Page 1 Procurement Plan for Consultant Services Republic of Yemen, Ministry of Agriculture and Irrigation P076185: Groundwater and Soil Conservation Project (GSCP) and Additional Finincing for the GSCP. Credit No.3860-Yem and Grant No. :IDA H4200 ** Applicable in case of Bank's prior review SL No. Package/ Reference No. Description of Services Estimated Cost Currency of Estimated Cost Review by Bank (Prior/ Post) Type of Consultant (Firm/ Individual) Method of Selection Advertising for Short listing (Date) TOR/Shortlist to be Finalised (Date) RFP Final Draft to be forwarded to the Bank (Date) No Objection from Bank for TOR (Date)** No Objection from Bank for Shortlist (Date)** No Objection from Bank for Final RFP (Date)** RFP Issued (Date) Proposal Submission Deadline (Date) No Objection by the Bank to the Technical Evaluation Report (Date)** No Objection by the Bank (Technical/ #Combined/ Draft Contract/ Final Contract) (Date)** Contract Signed (Date) Contract No. Name, City, and Country of Contractor (incl. Zip Code if US) Services Completion (Date) Expenses Incurred to Date Planned 1 - National Sociologist (3 sm) 6700 USD Post Individual IC 12/6/2008 NA NA NA NA NA NA NA NA NA 1/25/2009 Revised Actual 1/25/2009 Planned 2 International Sociologist (2sm) 30000 USD Post Individual IC 9/23/2008 NA NA NA NA NA NA NA NA NA 11/12/2008 Revised Actual 11/12/2008 Planned 3 - Monitoring hydrogeologist for PCU (3 sm) 30000 USD Post Individual IC NA NA NA NA NA NA NA NA NA NA NA Revised Actual NA Planned 4 -Internal Auditor (12 sm) USD Post Individual IC NA NA NA NA NA NA NA NA NA NA IBRD/IDA Financed Yassmin Ahmad Ali Al-Oudi Revised Actual 14400 Individual IC 2/1/2009 Planned 5 FMR Up-grading 33000 USD Prior Firm SS NA NA NA NA NA NA NA NA NA NA IBRD/IDA Financed Cumputer Engineering World 5/3/2009 Revised Actual 2/1/2009 5/3/2009 Planned 6 Planning Specialist for MWE (30 sm) 60,000 USD Post Individual IC NA NA NA NA NA NA NA NA NA NA 7/7/2009 Revised Actual Planned 7 Human Resources Development Specialistfor MWE (24 sm) 48000 USD Post Individual IC NA NA NA NA NA NA NA NA NA NA 7/7/2009 Revised Actual Planned 8 M.&.E Specisalist for MWE (18 sm) 45000 USD Post Individual IC NA NA NA NA NA NA NA NA NA NA 7/24/2009 Revised Actual Planned 9 Site Engineers for PCU (4 nos in FUs) 48 sm 72000 USD Post Individual IC NA NA NA NA NA NA NA NA NA NA 6/6/2009- 1/10/2009 Revised Actual Site Engineers for PCU forTihama 1/10/2009 Mohamed Abdu Hashim 1/22/2009 Planned 10 Site Technicians for for Hajah 8400 USD Post Individual IC NA NA NA NA NA NA NA NA NA NA Revised Actual Site Technicians for Hajah 5/5/2009 Faiz Hadi Al-Koori 5/17/2009 Planned Site Technicians for for Hajah 8400.00 USD Post Individual IC NA NA NA NA NA NA NA NA NA NA Revised Actual Site Technicians for Hajah 5/5/2009 Kalil Ibrahim 5/17/2009 Planned Site Technicians for Tihama Sharifeyeh 8400.00 USD Post Individual IC NA NA NA NA NA NA NA NA NA NA Revised Actual Site Technicians for Tihama Sharifeyeh 3/21/2009 Ameer Al-Sakkaf 4/2/2009 Planned Site Technicians for Tihama 8400.00 USD Post Individual IC NA NA NA NA NA NA NA NA NA NA Revised Actual Site Technicians for Tihama 3/21/2009 Abdelalim Al- Kamali 4/2/2009 Planned 11 Site Technicians for Abyan 8400.00 USD Post Individual IC NA NA NA NA NA NA NA NA NA NA Revised Actual 5/5/2009 Faiz Hadi Al-Koori 5/17/2009 Planned Sociol Assessment Study 25500 USD Post Individual IC 6/6/2010 7/6/2010 NA NA NA NA NA NA NA NA 7/21/2010 Revised Actual Planned Implementation Community Contracts 300000 USD Post Individual IC 2/6/2010 3/8/2010 NA NA NA NA NA NA NA NA 3/23/2010 Revised Actual Planned EMP Action Plan & Implementation 95500 USD Post Individual IC 1/6/2010 2/5/2010 NA NA NA NA NA NA NA NA 2/20/2010 Revised Actual Planned Monitoring Advisory Services 36000 USD Post Individual IC 6/6/2009 7/6/2009 NA NA NA NA NA NA NA NA 7/21/2009 Revised Actual Planned Field Days-Seminars & Workshops, and Establishment of WUGs 70000 USD Post Individual IC NA NA NA NA NA NA NA NA NA NA Revised Actual 3 5 4 Additional Finincing for GSCP Grant No. :IDA H4200 2 1 In some contracts, one or more of these approvals may be contained in one Bank communication. Groundwater and Soil Conservation Project (GSCP) Credit No.3860-Yem:
Группа Всемирного банка · Procurement Plan
Yemen - Groundwater and Soil Conservation Project : procurement plan (Vol. 2 of 4) : Procurement plan for consulting services
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Procurement Plan
Источник
Всемирный банк