Page 1 5 Contract 10 4 yuan Million USD I Works 77492.73 122.60 61 A Flood Control Works 58911.18 93.65 33 a Urban District 33105.92 52.04 13 1 WMW of Huangshui River between Railway Bridge and Haihu bridge 6869.00 10.51 Works NCB XN-W-2011-01 7.42 km of Waterway Management works with the embankment of 14.8 km (7.4 km for both banks), 1 set of river across, 1 set of temporary vechicle bridge, 4 sets of subsiding culverts, and 14.84 km of graveled road. prior Feb. 2011 2 WMW between Inlet of Chaoyang Hydro-Power Plant of Beichuanhe river and Menyuan Bridge 8826.36 13.81 Works NCB XN-W-2010-02 Waterway Management works in length of 7.78 km with with the embankment of 14.98 km (7.24 km for left bank and 7.74 km for right bank),1 set of river across, 3 sets of temporary vehicle bridges, and 14 sets of subsiding culverts, and paving 10.22 km of graveled road. prior Feb. 2010 3 GLW of Huangshui River 803.84 1.25 Works NCB XN-W-2011-03 Re-vegetation belt in length of 3.0 km and in area of 2.4 hm 2 post Feb. 2011 4 WMW on Nanchuanhe river between Xinanzhuang bridge and aqueduct of Jiefang Channel 3081.68 4.79 Works NCB XN-W-2009-04 Waterway management works in length of 9.45 km, 3 sets of bank-cross building, 8 sets of subsiding culverts, and 14.83 km of graveled road. prior July,2009 Retroactive Financing 5 GMW of Huoshaogou Stream 1280.92 1.97 Works NCB XN-W-2009-05 To build 1.125 km of drainage post Aug. 2009 6 GLW of Beichuanhe River 745.14 1.20 Works NCB XN-W-2010-06 Re-vegetation of 2.4hm 2 post Feb. 2010 7 Xichuanhe River Wetland Park 2142.37 3.38 Works NCB XN-W-2011-07 Re-vegetation of 1.1km 2, , a rubber dam post Feb. 2011 8 GLW of Nanchuanhe River 1092.73 1.77 Works NCB XN-W-2009-08 Forming Re-vegetated ground, roads/paths, and plaza, in total area of 1.1 km 2 , and 1 set of rubber Dam. post Aug. 2009 9 GMW of Baojiagou stream and Daaigou stream 522.56 0.83 Works NCB XN-W-2010-09 To build 2.63 km of drainage post Feb. 2010 10 Nanchuanhe River Wetland Park 1782.63 2.88 Works NCB XN-W-2009-10 Forming Re-vegetated ground, roads/paths, and plaza, in total area of 0.52 km 2 , and 1 set of rubber Dam. post Aug. 2009 11 Beichuanhe River Wetland Park 4984.82 8.04 Works NCB XN-W-2010-11 Forming Re-vegetated ground, roads/paths, and plaza, in total area of 1.1 km 2 , and 1 set of rubber Dam. prior Feb. 2010 12 Gully Control Works of New Chengnan District 705.67 1.17 Works NCB XN-W-2011-12 To build 2 km of culvert and repair the No. 2 pool of Xigou gully. post Feb.2011 13 GMW in Economic Development District 268.21 0.45 Works NCB XN-W-2012-13 To build 1.9 km of drainage, 3 sets of chute and 5 sets of temporary vehicle bridges post Feb. 2012 b Datong County 13673.56 22.00 11 1 Waterway Management for Urban Section of Dongxia River 2789.12 4.28 Works NCB DT-W-2009-01 Waterway Management works in length of 3.64 km, 7.28 km of graveled road. **prior Aug. 2009 2 Gully Management works for Yuanshuer 293.49 0.44 Works NCB DT-W-2010-02 Gully management works in length of 1.581km post Feb. 2010 3 Vegetation works for Urban Section of Dongxia River 335.09 0.52 Works NCB DT-W-2010-03 Re-vegetated green belt 1.58hm 2 post Feb. 2010 4 WMW for Beichuanhe River 6195.91 10.16 Works NCB DT-W-2010-04 Embankment in length of 22 km and Waterway management in length of 11.39 km 1 set of River-across bridge and 5 small-sized buildings, and 18.7 km of graveled road. prior Feb. 2010 5 Gully Management works for Qiaoergou 1105.71 1.70 Works NCB DT-W-2010-05 Gully management works in length of 2.71km post Feb. 2010 6 Vegetation Works for Beichuanhe River 1040.66 1.70 Works NCB DT-W-2010-06 Re-vegetated green belt in area of 3.7hm 2 . post Feb. 2010 7 Gully management works for Dameidonggou 38.86 0.06 Works Shopping DT-W-2010-07 Waterway Managing works in length of 0.345 km **prior Feb. 2010 8 Gully management works for Xiaomeidonggou 26.66 0.04 Works Shopping DT-W-2010-08 Gully Management works in length of 450 m post Feb. 2010 9 Gully management works for Hujigou 486.68 0.81 Works NCB DT-W-2009-09 Gully management works in length of 3.685 km post Aug. 2009 10 Gully management works for Maojiagou 689.21 1.15 Works NCB DT-W-2012-10 Gully Management works in length of 2.067 km post Feb. 2012 11 Gully management works for Miaogou 672.15 1.12 Works NCB DT-W-2011-11 Gully Management works in length of 4.233 km post Feb. 2011 c HuangYuan County 10882.63 17.69 7 1 Waterway management of Huangshui River 8397.83 13.62 Works NCB HY-W-2010-01 Waterway Management works of 14.12 km, 2 sets of River-Crossing, 30.25 km of graveled roads, and 4.71 km of concrete roads. prior Feb. 2010 2 Gully management Works of Bohanggou 167.20 0.26 Works NCB HY-W-2009-02 Gully Management works of 1.581 km, 2 sets of temporary vehicle-bridges **prior Aug. 2009 3 Vegetation works of Huangshui River 1271.92 2.09 Works NCB HY-W-2010-03 Re-vegetation in area of 3.0 hm 2 prior Feb. 2010 4 Gully management Works of Lasagou 318.40 0.52 Works NCB HY-W-2010-04 Gully Management of 1.79 km post Feb. 2010 5 Gully management Works of Yangjiagou 100.20 0.17 Works NCB HY-W-2010-05 Gully Management of 1.1 km post Feb. 2010 6 Gully management Works of Heladagou 433.27 0.72 Works NCB HY-W-2011-06 Gully Management of 1.83 km, and 1 set of temporary vehicle-bridges post Feb. 2011 7 Gully management Works of Quanerwangou 193.80 0.32 Works NCB HY-W-2012-07 Gully Management of 1.1 km. post Feb. 2012 d HuangZhong County 1249.06 1.92 2 1 Zhaojiazhuang GMW 828.13 1.26 Works NCB HZ-W-2009-01 Gully sides lining in length of 3.96 km **prior Aug. 2009 2 Jiaomugou GMW 420.93 0.66 Works NCB HZ-W-2009-02 To build 1.56 km of RC box culvert post Aug. 2009 B Water Quality Improvement Works 6061.53 9.35 6 a Urban District 4550.76 7.02 4 1 Wastewater networks of Huangshui River 1035.59 1.55 Works NCB XN-W-2011-14 To pipe 13.8 km and to build 313 sets of manholes, 2.26 km of sewer channel, and 14.47 km of graveled roads. post Feb. 2011 2 Trunk sewer works in Urban area of Beichuanhe River 832.74 1.29 Works NCB XN-W-2010-15 To pipe 14.276 km and to build 308 sets of manholes post Feb. 2010 3 Reforming of Sewer and Drainage Network Works for Xiaoqiao 353.53 0.53 Works NCB XN-W-2012-16 To pipe 571 m of Sewer-Rainfall drainage and to build 21 sets of manholes in Tianjun Road, to pipe 963 m of Sewer-Rainfall drainage and to build 36 sets of manholes in Chaidamu Road, to pipe 506 m of Sewer-Rainfall drainage and to build 21 sets of manholes in Qilian Road. post Feb. 2012 4 Trunk sewer works of Nanchuanhe River in Urban District 2328.91 3.65 Works NCB XN-W-2009-17 To pipe 26.91 km of sewer channel, and to build 769 sets of manholes. prior Aug. 2009 b Datong County 1192.99 1.85 1 1 Main pipes of Waste Water Collection in Datong County 1192.99 1.85 Works NCB DT-W-2010-12 To Pipe 10.507 km of channel, and to build 163 sets of manholes. post Feb. 2010 c HuangZhong County 317.78 0.48 1 Priod of Purchrement Procurement Plan of Xining Flood Control and Watershed Management Project Contract Description Bank Review Bid Opening Date Estimated Investment Disbursement Account Procurement Method Contract No. 573.3 393.8 7.4 3.8 90 : fi Page 2 5 Contract 10 4 yuan Million USD Priod of Purchrement Procurement Plan of Xining Flood Control and Watershed Management Project Contract Description Bank Review Bid Opening Date Estimated Investment Disbursement Account Procurement Method Contract No. 1 Trunk sewer works of Huangzhong County 317.78 0.48 Works NCB HZ-W-2010-03 To Build 6.2 km of wastewater channel, pipe 3.2 km wastewater drainage, and to build 50 sets of manholes. post Feb. 2010 C Watershed Management Works 10381.46 16.35 21 a Erosion Control Works 7823.99 12.49 17 1) Urban District 3054.35 4.89 4 1 Huoshaogou Watershed Management Works 1389.68 2.15 Works NCB XN-W-2009-18 To manage 10.51 km 2 of the watershed in Houxi and Huodong villages by means of 112 sets of check dams, 300 m of slope revetment, 1450 m of gully-head protection, afforestation of 200 hm 2 of shrub, and 801.29 hm 2 of rotational grazing. prior Aug. 2009 2 Baojiagou Watershed Management Works 99.63 0.16 Works NCB XN-W-2010-19 To manage 2.36 km 2 of the watershed in Paojiazhai village by means of 22 sets of check dams, 300 m of gully-head protection, afforestation of 34.6 hm 2 of shrubs, and 201 hm 2 rotational grazing. post Feb. 2010 3 Daaigou Watershed Management Works 337.30 0.55 Works NCB XN-W-2010-20 To manage 1.7 km 2 of the watershed in Mafang village, by means of 75 sets of check dams, 400 m of gully head protection works, afforestation of 40 hm 2 of shrubs, 33.7 hm 2 of mixture of arbors and shrubs, and 96.7 hm 2 of rotational grazing. post Feb. 2010 4 Dujiagou Watershed Management Works 1227.75 2.04 Works NCB XN-W-2011-21 To manage 7.08 km 2 of Dujiazhuang and Xiaxigou Villages by means of 46 hm 2 of To terrace, 415 sets of check dams, 850 m of gully-head protection, 5 km field accessing-paths, reinforcing 6 sets of dam/pool , afforesting 200 hm 2 of shrub, and 461.67 hm 2 of rotational grazing. post Feb. 2011 2) Datong County 1687.85 2.75 6 1 Hujigou Watershed Management Works 181.36 0.28 Works NCB DT-W-2009-13 To manage an area of 0,99 km 2 of the watershed by means of terracing 12.3 hm 2 of slopping farmland, building 33 sets of check dams and 1 set of warping dam, and afforesting 86.5 hm 2 of shrubs. **prior Aug. 2009 2 Maojiagou Watershed Management Works 182.41 0.29 Works NCB DT-W-2012-14 To manage 1.93 km 2 of the watershed in Maojiazhai village by means of terracing 26.67 hm 2 of slopping farmland, building 6 km of filed accessing path, building 50 sets of check dams, forming 150m of gully-head protection works, and afforesting 166 hm 2 of shrubs. post Feb. 2012 3 Qiaoergou Watershed Management Works 103.27 0.17 Works NCB DT-W-2010-15 To manage 2.21 km 2 of the watershed in Qiaoergou Village by means of building 7 sets of check dams and 1 set of warping dam, forming 100 m of gully-head protection, afforesting 36.1 hm 2 of shrubs, and rotational grazing on 184.9 hm 2 . post Feb. 2010 4 Dongxiagou Watershed Management Works 670.72 1.11 Works NCB DT-W-2011-16 To managing 2.96 km2 of Liujiazhuang, Erma and Yuandongzi villages, including 40 hm2 of terraces, 10 km of field access paths, 117 sets of check dams, 50 m of gully-head protection, 50 m of slope revetment, 73.6 hm2 of shrub Afforestation, 59.9 hm2 of arbor afforestation, and 226.48 hm2 of rotational grazing. post Feb. 2011 5 Dameidonggou Watershed Management Works 338.63 0.56 Works NCB DT-W-2010-17 To manage 4.42 km 2 of the watershed in Dameidong village, including 36 hm 2 of terraces, 83 sets of check dams, 850 m of gully head protection, 1 set of pool, 179.87 hm 2 of shrub plantation, and 193.2 hm 2 of rotational grazing post Feb. 2010 6 Miaogou Watershed Management Works 211.47 0.35 Works NCB DT-W-2011-18 To manage 12.21 km 2 of the watershed in Shangmiao and Xiamiao villages by terracing 28 hm 2 , building 24 sets of check dams, 150 m of gully head protection works, afforesting 193.2 hm 2 of shrub, and rotational grazing on 1000 hm 2 . post Feb. 2011 3) HuangYuan County 1576.42 2.45 4 1 Bohanggou Watershed Management Works 752.82 1.14 Works NCB HY-W-2009-08 To manage 4.4 km 2 of the watershed in Bohang, Nalong, Huendong and Shangquan villages by means of 288.69 hm 2 terraces, 21 sets of check dams, 6 sets of warping dams, 87.34 hm 2 of shrub afforestation and 63.63 hm 2 of rotational grazing. post Aug. 2009 2 Lasagou Watershed Management Works 617.10 0.97 Works NCB HY-W-2010-09 To manage 5.62 km 2 of the watershed in Yongxing and Guanghua villages by means of 15 sets of check dams, 360 m of gully-head protection, afforestation of 178.5 hm 2 of shrubs and 127.9 hm 2 of arbor trees, and 255.25 hm 2 of rotational grazing. post Feb. 2010 3 Heladagou Watershed Management Works 135.29 0.22 Works NCB HY-W-2011-10 To manage 5.11 km 2 of the watershed in Hela and Yongxing villages. It consists of 4.9 hm 2 of terraces, 12 km of field accessing paths, 15 sets of check dams, 1 set of warping dam, 127.5 hm 2 of shrubs afforestation, and 379 hm 2 of rotational grazing. post Feb. 2011 4 Quanwangou Watershed Management Works 71.21 0.12 Works NCB HY-W-2012-11 To manage 1.99 km 2 of the watershed in Wanfeng and Quanerwan villages be means of 15 sets of check dams, 93.14 hm 2 of shrub plantation, and 105.84 hm 2 of rotational grazing. post Feb. 2012 4) HuangZhong County 1505.36 2.40 3 1 Huoshaogou Watershed Management Works 534.21 0.81 Works NCB HZ-W-2009-04 To manage 16.75 km 2 of the watershed in Paojiazhai, Zhangliyao, Qingshan, Kongjia and Shuitan villages, by 106.1 hm 2 of terraces, 10 km of field access paths, 16 sets of check dams, 2 sets of pools, afforestation of 427.2 hm 2 of shrubs and 1.78 hm 2 of arbor trees, and 1141.5 hm 2 of rotational grazing. prior Aug. 2009 573.3 393.8 7.4 3.8 90 : ffl Page 3 5 Contract 10 4 yuan Million USD Priod of Purchrement Procurement Plan of Xining Flood Control and Watershed Management Project Contract Description Bank Review Bid Opening Date Estimated Investment Disbursement Account Procurement Method Contract No. 2 Fengtaigou Watershed Management Works 705.54 1.14 Works NCB HZ-W-2010-05 To manage 13.84 hm 2 of the watershed in Fengtai and Yangjuan villages, by means of 206.87 hm 2 of terraces, 67 sets of check dams, afforestation of 361.07 hm 2 of shrubs and 36.54 hm 2 of arbor trees, and 779.04 hm 2 of rotational grazing. post Feb. 2010 3 Lushaergou Watershed Management Works 265.61 0.44 Works NCB HZ-W-2011-06 To manage 6.27 hm 2 of the watershed in Qingyi, Qinger, Aongzhang and Zhaojiazhuang villages, by means of afforesting 219.44 hm 2 of shrubs and 41.17 hm 2 of arbor trees, and 366.5 hm 2 of rotational grazing. post Feb. 2011 b Livelihood Activities 2557.47 3.85 4 1 Livelihood Activities for Urban Districts 184.84 0.28 Works Community Participation XN-W-2009-22 To form 75 sheds of 20 and 176 pieces of methane-generating pits in Huoshaogou watershed, 101 pieces of sheds of 20 and consolidating 1.5 km of road in Dujiagou Watershed. post Aug. 2009 2 Livelihood Activities for Datong County 858.67 1.28 Works Community Participation DT-W-2009-19 To form 35 sheds of 20 and 120 pieces of methane-generating pits in Maojiagou watershed; to form 35 pieces of green house in size of 0.5 mu, 20 pieces of sheds of 20 , 100 pieces of methane-generating pits, consolidating of 3 km in Hujigou Watershed; to form 100 pieces of sheds and 250 pieces of methane-generating pits in Dameidonggou Watershed; to form 125 sheds of 20 and to consolidate 4 km of road in Qiaoergou Watershed; to form 130 sheds of 20 , 61 pieces of methane-generating pits and to consolidate 5 km of road in Dongxia Watershed; to form 80 sheds of 20 and 400 pieces of methane-generating pits in Miaogou watershed. post Aug. 2009 3 Livelihood Activities for Huangyuan County 729.79 1.09 Works Community Participation HY-W-2009-12 To form 191 pieces of cattle sheds of 20 m 2 and 168 pieces of pigsties of 20 m 2 in Bohanggou Watershed; to form 118 pieces of cattle sheds of 20 m 2 and 85 pieces of pigsties of 20 m 2 , and to consolidate 5.1 km of roads in Lasagou watershed, to form 119 pieces of cattle shed of 20 m 2 and 20 pieces of sheep pens of 20 m 2 in Heladagou watershed, 106 pieces of cattle sheds of 20 m 2 , 59 pieces of pigsties of 20 m 2 and 50 pieces of sheep pens of 20 m 2 in Quanwangou watershed. post Aug. 2009 4 Livelihood Activities for Huangzhong County 784.17 1.21 Works Community Participation HZ-W-2009-07 To form 99 cattle sheds of 20 m 2 , 69 pigsties of 20 m 2 and 163 sheep pens of 20 m 2 , to consolidate 8 km of roads, and to form methane-generating pits in Huoshaogou watershed of Huangzhong County; to form 42 cattle sheds of 20 m 2 , 55 pigsties of 20 m 2 and 141 sheep pens of 20 m 2 , and to consolidate 12 km of roads in Fengtaigou watershed; to form 87 cattle sheds of 20 m 2 , 58 pigsties of 20 m 2 , and 11 sheep pens of 20 m 2 . post Aug. 2009 D Institution Capacity Building 2138.56 3.25 1 a Urban District 2138.56 3.25 1 1 River & Watershed Management Center 2138.56 3.25 Works NCB XN-W-2010-23 Nachuanhe and Beichuanhe Management Stations, River Management Center, FFW Center, Training Center, and Monitoring Center. Relevant Flood Control Warehouse, and one set of Critical Meteorological Factors Observing Station. **prior Feb. 2010 II Goods 4477.40 6.91 18 A Flood control & Management works 1738.02 2.73 8 1 Precipitation and Runoff Information Collection Equipment 273.81 0.43 Goods NCB XN-G-2010-01 Procurement of 79 sets of pluviometer, 25 sets of nilometer, auxiliary rainfall information & relevant meteorology equipments, and installation services. prior Oct. 2010 2 Flood Info. Communication Equipments Purchasing and Debugging 323.06 0.51 Goods NCB XN-G-2010-02 81 sets of telemetry terminal, 85 sets of GSM communication module, 81 pieces of solar power, 5 sets of spare parts, service tools, and installation services. prior Oct. 2010 3 Works & Disaster Info. Collection System Purchasing and Debugging 183.41 0.29 Goods NCB XN-G-2010-03 Purchasing, installing, developing, and debugging of Information system of Facilities, Disasters, and Rainfall, including automatic video monitoring system on Urban section of Huanshui River and Ninghu sluice. post Oct. 2010 4 Computer Networks Purchasing and Debugging 321.59 0.50 Goods NCB XN-G-2010-04 Procurement Municipal Center of FFW and network equipments for three counties, optical-fibre circuit, Fitment of Equipment rooms, and installation services. prior Oct. 2010 5 DLP System Purchasing and Debugging 268.99 0.42 Goods NCB XN-G-2010-05 Procurement of Digital Light Procession system of FFW, and installation services. prior Oct. 2010 6 Video Meeting System Purchasing and Debugging 107.75 0.17 Goods NCB XN-G-2010-06 Purchasing and installing and debugging of Video communication system connecting 3 agencies such as FFW Center and Weather Forecasting Agency, and installation services. post Oct. 2010 7 Flood Warning Publication System Purchasing and Debugging 210.53 0.33 Goods NCB XN-G-2010-07 FFW information publication equipments for 26 main villages and towns, 25 sets of PDA FFW querying equipments, developing and debugging and training of relevant software. prior Oct. 2010 8 Un-Interrupted & Lightning-Protected Power Supplier 48.89 0.08 Goods Shopping XN-G-2010-8 Purchasing and installing of 25 sets of UPS and 4 sets of Lightening Protection system. **prior Oct. 2010 B Institution Capacity Building 1083.39 1.63 4 573.3 393.8 7.4 3.8 90 : ffi Page 4 5 Contract 10 4 yuan Million USD Priod of Purchrement Procurement Plan of Xining Flood Control and Watershed Management Project Contract Description Bank Review Bid Opening Date Estimated Investment Disbursement Account Procurement Method Contract No. 1 Office Equipment for Project Management 112.20 0.17 Goods NCB XN-G-2011-09 67 sets of computer, 12 sets of fax, 25 sets of printers, 9 sets of copier, 1 set of desk pressing system, 18 sets of DC and DV. post Aug. 2011 2 Traffic Equipments for Project Management 325.02 0.49 NCB XN-G-2009-10 2 vans, 4 off-road vehicles, 2 trucks, 5 all-terrain vehicles for flood control. prior Oct. 2009 3 Traffic Equipments for Project Management 321.14 0.479 Goods NCB XN-G-2011-11 1 set of van for sewer treatment, 11 off-road vehicles. prior Apr. 2011 4 Traffic Equipments for Project Management 325.02 0.50 Goods NCB XN-G-2012-12 5 vans, 3 off-road vehicles, 1 bus, and 3 all-terrain vehicles for flood control. prior Apr. 2012 C Water Quality Improvement Works 325.02 0.54 1 13 Special Equipment for Wastewater Collection works 325.02 0.542 Goods NCB XN-G-2013-13 1 set of Multifunctional Channel Cleaning vehicle, 2 sets of Channel Washer, 1 set of suction-type sewer scavenger, 4 sets of garbage truck, and 3 sets of transportation vehicles. prior Apr. 2013 D Watershed Management 1330.96 2.01 5 1 Livelihood Activities for Urban Districts 85.59 0.13 Goods Community Participation XN-G-2009-14 195 solar cookers for Huoshaogou Watershed, 400 solar cookers and 2260 pieces of sheep for Dujiagou watershed. post Aug. 2009 2 Livelihood Activities for Datong County 577.06 0.87 Goods Community Participation DT-G-2009-01 To purchase 40 cattle and 268 solar cookers for Hujigou Watershed; 60 cattle and 360 solar cookers for Maojiagou Watershed; 115 cattle and 900 sheep and 669 solar cookers for Qiaoergou Watershed; 130 cattle and 400 sheep and 375 solar cookers for Dongxiagou Watershed; 300 cattle and 1015 solar cookers for Dameidonggou Watershed, 48 cattle and 300 sheep and 750 solar cookers for Miaogou Watershed. post Aug. 2009 3 Livelihood Activities for Huangyuan County 170.19 0.25 Goods Community Participation HY-G-2009-01 To purchase 191 cattle, 62 calves, and 37 sheep for Bohanggou Watershed; 10 calves and 232 sheep for Lasagou Watershed; 12 cattle, 12 calves and 133 sheep for Quanwangou Watershed. post Aug. 2009 4 Livelihood Activities for Huangzhong County 496.90 0.76 Goods Community Participation HZ-G-2009-01 34 cattle and 274 sheep for Fengtaigou Watershed; 270 cattle, 1987 sheep and 52 solar cookers for Huoshaogou Watershed in Huangzhong County; 308 cattle and 694 sheep for Lushaergou Watershed. post Aug. 2009 5 Huoshaogou Watershed in Huangzhong County 1.22 0.002 Goods Community Participation XN-G-2009-02 To purchase 13 Sets of Hey Cutter post Aug. 2009 III Consultant 3013.51 4.81 16 B QBS 311.00 0.49 2 1 Integration of Flood Forecasting & Warning System, Forming of the Data Bank, Developing of Info Processing Software. 141.0 0.22 Consultant QBS XN-C-2010-01 Integration of the FFW system, Development of Information Querying and Analyzing system, Foundation of Information Data Bank of Facilities, Runoff, Disaster, and socio-economics. prior Oct. 2010 2 Development of Flood Forecasting and Control Programming System 170.0 0.27 Consultant QBS XN-C-2010-02 Programming of Flood Warning and Treatment, developing of Warning and Forecasting models by flood at gullies, and developing of the relevant software. prior Oct. 2010 C CQS 449.70 0.72 5 1 Research on Project Management Mechanism 85.03 0.14 Consultant CQS XN-C-2010-03 To probe into an Optimized Project Management Mechanism Favoring the Project Implementation. prior Apr. 2010 2 Research on Soil Erosion Mechnism 89.91 0.14 Consultant CQS XN-C-2010-04 Role and Mechanism of Participatory Watershed Management in soil erosion control. prior Apr. 2010 3 Probe in Environment Monitoring 64.82 0.10 Consultant CQS XN-C-2010-05 Role of Environment Monitoring & Evaluation in Project Decision. prior Apr. 2010 4 Research on Flood Forecasting & Warning Techniques 115.01 0.18 Consultant CQS XN-C-2011-06 Study on Flood Warning & Forecasting Techniques From Gullies. prior Apr. 2011 5 Research on Maintenance and Management of Flood Control Facilities 94.93 0.15 Consultant CQS XN-C-2012-07 Sustainable Mechanism in Maintaining Flood Control Facilities. prior Apr. 2012 D IC 247.00 0.40 8 1 Water Conservancy Tech. Consultant 20.80 0.03 Consultant IC XN-C-2009-08 Consultant on hydro-technics techniques. post Sept. 2009 2 Watershed Management Tech. Consultant 25.60 0.04 Consultant IC XN-C-2009-09 Consultant on watershed management techniques. post Sept. 2009 3 Project Management 40.00 0.06 Consultant IC XN-C-2009-10 Consultant project management post Sept. 2009 4 Water Resources Management 17.60 0.03 Consultant IC XN-C-2009-11 Consultant on Water Resources Management post Sept. 2009 5 FFW Technicques 33.60 0.05 Consultant IC XN-C-2009-12 Consultant on Flood Forecasting & Warning techniques. post Sept. 2009 6 Financial Management & Procurement Consultant 49.60 0.08 Consultant IC XN-C-2009-13 Consultant on Financial affairs and Procurement procedures prior Sept. 2009 7 Environment Management Consultant 28.80 0.05 Consultant IC XN-C-2009-14 Consultant on Environment Management post Sept. 2009 8 Professional Translater 31.00 0.05 Consultant IC XN-C-2009-15 Professional Translater post Sept. 2009 E SOE 2005.81 3.21 1 1 Training Courses, Study-Tours, Workshops 2005.81 3.21 Consultant SOE XN-C-2009-16 Training on Hydro-techniques, 3 courses, 24 persons. 84983.64 134.32 95 Remarks: **prior--contracts subjecting to post revirew but treated as prior review. FFWS--Flood Forecasting and Warning System WMW--Waterway Management Works GMW--Gully Management Works GLW--Green Landscape Works FFW--Flood Forecasting and Warning 573.3 393.8 7.4 3.8 90 : ff
Группа Всемирного банка · Procurement Plan
China - Xining Flood Control and Watershed Management Project : procurement plan
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Procurement Plan
Страна
Китай
Источник
Всемирный банк