Группа Всемирного банка · Integrated Safeguards Data Sheet

Indonesia - Jakarta Urgent Flood Mitigation Project

Индонезия Всемирный банк
Открыть оригинал документа

Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.

Полный текст

Page 1 INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3822 Date ISDS Prepared/Updated: 10/05/2009 I. BASIC INFORMATION A. Basic Project Data Country: Indonesia Project ID: P111034 Project Name: Jakarta Urgent Flood Mitigation Project Task Team Leader: Hongjoo J. Hahm Estimated Appraisal Date: January 20, 2010 Estimated Board Date: April 15, 2010 Managing Unit: EASIS Lending Instrument: Specific Investment Loan Sector: Flood protection (100%) Theme: Natural disaster management (67%);Other urban development (33%) IBRD Amount (US$m.): 0.00 IDA Amount (US$m.): 0.00 GEF Amount (US$m.): 0.00 PCF Amount (US$m.): 0.00 Other financing amounts by source: Borrower 0.00 Financing Gap 130.00 130.00 B. Project Objectives [from section 2 of PCN] JEDI will alleviate the impacts of annual floods in the Province of Jakarta (DKI Jakarta) and achieve reductions in associated socio-economic costs through: (i) priority rehabilitation of existing floodways and retention basins; and (ii) provision of technical expertise to improve stormwater drainage and flood control. Dredging and rehabilitation of existing floodways and retention basins will have immediate, positive impacts for over one million people who will no longer be directly affected by severe flooding, like the devastating February 2007 event. Beneficiaries will be predominantly poor communities living in flood-prone areas. Dredging and rehabilitation is only an entry point through which JEDI can begin to engage with and strengthen the capacity of the local government of DKI Jakarta to operate and maintain its flood control system. It represents a platform, a basis from which the World Bank can promote and support comprehensive flood mitigation interventions, not least of which is increased technical O&M capacity, and inter-agency coordination. JEDI has already generated momentum Page 2 towards creating inter-agency and inter-regional cooperation on a range of issues, including water resource management, environmental and social initiatives, and funding mechanisms. Regarding critical social safeguard issues, JEDI has introduced a rights-based approach to community engagement and social development ensuring that beneficiaries enjoy sustainable benefits from the project. Foremost in this endeavor is the development of a World Bank approved Resettlement Policy Framework that adequately engages with and addresses the needs of formal and informal communities alike. C. Project Description [from section 3 of PCN] C1. Project Components JEDI will target major waterways in order to clear serious bottlenecks that choke the system. At the same time, JEDI will support the development of technical and management capacity and inter-agency coordination. These factors have been identified as the critical

Основные сведения
Тип документа Integrated Safeguards Data Sheet
Дата принятия
Страна Индонезия
Источник Всемирный банк