Procurement Plan I General 1 Project Information Project Name: Integrated Irrigation Improvement & Management Project Country: Arab Republic of Egypt Project ID: Loan/Credit Numbers: EGT-7291 2 Bank's approval date of Procurement Plan Original:28/2/2008 Revision 1:3/12/2008 Update 16/11/2011 Update 10/9/2012 Update 4/2/2013 Update 23/1/2014 Update 2/9/2014 Update 23/1/2015 Update 4/3/2015 Updated 8/4/2015 Updated 25/5/2015 3 Date of General Procurement Notice 1 May 2005 II Goods, Work and Non-Consulting Services Thresholds 1 Prior Review Threshold Procurement Decisions subject to Prior Review by the Bank as stated in the Loan Agreement. The Loan Agreement was amended on 2 November 2012. The amended Loan Agreement stated that "The Procurement Plan shall set forth those contracts, which shall be subject to the Bank's Prior Review. All other contracts shall be subject to Post Review by the Bank" 1a Procurement Category Prior Review Threshold (USD) Comments Goods more than or equal 250,000 Works more than or equal 500,000 Procurement Method Threshold 1b Procurement Method (USD) Comments ICB (Goods) more than or equal 500,000 NCB (Goods) Less than 500,000 Shopping (Goods) Less than or equal 20,000 ICB (Works) More than or equal 10,000,000 NCB (Works) Less than 10,000,000 Shopping (Works) Less than 50,000 Procurement Plan for Goods Updated 24/6/2015 Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008 Completed Bank’s No Review by Domestic Preparation of Bid Invitation Bid Closing Bid Opening BER Bank’s No Contract Objection to Package reference No/ Procurement Fund Estimated Bank Preference Bid Document Objection to BER Contract Contract Contract Name, City, and Completion SLNo Description of Goods Status Currency Bidding Contract No method Source(s) Cost and Contract Signing (Date) Value Currency Country of Contractor Document (prior/post) (yes/no) (Date) (Date) (Date) (Date) (Date) Award (Date) (Date) (Date) Planned Global Cars & Spare Vehicles(Lot A) 64 Double cabin Pick-Up IBRD (70%) Revised 1 IIIMP/ICB/G- 01-2007 ICB USD Prior No 8,146,461.00 EGP Parts and Spare Parts increased to 73 GoE (30%) Actual 1,532,000.00 19/Oct/06 21/Dec/06 10/Feb/07 2/Apr/07 2/Apr/07 9/Aug/07 14/Aug/07 9/Sep/07 14/Nov/07 Vehicles(Lot B) 20 4X4 Wheel Drive Planned Global Cars & Spare IBRD (70%) Revised 2 IIIMP/ICB/G- 01-2007 Utility Vehicles and Spare Parts ICB USD Prior No 3,542,269.08 EGP Parts GoE (30%) increased to 23 Actual 1,850,000.00 19/Oct/06 21/Dec/06 10/Feb/07 2/Apr/07 2/Apr/07 18/Jul/07 18/Jul/07 4/Sep/07 21/Feb/08 Planned 675,000.00 31/Jan/08 Supply of Subsurface Drainage Laterals Revised Steenbergen 3 IIIMP/ICB/G- 08-2007 ICB IBRD EUR Prior No 489,750.00 EUR Laying Machines Hollanddrain B.V Actual 440,000.00 12/Feb/07 22/Feb/07 18/Mar/07 30/Apr/07 30/Apr/07 18/Jul/07 18/Jul/07 30/Sep/07 Completed Planned 825,000.00 16/Jan/08 Supply of Subsurface Drainage Revised 4 IIIMP/ICB/G- 09-2007 ICB IBRD EUR Prior No 439,500+7000 EUR+LE Inter - Drain Sales B.V Collectors Laying Machines Actual 510,000.00 12/Feb/07 22/Feb/07 18/Mar/07 2/May/07 2/May/07 18/Jul/07 18/Jul/07 17/Sep/07 Completed Planned 650,000.00 USD 31/May/08 150 km PVC pipes with different IBRD (70%) 5 IIIMP/ICB/G- 04-2008 ICB Revised Prior No 2,853,510.00 EGP Al-Hakeem Plast diameters GoE (30%) Actual 3,577,474.00 EGP 15/Jul/07 18/Jul/07 2/Aug/07 26/Aug/07 26/Aug/07 8/Nov/07 5/Dec/07 2/Jan/08 11/Jun/08 Planned 20,000.00 IIIMP/SHOPPING 01- 6000 m PVC pipes with 200 mm IBRD (70%) Inter-Plast for PVC 6 Shopping Revised USD Post No N/A N/A 113,816.00 EGP 2007 diameters GoE (30%) Pipes Actual 20,000.00 31/May/07 31/May/07 7/Jun/07 7/Jun/07 14/Jun/07 10/Jul/07 21/Jul/07 Planned 20,000.00 IIIMP/SHOPPING 02- IBRD (70%) Quality Standard 7 ArcEditor licence PMU Shopping Revised USD Post No N/A N/A 74,200.00 EGP 2008 GoE (30%) Actual 26/Feb/08 27/Feb/08 10/Mar/08 20/Mar/08 26/Mar/08 Planned 20,000.00 IIIMP/SHOPPING 03- IBRD (70%) Quality Standard 8 ArcEditor licence for Behira Shopping Revised USD Post No N/A N/A 74,200.00 EGP 2008 GoE (30%) Actual 26/Feb/08 27/Feb/08 10/Mar/08 20/Mar/08 26/Mar/08 Planned 20,000.00 IIIMP/SHOPPING 04- IBRD (70%) Quality Standard 9 ArcEditor licence for Kafr El-Sheikh Shopping Revised USD Post No N/A N/A 74,200.00 EGP 2008 GoE (30%) Actual 26/Feb/08 27/Feb/08 9/Mar/08 20/Mar/08 26/Mar/08 Planned 20,000.00 IIIMP/SHOPPING 05- IBRD (70%) Quality Standard 10 ArcEditor licence for Tanta Shopping Revised USD Post No N/A N/A 74,200.00 EGP 2008 GoE (30%) Actual 26/Feb/08 27/Feb/08 13/Mar/08 20/Mar/08 26/Mar/08 Planned 20,000.00 IIIMP/SHOPPING 06- IBRD (70%) 11 A0 Plotters (3) Shopping Revised USD Post No N/A N/A 97,500.00 EGP Global Computec 2008 GoE (30%) Actual 18/Aug/08 8/Sep/08 11/Sep/08 28/Sep/08 IIIMP/SHOPPING 07- IBRD (70%) Planned 12 A0 scanner (1) Shopping Revised USD Post No N/A N/A 99,000.00 EGP TIC Computing 2008 GoE (30%) Actual 20,000.00 18/Aug/08 2/Sep/08 11/Sep/08 23/Oct/08 Planned 20,000.00 IIIMPSHOPPING 09- IBRD (70%) Chemical&Technical 13 Water quality testing instruments (8) Shopping Revised USD Post No N/A N/A 108,072.00 EGP 2008 GoE (30%) services Actual 20,000.00 20/Nov/08 4/Dec/08 19/Dec/08 19/Dec/08 24/Dec/08 6/Jan/09 11/May/09 Planned 20,000.00 IIIMP/SHOPPING 10- 4000 m PVC pipes with 180 mm IBRD (70%) 14 Shopping Revised USD Post No N/A 88,469.00 EGP Al-Ameen for Pipes 2009 diameters GoE (30%) Actual 20,000.00 31/Mar/09 2/Apr/09 6/Apr/09 14/Apr/09 14/Apr/09 23/Apr/09 30/Apr/09 21/May/09 Planned 20,000.00 IIIMP/SHOPPING 11- 5000 m PVC pipes with 180 & 200 mm IBRD (70%) 15 Shopping Revised USD Post No N/A N/A 108,979.00 EGP Al-Ameen for Pipes 2009 diameters GoE (30%) Actual 20,000.00 8/Jun/09 14/Jun/09 21/Jun/09 21/Jun/09 28/Jun/09 5/Jul/09 20/Oct/09 1,800,000.00 5/Dec/10 IIIMP/PMU/G6- 400 km PVC pipes with different IBRD (70%) Canal Plastic Company 16 ICB Revised EGP Prior No 6,106,046.00 EGP 5/Jun/11 ICB/2009 diameters GoE (30%) for Pipes & Fittings Actual 1,800,000.00 12/Feb/09 10/May/09 27/May/09 12/Jul/09 12/Jul/09 19/Aug/09 23/Aug/09 6/Dec/09 23/May/11 Planned 20,000.00 IIIMP/SHOPPING 08- 4000 m PVC pipes with 200 mm IBRD (70%) Goldan Pipe for make 17 Shopping Revised USD Post No N/A N/A N/A 105,464.00 EGP 2008 diameters GoE (30%) PVC Actual 20,000.00 20/Nov/08 4/Dec/08 4/Dec/08 25/Dec/08 6/Jan/09 4/Feb/09 IIIMP/SHOPPING/ 12- 1 Total Station + 2 Theodolite + 10 spirit IBRD (70%) Planned Cairo Engineering & 18 Shopping Revised USD Post No N/A N/A N/A 106,602.05 EGP 2009 level GoE (30%) Technical Actual 20,000.00 20/Jul/09 20/Jul/09 17/Aug/09 3/Sep/09 16/Sep/09 Planned Surveying systems IIIMP/SHOPPING/G13- 19 10 GPS + 6 Steel Measuring Tape Shopping CA (100%) Revised USD Post No N/A N/A N/A 33,899.00 EGP company 2009 Actual 20,000.00 1/Oct/09 1/Oct/09 9/Nov/09 10/Nov/09 19/Nov/09 Conductivity, Salinity, TDS, Specific Planned IIIMP/SHOPPING/G14- Revised 20 conductance temperature meter +6 Shopping CA (100%) EGP Post No N/A N/A N/A 20,493.00 EGP Giga systems company 2009 Rechargeable battery Actual 1/Oct/09 1/Oct/09 9/Nov/09 10/Nov/09 9/Dec/09 Revised Ibrahem Mahmoud 2/Apr/12 IIIMP/PMU/G7- The Supply of Motorcycles and IBRD (70%) Revised 14/Dec/10 23/Jan/11 21/Mar/11 2/May/11 2/May/11 21/Jun/11 27/Jun/11 Tend. Ibrahem company for 21 NCB EGP Prior No 731,280.00 EGP NCB/2011 Tricycles GoE (30%) Revised 20/Jul/11 19/Aug/11 18/Sep/11 18/Sep/11 18/Oct/11 17/Nov/11 Production of Actual 19/Jul/11 24/Jul/11 24/Aug/11 29/Sep/11 29/Sep/11 13/Dec/11 13/Dec/11 28/Dec/11 Motorcycles and its 1/Feb/12 Planned 60,000.00 1/Jun/11 1/Jul/11 30/Aug/11 14/Sep/11 IIIMP/SHOPPING/G 21- 22 Supply of GPSs Shopping CA (100%) Revised EGP Post No N/A N/A 11,000.00 EGP Zoom Technologies 2010 Actual 24/Nov/10 24/Nov/10 2/Dec/10 4/Dec/10 19/Dec/10 14/Mar/11 Planned 600,000.00 1/Jun/11 1/Sep/11 31/Jul/11 30/Aug/11 14/Sep/11 IIIMP/PMU/SHORT- Supply of Current meters and survey SHORT- Cairo Engineeering & 23 CA (100%) Revised EGP Prior No N/A N/A 303,380.00 EGP LIST/G22-2010 equipment LIST Manufacturing Co. Actual 15-Dec.-10 16/Jun/11 Planned 20,000.00 IIIMP/PMU/NCB/G25- 24 Supply of Spinit Level Shopping CA (100%) Revised USD Post No N/A N/A 27,720.00 EGP Technoscient 2011 Actual 4/Jan/11 5/Jan/11 13/Jan/11 26/Jan/11 14/Mar/11 Actual 20,000.00 IIIMP/PMU/NCB/G26- 25 Supply of Total Station Shopping CA (100%) USD Post No N/A N/A 46,000.00 EGP Surveying Syatems 2011 4/Jan/11 5/Jan/11 13/Jan/11 19/Jan/11 20/Jan/11 26/Jan/11 14/Mar/11 Planned 50,000.00 15/Jan/12 16/Apr/12 CNS Group Company IIIMP/PMU/G8-NCBG27- Revised + Leaders for 26 Supply of Computers & Printers NCB CA (100%) EGP Post No N/A N/A 48,300.00 EGP 2012 Computers and Actual 27/Feb/12 14/Mar/12 14/Mar/12 8/Apr/12 22/Apr/12 28/May/12 Electronics Company Planned 40,000.00 1/Jun/11 1/Jul/11 30/Aug/11 5/Nov/12 IIIMP/SHOPPING/G 15- IBRD (70%) Cairo Center for 27 Supply of PVC Welding Machines Shopping Revised EGP Post No 20/Dec/12 N/A 25/Dec/12 N/A 9/Jan/13 32,725.00 EGP 2012 GoE (30%) Tools&Machinery Actual 10/Sep/12 15/Sep/12 30/Sep/12 30/Sep/12 3/Oct/12 24/Oct/12 15/Dec/12 Planned 7,000.00 1/Jun/11 1/Jul/11 30/Aug/11 24/Dec/12 IIIMP/SHOPPING/G16- IBRD (70%) Cairo Center for 28 Supply of Angle Grinders Shopping Revised EGP Post No 20/Dec/12 N/A 25/Dec/12 N/A 9/Jan/13 5,720.00 EGP 2012 GoE (30%) Tools&Machinery Actual 10/Sep/12 15/Sep/12 30/Sep/12 30/Sep/12 3/Oct/12 24/Oct/12 15/Dec/12 Planned 30,000.00 1/Jun/11 1/Jul/11 30/Aug/11 5/Nov/12 IIIMP/SHOPPING/G 17- IBRD (70%) Cairo Center for 29 Supply of Water Pumps Shopping Revised EGP Post No 25/Dec/12 N/A 30/Dec/12 N/A 14/Jan/13 30,250.00 EGP 2012 GoE (30%) Tools&Machinery Actual 10/Sep/12 15/Sep/12 30/Sep/12 30/Sep/12 3/Oct/12 24/Oct/12 15/Dec/12 Planned 70,000.00 1/Jun/11 1/Jul/11 30/Aug/11 24/Dec/12 IIIMP/SHOPPING/G 18- IBRD (70%) Revised 25/Dec/12 30/Dec/12 14/Jan/13 Cairo Center for 30 Supply of Generators Shopping EGP Post No N/A N/A 68,200.00 EGP 2012 GoE (30%) Tools&Machinery Actual 10/Sep/12 15/Sep/12 30/Sep/12 30/Sep/12 3/Oct/12 24/Oct/12 6/Feb/13 Planned 2,500,000.00 1/Jun/11 1/Jul/11 31/Jul/11 30/Aug/11 29/Jun/12 IIIMP/PMU/NCB/G20- IBRD (70%) Al-Ameen company for 31 Supply of PVC Pipes for Marwa NCB Revised EGP Post No 10/Jul/13 9/Aug/13 8/Sep/13 8/Oct/13 1,541,250.00 EGP 6/Apr/14 2013 GoE (30%) PVC Pipes Actual 3,500,000.00 2/Jul/13 21/Aug/13 29/Aug/13 30/Sep/13 30/Sep/13 5/Nov/13 10/Nov/13 27/Nov/13 1/Jun/14 Ongoing Review by Domestic Preparation of Bank’s No Bid Invitation Bid Closing Bid Opening BER Bank’s No Contract Package reference No/ Procurement Fund Estimated Bank Preference Bid Document Objection to Objection to BER Contract Contract Contract Name, City, and Completion SLNo Description of Goods Status Currency Contract No method Source(s) Cost Bidding and Contract Signing (Date) Value Currency Country of Contractor (prior/post) (yes/no) (Date) Document (Date) (Date) (Date) (Date) Award (Date) (Date) Planned 750,000.00 1/May/10 20/Mar/11 Supply, delivery, Installation and Revised commissioning of Ultra Sonic Flow 1 IIIMP/ICB/G- 05-2009 ICB IBRD USD Prior No 3,918,360.00 EGP Hydro Vision Gmbh. Measurement Equipment Including Data Actual 650,000.00 9/Jul/09 9/Aug/09 6/Sep/09 4/Nov/09 4/Nov/09 28/Mar/10 31/Mar/10 3/Jun/10 Processing and Interpretation Software Planned Review by Domestic Preparation of Bank’s No Bid Invitation Bid Closing Bid Opening BER Bank’s No Contract Package reference No/ Procurement Fund Estimated Bank Preference Bid Document Objection to Objection to BER Contract Contract Contract Name, City, and Completion SLNo Description of Goods Status Currency Contract No method Source(s) Cost Bidding and Contract Signing (Date) Value Currency Country of Contractor (prior/post) (yes/no) (Date) Document (Date) (Date) (Date) (Date) Award (Date) (Date) Planned 2,000,000.00 1/May/15 1/Jun/15 1/Jul/15 31/Jul/15 29/Oct/15 IBRD (70%) 1 IIIMP/PMU/NCB/G21 Supply of Spare parts for Vehicles (Pick Up) NCB Revised EGP Post No GOV (30%) Actual 4/Jun/15 7/Jun/15 11/Jun/15 14/Jul/15 14/Jul/15 Planned 3,500,000.00 20/May/15 7/Jun/15 7/Jul/15 6/Aug/15 4/Nov/15 IBRD (70%) 2 IIIMP/PMU/NCB/G22 Supply of Spare parts for Vehicles (Brado) NCB Revised EGP Post No GOV (30%) Actual 4/Jun/15 7/Jun/15 11/Jun/15 13/Jul/15 13/Jul/15 Planned 1,000,000.00 20/May/15 7/Jun/15 7/Jul/15 6/Aug/15 4/Nov/15 Supply of Data Loggars, Modems including IBRD (70%) 3 IIIMP/PMU/NCB/G23 NCB Revised EGP Post No Accessories, and water Level Sensors GOV (30%) Actual 21/May/15 7/Jun/15 11/Jun/15 12/Jul/15 12/Jul/15 Planned 1,000,000.00 15/Jun/15 1/Jul/15 31/Jul/15 30/Aug/15 28/Nov/15 Supply of Emergency Diesel & Electric water IBRD (70%) 4 IIIMP/M&E/ICB/G24 ICB Revised USD Prior No Pumps GOV (30%) Actual 2,368,421.05 10/Jun/15 15/Jun/15 Planned 24,000,000.00 30/Jul/15 15/Aug/15 29/Sep/15 29/Oct/15 27/Mar/16 Supply and delivery of spare parts of Water IBRD (70%) 4 IIIMP/M&E/ICB/G25 ICB Revised USD Prior No Pumps GOV (30%) Actual Supply, delivery, Installation and Planned 5,000,000.00 15/Jun/15 15/Jul/15 29/Aug/15 28/Sep/15 26/Mar/16 IBRD (70%) 5 IIIMP/EPADP/ICB/G26 commissioning of Production line for Pipes ICB Revised USD Prior No GOV (30%) and Spare Parts for EPADP Pipe Factories Actual Procurement Plan for Electrification Work (Meet Yazeed Updated 24/6/2015 Area) Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008 Completed Bank’s&or Preparation of Pmu No Bid Bid Opening BER Bank’s&or Pmu Contract Procuremen Bid Invitation Contract Signing Contract SL Package reference No/ Fund Bid Document Objection to Closing No Objection to Contract Name, City, and Country of Completion District Description of Works t Status Estimated Cost Commencement Contract Value No Contract No Source(s) Bidding BER and Contract Currency Contractor method (Date) (Date) (Date) (Date) Document (Date) (Date) (Date) Award (Date) (Date) (Date) Low and Medium Volt Planned 2,000,000.00 1/Aug/10 1-Nov-10 The North Delta for electricity 27/Feb/11 1 Sidi Ghazy IIIMP/IIS/MTYZ/ELL&ELM-04-2010 Direct GoE Revised 1,611,126.00 EGP Electrification Moheet distribution Actual 6/Apr/10 10/28/2010 10/28/2010 20/Jul/11 Total completed contracts Ongoing Bank’s&or Preparation of Pmu No Bid Bid Opening BER Bank’s&or Pmu Contract Procuremen Bid Invitation Contract Signing Contract SL Package reference No/ Fund Bid Document Objection to Closing No Objection to Contract Name, City, and Country of Completion District Description of Works t Status Estimated Cost Commencement Contract Value No Contract No Source(s) Bidding BER and Contract Currency Contractor method (Date) (Date) (Date) (Date) Document (Date) (Date) (Date) Award (Date) (Date) (Date) Planned 18,060,034.00 28/Apr/09 7/Jun/09 26/Jun/09 26/Jun/09 5/Jul/09 18/Jul/09 23/Jul/09 27/Aug/09 26/Aug/11 Gharb El- El-Sherka El-Ama General Medium Volt Electrification for Revised 1 Mahalla IIIMP/IIS/MTYZ/ELM-01-2009 NCB GoE 11,859,940.00 EGP Company for Electrical Gharb El-Mahalla +Qotor Actual 28/May/09 7/Jul/09 26/Jul/09 26/Jul/09 4/Aug/09 17/Aug/09 22/Aug/09 26-Sep-09 Projects (ELEGECT) Gharb El- Planned 11,400,000.00 30/Jul/09 24/Aug/09 15/Sep/09 15/Sep/09 25/Sep/09 17/Oct/09 24/Oct/09 20/Nov/09 El-Sherka El-Ama General 19/Nov/11 Low Volt Electrification for Gharb 2 Mahalla IIIMP/IIS/MTYZ/ELL-01-2009 NCB GoE Revised 11,296,244.00 EGP Company for Electrical El-Mahalla +Qotor Actual 12,640,014.00 29/Aug/09 23/Sep/09 15/Oct/09 15/Oct/09 25/Oct/09 16/Nov/09 23/Nov/09 20-Dec-09 Projects (ELEGECT) Gharb El- Double Medium Volt Planned 15/Sep/09 24/Oct/09 14/Nov/09 14/Nov/09 23/Nov/09 5/Dec/09 8/Jan/10 17/Jan/10 Electoro ElHany for 16/Jan/11 3 Mahalla IIIMP/IIS/MTYZ/ELM-02-2009 Electrification for Gharb El- NCB GoE Revised 4,179,047.00 EGP Contracting and Electrical +Qotor Mahalla and Qotor Actual 4,647,870.00 15/Oct/09 23/Nov/09 14/Dec/09 14/Dec/09 23/Dec/09 4/Jan/10 7/Feb/10 16-Feb-10 installations Company Sidi Ghazy Medium Volt Electrification for Planned 10,000,000.00 16/Jul/10 30/Jul/10 16/Aug/10 16/Aug/10 31/Aug/10 11/Sep/10 14/Sep/10 28/Oct/10 Electoro ElHany for 27/Oct/11 4 + Kafr El IIIMP/IIS/MTYZ/ELM-03-2010 Marsa EL Gamal & El Zawya NCB GoE Revised 8,385,222.50 EGP Contracting and Electrical Shiekh (Phase 1) Actual 10,255,843.00 15/Aug/10 29/Aug/10 15/Sep/10 15/Sep/10 30/Sep/10 11/Oct/10 14/Oct/10 11/27/2010 installations Company Planned 10,000,000.00 4/Apr/12 4/May/12 3/Jun/12 07/03/2011 Electoro ElHany for 2/Jul/12 Kafr El- Low Volt Electrification for Marsa 5 IIIMP/IIS/MTYZ/ELL-02-2010 NCB GoE Revised 8,785,382.45 EGP Contracting and Electrical Sheikh EL Gamal & El Zawya (Phase 1) Actual 25/Nov/10 25/Dec/10 16/Jan/11 16/Jan/11 20/Jan/11 15/Mar/11 29/Mar/11 8/May/11 installations Company Sidi Ghazy IBRD Planned 14,000,000.00 1/Dec/12 8/Dec/12 29/Dec/12 29/Dec/12 13/Jan/13 28/Jan/13 12/Feb/13 14/Mar/13 24/Mar/14 Low Volt Electrification for Kafr El Alamia for Engineering & 6 + Kafr El IIIMP/IIS/MTYZ/ELL-03-2013 NCB (90%)GoE Revised 5,000,000.00 1/Mar/13 8/Mar/13 24/Mar/13 21/Apr/13 21/Apr/13 1/Jun/13 16/Jun/13 16/Jul/13 31/Jul/13 4,544,748.00 EGP 30/Jul/14 El Shiekh 1 (El Halafy) Contracting Shiekh (10%) Actual 7/Feb/13 3/Mar/13 17/Mar/13 16/Apr/13 16/Apr/13 30/May/13 27/Jun/13 30/Jul/13 30/Jul/13 Sidi Ghazy IBRD Planned 7,000,000.00 1/Dec/13 8/Dec/13 29/Dec/13 29/Dec/13 13/Jan/14 28/Jan/14 12/Feb/14 14/Mar/14 14/Mar/15 Low Volt Electrification for Kafr 1/Jul/13 8/Jul/13 1/Feb/14 1/Mar/14 1/Mar/14 22/Mar/14 6/Apr/14 6/May/14 21/May/14 20/May/15 7 + Kafr El IIIMP/IIS/MTYZ/ELL-04 NCB (90%)GoE Revised 4,851,940.00 EGP Conex Company El Shiekh 2 (Daramally) Shiekh (10%) Actual 9/Oct/13 12/Nov/13 17/Feb/14 19/3/2014 19/3/2014 17/Feb/14 28/5/2014 06/26/2014 Done Planned 14,000,000.00 20/Nov/12 27/Nov/12 18/Dec/12 18/Dec/12 2/Jan/13 17/Jan/13 1/Feb/13 3/Mar/13 13/Mar/14 Sidi Ghazy IBRD Medium Volt Electrification for Revised 6,000,000.00 20/Mar/13 27/Mar/13 24/Mar/13 21/Apr/13 21/Apr/13 1/Jun/13 16/Jun/13 16/Jul/13 31/Jul/13 El Alamia for Engineering & 30/Jul/14 8 + Kafr El IIIMP/IIS/MTYZ/ELM-04-2013 NCB (90%)GoE 5,248,887.52 EGP Kafr El Shiekh 1 (El Halafy) Contracting Shiekh (10%) Actual 7/Feb/13 3/Mar/13 17/Mar/13 17/Apr/13 17/Apr/13 30/May/13 27/Jun/13 30/Jul/13 30/Jul/13 Sidi Ghazy IBRD Planned 4,000,000.00 10/Dec/12 17/Dec/12 7/Jan/13 7/Jan/13 22/Jan/13 6/Feb/13 21/Feb/13 23/Mar/13 2/Apr/14 Medium Volt Electrification for El Alamia for Engineering & 9 + Kafr El IIIMP/IIS/MTYZ/ELM-05-2013 NCB (90%)GoE 3,845,427.77 EGP Kafr El Shiekh 2 (Feeder) Revised 10/Mar/13 17/Mar/13 24/Mar/13 21/Apr/13 21/Apr/13 1/Jun/13 16/Jun/13 16/Jul/13 31/Jul/13 Contracting 30/Jul/14 Shiekh (10%) Actual 7/Feb/13 3/Mar/13 17/Mar/13 18/Apr/13 18/Apr/13 30/May/13 27/Jun/13 30/Jul/13 30/Jul/13 Sidi Ghazy Medium Volt Electrification for IBRD Planned 5,000,000.00 1/Jul/13 8/Jul/13 29/Jul/13 29/Jul/13 13/Aug/13 28/Aug/13 12/Sep/13 12/Oct/13 Electoro ElHany for 12/Oct/14 10 + Kafr El IIIMP/IIS/MTYZ/ELM-06 the rest of Kafr El Shiekh 3 NCB (90%)GoE Revised 1/Jul/13 8/Jul/13 1/Feb/14 1/Mar/14 1/Mar/14 22/Mar/14 6/Apr/14 6/May/14 21/May/14 4,559,740.00 EGP Contracting and Electrical 20/May/15 Shiekh (Daramally) (10%) Actual 9/Oct/13 12/Nov/13 17/Feb/14 20/3/2014 20/3/2014 17/Feb/14 28/5/2014 07/06/2014 Done installations Company Total ongoing contracts Planned Bank’s&or Preparation of Pmu No Bid Bid Opening BER Bank’s&or Pmu Contract Procuremen Bid Invitation Contract Signing Contract SL Package reference No/ Fund Bid Document Objection to Closing No Objection to Contract Name, City, and Country of Completion District Description of Works t Status Estimated Cost Commencement Contract Value No Contract No Source(s) Bidding BER and Contract Currency Contractor method (Date) (Date) (Date) (Date) Document (Date) (Date) (Date) Award (Date) (Date) (Date) Procurement Plan for Main Canal Rehabilitation Works (Meet Yazid Area) Updated 24/6/2015 Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008 Completed Review by Domestic Bank’s&or Pmu Bid Bid Opening BER Bank’s&or Pmu Contract Contract Preparation of Bid Invitation Contract Package reference No/ Procurement Fund Bank Preference No Objection to Closing No Objection to Signing Contract Name, City, and Country of Completion SL No District Description of Works Status Estimated Cost Currency Bid Document Commencement Contract Value Contract No method Source(s) Bidding BER and Contract Currency Contractor (Date) (Date) (Date) (prior/post) (yes/no) Document (Date) (Date) (Date) (Date) Award (Date) (Date) (Date) IBRD Planned 3,539,517.00 1/Feb/11 3/Mar/11 2/Apr/11 2/Apr/11 2/May/11 2/Jul/12 IIIMP/MAIN-CANAL/MTYZ/3- Stabilize Embankments at km 24.330 to Egyptian Integrated for 1 Qotor NCB (90%)GoE Revised EGP Post No 15/Sep/12 15/Dec/12 14/Jan/13 14/Jan/13 16/Mar/13 23/Mar/13 1,418,250.00 EGP 2012 km 26.754 contracting(Medeco) (10%) Actual 2,200,000.00 6/Sep/12 12/Sep/12 15/Dec/12 15/Jan/13 15/Jan/13 1/Apr/13 24/Apr/13 28/Apr/13 29/Apr/14 Planned 1,367,250.00 15/Feb/11 17/Mar/11 16/Apr/11 16/Apr/11 16/May/11 18/Apr/14 Raise & Widen Embankments of Meet IBRD Revised 6,700,000.00 15/Sep/12 15/Dec/12 14/Jan/13 14/Jan/13 17/Mar/13 24/Mar/13 17/Jun/14 IIIMP/MAIN-CANAL/MTYZ/4- Yazeed Canal at Different Locations From moradex Company for 2 Qotor NCB (90%)GoE Actual 6,700,000.00 EGP Post No 3/Oct/12 5/Nov/12 15/Dec/12 16/Jan/13 16/Jan/13 Retendering Retendering 6,761,000.00 EGP 2012 Km 21.500 to Km 34.00 & Removal of Construction (10%) Revised 6,700,000.00 18/Mar/13 1/Apr/13 1/May/13 1/May/13 1/Jun/13 8/Jun/13 15/Jun/13 22/Jun/13 Remains at Bridge Mit Yazid km 33+160 Actual 18/Mar/13 18/Mar/13 11/Apr/13 13/May/13 13/May/13 2/Jul/13 28/Jul/13 19/Aug/13 19/Aug/13 Completed Total completed contracts Ongoing Review by Domestic Bank’s&or Pmu Bid Bid Opening BER Bank’s&or Pmu Contract Contract Preparation of Bid Invitation Contract Package reference No/ Procurement Fund Bank Preference No Objection to Closing No Objection to Signing Contract Name, City, and Country of Completion SL No District Description of Works Status Estimated Cost Currency Bid Document Commencement Contract Value Contract No method Source(s) Bidding BER and Contract Currency Contractor (Date) (Date) (Date) (prior/post) (yes/no) Document (Date) (Date) (Date) (Date) Award (Date) (Date) (Date) Planned 292,500.00 1/Jan/11 1/Jun/11 1/Jul/11 1/Jul/11 31/Jul/11 28/Nov/11 Gharb El IIIMP/MAIN-CANAL/MTYZ/1- 1 Repair Road Bridge at Mit-Yazid km 4.745 Revised 15/Dec/12 14/Jan/13 14/Jan/13 4/Mar/13 11/Mar/13 18/Mar/13 25/Mar/13 24/Jul/13 Mahalla 2012 IBRD Actual 300,000.00 20/Jul/11 4/Oct/11 15/Dec/12 17/Jan/13 17/Jan/13 16/May/13 Retendered Ahmed Mansour Mohamed NCB (90%)GoE EGP Post No 198,009.00 EGP Revised 1/Feb/14 3/Mar/14 3/Mar/14 2/Apr/14 17/Apr/14 2/May/14 9/May/14 Mohamed Abdo Company 7/Sep/14 (10%) Revised 1/Nov/14 1/Dec/14 1/Dec/14 31/Dec/14 15/Jan/15 30/Jan/15 6/Feb/15 5/Aug/15 Actual 27/Mar/14 10/Nov/14 17/Dec/14 20/Jan/15 20/Jan/15 30/Mar/15 9/Apr/15 9/Apr/15 IBRD Planned 6,200,000.00 28/Feb/11 30/Mar/11 29/Apr/11 29/Apr/11 29/May/11 27/May/12 Kafr El- IIIMP/MAIN- Embankment Stability El Zawia at km Abo Taleb Company for 2 NCB (90%)GoE Revised EGP Post No 10/Dec/12 15/Dec/12 14/Jan/13 14/Jan/13 16/May/13 23/May/13 30/May/13 6/Jun/13 8,816,053.06 EGP 5/Jun/14 Sheikh CANAL/MTYZ/10-2013 19.110 - 19.730 Contracting (10%) Actual 9,856,000.00 5/Nov/12 16/Nov/12 9/Feb/13 13/Mar/13 13/Mar/13 14/May/14 19/May/13 29/May/13 16/Mar/14 IBRD Planned 6,200,000.00 28/Feb/11 30/Mar/11 29/Apr/11 29/Apr/11 29/May/11 27/May/12 Kafr El- IIIMP/MAIN- Embankment Stability El Zawia at km 3 NCB (90%)GoE Revised EGP Post No 20/Dec/12 15/Dec/12 14/Jan/13 14/Jan/13 16/May/13 23/May/13 30/May/13 6/Jun/13 8,768,147.20 EGP Manetso Masr for Contracting 5/Jun/14 Sheikh CANAL/MTYZ/11-2013 19.730 -20.360 (10%) Actual 9,928,000.00 5/Nov/12 16/Nov/12 9/Feb/13 14/Mar/13 14/Mar/13 14/May/14 19/May/13 29/May/13 16/Mar/14 IBRD Planned 11,700,000.00 5/Jan/12 4/Feb/12 5/Mar/12 5/Mar/12 4/Apr/12 Uotelko Company for 3/Mar/14 Gharb El IIIMP/MAIN- Replacement of siphon at Samatai, km Revised 18,000,000.00 15/Feb/14 17/Mar/14 16/Apr/14 16/Apr/14 1/Jun/14 8/Jun/14 15/Jun/14 22/Jun/14 21/Dec/15 4 NCB (90%)GoE EGP Prior No 9,801,119.00 EGP Engineering,Contracting & Mahalla CANAL/MTYZ/13-2014 19.770 (10%) Actual 17,000,000.00 27/Jan/14 23/Apr/14 8/Jul/14 29/Sep/14 29/Sep/14 24/Dec/14 3/Feb/15 28/Feb/15 15/Mar/15 Supplies Planned 12,000,000.00 15/Mar/15 14/Apr/15 14/May/15 14/May/15 13/Jul/15 8/May/16 IBRD IIIMP/MAIN- Embankment Stability El Zawia Canal at ElAshry Ashour & Muhammad 5 Various NCB (90%)GoE Revised EGP Post No 9,481,850.00 EGP CANAL/MTYZ/16-2015 km 18.650- 19.11 Amasha (El Fath) (10%) Actual 16/Mar/15 19/Mar/15 26/Mar/15 26/Apr/15 26/Apr/15 12/May/15 14/May/15 IBRD Planned 3,000,000.00 27/May/15 31/May/15 1/Jun/15 1/Jun/15 Uotelko Company For 29/Sep/15 Gharb El IIIMP/MAIN- Revised 6 Replacement of Beltag Siphon Direct (90%)GoE EGP Prior No 2,368,169.25 EGP Engineering, Contracting and Mahalla CANAL/MTYZ/17/2015 ???? ?????? (10%) Actual 2/Jun/15 7/Jun/15 15/Jun/15 Supplies Total ongoing contracts Planned Review by Domestic Bank’s&or Pmu Bid Bid Opening BER Bank’s&or Pmu Contract Contract Preparation of Bid Invitation Contract Package reference No/ Procurement Fund Bank Preference No Objection to Closing No Objection to Signing Contract Name, City, and Country of Completion SL No District Description of Works Status Estimated Cost Currency Bid Document Commencement Contract Value Contract No method Source(s) Bidding BER and Contract Currency Contractor (Date) (Date) (Date) (prior/post) (yes/no) Document (Date) (Date) (Date) (Date) Award (Date) (Date) (Date) Planned 7,600,000.00 28/Feb/11 30/Mar/11 29/Apr/11 29/Apr/11 29/May/11 24/Mar/13 IBRD Revised 15/Nov/12 1/Apr/14 2/May/14 2/May/14 1/Jun/14 16/Jun/14 1/Jul/14 8/Jul/14 EGP 7/May/15 Kafr El- IIIMP/MAIN-CANAL/MTYZ/6- Embankment Stability Meet Yazeed at 1 NCB (90%)GoE Actual 8,955,000.00 EGP Post No 4/Nov/12 16/Nov/12 Tender Cancelled Sheikh 2015 Km58.00 to 58.400 (10%) Revised 5,000,000.00 1/Jun/15 8/Jun/15 8/Jul/15 8/Jul/15 7/Aug/15 14/Aug/15 21/Aug/15 28/Aug/15 25/Mar/16 Actual 28/May/15 28/May/15 29/May/15 29/Jun/15 29/Jun/15 Planned 7,500,000.00 28/Feb/11 30/Mar/11 29/Apr/11 29/Apr/11 29/May/11 24/Mar/13 IBRD Revised 15/Nov/12 1/Apr/14 2/May/14 2/May/14 1/Jun/14 16/Jun/14 1/Jul/14 8/Jul/14 7/May/15 Kafr El- IIIMP/MAIN-CANAL/MTYZ/7- Embankment Stability Meet Yazeed at 2 NCB (90%)GoE Actual 8,925,000.00 EGP Post No 4/Nov/12 16/Nov/12 Tender Cancelled EGP Sheikh 2015 Km61.500 to Km61.900 (10%) Revised 5,000,000.00 1/Jun/15 8/Jun/15 8/Jul/15 8/Jul/15 7/Aug/15 14/Aug/15 21/Aug/15 28/Aug/15 25/Mar/16 Actual 28/May/15 28/May/15 29/May/15 30/Jun/15 30/Jun/15 Planned 6,500,000.00 28/Feb/11 30/Mar/11 29/Apr/11 29/Apr/11 29/May/11 24/Mar/13 IBRD Revised 15/Nov/12 1/Apr/14 2/May/14 2/May/14 1/Jun/14 16/Jun/14 1/Jul/14 8/Jul/14 7/May/15 Kafr El- IIIMP/MAIN-CANAL/MTYZ/8- Embankment Stability Meet Yazeed at 3 NCB (90%)GoE Actual 7,985,000.00 EGP Post No 4/Nov/12 16/Nov/12 Tender Cancelled EGP Sheikh 2015 Km62.650 to Km63.00 (10%) Revised 5,000,000.00 1/Jun/15 8/Jun/15 8/Jul/15 8/Jul/15 7/Aug/15 14/Aug/15 21/Aug/15 28/Aug/15 25/Mar/16 Actual 28/May/15 28/May/15 29/May/15 1/Jul/15 1/Jul/15 Inspection and Rehabilitation of Siphons IIIMP/MAIN-CANAL/MTYZ/2- Beltag Done by force account 4 Qotor at Samatay and Beltag,Mit Yazid Km 19- EGP 2012 and Samaty investigation done 21 Cancelled Cancelled 5 Qotor IIIMP/MAIN-CANAL/MTYZ/5- Scour at bridge Mit Yazid km33+160 Included in another contract EGP Cancelled Cancelled Planned 635,100.00 15/Mar/11 14/Apr/11 14/May/11 14/May/11 13/Jun/11 4/Dec/12 IBRD Kafr El- Raising Embankment & Pitching Works Revised 3,000,000.00 25/Feb/14 27/Mar/14 26/Apr/14 26/Apr/14 12/May/14 19/May/14 26/May/14 2/Jun/14 26/Aug/15 6 IIIMP/MAIN-CANAL/MTYZ/9- Cancelled (90%)GoE EGP Post No EGP Sheikh for El Zawia at Different Locations Revised 1/Jun/15 8/Jun/15 8/Jul/15 8/Jul/15 7/Aug/15 14/Aug/15 21/Aug/15 28/Aug/15 25/Mar/16 (10%) Actual Planned 353,000.00 1/Jan/12 31/Jan/12 1/Mar/12 1/Mar/12 31/Mar/12 30/Sep/12 Cancelled, IBRD Revised 1/Apr/14 1/May/14 31/May/14 31/May/14 16/Jun/14 23/Jun/14 30/Jun/14 7/Jul/14 3/Jan/15 Gharb El IIIMP/MAIN- Scour at bridge cluster at Mit Yazid km 7 Scoure is (90%)GoE Revised 1,500,000.00 EGP Post No 1/Jun/15 1/Jul/15 31/Jul/15 31/Jul/15 16/Aug/15 23/Aug/15 30/Aug/15 6/Sep/15 EGP 4/Mar/16 Mahalla CANAL/MTYZ/12/2015 4+721 stable (10%) Actual IBRD Planned 300,000.00 20/Dec/12 25/Dec/12 8/Feb/13 10/Mar/13 Gharb El IIIMP/MAIN- Scour at Samatai Siphon at Mit Yazid km Revised 1/May/14 31/May/14 31/May/14 16/Jun/14 23/Jun/14 30/Jun/14 16/May/14 15/Jul/14 8 Cancelled (90%)GoE EGP Post No EGP Mahalla CANAL/MTYZ/14- 19+777 (10%) Actual 127,000.00 28/Feb/13 Rehabilitation of Meet Yazeed IBRD Planned 6,000,000.00 20/Nov/14 20/Dec/14 19/Jan/15 19/Jan/15 20/Mar/15 19/Mar/16 IIIMP/MAIN- 9 Qotor Embankment at Different Location NCB (90%)GoE Revised EGP Post No 31/May/15 7/Jun/15 7/Jul/15 7/Jul/15 5/Sep/15 EGP 2/Apr/16 CANAL/MTYZ/15-2015 Contract 1 (from km 22.700 to Km 26.500) (10%) Actual 5,000,000.00 17/Jun/15 23/Jun/15 Rehabilitation of Meet Yazeed IBRD Planned 6,000,000.00 20/Nov/14 20/Dec/14 19/Jan/15 19/Jan/15 20/Mar/15 19/Mar/16 IIIMP/MAIN- Revised 31/May/15 7/Jun/15 7/Jul/15 7/Jul/15 5/Sep/15 2/Apr/16 10 Qotor Embankment at Different Location NCB (90%)GoE EGP Post No EGP CANAL/MTYZ/18-2015 Contract 2 (10%) Actual 6,000,000.00 18/Jun/15 23/Jun/15 Rehabilitation of Meet Yazeed IBRD Planned 6,000,000.00 20/Nov/14 20/Dec/14 19/Jan/15 19/Jan/15 20/Mar/15 19/Mar/16 IIIMP/MAIN- 11 Various Embankment at Different Location NCB (90%)GoE Revised EGP Post No 31/May/15 7/Jun/15 7/Jul/15 7/Jul/15 5/Sep/15 EGP 2/Apr/16 CANAL/MTYZ/19-2015 Contract 3 (10%) Actual 6,000,000.00 24/Jun/15 PS The name of Contract No. IIIMP/MAIN-CANAL/MTYZ/9 has changed to be as shown above (as the pitching works was added and different locations for raising are needed as old locations was done by the Government) The name of Contract No. IIIMP/MAIN-CANAL/MTZ 6 &7&8 have changed as the locations for the constructions was shifted The name of Contract No. IIIMP/MAIN-CANAL/MTYZ/15/2015 has changed to be as shown above The Investigation of Beltag and Samatay Siphons done in 2012 by force account from the drainage maintenance directorate Procurement Plan for Branch Canal Rehabilitation Works (Meet Yazeed Area) Updated 24/6/2015 Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008 Completed Review by Domestic Preparation of Bank’s&or Pmu No Bid Invitation Bid Bid Opening BER Bank’s&or Pmu Contract Contract Signing Contract Package reference No/ Procurement Fund Bank Preference Bid Document Objection to Closing No Objection to Contract Name, City, and Country of Completion SL No District Description of Works Status Estimated Cost Currency Commenceme Contract Value Contract No method Source(s) Bidding Document BER and Contract Currency Contractor (Date) nt (Date) (prior/post) (yes/no) (Date) (Date) (Date) (Date) (Date) (Date) Award (Date) (Date) Planned 1,650,000.00 26/Jun/07 14/Jul/07 21/Jul/07 15/Aug/07 15/Aug/07 8/Sep/07 3/Oct/07 24/Oct/07 14/Mar/09 Gharb El- Mesqa intake contract for Mit Yazid direct IBRD (70%) Adel Abdel Azez El- Shahawy 1 IIIMP/IIS/MITYZ/W01-2008 NCB Revised EGP Prior No 1,536,757.20 EGP 20/Oct/09 Mahalla Right from intake to km 21.600 GoE (30%) Company Actual 1,610,100.00 18/Sep/07 28/Nov/07 9/Feb/08 1/Mar/08 1/Mar/08 27/Mar/08 6/Apr/08 21/Apr/08 22/Apr/08 1/Mar/10 Mesqa intake contract for Mit Yazid direct Planned 2,800,000.00 26/Jun/07 14/Jul/07 21/Jul/07 15/Aug/07 15/Aug/07 8/Sep/07 3/Oct/07 30/Oct/07 14/Mar/09 Gharb El- IBRD (70%) Adel Abdel Azez El- Shahawy 2 IIIMP/IIS/MTYZ/W02-2008 Left from intake to km 21.601 & Nisheel El- NCB Revised EGP Prior No 2,707,429.19 EGP 20/Apr/09 Mahalla GoE (30%) Company Gededa & Khadiga Actual 2,200,000.00 10/Oct/07 3/Jan/08 9/Feb/08 2/Mar/08 2/Mar/08 25/Mar/08 6/Apr/08 21/Apr/08 22/Apr/08 20/Oct/09 Planned 4,034,400.00 26/Jun/07 2/Jul/07 14/Jul/07 21/Jul/07 15/Aug/07 8/Sep/07 22/Sep/07 3/Oct/07 8/May/10 Gharb El- Improvement of Works for Nesheel Canal IBRD (70%) Ibrahem Mohammed Abo Borda 3 IIIMP/IIS/MTYZ/W03-2008 NCB Revised EGP Prior No 4,701,350.00 EGP Mahalla and its Branches GoE (30%) Office Actual 4,750,000.00 25/Nov/08 1/Dec/08 18/Dec/08 17/Jan/09 17/Jan/09 3/Mar/09 24/Mar/09 30/Apr/09 9/May/09 8/May/10 Planned 3,800,000.00 26/Jun/07 14/Jul/07 21/Jul/07 15/Aug/07 15/Aug/07 8/Sep/07 3/Oct/07 24/Oct/07 20/Apr/09 Gharb El- Mesqa Intakes along Bahr Nemra El- IBRD (70%) 4 IIIMP/IIS/MTYZ/W04-2008 NCB Revised EGP Prior No 3,640,600.00 EGP El Asar Office for Contracting 20/Jun/09 Mahalla Banwan & Ahmed Basha Rashid Canals GoE (30%) Actual 3,348,820.00 18/Sep/07 21/Nov/07 9/Feb/08 3/Mar/08 3/Mar/08 25/Mar/08 6/Apr/08 21/Apr/08 21/Apr/08 20/Jun/09 Improvement of Mesqa intakes on Planned 1/Jan/11 1/Apr/11 14/Jul/11 Kafr El- Mares EL - Gamle from head to km IBRD (70%) 5 IIIMP/IIS/MTYZ/W05-2010 NCB Revised EGP Prior No 1/Jul/10 5,854,660.00 EGP El Asar Office for Contracting Sheikh 10.000& Kafr EL Morabeen& El Bashair& GoE (30%) Actual 6,269,950.00 9/May/10 13/May/10 22/May/10 22/Jun/10 22/Jun/10 1/Jul/10 21/Jul/10 15/Sep/10 15/Sep/10 13/Oct/11 Mafroza El Sheikh ( KafrWorks Mesqa intake for District - Kafr El EL - Shamarka Planned 1,328,800.00 15/Jun/11 9/Mar/12 Kafr El- EL - Gedida & Shorafa canals and Direct IBRD (70%) Cooperative Society for 6 IIIMP/IIS/MTYZ/W06-2010 NCB Revised EGP Prior No 1,221,750.00 EGP 9/Mar/13 Sheikh El Zawia canal Right Side from km 5.963 GoE (30%) Architectural Works Actual 1,275,200.00 22/Sep/10 6/Dec/10 18/Dec/10 31/Jan/11 31/Jan/11 28/Feb/11 23/May/11 10/Jul/11 10/Jul/11 9/Dec/12 to 6.252 Mit Yazeed Command Area in Planned 1,000,000.00 3/Jun/11 3/Jul/11 2/Aug/11 2/Aug/11 1/Sep/11 16/Sep/11 20/Mar/13 Gharb El- Bahr Nemra and Other Branch Canals IBRD (70%) 7 IIIMP/IIS/MTYZ/W08/2012 NCB Revised EGP Prior No 1/Feb/12 2/Mar/12 2/Mar/12 1/Apr/12 8/Apr/12 6,137,721.00 EGP El Asar Office for contracting 20/Mar/13 Mahalla Rehabilitation Mit Yazid Command Area GoE (30%) Actual 7,477,350.00 2/May/11 18/Oct/11 4/Jan/12 6/Feb/12 6/Feb/12 11/Mar/12 12/Mar/12 21/Apr/12 21/Apr/12 NesheelEl Gedeeda and El Shoka Branch Planned 3,000,000.00 1/Mar/12 31/Mar/12 30/Apr/12 30/Apr/12 30/May/12 6/Jun/12 30/Nov/13 Gharb El- IBRD (90%)GoE 8 IIIMP/IIS/MTYZ/W10-A Canals Rehabilitation Mit Yazid Command NCB Revised EGP Post No 15/Aug/12 14/Sep/12 14/Oct/12 14/Oct/12 1/Apr/13 8/Apr/13 2,658,275.00 EGP El Asar Office for contracting Mahalla (10%) Area Actual 3,163,400.00 23/Aug/12 12/Sep/12 17/Oct/12 18/Nov/12 18/Nov/12 16/Dec/12 18/Feb/13 1/Apr/13 1/Apr/13 Koum EL Roz El Kadeema and Other Planned 3,000,000.00 1/Mar/12 31/Mar/12 30/Apr/12 30/Apr/12 30/May/12 6/Jun/12 23/Feb/14 Kafr El- IBRD (90%)GoE Cooperative Socicty for 9 IIIMP/IIS/MTYZ/W10-C-2012 Canals Rehabilitation Mit Yazid Command NCB Revised EGP Post No 10/Sep/12 10/Oct/12 9/Nov/12 9/Nov/12 24/Mar/13 31/Mar/13 4,417,252.00 EGP Sheikh (10%) Construction &Development Area Actual 5,078,050.00 5/Sep/12 13/Sep/12 17/Oct/12 19/Nov/12 19/Nov/12 16/Dec/12 18/Feb/13 23/Mar/13 24/Mar/13 22/May/14 Planned 5,500,000.00 1/Mar/12 31/Mar/12 30/Apr/12 30/Apr/12 30/May/12 6/Jun/12 5/Jun/13 Kafr El- El Halafy and Other Branch Canals IBRD (90%)GoE 10 IIIMP/IIS/MTYZ/W11-2012 NCB Revised EGP Post No 15/Sep/12 20/Nov/12 20/Dec/12 20/Dec/12 1/Apr/13 8/Apr/13 5,111,825.00 EGP el Amana for General Contracting 7/Apr/14 Sheikh Rehabilitation Mit Yazid Command Area (10%) Actual 7,320,000.00 4/Oct/12 5/Nov/12 7/Dec/12 6/Jan/13 6/Jan/13 21/Jan/13 4/Mar/13 1/Apr/13 1/Apr/13 27/Apr/15 Preparation of civil works for ultrasonic Planned 900,000.00 15/Feb/11 1/Jun/11 1/Jul/11 1/Jul/11 31/Jul/11 6/Feb/12 IBRD (70%) 11 Various IIIMP/IS/MTYZ/W2-2011 flow meters and water levels equipment NCB Revised EGP Post No 30/Sep/11 1/Oct/11 1,140,068.75 EGP Eng. Abrahem Abo Bourda Office 5/Mar/13 GoE (30%) along meet yazeed canal and its branches Actual 979,700.00 3/Mar/11 N/A 9/Apr/11 9/May/11 9/May/11 N/A 10/Aug/11 10/Aug/11 5/Jan/13 Total completed contracts Ongoing Review by Domestic Preparation of Bank’s&or Pmu No Bid Invitation Bid Bid Opening BER Bank’s&or Pmu Contract Contract Signing Contract Package reference No/ Procurement Fund Bank Preference Bid Document Objection to Closing No Objection to Contract Name, City, and Country of Completion SL No District Description of Works Status Estimated Cost Currency Commenceme Contract Value Contract No method Source(s) Bidding Document BER and Contract Currency Contractor (Date) nt (Date) (prior/post) (yes/no) (Date) (Date) (Date) (Date) (Date) (Date) Award (Date) (Date) Mesqa intakes contract for El Zawia Planned 2,826,000.00 2/Jun/11 2/Jul/11 1/Aug/11 1/Aug/11 31/Aug/11 15/Sep/11 14/Sep/12 Right Side Ganabias No. 2,3,4 and the Kafr El- IBRD (70%) Revised 9/Nov/10 21/Jul/11 20/Aug/11 20/Aug/11 19/Nov/11 26/Nov/11 Cooperative Socicty for 25/Nov/12 1 IIIMP/IIS/MTYZ/W-07-2010 Branch of Ganabia 3, and the Al Zawia NCB EGP Prior No 4,030,495.50 EGP Sheikh GoE (30%) Construction &Development Left Side Ganabias No. 2,3,4,5,6 and Kom Actual 5,116,900.00 27/Jan/11 7/Jul/11 25/Jul/11 25/Aug/11 25/Aug/11 16/Oct/11 19/Oct/11 1/Dec/11 1/Dec/11 Al-Roz Al Kadema and Kom Al Roz Al Planned 3,000,000.00 5/Jun/11 5/Jul/11 4/Aug/11 4/Aug/11 3/Sep/11 18/Sep/11 17/Sep/12 IBRD Revised 1/Feb/12 2/Mar/12 2/Mar/12 1/Apr/12 8/Apr/12 8/Apr/13 Kafr El- Dakalt and Other Branch Canals 2 IIIMP/IIS/MTYZ/W09-2012 NCB (90%)GoE EGP Post No 8,994,600.00 EGP Ahmed Abo Eleneen Sheikh Rehabilitation Mit Yazid Command Area Revised 2/May/11 18/Oct/11 4/Jan/12 7/Feb/12 7/Feb/12 19/Mar/12 20/Mar/12 Retendered (10%) Revised 10/Oct/12 9/Nov/12 9/Nov/12 8/Apr/13 15/Apr/13 15/Apr/14 9,853,750.00 19/Mar/12 20/Mar/12 17/Oct/12 17/Nov/12 17/Nov/12 17/Mar/13 31/Mar/13 30/Apr/13 2/May/13 Planned 4,000,000.00 1/Mar/12 31/Mar/12 30/Apr/12 30/Apr/12 30/May/12 6/Jun/12 5/Jun/13 Kafr El- Mars El Gamal and Other Canals IBRD (90%)GoE Al-Amro Office for Contracting 3 IIIMP/IIS/MTYZ/W10-B-2012 NCB Revised EGP Post No 15/Sep/12 20/Nov/12 20/Dec/12 20/Dec/12 29/Mar/13 5/Apr/13 1,842,968.89 EGP 4/Apr/14 Sheikh Rehabilitation Mit Yazid Command Area (10%) Actual 2,425,700.00 4/Oct/12 5/Nov/12 5/12/25012 15/Jan/13 15/Jan/13 21/Jan/13 18/Feb/13 24/Mar/13 24/Mar/13 planned Review by Domestic Preparation of Bank’s&or Pmu No Bid Invitation Bid Bid Opening BER Bank’s&or Pmu Contract Contract Signing Contract Package reference No/ Procurement Fund Bank Preference Bid Document Objection to Closing No Objection to Contract Name, City, and Country of Completion Sn District Description of Works Status Estimated Cost Currency Commenceme Contract Value Contract No method Source(s) Bidding Document BER and Contract Currency Contractor (Date) nt (Date) (prior/post) (yes/no) (Date) (Date) (Date) (Date) (Date) (Date) Award (Date) (Date) Planned 5,000,000.00 1/Nov/14 1/Dec/14 31/Dec/14 31/Dec/14 30/Jan/15 6/Feb/15 5/Feb/16 Sidi Rehabilitation of Halafy and Other Branch IBRD (90%)GoE 1 IIIMP/IIS/MTYZ/W12/2015 NCB Revised EGP Post No 1/May/15 31/May/15 30/Jun/15 30/Jun/15 30/Jul/15 6/Aug/15 1/Jun/16 Ghazy Canal Structures (10%) Actual Planned 2,066,000.00 25/May/15 1/Jun/15 1/Jul/15 1/Jul/15 31/Jul/15 7/Aug/15 4/Mar/16 Gharb EL Rehabilitation of Branch Canals at Gharb IBRD (90%)GoE 2 IIIMP/IS/MTYZ/W13/2015 NCB Revised EGP Post No Mahala EL Mahala District: Contract No. 1 (10%) Actual 2,066,000.00 18/Jun/15 21/Jun/15 Planned 6,705,000.00 25/May/15 1/Jun/15 1/Jul/15 1/Jul/15 31/Jul/15 7/Aug/15 4/Mar/16 Gharb EL Rehabilitation of Branch Canals at Gharb IBRD (90%)GoE 3 IIIMP/IS/MTYZ/W14/2015 NCB Revised EGP Post No Mahala EL Mahala District: Contract No.2 (10%) Actual 6,705,000.00 18/Jun/15 21/Jun/15 Planned 2,100,000.00 25/May/15 1/Jun/15 1/Jul/15 1/Jul/15 31/Jul/15 7/Aug/15 4/Mar/16 Gharb EL Rehabilitation of Branch Canals at Gharb IBRD (90%)GoE 4 IIIMP/IS/MTYZ/W15/2015 NCB Revised EGP Post No Mahala EL Mahala District: Contract No. 3 (10%) Actual 2,100,000.00 18/Jun/15 21/Jun/15 Planned 1,900,000.00 25/May/15 1/Jun/15 1/Jul/15 1/Jul/15 31/Jul/15 7/Aug/15 4/Mar/16 Gharb EL Rehabilitation of Branch Canals at Gharb IBRD (90%)GoE 5 IIIMP/IS/MTYZ/W16/2015 NCB Revised EGP Post No Mahala EL Mahala District: Contract No. 4 (10%) Actual 1,900,000.00 18/Jun/15 21/Jun/15 Planned 1,800,000.00 25/May/15 1/Jun/15 1/Jul/15 1/Jul/15 31/Jul/15 7/Aug/15 4/Mar/16 Rehabilitation of Branch Canals at Qotoor IBRD (90%)GoE 6 Qotoor IIIMP/IS/MTYZ/W17/2015 NCB Revised EGP Post No District: Contract No. 1 (10%) Actual 18,000,000.00 18/Jun/15 21/Jun/15 Planned 2,360,000.00 25/May/15 1/Jun/15 1/Jul/15 1/Jul/15 31/Jul/15 7/Aug/15 4/Mar/16 Rehabilitation of Branch Canals at Qotoor IBRD (90%)GoE 7 Qotoor IIIMP/IS/MTYZ/W18/2015 NCB Revised EGP Post No District: Contract No. 2 (10%) Actual 2,360,000.00 18/Jun/15 21/Jun/15 Planned 1,800,000.00 25/May/15 1/Jun/15 1/Jul/15 1/Jul/15 31/Jul/15 7/Aug/15 4/Mar/16 Rehabilitation of Branch Canals at Qotoor IBRD (90%)GoE 8 Qotoor IIIMP/IS/MTYZ/W19/2015 NCB Revised EGP Post No District: Contract No. 3 (10%) Actual 1,800,000.00 18/Jun/15 21/Jun/15 Procurement Plan for Meska Improvement Rehabilitation Works (Meet Yazeed Area) Updated 1/5/2015 Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008 Updated 24/6/2015 Completed Area Review by Domestic Preparation of Bank’s&or Pmu No Bid Invitation Bid Bid Opening BER Bank’s&or Pmu No Contract Contract Signing Contract Package reference No/ Procurement Fund Bank Preference Bid Document Objection to Closing Objection to BER Contract Name, City, and Country of Completion SL No District Description of Works Status Estimated Cost Currency Commencement Contract Value Contract No method Source(s) Bidding Document and Contract Award Currency Contractor (Date) (Date) (fed) (prior/post) (yes/no) (Date) (Date) (Date) (Date) (Date) (Date) (Date) (Date) Planned 4,950,000.00 1/Oct/09 11/Oct/09 18/Oct/09 18/Nov/09 18/Nov/09 17/Dec/09 31/Dec/09 10/Jan/10 17/Sep/10 Ali Youssry Company for Gharb El- Meska Improvement Works in Mit Yazid Direct IBRD (70%) Revised Retendered 1 Mahalla IIIMP/IIS/MTYZ/MQ-01-2009 1,144 NCB GoE (30%) EGP Prior No 5,495,136.00 EGP Contracting from intake km 9.120 Revised Retendered Actual 5,500,000.00 5/Feb/09 19/Mar/09 29/Aug/09 28/Sep/09 28/Sep/09 15/Oct/09 29/Oct/09 9/Nov/09 15/Nov/09 17/Feb/11 Planned 7,235,000.00 1/Oct/09 11/Oct/09 27/Jun/09 28/Jul/09 28/Jul/09 5/Aug/09 19/Aug/09 10/Jan/10 17/Sep/10 Gharb El- Meska Improvement Works for Bahr Nemra Left IBRD (70%) Al-Amro Office for Contracting 2 Mahalla IIIMP/IIS/MTYZ/MQ-02-2009 990 NCB GoE (30%) Revised EGP Prior No 3/May/09 19/Mar/09 15/Apr/09 15/May/09 15/May/09 10/Oct/09 18/Oct/09 18/Nov/09 5,229,560.00 EGP 26/Jul/10 Side from Intake to the Km 4.8 Actual 5,152,795.00 28/Apr/09 24/May/09 27/Jun/09 27/Jul/09 27/Jul/09 13/Aug/09 17/Aug/09 10/Sep/09 10/Sep/09 30/Dec/10 Planned 7,620,000.00 1/Apr/09 11/Apr/09 18/Apr/09 19/May/09 19/May/09 19/Jun/09 2/Sep/09 14/Sep/09 22/May/10 Gharb El- Meska Improvement Works for Bahr Nemra IBRD (70%) Al-Amro Office for Contracting 3 Mahalla IIIMP/IIS/MTYZ/MQ-03-2009 1,447 NCB GoE (30%) Revised EGP Prior No 7,995,413.30 EGP Right Side from Intake to the Km 4.8 Actual 7,900,000.00 30/Apr/09 24/May/09 27/Jun/09 28/Jul/09 28/Jul/09 13/Aug/09 19/Aug/09 10/Sep/09 10/Sep/09 31/Dec/10 Mesqa Improvement Works in El Banawan Planned 4,900,000.00 3/Jan/10 13/Jan/10 20/Jan/10 21/Feb/10 21/Feb/10 21/Mar/10 4/Apr/10 18/Apr/10 24/Dec/10 Gharb El- IBRD (70%) Al-Amro Office for Contracting 4 Mahalla IIIMP/IIS/MTYZ/MQ-06-2009 Branch Canal - Left Side from the intake to the 1,218 NCB GoE (30%) Revised EGP Prior No 23/Aug/09 12/Oct/09 26/Oct/09 23/Nov/09 7,049,083.00 EGP 31/Jul/10 End Actual 6,900,000.00 21/Jun/09 23/Jun/09 8/Jul/09 9/Aug/09 9/Aug/10 23/Aug/09 30/Aug/09 3/Oct/09 3/Oct/09 19/Jul/10 Planned 8,488,855.00 1/Oct/09 12/Oct/09 29/Oct/09 19/Nov/09 19/Nov/09 19/Dec/09 2/Jan/10 22/Jan/10 Ali Youssry Company for 29/Sep/10 Gharb El- Mesqa Improvement Works in Khadiga Branch IBRD (70%) 5 Mahalla IIIMP/IIS/MTYZ/MQ-08-2009 1,305 NCB GoE (30%) Revised EGP Prior No 1/Sep/09 14/Oct/09 14/Nov/09 28/Nov/09 18/Dec/09 7,628,525.00 EGP Contracting 25/Aug/10 canal Actual 6,961,485.00 11/Jul/09 23/Aug/09 12/Sep/09 12/Oct/09 12/Oct/09 8/Nov/09 23/Nov/09 26/Dec/09 26/Dec/09 25/Oct/10 Improvement of Mesqas and Delivery Works for Planned 4,465,000.00 1/Jun/12 1/Jul/12 31/Jul/12 31/Jul/12 30/Aug/12 6/Sep/12 4/May/13 IBRD (70%) Al-Amro Office for Contracting 6 Sidi Ghazey IIIMP/IIS/MTYZ/MQ-09-2009 Al Mohet canal (Sidi Gazi District - Kafr Elshiekh 1,001 NCB GoE (30%) Revised 4,701,000.00 EGP Prior No 1/Jan/11 1/Mar/11 5,283,708.00 EGP 6/Nov/11 ) Actual 6,356,390.00 21/Jul/09 23/Aug/09 10/Feb/10 10/Mar/10 10/Mar/10 21/Mar/10 31/Mar/10 26/Apr/10 26/Apr/10 25/Feb/11 Mesqa Improvement Works in Nesheel El- Planned 6,268,725.00 1/Oct/09 12/Oct/09 19/Oct/09 19/Nov/09 19/Nov/09 19/Dec/09 2/Jan/10 22/Jan/10 Abnaa Ahmed Hamed Samaha 29/Sep/10 Gharb El- IBRD (70%) 7 Mahalla IIIMP/IIS/MTYZ/MQ-10-2009 Kadima Branch Canal Right Bank from the 1,109 NCB GoE (30%) Revised EGP Prior No 30/Aug/09 18/Oct/09 7,824,367.20 EGP Company Intake to the End Actual 7,400,000.00 13/Aug/09 1/Sep/09 12/Sep/09 13/Oct/09 13/Oct/09 8/Nov/09 23/Nov/09 2/Jan/10 2/Jan/10 Alexandria 1/Jan/11 Planned 4,700,000.00 1/Oct/09 12/Oct/09 19/Oct/09 19/Nov/09 19/Nov/09 19/Dec/09 2/Jan/10 22/Jan/10 29/Sep/10 Gharb El- Meska Improvement Works in Neshil El-Kadima IBRD (70%) Al-Huda Company for Contracting 8 Mahalla IIIMP/IIS/MTYZ/MQ-11-2009 910 NCB GoE (30%) Revised EGP Prior No 5,745,916.80 EGP Branch canal Left bank from Km 8.145 to the end Actual 5,400,000.00 13/Aug/09 1/Sep/09 12/Sep/09 14/Oct/09 14/Oct/09 29/Oct/09 23/Nov/09 26/Dec/09 26/Dec/09 25/Jan/11 Planned 5,400,000.00 1/Oct/09 12/Oct/09 19/Oct/09 19/Nov/09 19/Nov/09 19/Dec/09 2/Jan/10 22/Jan/10 29/Sep/10 Gharb El- Mesqa Improvement Works for Waslet Nesheel IBRD (70%) Al-Amro Office for Contracting 9 Mahalla IIIMP/IIS/MTYZ/MQ-13-2009 1,028 NCB GoE (30%) Revised EGP Prior No 5,494,475.00 EGP and El-Shiekha Branch canals Actual 5,850,000.00 16/Sep/09 18/Oct/09 7/Nov/09 6/Dec/09 6/Dec/09 27/Dec/09 5/Jan/10 20/Jan/10 20/Jan/10 19/Jan/11 Mesqa Improvement Works for Nesheel El- Planned 5,500,000.00 1/Nov/09 12/Nov/09 19/Nov/09 20/Dec/09 20/Dec/09 20/Jan/10 3/Feb/10 17/Feb/10 25/Oct/10 Gharb El- IBRD (70%) 10 Mahalla IIIMP/IIS/MTYZ/MQ-14-2009 Kadima Branch canal Left bank from intake to 944 NCB GoE (30%) Revised EGP Prior No 5,494,892.60 EGP El- Aaser for Contracting Km 8.145 Actual 5,559,000.00 22/Nov/09 8/Dec/09 22/Dec/09 19/Jan/10 19/Jan/10 4/Feb/10 21/Feb/10 15/Mar/10 15/Mar/10 14/Jan/11 Mesqa Improvement Works for Bahr Nemra Planned 3,830,000.00 1/Oct/09 11/Oct/09 18/Oct/09 19/Nov/09 19/Nov/09 19/Dec/09 2/Jan/10 14/Jan/10 21/Sep/10 Gharb El- IBRD (70%) Adel Abdel Azez El- Shahawy 11 Mahalla IIIMP/IIS/MTYZ/MQ-15-2009 Branch canal left Bank from km. 4.800 to km 834 NCB GoE (30%) Revised EGP Prior No 3,643,182.50 EGP Company 7.000 Actual 3,871,625.00 18/Nov/09 7/Dec/09 22/Dec/09 20/Jan/10 20/Jan/10 4/Feb/10 21/Feb/10 10/Mar/10 10/Mar/10 9/Nov/10 Planned 6,000,000.00 3/May/10 13/May/10 20/May/10 21/Jun/10 21/Jun/10 21/Jul/10 4/Aug/10 18/Aug/10 25/Apr/11 Gharb El- Mesqa Improvement Works for Direct Mit Yazid IBRD (70%) Upper Egypt General Contracting 12 Mahalla IIIMP/IIS/MTYZ/MQ-16-2009 978 NCB GoE (30%) Revised EGP Prior No 4,352,865.00 EGP canal Right Bank from KM 12.480 to KM 19.900 Company Actual 4,802,805.00 18/Nov/09 8/Dec/09 21/Dec/09 21/Jan/10 21/Jan/10 4/Feb/10 21/Feb/10 10/Mar/10 10/Mar/10 27/Oct/11 Mesqas Improvement Works for Direct Mit Yazid Planned 7,000,000.00 3/Jun/10 13/Jun/10 20/Jun/10 21/Jul/10 21/Jul/10 21/Aug/10 4/Sep/10 18/Sep/10 1/May/10 27/Dec/10 IBRD (70%) Upper Egypt General Contracting 13 Qotor IIIMP/IIS/MTYZ/MQ-17-2009 -Right Bank- from KM 20.530 to KM 26.340 823 NCB GoE (30%) Revised EGP Prior No 3,235,810.00 EGP Company (Qotor District) Actual 3,968,035.00 23/Dec/09 10/Jan/10 31/Jan/10 28/Feb/10 28/Feb/10 11/Mar/10 6/May/10 26/May/10 26/May/10 8/Apr/13 Planned 7,000,000.00 3/Jul/10 13/Jul/10 20/Jul/10 21/Aug/10 21/Aug/10 21/Sep/10 4/Oct/10 18/Oct/10 28/Oct/10 25/Jun/11 Mesqas Improvement Works for Direct Mit Yazid IBRD (70%) Upper Egypt General Contracting 14 Qotor IIIMP/IIS/MTYZ/MQ-18-2009 986 NCB GoE (30%) Revised EGP Prior No 2/Mar/10 6/Mar/10 8/Apr/10 8/Apr/10 9/May/10 16/May/10 15/Jun/10 4,298,790.00 EGP 10/Feb/11 -left Bank- from KM 20.270 to KM 20.500 Company Actual 4,746,065.00 30/Dec/09 24/Jan/10 31/Jan/10 1/Mar/10 1/Mar/10 11/Mar/10 6/May/10 26/May/10 26/May/10 Mesqas Improvement Works for Direct Mit Yazid Planned 6,075,000.00 1/Mar/10 15/Mar/10 31/Mar/10 30/Apr/10 30/Apr/10 30/May/10 6/Jun/10 1/Feb/11 IBRD (70%) Al Amro Contracting Office 15 Qotor IIIMP/IIS/MTYZ/MQ-19-2010 left Bank from KM 20.515 to KM 22.065 - Qptor 1,215 NCB GoE (30%) Revised EGP Prior No 5,316,344.82 EGP Damanhour Egypt District Actual 5,798,520.00 26/Jan/10 25/Feb/10 6/Mar/10 6/Apr/10 6/Apr/10 9/May/10 27/May/10 26/Jun/10 26/Jun/10 14/Mar/11 Planned 5,625,000.00 1/Mar/10 31/Mar/10 30/Apr/10 30/Apr/10 10/May/10 20/May/10 30/May/10 6/Jun/10 1/Feb/11 Completion of improvement of Civil Works in IBRD (70%) Al-Amro Office for Contracting 16 Desok IIIMP/IIS/MTYZ/F/COM-1-2008 4,127 NCB GoE (30%) Revised EGP Prior No 1/Jul/10 7,194,607.20 EGP Manaifa area (IIP-1) Actual 6,900,000.00 26/Aug/08 2/Sep/08 26/Oct/08 16/Nov/08 16/Nov/08 18/Dec/08 11/Feb/09 1/Mar/09 10/Mar/09 13/Mar/10 Mesqas Improvement Works for Mit Yazid Dir Planned 6,785,000.00 5/Feb/09 19/Mar/09 15/Apr/09 16/May/09 16/May/09 10/Oct/09 18/Oct/09 18/Nov/09 26/Jul/10 IBRD (70%) Al Amro Contracting Office 17 Qotor IIIMP/IIS/MTYZ/MQ-20-2010 Right Bank from KM 31.580 to KM 32.610 - 1,357 NCB GoE (30%) Revised EGP Prior No 7,123,249.50 EGP Damanhour Egypt Qotor District Actual 7,655,390.00 4/Feb/10 25/Feb/10 6/Mar/10 7/Apr/10 7/Apr/10 9/May/10 12/Aug/10 15/Sep/10 15/Sep/10 13/Feb/14 Planned 6,900,000.00 17/Jun/08 27/Jun/08 27/Jul/08 27/Aug/08 27/Aug/08 27/Oct/08 25/Nov/08 17/Dec/08 24/Aug/09 Mesqa Improvement Works for Mit Yazid Dir (LS) IBRD (70%) Revised 1/Jul/10 30/Nov/10 Al-Amro Office for Contracting 7/Aug/11 18 Qotor IIIMP/IIS/MTYZ/MQ-21-2010 1,082 NCB EGP Prior No 6,054,433.75 EGP from KM 24.780 - KM 26.650 in Qotor District GoE (30%) Revised 23/Feb/10 2/Mar/10 6/Mar/10 8/Apr/10 8/Apr/10 9/May/10 21/Jul/10 Retendered Actual 6,113,525.00 23/Feb/10 21/Jul/10 7/Aug/10 7/Sep/10 7/Sep/10 8/Nov/10 10/Nov/10 1/Dec/10 1/Dec/10 30/Mar/14 Mesqas Improvement Works for Mars El Gamle Planned 5,406,440.00 1/Mar/10 15/Mar/10 25/Mar/10 25/Apr/10 25/Apr/10 10/May/10 20/May/10 1/Jun/10 10/Jun/10 5/Feb/11 Kafr El- IBRD (70%) Revised 1/Oct/10 1/Nov/10 15/Nov/10 13/Jul/11 19 IIIMP/IIS/MTYZ/MQ-22-2010 (RS) - from head to km 6.504 in Kafr El-Shiekh 972 NCB EGP Prior No 4,545,531.76 EGP Dar El - Sahaba company Sheikh GoE (30%) District Actual 5,123,175.00 9/May/10 13/May/10 7/Aug/10 21/Sep/10 21/Sep/10 5/Oct/10 27/Oct/10 1/Dec/10 1/Dec/10 30/Jul/11 Mesqa Improvement Works for Mars El- Gamle Planned 9,412,000.00 1/Nov/12 1/Feb/10 9/Oct/10 Kafr El- IBRD (70%) Egyptian Contracting Company 20 Sheikh IIIMP/IIS/MTYZ/MQ-23-2010 (LS)- from head to km 3.439 and kafr El-Morabin 1,040 NCB GoE (30%) Revised EGP Prior No 6/Jun/10 1/Nov/10 2/Nov/10 4,436,071.15 EGP 30/Jun/11 (Mokhtar Ibrahim) in Kafr El-Shiekh District Actual 5,247,775.00 7/Jun/10 23/Jun/10 7/Aug/10 22/Sep/10 22/Sep/10 5/Oct/10 25/Oct/10 1/Dec/10 1/Dec/10 7/Dec/14 Mesqa Improvement Works for Mars EL - Gamle Planned 6,957,600.00 1/Dec/12 1/Mar/10 6/Nov/10 Kafr El- IBRD (70%) Al-Amro Office for Contracting 21 Sheikh IIIMP/IIS/MTYZ/MQ-24-2010 (RS), from Km 6.686 to km 9.886 and in Kafr El- 957 NCB GoE (30%) Revised EGP Prior No 8/Aug/10 5/Nov/10 15/Nov/10 3,990,886.74 EGP 13/Jul/11 Morabin ,Kafr El-Shiekh District Actual 4,860,600.00 7/Jun/10 28/Jun/10 7/Aug/10 23/Sep/10 23/Sep/10 5/Oct/10 24/Oct/10 1/Dec/10 1/Dec/10 28/Mar/13 Planned 7,230,000.00 1/Sep/10 1/Oct/10 31/Oct/10 31/Oct/10 30/Nov/10 15/Dec/10 12/Aug/11 Mesqa Improvement of Mars El Gamal Canal Left Revised 13/Feb/11 13/Mar/11 18/Jul/11 14/Mar/12 Kafr El- IBRD (70%) Al-Amro Office for Contracting 22 IIIMP/IIS/MTYZ/MQ-25-2010 Bank from 3.835 km to 9.828 km - Mit Yazeed 1,446 NCB Revised EGP Prior No 8/Aug/10 22/Sep/10 27/Sep/10 8/Nov/10 8/Nov/11 9/Jan/11 13/Jan/11 Tender Cancelled 7,654,842.00 EGP Sheikh GoE (30%) Command Area Actual 8,727,325.00 21/Sep/10 27/Jan/11 22/Jan/11 26/Feb/11 26/Feb/11 12/Apr/11 21/Jun/11 26/Jul/11 26/Jul/11 25/Jun/13 Planned 4,420,000.00 1/Sep/10 1/Dec/10 29/Jul/11 Mesqa Improvement Works Contract for Al- Kafr El- IBRD (70%) Revised 4,950,000.00 1/Jan/11 13/Feb/11 13/Mar/11 15/Jul/11 Adel Abdel Azez El- Shahawy 11/Mar/12 23 IIIMP/IIS/MTYZ/MQ-26-2010 Mafrooza- Right Bank and Al Mafrooza AL 1,048 NCB EGP Prior No 4,327,417.15 EGP Sheikh GoE (30%) Revised 8/Aug/10 22/Sep/10 27/Sep/10 9/Nov/10 9/Nov/10 9/Jan/11 13/Jan/11 Retendered Company Sharkia canal - Mit Yazeed Command Area Actual 5,056,700.00 21/Sep/10 27/Jan/11 22/Jan/11 27/Feb/11 27/Feb/11 10/May/11 11/Jul/11 15/Aug/11 15/Aug/11 14/Dec/14 Planned 4,940,000.00 1/Sep/10 1/Dec/10 29/Jul/11 Mesqa Improvement Works Contract for Al- Kafr El- IBRD (70%) Revised 13/Feb/11 13/Mar/11 15/Jul/11 Al-Amro Office for Contracting 11/Mar/12 24 IIIMP/IIS/MTYZ/MQ-27-2010 Mafrooza- left Bank and Al Mafrooza AL 979 NCB EGP Prior No 3,867,722.72 EGP Sheikh GoE (30%) Revised 8/Aug/10 22/Sep/10 27/Sep/10 10/Nov/10 10/Nov/10 9/Jan/11 13/Jan/11 Retendered Gadeeda - Mit Yazeed Command Area Actual 4,552,880.00 21/Sep/10 27/Jan/11 22/Jan/11 28/Feb/11 28/Feb/11 12/Apr/11 12/Jul/11 15/Aug/11 15/Aug/11 14/Sep/14 Planned 5,652,400.00 1/Sep/10 1/Dec/10 29/Jul/11 Mesqa Improvement Works Contract for Al Kafr El- IBRD (70%) Revised 6,450,000.00 1/Mar/11 13/Feb/11 13/Mar/11 15/Jul/11 11/Mar/12 25 IIIMP/IIS/MTYZ/MQ-28-2010 Bashair canal - Branch from Mars El Gamal 1,464 NCB EGP Prior No 6,078,248.70 EGP Dar El - Sahaba company Sheikh GoE (30%) canal - Mit Yazeed Command Area Revised 8/Aug/10 22/Sep/10 27/Sep/10 11/Nov/10 11/Nov/10 9/Jan/11 13/Jan/11 Retendered Actual 7,458,930.00 21/Sep/10 27/Jan/11 22/Jan/11 1/Mar/11 1/Mar/11 12/Apr/11 20/Jun/11 10/Jul/11 10/Jul/11 22/Apr/14 Mesqa Improvement Works Contract for El Planned 1/Jan/11 1/Apr/11 27/Nov/11 Kafr El IBRD (70%) Revised 5,850,000.00 1/Feb/11 5/Dec/10 5/Jan/11 5/Jan/11 1/Mar/11 8/Mar/11 Al-Amro Office for Contracting 3/Nov/11 26 Sheikh IIIMP/IIS/MTYZ/MQ-29-2010 Shorafa canal and direct El Zawia from km 5.963 1,084 NCB GoE (30%) EGP Prior No 5,717,101.15 EGP to 6.252 km Actual 6,689,800.00 22/Sep/10 2/Nov/10 10/Nov/10 9/Jan/11 9/Jan/11 18/Jan/11 23/Jan/11 30/Jan/11 5/Mar/11 3/Oct/13 Meska Improvement Works contracts for Kom Planned 5,850,000.00 1/Oct/11 30/Dec/11 6/Jan/12 2/Sep/12 Kafr El IBRD (70%) Al-Amro Office for Contracting 27 Shiekh IIIMP/IIS/MTYZ/MQ-30-2010 El Roz El Kadima from intake to km 3.80 and 1,143 NCB GoE (30%) Revised EGP Prior No 5/Dec/10 5/Jan/11 5/Jan/11 1/Mar/11 5,773,506.76 EGP 27/Oct/11 Tahwelet Kom El Roz El Kadima canal Actual 6,507,525.00 22/Sep/10 4/Nov/10 10/Nov/10 10/Jan/11 10/Jan/11 18/Jan/11 23/Jan/11 26-Fer-2011 5/Mar/11 30/Jun/14 Mesqa Improvement Works Contract for Al - Planned 5,850,000.00 1/Oct/12 1/Jan/11 8/Sep/11 Kafr El- IBRD (70%) Egyptian Contracting Company 28 Sheikh IIIMP/IIS/MTYZ/MQ-31-2010 Shamarqa Al- Gededa Canal - Mit Yazeed 1,039 NCB GoE (30%) Revised EGP Prior No 30/Oct/10 5/Dec/10 5/Jan/11 5/Jan/11 15/Jun/11 15/Jun/11 5,086,437.15 EGP 10/Feb/12 (Mokhtar Ibrahim) Command Area Actual 24/Oct/10 9/Nov/10 18-dec2010 29/Jan/11 29/Jan/11 20/Mar/11 12/Apr/11 15/Jun/11 15/Jun/11 1/Jul/14 Mesqa Improvement Works Contract for Kom Al - Planned 6,700,000.00 1/Oct/09 1/Sep/09 9/May/10 Kafr El- IBRD (70%) Mansour Company for Trade& 29 Sheikh IIIMP/IIS/MTYZ/MQ-32-2010 Roz Al- Kadeema Canal from Km 3.8 to end - 1,285 NCB GoE (30%) Revised EGP Prior No 1/Dec/10 24/Dec/10 24/Jan/11 24/Jan/11 15/Jun/11 15/Jun/11 6,759,847.20 EGP 10/Feb/12 Contracting Mit Yazeed Command Area Area Actual 7,877,850.00 24/Oct/10 6/Dec/10 18-dec2010 30/Jan/11 30/Jan/11 20/Mar/11 13/Apr/11 15/Jun/11 15/Jun/11 16/Jan/13 IBRD Planned 7,690,080.00 15/Jan/12 14/Feb/12 15/Mar/12 15/Mar/12 14/Apr/12 21/Apr/12 17/Dec/12 30 Sidi Ghazey IIIMP/IIS/MTYZ/MQ-44/2012 El Halafey canal LS from km 9,940 to km 14,445 1,328 NCB (90%)GoE Revised EGP Prior No 1/Nov/12 1/Dec/12 31/Dec/12 31/Dec/12 30/Jan/13 6/Feb/13 6,972,726.90 EGP Dar El - Sahaba company 4/Oct/13 (10%) Actual 7,690,080.00 5/Sep/12 13/Sep/12 17/Oct/12 20/Nov/12 20/Nov/12 16/Jan/13 9/Feb/13 17/Mar/13 17/Mar/13 15/Jan/15 IBRD Planned 11,147,045.00 15/Feb/12 16/Mar/12 15/Apr/12 15/Apr/12 15/May/12 22/May/12 18/Mar/13 31 Sidi Ghazey IIIMP/IIS/MTYZ/MQ-47-2012 El Halafey canal LS from km 13,500 to km 17,435 1,436 NCB (90%)GoE Revised EGP Prior No 1/Jan/13 31/Jan/13 2/Mar/13 2/Mar/13 1/Apr/13 8/Apr/13 9,322,364.80 EGP Dar El - Sahaba company 2/Feb/14 (10%) Actual 11,147,045.00 5/Sep/12 13/Sep/12 17/Oct/12 21/Nov/12 21/Nov/12 24/Dec/12 9/Feb/13 17/Mar/13 17/Mar/13 16/Nov/14 Planned 6,215,000.00 21/Mar/13 20/Apr/13 20/May/13 20/May/13 19/Jun/13 26/Jun/13 22/Apr/14 IBRD Meska Improvement Works for Sidi Gazy 18 on Revised 7,650,000.00 17/Jun/13 1/Jul/13 15/Jul/13 22/Jul/13 Al-Amro Office for Contracting 18/May/14 32 Sidi Ghazey IIIMP/IIS/MTYZ/MQ-54/2013 1,130 NCB (90%)GoE EGP Post No 10,985,850.88 EGP LS El Daramly from intake until km 3.500 (10%) Actual 11,997,835.00 20/Mar/13 1/Apr/13 23/Apr/13 27/May/13 27/May/13 8/Jul/13 11/Jul/13 Retendered 8/Jul/13 11/Jul/13 24/Apr/13 27/Aug/13 27/Aug/13 26/Sep/13 27/Oct/13 27/Oct/13 26/Nov/14 Planned 5,973,000.00 22/Apr/13 22/May/13 21/Jun/13 21/Jun/13 7/Jul/13 14/Jul/13 21/Jul/13 28/Jul/13 24/May/14 Revised 10,000,000.00 15/Jul/13 14/Aug/13 14/Aug/13 4/Sep/13 18/Sep/13 2/Oct/13 9/Oct/13 5/Aug/14 IBRD Meska Improvement Works for Sidi Gazy 21 on 33 Sidi Ghazey IIIMP/IIS/MTYZ/MQ-57 1,086 NCB (90%)GoE EGP Post No 9,438,540.00 EGP El safa company for Contracting RS El Daramly from intake to km 6.300 (10%) Actual 8,349,810.00 12/May/13 9/Jun/13 10/Jul/13 14/Aug/13 14/Aug/13 2/Sep/13 16/Sep/13 27/Oct/13 27/Oct/13 21/09/2014 (8%) Sheet Mesqa Improvement, page 7 of 11 Area Review by Domestic Preparation of Bank’s&or Pmu No Bid Invitation Bid Bid Opening BER Bank’s&or Pmu No Contract Contract Signing Contract Package reference No/ Procurement Fund Bank Preference Bid Document Objection to Closing Objection to BER Contract Name, City, and Country of Completion SL No District Description of Works Status Estimated Cost Currency Commencement Contract Value Contract No method Source(s) Bidding Document and Contract Award Currency Contractor (Date) (Date) (fed) (prior/post) (yes/no) (Date) (Date) (Date) (Date) (Date) (Date) (Date) (Date) Ongoing Area Review by Domestic Preparation of Bank’s&or Pmu No Bid Invitation Bid Bid Opening BER Bank’s&or Pmu No Contract Contract Signing Contract Package reference No/ Procurement Fund Bank Preference Bid Document Objection to Closing Objection to BER Contract Name, City, and Country of Completion SL No District Description of Works Status Estimated Cost Currency Commencement Contract Value Contract No method Source(s) Bidding Document and Contract Award Currency Contractor (Date) (Date) (fed) (prior/post) (yes/no) (Date) (Date) (Date) (Date) (Date) (Date) (Date) (Date) Planned 5,355,500.00 1/Nov/09 12/Nov/09 19/Nov/09 20/Dec/09 20/Dec/09 20/Jan/10 3/Feb/10 17/Feb/10 14/Dec/10 Gharb El- Meska Improvement Works for Direct Mit Yazid IBRD (70%) 1 Mahalla IIIMP/IIS/MTYZ/MQ-04-2009 1,524 NCB GoE (30%) Revised EGP Prior No Retendered 6,789,465.00 EGP Benass company for Constraction canal Direct -Left side km 10.410 to KM 19.900 Actual 7,100,000.00 3/May/09 27/May/09 29/Aug/09 26/Sep/09 26/Sep/09 26/Oct/09 5/Nov/09 15/Dec/09 5/Dec/09 Completed Meska Improvement Works in Bahr Nemra Planned 7,000,000.00 3/Jan/10 13/Jan/10 20/Jan/10 21/Feb/10 21/Feb/10 21/Mar/10 4/Apr/10 18/Apr/10 Ali Youssry Company for 12/Feb/11 Gharb El- IBRD (70%) 2 Mahalla IIIMP/IIS/MTYZ/MQ-05-2009 Branch Canal - Right Side from Km 4.8 to the 1,071 NCB GoE (30%) Revised EGP Prior No 26/Sep/09 5,766,755.00 EGP Contracting 23/Jul/10 end Actual 5,400,000.00 21/Jun/09 23/Jun/09 8/Jul/09 8/Aug/09 8/Aug/09 23/Aug/09 30/Aug/09 26/Sep/09 3/Dec/09 Completed Planned 8,749,500.00 1/Mar/10 11/Mar/10 18/Mar/10 18/Apr/10 18/Apr/10 18/May/10 1/Jun/10 15/Jun/10 11/Apr/11 Gharb El- Mesqa Improvement Works in El Banawan IBRD (70%) Revised 13/Oct/09 26/Oct/09 6/Sep/10 3 IIIMP/IIS/MTYZ/MQ-07-2009 1,103 NCB EGP Prior No 4,795,585.00 EGP Benass company for Constraction Mahalla Branch canal Right Side GoE (30%) Revised 21/Jun/09 23/Jun/09 8/Jul/09 8/Aug/09 8/Aug/09 15/Oct/09 Retendered Actual 4,821,770.00 21/Jun/09 23/Jun/09 29/Aug/09 27/Sep/09 27/Sep/09 15/Oct/09 29/Oct/09 12/Nov/09 15/Nov/09 Completed Planned 5,590,000.00 6/Feb/10 13/Feb/10 20/Feb/10 23/Mar/10 23/Mar/10 22/Apr/10 2/May/10 15/May/10 Ali Youssry Company for 20/Jan/11 Gharb El- Meska Improvement Works in Nesheel El-Gadida IBRD (70%) 4 Mahalla IIIMP/IIS/MTYZ/MQ-12-2009 960 NCB GoE (30%) Revised EGP Prior No 4,858,162.00 EGP Contracting Branch canal from Head to the End Actual 4,700,000.00 1/Sep/09 18/Oct/09 7/Nov/09 5/Dec/09 5/Dec/09 27/Dec/09 5/Jan/10 1/Feb/10 1/Feb/10 Completed Remaining Mesqa Improvement Works from IBRD Planned 7,019,548.00 10/Jul/14 9/Aug/14 8/Sep/14 8/Sep/14 8/Oct/14 15/Oct/14 27/Oct/15 Contract MQ 32 at Kom Al - Roz Al- Kadeema Cooperative Society for 5 Sidi Ghazey IIIMP/IIS/MTYZ/MQ-32 Remains- 1,285.0 NCB (90%)GoE Revised EGP Post No 7,835,007.50 EGP Canal from Km 3.8 to end - Mit Yazeed (10%) Construction &Development Command Area Actual 3/Jun/14 4/Jun/14 20/Sep/14 26/Oct/14 26/Oct/14 30/Nov/14 30/Nov/14 8/Dec/14 28/Dec/14 Planned 9,790,000.00 1/Jan/12 31/Jan/12 1/Mar/12 1/Mar/12 31/Mar/12 7/Apr/12 3/Dec/12 Mesqa Improvement Works Contract for Kom EL IBRD Revised 8,500,000.00 1/Jan/11 13/Mar/13 12/Apr/13 12/Apr/13 29/May/13 12/Jun/13 26/Jun/13 3/Jul/13 28/Feb/14 Kafr El- Cooperative Society for 6 Sheikh IIIMP/IIS/MTYZ/MQ-33-2010 - Roz EL - Gedida Canal - Mit Yazeed Command 1,780 NCB (90%)GoE Actual 8,236,575.00 EGP Post No 16/Jan/13 26/Feb/13 8/Apr/13 8/May/13 8/May/13 27/Jun/13 Retendered 10,145,056.52 EGP (10%) Construction &Development Area 7/Jul/13 11/Jul/13 18/Jul/13 18/Aug/13 18/Aug/13 9/Sep/13 19/Sep/13 22/Oct/13 22/Oct/13 Revised 1/Dec/10 1/Apr/12 7/Apr/12 3/Dec/12 Actual 9/Nov/10 12/Dec/10 25/Jul/11 23/Aug/11 23/Aug/11 5/Apr/12 9/Apr/12 Retendered Mesqa Improvement Works Contract for Al - IBRD Kafr El- Revised 5,100,000.00 13/Mar/13 12/Apr/13 12/Apr/13 30/May/13 13/Jun/13 27/Jun/13 4/Jul/13 Cooperative Society for 5/Mar/14 7 IIIMP/IIS/MTYZ/MQ-34-2010 Gnabia 2 canal the Right side of Al Zawia Canal - 752 NCB (90%)GoE EGP Post No 5,544,402.50 EGP Sheikh (10%) Actual 4,845,175.00 16/Jan/13 26/Feb/13 8/Apr/13 9/May/13 9/May/13 Retendered Construction &Development Mit Yazeed Command Area Actual 7/Jul/13 11/Jul/13 9/Sep/13 Retendered Actual 9/Sep/13 17/Sep/13 25/Sep/13 27/Oct/13 27/Oct/13 5/Dec/13 12/Dec/13 19/Jan/14 Planned 5,050,100.00 1/Nov/11 1/Jan/11 1/Feb/11 1/Feb/11 1/Feb/12 16/Feb/12 13/Oct/12 Meska Improvement Works for Kafr El Sheekh IBRD Revised 5,300,000.00 8/Mar/13 14/Mar/13 13/Apr/13 13/Apr/13 2/Jun/13 16/Jun/13 30/Jun/13 7/Jul/13 4/Mar/14 Kafr El- Al-Amro Office for Contracting 8 Sheikh IIIMP/IIS/MTYZ/MQ-36-2012 15 on El Ganabiet (3) RS El Zawiet from km 918 NCB (90%)GoE Actual 4,645,000.00 EGP Post No 16/Jan/13 27/Feb/13 8/Apr/13 12/May/13 12/May/13 Retendered 6,229,337.30 EGP 1.300m until the end and El Ganabiet (10%) Planned 7/Jul/13 11/Jul/13 18/Jul/13 20/Aug/13 20/Aug/13 9/Sep/13 Retendered Actual 7,016,740.00 9/Sep/13 17/Sep/13 25/Sep/13 28/Oct/13 28/Oct/13 5/Dec/13 12/Dec/13 19/Jan/14 19/Jan/14 Planned 5,005,550.00 26/Dec/10 20/Nov/11 20/Dec/11 20/Dec/11 19/Jan/12 26/Jan/12 22/Sep/12 IBRD Revised 5,800,000.00 10/Mar/13 18/Mar/13 17/Apr/13 17/Apr/13 3/Jun/13 17/Jun/13 1/Jul/13 8/Jul/13 5/Mar/14 Meska Improvement Works for Sidi Gazy 2 on El Al-Amro Office for Contracting 9 Sidi Ghazey IIIMP/IIS/MTYZ/MQ-37-2012 910 NCB (90%)GoE EGP Post No 5,578,886.00 EGP Halafey canal LS from km 6.00 (10%) Actual 4,884,325.00 16/Jan/13 8/Apr/13 13/May/13 13/May/13 27/Jun/13 Retendered 3/Mar/13 Actual 7/Jul/13 11/Jul/13 18/Jul/13 21/Aug/13 21/Aug/13 9/Sep/13 19/Sep/13 27/Oct/13 27/Oct/13 IBRD Planned 4,561,150.00 26/Dec/10 20/Nov/11 20/Dec/11 20/Dec/11 19/Jan/12 26/Jan/12 22/Sep/12 Meska Improvement Works for Sidi Gazy 3 on El khtab & Sawahly for General 10 Sidi Ghazey IIIMP/IIS/MTYZ/MQ-38-2013 648 NCB (90%)GoE Revised 7,000,000.00 EGP Post No 12/Mar/13 10/May/13 9/Jun/13 9/Jun/13 30/Jun/13 14/Jul/13 28/Jul/13 4/Aug/13 5,354,243.60 EGP 1/Apr/14 Halafey canal LS from km 6.00 until km 7.500 (10%) Contracting Actual 4,768,330.00 17/Apr/13 24/Apr/13 29/May/13 7/Jul/13 7/Jul/13 25/Aug/13 4/Sep/13 27/Oct/13 27/Oct/13 IBRD Planned 3,421,000.00 1/Jan/12 31/Jan/12 1/Mar/12 1/Mar/12 31/Mar/12 7/Apr/12 3/Dec/12 Meska Improvement Works for Sidi Gazy 6 on Cooperative Society for 11 Sidi Ghazey IIIMP/IIS/MTYZ/MQ-42-2013 622 NCB (90%)GoE Revised 9,515,000.00 EGP Post No 25/Mar/13 12/May/13 11/Jun/13 11/Jun/13 2/Jul/13 16/Jul/13 30/Jul/13 6/Aug/13 4,088,367.05 EGP 3/Apr/14 RS El Halafey from intake to km 6.950 (10%) Construction &Development Actual 3,646,200.00 17/Apr/13 24/Apr/13 29/May/13 8/Jul/13 8/Jul/13 25/Jul/13 6/Aug/13 15/Sep/13 15/Sep/13 Planned 5,093,000.00 1/Jan/12 31/Jan/12 1/Mar/12 1/Mar/12 31/Mar/12 7/Apr/12 3/Dec/12 IBRD Meska Improvement Works for Sidi Gazy 7 on Revised 8,475,000.00 27/Mar/13 26/Apr/13 26/May/13 26/May/13 13/Jun/13 27/Jun/13 11/Jul/13 18/Jul/13 khtab & Sawahly for General 15/Mar/14 12 Sidi Ghazey IIIMP/IIS/MTYZ/MQ-43 926 NCB (90%)GoE EGP Post No 8,517,480.00 EGP RS El Halafey from km 5.800 until km 9.490 (10%) Actual 7,910,040.00 20/Mar/13 1/Apr/13 23/Apr/13 23/May/13 23/May/13 8/Jul/13 11/Jul/13 Retendered Contracting Actual 8,106,720.00 8/Jul/13 11/Jul/13 24/Apr/13 25/Aug/13 25/Aug/13 15/Sep/13 24/Sep/13 25/Aug/13 10/Nov/13 Planned 9,157,500.00 1/Feb/12 2/Mar/12 1/Apr/12 1/Apr/12 1/May/12 8/May/12 4/Mar/13 IBRD Revised 12,525,145.00 1/Mar/13 15/Mar/13 14/Apr/13 14/Apr/13 4/Jun/13 18/Jun/13 2/Jul/13 9/Jul/13 5/May/14 Meska Improvement Works for Sidi Gazy 9 on El 13 Sidi Ghazey IIIMP/IIS/MTYZ/MQ-45-2013 1,665 NCB (90%)GoE Actual 12,525,145.00 EGP Post No 27/Nov/12 28/Feb/13 8/Apr/13 14/May/13 14/May/13 Retendered 12,635,246.50 EGP Dar El - Sahaba company Halafy canal RS from K 14,914 until end (10%) 11/Jul/13 18/Jul/13 22/Aug/13 22/Aug/13 9/Sep/13 19/Sep/13 27/Oct/13 27/Oct/13 Actual 7/Jul/13 Planned 4,570,500.00 15/Feb/12 16/Mar/12 15/Apr/12 15/Apr/12 15/May/12 22/May/12 18/Mar/13 IBRD Meska Improvement Works for Sidi Gazy 12 on Revised 8,280,000.00 5/Mar/13 4/Apr/13 4/May/13 4/May/13 16/Jun/13 30/Jun/13 14/Jul/13 21/Jul/13 17/May/14 14 Sidi Ghazey IIIMP/IIS/MTYZ/MQ-48-2013 831 NCB (90%)GoE EGP Post No 6,815,595.40 EGP Dar El - Sahaba company LS El Halafey from km 17.435 until the end (10%) Actual 8,091,460.00 20/Mar/13 1/Apr/13 23/Apr/13 26/May/13 26/May/13 8/Jul/13 11/Jul/13 Retendered Actual 80,436,305.00 8/Jul/13 11/Jul/13 24/Apr/13 26/Aug/13 26/Aug/13 15/Sep/13 24/Sep/13 27/Oct/13 27/Oct/13 Planned 6,341,500.00 20/Feb/12 21/Mar/12 20/Apr/12 20/Apr/12 20/May/12 27/May/12 23/Mar/13 IBRD Revised 10,750,000.00 5/Mar/13 14/Jul/13 13/Aug/13 13/Aug/13 3/Sep/13 17/Sep/13 1/Oct/13 8/Oct/13 Meska Improvement Works for Sidi Gazy 13 on Al-Amro Office for Contracting 15 Sidi Ghazey IIIMP/IIS/MTYZ/MQ-49/2013 1,153 NCB (90%)GoE EGP Post No 9,955,112.32 EGP LS El Marbet from km 5.580 + El Melaha (10%) Actual 8,944,355.00 12/May/13 9/Jun/13 10/Jul/13 12/Aug/13 12/Aug/13 26/Aug/13 1/Sep/13 27/Oct/13 27/Oct/13 Planned 5,901,500.00 3/Mar/12 2/Apr/12 2/May/12 2/May/12 1/Jun/12 8/Jun/12 4/Apr/13 Meska Improvement Works for Sidi Gazy 14 on IBRD Revised 10,100,000.00 1/Apr/13 15/Jul/13 14/Aug/13 14/Aug/13 4/Sep/13 18/Sep/13 2/Oct/13 9/Oct/13 Al-Amro Office for Contracting 5/Aug/14 16 Sidi Ghazey IIIMP/IIS/MTYZ/MQ-50/2013 LS El Marbet from km 5.580 until the end + El 1,073 NCB (90%)GoE Actual 8,257,010.00 EGP Post No 12/May/13 9/Jun/13 10/Jul/13 13/Aug/13 13/Aug/13 26/Aug/13 1/Sep/13 8,770,645.60 EGP (10%) Retendered Sant Actual 26/Aug/13 1/Sep/13 25/Sep/13 29/Oct/13 29/Oct/13 5/Dec/13 12/Dec/13 26/Jan/14 26/Jan/14 Planned 5,846,500.00 9/Apr/13 9/May/13 8/Jun/13 8/Jun/13 24/Jun/13 1/Jul/13 8/Jul/13 15/Jul/13 11/May/14 IBRD Meska Improvement Works for Sidi Gazy 19 on khtab & Sawahly for General 17 Sidi Ghazey IIIMP/IIS/MTYZ/MQ-55/2013 1,063 NCB (90%)GoE Revised 8,725,000.00 EGP Post No 9,198,069.95 EGP LS El Daramly from km 4.800 until km 7.400 (10%) Contracting Actual 8,298,075.00 17/Apr/13 24/Apr/13 29/May/13 9/Jul/13 9/Jul/13 25/Jul/13 6/Aug/13 15/Sep/13 15/Sep/13 IBRD Planned 7,227,000.00 17/Apr/13 17/May/13 16/Jun/13 16/Jun/13 2/Jul/13 9/Jul/13 16/Jul/13 23/Jul/13 19/May/14 Meska Improvement Works for Sidi Gazy 20 on Cooperative Society for 18 Sidi Ghazey IIIMP/IIS/MTYZ/MQ-56/2013 1,314 NCB (90%)GoE Revised 13,375,000.00 EGP Post No 12,602,131.00 EGP LS El Daramly from km7.527 until the end (10%) Construction &Development Actual 11,502,320.00 17/Apr/13 24/Apr/13 29/May/13 10/Jul/13 10/Jul/13 25/Jul/13 6/Aug/13 15/Sep/13 15/Sep/13 Planned 7,441,500.00 22/Apr/13 22/May/13 21/Jun/13 21/Jun/13 7/Jul/13 14/Jul/13 21/Jul/13 28/Jul/13 24/May/14 IBRD Meska Improvement Works for Sidi Gazy 22 on Revised 9,625,000.00 15/Jul/13 14/Aug/13 14/Aug/13 4/Sep/13 18/Sep/13 2/Oct/13 9/Oct/13 5/Aug/14 19 Sidi Ghazey IIIMP/IIS/MTYZ/MQ-58/2013 1,353 NCB (90%)GoE EGP Post No 11,769,915.70 EGP Eliet for Contracting RS El Daramly from km 6.300 to the end (10%) Actual 10,674,665.00 12/May/13 9/Jun/13 10/Jul/13 15/Aug/13 15/Aug/13 2/Sep/13 16/Sep/13 3/Nov/13 3/Nov/13 Planned 8,007,000.00 1/Nov/14 1/Dec/14 31/Dec/14 31/Dec/14 30/Jan/15 6/Feb/15 2/Jan/16 IBRD Revised 7,100,000.00 Extended Mesqa Improvement Works 1 (Neshil EGP Cooperative Society for 20 Various IIIMP/IIS/MTYZ/MQ-59/2014 2,669 NCB (90%)GoE EGP Post No 8,088,900.00 ElQadima+Bahr Nemra+ElBnwan) (10%) Actual 11/Sep/14 17/Sep/14 20/Sep/14 19/Oct/14 19/Oct/14 27/Nov/14 28/Nov/14 Retendered Construction &Development Actual 27/Nov/14 28/Nov/14 8/Dec/14 8/Jan/15 8/Jan/15 4/Mar/15 5/Mar/15 6/4/205 6/Apr/15 Extended Mesqa Improvement Works 2 (Waslat IBRD Planned 6,642,000.00 1/Nov/14 1/Dec/14 31/Dec/14 31/Dec/14 30/Jan/15 6/Feb/15 20/Oct/15 El.Mostaqbal company for 21 Various IIIMP/IIS/MTYZ/MQ-60/2014 Neshil+ElSheikha+Khadiga+Neshil 2,214 NCB (90%)GoE Revised 6,000,000.00 EGP Post No 7,205,000.00 EGP (10%) Business investment ElGedida+Mit Yazid) Actual 11/Sep/14 17/Sep/14 20/Sep/14 21/Oct/14 21/Oct/14 23/Nov/14 27/Nov/14 18/Dec/14 21/Dec/14 IBRD Planned 4,371,000.00 1/Nov/14 1/Dec/14 31/Dec/14 31/Dec/14 30/Jan/15 6/Feb/15 2/Jan/16 Extended Mesqa Improvement Works 3 (Mit 22 Various IIIMP/IIS/MTYZ/MQ-61 1,457 NCB (90%)GoE Revised 3,140,000.00 EGP Post No 3,463,900.00 EGP ElTawhid office for Contracting Yazid Left Side from km 10.410 to km 22.560) (10%) Actual 11/Sep/14 17/Sep/14 20/Sep/14 23/Oct/14 23/Oct/14 30/Nov/14 30/Nov/14 28/Dec/14 Sheet Mesqa Improvement, page 8 of 11 Area Review by Domestic Preparation of Bank’s&or Pmu No Bid Invitation Bid Bid Opening BER Bank’s&or Pmu No Contract Contract Signing Contract Package reference No/ Procurement Fund Bank Preference Bid Document Objection to Closing Objection to BER Contract Name, City, and Country of Completion SL No District Description of Works Status Estimated Cost Currency Commencement Contract Value Contract No method Source(s) Bidding Document and Contract Award Currency Contractor (Date) (Date) (fed) (prior/post) (yes/no) (Date) (Date) (Date) (Date) (Date) (Date) (Date) (Date) Planned Area Review by Domestic Preparation of Bank’s&or Pmu No Bid Invitation Bid Bid Opening BER Bank’s&or Pmu No Contract Contract Signing Contract Package reference No/ Procurement Fund Bank Preference Bid Document Objection to Closing Objection to BER Contract Name, City, and Country of Completion SL No District Description of Works Status Estimated Cost Currency Commencement Contract Value Contract No method Source(s) Bidding Document and Contract Award Currency Contractor (Date) (Date) (fed) (prior/post) (yes/no) (Date) (Date) (Date) (Date) (Date) (Date) (Date) (Date) IBRD Planned 5,000,000.00 1/Jan/14 31/Jan/14 2/Mar/14 2/Mar/14 1/Apr/14 8/Apr/14 4/Dec/14 1 Various IIIMP/IIS/MTYZ/IIP1-MQ-01/2015 The First Meska Improvement Works at IIP1 Area Cancelled (90%)GoE Revised EGP Post No 1/Jun/15 1/Jul/15 31/Jul/15 31/Jul/15 30/Aug/15 6/Sep/15 EGP 3/May/16 (10%) Actual IIIMP/IIS/MTYZ/MQ-35-2010 Mesqa Improvement Works Contract for Al Planned 8,019,000.00 1/Nov/12 25/Jul/11 24/Aug/11 24/Aug/11 23/Nov/11 30/Nov/11 27/Jul/12 IBRD Kafr El- Ganabia 3 and its Branch Canal the Right Side 2 Contract MTYZ/MQ-21 moved to 1,458 Cancelled (90%)GoE Revised EGP Post No 1/Dec/10 1/Apr/12 7/Apr/12 EGP 3/Dec/12 Sheikh of EL Zawia Canal from head to km 1.300 - Mit (10%) this area Yazeed Command Area Actual 9/Nov/10 12/Dec/10 25/Jul/11 24/Aug/11 24/Aug/11 5/Apr/12 9/Apr/12 IBRD Planned 7,477,800.00 1/Feb/11 20/Nov/11 20/Dec/11 20/Dec/11 19/Jan/12 26/Jan/12 22/Sep/12 3 Sidi Ghazey IIIMP/IIS/MTYZ/MQ-39- Meska Improvement Works for Sidi Gazy 4 1,359.6 Cancelled (90%)GoE Revised 7,900,800.00 EGP Post No 1/Oct/13 10/Jun/13 10/Jul/13 10/Jul/13 31/Jul/13 14/Aug/13 28/Aug/13 4/Sep/13 EGP 6/May/14 (10%) Actual IBRD Planned 8,250,000.00 1/Jan/12 31/Jan/12 1/Mar/12 1/Mar/12 31/Mar/12 7/Apr/12 3/Dec/12 Kafr El- Meska Improvement Works for Kafr El Sheekh 4 Sheikh IIIMP/IIS/MTYZ/MQ-40/2015 1,150 Cancelled (90%)GoE Revised 7,700,000.00 EGP Post No 1/Jul/15 4/Sep/15 4/Oct/15 4/Oct/15 25/Oct/15 8/Nov/15 22/Nov/15 29/Nov/15 EGP 30/Jul/16 16 (10%) Actual IBRD Planned 8,007,000.00 1/Oct/14 31/Oct/14 30/Nov/14 30/Nov/14 30/Dec/14 6/Jan/15 6/Jan/16 Kafr El- Meska Improvement Works for Kafr El Sheekh 5 Sheikh IIIMP/IIS/MTYZ/MQ-41/2015 1,500 Cancelled (90%)GoE Revised EGP Post No 1/Jul/15 31/Jul/15 30/Aug/15 30/Aug/15 29/Sep/15 6/Oct/15 EGP 2/Jun/16 17 (10%) Actual Sheet Mesqa Improvement, page 9 of 11 Procurement Plan for Drainage Rehabilitation Works (Meet Yazeed Area) Updated 24/6/2015 Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008 Completed Bid Bank’s&or Pmu Area Review by Domestic Preparation of Bid Invitation Bid Opening BER Contract Bank’s&or Pmu No Closing No Objection to Contract Signing Contract SL Package reference No/ Procurement Fund Bank Preference Bid Document Contract Name, City, and Country of Completion District Description of Works Status Estimated Cost Currency Objection to Bidding BER and Commencement Contract Value No Contract No method Source(s) Currency Contractor Document (Date) Contract Award (Date) (Date) (fed) (prior/post) (yes/no) (Date) (Date) (Date) (Date) (Date) (Date) (Date) Planned 1,800,000.00 15/May/07 14/Jun/07 14/Jul/07 14/Jul/07 21/Nov/07 24/May/09 Gharb El- IBRD (70%) Mohamed Ibrahim Saeid Abo 1 IIIMP/EPAD/MTYZ/W01-2007 Open drainage works of Gharb ElMehalla Drains - NCB Revised EGP Prior No 1,489,700.00 EGP Mahalla GoE (30%) Taleb Actual 1,500,000.00 31/May/07 12/Aug/07 29/Aug/07 29/Aug/07 9/Oct/07 7/Nov/07 1/Dec/07 1/Dec/07 31/May/09 Rehabilitation of Brides and Pitching of Open Planned 7,500,000.00 15/Sep/08 15/Oct/08 14/Nov/08 14/Nov/08 1/Feb/09 11/Feb/11 IBRD (70%) Revised Hamid Ahmed Ali El Banna 2 Sidi Ghazy IIIMP/EPAD/MTYZ/W02-2008 Drains in Sidy Ghazi District -Meet Yazid - NCB EGP Prior No 6,724,500.00 EGP GoE (30%) Office Commmand Area Actual 7,200,000.00 17/Nov/08 24/Nov/08 21/Jan/09 23/Feb/09 23/Feb/09 19/Mar/09 19/Mar/09 29/Apr/09 1/May/09 30/Apr/11 Planned 2,000,000.00 1/Apr/10 1/May/10 31/May/10 31/May/10 1/Jun/10 15/Dec/10 14/Dec/11 East Sidi IBRD (70%) El-Masrea for Integrated 3 IIIMP/EPAD/MTYZ/W03-2010 Pitching work on Nemra Thamnia El Asfal Drain - NCB Revised EGP Prior No 26/Aug/10 15/Sep/10 15/May/11 20/May/11 2,535,950.00 EGP 18/May/12 Salem GoE (30%) Contracting Actual 2,000,000.00 11/Jan/10 21/Mar/10 25/Aug/10 15/Sep/10 15/Sep/10 6/Mar/11 28/Mar/11 2/May/11 2/May/11 10/Apr/12 Planned 10,000,000.00 15/Sep/08 15/Oct/08 14/Nov/08 14/Nov/08 1/Feb/09 11/Feb/11 East Sidi Subsurface Drainage works in Nemra Thamnia Al IBRD (70%) Revised El-Rashedia Company for 4 IIIMP/EPAD/MTYZ/SSD01-2009 4,000 NCB EGP Prior No 9,949,250.00 EGP Salem Asfal area ) GoE (30%) General Contracting Actual 12,000,000.00 2/Jul/09 14/Jul/09 19/Aug/09 27/Sep/09 27/Sep/09 13/Dec/09 16/Dec/09 9/Jan/10 16/Jan/10 31/Jul/11 Planned 7,500,000.00 14/Aug/10 13/Sep/10 13/Oct/10 13/Oct/10 15/Nov/10 1/Dec/10 24/May/12 Replacement and Rehabilitation of Subsurface Gharb El- IBRD (70%) Revised 2/Dec/10 10/Jan/11 15/Jan/11 Egyptian Company for 8/Jul/12 5 Mahalla *IIIMP/EPADP/MTYZ/SSD02-2009 Drainage works in the command area of 3,000 NCB GoE (30%) EGP Prior No 7,417,499.25 EGP Irrigation and Drainage Terminated Abshoway 2nd Actual 7,500,000.00 21/Apr/10 27/Apr/10 9/May/10 12/Jun/10 12/Jun/10 30/Dec/10 28/Mar/11 27/Apr/11 10/May/11 13/6/2015 Planned 7,500,000.00 1/Jan/10 31/Jan/10 2/Mar/10 2/Mar/10 6/May/10 31/Dec/10 23/Jun/12 Gharb El- Replacement and Rehabilitation of Subsurface IBRD (70%) Al - Eman company for 6 IIIMP/EPADP/MTYZ/SSD03-2010 3,000 NCB Revised EGP Prior No 1/Jun/10 10/Jan/11 15/Jan/11 6,694,970.10 EGP 8/Jul/12 Mahalla Drainage Network in Abshaway 1st GoE (30%) contracting Actual 7,500,000.00 13/Jun/10 23/Jun/10 24/Aug/10 27/Sep/10 27/Sep/10 22/Dec/10 18/Jan/11 1/Mar/11 1/Mar/11 30/Aug/12 Replacement and Rehabilitation of Subsurface Planned 1/Feb/11 3/Mar/11 2/Apr/11 2/Apr/11 1/Jun/11 2/Dec/12 IBRD (70%) El Halowagi Company and his 7 Qotor IIIMP/EPADP/MTYZ/SSD04-2010 Drainage works in Matbool 2nd (A) Meet Yazied 1,700 NCB Revised EGP Prior No 1/Aug/10 7/Apr/11 7/May/11 7/May/11 1/Oct/11 1/Oct/11 4,769,940.00 EGP 24/Mar/13 GoE (30%) Partner Commmand Area Actual 4,250,000.00 30/Sep/10 11/Nov/10 5/Apr/11 7/May/11 7/May/11 5/Sep/11 20/Sep/11 1/Oct/11 5/Oct/11 10/Jul/12 Planned 11,500,000.00 1/Feb/11 3/Mar/11 2/Apr/11 2/Apr/11 1/Jun/11 2/Dec/12 Replacement and Rehabilitation of Subsurface IBRD (70%) El Salam Company for General 8 Qotor IIIMP/EPADP/MTYZ/SSD05-2010 2,200 NCB Revised EGP Prior No 1/Aug/10 7/Apr/11 7/May/11 7/May/11 23/Sep/11 1/Oct/11 6,264,510.00 EGP 24/Mar/13 Drainage works in Matbool 2nd (B) GoE (30%) Contracting Actual 5,500,000.00 30/Sep/10 11/Nov/10 5/Apr/11 10/May/11 10/May/11 5/Sep/11 20/Sep/11 1/Oct/11 1/Oct/11 16/Sep/12 Planned 13,000,000.00 1/Mar/10 31/Mar/10 30/Apr/10 30/Apr/10 1/Jul/10 31/Dec/10 23/Jun/12 Kafr El Replacement and Rehabilitation of Subsurface IBRD (70%) Revised 1/Jun/10 7/Apr/11 7/May/11 7/May/11 10/Apr/12 25/Apr/12 El Halowagi Company and his 17/Oct/13 9 IIIMP/EPADP/MTYZ/SSD06-2010 2,900 NCB EGP Prior No 7,408,193.75 EGP Shiekh Drainage works in El-Khadima and Al-Boteita (B) GoE (30%) Partner Actual 7,250,000.00 30/Sep/10 4/Nov/10 4/Apr/11 12/May/11 12/May/11 29/Mar/12 4/Apr/12 2/Jun/12 7/Jun/12 1/Aug/13 Replacement and Rehabilitation of Subsurface Planned 7,250,000.00 1/Mar/11 31/Mar/11 30/Apr/11 30/Apr/11 1/Jul/11 31/Dec/10 23/Jun/12 IBRD (70%) Revised 1/Dec/12 15/Sep/12 15/Oct/12 15/Oct/12 14/Nov/12 29/Nov/12 El Salam Company for General 23/May/14 10 Qotor IIIMP/EPADP/MTYZ/SSD07-A Drainage works in Matbool 1st and Kafr El-Taifa 2,900 NCB EGP Prior No 6,932,502.50 EGP GoE (30%) Contracting (A) Actual 7,250,000.00 4/Jan/12 26/Feb/12 4/Jun/12 9/Jul/12 9/Jul/12 27/Sep/12 1/Oct/12 15/Nov/12 15/Nov/12 26/Jun/13 Replacement and Rehabilitation of Subsurface IBRD Planned 5,500,000.00 1/Mar/11 31/Mar/11 30/Apr/11 30/Apr/11 1/Jul/11 31/Dec/10 23/Jun/12 El Salam Company for General 11 Qotor IIIMP/EPADP/MTYZ/SSD07-B Drainage works in Matbool 1st and Kafr El-Taifa 2,200 NCB (90%)GoE Revised EGP Post No 15/Dec/12 15/Nov/12 15/Dec/12 15/Dec/12 30/Mar/13 14/Apr/13 5,469,780.10 EGP 6/Oct/14 Contracting (B) (10%) Actual 5,500,000.00 4/Jan/12 26/Feb/12 14/Nov/12 18/Dec/12 18/Dec/12 13/Feb/13 10/Mar/13 2/May/13 2/May/13 16/Jul/14 Planned 7,000,000.00 1/Apr/12 1/May/12 31/May/12 31/May/12 30/Jun/12 7/Mar/11 28/Aug/12 Gharb El- Replacement and Rehabilitation of Subsurface IBRD (70%) Revised 1/Jan/11 1/May/12 31/May/12 31/May/12 31/Jul/12 15/Aug/12 6/Feb/14 12 IIIMP/EPADP/MTYZ/SSD08-2012 2,800 NCB EGP Prior No 8,262,580.00 EGP El Tokhy for Contracting Mahalla Drainage works in samtay first GoE (30%) Actual 7,000,000.00 23/Jan/12 26/Jan/12 8/Apr/12 13/May/12 13/May/12 17/Jul/12 18/Jul/12 1/Sep/12 1/Sep/12 14/May/14 Planned 6,250,000.00 1/Apr/12 1/May/12 31/May/12 31/May/12 30/Jun/12 15/Jul/12 14/Jul/14 Gharb El- Replacement and Rehabilitation of Subsurface IBRD (70%) Al - Iman company for General 13 IIIMP/EPADP/MTYZ/SSD09-2011 3,000 NCB Revised EGP Prior No 1/Mar/11 15/Aug/11 14/Sep/11 14/Sep/11 1/Mar/12 16/Mar/12 6,669,810.65 EGP 15/Mar/14 Mahalla Drainage works in samtay Second GoE (30%) contracting Actual 7,500,000.00 10/Feb/11 29/May/11 9/Aug/11 12/Sep/11 12/Sep/11 4/Dec/11 7/Dec/11 15/Jan/12 15/Jan/12 14/Jan/14 Planned 6,750,000.00 01-Jan-12 31/Jan/12 1/Mar/12 1/Mar/12 31-Mar-12 15/Apr/12 7/Oct/13 Gharb El- Replacement and Rehabilitation of Subsurface IBRD (70%) Upper Egypt for General 14 IIIMP/EPADP/MTYZ/SSD10-A 2,700 NCB Revised EGP Prior No 1/Feb/12 15/Sep/12 15/Oct/12 15/Oct/12 14/Nov/12 29/Nov/12 6,327,046.75 EGP 23/May/14 Mahalla Drainage works in Neshil (A) GoE (30%) Contracting Actual 6,750,000.00 23/Jan/12 26/Feb/12 4/Jun/12 8/Jul/12 8/Jul/12 13/Sep/12 26/Sep/12 15/Nov/12 15/Nov/12 12/Oct/14 Planned 4,625,000.00 01-Jan-12 31/Jan/12 1/Mar/12 1/Mar/12 31-Mar-12 15/Apr/12 14/Apr/14 Gharb El- Replacement and Rehabilitation of Subsurface IBRD (70%) El Salam Company for General 15 IIIMP/EPADP/MTYZ/SSD10-B 1,850 NCB Revised EGP Prior No 1/Feb/12 20/Apr/12 2/Jul/12 2/Jul/12 20/Sep/12 5/Oct/12 4,277,850.00 EGP 4/Oct/14 Mahalla Drainage works in Neshil (B) GoE (30%) Contracting Actual 4,625,000.00 23/Jan/12 26/Feb/12 5/May/12 12/Jun/12 12/Jun/12 26/Aug/12 10/Sep/12 15/Oct/12 15/Oct/12 29/Apr/13 Planned 6,000,000.00 01-Apr-13 1/May/13 31/May/13 31/May/13 30-Jun-13 15/Jul/13 30/Apr/14 Kafr El Replacement and Rehabilitation of Subsurface IBRD (70%) Engineer Awad Taha Gad 16 IIIMP/EPADP/MTYZ/SSD11-A 2,400 NCB Revised EGP Prior No 5/Apr/12 5/May/12 4/Jun/12 4/Jun/12 1/Aug/12 16/Aug/12 5,673,270.00 EGP 30/Apr/14 Shiekh Drainage works in El Arian (A) GoE (30%) Osman Actual 6,000,000.00 17/Aug/11 27/Oct/11 5/May/12 10/Jun/12 10/Jun/12 26/Aug/12 12/Sep/12 1/Nov/12 1/Nov/12 29/Aug/13 Planned 5,750,000.00 01-Apr-13 1/May/13 31/May/13 31/May/13 30-Jun-13 15/Jul/13 14/May/14 Kafr El Replacement and Rehabilitation of Subsurface IBRD (70%) El Salam Company for General 17 IIIMP/EPADP/MTYZ/SSD11-B 2,300 NCB Revised EGP Prior No 16/Mar/12 15/Apr/12 15/May/12 15/May/12 1/Aug/12 16/Aug/12 5,604,823.36 EGP 14/May/14 Shiekh Drainage works in El Arian (B) GoE (30%) Contracting Actual 5,750,000.00 17/Aug/11 27/Oct/11 5/May/12 11/Jun/12 11/Jun/12 28/Aug/12 27/Sep/12 15/Nov/12 15/Nov/12 6/Feb/14 Planned 5,750,000.00 1/Mar/11 31/Mar/11 30/Apr/11 30/Apr/11 1/Jul/11 7/Jul/11 30/Sep/13 Kafr El Replacement and Rehabilitation of Subsurface IBRD (70%) El Halowagi Company and his 18 IIIMP/EPADP/MTYZ/SSD14-2011 2,600 NCB Revised EGP Prior No 1/Aug/11 31/Aug/11 31/Aug/11 10/Apr/12 25/Apr/12 6,903,051.00 EGP Shiekh Drainage works in El-Khadima and Al-Boteita (A) GoE (30%) Partner Actual 6,500,000.00 9/Jan/11 29/May/11 28/Aug/11 29/Sep/11 29/Sep/11 21/Feb/12 23/Feb/12 22/Mar/12 1/Apr/12 30/May/13 Total completed contracts Ongoing Bid Bank’s&or Pmu Area Review by Domestic Preparation of Bid Invitation Bid Opening BER Contract Bank’s&or Pmu No Closing No Objection to Contract Signing Contract SL Package reference No/ Procurement Fund Bank Preference Bid Document Contract Name, City, and Country of Completion District Description of Works Status Estimated Cost Currency Objection to Bidding BER and Commencement Contract Value No Contract No method Source(s) Currency Contractor Document (Date) Contract Award (Date) (Date) (fed) (prior/post) (yes/no) (Date) (Date) (Date) (Date) (Date) (Date) (Date) Remaining area of Contract SSD 02 for Planned 4,680,000.00 14/Sep/14 14/Oct/14 13/Nov/14 13/Nov/14 15/Feb/15 22/Feb/15 Cooperetive Society Gharb El- IIIMP/EPADP/MTYZ/SSD02 Replacement and Rehabilitation of Subsurface IBRD (70%) 1 1,800 Direct Revised EGP Post No 14/Jun/15 21/Jun/15 21/Jul/15 21/Jul/15 25/Aug/15 1/Sep/15 4,441,611.58 EGP Productivity for Reconstruction Mahalla Remains-/2015 Drainage works in the command area of GoE (30%) & Development at Gharbia Abshoway 2nd Actual 11/Jun/15 13/Jun/15 IBRD Planned 8,375,000.00 01-May-13 31/May/13 30/Jun/13 30/Jun/13 30-Jul-13 14/Aug/13 5/Feb/15 Replacement and Rehabilitation of Subsurface El Halowagi Company and his 2 Qotor IIIMP/EPADP/MTYZ/SSD12-2012 3,350 NCB (90%)GoE Revised EGP Post No 25/Feb/13 27/Mar/13 26/Apr/13 26/Apr/13 11/Jul/13 18/Jul/13 25/Jul/13 9/Aug/13 7,191,888.00 EGP 31/Jan/15 Drainage works in Meniat Maser Partner (10%) Actual 8,375,000.00 23/Aug/12 27/Sep/12 8/Dec/12 8/Jan/13 8/Jan/13 18/May/13 6/Nov/13 5/Dec/13 5/Dec/13 Replacement and Rehabilitation of Subsurface Planned 5,625,000.00 01-Jul-13 31/Jul/13 30/Aug/13 30/Aug/13 29-Sep-13 14/Oct/13 13/Oct/14 IBRD Kafr El Revised 15/Mar/13 27/Mar/13 26/Apr/13 26/Apr/13 11/Jul/13 18/Jul/13 25/Jul/13 9/Aug/13 8/Aug/14 3 IIIMP/EPADP/MTYZ/SSD13-A/2013 Drainage works for the extension Nemra Thamnia 2,250 NCB (90%)GoE EGP Post No 5,175,056.00 EGP Mohamed Abdalla Zaid Shiekh El Asfal Drain (10%) Actual 5,625,000.00 19/Feb/13 25/Feb/13 10/Apr/13 13/May/13 13/May/13 30/Jul/13 1/Oct/13 1/Oct/13 Total ongoing contracts Planned Bid Bank’s&or Pmu Area Review by Domestic Preparation of Bid Invitation Bid Opening BER Contract Bank’s&or Pmu No Closing No Objection to Contract Signing Contract SL Package reference No/ Procurement Fund Bank Preference Bid Document Contract Name, City, and Country of Completion District Description of Works Status Estimated Cost Currency Objection to Bidding BER and Commencement Contract Value No Contract No method Source(s) Currency Contractor Document (Date) Contract Award (Date) (Date) (fed) (prior/post) (yes/no) (Date) (Date) (Date) (Date) (Date) (Date) (Date) Planned 2,500,000.00 14/Jun/15 21/Jun/15 21/Jul/15 21/Jul/15 25/Aug/15 1/Sep/15 28/Feb/16 Kafr El Replacement of El Nestawy Drain Siphon at Km IBRD (90%) 1 IIIMP/EPADP/MTYZ/W04/2015 NCB Revised EGP Post No Shiekh 4.100 under Zawia Canal GoE (10%) Actual *Terminated Contract Procurement Plan for Miscellaneous Works (Meet Yazeed Area) Updated 24/6/2015 Arab republic of Egypt EGT-7291: Integrated Irrigation Improvement & Management Project Original:28/2/2008 Completed Preparation Bid Bank’s No Review by Domestic Bank’s No Bid Bid Opening BER Contract Contract Procureme of Bid Invitation Objection to Contract Contract Package reference No/ Fund Bank Preference Objection to Closing Signing Name, City, and Country of Completion SL No District Description of Works nt Status Estimated Cost Currency Document BER and Commence Contract Value Currenc Final Contract Value Contract No Source(s) Bidding Contractor method Contract ment (Date) y (Date) (prior/post) (yes/no) Document (Date) (Date) (Date) (Date) (Date) (Date) (Date) Award (Date) Planned 400,000.00 1/Jan/10 New Metal for mineral 1/Nov/10 Kafr El IIIMP/IS/MTYZ/MIS 01 Steel Sheds for Storage and IBRD (70%) 1 NCB Revised EGP Post No N/A N/A 387,757.50 EGP constructions and 381,248.51 Shiekh 2010 protection kafr El Shiekh GoE (30%) Actual 400,000.00 12/Feb/10 23/Mar/10 23/Mar/10 18/May/10 28/Jun/12 2/May/10 contracting 6/Jul/10
Группа Всемирного банка · Procurement Plan
Egypt, Arab Republic of - Integrated Irrigation Improvement and Management Project : procurement plan
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Procurement Plan
Источник
Всемирный банк