49461 Procurement Plan of Xinjiang Uygur Autonomous Region I. General I. Project information: [ Example: Country, Borrower, Project Name, Loan/Credit No., Project Implementing Agency (PIA) etc. The Project team may decide to have different sections to reflect projects with many PIAs ] Borrower: People's Republic of China Credit No: PIA: Xinjiang centers for disease prevention and control 2. Bank's approval Date of the procurement Plan [Original: .........; Revision 1:. ..] 3. Date of General Procurement Notice: 4. Period covered by this procurement plan: II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix I to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency's capacity.] Procurement Method Prior Review Threshold Comments 1. ICB and LIB (Goods) 2. NCB (Goods) 3. ICB (Works) 4. NCB (Works) 5. ICB (Non-Consultant Services) [Add otherlllethods ifllecessaJJ'l / 2. Procurement Packages with Methods and Time Schedule [List the Packages which require Bank's prior review first and then the other packages] I 2 3 4 5 6 7 8 9 Ref. Contract Estimated Procurcm Prequalif Domcsti Review Expected Comments No. (Description) Cost cnt ication c by Bank Bid-Opening Method (yes/llo) Prcfercn (Prior / Date ce Post) (yes/llo) I Binocular microscope 2 Desk computer 3 Portable computer 4 Portable 151,300 shopping No No Post June. 2009 computer 5 Multimedia 150,000 shopping No No Post June. 2009 projector 6 Facsimile machine 7 Copy machine 12,800 shopping No No Post June. 2009 8 Developing machine 9 Biological Safety Cabinet 10 Incubator II Vortex Vibrate machine 12 Autoclave Subtotal 314,100 I~tl'f 2 I~' JilU I rif;F'J l

Основные сведения
Тип документа Procurement Plan
Дата принятия
Страна Китай
Источник Всемирный банк