Agreed by the Recipient, dated June 15, 2009 KYRGYZ REPUBLIC: Small Towns Infrastructure and Capacity Buiding Project (CREDIT NUMBER 4016-KG/GRANT NUMBER H139-KG) 49033 ORIGINAL ACTIVITIES UNDER THE PROJECT DATA UPDATED PROCUREMENT PLAN - CONSULTANT SERVICES for 2008-2009 Bid Bid Ref Type Total Bid Method Finaliz. Of Req.for Draft RFP inc Bank's No RFP Issued Technical Technical Bank's No Comb Bank's No Receipt of Bank's no Contract Contract Bank's Review No: Est.(US$) TOR Exp.of TOR, Short objection to Proposal Evaluation objection to tech/financial objection to Draft objection to Signature Completion interest list full package Opening Report tech.eval.Report evaluation comb Contract Contract of RFP Report Report Signature 1 Project Management Consultant CS 936,644 QCBS 03/02/2005 12/09/2004 03/03/2005 03/10/2005 03/10/2005 04/13/2005 05/13/2005 05/21/2005 06/08/2005 06/10/2005 06/29/2005 07/12/2005 07/12/2005 02/18/2008 Prior Review Services (PMC) 2 Base servey for 12 towns CS 40,000 QCBS 02/20/2006 05/05/2006 05/19/2006 n/a n/a n/a n/a n/a n/a n/a 06/29/2006 06/29/2006 06/29/2006 01/15/2007 Prior Review 5 Development of a training CS 6,000 SSS 10/10/2005 n/a n/a n/a n/a n/a n/a n/a n/a n/a 01/11/2006 01/11/2006 02/16/2006 08/15/2006 Post Review module and provision of training services for training of Small towns water utilities chlorination unit Specialists on drinking water testing and desinfection 6 Quality Assurance Engineer CS 7,200 INDV 24/11/06 08/12/06 15/12/06 n/a n/a n/a n/a n/a n/a 22/12/06 22/12/06 22/12/06 22/12/07 Post Review Technical supervisor for Jalalabat Post Review 7 CS 5,100 INDV 16/02/07 02/03/07 09/03/07 n/a n/a n/a n/a n/a n/a 16/03/07 23/03/07 23/03/07 22/03/08 8 Technical supervisor for Maili-Suu CS 5,100 INDV 16/02/07 02/03/07 09/03/07 n/a n/a n/a n/a n/a n/a 16/03/07 23/03/07 23/03/07 22/03/08 Post Review 9 Technical supervisor for Kara- Suu CS 5,100 INDV 16/02/07 02/03/07 09/03/07 n/a n/a n/a n/a n/a n/a 16/03/07 23/03/07 23/03/07 22/03/08 Post Review 10 Technical supervisor for Kant CS 5,100 INDV 16/02/07 02/03/07 09/03/07 n/a n/a n/a n/a n/a n/a 16/03/07 23/03/07 23/03/07 22/03/08 Post Review 11 Technical supervisor for Balykchy CS 5,100 INDV 16/02/07 02/03/07 09/03/07 n/a n/a n/a n/a n/a n/a 16/03/07 23/03/07 23/03/07 22/03/08 Post Review Post Review 12 Preparation of Design Cost Estimates CS 90,000 CQ 20/02/07 07/03/07 06/04/07 n/a n/a n/a n/a n/a n/a n/a 18/05/07 01/06/07 29/10/07 13 Utility Financial Management CS 10,000 CQ 01/03/07 16/03/07 15/04/07 n/a n/a n/a n/a n/a n/a n/a 03/06/07 17/06/07 14/11/07 Post Review 14 Utility Management Training CS 15,000 CQ 12/03/07 26/03/07 09/04/07 n/a n/a n/a n/a n/a n/a n/a 07/05/07 14/05/07 13/07/07 Post Review 15 Audit CS 10,000 CQ 14/12/06 25/12/06 05/01/07 n/a n/a n/a n/a n/a n/a n/a 26/01/07 02/02/07 03/04/07 Post Review 16 Billing and Collection Software CS 40,000 CQ 01/12/06 15/12/06 29/12/06 n/a n/a n/a n/a n/a n/a n/a 26/01/07 02/02/07 03/04/07 Post Review 17 Financial Statements Post Review conversation CS 60,000 CQ 11/12/06 25/12/06 08/01/07 n/a n/a n/a n/a n/a n/a n/a 05/02/07 12/02/07 13/04/07 18 International Accounting Post Review Standards Training CS 10,000 CQ 13/03/07 27/03/07 10/04/07 n/a n/a n/a n/a n/a n/a n/a 08/05/07 15/05/07 14/07/07 Preparation of methodical Post Review 19 recommendations and training on CS 5,000 CQ 01/02/07 15/02/07 01/03/07 n/a n/a n/a n/a n/a n/a n/a 29/03/07 05/04/07 04/06/07 environmental protection 20 Basic and Advanced Customer Post Review Service Practices CS 5,000 CQ 13/02/07 27/02/07 13/03/07 n/a n/a n/a n/a n/a n/a n/a 10/04/07 17/04/07 16/06/07 Development and introduction of Post Review standard industrial and economic and financial documentations, 21 and preparation of feasibility CS 7,000 CQ 27/02/07 13/03/07 27/03/07 n/a n/a n/a n/a n/a n/a n/a 24/04/07 01/05/07 30/06/07 study for renewal/establishing specialized machinery pool for Nookat and Talas Technical supervisor for Nookat Post Review 22 CS 6,140 INDV 10/06/09 19/06/09 03/07/09 n/a 19.06.09. n/a n/a n/a 10/07/09 n/a 10/07/09 n/a 17/07/09 17/07/10 23 Technical supervisor for Kok- Post Review Jangak CS 6,140 INDV 10/06/09 19/06/09 03/07/09 n/a 19/06/09 n/a n/a n/a 10/07/09 n/a 10/07/09 n/a 17/07/09 17/07/10 24 Technical supervisor for Kara- Post Review Balta CS 6,140 INDV 10,06/2009 12/06/09 26/06/09 n/a 12/06/09 n/a n/a n/a 02/07/09 n/a 03/07/09 n/a 03/07/09 03/07/10 25 Technical supervisor for Batken CS 6,140 INDV 10/06/09 12/06/09 26/12/09 n/a 12/06/09 n/a n/a n/a 02/07/09 n/a 03/07/09 n/a 03/07/09 03/07/10 Post Review Post Review 26 Impact assessment in 14 towns and base servey for 4 towns CS 44,000 CQ 19/06/09 26/06/09 10/07/09 n/a 26/08/09 n/a n/a n/a 20/08/09 n/a 09/09/09 n/a 10/09/09 10/12/09 Bid Bid Ref Type Total Bid Method Finaliz. Of Req.for Draft RFP inc Bank's No RFP Issued Technical Technical Bank's No Comb Bank's No Receipt of Bank's no Contract Contract Bank's Review No: Est.(US$) TOR Exp.of TOR, Short objection to Proposal Evaluation objection to tech/financial objection to Draft objection to Signature Completion interest list full package Opening Report tech.eval.Report evaluation comb Contract Contract of RFP Report Report Signature Post Review Preparation of Design Cost 27 Estimates for towns:Tash-Kumyr, CS 100,000 CQ 25/09/09 02/10/09 02/11/09 n/a 06/11/09 n/a n/a n/a 05/11/09 n/a 13/11/09 n/a 20/11/09 02/06/10 Mailuu-Suu, Naryn, Shopokov Total 168,560
Группа Всемирного банка · Procurement Plan
Kyrgyz Republic - Small Towns Infrastructure and Capacity Building Project : procurement plan for consultant services for 2008-2009
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Procurement Plan
Источник
Всемирный банк