Группа Всемирного банка · Procurement Plan

China - Wenchuan Earthquake Reconstruction Project : procurement plan

Китай Всемирный банк
Открыть оригинал документа

Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.

Полный текст

50677 Project Name: Wenchuan Earthquake Resconstruction Project (Sichuan Component) 6.800 Component: Infrastructure Component TTL: Mara. K. Wrick Subject: Tentative Procurement Plan for Good, Works and Consultancy Services Date: 30-Jun-09 1 2 3 5 6 7 8 9 10 11 12 13 14 15 16 Prior / District / Batch Pre.Design Bidding Const. Start Const. End Ref. No. Municipal Con. No. Contract Description Estimated Cost Proc. Method Post FSR Complete Remark County Number Complete Complete Date Date Review (RMB 10000) (US$ million) (mm/dd/yy) (mm/dd/yy) (mm/dd/yy) (mm/dd/yy) (mm/dd/yy) A1) Civil Works Contracts for First Batch Sub-Projects 133864.01 196.859 Reconstruction of town roads and sewers covering Longmen, Xinzao, Qingyi, Chengjiao, Fenggu, 1 MY FC One FC1-1,2 7424.68 10.919 NCB/Works Prior 2009/02/28 2010/01/05 2010/02/25 2010/04/05 2011/04/05 100d Fucheng urban Reconstruction of town roads and sewers covering Bolin, Weicheng, Zhongxing;Reconstruction 2 MY YX One YX1-1 of flood embankment and roads in and Youxian 11775.06 17.316 NCB/Works Prior 2009/02/28 2009/12/25 2010/02/15 2010/03/25 2011/03/25 ; 3 MY YX One YX1-2 Reconstruction of flood embankment in Songya 0.00 0.000 NCB/Works Prior 2009/02/28 40162 40214 40252 40617 Reconstruction of water supply piping networks, three solid waste transfer stations, and roads for 4 MY ST One ST1-1 11654.80 17.139 NCB/Works Prior 2009/02/28 2009/11/10 2009/12/10 2009/12/15 2010/12/15 Tongchuan and Beiba Towns3 Reconstruction of town roads, bridge, and sewer networks for Chengyun town 5 MY YT One YT1-1,2 16418.08 24.144 NCB/Works Prior 2009/02/28 2009/12/30 2010/02/20 2010/03/30 2011/03/30 Reconstruction of roads, embankments and bridges for Qinglian town 6 MY JY One JY1-1 4913.95 7.226 NCB/Works Post 2009/02/28 2009/12/30 2010/02/20 2010/03/30 2011/03/30 7 MY ZT One ZT1-1 Reforcing of bridge for Wenchang towm 650.04 0.956 NCB/Works Post 2009/02/28 2009/12/30 2010/02/20 2010/03/30 2011/03/30 8 GY CT One CT1-1 Reconstruction of town roads for Chaotian and Muyang towns 7957.83 11.703 NCB/Works Prior Yet to be decided Reconstruction of roads and bridges for Donghe,Sanjiang and Mumen townships 9 GY WC One WC1-1 5998.74 8.822 NCB/Works Post 2009/02/28 2009/12/30 2010/02/20 2010/03/30 2011/03/30 Reconstruction of roads 7900m, bridges 560m, water supply networks 30.81km, and solid wastes 10 GY CX One CX1-1 transfer-stations 100t/day for Lingjiang township7900560 12730.51 18.721 NCB/Works Prior 2009/02/28 2009/12/25 2010/02/15 2010/03/25 2011/03/25 30.81100/ Construction of roads 3.39km, sewers networks 5.72km and river embankments 2.86kmx2 for 11 GY LZ One LZ1-1 0.00 0.000 NCB/Works Prior 2009/02/28 2010/01/05 2010/02/25 2010/04/05 2011/04/05 Baolun township3.39km5.72km2.86kmx2 Project Name: Wenchuan Earthquake Resconstruction Project (Sichuan Component) 6.800 Component: Infrastructure Component TTL: Mara. K. Wrick Subject: Tentative Procurement Plan for Good, Works and Consultancy Services Date: 30-Jun-09 1 2 3 5 6 7 8 9 10 11 12 13 14 15 16 Prior / District / Batch Pre.Design Bidding Const. Start Const. End Ref. No. Municipal Con. No. Contract Description Estimated Cost Proc. Method Post FSR Complete Remark County Number Complete Complete Date Date Review (RMB 10000) (US$ million) (mm/dd/yy) (mm/dd/yy) (mm/dd/yy) (mm/dd/yy) (mm/dd/yy) Reconstruction of roads 8.9km, sewer networks 22km, solid wastes treatment plant 60t/day, water supply networks 13.56km, bridges 5 nos, and bus stations8.9km 12 GY YB One YB1-1 5928.70 8.719 NCB/Works Post 2009/02/28 2009/12/25 2010/02/15 2010/03/25 2011/03/25 22km60/13.56km14 Reconstruction of street roads 7836m, water supply networks 40000t/day7836 13 NC LZ One LZ1-1 9331.91 13.723 NCB/Works Prior 2009/02/28 2009/12/20 2010/02/10 2010/03/20 2011/03/20 4/ Reconstruction of bridges 3 nos. and flood embankment 5km for Nanjiang35km 14 NC BZ One BZ1-1,2 13639.62 20.058 NCB/Works Prior 2009/02/28 2009/12/25 2010/02/15 2010/03/25 2011/03/25 Reconstruction of roads 10520m, water supply plants 2500t/day , sewers networks 11600m and 15 YA BX One BX1-1 reciptors 11600m for Muping and Lingguan105202500t/ 7024.18 10.330 NCB/Works Prior 2009/02/28 2009/06/19 2009/09/19 2009/09/29 2010/10/30 11600m11600m Reconstruction of roads 10.37km, water supply networks (main 4km and branches 15.5km), 16 YA SM One SM1-1 sewer networks 12.58km for Xinmian10.37km4km 7345.19 10.802 NCB/Works Prior 2009/02/28 2009/06/18 2009/09/23 2009/09/30 2010/10/30 15.5km)12.58km Reconstruction of roads 21.628km and sloping 2.368km21.628km1/ 17 YA LS One LS1-1,2 11070.72 16.280 NCB/Works Prior 2009/02/28 2009/06/24 2009/09/28 2009/09/30 2010/11/05 A2) Civil Works Contracts for Second Batch Sub-Projects 165384.61 243.213 Construction of three roads 4780m long and sewer networks 9560m in countryside 1 MY FC Two FC2-1 3750m7500m6490m980m7540m 7340.87 10.795 NCB/Works Prior 2009/08/28 2009/10/27 2010/01/25 2010/02/24 2011/08/18 1080m Construction of four roads 4000m and sewer networks 8000m in Longmen, and three roads 2 MY FC Two FC2-2 5100m and sewer networks 10200m in Qingyi 44000m, 8113.08 11.931 NCB/Works Prior 2009/08/28 2009/10/27 2010/01/25 2010/02/24 2011/08/18 4000m 35100m10200m Construction of a water supply plant with a capacity of 2000 ton/day 20000t/d 3 MY FC Two FC2-3 2821.52 4.149 NCB/Works Post 2009/08/28 2009/10/27 2010/01/25 2010/02/24 2011/08/18 Construction of two roads 2647m and sewer networks 5294 in Shima, three roads 5400m and 4 MY YX Two YX2-1 sewer networks 10800m in Xinqiao 2 (2647m)(5294m) 3 4399.94 6.471 NCB/Works Post 2009/08/28 2009/10/27 2010/01/25 2010/02/24 2011/08/18 (5400m) (10800m) Construction of a WWTP (15000t/d) and ancillary networks 1000m in Shima, and a 5 MY YX Two YX2-2 WWTP(10000t/d)and ancillary networks 2000m in Xinqiao WWTP (15000t/d) 3700.02 5.441 NCB/Works Post 2009/08/28 2009/10/27 2010/01/25 2010/02/24 2011/08/18 1000mWWTP (10000t/d)2000m Project Name: Wenchuan Earthquake Resconstruction Project (Sichuan Component) 6.800 Component: Infrastructure Component TTL: Mara. K. Wrick Subject: Tentative Procurement Plan for Good, Works and Consultancy Services Date: 30-Jun-09 1 2 3 5 6 7 8 9 10 11 12 13 14 15 16 Prior / District / Batch Pre.Design Bidding Const. Start Const. End Ref. No. Municipal Con. No. Contract Description Estimated Cost Proc. Method Post FSR Complete Remark County Number Complete Complete Date Date Review (RMB 10000) (US$ million) (mm/dd/yy) (mm/dd/yy) (mm/dd/yy) (mm/dd/yy) (mm/dd/yy) 6 MY ST Two ST2-1 Reconstruction of WTP 50000t/d in Beiba, (50000t/d) 6499.98 9.559 NCB/Works Post 2009/08/28 2009/10/27 2010/01/25 2010/02/24 2011/08/18 Construction of four roads 5902m and sewers 11804m, 4 (5902m) 7 MY ST Two ST2-2 9221.00 13.560 NCB/Works Prior 2009/08/28 2009/10/27 2010/01/25 2010/02/24 2011/08/18 (11804m) Reconstruction of one road 800m and sewers 1600m, and Construction of two segments of 8 MY YT Two YT2-1 embankment 2800m and roads 3100m and sewers 6200m 1 (800m) 6918.66 10.175 NCB/Works Prior 2009/08/28 2009/10/27 2010/01/25 2010/02/24 2011/08/18 (1600m)2 (2800m) 2(3100m)(6200m) Construction of two roads 3640m and sewers 7280m, and Reconstruction of three roads 6732m 9 MY ZT Two ZT2-1 and sewers 13464m 2 (3640m)(7280m)3 7349.98 10.809 NCB/Works Prior 2009/08/28 2009/10/27 2010/01/25 2010/02/24 2011/08/18 (6732m) (13464m) Reconstruction of Jiukuaishi bridge 568m long and 16.5m wide 568m 10 MY ZT Two ZT2-2 4500.04 6.618 NCB/Works Post 2009/08/28 2009/10/27 2010/01/25 2010/02/24 2011/08/18 16.5m Reconstruction of water supply networks 28570m, construction of a WTP(40000t/d), and 11 MY ZT Two ZT2-3 rehabilitation of drainage channel 1810m 28570m 6370.99 9.369 NCB/Works Post 2009/08/28 2009/10/27 2010/01/25 2010/02/24 2011/08/18 (40000t/d) (1810m) Construction of roads 6200m and sewers 12400m, and construction of 9 bus stations, 12 MY CT Two CT2-1 7220.24 10.618 NCB/Works Prior 2009/08/28 2009/10/27 2010/01/25 2010/02/24 2011/08/18 (6200m)12400m,9 13 MY CT Two CT2-2 Reforcing of Qinhe bridge 240m long and 12 wide 240m12m 800.00 1.176 NCB/Works Post 2009/08/28 2009/10/27 2010/01/25 2010/02/24 2011/08/18 Construction of WWTP (8000t/d)and ancillary pipes 200m,WWTP (8000t/d) 14 MY CT Two CT2-3 1800.00 2.647 NCB/Works Post 2009/08/28 2009/10/27 2010/01/25 2010/02/24 2011/08/18 200m Construction of six roads 8580m long and 8-31m wide, and sewers 17160 6 15 GY CX Two CX2-1 9336.40 13.730 NCB/Works Prior 2009/08/28 2009/10/27 2010/01/25 2010/02/24 2011/08/18 8580m8-3117160m Construction of three urban bridges 860m long and 20m wide 260 16 GY CX Two CX2-2 7357.60 10.820 NCB/Works Prior 2009/08/28 2009/10/27 2010/01/25 2010/02/24 2011/08/18 20260020600 Construction of Jialing river bridge 1014m910m19m 17 GY CX Two CX2-1 10138.00 14.909 NCB/Works Prior 2009/08/28 2009/10/27 2010/01/25 2010/02/24 2011/08/18 131m Project Name: Wenchuan Earthquake Resconstruction Project (Sichuan Component) 6.800 Component: Infrastructure Component TTL: Mara. K. Wrick Subject: Tentative Procurement Plan for Good, Works and Consultancy Services Date: 30-Jun-09 1 2 3 5 6 7 8 9 10 11 12 13 14 15 16 Prior / District / Batch Pre.Design Bidding Const. Start Const. End Ref. No. Municipal Con. No. Contract Description Estimated Cost Proc. Method Post FSR Complete Remark County Number Complete Complete Date Date Review (RMB 10000) (US$ million) (mm/dd/yy) (mm/dd/yy) (mm/dd/yy) (mm/dd/yy) (mm/dd/yy) Reconstruction of a solid waste filling yard (80t/d) and two transfer stations, and Construction of two new transfer stations for urban, and another yard (10t/d) and one transfer station for Hongyan 18 GY YB Two YB2-1 3400.00 5.000 NCB/Works Post 2009/08/28 2009/10/27 2010/01/25 2010/02/24 2011/08/18 (80t/d) 2 2 10t/d11 Construction of roads 12000m and sewers 24000m in urban (12000m) 19 GY YB Two YB2-2 8441.52 12.414 NCB/Works Prior 2009/08/28 2009/10/27 2010/01/25 2010/02/24 2011/08/18 (24000m) Construction of Hongyan town urban facilities, roads 1200m and sewers 2400m, a solid waste filling yard (10t/d),a transfer station, a WTP 300t/d and networks 4500m, a WWTP 300t/d 20 GY YB Two YB2-3 1713.60 2.520 NCB/Works Prior 2009/08/28 2009/10/27 2010/01/25 2010/02/24 2011/08/18 (1200m)(2400m),300t/d4500m, 300t/d Reconstruction of roads 484m and sewers 968m, construction of roads 2511m and sewers 21 NC LZ Two LZ2-1 5022m 48440968m251130 3314.59 4.874 NCB/Works Post 2009/08/28 2009/10/27 2010/01/25 2010/02/24 2011/08/18 5022m 22 NC LZ Two LZ2-2 Construction of Jialing river bridge No.2 1200m25m 14999.98 22.059 NCB/Works Prior 2009/08/28 2009/10/27 2010/01/25 2010/02/24 2011/08/18 Construction of embankment 4107m 23 BZ NJ Two NJ2-1 4107.20 6.040 NCB/Works Prior 2009/08/28 2009/10/27 2010/01/25 2010/02/24 2011/08/18 4107m20 24 BZ NJ Two NJ2-2 Construction of golden bridge 320m long and 18m wide 320m18m 2012.80 2.960 NCB/Works Prior 2009/08/28 2009/10/27 2010/01/25 2010/02/24 2011/08/18 Construction of Muping urban infrastructures, four roads 4000m, water supply networks 4150m, 25 YA BX Two BX2-1 and sewers 8300m, and a bridge 125m long and 12m wide 4(4000m) 3005.60 4.420 NCB/Works Post 2009/08/28 2009/10/27 2010/01/25 2010/02/24 2011/08/18 (4150m) (8300m),12512 Construction of Lingguan urban infrastructure, five roads 5690m, water supply networks 6000m, 26 YA BX Two BX2-2 3028.04 4.453 NCB/Works Post 2009/08/28 2009/10/27 2010/01/25 2010/02/24 2011/08/18 sewers 12000m 5 (5690m),(6000m)(12000m) Construction of a WTP 25000t/d and water supply networks 42576m, 25000t/d 27 YA SM Two SM2-1 4999.97 7.353 NCB/Works Post 2009/08/28 2009/10/27 2010/01/25 2010/02/24 2011/08/18 14476m()28100m Construction of Dadu river bridge 259m long and 16m wide 259 28 YA SM Two SM2-2 3400.00 5.000 NCB/Works Post 2009/08/28 2009/10/27 2010/01/25 2010/02/24 2011/08/18 16310 Construction of embankment 1726m, roads 1726m and sewers 3456m 29 YA SM Two SM2-3 1726172614.533.58 3000.02 4.412 NCB/Works Post 2009/08/28 2009/10/27 2010/01/25 2010/02/24 2011/08/18 3456m Project Name: Wenchuan Earthquake Resconstruction Project (Sichuan Component) 6.800 Component: Infrastructure Component TTL: Mara. K. Wrick Subject: Tentative Procurement Plan for Good, Works and Consultancy Services Date: 30-Jun-09 1 2 3 5 6 7 8 9 10 11 12 13 14 15 16 Prior / District / Batch Pre.Design Bidding Const. Start Const. End Ref. No. Municipal Con. No. Contract Description Estimated Cost Proc. Method Post FSR Complete Remark County Number Complete Complete Date Date Review (RMB 10000) (US$ million) (mm/dd/yy) (mm/dd/yy) (mm/dd/yy) (mm/dd/yy) (mm/dd/yy) Reconstruction of three bridges total 383m long and 12-18m wide 175 30 YA LS Two LS2-1 3039.20 4.469 NCB/Works Post 2009/08/28 2009/10/27 2010/01/25 2010/02/24 2011/08/18 18135167312 Construction of three roads 2988m long, water supply networks 2988m,and sewer networks 31 YA LS Two LS2-2 5976m, soure water pipes 10000m 3 (2988m)(2988m) 3033.75 4.461 NCB/Works Post 2009/08/28 2009/10/27 2010/01/25 2010/02/24 2011/08/18 (5976m);(DN40010000m) B) Consultancy Services Contracts 5858.88 8.616 EOI Issue RFP Issue Evaluation Start Date End Date Procurement services for selecting engineering design consultants of the infrastructure component 1 PPMO TA01 42.84 0.063 SS/Service Prior 2009/05/15 2009/07/29 Procurement agent of the infrastructure component under Sichuan Part 2 PPMO TA02 1525.24 2.243 QCBS/Service Prior 2009/05/15 2009/05/30 2009/07/14 2009/07/29 2012/07/28 Engineering design services for Yuanba, Chaotian, Wangcang and Cangxi (batch No.1 sub- 3 PPMO TA03 1054.00 1.550 QCBS/Service Prior 2009/05/15 2009/05/30 2009/07/14 2009/07/29 2009/12/26 projects) Engineering design services for Zitong, Fuchang, Youxian, and Langzhong(batch No.1 sub- 4 PPMO TA04 958.80 1.410 QCBS/Service Prior 2009/05/15 2009/05/30 2009/07/14 2009/07/29 2009/12/26 projects) Engineering design services for Jiangyou, Santai, Yanting, Nanjiang(batch No.1 sub-projects) 5 PPMO TA05 1448.40 2.130 QCBS/Service Prior 2009/05/15 2009/05/30 2009/07/14 2009/07/29 2009/12/26 Engineering design services for Baoxing, Lushang, Shimian (batch No.1 sub-projects) 6 PPMO TA06 829.60 1.220 QCBS/Service Prior 2009/05/15 2009/05/30 2009/07/14 2009/07/29 2009/12/26 SUMMARY FOR INFRASTRUCTURE BATCH ONE 1 NCB/Works contracts 52 440.072 2 SS/Services contract 1 0.063 3 QBS/Services contracts 5 8.553 4 Prior review contracts 37 333.092 5 Ex-post review contracts 21 115.596 6 Total 58 448.688

Основные сведения
Тип документа Procurement Plan
Дата принятия
Страна Китай
Источник Всемирный банк