73674 LAO PDR - GMS Power Trade Project (Revised June 19, 2009) Goods & Works 1 2 3 4 5 6 7 8 9 Ref. Contract Procur P- Domestic Review Expected Comment Status as of October 23, 2008 No. (Descriptio ement Q Preferenc by IDA Bid- s Revised as of June 19, 2009 n) Metho e (Prior / Opening d (yes/no) Post) Date IFB-1 115kV ICB No No Prior February Supply & On going. transmissio 2008 Installatio n system n from Ban Hat to the Cambodia border IFB-2 115kV ICB No No Prior August Supply & Contract Signature Date: July 4, 2008 transmissio 2007 Installatio Awarded Bidder(s) n system n Name: BEIJING POWER ENGINEERING COMPANY from Xeset 1 to Saravan IFB-3 National ICB No No Prior To be Supply & Bank NOL on draft REP 4/20/09 and determine Installatio regional d n load Possible dispatch two-stage centers bidding IFB-4 Field Work ICB No No Prior To be Supply NOL on BER 3/18/09 Vehicles determine only d 5 Computers Shoppi No No Post To be Supply Contract signed 4/29/08 & office ng determine only equipment d 1 Consultants 1 2 3 4 5 6 7 Review by Expected Ref. Description of Assignment Selection IDA Proposals Status as of October 23, 2008 No. Comments Method (Prior / Submission Revised as of June 19, 2009 Post) Date 1. Consultant services for QCBS Prior August 2007 EdL - Contract signed with Maunsell transmission lines and Power Grid on 2/17/09 substations - Submitted signed contract on (Consultant for Supervision 2/23/09 of Construction IFB 1 & 2) 2. Consultant services for load QCBS Prior August 2007 EdL NOL draft REP on 4/20/09 dispatch centers (design and project management) 3. Tariff study QCBS Prior August 2007 EdL Bank NOL Evaluation Report: 07/21/2008 Signed contract: 10/01/2008 4. Feasibility study of Houay QCBS Prior August 2007 DOE Bank NOL TER: 03/12/2008 Lamphang Gnai Hydro Combined TER: 03/21/2008 Bank NOL draft contract: 04/28/2008 Signed contract: 05/08/2008 5. Environmental and social QCBS Prior August 2007 DOE Bank NOL the Technical Evaluation Reports assessment of Houay EIA & SIA for Houay Lamphan Hydropower Lamphang Gnai Hydro Project :05/12/2008 Combined TER: 05/26/2008 Signed Contract: 06/23/2008 6. Technical assistance for QCBS Prior To be DOE Procurement has not yet started. collector substation system determined 2
Группа Всемирного банка · Procurement Plan
Laos - Greater Mekong Subregion (GMS) Power Trade Project : procurement plan
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Procurement Plan
Источник
Всемирный банк