Группа Всемирного банка · Procurement Plan

Ethiopia - East Africa Agricultural Productivity Program Project : procurement plan for the next eighteen (18) months

Всемирный банк
Открыть оригинал документа

Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.

Полный текст

 66725 EAAPP PROCUREMENT PLAN FOR THE NEXT EIGHTEEN (18) MONTHS (2010-2011) (COST IN US DOLLARS –‘000) Lot Contract Package No of Unit Estimated Procurement Pre- Domestic Reviews Expected Coordinating No Units cost Cost Method qualification Preference by the Date of Agency (Yes/No) Bank Bid Opening MOTOR VEHICLES 1 4 WD Station Wagon 3 50 150 ICB N/A N/A PRIOR 13/09/2010 MOA 5 doors 2 4 WD Double cabin 10 28.6 286 ICB N/A N/A PRIOR 13/09/2010 MOA pickups 3 4 WD Single CAB. 1 21.4 21.4 ICB N/A N/A PRIOR 13/09/2010 MOA pickup 4 Van 1 28 28 ICB N/A N/A PRIOR 13/09/2010 MOA 5 Lorry 3 Tons* 1 50 50 ICB N/A N/A PRIOR 13/09/2010 MOA 6 Lorry 5 Tons* 1 80 80 ICB N/A N/A PRIOR 13/09/2010 MOA 1 7 Motor Cycles 175 cc – 9 4 36 ICB N/A N/A PRIOR 13/09/2010 MOA 195 cc 8 Mini Bus 25 Seater 1 38 38 ICB N/A N/A PRIOR 13/09/2010 MOA 9 72 Seater Bus 1 86 86 ICB N/A N/A PRIOR 13/09/2010 MOA Estimated Sub Total 775.4 Cost For Vehicle COMPUTER EQUIPMENTS 1 1 Desktop Computers 42 1 42 NCB N/A N/A PRIOR 27/08/2010 MOA 2 Computer Printers 40 0.29 11.6 NCB N/A N/A PRIOR 27/08/2010 MOA 3 Laptop Computers 26 1.2 31.2 NCB N/A N/A PRIOR 27/08/2010 MOA Estimated Sub Total Cost 84.8 1 Furniture Various Variou N/A 40 NS N/A N/A POST 27/08/2010 MOA s Estimated Sub Total Cost 40 OFFICE EQUIPMENTS 1 Photocopier 3 4.280 12.84 NS N/A N/A POST 27/08/2010 MOA 2 Scanners 4 0.7 2.8 NS N/A N/A POST 27/08/2010 MOA 3 Binding Machines 4 0.5 2 NS N/A N/A POST 27/08/2010 MOA 4 Water Dispensers 10 0.3 3 NS N/A N/A POST 27/08/2010 MOA Estimated Sub Total 20.64 Cost 1 Misc Laboratory Various N/A 348.539 NS N/A N/A POST 27/08/2010 MOA Equipments 2 Liquid Nitrogen 4 30 120 NCB N/A N/A PRIOR 27/08/2010 MOA Reservoir 3 Scanning Electron 1 137.4 137.402 NCB N/A N/A PRIOR 27/08/2010 MOA microscope 02 4 2 85.71 171.428 NCB N/A N/A PRIOR 27/08/2010 MOA Mineral analyzers 4 5 Gas production 2 42.85 85.714 NCB N/A N/A PRIOR 27/08/2010 MOA equipments 7 Estimated Sub Total 863.083 Cost 2 S/ No Contract Package No of Unit Estimated. Procuremen Pre- Domestic Reviews Expected Coordin Units cost Cost t Method qualification Preference by the Date of ating (Yes/No) Bank Bid Agency Opening TRACTORS AND FARM EQUIPMENT 1 Tractors 10 40 400 ICB N/A N/A PRIOR 13/09/2010 MOA 2 Bailer 2 30 60 ICB N/A N/A PRIOR 13/09/2010 MOA 3 Ploughs 10 1.715 17.15 ICB N/A N/A PRIOR 13/09/2010 MOA 4 Harrows 10 2.142 21.42 ICB N/A N/A PRIOR 13/09/2010 MOA 2 5 Row Planter 9 4.286 38.574 ICB N/A N/A PRIOR 13/09/2010 MOA 6 Side Mower 2 20 40 ICB N/A N/A PRIOR 13/09/2010 MOA 7 Forage Chopper unit 2 35 70 ICB N/A N/A PRIOR 13/09/2010 MOA 8 Forage trailers 2 35 70 ICB N/A N/A PRIOR 13/09/2010 MOA 9 Sprayer 2 2.857 5.714 ICB N/A N/A PRIOR 13/09/2010 MOA 10 Spreader 2 2.142 4.284 ICB N/A N/A PRIOR 13/09/2010 MOA 11 Seed harvester 6 15 90 ICB N/A N/A PRIOR 13/09/2010 MOA 3 12 Seed 1 19.286 19.286 ICB N/A N/A PRIOR 13/09/2010 MOA Harvester(wheat) 13 Seed processors 15 4 60 ICB N/A N/A PRIOR 13/09/2010 MOA 14 Rake 2 5 10 ICB N/A N/A PRIOR 13/09/2010 MOA Estimated Sub Total 906.428 Cost CONSULTANCY CONTRACTS Lot No Contract Package No of Unit Estimated Selection Pre- Domestic Reviews Expected Coordin Units cost Cost Method qualification Preference by the Date of ating (yes/no) (Yes/No) Bank Bid Agency 3 Opening 1 Design of irrigation 7 60 QCBS Yes No PRIOR 22/10/2010 MOA system Estimated Sub Total 60 Cost S/No Contract Package No of Unit Estimated Procuremen Pre- Domestic Reviews Expected Coordin Units cost Cost t Method qualification Preference by the Date of ating (yes/no) (Yes/No) Bank Bid Agency Opening Construction and 1.143 NCB N/A N/A PRIOR 20/09/2010 MOA equipping of centre of excellence Rehabilitation of Staff 428.4 NCB N/A N/A POST 20/09/2010 MOA Houses Rehabilitation of 250 NCB N/A N/A POST 20/09/2010 MOA livestock structures Rehabilitation of 80 NCB N/A N/A POST 20/09/2010 MOA quarantine facility Road Tarmac(6km) 85.715 NCB N/A N/A POST 20/09/2010 MOA Electrification 25km 14.3 NCB N/A N/A POST 20/09/2010 MOA Ordinary Fencing 42.8 NS N/A N/A POST 27/08/2010 MOA Electric fencing 58.6 NS N/A N/A POST 27/08/2010 MOA Estimated Sub Total 960.958 Cost COMMUNICATION EQUIPMENT 1 Digital LCD Projector 2 2.857 5.714 NS N/A N/A POST 27/08/2010 MOA 2 Television 2 1 2 NS N/A N/A POST 27/08/2010 MOA 4 3 VCR 2 0.571 1.142 NS N/A N/A POST 27/08/2010 MOA 4 Digital Camera 1 1 1 NS N/A N/A POST 27/08/2010 MOA 5 camcorders 3 1.428 4.284 NS N/A N/A POST 27/08/2010 MOA 6 Satellite Dish 1 7.143 7.143 NS N/A N/A POST 27/08/2010 MOA 7 Internet connection N/A 28.571 28.571 NS N/A N/A POST 27/08/2010 MOA 8 Telephone and fax lines 5 0.286 1.43 NS N/A N/A POST 27/08/2010 MOA Estimated Sub Total 51.284 Cost Lot Contract Package No of Unit Estimat Procure Pre- Domestic Reviews Expected Date Coordinating No Units cost ed. Cost ment qualificati Preference by the of Bid Opening Agency Method on (Yes/No) Bank (yes/no) WATER SUPPLY FACILITY EQUIPMENT 1 Borehole drilling 3 14.28 42.858 NS N/A N/A POST 27/08/2010 MOA 6 2 Pumps 4 21.42 85.712 NS N/A N/A POST 27/08/2010 MOA 8 3 Electricity installation 1 4.285 4.285 NS N/A N/A POST 27/08/2010 MOA 4 Piping 1 42.85 42.857 NS N/A N/A POST 27/08/2010 MOA 7 5 Storage tanks 2 2.857 5.714 NS N/A N/A POST 27/08/2010 MOA 6 Drinking troughs 20 1.428 28.56 NS N/A N/A POST 27/08/2010 MOA Estimated Sub Total 51.284 Cost 5 1 Pivot irrigation system 2 300 600 ICB N/A N/A PRIOR 13/09/2010 MOA 2 Irrigation equipments 5 60 300 ICB N/A N/A PRIOR 13/09/2010 MOA (overhead) 3 Estimated Sub Total 900 Cost OTHER EQUIPMENTS 1 Milk Processor 1 80 80 NS N/A N/A POST 27/08/2010 MOA 2 Pasture/fodder breeder 1 20 20 NS N/A N/A POST 27/08/2010 MOA seed 3 Automatic standby 1 57.14 57.142 NS N/A N/A POST 27/08/2010 MOA generator 2 4 Manual standby 7 2 14 NS N/A N/A POST 27/08/2010 MOA generators 5 Installation of seed 7 2 14 NS N/A N/A POST 27/08/2010 MOA driers Estimated Sub Total 185.142 Cost GRAND TOTAL 4,899.019 Footnotes 1. Njoro research station no longer requires a motor cycle because it is not a priority as for now. So the total number of motor cycles has reduced by one i.e. from ten (10) to nine(9) 2. Njoro research station no longer requires a row planter because it is not a priority as for now. So the total number of row planters has reduced by one i.e. from ten (10) to nine (9) 3. Njoro research station requires a special seed harvester for wheat. The seed harvester for wheat is slightly more expensive than the ordinary seed harvesters. So the funds that were meant for row planter for the station was re allocated to the special harvester to cushion the difference. 6 7

Основные сведения
Тип документа Procurement Plan
Дата принятия
Источник Всемирный банк