Группа Всемирного банка · Announcement

Announcement of 13.6 Million Dollars Credit to Ghana for an Oil Palm Project on February 20, 1975

Гана Всемирный банк
Открыть оригинал документа

Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.

Полный текст

• INTERN.A.TIONAL DEVELOPMENT ASSOCIATION 1818 H STREET. N.W., WASHINGTON D. C. 20433 TELEPHONE: EXECUTIVE 3-6360 IDA News Release No. 75/7 February 20: 1975 $13.6 MILLION CREDIT TO GHANA FOR AN OIL PALM PROJECT The International Development Association, an affiliate of the World B&nk, has approved a $13.6 million credit to the Republic of Ghana to help finance an oil palm project. The project is the first phase of a 25,000-acre integrated oil palm development program based on the concept of a nucleus plantation with outgrower holdings. It involves planting 13,000 acres of oil palm about 90 miles northeast of Accra. The project includes the establishment and operation of a 10,000 acre nucleus plantation; 3000 acres of outgrower plantings accessible by moto~able roads; a 10 ton/hour palm oil mill; a fruit collection system, training of personnel; • field trials with palm oil; construction of 10 miles of road and a provision of technical assistance to the Agricultural Development Bank (ADB). The project is expected to generate.an annual production of 14,000 tons of palm oil and 3,000 tons of palm kernel; sustain and develop an industry generating a gross income of $17 million annually in a poor and relatively underdeveloped region of Ghana; anu will result in a net annual foreign exchange saving of about $5 million at full production. The nuclem~ plantation will provide employment for 600 staff and laborers and the outgrower program will benefit about 250 farmers who would serve as a base on which to expand the outgrower program in the second :phase of the project. In addition, the nucleus plantation is expeeted to have a beneficial demonstration effect on the standard of husbandry in the outgrowrr farms. The credit is for 50 years with 10 year grace period. It is interest-free except for a service charge of 3/4 of 1% to cover IDA's administrative expenses. • 1 Note: Money figures are expressed in US dollar equivalents. PROJECT: T E CHNI CAL DAT A Oil Palm Project • COUNTRY: Ghana TOTAL COST: $22 • 5 million IDA FINANCING: $13.6 million OTHER FINANCING: rThe Government of Ghana; (the outgrowers will contribute 1% of total project cost--$120,000) IMPLEMENTING ORGANIZATION: The Ghana. Oil Palm Development Corporation ( GOPD) , c/o Ministry of Economic Planning P.O. Box M-76 Accra, Ghana PROJECT DESCRIPTION: The project comprises the following: a) estab- lishment and operation of a 10,000-acre nucleus ~ plantation, and carrying out of field trials with oil palms; b) provision of technical services and credit facilities to assist smallholders develop 3,000 acres of outgrower holdings; c) construction and operation of a 10 ton/hour palm oil mill, and establishment of a fruit coll,ection system for outgrowers; d) training of personnel; e) construction of 10 miles of road in project area; and f) provision of technical assistance to the Agricultural Development Bank. PROCUREMENT: Fertilizer and insecticides; vehicles and the construction and equipment of the oil palm mill valued at $10.7 million will be procured on the basis of international competition. Civil works contracts for non-plantation roads valued at $0.3 million will be exe- cuted by contractors selected through competitive biddin. ~ locally advertised. Contracts for land clearing($1.l million) will be awarded through competitive bidding locally advertised. Portions may be carried out on a piece work basis. Retroactive financing of about $600,000 equivalent for GOPD (only a small proportion of this may now be required) and about $200,000 equivalent for technical assistance to ADE. CONSULTANTS: A consulting firm will be retained to provide the senior staff of GOPD; a plant breeding consultant will be employed during the planting period; consulting engi~eers will draw up specifications and tender documents for the oil mill and also supervise construction; and consultants have been engaged for the technical assistance to ADB. ESTI~. .ATED COMPLETION DATE: 1983/84 •

Основные сведения
Тип документа Announcement
Дата принятия
Страна Гана
Источник Всемирный банк