Project Name : China - Shihutang Navigation & Hydro-power Complex Project 项目名称 中国石虎塘航电枢纽工程 Loan number : 贷款编号 TTL: Wenlai Zhang(张文来) Subject: Procurment Implementation Plan for Goods, and Works and Services 科目 工程、货物及服务采购实施计划 PMO: JANA 项目办 Date: 22-Apr-10 日期 2010年4月22日 江西省赣江石虎塘航电枢纽工程采购计划 Procurement Plan (Version 4/22/2010) 1 2 3 4 5 6 Exchange Rate: 7 US$1 = RMB 8 7.0 Ref. Procurement Review by Bank Invitation for Contract Contract No. Contract Description Estimate Cost No. Method (Prior / Post) Bid Award 编号 合同编号 合同描述 估算费用 采购方式 前 /后 审 招标 授标 (million RMB) (million US$) 百万元 百万美元 Shihutang Main Complex Works (1) (石虎塘枢纽主要土建工程) 1 W1 Preparation of Site(四通一平) 13.58 1.94 NBF/Works N/A 02/01/2009 Buildings Works of Complex 2 W2 13.54 1.93 NBF/Works N/A 06/01/2009 (枢纽房屋建筑工程) Buildings Works in the Jian City 3 W3 7.03 1.00 NBF/Works N/A 08/01/2011 (吉安市房屋建筑) Construction of Powerhouse and Right Part Sluices 4 W4 (电厂及右侧闸坝土建工程--- 517.93 73.99 ICB/Works Prior 01/16/2009 04/29/2009 包括相应金结及电气安装) Construction of Ship-lock and Rest 5 W5 Sluices(船闸及左侧闸坝土建工程------- 240.24 34.32 ICB/Works Prior 01/16/2009 04/29/2009 包括相应金结及电气安装) Subtotal 5contracts(5个合同包) (小计) (2) Flood Protection Works (防洪工程) River Bank Protection Works in Wanhe & 6 W6 122.48 17.50 NBF/Works N/A 01/15/2009 Zhangtang(万合、樟塘防护区工程) River Bank Protection Works in Yanxi 7 W7 63.65 9.09 NBF/Works N/A 01/15/2009 (沿溪防护区工程) River Bank Protection Works in Taihe 8 W8 68.34 9.76 NBF/Works N/A 01/29/2010 (泰和防护区工程) River Bank Protection Works in Jingtan 9 W9 134.91 19.27 NBF/Works N/A 01/26/2010 (金滩防护区工程) Subtotal 4 contract(4个合同包) (小计) Complex M&E Equipment Supply (3) (枢纽机电设备供应) Turbine Sets and its automation element 10 G1 329.15 47.02 ICB/Goods Prior 04/23/2009 08/20/2009 (机组及自动化元件设备) Hydraulic Hoists for Flood Gates and Ship 11 G2 41.84 5.98 ICB/Goods Prior 03/24/2010 06/10/2010 lock(泄水闸、船闸液压启闭设备) Metal structure of hydropower 12 G3 28.78 4.11 NBF/Goods N/A 04/04/2010 house(电站厂房金属结构制造) Metal structure of flood 13 G4 62.97 9.00 NBF/Goods N/A 05/30/2009 gate(泄水闸金属结构制造) Metal structure of 14 G5 17.56 2.51 ICB/Goods Prior 03/28/2010 shiplock(船闸工程金属结构制造) Speed Goveror and oil pressure unit 15 G6 3.60 0.51 NBF/Goods N/A 05/30/2010 (调速器及油压装置) Automatic excitation regulator 16 G7 4.80 0.69 NBF/Goods N/A 05/30/2010 (自动励磁调节装置) Gantry Crane 、 Crest Lifting Machinery of Powerhouse & trash Rack 17 G8 18.85 2.69 NBF/Goods N/A 05/30/2010 Equipment(厂房门机、桥式起重机及清污设备 等) Main Transformers and other dry 18 G9 13.75 1.96 NBF/Goods N/A 07/10/2010 transformers(主变压器及干式变压器) 19 G10 Switchyard Equipment(开关站设备) 10.47 1.50 NBF/Goods N/A 07/10/2010 20 G11 Isolated-phase bus (离相全封闭母线) 10.22 1.46 NBF/Goods N/A 07/10/2010 High/Low voltage switchgear and switch power 21 G12 16.23 2.32 NBF/Goods N/A 07/10/2010 panel(高/低压开关柜及动力箱) Cable for power and electric 22 G13 16.23 2.32 NBF/Goods N/A 07/10/2010 wire(电力及动力电缆) 23 G14 Relay protection systems (继电保护系统) 10.32 1.47 NBF/Goods N/A 12/20/2010 Control & Monitoring System of 24 G15 Complex(枢纽监控监视系统) 10.52 1.50 NBF/Goods N/A 12/20/2010 25 G16 Communication System(通讯系统) 2.30 0.33 NBF/Goods N/A 12/20/2010 Automatic Forecast of Water Situation 26 G17 3.65 0.52 NBF/Goods N/A 12/20/2010 System (水情自动测报) Installation of generating units and other M&E 27 G18 equipment in Hydro- 23.90 3.41 NBF/Goods N/A 11/06/2009 plant(电站机电设备安装工程) Dam Safety monitoring 28 G19 6.20 0.89 NBF/Goods N/A 11/06/2009 system(大坝安全监测系统) Powerhouse Auxiliary 29 G20 4.74 0.68 NBF/Goods N/A 07/10/2010 Systems(电站辅助设备系统) 30 G21 fire-extinguishing system (消防系统) 0.49 0.07 NBF/Goods N/A 08/20/2010 Electrical Equipment for Ship Lock & Flood 31 G24 2.84 0.41 NBF/Goods N/A 06/01/2010 Gates(船闸及闸坝电气设备) Electrical Equipment of Protection 32 G25 6.50 0.93 NBF/Goods N/A 03/01/2009 Areas(防护区电排站电气设备) Crest Lifting Machinery of Protection 33 G26 4.20 0.60 NBF/Goods N/A Works (防护区启闭设备) 34 G27 Pump-set of protection areas(防护区泵组) 10.90 1.56 NBF/Goods N/A 05/30/2009 Subtotal 25contracts(25个合同包) (小 计 ) (4) Consultant Service(咨询服务) Study on Reservoir Optimizing 35 C1 2.72 0.39 NBF/Services N/A 06/30/2009 Control(水库优化调度研究) Research on Downstream Water Level Connection 36 C2 2.49 0.36 NBF/Services N/A 12/20/2007 (下游水位衔接研究) 37 C3 Survey and Design(勘测设计) 59.60 8.51 NBF/Services N/A 06/05/2007 Supervision Services for Construction of W4 &Supervision for major Equipments 38 C4 14.91 2.13 NBF/Services N/A 01/15/2009 Manufacturing(W4土建工程施工监理及重要设 备监造) Construction Supervision Services for 39 C5 W5 & Flood Protection Works 5.30 0.76 NBF/Services N/A 01/15/2009 (W5土建库区工程施工监理) 40 C6 Bidding Agent(招标代理) 5.10 0.73 NBF/Services N/A 12/12/2007 Overseas Training/Technical 41 C7 3.56 0.51 CQS/Services Prior 11/01/2010 Assistance (国外培训) Subtotal 7contracts(7个合同包) Total of All 276 Total of ICB/Works 108 Total of NCB/Works 0 Total of NBF/Works 61 Total of ICB/Goods 56 Total of NCB/Goods 0 Total of NBF/Goods 39 Total of CQS Services 1 Total of QBS Services 0 Total of SOE/CQ 0 Total of NBF Services 13 Total of above 277 Total of Prior Review 164 Total of Post Review 0
Группа Всемирного банка · Procurement Plan
China - Jiangxi Shihutang Navigation and Hydropower Complex Project : procurement plan : China - Jiangxi Shihutang Navigation and Hydropower Complex Project : procurement plan
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Procurement Plan
Страна
Китай
Источник
Всемирный банк