/ , 55137 Procurement Planning And Monitoring Format Name of Project: Enterprise Growth And Bank Modernization Project(IDA Credit No. 3917-BD) (1 US$ = BOT 69.00) Sub Project: Refurbishing Assets of Chittagong Steel Mills And Adamjee Jute Mills for Converting into EPZs Implementing Agency: Bangladesh Export processing Zones Authority (BEPZA) Credit Effective Date: July 19, 2004 Credit Closing Date: November 30, 2009 Revised as on 26.04.2009 Planned date Progress Estimated Cost Planned date Name of Contract Prior of delivery of Name of the Contract Quantityl (in US$) Procedure of contract Supplierl SI package Review I completion procurment Remarks (Brief Description) Number Contract Price Imethod signing and Contractorl no (Yes/No) and as on with currency actual date Consultant actual date today 1 2 3 4 5 6 7 8 9 10 11 12 Refurbishing Assets of Chittagong Steel Mills for converting into EPZ As per decision of government the existing old unusable structures is Dismantling & partial Tk.50,000.00 being demolished through 1 W-1 Refurbishment works NCB No Jul2009 Dec 2009 (us$ 724.64) international auction. However some (North) demolishl site cleaning may require at final staQe. Tk. 9,34,20,794.57 (us$ 13,53,924.56) Refurbishment of Contract amount: AWCPL& 2 W-3 8800 sqm NCB Yes 17-Aug-06 30-Aug-08 100% Completed. Factory Building-1 Tk. 9,03,48,259.91 FAEL JV Revised amount Tk. 82 421 864.84 Tk. 9,44,17,212.47 (us$13,68,365.40) Refurbishment of Contract amount: Mis. Taher 3 W-4 8800 sqm NCB Yes 17-Aug-06 30-Aug-08 100% Completed. Factory Building-2 Tk.8,91,80,936.74 Brothers Ltd I Revised amount Tk. 791 83315.38 Tk.12,79,99,163.90 Refurbishment of (us$18,55,060.35) Mis. Samsuddin 4 W-5 8800 sqm NCB Yes Jan 2008 30-0ct-09 37% Construction is ongoing. I Factory Building-3 Contract amount: Ahmed & Co. Ltd Tk.11,28,88,655.79 3rd RDPP 11 mar 09 , ~ Procurement Planning And Monitoring Format Name of Project: Enterprise Growth And Bank Modernization Project(IDA Credit No. 3917-BD) (1 US$ = BOT 69.00) Sub Project: Refurbishing Assets of Chittagong Steel Mills And Adamjee Jute Mills for Converting into EPZs Implementing Agency: Bangladesh Export processing Zones Authority (BEPZA) Credit Effective Date: July 19, 2004 Credit Closing Date: November 30, 2009 Revised as on 26.04.2009 Planned date Progress Estimated Cost Planned date Name of Contract Prior of delivery of Name of the Contract Quantityl (in US$) Procedure of contract Supplierl SI package Review I completion procurment Remarks (Brief Description) Number Contract Price Imethod signing and Contractorl no (Yes/No) and as on with currency actual date Consultant actual date today 1 2 3 4 5 6 7 8 9 10 11 12 Tk.4,25,80,797.01 NOC for draft bidding document has Renovation of Existing (us$ 6,17,113.00) 5 W-6 41115 sqm NCB Yes Jul2009 Jun 2010 been obtained and tendering Road Recast amount: process is ongoing. Tk. 44875057.00 Tk.5,29,40,000.00 Re-Excavation of existing NOC for draft bidding document has (us$7,67,246.38) 6 W-7 canal and Renovation of 7078 m NCB Yes Jul2009 Jun 2010 been obtained and tendering Recast amount: drainage system process is ongoing. Tk. 50837511.48 Tk.1,65,45,192.04 (us$2,39,785.39) Strengthening of MIs. M.N Alam 3026 m, Contract amount: 7 W-8 boundary wall and Sentry NCB No Nov 2006 Mar 2008 Brothers - Asha 100% Completed. 25 sqm Tk.1 ,45,46,095.71 post Construction Revised amount: 1 1891 491.77 Tk.84,99,518.16 Renovation of Existing (us$ 1,23,181.42) M/s.Prime Work is suspended due to 8 W-10 5710 m NCB No Jan 2008 Jun 2009 75% water supply system Contract amount: construction. unavailability of workable site. Tk.8673190.54 Upgradaton and Tk.1,15,57,824.90 installation of 11 1.415 11 no, (us$1,67,504.70) Energypac 9 W-12 NCB No Feb 2007 Apr 2009 100% Completed. KV SUb-Station and 4100 m Contract price: Engineering Ltd 11 kv high tension line Tk.1 14 48 645.00 3rd RDPP 11 mar 09 2 Procurement Planning And Monitoring Format Name of Project: Enterprise Growth And Bank Modernization Project(IDA Credit No. 3917-BD) (1 US$ = BOT 69.00) Sub Project: Refurbishing Assets of Chittagong Steel Mills And Adamjee Jute Mills for Converting into EPZs Implementing Agency: Bangladesh Export processing Zones Authority (BEPZA) Credit Effective Date: July 19, 2004 Credit Closing Date: November 30, 2009 Revised as on 26.04.2009 Planned date Progress Estimated Cost Planned date Name of Contract Prior of delivery of Name of the Contract Quantity/ (in US$) Procedure of contract Supplier/ SI package Review / completion procurment Remarks (Brief Description) Number Contract Price /method signing and Contractor/ no (Yes/No) and as on with currency actual date Consultant actual date today 1 2 3 4 5 6 7 8 9 10 11 12 Up gradation of Gas Tk.6,75,360.00 Comencement of work is waiting Supply System: (us$9,787.83) M/s.R.M. 10 W-28 4500 m NCB No Apr 2008 Jun 2009 upto obtaining completion material Installation of Gas Supply Contract price: construction from BGSL. Line i/c related works. Tk.6,61 ,202.00 Up gradation of Gas Supply System at Tk.1 ,00,19,385.05 The work has to be done through Kamaphuli EPZ: (us$1,45,208.48) 11 W-31 4500 m FA Yes Nov 2008 Jun 2009 BGSL by deposit work. Deposit Procurement of special Contract amount: payment to BGSL is under process. quality materials for Gas Tk.1,13,75,439.00 Supply system Tk.48,70,963.07 Upgradation of (us$ 70,593.67) Work is suspended due to 12 W-32 4000 m NCB No Jan 2008 Jun 2009 38% Street Light Contract amount: unavailability of workable site. Tk.43 60 331.29 M/s.Modhu Traders Tk. 53,09,480.07 Upgradation of (us$ 76,948.99) Work is suspended due to 13 W-33 2970 m Jan 2008 Jun 2009 57% Security light Contract amount: unavailability of workable site. Tk. 47 31 286.09 3rd RDPP 11 mar 09 3 : Procurement Planning And Monitoring Format Name of Project: Enterprise Growth And Bank Modernization Project(IOA Credit No. 3917-BO) (1 US$ = BOT 69.00) Sub Project: Refurbishing Assets of Chittagong Steel Mills And Adamjee Jute Mills for Converting into EPZs Implementing Agency: Bangladesh Export processing Zones Authority (BEPZA) Credit Effective Date: July 19, 2004 Credit Closing Date: November 30, 2009 Revised as on 26.04.2009 Planned date Progress Estimated Cost Planned date Name of Contract Prior of delivery of Name of the Contract Quantity/ (in US$) Procedure of contract Supplier/ SI package Review / completion procurment Remarks (Brief Description) Number Contract Price /method signing and Contractor/ no (Yes/No) and as on with currency actual date Consultant actual date today I 1 2 3 4 5 6 7 8 9 10 11 12 Newly proposed works for KEPZ I There is an old boundary wall at the I Construction of boundary west which needs to be dismantled wall of sector-02, KEPZ, Tk. 1,57,76,255.00 14 W-37 929 rm NCB No Jul2009 Jun 2010 and to buil a new boundary wall as North Pantenga. (US$ 228,641.37) per SOP which are away from the I Chittagong (Group-Ka) I existing boundary wall. Construction of boundary wall at the South-east of There is about 6'-0"high boundary Tk.1,96,26,656.00 15 W-38 sector-01, KEPZ, North 1294.11rm NCB No Jul2009 Jun 2010 wall which needs to be dismantled & (US$ 284,444.28) Pantenga, Ctg. (Group- rebuild as per SOP of BEPZA. Khal Construction of boundary There is an old boundary wall which wall at the South-east of Tk. 35,01,179.56 needs to be dismantled and to 16 W-39 sector-01, KEPZ, North 268.29 rm NCB No Jul2009 Jun 2010 (US$ 50,741.73) rebuild a new boundary wall near to Pantenga. Ctg (Group- the boundary wall as per SOP. Gal 3rd RDPP 11 mar 09 4 : Procurement Planning And Monitoring Format Name of Project: Enterprise Growth And Bank Modernization Project(lDA Credit No. 3917.BD) (1 US$ = BOT 69.00) Sub Project: Refurbishing Assets of Chittagong Steel Mills And Adamjee Jute Mills for Converting into EPZs Implementing Agency: Bangladesh Export processing Zones Authority (BEPZA) Credit Effective Date: July 19, 2004 Credit Closing Date: November 30, 2009 Revised as on 26.04.2009 Planned date Progress Estimated Cost Planned date Name of Contract Prior of delivery of Name of the Contract Quantityl (in US$) Procedure of contract Supplierl SI package Review I completion procurment Remarks (Brief Description) Number Contract Price Imethod signing and Contractorl no (Yes/No) and as on with currency actual date Consultant actual date today 1 2 3 4 5 6 7 8 9 10 11 12 Refurbishin~Assets of Adamjee Jute Mills for converting into EPZ Tk.13,41,84,640.05 (us$19,44,704.93) Problems are: Refurbishment of Contract amount: MIs. The United 1. Site Icoation changed 17 W-16 8800 sqm NCB Yes Dec 2007 Dec 2009 30% factory building-1 Tk.12,41 ,68, 195.67 Construction Ltd. 2. Soil tested Revised amount: 3. Design revetting by BUET 123623752.00 Tk.13,41,84,640.05 (us$19,44,704.92) Problems are: Refurbishment of Contract amount: MIs. The United 1. Site Icoation changed 18 W-17 8800 sqm NCB Yes Dec 2007 Aug 2009 55% factory building-2 Tk.12,41 ,68, 195.67 Construction Lte 2. Soil tested Revised amount: 3. Design revetting by BUET 121982629.00 Tk.8,93,42, 733.74 Problems are: (us$ 12,94,822.23) 1. Geneva camp has not yet Renovation of Contract amount: MIS. PTSL- 19 W-19 50835 sqm NCB Yes Dec 2007 Jun 2009 40% removed Existing Road Tk.8,70,33,905.36 STCJV 2. BJMC old structures are not yet Revised amount: fully removed lt49,55,07 4~94 - - - - - - - - - - - 3rd RDPP 11 mar 09 5 : Procurement Planning And Monitoring Format Name of Project: Enterprise Growth And Bank Modernization Project(IDA Credit No. 3917-BD) (1 US$ = BOT 69.00) Sub Project: Refurbishing Assets of Chittagong Steel Mills And Adamjee Jute Mills for Converting into EPZs Implementing Agency: Bangladesh Export processing Zones Authority (BEPZA) Credit Effective Date: July 19, 2004 Credit Closing Date: November 30, 2009 Revised as on 26.04.2009 Planned date Progress Estimated Cost Planned date Name of Contract Prior of delivery of Name of the Contract Quantityl (in US$) Procedure of contract Supplierl SI package Review I completion procurment Remarks (Brief Description) Number Contract Price Imethod signing and Contractorl no (Yes/No) and as on with currency actual date Consultant actual date todav 1 2 3 4 5 6 7 8 9 10 11 12 Work is going on. Tk.2,19,72,313.55 Problems are: (us$318,439.33) 1. Geneva camp has not yet Repair & Renovation of Contract amount: MIS Mitali 20 W-20 6660 m NCB No Dec 2006 Jul 2009 39% removed existing Drain Tk.2,58,21,000.00 Enterprise 2. BJMC old structures are not yet Revised amount: fully removed 2,58,21,399.14 3. Shortaae of MS Rod. Work is going on. Tk. 1,30,80,541.65 Problems are: Convertion of Existing (us$ 1,89,573.07) 1. Geneva camp has not yet boundary wall to 1872 m, Contract amount: MIS Bhuban Kabir removed 21 W-21 NCB No Apr 2007 Nov 2009 60% custom fance and 10 nos Tk.1 ,52,28,110.61 Consurtium 2. BJMC old structures are not yet Security boxes Revised amount: fully removed 1,26,66,343.61 3. PDB power plant drain outlet not Ivet comoleted Renovation of existing The work was stopped since 10-May Over head water tank, 3No, Tk.1,63,38,062.75 08 because the rest of the site is not water supply system i/c 7150 m, (us$ 2,36,783.52) Md.Khairul 22 W-22 NCB No Apr 2007 Jun 2009 75% workable now due to existence of pumphouse, deep 1 no, Contract amount: Kabir Rana Sumilpara Geneva camp. Balance tube well, surface 30 Acrs Tk.1,50,47,041.45 time required is 60 days. water tank (Pond) 3rd RDPP 11 mar 09 6 : Procurement Planning And Monitoring Format Name of Project: Enterprise Growth And Bank Modernization Project(IDA Credit No. 3917-BD) (1 US$ = BOT 69.00) Sub Project: Refurbishing Assets of Chittagong Steel Mills And Adamjee Jute Mills for Converting into EPZs Implementing Agency: Bangladesh Export processing Zones Authority (BEPZA) Credit Effective Date: July 19, 2004 Credit Closing Date: November 30, 2009 Revised as on 26.04.2009 Planned date Progress I Estimated Cost Planned date Name of Contract Prior of delivery of Name of the Contract Quantityl (in US$) Procedure of contract Supplierl I SI package Review I completion procurment Remarks (Brief Description) Number Contract Price Imethod signing and Contractorl no (Yes/No) and as on I with currency actual date Consultant actual date today 1 2 3 4 5 6 7 8 9 10 11 12 I Tk.,1,22,75,981.50 Work is suspended now due to non Upgradaton and (us$1,77,912.77) availability of site for the existence of l installation of 11/.415 Kv 11 no, Contract price: MIs. Subecha old structures of BJMC. Remaining 23 W-26 NCB No Mar 2007 Jun 2009 65% Sub-Station and 11 Kv 3900 m Tk.,1 ,20,16,900.00 Engineering work will be completed within next high tension line Revised amount: 18 days after availability of balance 11013320.00 site. Tk.1,15,02,454.00 Due to unavailability of workable site Upgradation of Street (us$166,702.23) M/s.A.S. 24 W-27 48720 m NCB No Aug 2007 Jun 2009 40% the work was suspended from 15- Light & Security light Contract amount Corporation Oct-08. Tk. 9896864.19 Renovation of existing Gas Supply System: Work is suspended until obtaining Tk.14,62,497.00 25 W-29 Installation of Gas 4500 m NCB No Nov 2008 Oct 2009 MIs. Gasoil Liners - necessary material from Bakhrabad (us$21,195.61) Supply Line i/c Gas Systems Ltd. related works. Tk.49,48,836.98 (us$71,722.28) Renovation of Guest Contract price: MIS Foresight 26 W-30 1385 sqm NCB No Mar 2007 Feb 2008 100% Completed house, GM Banglo Tk.37,10,000.00 Builders Revised amount: 41.98.184.26 - 3rd RDPP 11 mar 09 7 f
Группа Всемирного банка · Procurement Plan
Bangladesh - Enterprise Growth and Bank Modernization Project : procurement plan for Bangladesh Export processing Zones Authority (BEPZA)
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Procurement Plan
Страна
Бангладеш
Источник
Всемирный банк