BANGLADESH National Agricultural Technology Project (NATP): Phase 1 [IDA Cr. No. 4386 BD and IFAD Cr. No. 739 BD] PROCUREMENT PLAN FY - 2007 to 2013 Project Implementation Unit (PIU) Department of Agricultural Extension (DAE) Ministry of Agriculture (MOA) Updated in July 2010 Procurement Threshold Table Expenditure Contract Value Procurement Method a/ Contracts Subject to Prior Review Category (Threshold) Goods Any Value ICB/NCB First contract by each implementing agency regardless of value and all contracts of value =US $ 600,000 or more As per PPR RFQ/Shopping Post-review <US$ 2,000 Direct Contracting All contracts (on a case by case basis, as per paragraph 3.6 of the Procurement Guidelines) All other contracts Post Review Works All contracts ICB/NCB First contract by each implementing agency regardless of value and thereafter, all contracts valued US $ 4,000,000 or more As per PPR RTM Post-review As per PPR RFQ Post-review Services Consulting Firm Any method US $ 200 000 or more Individual Consultant US $ 100 000 or more Single source selection All contracts All other contracts Post Review a/ Prior review threshold would be reviewed after 18 months and adjusted, if necessary. In addition, applicable guidelines may also be re-designated, based upon the review. Procurement Plan Summary Total estimated value of contract Total number of Number of contract awarded up to Total value of awarded contracts up to June Sl. No. Items (in 000' US$) packages June 30, 2011 30, 2010 (in 000'US$) (1 $=BDT. 73) 1 Goods 1912.28 37 32 1048.00 2 Works 1889.892 26 23 1517.00 3 Services 796.078 25 18 273.39 Total 4598.25 88 73 2838.39 Planned Date of Planned Date of Bid Estimated Price in Planned Date of Delivery/ Progress of Opening/ Proposals Name of Supplier/ Contract package US$ ‘000 (Actual Procedure/ Prior Review2 Contract Signing Completion Procurement as Sl. No. Contract Description Unit Qty/ Nos. PPR/BG Submission (Actual Date Contractor / Remarks Number1 Contract Price in Method (Yes / No) (Actual Date of (Actual Date of of ________ of Bid Opening/ Proposals Consultant Contract Currency) Contract Signing) Delivery/ (date) Submission) Completion) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 National Competative Bidding (NCB) NCB for the Year 2007-08 Computer and Accessories, and MIS equipments 88.276 First NCB contract 1 PG/DAE/01/07-08 no. 56 NCB PPR Yes (17-May-08) (16-Jul-08) (22- Aug-08) Flora Ltd Completed for PIU-DAE and P&E of DAE [BDT 54,22,463] for prior review. Office Equipments - Fax Machine, Scanner, 11.909 2 PG/DAE/02/07-08 no. 8 NCB PPR No (11-May-08) (16-Jul-08) (22- Aug-08) BD Machine Completed Intercom set, Photocopier etc. [BDT 8,28,150] Office Furniture for PIU- DAE and Upazila (Table, 24.422 3 PG/DAE/03/07-08 Chair, Computer Table, Compute Chair, Steel no. 112 NCB PPR No (11-May-08) (17-Jul-08) (22- Aug-08) DesignPlus Completed [BDT 11,30,955] Alimra, File Cabinet etc. Electrical Equipments/Electronic Goods - Split type 14.134 4 PG/DAE/04/07-08 no. 16 NCB PPR No (11-May-08) (17-Jul-08) (20- Aug-08) OTOBI Ltd Completed A/C, Camera, Refrigerator, TV, IPS etc. Y1 [BDT 7,85,683] NCB for the Year 2008-09 Lot-1: Computer and Accessories (80 Upazila) - 141.98 Thakral Information no. 80 NCB BG Yes (15-Dec-08) (17-Feb-09) ( 20-May-09) Completed (Desktop computer, Printer, UPS, GPRS etc.) BDT [68,83,900] System Private Ltd. 5 PG/DAE/05/08-09 Lot-2: Equipments and software for MIS, LAN 15.00 LS LS NCB BG Yes (15-Dec-08) (10-Feb-09) (16-Apr-09) Connect BD. Ltd. Completed conection and Web Server etc. Y2 BDT [7,34,600] 62.792 6 PG/DAE/06/08-09 Jeep (4WD) (For PIU-DAE) no. 1 BDT[63,09,000] NCB PPR No (04-Nov-08) (13-Nov-08) (30 -Jan- 08) Navana Motors Ltd Completed 155.416 7 PG/DAE/07/08-09 Motor Cycle (95 for Upazila no. 95 [BDT [78,84050] NCB BG Yes (25-Nov-08) (07-Apr-09) 07-Jun-09) Motodrive Ltd. Completed Lot-1: Technical Equipments for pesticide 115.06 M.N. Mallick & no. 79 NCB BG Yes (05-Feb-09) (07-Apr-09) (30-Jun-09) Completed laboratory. BDT 53,94,708 Company 8 PG/DAE/08/08-09 10.40 Lot-2: Office Equipments for Pesticides Lab. no. 9 NCB PPR No (05-Feb-09) (24-Mar-09) (24-May-09) Xebec IT Services Completed [BDT 9,81,113] 10.90 Lot-3: Computer and Accessories for Pesticides Set 2 [BDT 3,76,800] NCB PPR No (05-Feb-09) (31-Mar-09) (24-May-09) Liza Enterprise Completed lab. 15.698 Office Furniture for DAE (80 sets Computer table & 9 PG/DAE/09/08-09 no. 92 BDT 9,83,480 NCB PPR No (22-Jan-09) (18-May-09) (17-Jun-09) Otobi Ltd. Completed Chair, Table & Chair for experts etc.) 894.791 Furniture for FIAC - Chair , Table, Almira, File 10 PG/DAE/10/08-09 Set 570 [BDT 2,08,73,400] NCB BG Yes (25-Feb-09) (31-Mar-09) (11-May-09) Icon Architects Ltd. Completed cabinet etc. Canceled due to Lot-1:Miscellaneous Equipments and materials for no. 50 9.74 NCB PPR No (15-Dec-08) (15-Jan-09) - Not selected Not Completed higher quoated PIU and Field (Camera) rate Lot-2: Office Consumeables 7.14 LS LS NCB PPR No (15-Dec-08) (15-Jan-09) (29-Apr-09) Liza Enterprise Completed (BDT 1,11,250) 11 PG/DAE/11/08-09 Lot-3: Bags for Workshops 4.80 No. 450 NCB PPR No (11-Feb-09) (31-Mar-09) (20-Apr-09) Liza Enterprise Completed (BDT 2,80,980] Lot-4: Vertical Blind 2.14 no. LS NCB PPR No (11-Feb-09) (31-Mar-09) (17-May-09) Liza Enterprise Completed [BDT 1,10,250] NCB for the Year 09-10 Laboratory apparatus, glassware, chemicals and no./gm/m 28.70 15-Aug-09 15-Sep-09 15-Dec-09 Bangladesh Science 12 PG/DAE/12/09-10 LS NCB PPR No Completed consumables l (BDT 17,14,320) (09-Nov-09) (08-Dec-09) (09-Mar-10) House Computer and Accessories (for 25 Upazilas) 39.24 15-Aug-09 15-Sep-09 15-Feb-10 Year 2000 Co. (pvt.) PG/DAE/13(i)/09-10 Sets 25 NCB PPR No Completed (Desktop computer, Printer, UPS, GPRS etc.) (BDT 19,48,980) (01-Oct-09) (09-Nov-09) (20- May-10) Ltd. 13 7.17 15-Aug-09 15-Sep-09 15-Feb-10 Thakral Information PG/DAE/13(ii)/09-10 Equipments and software MIS for PE-DAE no. LS NCB PPR No Completed (BDT 5,16,000) (27-Oct-09) (01-Dec-09) (28-Feb-10) System Private Ltd. Miscellaneous Equipments and materials. (Camera 14.00 15-Aug-09 15-Sep-09 15-Dec-09 Bangladesh Machines PG/DAE/14.1/09-10 no. 50 NCB PPR No Completed for field) (BDT 7,24,000) (28-Oct-09) (26-Nov-09) (27-Dec-09) Company 14 Planned Date of Planned Date of Bid Estimated Price in Planned Date of Delivery/ Progress of Opening/ Proposals Name of Supplier/ Contract package US$ ‘000 (Actual Procedure/ Prior Review2 Contract Signing Completion Procurement as Sl. No. Contract Description Unit Qty/ Nos. PPR/BG Submission (Actual Date Contractor / Remarks Number1 Contract Price in Method (Yes / No) (Actual Date of (Actual Date of of ________ of Bid Opening/ Proposals Consultant Contract Currency) Contract Signing) Delivery/ (date) Submission) Completion) 2.30 15-Aug-09 15-Sep-09 15-Dec-09 PG/DAE/14.2/09-10 Photocopier-1, no. 1 RFQ PPR No M/S Hawa Enterprise Completed 14 (BDT 1,45,000) (25-Oct-09) (04-Nov-09) (09-Nov-09) TS of st lowest 5.30 15-Aug-09 15-Sep-09 15-Dec-09 M.N. Mallick & forfitted, 2nd PG/DAE/14.3/09-10 Bags for Workshops, no. 450 NCB PPR No Completed (BDT 2,79,450) (26-Oct-09) (27-Apr-10) (28-Apr-10) Company lowest completd the supply 45.48 15-Aug-09 15-Sep-09 30-Mar-10 15 PG/DAE/15/09-10 Motor Cycle (for 25 Upazila & PIU) no. 29 NCB PPR No Grameen Motors Completed (BDT 25,95,000) (15-Sep-09) (11-OCt-09) (15-Nov-09) Furniture for FIAC - Chair, Table, Almira, File 47.00 15-Nov-09 30-Dec-09 28-Mar-10 16 PG/DAE/16/09-10 no. 50 NCB PPR Yes Red Hard International Completed Cabinet etc. (BDT 20,29,800) (26-Oct-09) (22-Nov-09) (17-Feb-10) NCB for the Year 10-11 Equipments ans software for MIS (P&E, DG-DAE 31.82 15-Aug-10 30-Sep-10 15-Nov-09 17 PG/DAE/17/10-11 no. LS NCB PPR No Connect BD. Ltd. Completed Conference Room) (BDT 22,10500) (14-Dec-10) (02-Jan-11) (03-Jun-11) Miscellaneous Equipments and Materials (Camera, 10.66 15-Aug-10 15-Sep-10 15-Nov-09 MS Susmita & Moon 18 PG/DAE/18/10-11 no. LS NCB PPR No Completed EC Meter, PH Meter etc.) (BDT 7,40,000) (29-Nov-10) (05-Jan-11) (07-Feb-11) Industries NCB for the Year 2011-12 (No NCB is possible in 2011-12 as per provision of present DPP. If DPP is revised, then some procurement will be included in the procurement plan after finalization of revised DPP) Equipments ans software for MIS (P&E) (Need Not needed in 19 PG/DAE/19/12-13 no. LS 9.41 NCB PPR No 15-Jul-12 15-Aug-12 15-Oct-12 based) Y5 2011-12 Request for Quatations (RFQ) RFQ for the Year 07-08 2.87 20 PG/DAE/20/07-08 Office gate and Signboard no. LS RFQ PPR No (29-May-08) (01-Jun-08) (12-Jun-08) Allaksa Enterprise Completed BDT[1,99,445] 2.87 21 PG/DAE/21/07-08 Furniture for Director's Room no. LS RFQ PPR No (29-May-08) (23-Jun-08) (07-Jul-08) Xebec Ltd Completed BDT [1,95,800] 2.87 22 PG/DAE/22/07-08 Procurement of cash Book and Stock Book no. LS RFQ PPR No (20-May-08) (23-Jun-08) (07-Jul-08) Likhon International Completed BDT [1,15,200] RFQ for the Year 08-09 2.87 Collegiate Binding and 23 PG/DAE/23/08-09 Procurement of Spiral Binding Note Book no. LS RFQ PPR No (20-Aug-08) (14-Oct-08) (27-Oct-08) Completed BDT [1.99,500] Printing 2.87 Collegiate Binding and 24 PG/DAE/24/08-09 Procurement of Project Brochure no. LS RFQ PPR No (04-Jan-09) (14-Jan-09) (25-Jan-09) Completed BDT [1,97,000] Printing USD 2.90 M/S Mokbul Motors 25 PG/DAE/25/08-09 Vehicle Repairing (Vehicle No. 11-1687) No. 1 RFQ PPR No (15-Sep-09) (15-Nov-09) (30-Dec-09) Completed (BDT 1,96,950.00) Works RFQ for the Year 09-10 4.55 30-Oct-09 15-Nov-09 30-Dec-09 26 PG/DAE/26/09-10 Printing of Cash/stock Book no. 450 RFQ PPR No New Royal Printing Completed (BDT 3,16,950) (17-Jan-10) (18-Jan-10) (18-Mar-10) 2.90 15-Nov-09 10-Dec-09 30-dec-09 Collegiate Printing 27 PG/DAE/27/09-10 Printing of Booklet on Fertilizer Use no. 50,000 RFQ PPR No Completed (BDT 2,02,000) (17-Jan-10) (18-Jan-10) (16-Mar-10) and Binding 4.50 15-Nov-09 10-Dec-09 30-Dec-10 Collegiate Printing 28 PG/DAE/28/09-10 Printing of Writing Pads no. 1,000 RFQ PPR No Completed (BDT 3,10,000) (28-Feb-10) (02- Mar-10) (18-Apr-10) and Binding 7.17 15-Sep-09 15-Oct-09 15-Nov-09 29 PG/DAE/29/09-10 Office Consumeables LS LS RFQ PPR No Sidratul Montaha Completed (BDT 4,46,500) (17-Jan-10) (18-Jan-10) (24-Jan-10) RFQ for the Year 10-11 7.17 15-Aug-10 15-Sep-10 15-Nov-10 30 PG/DAE/30/10-11 Office Consumeables LS LS RFQ PPR No T S Enterprise Completed (BDT 4,95,650) (14-Nov-10) (28-Nov-10) (07-Dec-10) Vehicle Repairing (Vehicle No. Dhaka Metro-11- 7.18 15-Aug-10 15-Sep-10 15-Nov-10 31 PG/DAE/31/10-11 No. 1 RFQ PPR No M S Mokbul Motor Completed 3860 PRADO Jeep) (BDT 4,56,700) (08-Nov-10) (07-Dec-10) (01-March-11) Printing of (Communication Materials) 7.18 15-Aug-10 15-Sep-10 15-Nov-10 College gate Binding 32 PG/DAE/32/10-11 No. LS RFQ PPR No Completed Booklets/Leaflet/brochure on project activities (BDT 4,94,000 +15%) (08-Nov-10) (29-Nov-10) (31-Jan-11) and Printing Development and Printing of Training Module and 7.18 15-Aug-10 15-Sep-10 15-Nov-10 33 PG/DAE/33/10-11 Guideline on Social Mobilization Process for No. LS RFQ PPR No New Royal Printing Completed (BDT 4,97,000 + 15%) (14-Nov-10) (08-Dec-10) (05-Feb-11) SAAOs Procurement Plan for Service Contracts Planned Date of Bid Opening/ Planned Date Planned Date of Progress of Estimated Price in Prior Proposals of Delivery/ Name of Contract Signing Procurement Sl. Contract package US$ ‘000 (Actual Procedure/ 2 Submission Completion Supplier/ 1 Contract Description Unit Qty/ Nos. PPR/BG Review (Actual Date of as of Remarks No. Number Contract Price in Method (Yes / No) (Actual Date of Bid (Actual Date of Contractor/ Contract ________ Contract Currency) Opening/ Delivery/ Consultant Signing) (date) Proposals Completion) Submission) 1 2 3 4 5 6 7 8 9 10 11 12 15.84 1 PS/DAE/01/07-08 Procurement expert mm 12 SIC PPR No 21-Apr-08 25-Sep-08 24-Aug-09 A. Rashid Dhali Completed [BDT 11,04,000] Training and Communication 60 (Initailly for 79.20 Dr. Md. Mustak Initially for 24 2 PS/DAE/02/07-08 mm SIC PPR No 21-Apr-08 12-Nov-08 11-Nov-10 Completed Expert 24 months) [BDT 22,08,000] Ahmed months. TOR Monitoring and Evaluation 60 (Initailly for 79.20 Md. M. M. Reviewed by 3 PS/DAE/03/07-08 mm SIC PPR No 21-Apr-08 1-Sep-08 31-Aug-10 Completed Expert 24 months) [BDT 22,08,000] Rahman WB. Manager (Financial 60 (Initailly for 79.20 4 PS/DAE/04/08-09 mm SIC PPR No 21-Apr-08 8-Oct-08 7-Oct-10 Md. Z. Islam Completed Management) 24 months) [BDT 22,08,000] Data Analyst and Computer 60 (Initailly for 17.219 Md. Muslem 5 PS/DAE/05/08-09 mm SIC PPR No 21-Apr-08 2-Nov-08 1-Nov-10 Completed Operator- Position 1 24 months) [ BDT 4,80,000] Uddin Data Analyst and Computer 60 (Initailly for 17.219 Syeda Nazneen 6 PS/DAE/06/08-09 mm SIC PPR No 21-Apr-08 9-Nov-08 8-Nov-10 Completed Operator- Position 1 24 months) [BDT 4,80,000] Jahan 60 (Initailly for 21.52 7 PS/DAE/07/08-09 Accountant mm SIC PPR No 21-Apr-08 27-Nov-08 26-Nov-10 Arifur Rahman Completed 24 months) [BDT 6,00000] 8 PS/DAE/08/07-12 National Consultants (Short-term): Need based 10.76 PPR/ Md. Sanoar PS/DAE/8(i)/09-10 Sociial Mobilization Consualtant mm 6 SIC No 1-Mar-10 31-Jul-10 Completed (BDT. 6,00,000) WBG Hossain Sociial Mobilization Consualtant 10.76 PPR/ 01-Aug-10 30-Dec-10 Md. Sanoar Has been continued for 5 PS/DAE/8(ii)/10-11 mm 4 SIC No (Continuation) (BDT 3,22,500) WBG (01-Jun-11) (30-Oct-11) Hossain months only PPR/ PS/DAE/8(iii)11-12 Need Based mm 6 10.76 SIC No Need Based Not Require now WBG PPR/ PS/DAE/8(iv)11-12 Need Based mm 6 10.76 SIC No Need Based Not Require now WBG PPR/ PS/DAE/8(v)11-12 Need Based mm 6 10.76 SIC No Need Based Not Require now WBG National Consultants - Overview PPR/ 9 PS/DAE/09/11-12 and analysis of project impact mm 6 10.76 SIC No Need Based Need Based Need Based Not Require now WBG (Short-term) Consultant for National 10.76 PPR/ 20-Sep-10 20-Mar-11 For 5 months 10 PS/DAE/10/10-11 Agricultural Extension Policy mm 5 SIC No Md. Sayeed Ali On going (BDT 5,17,000) WBG (01-April-11) (30-Oct-11) with 7 months (NAEP) Updating PPR/ Not require at all because it has all ready been 11 PS/DAE/11/10-11 Dev. Agril. Polocy mm 5 10.76 SIC No 20-Sep-10 20-Mar-11 WBG updated by MOA International Consultants for 12 PS/DAE/12/07-12 policy framework (NAP and mm 3 52.30 SIC BG Yes Need Based Need Based Need Based Not Require at all other issues.) Need based International Consultants for 13 PS/DAE/13/07-12 policy framework (NAEP and mm 3 52.30 SIC BG Yes Need Based Need Based Need Based Not Require at all other issues.) Need based Page 6 PP - Service Planned Date of Bid Opening/ Planned Date Planned Date of Progress of Estimated Price in Prior Proposals of Delivery/ Name of Contract Signing Procurement Sl. Contract package US$ ‘000 (Actual Procedure/ 2 Submission Completion Supplier/ 1 Contract Description Unit Qty/ Nos. PPR/BG Review (Actual Date of as of Remarks No. Number Contract Price in Method (Yes / No) (Actual Date of Bid (Actual Date of Contractor/ Contract ________ Contract Currency) Opening/ Delivery/ Consultant Signing) (date) Proposals Completion) Submission) Hiring consulting firm for works contract of PIU-DAE component 60.00 Shaheedullah & 14 PS/DAE/14/08-09 mm LS QCBS PPR No 3-Nov-08 11-Feb-09 22-May-09 Completed (Survey, bidding doc preparation [BDT 3997118.28] Associates for rennovation and repairing). Hiring consulting firm for supervision of works (Repairing 04-Aug-09 30-Oct-09 Engineering 15 PS/DAE/15/09-10 and Rennovation) contract for mm LS 72.00 (BDT. LCS PPR No 1-Jul-09 Completed For 24 months (01-Jan-10) (30-June-11) Consortium Ltd. PIU-DAE component. (for FY 2009-10 and 2010-2011) Training and Communication Dr. Md. Mustak Has been continued for 1 year 16 PS/DAE/02/10-11 mm 32 43.00 SIC PPR No 21-Aug-10 11-Nov-10 30-Jun-13 Expert Ahmed i.e, upto December 2011 Monitoring and Evaluation Md. M. M. Has been continued for 1 year 17 PS/DAE/03/10-11 mm 34 45.00 SIC PPR No 21-Aug-10 31-Aug-10 30-Jun-13 Expert Rahman i.e, upto December 2011 Manager (Financial 07-Oct-10 Md. Newly recruited for upto 18 PS/DAE/04/10-11 mm 33 44.00 SIC PPR No 21-Aug-10 31-Dec-13 Management) (15-Dec-10) Shahiduzzaman December 2013 Data Analyst and Computer Md. Muslem Has been continued for 1 year 19 PS/DAE/05/10-11 mm 32 10.00 SIC PPR No 21-Aug-10 2-Nov-10 30-Jun-13 Operator- Position 1 Uddin i.e, upto December 2011 Data Analyst and Computer Syeda Nazneen Has been continued for 1 year 20 PS/DAE/06/10-11 mm 32 10.00 SIC PPR No 21-Aug-10 9-Nov-10 30-Jun-13 Operator- Position 1 Jahan i.e, upto December 2011 Has been continued for 1 year 21 PS/DAE/07/10-11 Accountant mm 32 12.00 SIC PPR No 21-Aug-10 27-Nov-10 30-Jun-13 Arifur Rahman i.e, upto December 2011 Page 7 PP - Service Procurement Plan for Works Contract Planned Date of Bid Opening/ Planned Date Planned Date Progress of Estimated Price in Prior Proposals of Contract of Delivery/ Name of Procedur Procurement Sl. Contract package Qty/ US$ ‘000 (Actual PPR/B 2 Submission Signing Completion Supplier/ Contract Description Unit e/ Review as of Remarks No. Number1 Nos. Contract Price in G (Yes / No) (Actual Date of (Actual Date (Actual Date of Contractor / Method ________ Contract Currency) Bid Opening/ of Contract Delivery/ Consultant (date) Proposals Signing) Completion) Submission) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Prior review Pesticide Testing Laborator and 40.292 2-Mar-09 25-Mar-09 (27- 25-Jun-09 Al-Aksa of The Bank 1 PW/DAE/01/08-09 LS 5 NCB PPR No Completed PIU-DAE (BDT. 16,81,323.42) (25-Mar-09) Apr-09) (25-Jun-09) Enterprise for first NCB Contract. Lot-1: Repair and Renovation of District, Upazilla Training Center 83.64 15-Sep-09 15-Oct-09 30-Mar-10 Iran no. 36 NCB PPR Yes Completed and FIAC (BDT 58,16,812.34) (18-Nov-09) (10-Jan-10) (20-Jun-10) Construction Lot-2: Repair and Renovation of Upazilla Training Center and 76.54 15-Sep-09 15-Oct-09 30-Mar-10 Polash PW/DAE/02.1/09-10 no. 32 NCB PPR No Completed FIAC (BDT 53,34,529.23) (18-Nov-09) (04-Jan-10) (20-Jun-10) Enterprise Lot-3: Repair and Renovation of Disrtict, Upazilla Training Center 68.13 15-Sep-09 15-Oct-09 30-Mar-10 Polash no. 31 NCB PPR No Completed and FIAC (BDT 47,48,451.64) (18-Nov-09) (04-Jan-10) (20-Jun-10) Enterprise 2 Lot-1: Repair and Renovation of District, Upazilla Training Center 51.00 15-Sep-09 15-Oct-09 30-Mar-10 M/S Shawon no. 21 NCB PPR No Completed and FIAC (BDT 45,47,691.92) (22-Nov-09) (04-Jan-10) (20-Jun-10) Enterprise Lot-2: Repair and Renovation of 63.49 15-Sep-09 15-Oct-09 30-Mar-10 M/S Sadi PW/DAE/02.2/09-10 Upazilla Training Center and no. 34 NCB PPR No Completed (BDT 40,18,271.00) (22-Nov-09) (30-Dec-09) (20-Jun-10) Enterprise FIAC Lot-3: Repair and Renovation of Upazilla Training Center and 67.13 15-Sep-09 15-Oct-09 30-Mar-10 M/S B M no. 34 NCB PPR No Completed FIAC (BDT 46,73,444.85) (22-Nov-09) (30-Dec-09) (17-Jun-10) Construction Lot-1:Repair and Renovation of 30.17 15-Sep-09 15-Oct-09 30-Mar-10 M/S Kundu Upazilla Training Center and no. 23 NCB PPR No Completed (BDT 20,95,933.20) (24-Nov-09) (14-Jan-10) (08-Jun-10) Traders FIAC Lot-2: Repair and Renovation of 29.71 15-Sep-09 15-Oct-09 30-Mar-10 M/S Babu PW/DAE/03.1/09-10 Upazilla Training Center and no. 25 NCB PPR No Completed (BDT 20,47,503.08) (24-Nov-09) (30-Dec-09) (20-Jun-10) Enterprise FIAC Lot-3: Repair and Renovation of Upazilla Training Center and 86.43 15-Sep-09 15-Oct-09 30-Mar-10 Mastura no. 33 NCB PPR No Completed FIAC (BDT 60,21,918.13) (24-Nov-09) (28-Jan-10) (20-Jun-10) Enterprise 3 Lot-1:Repair and Renovation of District, Upazilla Training Center 79.01 15-Sep-09 15-Oct-09 30-Mar-10 no. 30 NCB PPR No M/S H Kabir Completed and FIAC (BDT 55,10250.00) (26-Nov-09) (04-Jan-10) (17-Jun-10) Lot-2:Repair and Renovation of PW/DAE/03.2/09-10 District, Upazilla Training Center 65.45 15-Sep-09 15-Oct-09 30-Mar-10 Mastura no. 26 NCB PPR No Completed (BDT 44,49,020.18) (26-Nov-09) (06-Jan-10) (20-Jun-10) Enterprise and FIAC Lot-3: Repair and Renovation of District, Upazilla Training Center 38.44 15-Sep-09 15-Oct-09 30-Mar-10 M/S Kasfia no. 16 NCB PPR No Completed and FIAC (BDT 26,72,113.09) (26-Nov-09) (07-Jan-10) (20-Jun-10) Engineering Repair and Renovation of 106.57 15-Sep-09 15-Oct-09 30-Mar-10 M/S Rhidoy PW/DAE/04.1/09-10 District, Upazilla Training Center no. 40 NCB PPR No Completed and FIAC (BDT 74,10433.80) (16-Nov-09) (30-Dec-09) (20-Jun-10) Construction Lot-1:Repair and Renovation of Upazilla Training Center and 72.27 15-Sep-09 15-Oct-09 30-Mar-10 M/S Runa no. 32 NCB PPR No Completed FIAC (BDT 49,63,625.05) (25-Nov-09) (30-Dec-09) (20-Jun-10) Enterprise 4 Lot-2: Repair and Renovation of 39.82 15-Sep-09 15-Oct-09 30-Mar-10 M/S Runa PW/DAE/04.2/09-10 Upazilla Training Center and no. 21 NCB PPR No Completed FIAC (BDT 26,41,467.62) (25-Nov-09) (30-Dec-09) (20-Jun-10) Enterprise Lot-3: Repair and Renovation of Upazilla Training Center and 41.17 15-Sep-09 15-Oct-09 30-Mar-10 M/S Runa no. 19 NCB PPR No Completed FIAC (BDT 27,11,774.20) (25-Nov-09) (30-Dec-09) (20-Jun-10) Enterprise Repair and Renovation of District, 68.09 15-Sep-09 15-Oct-09 30-Mar-10 M/S Prime PW/DAE/05.1/09-10 Upazilla Training Center and no. 28 NCB PPR No Completed FIAC (BDT 47,32,102.00) (11-Nov-09) (09-Dec-09) (20-Jun-10) International 5 Repair and Renovation of District, 24.69 15-Sep-09 15-Oct-09 30-Mar-10 Manik & PW/DAE/05.2/09-10 Upazilla Training Center and no. 12 NCB PPR No Completed (BDT 17,20,905.75) (09-Nov-09) (06-Dec-09) (20-Jun-10) Brothers FIAC Repair and Renovation of District, 55.31 15-Sep-09 15-Oct-09 30-Mar-10 M/S Unique PW/DAE/06.1/09-10 Upazilla Training Center and no. 25 NCB PPR No Completed (BDT 38,19,679.00) (10-Nov-09) (06-Dec-09) (20-Jun-10) Traders FIAC 6 Repair and Renovation of District, 63.96 15-Sep-09 15-Oct-09 30-Mar-10 M/S Matiur PW/DAE/06.2/09-10 Upazilla Training Center and no. 33 NCB PPR No Completed FIAC (BDT 43,54,411.55) (08-Nov-09) (19-Nov-09) (25-Jun-10) Rahman Lot-1: Repair and Renovation of District, Upazilla Training Center 44.87 15-Sep-09 15-Oct-09 30-Mar-10 Md. Mizanur no. 24 NCB PPR No Completed and FIAC (BDT 31,26,164.39) (17-Nov-09) (29-Dec-09) (20-Jun-10) Rahman 7 PW/DAE/07.1/09-10 Lot-2:Repair and Renovation of Upazilla Training Center and 41.64 15-Sep-09 15-Oct-09 30-Mar-10 M/S Rabbi no. 29 NCB PPR No Completed FIAC (BDT 29,01,107.96) (17-Nov-09) (11-Jan-10) (20-Jun-10) Enterprise Renovation of Pesticide Testing Laborator y/PIU Conference room 17.20 15-Sep-09 15-Oct-09 30-Mar-10 S A Trading 8 PW/DAE/08/09-10 LS LS NCB PPR No Completed etc. (BDT 11,82,820.02) (19-Nov-09) (29-Nov-09) (26-Feb-10) Corporation Lot-1 Repair and Renovation of 68.98 15-Sep-09 15-Oct-09 30-Mar-10 M/S Kamrual PW/DAE/09.1/09-10 District, Upazilla Training Center no. 37 NCB PPR No Completed and FIAC (BDT 47,32,920.00) (15-Nov-09) (03-Jan-10) (20-Jun-10) Enterprise 9 Repair and Renovation of District, 44.96 15-Sep-09 15-Oct-09 30-Mar-10 M/S Ziaul PW/DAE/09.2/09-10 Upazilla Training Center and no. 25 NCB PPR No Completed FIAC (BDT 30,79,594.00) (19-Nov-09) (03-Jan-10) (20-Jun-10) Traders Repair and Renovation of District, Upazilla Training Center and 35.23 15-Sep-09 15-Oct-09 30-Mar-10 M/S Bhirob PW/DAE/10.1/09-10 no. 23 NCB PPR No Completed FIAC (BDT 24,42,969.85) (23-Nov-09) (14-Jan-10) (25-Jun-10) Traders 10 Repair and Renovation of District, 22.57 15-Sep-09 15-Oct-09 30-Mar-10 M/S Matiur PW/DAE/10.2/09-10 Upazilla Training Center and no. 11 NCB PPR No Completed FIAC (BDT 15,67,905.51) (12-Nov-09) (29-Dec-09) (25-Jun-10) Rahman Renovation of District Training 10.90 15-Aug-10 15-Oct-10 30-Mar-10 M S Rabbi PW/DAE/11(a)/10-11 no. 2 NCB PPR No Completed Center(Natore, Bogra) (BDT. 6,67,039.09) (25-Nov-10) (30-Jan-11) (23-May-11) Enterprise Renovation of District Training 16.41 15-Aug-10 15-Oct-10 30-Mar-10 MS Rabbi PW/DAE/11/(b)10-11 no. 2 NCB PPR No Completed Center (Dinaajpur, Rangpur) ( BDT. 9,44,103.68) (29-Nov-10) (30-Jan-11) (12-April-11) Enterprise 11 Renovation of District Training 17.22 15-Aug-10 15-Oct-10 30-Mar-10 MS Sadi 11 PW/DAE/11(c)/10-11 no. 2 NCB PPR No Completed Center(Sylhet, Moulavibazer) (BDT. 9,69,040.51) (30-Nov-10) (25-Jan-11) (26-April-11) Engineers Renovation of District Training 25.42 15-Aug-10 15-Oct-10 30-Mar-10 MS Motlabgonj PW/DAE/11(d)/10-11 no. 2 NCB PPR No Completed Center(Gazipur, Kishoreganj) (BDT. 15,05,308.39) (01-Dec-10) (30-Jan-11) (18-May-11) Traders Renovation of District Training 12.85 15-Aug-10 15-Oct-10 30-Mar-10 MS Rabbi PW/DAE/11(e)/10-11 no. 2 NCB PPR No Completed Center(Mtymensingh, Sherpur) (BDT. 7,58,523.03) (02-Dec-10) (30-Jan-11) (12-May -11) Enterprise Pesticide Testing Laborator, DG- 14.35 15-Aug-10 15-Oct-10 30-Mar-10 MS Mastura 12 PW/DAE/12/10-11 DAE Office and Conference LS LS NCB PPR No Completed (BDT. 8,70,559.32) (05-Dec-10) (24-Jan-11) (20-April-11) Enterprise Room, PIU-DAE FIAC at Union Parishad Complex 13 PW/DAE/13/11-12 LS 125 120.85 NCB PPR No 15-Sep-10 30-Oct-10 30-Mar-11 After DPP Revision FIAC at Union Parishad Complex 14 PW/DAE/14/11-12 LS 125 120.85 NCB PPR No 15-Sep-11 30-Oct-11 30-May-12 After DPP Revision Renovation of Pesticide Testing 15 PW/DAE/15/11-12 Laborator (Not required now) LS LS 24.18 NCB PPR No 15-Jul-11 15-Aug-11 15-Feb-12 After DPP Revision
Группа Всемирного банка · Procurement Plan
Bangladesh - National Agricultural Technology Project : procurement plan (Vol. 3 of 6) : Procurement plan for Department of Agricultural Extension (DAE)
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Procurement Plan
Страна
Бангладеш
Источник
Всемирный банк