.00 Km 13.37 Km 8.61 14.36 NCB No 4/19/2005 4/19/2006 3/30/2006 3/30/2005 Road & Bridge 100% 100% Completed Engineering Co. Ltd. RPM-34.2 Kashiabari GC (Naoduli)-Kaligonj GC 3.37 Km 5.76 5/5/2005 5/5/2006 12/30/2006 4/20/2005 K. H. Mainul Islam 100% 100% Completed 562. Sir/RPM-35 RPM-35.1 Tarash-Ranir hat Road 6.90 Km 20.65 Km 4.35 18.65 NCB No 6/20/2005 6/20/2006 6/19/2006 6/5/2005 JV of Md. Abu Bakkar 100% 100% Sk. (Khoka) M/S Haque Construction and K. M. Hossain Ali RPM-35.2 Jamtail GC-Ullapara GC 5.55 Km 4.70 6/30/2005 6/30/2006 7/30/2006 6/15/2005 M/S Munir Enterprise 100% 100% RPM-35.3 Raipur Mour-Kandapara 2.25 Km 2.52 6/20/2005 6/20/2006 6/19/2006 6/5/2005 S.M. Liaquat Ali 100% 100% RPM-35.4 Dariapur GC-Kaizuri GC 5.95 Km 7.07 6/20/2005 6/20/2006 1/31/2007 6/5/2005 JV of Ismail Hossain 100% 100% and M/S Pias Construction (IH- PC JV) 51 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 563. Hab/RPM-36 RPM-36.1 Chunarughat-Assampara Road 14.10 Km 26.12 Km 13.07 32.08 NCB Yes 11/17/2005 11/17/2006 6/30/2007 10/30/2005 M/S Provatee 100% 100% Enterprise. RPM-36.2 Madhabpur-Chowmohani Bazar Road 12.02 Km 19.01 7/6/2005 7/6/2006 3/31/2007 6/25/2005 JV of S.Islam & Jamil 100% 100% Iqbal. 564. Naw/RPM-37 Nachole-Mollikpur road 17.60 Km 17.60 Km 7.34 7.34 NCB No 3/22/2005 3/22/2006 3/21/2006 3/15/2005 M/S Shafique Traders 100% 100% 565. Nat/RPM-38 RPM-38.1 Lalpur-Bilmaria-Durduria Road 10.00 Km 18.20 Km 15.85 27.98 NCB No 8/13/2005 8/13/2006 6/30/2007 8/4/2005 M/S Padma Associates 100% 100% & Engineers Ltd. RPM-38.2 Bonapara GC - Moukhara GC 8.20 Km 12.14 7/27/2005 7/27/2006 10/31/2007 7/20/2005 JV of 100% 100% (i) A. H. M. Tazamel Haque & (ii) Md. Abdur Rakib 566. Pab/RPM-39 RPM-39.1 Bharamara-Dhanuaghata GCM road(Faridpur Upazila 6.24 Km 20.00 Km 6.63 23.37 NCB No 5/4/2005 5/4/2006 5/4/2006 4/16/2005 M/S PABON's 100% 100% Part) RPM-39.2 Santhia GC-24 Mile R&H road 7.10 Km 9.12 4/17/2005 4/17/2006 8/31/2008 4/12/2005 Md. Ataur Rahman 100% 100% RPM-39.3 Bera Upazila HQ (GC)-Nakalia GCM Road 5.16 Km 5.93 5/5/2005 5/5/2006 12/31/2006 4/28/2005 M/S Sunny Traders 100% 100% RPM-39.4 Chatmohar RHD (Bypass)-Jonail GC via Haripur road 1.50 Km 1.69 4/16/2005 4/16/2006 12/31/2006 4/9/2005 M/S Orin Engineers 100% 100% 52 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 567. Nara/RPM-40 RPM-40.1 Chaowrapara R&H-Langalbandh GC Road 4.60 Km 22.60 Km 6.10 28.90 NCB No 3/30/2005 3/30/2006 3/30/2006 3/12/2005 The Joint Venture of 100% 100% (i) M/S Ahasan Enterprise (ii) M/S Ratna Enterprise RPM-40.2 Araihazar-Elomdi-Jangalia Bazar-Uchitpura Road 11.00 Km 14.39 3/30/2005 3/30/2006 3/30/2006 3/12/2005 The Joint Venture of 100% 100% (i) M/S SCM Construction (ii) M/S Four Star & (iii) M/S Ratna Enterprise RPM-40.3 Mograpara GC - Shubdi Bazar via Hossainpur Road 7.00 Km 8.42 3/30/2005 3/30/2006 3/30/2006 3/12/2005 The Joint Venture of 100% 100% (i) M/S SCM Construction (ii) M/S Ahasan Enterprise & (iii) M/S Ratna Enterprise 568. Nar/RPM-41 RPM-41.1 Monohardi HQ-Panchabati Ferryghat Road 10.74 Km 27.51 Km 13.93 30.19 NCB Yes 5/22/2005 5/22/2006 2/28/2007 4/27/2005 M/S Prokalpo 100% 100% Bastobayon Ltd. RPM-41.2 Gopinathpur-Hasnabad upto Thana Border Road 7.84 Km 6.44 5/13/2005 5/13/2006 12/31/2006 4/27/2005 M/S Prokalpo 100% 100% Bastobayon Ltd. RPM-41.3 Baniadi R&H-Shibpur bazar 2.00 Km 2.28 5/22/2005 5/22/2006 5/15/2006 5/8/2005 M/S Bhuiyan & Sons 100% 100% RPM-41.4 Madhabdi GC-Araihazar Upazila via Kharia bazar Road 2.43 Km 2.51 5/22/2005 5/22/2006 5/15/2006 5/9/2005 M/S Bikalpa Trade 100% 100% International RPM-41.5 Charnagardi GC-Purandia RHD via Sukundirghat Road 4.50 Km 5.03 5/16/2005 5/16/2006 5/10/2006 5/8/2005 M/S Khaleque 100% 100% Construction 569. Mun/RPM-42 RPM-42.1 Munshirhat-Chitulia Road 4.65 Km 14.53 Km 4.86 13.44 NCB No 3/22/2005 3/22/2006 3/14/2006 3/14/2005 Nasir-Jasim JV 100% 100% RPM-42.2 Kalma-Baligaon Road 3.88 Km 3.08 3/22/2005 3/22/2006 3/14/2006 3/10/2005 Khan-Punam JV 100% 100% RPM-42.3 Kalma-Baligaon Road 3.00 Km 2.61 3/22/2005 3/22/2006 3/14/2006 3/12/2005 M/S Sarder 100% 100% RPM-42.4 Meghna Bridge-Hossaindi Bazar Road 3.00 Km 2.88 3/13/2005 3/13/2006 3/5/2006 2/28/2005 Pearl Engineering & 100% 100% Construction 53 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 570. Cha/RPM-43 RPM-43.1 Kachua-Kashempur- Matlab Road 10.64 Km 20.49 Km 17.06 35.41 NCB Yes 5/17/2005 5/17/2006 3/30/2007 5/10/2005 M/S. Partner incharge 100% 100% Completed (JV of M/S. Patwary Trade International & M/S. G.K. Enterprise) RPM-43.2 Matlab Bazar-Sengarchar Road 9.85 Km 18.35 5/24/2005 5/24/2006 12/30/2006 5/17/2005 M/S Bashundhara 100% 100% Completed 571. Bra/RPM-44 RPM-44.1 Nurpur-Singerbeel Road 7.18 Km 20.18 Km 8.18 21.98 NCB No 5/14/2005 5/14/2006 5/6/2006 4/10/2005 M/S Ashraf & Sons 100% 100% RPM-44.2 Saydabad C&B Road-DC Road-Mondabagh Road 5.50 Km 6.05 5/18/2005 5/18/2006 5/10/2006 5/3/2005 M/S. Nilu Enterprise 100% 100% RPM-44.3 Bancharampur GC-Ujanchar GC via Dariachar bazar 7.50 Km 7.76 5/14/2005 5/14/2006 7/31/2006 4/19/2005 M/S Azad & Brothers 100% 100% Road 572. Com/RPM-45 RPM-45.1 Comilla-Fakir Bazar-Saldanadi Road under 6.59 Km 24.54 Km 19.85 54.50 NCB Yes 6/17/2005 6/17/2006 10/31/2006 6/11/2005 M/S. Golden Traders 100% 100% Brahmanpara Upazila RPM-45.2 Comilla-Fakir Bazar-Saldanadi Road under Burichong 11.30 Km 20.31 6/30/2005 6/30/2006 9/30/2006 6/18/2005 M/S Toaa Enterprise 100% 100% Upazila RPM-45.3 Comilla (Chandpur Bridge)-Fakir Bazar-Saldanadi 6.65 Km 14.34 8/2/2005 8/2/2006 7/15/2007 7/19/2005 M/S Al-Haj Abdul 100% 100% (B.Para)Road under Comilla-S Upazila Haque 573. Com/RPM-46 Chandina-Dollai Nawabpur Road 9.27 Km 9.27 Km 14.10 14.10 NCB No 7/29/2005 7/29/2006 8/31/2007 7/12/2005 M/S Surma 100% 100% International 574. Mou/RPM-47 RPM-47.1 Shahbandar - Dighirpar - Gobindapur Road 3.00 Km 17.42 Km 3.45 21.72 NCB No 4/11/2005 4/11/2006 4/10/2006 3/17/2005 Joint Venture of S.M. 100% 100% Consotium RPM-47.2 Agunshi-Aguin-Podinapur-Baburbazar Road 2.70 Km 3.60 4/11/2005 4/11/2006 4/10/2006 3/17/2005 Joint Venture of A.M. 100% 100% Consotium RPM-47.3 Shahbandar-Shomshargonj Road 1.00 Km 1.39 4/17/2005 4/17/2006 3/6/2007 1/27/2005 Misbah Uddin Ahmed 100% 100% RPM-47.4 Dewandighi (RHD)-Paulpur Road 10.72 Km 13.28 4/4/2005 4/4/2006 3/31/2007 3/17/2005 Md. Monayem Khan 100% 100% 54 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 575. Syl/RPM-48 RPM-48.1 Salutikar-Gowainghat Road 6.35 Km 13.72 Km 7.75 16.62 NCB No 7/3/2005 7/3/2006 6/26/2006 6/21/2005 Tower Enterprise Ltd. 100% 100% RPM-48.2 Horripur-Shaheberbazar-Salutikar Road 2.71 Km 3.53 12/27/2005 12/27/2006 12/27/2006 12/20/2005 A.T. M. Belayet 100% 100% Hossain RPM-48.3 Horripur-Shaheberbazar-Salutikar Road 4.66 Km 5.33 7/4/2005 7/4/2006 6/27/2006 6/27/2005 M/S Md. Jamil Iqbal 100% 100% 576. Syl/RPM-49 RPM-49.1 Kumargaon-Badaghat-Shiberbazar Road 3.01 Km 12.01 Km 3.58 14.59 NCB No 7/9/2005 7/9/2006 7/1/2006 7/2/2005 A. K. M. Delwar 100% 100% Hossain RPM-49.2 Beanibazar-Sharupar Road 4.00 Km 2.61 7/9/2005 7/9/2006 7/1/2006 7/2/2005 A. K. M. Delwar 100% 100% Hossain RPM-49.3 Fenchugonj GC-Gillachara GC Road 5.00 Km 8.40 7/3/2005 7/3/2006 6/26/2006 6/26/2005 Mahmud Mamun 100% 100% 577. Sun/RPM-50 RPM-50.1 Sunamgonj-Mongalkata road 2.00 Km 31.20 Km 2.22 24.38 NCB Yes 2/12/2006 2/12/2007 6/11/2007 1/5/2006 Moni Construction 100% 100% RPM-50.2 Sunamgonj-Bitgonj Road 4.85 Km 6.85 2/5/2006 2/5/2007 12/30/2007 1/8/2006 JV of (i) M/S Belal 100% 100% Enterprise (ii) Alam Construction RPM-50.3 Derai-Shyamerchar Road 9.40 Km 8.65 9/1/2005 9/1/2006 2/28/2008 8/8/2005 JV of i) M/S. Sayed 100% 100% Enterprise ii) M/S. Nural Islam RPM-50.4 Keshabpur-Rasulgonj-Tuker Bazar-Panaullah Bazar 14.95 Km 6.66 3/7/2006 3/7/2007 11/30/2007 2/26/2006 JV of M/S Badrul Huda 60% 60% Cancelled Road Mukal 578. Nao/RPM-51 Badalgachi GC-Paharpur-Durgadaha GC (Joypurhat) 13.70 Km 13.70 Km 7.22 7.22 NCB No 12/18/2005 12/18/2006 6/30/2007 4/12/2005 ATCO-Ethen Joint 46% 46% Contract venture. cancelled and the remaining work being executed through new contract package no. Nao/RPM-51A. Payment settlement finalized 579. Dha/RPM-52 Uttar Budda Pragati Shrani-Baried road 7.00 Km 7.00 Km 14.55 14.55 NCB No 12/14/2005 12/14/2006 11/23/2006 11/23/2005 M/S Rahman Brothers 100% 100% 55 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 580. Gaz/RPM-53 RPM-53.1 a) Kapasia GC-Sreepur Road. 11.58 Km 35.00 Km 22.12 48.88 NCB Yes 7/19/2006 7/19/2007 6/30/2008 7/12/2006 M/S Orient Trading & 100% 100% b) Aral GC-Hatirdia GC Road Builders Ltd RPM-53.2 Shafipur- Boraibri Road 4.10 Km 6.47 7/19/2006 7/19/2007 12/31/2007 7/12/2006 JV of M/S SH & Akhter 100% 100% RPM-53.3 Mowchak- Fulbaria Road 9.07 Km 10.92 7/19/2006 7/19/2007 2/25/2008 7/12/2006 JV of M/S Olive, Refat 100% 100% & Siraj Enterprise RPM-53.4 Sreepur College-Kapasia Road. 10.25 Km 9.37 7/19/2006 7/19/2007 7/18/2007 7/12/2006 M/S LM Traders 100% 100% 581. Dha/RPM-54 RPM-54.1 Kalatia GC-Taranagar UP office via Chapara Bariakandi 2.40 Km 18.83 Km 4.19 17.87 NCB No 4/10/2006 4/10/2007 4/3/2007 3/29/2006 Bikalpa Trade 100% 100% Road. International RPM-54.2 Nawabgonj -Paragramhat GC Road. 16.43 Km 13.68 4/16/2006 4/16/2007 12/15/2007 4/6/2006 JV of M/S Friends 100% 100% Construction & M/S Janani Traders & International 582. Man/RPM-55 RPM-55.1 Doulatpur-Kolia hat Road. 9.30 Km 28.40 Km 0.87 12.09 NCB No 9/6/2006 9/6/2007 3/31/2008 8/31/2006 M/S Unnayan 15% 15% Cancelled and Engineers & Dropped Associates RPM-55.2 Mahadebpur-Jhikta GC via Gangasagar Road 9.10 Km 2.66 11/1/2006 11/1/2007 6/30/2008 8/20/2006 M/S Sugandha 45% 45% Cancelled and Enterprise remaining works taken under Flood Component RPM-55.3 Nayadingi NHR-Katigram Road 4.00 Km 3.40 9/6/2006 9/6/2007 11/6/2007 8/31/2006 M/S Unnayan 100% 100% Completed Engineers & Associates RPM-55.4 Saturia GC-Dargram GC Road 6.00 Km 5.16 8/28/2006 8/28/2007 7/31/2008 8/20/2006 M/S Sugandha 100% 100% Completed Enterprise 583. Nara/RPM-56 RPM-56.1 Rupganj-Debori-Beldi Bazar-Kaliganj Road. 8.80 Km 18.65 Km 8.88 23.77 NCB No 4/17/2006 4/17/2007 4/17/2007 4/10/2006 M/S Yousuf & 100% 100% Associates RPM-56.2 Uchitpura GC-Jangalia Bazar-Shantir Bazar-Barodi GC 2.85 Km 7.78 4/12/2006 4/12/2007 4/12/2007 4/4/2006 M/S Hasina Enterprise 100% 100% Road. & M/S Mohammadi Traders (JV) RPM-56.3 Noyapur-Panchmighat GC Road 2.50 Km 4.00 4/23/2006 4/23/2007 4/29/2007 4/17/2006 M/S Khandakar Shahin 100% 100% Ahamed RPM-56.4 Demra-Narshingdi R&H Borpa Mazerchara via Pakunda- 4.50 Km 3.11 4/19/2006 4/19/2007 4/19/2007 4/12/2006 M/S SCM Construction 100% 100% Taltala-Mahajompur Road 56 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 584. Mun/RPM-57 RPM-57.1 Mowaghat-Bhagyakul road 4.20 Km 22.31 Km 2.59 34.97 NCB Yes 5/25/2006 5/25/2007 5/24/2007 5/16/2006 Authentic Enterprise 100% 100% RPM-57.2 Bejgoan RHD-Kukutia-Nagerhat-Kanakshar road 4.86 Km 18.47 1/11/2007 1/11/2008 4/30/2009 1/4/2007 Yousuf & Associates 100% 97% RPM-57.3 National Highway-Bhaberchar GC road 1.20 Km 1.33 6/21/2006 6/21/2007 6/13/2007 5/25/2006 M/S Hema 100% 100% Construction RPM-57.4 Munshigonj HQ (Loharpur)-Aldi RHD road 6.00 Km 7.17 6/21/2006 6/21/2007 4/30/2008 5/23/2006 M/S Bashundhara 75% 75% Cancelled RPM-57.5 Dhaka Mawa RHD-Kuchiamara-Shekernagar GC via 6.05 Km 5.41 5/25/2006 5/25/2007 5/31/2008 5/15/2006 Nazma Construction 70% 70% Cancelled Sayedpur-Chittrakot UP road Co. 585. Nar/RPM-58 RPM-58.1 Monohordi HQ-Drinerghat RHD road 1.63 Km 25.79 Km 5.53 28.09 NCB No 1/23/2008 1/22/2009 4/30/2009 1/17/2008 M/S Scan Associates 100% 100% Pvt. Ltd. RPM-58.2 Monohordi GC-Shavardi R&H road 5.50 Km 1.96 7/20/2006 7/20/2007 7/12/2007 7/9/2006 M/S S & S Co. 100% 100% RPM-58.3 Upazila HQ-Charsindur GC road 2.25 Km 6.29 7/20/2006 7/20/2007 10/31/2007 7/9/2006 M/S Khaleque 100% 100% Construction RPM-58.4 Sreerampur Railgate R&H-Monipura GC road 16.41 Km 14.30 12/4/2006 12/4/2007 12/30/2009 11/28/2006 M/S Good Luck 72% 38% Trading Corporation 586. Com/RPM-59 RPM-59.1 Upazila HQ (Nabagram)-Munshirhat-Kadir bazar- 6.71 Km 38.24 Km 9.38 68.98 NCB Yes 9/18/2006 9/18/2007 9/17/2007 9/10/2006 M/S A & Z Construction 78% 78% Cancelled and Kashinagarbazar road remaining work will be implemented through a new contract Com/RPM-59.1A RPM-59.2 Kongshanagar bazar-Abidpur road 1.74 Km 2.56 9/25/2006 9/25/2007 12/30/2007 9/12/2006 M/S Islam Traders 100% 100% RPM-59.3 B.Para-Dulalpur GC road 4.54 Km 3.72 3/16/2008 3/16/2009 3/22/2009 3/16/2008 M/S Toaa Enterprise 48% 38% Cancelled and remaining work will be implemented through a new contract Com/RPM-59.3A RPM-59.4 Madhaiya GC-Punchpukuria GC (Debidwar Portion) 8.00 Km 17.30 6/6/2007 6/5/2008 6/5/2008 5/29/2007 JV of M.S.T.C. & M.I.T 62% 39% RPM-59.5 Laksam-Mudaffargonj road 5.10 Km 11.97 4/17/2007 4/16/2008 4/16/2008 4/11/2007 M/S Pappu Traders 39% 18% Cancelled RPM-59.6 Balutupa-Suagonj-Bijoypur-Adinamura-Bataichari- 6.75 Km 11.80 9/10/2006 9/10/2007 9/9/2007 9/3/2006 M/S Moni Roni 100% 100% Barura Enterprise 57 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 RPM-59.7 Nangalkot-Khila road 5.40 Km 12.26 9/26/2006 9/26/2007 5/30/2008 9/18/2006 M/S Surma 100% 100% International 58 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 587. Bra/RPM-60 RPM-60.1 Singerbeel-Harashpur road via Paharpur UP 2.80 Km 16.95 Km 2.78 24.55 NCB No 7/2/2006 7/2/2007 6/24/2007 5/22/2006 TE-MB Joint Venture 100% 100% RPM-60.2 Tinlacpur R&H-Simrail GC road via Chargas Bazar 9.15 Km 13.91 5/14/2006 5/14/2007 3/31/2008 5/7/2006 Kamal Associates 100% 100% RPM-60.3 Bitghar hat-Tinlacpur via Kitala bazar road 5.00 Km 7.85 5/23/2006 5/23/2007 5/15/2007 5/15/2006 Urmi Enterprise 100% 100% 588. Cha/RPM-61 RPM-61.1 a) Faridgonj R&H-Rampur Sollakhali road 17.20 Km 27.73 Km 18.85 33.66 NCB Yes 4/2/2007 4/1/2008 8/30/2008 8/3/2006 The Sun Flower 100% 97% Completed b) Rampur GC-Haimchar Upazila road RPM-61.2 Chandpur Puran bazar-Haimchar-Char Bhairabi road 10.53 Km 14.81 8/27/2006 8/27/2007 12/30/2007 8/21/2006 Mizanur Rahman Liton 100% 100% Completed 589. Syl/RPM-62 RPM-62.1 Hetimgonj-Dhaka Dakshin Chandarpur-Beanibazar road 12.48 Km 17.48 Km 19.33 21.37 NCB No 6/17/2006 6/17/2007 10/30/2007 6/10/2006 NA-JI (JV) 100% 100% (Golapganj Portion) RPM-62.2 Hetimgonj-Dhaka Dakshin Chandarpur-Beanibazar road 5.00 Km 2.04 4/27/2006 4/27/2007 4/27/2007 4/10/2006 M/S Md. Jahed Iqbal 100% 100% (Beanibazar Portion) 590. Sun/RPM-63 RPM-63.1 Mongalkata-Narayantala-Kapua (Chinakandi- 6.70 Km 9.19 Km 12.69 16.07 NCB No 9/26/2007 9/25/2008 10/7/2008 9/6/2007 Mark International 100% 100% Moheshkhola) road RPM-63.2 Anwarpur-Badaghat-Kawkandi road 2.49 Km 3.38 9/26/2007 9/25/2008 10/7/2008 9/6/2007 Mark International 100% 100% 591. Hab/RPM-64 RPM-64.1 Nabiganj-Rudragram Road. 8.40 Km 10.30 Km 10.99 12.80 NCB No 4/24/2006 4/24/2007 6/30/2007 4/9/2006 Rathindra Chandra Roy 100% 100% RPM-64.2 Dhuliakhal - Kotiadi road 1.90 Km 1.81 4/24/2006 4/24/2007 4/23/2007 4/9/2006 Chowdhury Enterprise 100% 100% 592. Mou/RPM-65 RPM-65.1 Lwayuni-Munshibazar road 3.30 Km 9.90 Km 6.04 9.95 NCB No 8/14/2006 8/14/2007 3/31/2008 6/27/2006 M/S Ali Prokoushali 100% 100% RPM-65.2 Muraul RHD-Chandgram GC road 6.60 Km 3.91 7/23/2006 7/23/2007 7/9/2007 7/10/2006 M/S Ali Prokoushali 100% 100% 593. Raj/RPM-66 RPM-66.1 Bagha Bus stand-Mirgonj (R&H) via Harirampur GC 7.35 Km 44.12 Km 9.29 32.80 NCB Yes 9/25/2006 9/25/2007 9/17/2007 9/14/2006 Md. Fazlur Rahman 100% 100% road RPM-66.2 Kamarpara-Gangopara UZR road 7.85 Km 8.05 9/7/2006 9/7/2007 4/30/2008 8/31/2006 M/S Rana International 100% 100% Builders RPM-66.3 (a) Tanore-Chowbaria UZR road 21.17 Km 4.54 9/7/2006 9/7/2007 8/30/2007 8/31/2006 M/S Taher Brothers 100% 100% (b) Kakonhat GC-Kaligonj road RPM-66.4 Darusha-Kakon GC via Darshanpara road 7.75 Km 10.92 9/7/2006 9/7/2007 12/31/2007 8/31/2006 Md. Fazlur Rahman 100% 100% 59 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 594. Bog/RPM-67 RPM-67.1 Sonatala-Naruamala road 21.06 Km 32.06 Km 13.98 23.54 NCB No 6/13/2006 6/13/2007 2/28/2008 6/1/2006 M/S OK Enterprise Pvt. 100% 100% Ltd. RPM-67.2 Shariakandi-Chandanbaisha road 2.45 Km Dropped from the project RPM-67.3 Namajgor-Namuja road 11.00 Km 9.56 6/25/2006 6/25/2007 10/31/2007 6/15/2006 M/S Ataur Rahman 100% 100% Khan 595. Nao/RPM-68 RPM-68.1 Hapania-Katkhur road 11.21 Km 28.10 Km 12.54 28.06 NCB No 1/7/2008 1/6/2009 2/28/2009 12/31/2007 M/S Ataur Rahman 100% 94% Completed Khan RPM-68.2 Modhuil GC-Shibpur GC road 8.55 Km 7.15 1/7/2008 1/6/2009 1/6/2009 12/31/2007 M/S Ataur Rahman 100% 100% Completed Khan RPM-68.3 Ahsangonj GC-Kaligonj GC via Kasiabari GC road 8.35 Km 8.36 10/5/2006 10/5/2007 3/31/2009 8/9/2006 Ram Babu 100% 99% Completed 596. Sir/RPM-69 RPM-69.1 (a) Dhangora GC-Bhuyaganti NHW 5.65 Km 30.65 Km 7.88 37.21 NCB Yes 2/27/2007 2/27/2008 6/30/2008 2/20/2007 Md. Amirul Islam 100% 100% (b) Nimgachi-Salangha GC road RPM-69.2 (a) Ullapara-Mohonpur GC 8.35 Km 7.43 9/5/2007 9/4/2008 3/4/2009 8/29/2007 M/S Mita Consruction 100% 82% Ullapara- (b) Ullapara-Goyhatta GC road Mohonpur GC road is dropped from the project. Contract needs to be revised RPM-69.3 (a) Harinatpur GC to Sonamukhi GC 16.65 Km 21.90 8/20/2006 8/19/2007 9/30/2008 8/13/2006 M/S Munir Enterprise 100% 100% (b) Alokdiar DR-Bolorampur GC (c) Enayetpur GC-KG School DR road 597. Naw/RPM-70 RPM-70.1 Nawabgonj-Shibgonj R&H-Ramchandrapur GC road 2.20 Km 9.40 Km 2.52 6.95 NCB No 3/22/2006 3/22/2007 3/21/2007 3/8/2006 Md. Saidur Rahman 100% 100% Consturction Ltd. RPM-70.2 Bholahat (Chawmohany)-Futani bazar road 7.20 Km 4.43 3/22/2006 3/22/2007 3/21/2007 3/8/2006 M/S Shafique Traders 100% 100% 60 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 598. Pab/RPM-71 RPM-71.1 Dublia GCM-Kuchiamora RHD road 5.95 Km 18.39 Km 8.41 29.43 NCB Yes 8/12/2006 8/12/2007 8/12/2007 8/6/2006 Binoy Joty Kundu 100% 100% RPM-71.2 Pabna-Pakshi RHD (Zero Point) at Library Bazar- 2.44 Km 4.23 10/18/2006 10/17/2007 12/31/2007 10/10/2006 M/S Shafique Traders 100% 100% Khayerbagan GCM via Char Shibrampur Sluice gate road RPM-71.3 Bhangura H/Q at Baral River ghat Mondotos at R&H 2.75 Km 4.82 8/8/2006 8/8/2007 1/31/2008 7/24/2006 Sarker Golam 100% 100% road Mohammad & Co. Ltd. RPM-71.4 Nakalia GC-Nalkhola GC road 7.25 Km 11.96 7/17/2006 7/17/2007 7/16/2007 7/4/2006 Sarker Golam 100% 100% Mohammad & Co. Ltd. 599. Nat/RPM-72 Chowgarm RHD-Kaligonj GCM Road 8.04 Km 8.04 Km 15.98 15.98 NCB No 5/17/2006 5/17/2007 5/10/2007 5/10/2006 JV of Md. Anisur 100% 100% Rahman, Md. Abdul Motin Mia & M/S Khan Traders 600. Nat/RPM-73 Jamtoli RHD-Bamihal-Ranirhat GCM Road 9.70 Km 9.70 Km 24.86 24.86 NCB No 5/22/2006 5/22/2007 5/15/2007 5/15/2006 Mita Construction 100% 100% 601. Dha/RPM-74 Matuyal Mirdhabari-Golokata road via Konapara Hazi 6.00 Km 6.00 Km 14.32 14.32 NCB No 4/13/2006 4/13/2007 4/6/2007 4/6/2006 JV of M/S Joney 100% 100% nogor Road. Enterprise & M/S Mohuya Enterprise 602. Nao/RPM-75 Mohadevpur GCM-Matajee hat GCM road 12.37 Km 12.37 Km 11.65 11.65 NCB No 10/5/2006 10/5/2007 11/30/2009 8/8/2006 Ram Babu 100% 81% 603. Nao/RPM-76 Maintenance of Chatra GC - Shibpur GC Road. 3.38 Km 3.38 Km 10.46 10.46 NCB No 7/22/2007 7/21/2008 12/31/2008 7/15/2007 M/S JE & MSH JV 100% 99% 0 604. Gaz/RPM-77 Maintenance of Mouchak-Fulbaria road 7.50 Km 7.50 Km 38.92 38.92 NCB Yes 11/1/2007 10/31/2008 3/15/2009 10/25/2007 M/S Amzad Traders 100% 100% 605. Gaz/RPM-78 Maintenance of Jaina Bazar-Batajor road 5.50 Km 5.50 Km 16.95 16.95 NCB No 12/30/2007 12/29/2008 12/31/2009 12/23/2007 SHK & Co & Dhiman 100% 97% 0 Construction 606. Nat/RPM-79 Maintenance of Koyen RHD-Jonail road (Ch. 0+000- 6.02 Km 6.02 Km 30.31 30.31 NCB Yes 2/27/2008 2/26/2009 12/31/2009 2/7/2008 M/S. Padma 100% 93% 6+016km) Associates & Engineers Ltd. 607. Nao/RPM-80 Maintenance of Abadpukur GC-Kaligonj GC road 2.75 Km 2.75 Km 7.41 7.41 NCB No 7/22/2007 7/21/2008 11/30/2008 7/12/2007 Mrs. Jesmin BHB JV 100% 89% 0% 608. Sir/RPM-81 Maintenance of Baruhash RHD-Ranirhat GC road 2.23 Km 2.23 Km 7.46 7.46 NCB No 7/17/2007 7/16/2008 12/31/2008 7/12/2007 M/S Jumuna 100% 100% Construction JV M/S Ashraf & Sons 609. Pab/RPM-82 Maintenance of Debuttor RHD-Ekdanta GC road 5.20 Km 5.20 Km 20.74 20.74 NCB No 10/16/2007 10/15/2008 6/30/2009 9/30/2007 Md. Shahjahan Ali 100% 98% 0 610. Cha/RPM-83 Maintenance of Chandpur (Raghunathpur)-Balia GC- 2.68 Km 2.68 Km 4.53 4.53 NCB No 5/10/2007 5/9/2008 5/6/2008 5/7/2007 M/S. Property 100% 100% Completed Chandra GC road Construction 611. Bra/RPM-84 Maintenance of Singerbeel-Harashpur via Paharpur UP 7.95 Km 7.95 Km 21.81 21.81 NCB No 9/23/2007 9/22/2008 9/22/2008 9/9/2007 M/S. TE-MB & NI 100% 97% 0 Brothers JV 61 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 612. Hab/RPM-85 Maintenance of Dhuliakhal-Mirpur road (Sadar Part) 5.10 Km 5.10 Km 15.40 15.40 NCB No 7/23/2007 7/22/2008 1/31/2009 7/5/2007 Farazi-Akbar JV 100% 89% 0 613. Syl/RPM-86 Maintenance of Kanaighat-Gachbari-Sylhet road 22.13 Km 22.13 Km 0.00 0.00 NCB No May'07 Nov'08 0% 0% This package has been dropped from maintenance work 614. LG1-LG186 Local Infrastructure Maintenance under LGIP. 9.22 9.22 CP No Nov'05 Jun'06 0% 0% (186 Packages) 615. LG187-LG373 Local Infrastructure Maintenance under LGIP. 9.25 9.25 CP No Nov'06 Jun'07 0% 0% (187 Packages) 616. LG374-LG560 Local Infrastructure Maintenance under LGIP. 9.25 9.25 CP No Nov'07 Jun'08 0% 0% (187 Packages) 617. Raj/IPDP-1 Physical Facilities by Construction School for 1 No. 1 No. 1.62 1.62 NCB No 5/25/2006 5/25/2007 5/24/2007 5/18/2006 M/S Razy and 100% 100% development of road side indigenous people of Rajabari- Associate Kakonhat road (Part-A) Link road from Main Road to School (Physical Facilities for indigenous people, road length-300m) (Part-B) 618. Nao/IPDP-2 Physical Facilities by Construction School for 1 No. 1 No. 2.12 2.12 NCB No 10/05/06 10/05/07 5/9/2007 4/26/2006 M/S Momin 100% 100% Completed development of road side for indigenious people (Part- Construction A) Link from Main Road to School (Part-B) (Ch. 0+000- 0+450km) 619. IPDP 3-7 Social Enhancement Activities as per IPDP 5 No. 5 No. 4.50 4.50 NCB No Nov'07 Oct'08 0% 0% (5 Packages) 620. Bog/UZR-307 UZR-307.1 Improvement of Naruamala - Matidhali Road and 8.15 Km 18.31 Km 60.46 136.19 NCB Yes 10/22/2006 4/24/2008 5/31/2009 10/8/2006 M/S Ataur Rahman 100% 99% construction of appurtenant structures. Khan UZR-307.2 Improvement of Baluahat - Sukhanpukur and 10.16 Km 75.72 12/26/2006 6/28/2008 8/30/2009 12/17/2006 Islam Trading 100% 100% construction of appurtenant structures. Consortium Ltd. 62 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 621. Com/UZR-308 UZR-308.1 Improvement of Dulalpur-Bancharampur Road and 3.00 Km This slice (UZR-308.1) has been excluded from RTIP as a parallel road including a large bridge on "Titas River" has already being improved by RHD. construction of appurtenant structures. UZR-308.2 Improvement of Comilla-Rasulpur Road and 4.22 Km This slice (UZR-308.2) has been excluded from RTIP as the road has already been rehabilitated by other project of LGED. construction of appurtenant structures. 622. Dha/UZR-309 Improvement of Dhaka Mawa RHD at Tegharia-Bibir 5.00 Km 5.00 Km 54.37 54.37 NCB Yes 5/8/2005 11/9/2006 9/30/2007 5/5/2005 M/S Ali & Co. 100% 100% Bazar-Shaper Bazar-Taltala hat GC-Betka Road (Dhaka Portion) and construction of 65 m bridge at chainage 6720 m including other appurtenant structures. 623. Dha/UZR-312 Improvement of Dhaka Mawa RHD at Tegharia-Bibir 3.01 Km 3.01 Km 40.82 40.82 NCB Yes 11/1/2007 5/4/2009 3/30/2010 6/25/2007 M/S Ali & Co. 96% 88% Bazar-Shaper Bazar-Taltala hat GC-Betka Road (Dhaka Portion Part-2) 624. Dha/UZR-313 a) Improvement of Dhaka Aricha highway-Kalatipara GC 8.63 Km 12.93 Km 60.58 60.58 NCB Yes 9/25/2007 3/28/2009 12/31/2009 9/18/2007 JV of Sarker Golam 55% 49% Cancelled via Vakurta bazar. and construction of appurtenant Mohammad Co. Ltd. structures. and M/S N. N. Traders b) Improvement of Dhaka Aricha RHD-Mugrakanda- 4.30 Km 0.00 M.pur.city prot. Embank. Road and construction of appurtenant structures. 625. Sun/UZR-314 UZR-314.1 Improvement of Dharmapasha-Joysree Road(Chainage 6.15 Km 10.95 Km 98.18 199.53 NCB Yes 10/8/2007 4/10/2009 6/30/2010 9/25/2007 Project Builders Ltd. 51% 35% 0% : 0+000-6+150 km) UZR-314.2 Improvement of Dharmapasha-Joysree Road.(Chainage 4.80 Km 101.35 10/8/2007 4/10/2009 6/30/2009 9/25/2007 Project Builders Ltd. 25% 18% 0 : 6+150-10+950 km) 626. Gaz/UZR-315 UZR-315.1 Improvement of Mouchak- Fulbaria Road (Ch.11500m- 4.85 Km 9.72 Km 32.57 64.73 NCB Yes 6/20/2007 12/21/2008 12/19/2008 6/13/2007 JV of i) M/S Amzad 100% 100% 0% Ch.16350m) Traders ii) M/S Reefat Enterprise UZR-315.2 Improvement of Mouchak- Fulbaria Road (Ch.16350m- 4.87 Km 32.16 NCB Yes 5/23/2007 11/23/2008 2/26/2009 5/15/2007 M/S Sarker Golam 100% 100% Ch.21220m) Mohammad Co. Ltd. 627. Nat/UZR-316 Improvement of Koyen RHD-Jonail GC Road 7.47 Km 7.47 Km 48.79 48.79 NCB Yes 4/15/2007 10/16/2008 10/13/2008 4/8/2007 M/S Shafique Traders 100% 100% 628. Nao/UZR-317 Improvement of Chatra GC-Shibpurhat GC Road 8.93 Km 8.93 Km 55.12 55.12 NCB Yes 4/22/2007 10/23/2008 11/30/2008 4/1/2007 M/S Ataur Rahman 100% 100% Khan 629. Sir/UZR-318 UZR-318.1 Improvement of Baruhash RHD-Ranirhat Road (Ch. 5.60 Km 12.75 Km 44.49 104.82 NCB Yes 3/15/2007 9/15/2008 12/31/2009 3/8/2007 Alpana-Joy-M.H JV 100% 90% 0+000-5+600 km) UZR-318.2 Improvement of Baruhash RHD-Ranirhat Road (Ch. 7.15 Km 60.33 NCB Yes 2/2/2008 8/5/2009 12/30/2009 1/17/2008 M/S Ataur Rahman 100% 86% 0 5+600-12+750 km) Khan 630. Raj/UZR-319 Improvement of Bidhirpur GC-Basantapur R&H road 5.90 Km 5.90 Km 40.05 40.05 NCB Yes 7/15/2007 1/15/2009 1/9/2009 6/17/2007 Md. Fazlor Rahman 100% 100% 63 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 631. Pab/UZR-320 Improvement of Debottor RHD-Ekdanta GC Road. 7.30 Km 7.30 Km 51.59 51.59 NCB Yes 7/6/2007 1/6/2009 12/26/2008 6/12/2007 JV of Mag Trade 100% 97% System and Others 632. Syl/UZR-321 UZR-321.1 Improvement of Sylhet-Gachbari GC-Kanaighat Upazila 9.00 Km 17.35 Km 58.59 116.25 NCB Yes 6/13/2007 12/14/2008 1/31/2010 5/29/2007 Project Builders Ltd. 69% 66% 0 HQ road (Chainage : 0+000-9+000 km) UZR-321.2 Improvement of Sylhet-Gachbari GC-Kanaighat Upazila 8.35 Km 57.66 NCB 6/1/2007 12/2/2008 1/31/2010 5/29/2007 Project Builders Ltd. 77% 69% 0 HQ road (Chainage : 9+000-17+350 km) 633. Hab/UZR-322 UZR-322.1 Improvement of Inathgonj (Kazir Bazar)-Kadirgonj 8.80 Km 19.56 Km 57.95 157.35 NCB Yes 4/23/2008 10/25/2009 6/30/2010 4/9/2008 21st Century-Maitry JV 61% 53% (Chainage : 4+200-13+000 km) UZR-322.2 Improvement of Inathgonj (Kazir Bazar)-Kadirgonj 10.76 Km 99.40 NCB 1/6/2008 7/9/2009 6/30/2010 12/23/2007 21st Century-Maitry JV 58% 34% (Chainage : 13+000-23+760 km) 634. Cha/UZR-323 Improvement of Chandpur (Raghunathpur)-Balia GC- 5.44 Km 5.44 Km 27.62 27.62 NCB No 7/18/2007 1/18/2009 1/17/2009 7/15/2007 The Sun Flower 100% 100% Completed Chandra GC road 635. Mou/UZR-324 Improvement of RHD-Bhairob bazar-Munshibazar via 4.18 Km 4.18 Km 32.42 32.42 NCB Yes 8/15/2007 2/15/2009 12/31/2009 8/5/2007 M.A.H.M.I JV 90% 79% 0 Mirtinga Tea Garden road 636. Mou/UZR-325 Improvement of Munshibazar-Mirtinga-Bhairobbazar 6.83 Km 6.83 Km 36.55 36.55 NCB Yes 8/15/2007 2/15/2009 12/31/2009 7/31/2007 M.A.H.M.I JV 85% 74% 0 RHD road 637. Bra/UZR-326 Improvement of Singerbeel-Harashpur via Paharpur UP 7.55 Km 7.55 Km 54.89 54.89 NCB Yes 6/11/2007 12/12/2008 12/31/2009 5/29/2007 JV of 21st Century 100% 74% 0 Housing Ltd.-M/S. Maitry Builders 638. Bra/UZR-327 Improvement of Bottali-Bitghar road 7.68 Km 7.68 Km The road has been dropped from ICB package of B.Baria district and the techno-economic feasibility report has sent to IDA for clearance. After receiving clearance fresh bid will be invited 639. Nao/UZR-328 Improvement of Chatra GC-Mohadevpur GC road 1.16 Km 1.16 Km 52.52 52.52 NCB Yes 1/15/2008 7/18/2009 3/31/2010 1/8/2008 M/S S. F & M.B JV 92% 78% including construction of 100 m RCC Bridge 640. SirUZR-330 Improvement of Dhamai kandi R&H - Solonga GC and 6.98 Km 6.98 Km 42.90 42.90 NCB Yes 6/4/2008 12/6/2009 12/6/2009 5/20/2008 Mir Shariful Alam 50% 34% Remaining construction of appurtenant structures. works of contract package Sir/UZR-38.3 being implemented through this contract 641. Mun/UZR-25A UZR-25A.1 Improvement of Shirajdikhan-Shaperchar road (Ch. 4.70 Km 7.23 Km 52.92 82.05 NCB Yes 6/26/2008 12/28/2009 12/29/2009 6/15/2008 JV of 21st Century 62% 54% Original contract 0+000-4+700 km) Housing Ltd.-M/S. package Maitry Builders Mun/UZR-25 was cancelled 64 and this PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 Original contract package Mun/UZR-25 UZR-25A.2 Improvement of Shirajdikhan-Shaperchar road (Ch 2.53 Km 29.12 NCB Yes 6/22/2008 12/24/2009 12/25/2009 6/15/2008 Md. Rashaduzzaman 62% 58% was cancelled 4+700-7+235 km) and this 642. Com/UZR-33.2A Improvement of Noagaon - Panchkitta Road and 5.45 Km 5.45 Km 56.13 56.13 NCB Yes 4/28/2008 10/30/2009 10/31/2009 4/21/2008 JV of M/S A.B.M. 60% 37% construction of 45 m bridge at chainage 3060 m Delwar Hossain and including other appurtenant structures. M/S Ashraf & Sons 643. Raj/UZR-41.2A Improvement of Mundumala Hat to Hat bakoil (GCM) 6.50 Km 6.50 Km 39.30 39.30 NCB Yes 6/30/2008 1/1/2010 5/30/2010 6/2/2008 JV of M/S Md. Saidur 63% 56% Original contract road and construction of appurtenant structures. Rahman & Co. and slice Raj/UZR- M/S Shahriar Ahmed 41.2 was cancelled and this package is for the remaining works 644. Bog/UZR-56.2A UZR-56.2A.1 Improvement of Simabari - Ranir hat Road 7.50 Km 15.20 Km 47.75 90.43 NCB Yes 2/16/2008 8/19/2009 8/15/2009 2/6/2008 M/S Ataur Rahman 100% 95% Original contract Khan slice Bog/UZR- 56.2 was cancelled and this package is for the remaining works. UZR-56.2A.2 Improvement of Simabari - Ranir hat Road 7.70 Km 42.68 2/16/2008 8/19/2009 8/15/2009 2/6/2008 M/S Ataur Rahman 100% 98% Khan 65 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 645. Bog/UR-9A Bihigram hat-Baldakuri road 5.26 Km 5.26 Km 14.29 14.29 NCB No 2/16/2008 8/19/2009 8/15/2009 2/4/2008 M/S Alam Construction 100% 100% Original contract package Bog/UR- 9 was cancelled and this package is for the remaining works 646. Bog/UR-12A Malancha hat-Jamgram UP 4.30 Km 4.30 Km 7.28 7.28 NCB No 1/27/2008 7/30/2009 7/26/2009 1/17/2008 M/S Runa Enterprise 100% 93% Original contract package Bog/UR- 12 was cancelled and this package is for the remaining works. Contract awarded 647. Raj/RPM-29A Biraldaha Mazar-Noapara via Singa 13.40 Km 13.40 Km 29.43 29.43 NCB Yes 03/7/08 03/7/09 7/2/2009 6/17/2008 M/S Padma Associates 85% 63% Original contract & Engineers Ltd. package Raj/RPM-29 was cancelled and this package is for the remaining works 648. Raj/RPM-30A Kanpara GC-Alipur RHD via Durgapur 15.48 Km 15.48 Km 18.83 18.83 NCB No 4/9/2008 4/9/2009 11/30/2009 3/30/2008 Md. Shahjahan Ali 100% 93% Original contract package Raj/RPM-30 was cancelled and this package is for the remaining works 66 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 649. Mun/RPM-5.2A Maintenance of Serajdikhan-Taltala GC Road 6.15 Km 6.15 Km 4.14 4.14 NCB No 6/12/2007 6/11/2008 6/11/2008 5/28/2007 M/S Punam Enterprise 100% 100% Original contract Mun/RPM-5.2 was cancelled and this package is for the remaining works 650. Com/UR-38A Pipulia-Hazatkhola road 1.88 Km 1.88 Km 6.52 6.52 NCB No 3/31/2009 10/2/2010 3/24/2010 3/24/2009 M/S Mainamoti 95% 46% Builders 651. Nao/RPM-51A Badalgachi GC-Paharpur-Durgadaha GC (Joypurhat) 13.70 Km 13.70 Km 24.83 24.83 NCB No 3/19/2008 3/19/2009 3/18/2009 3/12/2008 M/S Ataur Rahman 100% 97% Original contract Khan Nao/RPM-51 was cancelled and this package is for the remaining works 652. Syl/UZR-22A Improvement of Tajpur-Balagonj & Doyameer- 15.00 Km 15.00 Km 78.70 78.70 NCB Yes 11/13/2008 5/17/2010 5/16/2010 11/9/2008 JV of M/S. Intraco (BD) 91% 87% Original contract Dewanbazar road Associate Ltd. & M/S. Syl/UZR-22 was Islam Traders (IBAL-IT cancelled and JV) this package is for the remaining works 67 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 653. Raj/UZR-15A Improvement of Jholmolia-Mollapara Hat and Arani- 16.74 16.74 Km 19.34 19.34 NCB Yes 11/12/2008 5/16/2010 4/14/2010 9/22/2008 Anisur Rahman 98% 65% Original contract Galimpur Ferighat road Chowdhury Raj/UZR-15 was cancelled and this package is for the remaining works 654. Pab/UZR-50A UZR-50A.1 Improvement of Chatmohar R&H Janata Bank- 3.34 Km 9.89 Km 36.69 139.28 NCB Yes 3/20/2009 9/21/2010 9/25/2010 3/16/2009 Sarker Golam 70% 48% Astomonisha GCM via Noornagar (Ch. 0+000-3+337 Mohammad Co. Ltd. km) including 100 m RCC girder bridge UZR-50A.2 Improvement of Astomonisha GCM to Mirzapur GCM 1.25 Km 11.42 NCB Yes 11/1/2008 5/5/2010 5/4/2010 8/21/2008 Foundation Engineers 25% 19% Cancelled and road (Ch. 0+000-1+254 km) including 158.60 m RCC Ltd. remaining work girder bridge will be implemented UZR-50A.3 Improvement of Mohela GCM-Sharatgonj GC via 5.30 Km 54.57 NCB Yes 11/1/2008 5/5/2010 5/4/2010 8/21/2008 Foundation Engineers 12% 3% Cancelled and Parshadanga hat road (Ch. 0+000-6+780 km) Ltd. remaining work will be implemented UZR-50A.4 100 m RCC girder bridge on Mohela GCM-Sharatgonj 100.00 m 36.60 NCB Yes 3/20/2009 9/21/2010 9/25/2010 3/16/2009 Sarker Golam 45% 28% GC via Parshadanga hat road Mohammad Co. Ltd. 655. Joy/GCM-1(A) Improvement of Puranapail Hat (Women Corner) 1 No. 1 No. 1.12 1.12 NCB No 2/25/2007 2/25/2008 2/24/2008 2/13/2007 M/S Duke Construction 100% 100% 656. Gaz/RJ-2(A) Improvement of Ramp for Chabagan Bazar Ghat 1 No. 1 No. 1.73 1.73 NCB No 3/4/2009 3/4/2010 5/20/2010 2/25/2009 M/S Associate Builders 50% 44% 657. Bog/RJ-28(A) Improvement of Ramp of Chamarpathalia Ghat 1 No. 1 No. 2.06 2.06 NCB No 3/5/2008 9/6/2009 3/4/2009 2/25/2008 M/S Masfa Enterprise 60% 56% 658. Nao/UR-25A Improvement of Bakrail-Mandain-Ustihat road 8.66 Km 8.66 Km 20.68 20.68 NCB No 2/24/2009 6/4/2010 6/15/2010 2/17/2009 Md. Aminul Haque & 99% 96% BHB JV 659. Syl/UZR-40.2A Improvement of Zakiganj - Dubag Bazar and 3.65 Km 3.65 Km 14.57 14.57 NCB Yes 3/1/2009 6/4/2010 2/28/2010 2/26/2009 M/S Md. Jamil Iqbal 100% 96% construction of appurtenant structures. 68 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 660. Bog/UZR-56.1A Improvement of Sonahata-Bagbari Road via Berebari 7.14 Km 7.14 Km 54.51 54.51 NCB Yes 3/18/2009 9/19/2010 9/10/2010 3/9/2009 JV of Kamal 52% 26% Original contract road Associates & SA Bog/UZR-56.1 Construction (KA-SA was cancelled Consortium) and this package is for the remaining works. LOA issued on 24/02/09 661. Pab/UR-98A Improvement of Manik hat-Bikramaditta via Daspara 5.30 Km 5.30 Km 21.91 21.91 NCB No 11/17/2008 5/21/2010 4/6/2010 10/30/2008 Md. Anisur Rahman 80% 50% Original contract Pab/UR-98A was cancelled and this package is for the remaining works 662. Raj/UR-16A Improvement of Darshanpara UP-Baghdhani road 9.10 Km 9.10 Km 19.69 19.69 NCB No 1/6/2009 7/10/2010 7/4/2010 12/17/2008 M/S Hossain 100% 100% Original contract Enterprise Raj/UR-16 was cancelled and this package is for the remaining works 663. Cha/UR-83A Improvement of Kalipur-Gazra Bazar 4.43 Km 4.43 Km 13.47 13.47 NCB No 4/7/2009 4/7/2010 4/6/2010 4/1/2009 M/S Shohagi 57% 38% Enterprise 69 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 664. Com/UZR-33.1A Improvement of Birallah R&H - Dhampti hat GC. Road 7.77 Km 7.77 Km 6.61 6.61 NCB No 5/28/2009 5/28/2010 5/21/2010 5/21/2009 Funka Industries Ltd. 98% 75% Original contract and construction of appurtenant structures. Com/UZR-33.1A was cancelled and this package is for the remaining works. 665. Com/UR-36A Monohargonj-Hasnabad road 8.06 Km 8.06 Km 44.70 44.70 NCB Yes 6/10/2009 6/10/2010 6/3/2010 6/3/2009 JV of Md. Abdul 59% 46% Mannan and Tushar Enterprise 666. Com/GCM-22A Improvement of Langnashar Bazar under Barua Upazila 1 No. 1 No. 4.83 4.83 NCB No 3/31/2009 3/31/2010 3/24/2010 3/24/2009 M/S Mainamoti 95% 78% Builders 667. Com/UZR-58.1A Improvement of Nangalkot-Doulkhar - Boxgonj Road 15.00 Km 15.00 Km 14.05 14.05 NCB No 5/20/2009 5/20/2010 5/20/2010 5/20/2009 M/S M. I. Construction 98% 81% and construction of appurtenant structures. 668. Mun/UR-34A Bakultala-Banglabazar road 3.72 Km 3.72 Km 3.17 3.17 NCB No Jan'09 Jan'10 0% Dropped 669. Dha/UR-29A Gangutia UP Office-Kawali bazar road 8.20 Km 8.20 Km 12.01 12.01 NCB No 2/17/2009 2/17/2010 6/5/2010 1/28/2009 JV of M/S United 65% 60% Builders & Surma Enterprise 670. Mun/UR-33A Masadgaon-Kahetara-Nagerhat road 2.71 Km 2.71 Km 9.60 9.60 NCB No 3/25/2009 3/25/2010 3/24/2010 3/17/2009 M/S Dulal Enterprise 100% 45% 671. Joy/UZR-66.2A Improvement of Itkhola - Jamalgonj and construction of 6.07 Km 6.07 Km 31.64 31.64 NCB Yes 3/15/2009 3/15/2010 9/18/2010 3/5/2009 JV of (i) SA Traders & 48% 18% appurtenant structures. (ii) Md. Nazir Hossain 672. Syl/UZR-40.1A Improvement of Salutikar - Shaheber Bazar - Horipur 7.26 Km 7.26 Km 34.28 34.28 NCB Yes 5/23/2009 5/23/2010 5/23/2010 5/14/2009 IT-LE (JV) 52% 28% and construction of appurtenant structures. 673. Raj/UZR-41.1A Improvement of Bhawanigonj - Bandaikhara and 9.28 Km 9.28 Km 15.27 15.27 NCB No 3/23/2009 3/23/2010 6/8/2010 3/11/2009 Joint Venture of (i) 60% 20% construction of 90 m bridge at chainage 9110 m M/S. Mozahar including other appurtenant structures. Enterprise & (ii) M/S. A.B Construction 674. Gaz/UZR-57.2A Improvement of Sreepur - Gusahinga Bazar and 6.44 Km 6.44 Km 13.67 13.67 NCB No 3/4/2009 3/4/2010 5/20/2010 2/25/2009 M/S M. L. Enterprise 40% 18% construction of appurtenant structures. 70 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 675. Pab/UR-22A Shayamnagar GC-Raninagar UP road 6.47 Km 6.47 Km 30.21 30.21 NCB Yes 7/21/2009 7/21/2010 6/12/2010 7/15/2009 M/S Tushar Enterprise 50% 0% & Rafiqul Islam (JV) 676. Com/UR-37A Pipulia-Hazatkhola-Bagmara road 1.64 Km 1.64 Km 4.39 4.39 NCB No 3/31/2009 3/31/2010 3/24/2010 3/24/2009 M/S Mainamoti 100% 96% Builders 677. Com/UR-39A Pipulia-Bagmara via Hazatkhola road 6.55 Km 6.55 Km 12.54 12.54 NCB No 5/3/2009 5/3/2010 4/26/2010 4/26/2009 M/S AKC & MAR JV 57% 28% 678. Com/UR-40A Sanchail-Bangura road 8.47 Km 8.47 Km 26.64 26.64 NCB No 5/3/2009 5/3/2010 4/26/2010 4/26/2009 M/S AL Aksha 50% 41% Construction 679. Bra/UR-43A (a) Akhaura (Fire Brigade)-Khalajura-Gazir bazar- 4.16 Km 4.16 Km 20.94 20.94 NCB No 10/21/2009 10/21/2010 10/20/2010 10/14/2009 JV of M/S. Raj 11% 0% Abdullahpur (Checkpost) road Construction & M/S. (b) Construction of 20m RCC girder bridge on Ch. Mostafa Kamal (MRC 6628m of Tinlacpur R&H-Simrail via Chargach & MMK JV) Ballabpur road 680. Mou/UR-51A Asian RHD-Uttarbag UP Office road 1.13 Km 1.13 Km 2.35 2.35 NCB No Jan'09 Jan'10 0% Bidding document sent XEN, but tender yet not invited 681. Man/UR-65A Paila UP-Singiuri UP 1.62 Km 1.62 Km 10.03 10.03 NCB No 10/6/2009 10/6/2010 6/30/2010 9/30/2009 M/S Chowdhury 10% 0% Construction 682. Man/UR-66A Boyra UP-Kanthapara Bazar via Lesergonj Bazar 2.21 Km 2.21 Km 7.14 7.14 NCB No 2/23/2009 2/23/2010 6/30/2010 2/16/2009 M/S Palash Enterprise 66% 37% 683. Dha/UR-99A Monu Baperir Dhal-Rajabari Bazar via Borhanibag road 4.26 Km 4.26 Km 5.17 5.17 NCB No Jan'09 Jan'10 0% Re-tender 684. Com/GCM-21A Improvement of Jhalom Bazar under Barua Upazila 1 No. 1 No. 2.48 2.48 NCB No 3/31/2009 3/31/2010 3/24/2010 3/24/2009 M/S Pinki Enterprise 80% 48% 685. Mou/GCM-82A Improvement of Braman Bazar under Kulaura Upazila 1 No. 1 No. 1.74 1.74 NCB No 10/20/2009 10/20/2010 2/27/2010 11/1/2009 Md. Zafor Ahmed 25% 0% Gilman 686. Syl/GCM-105A Improvement of Goala Bazar under Balaganj Upazila 1 No. 1 No. 0.00 0.00 0% Dropped 687. Syl/GCM-150A Improvement of Fenchuganj Bazar under Fenchuganj 1 No. 1 No. 3.68 3.68 NCB No 7/26/2009 7/26/2010 7/25/2010 7/15/2009 M/S J. B. Construction 37% 0% Upazila 71 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 688. Syl/RJ-11A Improvement of Khosrupur Ghat Ghat (RJ) under 1 No. 1 No. 4.52 4.52 NCB No 7/16/2009 7/16/2010 7/15/2010 7/8/2009 M/S Kushiara Trading 15% 0% Awarded Balaganj Upazila 689. Man/RPM-55.1A Doulatpur-Kolia hat Road. 9.30 Km 9.30 Km 26.34 26.34 NCB No 6/23/2009 6/23/2010 6/30/2010 6/17/2009 M/S Good Luck 15% 0% Trading Corporation 690. Mun/RPM-57.5A Dhaka Mawa RHD-Kuchiamara-Shekernagar GC via 6.05 Km 6.05 Km 8.00 8.00 NCB No 5/10/2009 5/10/2010 5/2/2010 4/27/2009 M/S Chowdhury 25% 0% Sayedpur-Chittrakot UP road Construction 691. Com/RPM-59.1A Upazila HQ (Nabagram)-Munshirhat-Kadir bazar- 6.71 Km 6.71 Km 15.94 15.94 NCB No 1/18/2009 1/18/2010 1/11/2010 1/11/2009 M/S Majumdar Traders 98% 96% Kashinagarbazar road 692. Com/RPM-19.2A Maintenance of Laksam-Monohargonj Road 11.99 Km 11.99 Km 11.52 11.52 NCB No 9/1/2009 9/1/2010 9/1/2010 9/1/2009 M/S Meghna Traders 100% 87% 693. Pab/UR-79A Handial UP Office-Shamaj bazar 6.00 Km 6.00 Km 28.45 28.45 NCB No Oct'09 Dec'10 0% 0% Original contract Pab/UR-79 was cancelled and this package is for the remaining works. Tender document under process 694. Joy/UZR-35.2A Improvement of Kalai - Moslemgonj Road and 8.07 Km 8.07 Km 15.51 15.51 NCB No 10/15/2009 12/14/2010 12/29/2009 JV of JE & MSH 1% Original contract construction of appurtenant structures. Joy/UZR-35.2 was cancelled and this package is for the remaining works. 72 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 695. Gaz/UZR-57.3A Improvement of Baliadi R&H to Chandabaha and 3.40 Km 3.40 Km 20.74 20.74 NCB No Oct'09 Dec'10 Original contract construction of appurtenant structures. Gaz/UZR-57.3 was cancelled and this package is for the remaining works. Tender document under process 696. Mun/UZR-60.1A Improvement of Kanakshar - Nagerhat Bazar and 3.12 Km 3.12 Km 27.00 27.00 NCB No Oct'09 Dec'10 Original contract construction of appurtenant structures. Mun/UZR-60.1 was cancelled and this package is for the remaining works. Tender document under process 73 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 697. Com/RPM-59.3A B.Para-Dulalpur GC road 4.54 Km 4.54 Km 8.97 8.97 NCB No Oct'09 Dec'10 Original contract Com/RPM-59.3 was cancelled and this package is for the remaining works. Tender document under process 698. Pab/UZR-50A.2A Improvement of Astomonisha GCM to Mirzapur GCM 1.25 Km 1.25 Km 50.55 50.55 NCB Yes Oct'09 Dec'10 Tender road (Ch. 0+000-1+254 km) including 158.60 m RCC document under girder bridge process 699. Mou/UR-52A Bauli-Nijbahadurpur road 8.85 Km 8.85 Km 9.47 9.47 NCB No Oct'09 Dec'10 Tender document under process 700. Syl/GCM-106A Improvement of Balaganj Bazar under Balaganj Upazila 1 No. 1 No. 0.00 0.00 Dropped 701. Sun/RPM-50.4A Keshabpur-Rasulgonj-Tuker Bazar-Panaullah Bazar 14.95 Km 14.95 Km 0.00 Dropped Road 702. Sun/RJ-9A Improvement of Joynagar Hat Ghat (RJ) under 1 No. 1 No. 0.00 0.00 Dropped Sunamganj-S Upazila 703. Com/RPM-87 Maintenance of Gunabati-Akadia Road (Part-A: Safua 4.50 Km 4.50 Km 31.73 31.73 NCB Yes 11/1/2009 12/31/2010 10/26/2010 10/26/2009 M/S Mazumder 55% 50% NHW-Nalgar Bazar Chowmouhony Modina Bazar via Traders Sreepur UP office (Padua) Road (Ch. 0+000-4+500km) 704. Com/RPM-88 Maintenance of Gunabati-Akadia Road (Part-A: Safua 4.90 Km 4.90 Km 28.86 28.86 NCB No 11/1/2009 12/31/2010 10/26/2010 10/26/2009 Md. Abul Hossem 65% 61% NHW-Nalgar Bazar Chowmouhony Modina Bazar via Sreepur UP office (Padua) Road (Ch. 4+500-9+396km) 74 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 705. Com/RPM-89 Maintenance of Barura Bazar-Ebdarpur road via 4.92 Km 4.92 Km 17.47 17.47 NCB No 11/30/2009 1/29/2011 11/23/2010 11/23/2009 M/S R. Ta. Enterprise 66% 62% Rammohon Bazar road (Nimshar College-Chitoshi Railway Station via Kedarpur bazar Barura ourashava- Poyalgacha College Natua Chandpur road) (Ch. 0+000- 4+920km) 706. Com/RPM-90 Maintenance of Barura Bazar-Ebdarpur road via 1.37 Km 1.37 Km 8.27 8.27 NCB No 12/2/2009 1/31/2011 11/26/2010 11/26/2009 Mir Shariful Alam 20% 0% Rammohon Bazar road (Nimshar College-Chitoshi Railway Station via Kedarpur bazar Barura ourashava- Poyalgacha College Natua Chandpur road) (Ch. 4+920- 6+290km) 707. Com/RPM-91 Maintenance of Barura Bazar-Ebdarpur road via 3.75 Km 3.75 Km 21.52 21.52 NCB No 11/26/2009 1/25/2011 11/22/2010 11/22/2009 Funka Industries Ltd. 16% 0% Rammohon Bazar road (Horipur Bazar-Aganagar- Kalirbazar GC road) (Ch. 0+000-3+750km) 708. Com/RPM-92 Maintenance of Fakirbazar-Salda river road 6.00 Km 6.00 Km 9.42 9.42 NCB No Apr'10 May'11 Tender under (Kalekharpara-Janata bazar-Golabari road) (Ch. 0+000- process 6+000km) 709. Com/RPM-93 Maintenance of Nangalkot-Tuguria road (Ch. 5+860- 4.90 Km 4.90 Km 15.15 15.15 NCB No Apr'10 May'11 Tender under 10+760km) process 710. Pab/GCM-126A Improvement of Chaikola Hat under Chatmohor Upazila 1 No. 1 No. 3.54 3.54 NCB No Apr'10 May'11 Md. Afzal Hossain LC not received 711. Com/RPM-94 Maintenance of Madhaiya-Dollai Nowabpur- 4.70 Km 4.70 Km 17.75 17.75 NCB No Apr'10 May'11 Tender under Rahimanagar road (Ch. 16+500-21+200km) process 712. Nao/RPM-95 Maintenance of Raninagar-Abadpukur GC road (Ch. 7.40 Km 7.40 Km 13.72 13.72 NCB No Apr'10 May'11 Ethen Enterprise LOA issued 0+000-7+400km) 713. Nao/RPM-96 (a) Maintenance of Raninagar-Abadpukur GC road (Ch. 6.91 Km 6.91 Km 13.29 13.29 NCB No Apr'10 May'11 M/S Hossain LOA issued 7+400-14+000 km) (b) Maintenance of Kashiabari GC- Enterprise Kaliganj GC (Kaliganj bridge approach inclusive) road (Ch. 13+640-13+945 km) 714. Bog/RPM-97 Maintenance of Kahaloo UP office-Eruil Bazar (via 3.13 Km 3.13 Km 11.21 11.21 NCB No Apr'10 May'11 Tender under Aghorsha) road (Ch. 1+773-3+935 km and 4+935-5+900 process km) 715. Pab/RPM-98 Maintenance of Bheramara-Dhanuaghata road (Ch. 3.00 Km 3.00 Km 26.90 26.90 NCB No Apr'10 May'11 Tender under 0+000-3+000 Km) process 716. Pab/RPM-99 Maintenance of Bheramara-Dhanuaghata road (Ch. 4.90 Km 4.90 Km 24.45 24.45 NCB No Apr'10 May'11 Tender under 3+000-4+900 Km) process 75 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 717. Mou/GCM-85A Improvement of Munshibazar under Rajnagar Upazila 1 No. 1 No. 4.50 4.50 NCB No Apr'10 May'11 Tender under process 718. Hab/UZR-51A Improvement of Baniachang - Azmirigonj Road via 1.67 Km 1.67 Km 27.89 27.89 NCB No Apr'10 May'11 Tender under Shibpasha Road (Ch. 1+900-3+570 km) process 719. Hab/UZR-51B Improvement of Baniachang - Azmirigonj Road via 2.43 Km 2.43 Km 32.51 32.51 NCB Yes Apr'10 May'11 Tender under Shibpasha Road (Ch. 3+570-6+000 km) process 720. Hab/UZR-51C Improvement of Baniachang - Azmirigonj Road via 2.50 Km 2.50 Km 30.70 30.70 NCB Yes Apr'10 May'11 Tender under Shibpasha Road (Ch. 6+000-8+500 km) process 721. Hab/UZR-51D Improvement of Baniachang - Azmirigonj Road via 2.30 Km 2.30 Km 29.42 29.42 NCB Yes Apr'10 May'11 Tender under Shibpasha Road (Ch. 8+500-10+800 km) process 76 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 722. Dha/RPM-100 Maintenance of Zirani Bazar - Shimulia Bazar Road 5.44 Km 10.14 Km 7.32 23.15 NCB No Apr'10 May'11 Tender under (CH: 580-6023m) process Maintenance of Dhaka Aricha Highway to Ashulia GC 3.30 Km 6.27 Apr'10 May'11 Road (CH:1000-4300m) Maintenance of Joupura Bazar - Sombag UP Office 1.40 Km 9.56 Apr'10 May'11 Road (CH:00-1400m) 723. Nara/RPM-101 Maintenance of Araihazar-Purinda Road (CH:5500- 3.00 Km 19.83 Km 2.48 21.09 NCB No Apr'10 May'11 Tender under 8500m) process Maintenance of Baliapara Bazar - Eidbordi Road (CH:00- 4.13 Km 7.63 Apr'10 May'11 4130m) Maintenance of Uchitpura Gc-Gopaldi Road via 5.00 Km 5.19 Apr'10 May'11 Ramchandradi Ghordi (CH:00-5000m) Maintenance of Porshi GC-Rupgonj-Kayetpara-Demra 7.70 Km 5.79 Apr'10 May'11 RHD Road (CH:00-7720m) 724. Man/RPM-103 Maintenance of Uthali-Jafargonj Road (CH:2850-6800m) 3.95 Km 6.02 Km 10.68 14.80 NCB No Apr'10 May'11 Tender under process Maintenance of Ghior GC-Kolia GC via Banglabazar 2.07 Km 4.12 Apr'10 May'11 Road (CH:00-2070m) 725. Nar/RPM-104 Maintenance of Bhelanagar Bazar (Jelkhanar Mour)- 2.10 Km 8.68 Km 5.18 15.57 NCB No Apr'10 May'11 Tender under Rajadigram Sarak via Titas Gas Office (CH:00-2100m) process Maintenance of Sreerampur GC to Gokulnagar bus 6.58 Km 10.39 Apr'10 May'11 stand Road (CH:00-0975, 1000-2975, 4143-8650m) 726. Gaz/RPM-105 Maintenance of Kapasia GC-Kaligong GC Road (CH:00- 9.30 Km 9.30 Km 31.46 31.46 NCB No Apr'10 May'11 Tender under 9300m) process 727. Raj/RPM-106 Maintenance of Godagari-Kakonhat GC Road (CH:00- 7.00 Km 17.60 Km 10.54 28.39 NCB No Apr'10 May'11 Tender under 7000m) process Maintenance of Keshore Hat-Mochmoil Hat Road 5.00 Km 9.99 Apr'10 May'11 (CH:00-5000m) Maintenance of Tanore-Amnura via Mondumala Hat 5.60 Km 7.86 Apr'10 May'11 Road (CH:11500-17100m) 728. Nat/RPM-107 Maintenance of Tebaria GC-Bagatipara Upazila HQ 7.45 Km 15.68 Km 4.42 14.16 NCB No Apr'10 May'11 Tender under Road (CH:00-7450m) process Maintenance of Bonbeldharia RHD-Taherpur GC via 3.50 Km 3.49 Apr'10 May'11 Mominpur Hat Road (CH:00-3500m) 77 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 Maintenance of Jamtoil-Bamihal-Ranir Hat Road (CH:00- 4.73 Km 6.24 Apr'10 May'11 4730m) 729. Nao/RPM-108 Maintenance of Naogaon RHD-Shoilgachi GC Road at 2.20 Km 12.15 Km 3.60 13.51 NCB No Apr'10 May'11 Tender under Link Road from Calkpran GPS - Arzi Naogaon Road process (CH:00-2200m) Maintenance of Nazirpur Natunhat GC (Girls School)- 3.25 Km 3.08 Apr'10 May'11 Gaganpur GC Road (CH:3150-6400m) Maintenance of Kola GC-Kirtipur GC (Badalgach Part) 2.50 Km 2.84 Apr'10 May'11 (CH: 00-2500m) Maintenance of Matajee GC-Kalushahar RHD Mour 4.20 Km 4.00 Apr'10 May'11 Road (CH: 4400-8600m) 730. Bog/RPM-109 a) Maintenance of Bogra-Taroni Hat Road (Sadar Part) 3.40 Km 14.75 Km 8.86 35.60 NCB Yes Jul'10 Jul'11 Tender under (CH: 2200-5600m) process b) Maintenance of Bogra-Taroni Hat Road (Gabtoli Part) 11.35 Km 26.74 Jul'10 Jul'11 (CH: 5600-16950m) 731. Joy/RPM-110 Maintenance of R&H (Jamalgonj Charmatha)- 2.10 Km 11.10 Km 2.80 15.78 NCB No Apr'10 May'11 Tender under Rukindipur GC (Jamalgonj Hat) (CH:00-2100m) process Maintenance of Kichok-Moslemgonj Road (CH:00- 9.00 Km 12.97 Apr'10 May'11 9000m) 732. Pab/RPM-111 Maintenance of Nakalia GCM-Nalkhola GCM Road 2.00 Km 5.36 Km 4.86 10.11 NCB No Apr'10 May'11 Withheld (CH:0-2000m) Maintenance of Santhia UZ HQ-Banagram GC (CH: 3.36 Km 5.26 Apr'10 May'11 3878-7240m) 733. Sir/RPM-112 Maintenance of Belkuchi UZ HQ-Balarampur GC via 2.71 Km 9.26 Km 4.17 12.47 NCB No Apr'10 May'11 Tender under Bangabari UP Chowbari Bazar Road (CH: 3000-5710m) process Maintenance of Panchakushi-Shahajanpur Road (CH:00- 6.55 Km 8.30 Apr'10 May'11 6550m) 734. Com/RPM-113 Maintenance of Dayapur-Chowara-Kanashtola Road 2.80 Km 7.10 Km 2.25 13.91 NCB No Apr'10 May'11 Tender under (CH:2200-2800m & 4800-7000m) process Maintenance of Dakkhin Shilmuri UP Office-Bataichari 4.30 Km 11.66 Apr'10 May'11 Bazar Road (CH:00-4300m) 735. Cha/RPM-115 Maintenance of Hanarchar UP-Chandra GC Road 3.63 Km 10.93 Km 5.34 14.85 NCB No Apr'10 May'11 Tender under (CH:00-3630m) process Maintenance of Kallyanpur UP (Baburhat GC)-UZ HQ 6.25 Km 6.74 Apr'10 May'11 (Bishnadi) Road via Kashim Bazar (CH:00-6250m) 78 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 Maintenance of Sandra R&H-Palishara Bazar Road 1.05 Km 2.78 Apr'10 May'11 (CH:00-1046m) 736. Bra/RPM-116 Maintenance of Salimabad UP (Asrafbad)-Rupasdi 2.20 Km 9.20 Km 4.26 14.27 NCB No Apr'10 May'11 Withheld bazar Road via Hoglakanda (Towards Rupasdi Hospital) road (CH:00-2200m) Maintenance of Bitgar Hat-B. Baria RHD Road via 6.00 Km 8.26 Apr'10 May'11 Kurighar Hat (CH:00-6000m) Maintenance of Talsahar Bazar-Bahadurpur Bazar Road 1.00 Km 1.75 Apr'10 May'11 via Talshahar UP, Kamaura Road (CH:00-1000m) 737. Syl/RPM-117 Maintenance of RHD (Shalutikar)-Shaheber Bazar- 6.40 Km 14.02 Km 8.17 14.06 NCB No Apr'10 May'11 Tender under Haripur Road (Sadar Part) (CH:00-6400m) process Maintenance of Lakhanbondh UP-Fulshaind- 3.62 Km 2.94 Apr'10 May'11 Porokayestha bazar Road (CH:00-3620m) Maintenance of Hetimgonj-Chandarpur-Beanibazar 4.00 Km 2.95 Apr'10 May'11 Road (CH:00-4000m) 738. Sun/RPM-118 Maintenance of Jagannathpur-Biswanath Road (CH:00- 13.33 Km 13.33 Km 20.23 20.23 NCB No Apr'10 May'11 Tender under 13330m) process 739. Mou/RPM-119 Maintenance of Saifur Rahman Circular Road 5.00 Km 30.42 Km 3.22 23.62 NCB No Apr'10 May'11 Tender under (Sadarpart) (CH:00-5000m) process Maintenance of Moulvibazar-Kulaura RHD (Chadnighat)- 10.20 Km 7.01 Apr'10 May'11 Sylhet-Dhaka RHD(Kamalpur) Road (CH:00-10200m) Maintenance of Baharmardan-Office bazar-Mokambazar 8.50 Km 7.02 Apr'10 May'11 Road (CH:00-8500m) Maintenance of Dewan dighi (Tengra)-Paulpur- 6.72 Km 6.38 Apr'10 May'11 Shamsernagar road (CH:4000-10720m) 740. Gaz/RPM-121 Bormi-Joina via Kawraid Road (CH:8000-13000m) 5.00 Km 5.00 Km 20.96 20.96 NCB No May'10 May'11 Tender under process 741. Dha/UZR-313A Improvement of Dhaka Aricha highway-Kalatipara GC 4.00 Km 4.00 Km 32.07 32.07 NCB No May'10 May'11 Tender under via Vakurta bazar road (Ch. 00-4000 m) process 742. Dha/UZR-313B Improvement of Dhaka Aricha highway-Kalatipara GC 4.13 Km 4.13 Km 25.52 25.52 NCB No May'10 May'11 Tender under via Vakurta bazar road (Ch. 4000-8130 m) process 79 PROCUREMENT PLANNING AND MONITORING FORMAT Name of the Project : Rural Transport Improvement Project IDA Credit No. : 3791-BD Credit Effective Date : July 30, 2003 Credit Closing Date : June 30, 2009 #DIV/0! Sl. No. Contract Package Number* Name of Contract (Brief Description) Quantity/ Number Estimated Cost Procedure/ Prior Planned Date Actual Date of Supplier's Name OR Progress of Financial Remarks (in million Taka) OR Actual Method Review** Completion Contract Contractor's Name Procurement Progress as Contract Price (with Contract (Yes/No) Date Signing OR Consultant's as of 31 of 31 Mar'10 Currency) Start Completion Name Mar'10 743. Dha/UZR-313C Improvement of Dhaka Aricha RHD-Mugrakanda- 3.60 Km 3.60 Km 36.55 36.55 NCB Yes May'10 May'11 Tender under M.pur.city prot. Embank. Road (Ch. 00-3600 m) process 744. Dha/UZR-313D Improvement of Dhaka Aricha RHD-Mugrakanda- 1.54 Km 1.54 Km 53.48 53.48 NCB Yes May'10 May'11 Tender under M.pur.city prot. Embank. Road (Ch. 3600-5140 m) process 745. Dha/UZR-313E Improvement of Dhaka Aricha RHD-Mugrakanda- 1.00 Km 1.00 Km 21.85 21.85 NCB No May'10 May'11 Tender under M.pur.city prot. Embank. Road (Ch. 5140-6135 m) process 746. Bra/UR-101 Improvement of (a) Salimabad UP (Asrafbad)-Rupusdi 2.70 Km 2.70 Km 8.40 8.40 NCB No May'10 May'11 Tender under Bazar road-via-Hogla Kanda (Towards Rupasdi process Hospital) (Ch. 0+000-2+200 km), (b) Sonarampur UP- Marichakandi GC Road (Ch. 0+000-0+500 km) & (c) Landing ram at (1) Imamnagar Jame Mosque, (2) Bakhanagar Dakhinpara riiver ghat, (3) Dorikandi near vorerbazar Mosque, (4) Hijlakandi Kala Mia's houseghat, (5) Darivelanagar rivr ghat, (6) Salimabad Shahebnagar Mohammad Dano bari ghat, (7) Charshibpur Bhuyea bari ghat, (8) Domrakandi Jame Mosque ghat, (9) Bancharampur Mollah bari river ghat, (10) Ropasdi Madhapara river ghat beside R&H. 747. Bra/RPM-125 Maintenance of Nasirnagar-Chaiarkuri GC

Основные сведения
Тип документа Procurement Plan
Дата принятия
Страна Бангладеш
Источник Всемирный банк